HomeMy WebLinkAbout33-Development Services e
CITY OF SAN BERNARDINO—REQUEST FOR COUNCIL ACTION R I G), i I Nv��
From: Valerie C. Ross,Director Subject: Public Hearing 4:00 p.m. -
Resolution adopting updated
building permit and plan review
Dept: Development Services fees.
Date: June 17, 2008 MCC Date: July 7,2008
Synopsis of Previous Council Action:
Adopted 1991 Uniform Administrative Code fee tables in 1991 (MC-880)
Reviewed by Ways&Means and forwarded to MCC—June 4,2008
Continued from June 16,2008 MCC Meeting
Recommended Motion:
1. That the public hearing relative to the Resolution to adopt updated building permit and
plan review fees be closed.
2. Adopt Resolution.
rd�G RN+--
Valerie C. Ross
Contact person: jo,.Cph T cage Ruild_ing Official Phone: 384-5171
Supporting data attached: Staff Renort&Resolution Ward: All
FUNDING REQUIREMENTS: Amount: NIA
Source: (Acct.No.)
(Acct. Description)
Finance:
Council Notes: ��Sa Zd°�- Z77
#71 7/b
Agenda Item No. 3-3
r
CITY OF SAN BERNARDINO— REQUEST FOR COUNCIL ACTION
Staff Report
Subiect:
A Resolution adopting updated building permit and plan review fees.
Background:
The Development Services Department charges regulatory fees for plan reviews and building
permits to cover the costs of providing the services associated with the enforcement of building
codes as mandated by state law.
The Department has undertaken a fee study (available from the Department or the City Clerk) to
review and update the fees charged for building and plan review services. One part of this study
was a time/cost analysis in regards to residential housing construction, both tract housing and in-
fill housing, in order to develop a schedule of fees specific to single-family housing. As is
clearly evident from the analysis, construction of homes in quantity, as is characterized by
typical tract developments, results in economies of scale and consequently reduced overall
inspection costs. As a result, separate fee schedules have been developed for tract homes
(Attachment A) and infill homes (Attachment B), since the costs associated with inspections of
each are significantly different.
The proposed resolution includes these fee schedules in addition to other fee results from the
study. The minimum permit fee and the fully burdened hourly rates for building inspection and
plan review have been analyzed and updated. Fees are proposed for residential additions based
on a computed average inspection cost per square foot.
The Department currently utilizes building construction valuation and fee tables that were last
updated in 1991. These tables do not reflect current construction costs, but rather those that were
in effect in 1991. The existing level of fees based on 1991 building valuation rates are not
adequate to provide the personnel and resources that the Department requires to provide an
adequate level of service to the development community. Furthermore, the use of outdated
valuation rates does not accurately report the level of construction activity in current dollars.
The following chart compares the total costs of providing building inspection and plan check
services and the revenues associated with these activities over the past ten (10) fiscal years. The
total costs include departmental and general city overhead.
COSTS VS.REVENUE
Building Inspection and Plan Check
Fiscal Year Total Costs Total Revenue Shortfall or Surplus % Over or Under
Break Even Point
1998-99 $1,213,808 $868,634 ($345,174) - 28.4%
1999-00 $1,171,579 $860,719 ($310,860) - 26.5 %
2000-01 $1,130,365 $919,271 ($211,094) - 18.7%
2001-02 $1,290,114 $1,051,134 ($238,980) - 18.5%
2002-03 $1,464,012 $1,235,800 ($228,212) - 15.6%
2003-04 $1,348,657 $1,266,569 ($82,088) - 6.1 %
2004-05 $1,610,464 $1,913,092 $302,628 + 18.8%
2005-06 $1,842,616 $2,059,631 $217,015 + 11.8%
2006-07 $1,982,957 $1,924,589 ($58,368) - 2.9%
2007-08* $2,295,325 $1,368,000 ($927,325) - 40.4%
*projected values as of 3/31/08
Except for the two peak years (2005 and 2006) Building Division revenues have consistently
been below the cost recovery point.
The Department has developed an updated Building Valuation Table based on current
construction costs published in the February 2005 Edition of Building Safety Journal by the
International Code Council (Attachment Q. The valuation table currently in use has not been
updated since August 1991 . The adoption of the updated Building Valuation Table will result in
an increase in the amount of fees charged, and revenues collected, the magnitude of which will
vary by the use (occupancy classification) and the type of construction of the buildings
constructed.
The amount of fee increase or decrease for any given project is highly variant based on the type
of use, type of construction, its size, and complexity. On average the change in the amount of
fees collected for various types of projects is estimated to be a decrease of 45 percent for tract
homes, an increase of 33 percent for infill homes, an increase of 52 percent for residential
additions, an increase of 40 percent for miscellaneous electrical/plumbing/mechanical permits,
an increase of 35 percent for commercial projects, and an increase of 74 percent for industrial
projects. Attachment E provides some examples of the impact of the fee adjustments on specific
projects that have been permitted in recent years. The overall increase in revenues would be
dependent on the mix or proportion of residential, commercial and industrial projects in future
years. Given the current recessionary trend, it is anticipated that construction levels and permit
revenues will continue to fall in the coming year.
If approved at the public hearing, the fees would be effective on August 15, 2008. The
Government Code requires that all development related fees take effect no sooner than 60 days
after their adoption.
The Ways & Means Committee reviewed this fee proposal on June 4, 2008 and requested
additional information in the form of specific examples of how the fee adjustments affect various
projects. This information is summarized in Attachment E. Additionally, representatives from
homebuilder GFR Enterprises Inc. spoke to the Committee in support of this fee proposal. They
also asked the committee to consider altering the fee structure of various development impact
fees (DIF) from the current one based per dwelling unit to a fee structure based on square feet.
Since the DIF's are not part of this fee proposal, the committee agreed to review the matter
separately. The Committee decided to forward this fee proposal on to the Mayor and Common
Council.
A proposed Ordinance amending SBMC Section 15.04.080A has been placed on the MCC
agenda for concurrent consideration with this Resolution. It is necessary to update and reconcile
the text of the Municipal Code with this Resolution.
Financial Impact:
It is anticipated that these fee increases would result in increased revenues of$430,000, offset by
revenue losses of $315,000 due to lower construction activity, resulting in a net increase of
$115,000. However, given the current economic climate and uncertainty, this is highly variable
and dependent on the future level of construction activity.
Recommendation:
That the public hearing relative to the Resolution to adopt updated building permit and plan
review fees be closed and the Resolution be adopted.
Attachments:
Resolution
A. Table IA. Building Permit Fees—Tract Homes
B. Table I B. Building Permit Fees—Infill Homes
C. Table 2. Building Construction Valuations
D. Table 3. Building Permit Fees
E. Permit Examples for Comparison of the Impact of Building Fee Adjustments
FD
1 RESOLUTION NO.
2
A RESOLUTION OF THE CITY OF SAN BERNARDINO ADOPTING
3 UPDATED BUILDING PERMIT AND PLAN REVIEW FEES.
4 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE
5 CITY OF SAN BERNARDINO AS FOLLOWS:
6
WHEREAS, pursuant to California Govt Code Section 66014, fees charged for building
7
8 inspections, building permits, and plan review and application processing may not exceed the
9 estimated reasonable cost of providing the service for which the fee is charged; and
10 WHEREAS, the Development Services Department has completed an analysis of said
11 fees in order to determine the estimated reasonable costs of the services rendered; and
12 WHEREAS, the last significant update of said fees occurred in 1991; and
13 WHEREAS, it is necessary to update fees charged for building permits, inspections, and
14
plan review services in order to provide revenues adequate to support an appropriate level of
15
16 services in regards to the administration and enforcement of the California Building Standards
17 Codes as mandated by the California Health and Safety Code, Section 17960.
18 NOW, THEREFORE, THE MAYOR AND COMMON COUNCIL OF THE CITY OF
19 SAN BERNARDINO DO ORDAIN AS FOLLOWS:
20 SECTION 1: Effective Date. This resolution shall be effective 60 days following final
21 adoption.
22
23 SECTION 2: Fees for building permits shall be as set forth in the latest adopted edition
24 of the Uniform Administrative Code, published by the International Conference of Building
25 Officials, except as otherwise modified by the San Bernardino Municipal Code, Chapter 15.04
26 and this resolution. Fees for building permits and plan review of nonresidential occupancies
27 shall be based on Table 3 (Attachment D) except as otherwise modified by this resolution.
28 7 _ 7-e;8
�o , 33
1
2 SECTION 3. Building Permit Fees for new residential tract housing shall be as set forth
3
in Table IA. Building Permit Fees—Tract Homes (Attachment A).
4
SECTION 4. Building Permit Fees for new residential infill housing shall be as set
5
6 forth in Table 1 B. Building Permit Fees— Infill Homes (Attachment B).
7 SECTION 5. Building Permit Fees for residential additions shall be as follows:
8 A. Additions without a bath or kitchen: $1.39 per square foot.
9 B. Additions with a bath and/or kitchen: $1.54 per square foot.
10
C. The minimum fee for a residential room addition shall be $300.
11
D. The maximum fee for a residential addition up to 1200 square feet shall be $1166,
12
13 thereafter the fee shall be as noted in Table 1 B for infill housing.
14 SECTION 6. The fully burdened hourly rate for building inspection shall be $94.45,
15 and the fully burdened hourly rate for plan review shall be $94.15.
16 SECTION 7. The minimum permit fee shall be $60.00.
17 SECTION 8. The per square foot cost factors used to determine the valuation of
18
building construction shall be as set forth in Table 2. Building Construction Valuations
19
20 (Attachment C).
21
22
23
24
25
26
27
28
2
1 A RESOLUTION OF THE CITY OF SAN BERNARDINO ADOPTING
2 UPDATED BUILDING PERMIT AND PLAN REVIEW FEES.
3 I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor
4 and Common Council of the City of San Bernardino at a meeting thereof, held
5 on the day of , 2008, by the following vote, to wit:
6 Council Members: AYES NAYS ABSTAIN ABSENT
7 ESTRADA
8
BAXTER
9
10 BRINKER
11 DERRY
12 KELLEY
13 JOHNSON
14
MCCAMMACK
15
16
17 Rachel G. Clark, City Clerk
18 The foregoing Resolution is hereby approved this day of ,
2008.
19
20
21 Patrick J. Morris, Mayor
City of San Bernardino
22 Approved as to Form:
23
JAMES F. PENMAN
24 City Attorney
25
26 By: ev;'
Jam . Penman, City Attorney
27
28
3
City of San Bernardino Attachment A
Development Services Department
Table 1A. Building Permit Fees - Tract Homes
Square Feet Insp. Time(hr) Permit Fee Square Feet. Insp. Time(hr.) Permit Fee.
to 1200 4.77 $451
1300 4.94 $467
1400 5.11 $483
1500 5.28 $499
1600 5.45 $515 4600 10.51 $993
1700 5.62 $531 4700 10.68 $1,009
1800 5.78 $546 4800 10.85 $1,025
1900 5.95 $562 4900 11.02 $1,041
2000 6.12 $578 5000 11.18 $1,056
2100 6.29 $594 5100 11.35 $1,072
2200 6.46 $610 5200 11.52 $1,088
2300 6.63 $626 5300 11.69 $1,104
2400 6.80 $642 5400 11.86 $1,120
2500 6.97 $658 5500 12.03 $1,136
2600 7.13 $673 5600 12.2 $1,152
2700 7.30 $689 5700 12.37 $1,168
2800 7.47 $706 5800 12.53 $1,183
2900 7.64 $722 5900 12.7 $1,200
3000 7.81 $738 6000 12.87 $1,216
3100 7.98 $754 6100 13.04 $1,232
3200 8.15 $770 6200 13.21 $1,248
3300 8.32 $786 6300 13.38 $1,264
3400 8.48 $801 6400 13.55 $1,280
3500 8.65 $817 6500 13.71 $1,295
3600 8.82 $833 6600 13.88 $1,311
3700 8.99 $849 6700 14.05 $1,327
3800 9.16 $865 6800 14.22 $1,343
3900 9.33 $881 6900 14.39 $1,359
4000 9.50 $897 7000 14.56 $1,375
4100 9.66 $912 7100 14.73 $1,391
4200 9.83 $928 7200 14.9 $1,407
4300 10.00 $945 7300 15.06 $1,422
4400 10.17 $961 7400 15.23 $1,438
4500 10.34 $977 7500 15.4 $1,455
(Source:Building Inspection Fee Analysis,May 2008)
Notes: 1.The indicated fees include building,electrical,plumbing and mechanical inspection fees.
2.The indicated fees do not include plan review, issuance or other aplicable fees.
3.The indicated fees include a standard 2-car garage.
4. For homes larger than 7500 sq.ft., use the following formula: $1455+(size-7500)/100 X 15.94.
5.This table applies to tract homes built in phases of 5 or more.
City of San Bernardino Attachment B
Development Services Department
Table 1B. Building Permit Fees - Infill Homes
Permit Square Feet Insp.Time(hr) Permit Fee Square Feet. Insp. Time(hr-)
to 1200 12.35 $1,166
1300 12.65 $1,195
1400 12.95 $1,223
1500 13.25 $1,251
1600 13.55 $1,280 4600 22.50 $2,125
1700 13.84 $1,307 4700 22.80 $2,153
1800 14.14 $1,336 4800 23.10 $2,182
1900 14.44 $1,364 4900 23.40 $2,210
2000 14.74 $1,392 5000 23.69 $2,238
2100 15.04 $1,421 5100 23.99 $2,266
2200 15.34 $1,449 5200 24.29 $2,294
2300 15.64 $1,477 5300 24.59 $2,323
2400 15.93 $1,505 5400 24.89 $2,351
2500 16.23 $1,533 5500 25.19 $2,379
2600 16.53 $1,561 5600 25.49 $2,408
2700 16.83 $1,590 5700 25.78 $2,435
2800 17.13 $1,618 5800 26.08 $2,463
2900 17.43 $1,646 5900 26.38 $2,492
3000 17.72 $1,674 6000 26.68 $2,520
3100 18.02 $1,702 6100 26.98 $2,548
3200 18.32 $1,730 6200 27.28 $2,577
3300 18.62 $1,759 6300 27.58 $2,605
3400 18.92 $1,787 6400 27.87 $2,632
3500 19.22 $1,815 6500 28.17 $2,661
3600 19.52 $1,844 6600 28.47 $2,689
3700 19.81 $1,871 6700 28.77 $2,717
3800 20.11 $1,899 6800 29.07 $2,746
3900 20.41 $1,928 6900 29.37 $2,774
4000 20.71 $1,956 7000 29.66 $2,801
4100 21.01 $1,984 7100 29.96 $2,830
4200 21.31 $2,013 7200 30.26 $2,858
4300 21.61 $2,041 7300 30.56 $2,886
4400 21.90 $2,068 7400 30.86 $2,915
4500 22.20 $2,097 7500 31.16 $2,943
(Source:Building Inspection Fee Analysis,May 2008)
Notes: 1.The indicated fees, include building,electrical, plumbing and mechanical inspection fees.
2.The indicated fees do not include plan review,issuance or other aplicable fees.
3.The indicated fees include a standard 2-car garage.
4. For homes larger than 7500 sq.ft.,use the following formula: $2943+(size-7500)/100 X 28.19.
5.This table applies to infill,custom,and tract homes built in phases of 4 or less.
ATTACHMENT C
Table 2. Building Construction Valuations
(Construction costs per square foot($))
Group(2006 International Building Code) Type of Construction
IA 113 IIA 116 IIIA IIIB IV VA VB
A-1 Assembly,theaters,with stage 19611 189.78 185.37 177.60 167.20 162.27 171.92 152.56 146.94
A-1 Assembly,theaters,without stage 177.62 171.29 166.88 159.10 148.75 143.82 153.43 134.10 128.49
A-2 Assembly,nightclubs 149.94 145.74 142.04 136.49 128.53 124.91 131.71 116.50 112.58
A-2 Assembly.restaurants, bars, banquet halls 148.94 144.74 140.04 135.49 126.53 123.91 130.71 114.50 111.58
A-3 Assembly,churches 180.72 174.39 169.98 162.21 151.82 146.89 156.54 137.18 131.57
A-3 Assembly,general,community halls,libraries, 152.81 146.48 141.07 134.30 122.33 118.97 128.63 108.26 10165
museums
A-4 Assembly,arenas 176.62 170.29 164.88 158.10 146.75 142.82 152.43 132.10 127.49
B Business 154.16 148.70 144.00 137.27 125.07 120.41 131.97 109.81 105.37
E Educational 166.52 160.91 156.34 149.52 140.14 132.98 144.59 123.34 118.69
F-1 Factory and industrial, moderate hazard 92.68 88.42 83.70 80.93 72.45 69.29 77.68 59.67 56.50
F-2 Factory and industrial, low hazard 91.68 87.42 83.70 79.93 72.45 68.29 76.68 59.67 55.50
H-1 High Hazard,explosives 86.84 82.58 78.86 75-09 67.79 63.63 71.84 55.02 N.P.
H234 High Hazard 86.84 82.58 78.86 75.0 67.79 63.63 71.84 55.02 50.85
H-5 HPM 154.16 148.70 144.00 137.27 125.07 120.41 131.97 109.81 105.37
1-1 Institutional,supervised environment 152.30 147.08 143.14 137.34 128.24 124.7 138.61 116.09 111.54
1-2 Institutional,hospitals 256.26 250.80 246.11 239.38 226.55 N.P. 234.08 211.31 N.P.
1-2 Institutional, nursing homes 179.18 173.72 169.02 162.30 150.51 N.P. 157.00 135.27 N.P.
1-3 Institutional,restrained 174.99 169.52 164.83 158.10 147.16 141.52 152.80 131.92 125.48
1-4 Institutional,day care facilities 152.30 147.08 143.14 137.34 128.24 124.7Z 138.61 116.09 111.54
M Mercantile 111.44 107.24 102.53 97-99 89.62 87.00 93.21 77.59 74.67
R-1 Residential, hotels 154.24 149.02 145.08 139.28 129.95 126A4 140.32 117.80 113.25
R-2 Residential, multiple family 129.33 124.11 120.17 114.37 105.16 101.6E 115.53 93.01 88.46
R-3 Residential,one-and two-family 122.11 118.76 115.86 112.68 108.62 105.7 110.77 101.74 95.91
R-4 Residential,care/assisted living facilities 152.30 147.08 143.14 137.34 128.24 124.7Z 138.61 116.09 111.54
S-1 Storage,moderate hazard 85.84 81.58 76.86 74.09 65.79 62.6 70.84 53.02 49.85
S-2 Storage,low hazard 84.84 80.58 76.86 73.09 65.79 61.6 69.84 53.02 48.85
U Utility,miscellaneous 65.15 61.60 57.92 55.03 49.70 46.3 51.94 39.23 37.34
Notes: (Source:Building Safety Journal Jan-Feb 2008)
a. Private Garages use Utility,miscellaneous
b. Unfinished basements(all use group)=$15.00 per sq.ft.
c. For shell only buildings deduct 20 percent.
d.N.P.=not permitted
ATTACHMENT D
TABLE 3. BUILDING PERMIT FEES
TOTAL VALUATION FEE
$1.00 to $500.00 $15.00
$501.00 to $2,000.00 $15.00 for the first $500.00 plus $2.00 for each additional
$100.00 or fraction thereof, to and including $2,000.00.
$2,001.00 to $25,000.00 $45.00 for the first $2,000.00 plus $9.00 for each additional
$1,000.00 or fraction thereof, to and including $25,000.00.
$25,001.00 to $50,000.00 $252.00 for the first $25,000.00 plus $6.50 for each additional
$1,000.00 or fraction thereof, to and including $50,000.00.
$50,001.00 to $100,000.00 $414.50 for the first $50,000.00 plus $4.50 for each additional
$1,000.00 or fraction thereof, to and including $100,000.00.
$100,001.00 to $500,000.00 $639.50 for the first$100,000.00 plus $3.50 for each additional
$1,000.00 or fraction thereof, to and including $500,000.00.
$500,001.00 to $1,000,000.00 $2,039.50 for the first$500,000.00 plus $3.00 for each
additional $1,000.00 or fraction thereof, to and including
$1,000,000.00.
$1,000,001.00 and up $3,539.50 for the first$1,000,000.00 plus $2.00 for each
additional $1,000.00 or fraction thereof.
Source: 1991 Uniform Building Code
I
Attachment E
9
PERMIT EXAMPLES FOR COMPARISON OF THE IMPACT OF BUILDING FEE ADJUSTMENTS
Permit Description Old Building New Building % Total City Fees*
No. Permit Fee Permit Fee Change Old New % Change in Overall
Fee Burden
60701554 1858 s.f.Tract Home $1184 $562 -52% $20,971 $20,349 -3.0%
60601980 2010 s.f.Tract Home $1077 $594 -45% $21,029 $20,546 -2.3%
60700552 2305 s.f.Tract Home $1369 $642 -53% $29,702 $28,975 -2.4%
60600836 2703 s.f.Tract Home $1456 $706 -52% $29,789 $29,039 -2.5%
60701656 1038 s.f. Infill Home $762 $1166 +53% $20,549 $20,953 +2.0%
B0702121 1720 s.f. Infill Home $984 $1336 +36% $20,771 $21,123 +1.7%
60702135 2036 s.f. Infill Home $1031 $1421 +38% $20,818 $21,208 + 1.8%
B0702892 2468 s.f.Infill Home $1167 $1553 +33% $20,954 $21,340 +1.8%
B0603472 3288 s.f.Infill Home $1545 $1759 +14% $21,332 $21,546 +1,0%
B0703101 260 s.f.Room Addition $254 $361 +42% $545 $652 +19%
60702896 482 s.f.Room Addition $403 $742 +84% $788 $1127 +43%
60702881 1020 s.f.Room Addition $719 $1570 +118% $1240 $2091 +68%
80800015 Electric Panel Upgrade $43 $60 +40% $84 $101 +20%
B0800028 HVAC Replacement $43 $60 +40% $84 $101 +20%
60800102 Sewer Connection $43 $60 +40% $84 $101 +20%
60800169 Water Heater Install $43 $60 +40% $84 $101 +20%
B0602485 New 12,750 s.f. $2508 $3396 +35% $44,218 $45,106 +2%
Pharmacy
60600608 New 3536 s.f.Gas $1541 $2094 +36% $93,075 $93,628 +0.6%
Station/Conv.Store
60600343 Lowe's Home $16,786 $26,317 +57% $338,111 $347,642 +2.8%
Improvement Center
B0702906 New 44,538 s.f. $4752 $7,030 +48% $149,412 $151,690 + 1.5%
Warehouse
'Total City Fees includes the building permit fee as well as plan review fees,and all current development impact fees collected by the
City and the Water Dept. It does not include School Fees.
Development impact fee credits are available to many infill homes and can offset a significant proportion of the total city fees shown
above. For comparison purposes,the above numbers do not take into account any available fee credits.
?StJ
r S
26. Continued.
No Action Taken
MOTION #1: That the hearing be closed; and that the Mayor and Common
Council uphold the decision of the City Clerk and adopt her
letter of May 21, 2008, as its findings and conclusions, based
upon the back-up information submitted and any additional
evidence presented at the hearing; or
No Action Taken
MOTION #2: That the hearing be closed; and that the Mayor and Common
Council uphold the appeal of the applicant and reverse the
decision of the City Clerk; or
No Action Taken
MOTION #3: That the hearing be closed; and that the Mayor and Common
Council uphold the appeal of the applicant, in part, and direct
the City Attorney's Office to prepare findings and conclusions
consistent with its decision.
Approved
MOTION: That the matter be continued 45 days (Council meeting of August
4, 2008).
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Heard at the Ways and Means Committee meeting on June 4, 2008 -
Committee Members Present: McCammack, Johnson & Alternate Estrada
TO BE HEARD AT 4:00 P.M.
Development Services
27. Public hearing to consider a resolution adopting updated building permit and
plan review fees. (See Attached) (No Cost to the City) All Wards
Resolution of the City of San Bernardino adopting updated building permit and
plan review fees. (Resolution not available at time of printing.)
Mayor to open the hearing . . .
Approved
MOTION: That the matter be continued to July 7, 2008.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
19 06/16/2008
CITY OF SAN BERNARDINO—REQUEST FOR COUNCIL ACTION
From: Valerie C. Ross, Director Subject: Public Hearing 4:00 p.m. -
Resolution adopting updated
building permit and plan review
Dept: Development Services fees.
Date: June 10, 2008 MCC Date: June 16, 2008
Synopsis of Previous Council Action:
Adopted 1991 Uniform Administrative Code fee tables in 1991 (MC-880)
Reviewed by Ways&Means and forwarded to MCC—June 4,2008
Recommended Motion:
1. That the public hearing relative to the Resolution to adopt updated building permit and
plan review fees be closed.
2. Adopt Resolution.
Valerie C. Ross
Contact person: Tncenh I lease Rnildina Official Phone: 384-5171
Supporting data attached: Staff Report& Resolution Ward: All
FUNDING REQUIREMENTS: Amount: N/A
Source: (Acct. No.)
(Acct. Description)
Finance:
Council Notes:
('J1 le J d
Agenda Item No. 0
I,I .
CITY OF SAN BERNARDINO—REQUEST FOR COUNCIL ACTION
Staff Report
Subject:
A Resolution adopting updated building permit and plan review fees.
Background:
The Development Services Department charges regulatory fees for plan reviews and building
permits to cover the costs of providing the services associated with the enforcement of building
codes as mandated by state law.
The Department has undertaken a fee study (available from the Department or the City Clerk)to
review and update the fees charged for building and plan review services. One part of this study
was a time/cost analysis in regards to residential housing construction, both tract housing and in-
fill housing, in order to develop a schedule of fees specific to single-family housing. As is
clearly evident from the analysis, construction of homes in quantity, as is characterized by
typical tract developments, results in economies of scale and consequently reduced overall
inspection costs. As a result, separate fee schedules have been developed for tract homes
(Attachment A) and infill homes (Attachment B), since the costs associated with inspections of
each are significantly different.
The proposed resolution includes these fee schedules in addition to other fee results from the
study. The minimum permit fee and the fully burdened hourly rates for building inspection and
plan review have been analyzed and updated. Fees are proposed for residential additions based
on a computed average inspection cost per square foot.
The Department currently utilizes building construction valuation and fee tables that were last
updated in 1991. These tables do not reflect current construction costs, but rather those that were
in effect in 1991. The existing level of fees based on 1991 building valuation rates are not
adequate to provide the personnel and resources that the Department requires to provide an
adequate level of service to the development community. Furthermore, the use of outdated
valuation rates does not accurately report the level of construction activity in current dollars.
The following chart compares the total costs of providing building inspection and plan check
services and the revenues associated with these activities over the past ten (10) fiscal years. The
total costs include departmental and general city overhead.
COSTS VS.REVENUE
Building Inspection and Plan Check
Fiscal Year Total Costs Total Revenue Shortfall or Surplus % Over or Under
Break Even Point
1998-99 $1,213,808 $868,634 ($345,174) - 28.4
1999-00 $1,171,579 $860,719 ($310,860) - 26.5
2000-01 $1,130,365 $919,271 ($211,094) - 18.7%
2001-02 $1,290,114 $1,051,134 ($238,980) - 18.5
2002-03 $1,464,012 $1,235,800 ($228,212) - 15.6
2003-04 $1,348,657 $1,266,569 ($82,088) - 6.1 %
2004-05 $1,610,464 $1,913,092 $302,628 + 18.8%
2005-06 $1,842,616 $2,059,631 $217,015 + 11.8
2006-07 $1,982,957 $1,924,589 ($58,368) - 2.9
2007-08* $2,295,325 $1,368,000 ($927,325) 40.4%
*projected values as of 3/31/08
Except for the two peak years (2005 and 2006) Building Division revenues have consistently
been below the cost recovery point.
The Department has developed an updated Building Valuation Table based on current
construction costs published in the February 2005 Edition of Building Safety Journal by the
International Code Council (Attachment Q. The valuation table currently in use has not been
updated since August 1991 . The adoption of the updated Building Valuation Table will result in
an increase in the amount of fees charged, and revenues collected, the magnitude of which will
vary by the use (occupancy classification) and the type of construction of the buildings
constructed.
The amount of fee increase or decrease for any given project is highly variant based on the type
of use, type of construction, its size, and complexity. On average the change in the amount of
fees collected for various types of projects is estimated to be a decrease of 45 percent for tract
homes, an increase of 33 percent for infill homes, an increase of 52 percent for residential
additions, an increase of 40 percent for miscellaneous electrical/plumbing/mechanical permits,
an increase of 35 percent for commercial projects, and an increase of 74 percent for industrial
projects. Attachment E provides some examples of the impact of the fee adjustments on specific
projects that have been permitted in recent years. The overall increase in revenues would be
dependent on the mix or proportion of residential, commercial and industrial projects in future
years. Given the current recessionary trend, it is anticipated that construction levels and permit
revenues will continue to fall in the coming year.
If approved at the public hearing, the fees would be effective on August 15, 2008. The
Government Code requires that all development related fees take effect no sooner than 60 days
after their adoption.
The Ways & Means Committee reviewed this fee proposal on June 4, 2008 and requested
additional information in the form of specific examples of how the fee adjustments affect various
projects. This information is summarized in Attachment E. Additionally, representatives from
homebuilder GFR Enterprises Inc. spoke to the Committee in support of this fee proposal. They
also asked the committee to consider altering the fee structure of various development impact
fees (DIF) from the current one based per dwelling unit to a fee structure based on square feet.
Since the DIF's are not part of this fee proposal, the committee agreed to review the matter
separately. The Committee decided to forward this fee proposal on to the Mayor and Common
Council.
Financial Impact:
It is anticipated that these fee increases would result in increased revenues of$430,000, offset by
revenue losses of $315,000 due to lower construction activity, resulting in a net increase of
$115,000. However, given the current economic climate and uncertainty, this is highly variable
and dependent on the future level of construction activity.
Recommendation:
That the public hearing relative to the Resolution to adopt updated building permit and plan
review fees be closed and the Resolution be adopted.
Attachments:
Resolution
A. Table IA. Building Permit Fees—Tract Homes
B. Table 1 B. Building Permit Fees—Infill Homes
C. Table 2. Building Construction Valuations
D. Table 3. Building Permit Fees
E. Permit Examples for Comparison of the Impact of Building Fee Adjustments
11. Continued.
Approved
MOTION: That the Mayor and Common Council set the Fiscal Year
2008/09 budget workshop dates for June 11, 18, 25 and 30 at
5:00 5:30 p.m. in the Economic Development Agency
Boardroom to review the Fiscal Year 2008/09 City and Economic
Development Agency Budgets.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Development Services
12. Set a public hearing for Monday, June 16, 2008 at 4:00 p.m. to consider a
resolution adopting updated building permit and plan review fees. (See
Attached) (No Cost to the City) All Wards
Approved
MOTION: That a public hearing be set for Monday, June 16, 2008, at 4:00
p.m., in the City Hall Council Chambers, to consider a resolution
adopting updated building permit and plan review fees.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
13. Resolution of the City of San Bernardino determining the amount of property
tax revenues to be exchanged between and among the City of San Bernardino
and the City of Highland resulting from the jurisdictional change described by
LAFCO 3096 for the area generally located at the northerly terminus of
Applewood Street in the City of San Bernardino. (See Attached) (No Cost to
the City) Ward 4
Approved
MOTION: That said resolution be adopted.
Adopted 2008-165
14. Item Deleted.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
15. Norton Space and Aeronautics Academy - Reimbursement Agreement for
waiver/refund of fees.
Approved
MOTION: That the matter be continued to August 4, 2008
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXI �Q
6
CITY OF SAN BERNARDINO—REQUEST FOR COUNCIL ACTION
From: Valerie C. Ross, Director Subject: Set a public hearing for Monday,
June 16, 2008 at 4:00 p.m. in the
City Hall Council Chambers to
Dept: Development Services consider a Resolution adopting
updated building permit and plan
Date: May 13, 2008 review fees.
MCC Date: June 2, 2008
Synopsis of Previous Council Action:
Adopted 1991 Uniform Administrative Code fee tables in 1991 (MC-880)
Recommended Motion:
That a public hearing be set for Monday, June 16, 2008 at 4:00 p.m. in the City Hall Council
Chambers to consider a Resolution adopting updated building permit and plan review fees.
Valerie C. Ross
Contact person: Jnve1jh L,en-,P, Rnildinu Offininl Phone: 384-5171
Supporting data attached: Staff Report &Resolution Ward: All
FUNDING REQUIREMENTS: Amount: N/A
Source: (Acct. No.)
(Acct. Description)
Finance:
Council Notes:
Agenda Item No. /
&/T W
I
CITY OF SAN BERNARDINO— REQUEST FOR COUNCIL ACTION
i
Staff Report
Subiect:
Set a public hearing for Monday, June 16, 2008 at 4:00 p.m. in the City Hall Council Chambers
to consider a Resolution adopting updated building permit and plan review fees.
Background:
The Development Services Department charges regulatory fees for plan reviews and building
permits to cover the costs of providing the services associated with the enforcement of building
codes as mandated by state law.
The Department has undertaken a fee study (available from the Department or the City Clerk) to
review and update the fees charged for building and plan review services. One part of this study
was a time/cost analysis in regards to residential housing construction, both tract housing and in-
fill housing, in order to develop a schedule of fees specific to single-family housing. As is
clearly evident from the analysis, construction of homes in quantity, as is characterized by
typical tract developments, results in economies of scale and consequently reduced overall
inspection costs. As a result, separate fee schedules have been developed for tract homes
(Attachment A) and infill homes (Attachment B), since the costs associated with inspections of
each are significantly different.
The proposed resolution includes these fee schedules in addition to other fee results from the
study. The minimum permit fee and the fully burdened hourly rates for building inspection and
plan review have been analyzed and updated. Fees are proposed for residential additions based
on a computed average inspection cost per square foot.
The Department currently utilizes building construction valuation and fee tables that were last
updated in 1991. These tables do not reflect current construction costs,but rather those that were
in effect in 1991. The existing level of fees based on 1991 building valuation rates are not
adequate to provide the personnel and resources that the Department requires to provide an
adequate level of service to the development community. Furthermore, the use of outdated
valuation rates does not accurately report the level of construction activity in current dollars.
The following chart compares the total costs of providing building inspection and plan check
services and the revenues associated with these activities over the past ten (10) fiscal years. The
total costs include departmental and general city overhead.
COSTS VS.REVENUE
Building Inspection and Plan Check
Fiscal Year Total Costs Total Revenue Shortfall or Surplus % Over or Under
Break Even Point
1998-99 $1,213,808 $868,634 $345,174 - 28.4%
1999-00 $1,171,579 $860,719 $310,860 - 26.5 %
2000-01 $1,130,365 $919,271 $211,094 - 18.7%
2001-02 $1,290,114 $1,051,134 $238,980 - 18.5 %
2002-03 $1,464,012 $1,235,800 $228,212 - 15.6%
2003-04 $1,348,657 $1,266,569 $82,088 - 6.1 %
2004-05 $1,610,464 $1,913,092 $302,628 + 18.8%
2005-06 $1,842,616 $2,059,631 $217,015 + 11.8%
2006-07 $1,982,957 $1,924,589 $58,368 - 2.9%
2007-08* $2,295,325 $1,368,000 ($927,325) - 40.4%
*projected values as of 3/31/08
Except for the two peak years (2005 and 2006) Building Division revenues have consistently
been below the cost recovery point.
The Department has developed an updated Building Valuation Table based on current
construction costs published in the February 2005 Edition of Building Safety Journal by the
International Code Council (Attachment Q. The valuation table currently in use has not been
updated since August 1991 . The adoption of the updated Building Valuation Table will result in
an increase in the amount of fees charged, and revenues collected, the magnitude of which will
vary by the use (occupancy classification) and the type of construction of the buildings
constructed.
The average change in the amount of fees collected for various types of projects is estimated to
be minus 45 percent for tract homes, plus 33 percent for infill homes, plus 52 percent for
residential additions, plus 28 percent for miscellaneous electrical/plumbing/mechanical permits,
plus 20 percent for commercial projects, and plus 74 percent for industrial projects. The overall
increase in revenues would be dependent on the mix or proportion of residential, commercial and
industrial projects in future years. Given the current recessionary trend, it is anticipated that
construction levels and permit revenues will continue to fall in the coming year.
If approved at the public hearing, the fees would be effective on August 15, 2008. The
Government Code requires that all development related fees take effect no sooner than 60 days
after their adoption.
Financial Impact:
It is anticipated that these fee increases would result in increased revenues of$430,000, offset by
revenue losses of $315,000 due to lower construction activity, resulting in a net increase of
$115,000. However, given the current economic climate and uncertainty, this is highly variable
and dependent on the future level of construction activity.
Recommendation:
Refer to Ways and Means Committee, and set a public hearing for Monday, June 16, 2008 at
4:00 p.m. in the City Hall Council Chambers to consider a Resolution adopting updated building
permit and plan review fees.
Attachments:
Resolution
A. Table IA. Building Permit Fees—Tract Homes
B. Table 1B. Building Permit Fees—Infill Homes
C. Table 2. Building Construction Valuations
D. Table 3. Building Permit Fees
F
elrowairl ifilo
BUILDING INSPECTION FEE
ANALYSIS
Building and Safety Division
Development Services Department
City of San Bernardino, CA
May 2008
J
;77 )
i
ABSTRACT
This report examines the issues, both legal and procedural, surrounding regulatory fees and their
effects on building fees within the City of San Bernardino. As elements of the larger study, various smaller
studies, such as time and motion studies of the building inspector's activities and a Fully Burdened Hourly
Rate Study, were completed.
Where it was considered necessary, the methodologies used or not used were explained so that
the reader could better understand the reasoning for using the methodologies chosen. Likewise, to explain
the disparity between inspection times and why some inspections were necessary, a detailed explanation
of the inspections was given.
The last few chapters of this report provides suggestions for updating various permit fees,
particularly those for single family tract homes and in-fill homes based on current costs of providing building
services.
The basis of this report is the master's thesis entitled "Building Inspection Fee Analysis" (April
2007) written by John Dohm and submitted to the College of Business and Public Administration, California
State University, San Bernardino. Mr. Dohm served an internship with the Development Services
t Department from June 2005 through November 2007, during which time the data compilation and initial
analysis was completed. This report was compiled and the financial information updated as of May 2008
by the Building Official, Joseph Lease of the Development Services Department.
i
l
2
I
i
ACKNOWLEDGMENTS
My sincerest thanks to Dr. Lee Hanson who made my internship and research possible, to Joseph
Lease, Building Official, who supervised and guided me through this study and to Brenda Leggitt, Building
Services Division Clerk and Jack Masters, Senior Building Inspector, who kept me headed in the right
direction. Additionally, I would like to thank Mary Freiberg; Gene Cahoon, Building Inspector III; Tom Odell,
Building Inspector III; Ron Gaston, Building Inspector II; Barry Reynolds, Building Inspector Il; Mike
Hansen, Building Inspector II; Richard Lawson, Building Inspector I; and Tony Meyers, Building Inspector I
for providing me with information and explanations throughout my study.
John Dohm
In Memoriam,
A special thanks is due to Mr. Richard "Dick" McCarthy of the Paladin Group, who graciously
volunteered his services, advice, and a multitude of information relating to building inspection fees. His
review of the analysis methodology and initial conclusions of the fee analysis were invaluable. It is with
great regret that we acknowledge his passing prior to the completion of this study. His legacy of promoting
good governance will not be forgotten.
Joseph Lease, Building Official
4
3
TABLE OF CONTENTS
ABSTRACT........................................................................................................................................................2
ACKNOWLEDGMENTS.....................................................................................................................................3
CHAPTER1 - INTRODUCTION .......................................................................................................................6
Introduction....................................................................................................................................................6
Background....................................................................................................................................................7
ProblemStatement...................................................................................................................7
Data.......................................................................................................................................8
RelatedLiterature.....................................................................................................................9
Definitions....................................................................................................................................................10
CHAPTER2- REGULATORY ISSUES...........................................................................................................11
Introduction..................................................................................................................................................11
FederalLaws...............................................................................................................................................11
StateLaws............................................................................................................................
CaseLaw .........................................................................................................................12
Conclusion...................................................................................................................................................15
CHAPTER 3 - COST RECOVERY METHODOLOGIES...............................................•.•••••.••••"'...... 16
Introduction...........................................................................................................................
Total Cost/Total Revenue Methodology.......................................................................................17
Division Cost/Revenue Analysis.................................................................................................18
Uniform Administrative Code Fee Tables.....................................................................................20
AverageTime/Cost Methodology ...............................................................................................20
Conclusion...................................................................................................................................................22
CHAPTER4- INSPECTIONS..........................................................................................................................23
Introduction..................................................................................................................................................23
ProgramBasis........................................................................................................................23
InspectionVariables ................................................................................................................23
ServiceLevel.........................................................................................................................24
Conclusion...................................................................................................................................................25
CHAPTER 5 - BUILDING SERVICES DIVISION COST/REVENUE ANALYSIS......................................26
Introduction..........................................................................................................................
Cost vs. Revenue Combined Building Inspection and Plan Review Table....................................... .26
Cost vs. Revenue Plan Review.................................................................................................
7
Cost vs. Revenue Building Inspection.........................................................................................27
Department Overhead Attributable to Combined Division..............................................................28
Conclusion...........................................................................................................................28
4
CHAPTER 6 - NEW RESIDENTIAL TIME AND COST STUDY ......................................................................30
Introduction..................................................................................................................................................30
TractHome Inspection Times......................................................................................................................30
Building Inspection Times for Tract Homes...................................................................................30
In-fill (custom) Homes Inspection Times..............................................................••••.••••.••••..........43
ResidentialAdditions...............................................................................................................
Conclusion............................................................................................................................44
CHAPTER 7 - FULLY BURDENED HOURLY RATE .......................................................................................46
Introduction..................................................................................................................................................46
Annual Available Hours - Building Inspection ..............................................................................................46
Fully Burdened Hourly Rate Calculation ......................................................................................................51
Plan Check Division Cost Analysis.............................................................................................
Conclusion...................................................................................................................................................51
CHAPTER 8 - PROPOSALS FOR FEES AND TECHNOLOGY.......................................................................52
Building Permit Fee Tables for Residential Construction ............................................................................52
Building Construction Valuations................................................................................................54
CHAPTER 9- Electrical/Plumbing/Mechanical Permit Fees.................................................................56
Introduction.............................................................................................................................
5
EPMFee Summary..................................................................................................................57
CHAPTER 10 - CONCLUDING REMARKS .................................................................59
ADDENDUM A Building Inspection Descriptions...............................................................................60
ADDENDUMB Driving Time Analysis.............................................................................................63
ADDENDUM C Employee Leave Time Analysis...............................................................................65
ADDENDUM D Inspection Time Analysis........................................................................................75
ADDENDUM E Time/Costs for Room Additions..............................................................................124
ADDENDUM F Electrical/Plumbing/Mechanical Permit Data Tables....................................................128
REFERENCES........................................................................................................................139
5
CHAPTER 1 — INTRODUCTION
Introduction
The focus of this study involves regulatory fees charged for building permits which are issued for
construction projects of varying scopes within the City of San Bernardino. Building permit fees are fees that
cover the cost of administering the document (the building permit) and the cost of inspecting the construction
for which the permit was issued. The building permit is the enforcement mechanism mandated by the building
codes. The building codes mandate that construction plans be reviewed and approved prior to the issuance of
a building permit, and that inspections be performed and approved at various stages of the construction
process to ensure that construction complies with minimum health, fire, and life safety standards and to
provide a minimum threshold of durability and serviceability. Thus, the plan review and inspection processes
provide the means to carry out the provisions of the code. The term "building inspection" used throughout this
report encompasses inspection of building, electrical, mechanical and plumbing components and systems.
The terms "plan review," "plan examination" and "plan check" all refer to the process of reviewing building
plans and the administrative tasks necessary to support the review process, such as writing and
communicating review corrections or approvals.
Fees collected for inspection activities, according to the U.S. Congressional Budget Office, are
"regulatory fees", which are a type of user charge. Regulatory fees are payments based on government
authority to regulate particular businesses or activities that stem from the sovereign powers of the
government. However, in the publications of the various professional organizations made up of building
officials throughout the country, and adopted by the state of California, building permit and plan examination
fees are sometimes referred to as user fees.
In a December 1996 report entitled "Understanding Proposition 218," Marianne O'Malley of the
Legislative Analyst's Office of the State of California defined a user fee as follows..
"A fee is a charge imposed on an individual or business for a service or facility provided directly to an
individual or business. Local governments charge fees for a wide range of purposes, from park entry
fees to building plan check fees. The amount of the fee may not exceed the cost of government to
provide the service."
The confusion over the definition of building inspection fees is best clarified by West's ANNOTATED
CALIFORNIA CODES, CONSTITUTION of the STATE OF CALIFORNIA Articles 10 to 14, Volume 2A, 2006
Cumulative Pocket Part, Page 62. Subsection 17.5 defines a "User Fee" as those which are charged only to
the person actually using the service, and the amount of the charge is generally related to the actual goods or
services provided and is a monthly charge rather than a one time charge... It is the criteria that the charge be
a monthly charge rather than a one time charge (as is the case with building services fees) that excludes
building services fees from being a user fee."
6
Subsection 17 on the same page explains "Regulatory fees" as follows:
"A regulatory fee may be imposed under the police power of a city, county, or special district, and is
not subject to the "super-majority" requirement applicable to special taxes under State Constitution,
when the fee constitutes an amount necessary to carry out the purposes and provisions of the
regulation; such costs include all those incident to the issuance of the license or permit, investigation,
inspection, administration, and maintenance of a system of supervision and enforcement."
Subsection 17.5 further states that legislators need only apply sound judgment and consider
probabilities according to the best, and honest viewpoint of informed officials in determining the amount of the
regulatory fee.
Finally, Subsection 17.5 states in part, "Regulatory fees... must not exceed the reasonable cost of the
services necessary for the activity for which the fees are charged and for carrying out the purpose of the
regulation, and the fees may not be levied for unrelated purposes."
Considering the conditions of a regulatory fee—that they may be imposed by a city, county, or special
district, and they must be an amount necessary to carry out the purposes and provisions of the regulation, it is
clear that building services fees are regulatory fees and not strictly speaking, user fees.
Background
Both the use and magnitude of regulatory and user fees have continued to grow as California voters
have passed legislation such as Propositions 13 and 218. Provisions of Proposition 13 passed in 1978 have
limited local government's ability to raise revenues by placing caps on increases in property taxes. By setting
the tax rate at 1% of the property's assessed value and limiting the allowable increase in property valuations
to a maximum of 2% per year with the exception of new construction and some property transfers, the voters
have reduced property tax revenues to local governments.
Proposition 218, passed in 1996, further restricted local government's ability to raise revenue by
requiring new taxes to be passed by a two-thirds majority of the electorate. To make up for losses in property
tax revenues, local governments have increased the use of regulatory and user fees.
Problem Statement
Local governments should employ equitable methodologies for setting and analyzing building services
fees. The methodologies must be able to withstand all tests currently used by the courts to determine whether
or not building permit fees charged by counties and cities are reasonable and fair to both the agencies
providing these services and the fee payers that use building services. There are two basic tests to determine
if a fee is reasonable.
7
The first test consists of determining whether or not the fees charged by the building department,
within reason, balance the expenses incurred in providing building permit services with revenues collected in
the form of building permit fees on an annual or multi-year basis.
The second test consists of determining whether or not the fees charged for individual services such
as specific types of building inspections have a reasonable nexus' to the cost of providing those inspections.
It is the providers of building services that bear the burden of proof for meeting these tests, in our case, the
City of San Bernardino.
The City of San Bernardino has adopted the Uniform Administrative Code(UAC), 1997 Edition(UAC),
published by the International Code Council (ICC), formerly the International Conference of Building Officials
(ICBO). The UAC contains fee tables used by the majority of counties and cities to calculate plan check and
building inspection fees. The use of these fee tables are contingent on providing a nexus between the actual
fee charged and the cost of the services provided.
Jurisdictions that have been ordered by the courts to adopt a fee recovery system that bears a nexus
between costs and fees, or those that choose to voluntarily comply with the law, the most common cost
recovery methodology is to periodically (every three to five years) recalculate the cost of providing services. If
this reevaluation process concludes that revenues exceed costs, then the law requires that any excess
revenues be used to offset or reduce fees in future years. Another alternative would be to expend excess
revenues in the short term on service improvements where service inefficiencies or shortcomings have been
identified, or by expenditures to enhance services based on customer demands.
Data
The data used in this report was obtained from the City of San Bernardino Building Divisions records,
including the building Inspectors' Daily Inspection Logs, databases kept by the City in the PermitsPlus
software system, the City's budget and financial records, and personal interviews with the City's building
division staff. Additionally, a personal meeting with Mr. Dick McCarthy of Paladin Group, and publications
provided to the City by the Paladin Group were used to compare the City's survey data to that collected by
the Paladin Group regarding times, activities, and costs required to complete the building inspection process.
The data sources utilized for this study are summarized as follows:
Logs. The Building Division's inspectors and plan examiners are required to keep daily logs detailing
their job-related activities. The administrative staff also keeps logs on all of the division's employees' leave
time, such as sick or holiday leave, and meeting and training time. Daily activity logs kept by the inspectors
are used to record the type of inspections completed, beginning and ending inspection times, disposition of
It appears that the Court's preference for a "nexus", or causal link, beyond a simple
relationship, is to make the point that the cost of providing building services must stay constantly
linked to the fees charged for those services and not just bear a floating relationship to each
other.
8
a
each inspection, driving time, and the occurrence and duration of meetings and training activities. The Annual
Inspection Calls Completed Report from the Permits Plus database indicates that the number of inspections
completed per year, over the multi-year period that was examined in this report, averaged 15,634 per year.
Databases. The City uses Permits Plus software to archive their building permit and plan examination
data. This PermPlus database is the source of the majority of the data utilized in this study. Inspection
information is accessed by permit number, street address, assessor's parcel number or date, and consists of
the inspection type, inspector's number, inspection dates, beginning and ending time, elapsed time and re-
inspections required.
Personal Interviews. Personal interviews with Building Division Staff included formal and informal
converstions with Mr. Joseph Lease, the City's Building Official, and daily conversations with: Jack Masters,
Senior Building Inspector; Gene Cahoon, Building Inspector III; Tom Odell, Building Inspector III; Ron Gaston,
Building Inspector II; Barry Reynolds, Building Inspector II; Mike Hansen, Building Inspector II; Richard
Lawson, Building Inspector I; and Tony Meyers, Building Inspector I.
Written Reports. Mr. Dick McCarthy of the Paladin Group analyzed the City's building permit and plan
examination fees using his methodology for calculating the estimated reasonable cost of providing building
services for tract homes. His analysis and supporting data regarding costs of providing building services and
the legal issues that pertain to building services fees are presented in Mr. McCarthy's reports. Data presented
in the reports has been used to compare the City's findings and opinions with those of Mr. McCarthy and other
jurisdictions that he has reviewed.
Fiscal Documents. The City's Budget Reports for Fiscal Years 1998/1999 through 2007/2008 were
used to collect revenue, expense and personnel data.
Related Literature. Several important documents have been utilized in this study and are noted below.
The Fee Committee of the San Diego Area Chapter of the International Conference of Building
Officials published "A Guide for Justifying Building Department Fees" (1994, private publication). This
document reviews applicable Government Codes, discusses the Attorney General's Opinion No. 92-506, and
presents the Total Cost/Total Revenue Methodology of analyzing and calculating fees.
Michael Bouse(1998) in his book Establishing Building Permit Fees, defines and discusses the issues
associated with building services' costs and cost recovery methodologies. He also presents the procedures
and findings from his own study.
Building Department Administration. (O'Bannon,1989)is an informative text which covers: the intent
of and authority for building codes, justifications for fee levels, the creation of model codes, and legal issues
surrounding building fees.
- f
Definitions
Definitions used in this study include the following:
"Council of American Building Officials (CABO)," a non-profit professional organization of building
officials.
"California Building Standards Code" (CBSC),",known as the California Code of Regulations, Title 24.
"Driving Time." The time required to commute from inspection site or cluster of contiguous properties
(typically a tract) to another site, or from lunch, the office or other necessary stop to an inspection site. This
does not include the time required to walk from one inspection site in a tract of buildings to another.
"International Conference of Building Officials (ICBO)," an organization of building officials. Publishes the
UBC and other proprietary publications. ICBO has been absorbed into the International Code Council (ICC).
"Site Visits." The number of times that a building inspector must visit a given property, whether the visit
results in an inspection being completed or not.
"Uniform Building Code (UBC) or International Building Code (IBC)," Published by ICBO, the UBC is a
compilation of minimum requirements for safe construction and occupancy of buildings, formerly adopted as
the basis of the California Building Code, and updated every three years. As of January 1, 2008, the UBC has
been replaced by the International Building Code (IBC), 2006 Edition and incorporated into the 2007 California
Building Code as adopted by the California Building Standards Commission (CBSC). Once adopted by the
CBSC, codes become building standards applicable throughout the State.
"California Code of Regulations (CCR)Title 24," also known as the California Building Standards Code, is
a compilation of twelve parts establishing building standards regulating all facets of public and private
construction.
"California Building Officials (CALBO)," A nonprofit organization dedicated to promoting public health and
safety in building construction through legislation, education and building code development.
10
CHAPTER 2 - REGULATORY ISSUES
Introduction
The legal issues discussed in this section are those issues that directly or indirectly define or affect
building inspection or plan review fees. Building inspection and plan review fees are within the larger category
of regulatory fees.
As stated in the preceding chapter, it is the intent of the voters of the State of California that regulatory
fees not exceed the reasonable cost of providing services to the specific users of those services. It is also the
intent of the voters that any revenues collected as regulatory fees that exceed the reasonable cost of
providing the specific service for which they were collected be used to reduce future fees for providing those
services. It is the widespread practice of charging excessive fees and using them as general fund revenues
that has necessitated the involvement of the courts in the dispute between the building community and their
watchdog groups and local governments. Until a recent court decision drew a distinction between excess fees
and special taxes, excess fees were considered illegal taxes because they had not been approved by the
required two-thirds majority vote of the electorate.
Federal Laws
The federal government's involvement in building inspection and plan review fees and indirect
activities necessary to support building services is limited. Forms of involvement consist of the constitutional
guarantees of the Fifth and Fourteenth Amendments, the U.S. Supreme Court's oversight of the lower courts,
and the provision of guidelines for recovering cost for regulatory and administrative activities. The Fifth
Amendment's requirement that both the nature and extent of the dedication required of the applicant be
roughly proportional to the proposed development's impact is one of the guiding principles behind the
requirement that user fees not exceed the cost of providing the service they support. However, enforcement
and administration of building department services lies mainly with the state and local governments.
State Laws
The laws governing building permit and plan review fees in California have three main sources. The
first are adoptions and amendments of building regulations to the California Code of Regulations, Title 24, by
order of the California Legislature; and regulations by other organizations with authority delegated by the State
Legislature. The second source consists of bills by the state legislature, initiatives, and referendums. Third is
the judicial system that creates the common laws of the state through court decisions.
The Uniform Building Code (UBC), as adopted by the state, anticipates that many jurisdictions will
establish their own fee schedule using either the fee tables contained in Part 2 of the California Building Code
or another methodology adopted by the jurisdiction. Section 107, FEES AND PLAN REVIEW, states the intent
of the California Building Standards Law regarding building fees in subsections 107.1 and 107.1.1, 2001
11
California Building Code 1, California Code of Regulations Title 24 Part 2 Volume 1, Page 1-6.7. It states that
"Fees shall be assessed in accordance with the provisions of this section or shall be as set forth in the fee
schedule adopted by the jurisdiction." Authority to collect building permit and plan review fees is set forth in
the State Housing Law, Health and Safety Code, Division 13, Part 1.5, Section 17951.
At the state and local level the statutory regulations and government codes pertaining to building
permit and plan review fees are woven into the statutes dealing with taxation based on what the fees are and
are not.
California Government Code Sections 66005 through 66024 of the Mitigation Fee Act specifically
regulate building permit and inspection fees. The maximum amount that can be charged for building permit
and plan review fees is set by Govt Code Section 66014,Subd. (a), which states that"Notwithstanding any
other provision of law, when a local agency charges fees for . . . use permits; building inspections; building
permits; . . . those fees may not exceed the estimated reasonable cost of providing the service for which the
fee is charged, unless a question regarding the amount of the fee charged in excess of the estimated
reasonable cost of providing the services or materials is submitted to and approved by a popular vote of two-
thirds of those electors voting on the issue."(West's 224)
Govt Code Section 66016 Subd.(a) explains when, to what extent, and in what manner prior public
notice of any fee change must be given and how excess funds must be handled: "Prior to levying a new fee
or service charge, or prior to approving an increase in an existing fee or service charge, a local agency shall
hold at least one open and public meeting, at which oral or written presentations can be made . . . Notice of
the time and place of the meeting . . . and a statement that the data required by this section is available, shall
be mailed at least 14 days prior to the meeting to any interested party who files a written request." (West's
225) This section also outlines how any excess funds that are created are to be discharged: "Unless there
has been voter approval, as prescribed by Section 66013 or 66014, no local agency shall levy a new fee or
service charge or increase an existing fee or service charge to an amount which exceeds the estimated
amount required to provide the service for which the fee or service charge is levied. If, however, the fees or
service charges create revenues in excess of actual cost, those revenues shall be used to reduce the fee or
service charge creating the excess." (West's 225 & 226)
Case Law
Locally imposed user fees have been challenged in the courts, and the courts become involved in
resolving disputes over fees for building services. These disputes include what constitutes a permit or plan
review fee, which methodologies for calculating building services fees do and do not comply with current state
laws, when fees are excessive, and what remedies should apply to their misuse.
In 2001 in Barratt American Inc. v. County of Orange, the Superior Court of California (Case No.
814037 related to 01 CC04025), ruled on the following issues.
12
i
f
S
E
k
Issue No. 1: What manner or method must the County of Orange use to satisfy its duty under
Government Code 66016(a)?
A. The County must use surplus fee revenue to reduce the fees charged to fee payers.
Additionally, the Court may use its equitable power to compel a public agency to comply with its
statutory duties, and a writ of mandate may be used to enforce the County's statutory duty if it
fails to satisfy its duty under Govt Code 66016(a).
B. OMB A-87 per GC 549852 has nothing to do with the method of disposing of the existing surplus.
Furthermore, under OMB A-87 the County may retain a portion of the fee revenue, to provide
services and for committed services (next year inspections) in the Health and Safety Fund.
However, under OMB A-87 treating the Fund balance as a contingency reserve for emergencies
(natural disasters) is not allowable, as contingencies are not allowable indirect costs.
C. If the County's budget reflects user fees based on allowable costs per OMB A-87 and the
County's expenditures of surpluses . . . reduces its need for revenue to meet the costs of
providing services, reducing future user fees, this is an acceptable method of meeting the
County's duty under GC 66016(a).
Issue No. 2: Approximately $2.5 Million lost from the Building and Safety Fund in the County's
bankruptcy action should not be considered a part of the total surplus of revenue subject to the
County's duty under GC 66016(a). The State Court lacks the jurisdiction (the Bankruptcy Court has
exclusive jurisdiction) to make an order that, in practical effect, would conflict with or invalidate the
Bankruptcy Court's order.
More recently (2005), the Supreme Court of California in Barratt American v. The City of Rancho
Cucamonga clarified five disputes, affirming four lower court decisions and setting aside one decision. Justice
J. Chin wrote the court's decision, recorded in 2005 Cal. LEXIS 14240; 2005 Daily Journal DAR 14715, Files
December 22, 2005.
Issue 1. First, it was the decision of the court that the individual refunds remedy and limitations period
under Sections 66020 and 66021 do not apply to the building permit fees. Secondly, The California
Legislative Council has similarly concluded that Section 66020 does not include fees associated with
plan review or inspection fees, leading the court to conclude that the Legislature did not intend that
this section authorize refunds of overcharges of building permit or plan review fees. Third, required
fees by Health and Safety Code do not relate to development projects, instead they fund programs
that supervise "how" not "whether" builders build. Finally, the remedies within Section 66016, which
apply to building permit fees, state that the remedy for overcharges that create revenues in excess
of actual costs is to use those revenues to reduce the fee or service charge creating the excess.
'Federal Government Office of Management and Budget Circular A-87 limits the indirect cost that may be charged by
a state or county government enforcing any regulation. Government Code Section 54985-54988 of California Codes
(a)states that a county board of supervisors shall have the authority to increase or decrease the fee or charge
...necessary to recover the cost of providing any service or the cost of enforcing any regulation.
13
Because Section 66016 applies specifically to building fees, it prevails over the more general
statutes that might otherwise seem to conflict with it. (See San Francisco Taxpayers Assn.v.Bd. of
Supervisors (1992) 2 Cal.41h 571, 577-578 [7 /Cal. Rptr. 2d 245, 828 P.2d 147].) (2005 Daily Journal
DAR 14715)
Issue 2. It is the court's opinion that simply because a fee exceeds the reasonable cost of providing
the service or regulatory activity for which it is charged does not transform it into a tax. (See Alamo
Rent-A-Car, Inc. V. Board of Supervisors (1990) 221 Cal. App. 3d 198, 205-206 [272 Cal. Rptr. 191
["reverse logic" does not compel the conclusion that an allegedly excess fee was a tax].)
Section 66000 provides the exclusive remedy for overcharges. If actual revenues exceed actual
costs, the City must make a prospective fee adjustment by using that surplus, in lieu of fee revenue,
to cover future expenses. (66016. Subd. (a).) It cannot refund the excess or transfer it to the City's
general fund to replace or augment tax revenue. (See Health and Safety. Code, 17951, subd. (c).
[local permit fees "shall not be levied for general revenue purposes"], 19132.3 [same].) Accordingly,
the dollar-for-dollar penalty or offset allowed by Section 53728 does not apply to Barratt's claim. (See
Sinclair Paint Co.), supra, 15 Cal. 4th at p. 876 ["Special taxes" in Article XIII A, Section 4, of the
California constitution do not include regulatory fees that do not exceed the reasonable cost of
providing services necessary to the activity for which the fee is charged and that are not levied for
unrelated revenue purposes].
Issue 3. In the court's opinion, neither Section 1.5 nor Section 8 of Article XIII B states that those
costs must be actual costs, rather than reasonable estimates, or that the fee-cost relationship must be
determined over the course of a single year.
Issue 4. In the court's opinion, the 2002 reenactment of the previous building permit and plan review
fees constitute a "modification or amendment of an existing fee or service charge." (66022 Subd. (a).)
Resolution No. 02-023 changed the duration of the fee by extending its applicability, and by
implication its validity. When the City adopted that resolution, it implicitly represented that the building
permit and plan review fees continued to be valid. This determination would have or should have
required some type of accounting of operating expenses and revenues, resulting in surplus revenues,
a deficit, or no required change in the fees. The court considering Barratt American's argument that
the City's reenactment of its building permit fees as part of a revised comprehensive fee resolution is
analogous to legislation at the state level that amends a portion of a statute while leaving the
unamended portion unchanged. Under the "reenactment rule" of statutory interpretation, the
unamended portion of the statute is reenacted with the enactment of the amendment, so that the
statute is deemed to have been acted on as a whole. (See Brown v. Superior Court (1982) 33 Cal.3d
242, 251-252 [188 Cal. Rptr. 655 P.2d 1260); People v. Scott (1987) 194 Cal. App. 3d 550, 554-556
[239 Cal. Rptr. 588].) After consideration, the court concluded that Barratt could seek to invalidate the
building permit and plan review fees in resolution No. 02-023 and that its challenge was timely as to
applicable claims arising after January 16, 2002, the effective date of the resolution. (Brown 9)
14
In the final case (Case No., RIC 359371) the court rejected a methodology for determining building
services, reaffirming that methodologies that lack a nexus between costs and revenues will not pass judicial
scrutiny. In The Paladin Fair Housing Coalition, Inc., et al. V. City of Corona, et al., Superior Court Judge E.
Michael Kaiser rejected the city's methodology of determining whether or not Corona's building department
was charging fees in excess of the cost of providing services. The city's methodology consisted of:
• An estimate the time to conduct building inspections and plan reviews by interviewing building department
employees.
• Averaging nine years of actual revenue plus one year of projected revenue for the current year.
• A comparison of the average revenue figure with the projected budget cost of providing building services
for the current year to determine whether revenues and costs balanced, revenues exceeded costs, or
revenues fell short of costs.
In the opinion of the court, the comparison of nine years of actual revenue plus one year of projected
revenue against one year of projected cost does not meet the statutory requirement of determining if fees
exceed the estimated cost to perform the service. By definition the ninth year of revenue, which is
evidence of actual revenue, averaged with the budgeted revenue and the other eight years of actual
revenue will reduce the ninth year actual revenue and correspondingly any excess revenue over cost.
This imprecise method of determining the fee does not comply with Government code 66014 and 66016.
(Portillo p. 5,6). Portillo, "Statement of Intended Decision, The Paladin Fair Housing Coalition, Inc., et
al.vs. City of Corona, et. al." Superior Court of California, County of Riverside, May 14, 2003.
Conclusion
Building permit and plan review fees and their legal environment are framed by the U.S. constitution,
the California Constitution, the regulations and statues of the state of California, and the case law created by
the courts.
On the federal level, police power authorizes the collection of building permit and plan review fees
and mandates a rough proportionality between the costs of services to the benefit they provide. On the state
level, the Constitution, statutes, regulations, codes and case law create and control the structure, the
processes (mainly fee determination methodologies), and boundaries of building permit and plan review fees.
Methodologies that do not comply with the government codes will not pass judicial scrutiny.
t
15
CHAPTER 3 - COST RECOVERY METHODOLOGIES
Introduction
The methodologies used in this study fall into one of two categories. The first category analyzes
the balance between total costs incurred providing building inspection services and the total revenues
(fees) charged to the applicants for those services. The second is a more detailed analysis in line item
form that is used to analyze and project the fee amounts needed to recover the cost of providing the
individual building services.
For a cost recovery methodology to be viable it should be physically possible, financially feasible,
and able to pass judicial scrutiny. To be physically possible, there must exist data that can be collected
and analyzed sufficiently to yield the desired result. In the case of this study the city's records were
sufficient to utilize the methodology employed. Financial feasibility requires that the benefit from employing
a particular methodology be greater than the burden placed on the city by the methodology. When the
consequences of the risk of litigation were weighed against the cost of utilizing the methodology used in
this study the methodology was considered to be feasible. Of absolute necessity is that the methodology
be able to pass judicial scrutiny. California law is filled with court decisions that have invalidated
methodologies that the courts did not consider to be in compliance with the requirements or intent of the
laws that govern building services fees. The methodologies used in this study were chosen because they
are considered to be in compliance with state laws and recent judicial decisions regarding building service
fees.
In addition to the methodology discussed in the previous section that was rejected by the courts,
there are four common methodologies, which are discussed below. The first methodology is a retrospective
analysis of costs and revenues used to determine whether or not the Building Division's plan check or
building inspection fees have been set at the proper level. The remaining three methodologies (proposed
fee methodologies) are different in that they all attempt to create fee schedules to be used to calculate
building inspection and plan review fees. This section explains the different methodologies and then
discusses why they are or are not considered acceptable.
The following criteria were given primary weight in the decision regarding which of the fee
methodologies to use in this study. First, there should be a nexus between the costs borne by the city in
connection with providing inspection services and the costs borne by the individuals paying building permit
fees. For example, types of costs not incurred in providing building services should not be used to
calculate building permit fees. Second, the cost of performing the study and calculating new fees must be
less than the cost of leaving fees low or risking litigation. Third, the data used should be taken from the
actual tasks performed in the process of providing inspection services, as opposed to opinions of the
effects or results of hypothetical situations.
16
Methodologies using actual data collected from the City of San Bernardino's financial records and
the building department's inspection records were chosen to determine the reasonable cost of building
services. The minimum dwelling size difference necessary to cause a reliable change in inspection time
was assumed to be 200 square feet. As a test of the overall fee cost recovery levels for the building division
as a whole, the Total Cost/Total Revenue Methodology was chosen. Of the prospective methodologies,
those that utilize economic forecasting, rounding (early in the process of calculating fees), opinions, or
those that required the use of indexes with no identifiable relationship to the cost of building services were
rejected.
Total Cost/Total Revenue Methodoloqy
The "Total Cost/Total Revenue Methodology" (TC/TR), which calculates the total annual costs of
building services and estimates the total revenue needed to fund those costs, is a useful tool for
retrospective analysis. This methodology can be applied to the Building & Safety Division (BSD) as a
whole or to each individual Section of the BSD such as building inspection or plans examination. The
TC/TR methodology is used to compare the total revenues to the total expenses of the unit being analyzed
to determine whether or not the fees being charged are reasonable, too high, or too low. This methodology
has also been used as one part of a two-part test by the courts to determine whether or not building fees
charged by jurisdictions are excessive. When used in conjunction with one of the other methodologies that
focus on individual tasks, such as specific inspection types, this methodology makes it apparent whether or
not the sum of the parts truly equals the whole regarding each division's revenues and expenses.
The TC/TR methodology is also preferred by jurisdictions which have limited resources because it
is the least costly of the methodologies. The courts prefer this methodology to most of the others because
of its close nexus to the jurisdiction's actual income and expense accounting system, which makes it easy
to understand and hard to manipulate.
The Total Cost/Total Revenue Methodology was first presented in "A Guide for Justifying Building
Department Fees,"published in 1994 by the San Diego Chapter of the International Council of Building
Officials. This seven-step methodology was then modified and republished by Michael Bouse in his
publication "Establishing Building Permit Fees," as a six-step methodology. Below is an explanation of the
six-step process.
The total cost/total revenue methodology involves identifying all costs of services rendered by a
unit(s) of government and all revenues (fees) received for those services. The next step is to allocate the
costs and revenues to the unit(s) of government from which they have been generated. For this study the
costs and revenues have been allocated to the Building and Safety Division. Next, the entire exercise is
repeated and the costs and revenues are allocated between the Building Inspection and Plan Examination
Sections separately. Finally, for both exercises, the costs incurred by each specific unit are totaled and then
subtracted from the total revenues (fees) collected from service users. In this methodology, all sources of
revenues, including building, plumbing, electrical and mechanical permit fees are taken into consideration.
17
Division Cost/Revenue Analysis
Following are the six steps involved in the total cost/total revenue methodology along with
discussions of each step for the Building Inspection Section. Multiyear cost/revenue tables are provided in
Chapter 5:
Step 1. Identify all services rendered by the Section. Services provided include building
inspection and building code enforcement in regards to construction projects throughout the City and such
costs are recoverable through building permit fees. One minor exception is the Mobile Home Park
Inspection Program (MHPIP), which funds a portion (approximate 1/3) of an inspector, the Mobile Home
Park Inspector, through "permit to operate"fees. The remainder of this inspector is funded through MHP
building permits and other building permits. These costs and revenues are included in the overall totals in
the analysis.
Step 2. Review and group services by type (public or private goods) and user(permit
applicant or general public) after all Building Division services have been listed. The purpose of this
step is to identify which services should be recovered from the specific users and which services benefit
and should be recovered from the general public (State tax revenues). The services provided are direct
services provided to private individuals, with the exception of the MHPIP as noted above, and are
recoverable through permit fees.
Step 3. Identify the funding source for each group of services. In this step, a determination is
made by the jurisdiction regarding how each group of services identified in Step 2 is to be funded. In this
step it is important that there is a nexus between costs and revenues. If the costs were incurred in the
building inspection process, the revenues collected (and allocated) must be to cover those costs, and not
the costs of other services. In the City of San Bernardino, inspection services fees are collected directly
from building permit applicants, with the exception of the mobile home inspection program funds, which are
collected from mobile home park owners as annual permit to operate fees.
Step 4. Estimate the total costs of services to be funded by users. In this step, the costs of
services identified in Step 3 were taken from the City's budget reports and adjusted to account for
departmental and general city overhead. It is the intent of the city that all costs of providing building
inspection and plan examination services be recovered by charging user fees.
Permits issued during one fiscal year may require services in the following fiscal year. For
example, fees may be collected for permits for a housing tract late in the current fiscal year, however, the
inspection services may not be requested until after the start of the next fiscal year or thereafter. Situations
such as this will give the impression that the agency is charging more for building services than it is
spending on them in the first year, when the fees are received. Conversely, in the second year when the
cost of providing the building services is realized it will appear that the agency is not recovering the full cost
18
of providing services. The cost of this "work-in-progress liability" should be noted so that revenues from the
first year can be credited to the second year so that an accurate cost/revenue relationship can be
calculated.
Step 5. Compare total costs to total revenues. This is done on an annual and multi-year basis.
A multi-year analysis will indicate whether losses in some years outweigh overages in other years, whether
the overages outweigh the losses and by how much or whether cost and revenues are reasonably
balanced.
Step 6. Evaluate noted differences between total costs and total revenues. Due to fluctuations
in service demand and permit activity, there may be a surplus of revenues in one year, and a revenue
shortfall the following year. Adjusting fees or services based upon annual activity fluctuations would be
extremely difficult and impractical. Comparing revenues and costs over a multi-year period was considered
as a practical and defensible approach. Another approach to compare costs and revenues is an analysis
over a "building activity cycle". Such an analysis would compare service costs and revenues averaged
over the most recent period in which permit activity level ranged from a period of high activity, through a
period of low activity, and back to a period of high activity. This "building activity cycle" approach results in
averaging costs and revenues over longer periods of time. However, if the cycle is very long, the data
becomes less relevant with age.
If total revenues equal total costs no adjustment to fees is indicated. If total revenues exceeded
total costs, a decrease in fees is indicated. However, before decreasing fees, it is necessary to verify that
consideration has been given to work-in-progress liabilities. Next, the revenue surplus should be averaged
with revenue surpluses or shortages for the number of fiscal years being considered in order to arrive at a
single or multi-year cost recovery average. If the balance is positive after averaging the years being used,
the excess should be used to reduce future fees.
If the average of the years examined produces a revenue surplus, it would be appropriate to
examine the level of service rendered by the department. If the level of service is deemed low, excess
revenues should be used to improve the service level, for example hiring additional departmental personnel
or investing in technology (hardware and software) to increase service delivery or quality. If the service
level is deemed appropriate, then reducing fees may be necessary to comply with Government Code
Section 66016.
The costs used in this section refers to the expenditures made or budgeted for building inspection
services by the City, as well as the Division's proportional share of departmental overhead and city
administrative overhead.
Tables 5A, 56, and 5C in Chapter 5 provide information regarding the Divisional relationship of
cost to revenue over the past 10 years.
19
Uniform Administrative Code Fee Tables
As have most jurisdictions, the City of San Bernardino has historically used the fee tables
contained in the Uniform Administrative Code, published by ICBO. These tables are based on a structure's
use (e.g. business, factory, residential, etc.) and construction type which serves to differentiate buildings
based on size and complexity. The tables provide a fee formula which is based on the construction
valuation of a building. A building's valuation is computed by multiplying the square feet of the building by a
costs/sq. ft. factor. These cost factors, or Building Valuation Data, are published by the International Code
Council (ICC) periodically, and are based on national construction cost averages. The concept of
determining the cost of building department services based on a structure's valuation is based on the
proposition that the valuation of a structure is related to the amount of work to be expended in plan review,
inspections and administering the permit, and that such costs are reasonably related to a building's
complexity and size.
Table 3A. Permit Fee Formula
Building Permit Fee Table
Total Valuation Fee
$1 to$500 $15.00
$501 to$2,000 $15.00 for the first$500 plus$2.00 for each additional$100,or fraction thereof,to and
including$2000.
$45.00 for the first$2,000+$9.00 for each$1,000 or fraction thereof,to and including
52,001 to$25,000 $25,000
$25,001 to$50,000 $252.00 for the first$25,000+$6.50 for each$1,000 or fraction thereof,to and including
$50,000
$50,001 to$100,000 $414.50 for the first$50,000+$4.50 for each$1,000 or fraction thereof,to and including
$100,000
$100,001 to$500,000 $639.50 for the first$100,000+$3.50 for each$1,000 or fraction thereof,to and
including$500,000
$500,001 to$1,000,000 $2,039.50 for the first$500,000+$3.00 for each$1,000 or fraction thereof,to and
including$1,000,000
$1,000,001 and u $3,539.50 for the first$1,000,000+$2.00 for each additional$1,000 or fraction thereof
Source: 1991 Uniform Administrative Code
In order for the use of this method to be valid, a nexus between the fee charged and the service
provided must be established. The Total Cost/Total Revenue methodology provides a basic nexus,
however the method described in the next section provide a much stronger connection.
Average Time/Cost Methodology
The primary goal of this analysis is to provide fees based on the reasonably estimated costs of the
services provided. Therefore, the methodology used to complete this analysis involved collecting and
analyzing data directly from the building inspectors' daily logs to develop average inspection service times.
This was done for various groupings of construction projects for which permits were obtained, and where
20
adequate sample sizes were available to provide a reasonable degree of reliability.
The following steps were taken to estimate reasonable inspection fees for building inspection
services in the City of San Bernardino.
Step 1. All services rendered by the Building Division were identified. The costs of all of the
services analyzed should be recovered through user fee charges.
Step 2. Direct activities and the times required to perform them (i.e. inspector's onsite inspections,
writing correction notices, explaining needed corrections, and completing inspection records),and indirect
activities required to support the services were separated. Examples of support activities are driving to and
from required stops, office, and administrative activities. Average driving and contingent times were
calculated separately from the direct activity times. Nonproductive time, such as leave and training time,
were accounted for in the calculation of the Fully Burdened Hourly Rate for inspections.
Step 3. In the case of residential construction, samples were grouped by size in ranges of 200
square feet, and consisting of sets of approximately 25 homes each. This was done for both tract homes
and custom homes constructed on in-fill lots.
Step 4. Inspection time required to perform the various activities was collected from the inspectors'
daily logs and recorded into tables to be analyzed.
Step 5. The average time required to complete each inspection type in the different size groups
was calculated. The average individual inspection times were aggregated into one average inspection time
for each dwelling size range.
Step 6. The average available workdays for inspectors using the method shown in the
Cost/Recovery Section was calculated.
Step 7. The cost of inspection services using the method shown in the Cost/Recovery Section was
calculated.
Step 8. Non-variable costs and contingent costs identified in the Cost/Recovery Section were
added to calculate the total cost of providing inspections.
Step 9. The fully burdened rate was calculated by dividing the cost of providing inspection services
by the average available working hours in a year.
Step 10. The cost of providing custom and tract home inspection services was calculated by
multiplying the fully burdened hourly rate (in dollars) by the time required to perform the inspection services
including non-variable and contingent costs.
21
Conclusion
The practicability of any methodology to determine the level of fees for services requires the
consideration of, and is limited by, several factors. Two of these, the availability and accuracy of inspection
data, and the time and costs of analysis, are crucial to feasibility and achieving the ultimate goal of a
reliable outcome. It is noted that this study consumed an estimated 2600 labor hours to collect and analyze
the data, and to develop this report. Given this fact, it would not be practical to repeat this process on an
annual basis. Further automation of building inspection processes should make data collection and
analysis much more efficient in the future.
Any annual comparison of the cost of services and the revenues collected to pay for such services
is only a "snapshot in time." The process of adjusting fees in order to match costs with revenues is
extremely dynamic, since both sides of the equation are always in flux. While every attempt should be
made to balance costs with revenues to the degree that is reasonably possible, uncontrollable
circumstances will always be ever-present. Be they weather, changes in staff efficiency or effectiveness,
the quality of tradesmen, changes in inspection mandates, fluctuations in building activity, and the inability
of government to allocate resources quickly when faced with changes in the demand for services, it is
unlikely that the equation will be in balance in any given year. Keeping these variables in mind, it is
apparent that no methodology for determining building services fees can be totally accurate or perfect. Nor
must it be, since the legal mandate for any given fee is that it is reflective of a reasonable estimation of the
cost of the service provided.
22
ti
i
CHAPTER 4- INSPECTIONS
i
Introduction
Any study of the cost of providing building inspections would be meaningless without understanding what
must be accomplished during the inspections and at what level of service they are to be performed.
The Building Inspection Process Section of this chapter lists the items that are inspected during each
inspection, and the Service Level Section explains what is considered a high, medium or low level of service.
Though the California Code is specific regarding when building inspections are to be performed, there is no
model or guidelines detailing the steps to be taken during the individual inspections. For this reason, inspections
and the amounts of time needed to perform them may vary from one jurisdiction to another.
This chapter explains the different building inspections, including their constituent tasks, and why they are
done.
Program Basis
The Building Division of the City of San Bernardino performs 16 different inspections for every dwelling that
is constructed within the City. These inspections have been adopted and are required by the state Department of
Housing and Community Development, the California Building Standards Codes, and the Division and are deemed
necessary to ensure compliance with the provisions of the codes. The individual inspections are listed in
Addendum A in this report along with the items that must be inspected.3
Inspection Variables
There is a large disparity between the number, complexity of, and area occupied by items that must be
inspected during the different building inspections. These variations result in a disparity in the amount of time
needed to perform an inspection. Ultimately the time required determines the cost of providing building inspection
services. For example, reading a gas meter during a gas test can be done while standing in one spot, only
considering whether or not the needle has moved. On the other hand a framing inspection requires understanding
and verifying the use of lumber, the hardware used to fasten it, and the effects of notching or boring the lumber, et
cetera. But even more apt to cause inspection times to vary are corrections that have to be written and explained.
3 Unless otherwise noted in this chapter, the explanations of the building inspections were the result of
interviews with J. Masters, Senior Building Inspector, on December 14, and 15, of 2005.
23
Other tasks such as writing correction notices, explaining what needs to be corrected, and re-inspecting
building components to assure that the corrections were made, seriously impacts the cost of performing each
inspection and ultimately the cost of the building inspection program as a whole.
Conversely, during the inspection process, grouping inspections to increase efficiency and reduce costs by
reducing the amount of time needed for inspectors to perform individual inspections has become an industry
paradigm. Either dissimilar inspections can be performed at the same time or the same inspection can be
performed for two or more structures. During the foundation inspection, inspectors typically verify that the LIFER
(electrical grounding rod) has been installed next to the reinforcing steel. The inspection of the sewer and water
services may or may not occur during the same visit to the jobsite. One of the most common groupings of building
inspections occurs during the final inspection process. Typically the building, plumbing, mechanical, and electrical
finals are performed simultaneously.
Service Level
Knowing which tasks have to be performed is only a part of understanding why building inspections require
the time and effort that they do. To totally understand the inspection process it is necessary to understand the level
of services that are expected. For example, it would be less costly for an inspector to approve roof sheathing or
any other construction component without getting out of his/her vehicle, or from the curb without having to look at
the entire construction component being inspected. Likewise, a plans examiner or building inspector that skipped
over items that did not meet code requirements, or was short with the permit applicants and did not bother to
suggest alternatives to unacceptable construction items, could address more items in a day, but would accomplish
less for the client.
The Table 4A in this section identifies the levels that are considered to be appropriate for the various
objectives listed. Appropriate service levels are listed for both the building inspectors and the plans examiners,
however, the two categories are listed separately to avoid confusion.
The methodologies used in this report were taken from the 1991 City Manager's Department of the League
of California Cities paper entitled, A 'How To' Guide For Assessing Effective Service Levels in California Cities.
While the guide's performance measures and service levels were considered, the methodologies were not strictly
conformed to for this report. Service levels listed in Table 4A, are intended to represent different areas on a service
continuum, with "high" meaning the greatest level of service, "medium" meaning a level of service between high and
"low", and low meaning the lowest level of service. Under Table 4A is an explanation of which of the service levels
is considered to be the building department's appropriate level or minimum standard.
The service level expectations of the Division of the City of San Bernardino are that the building inspectors
will perform their duties at or above the levels identified as medium. However, the goal is to provide effective
service levels identified in Table 4A as high. Discussions with Mr. Masters indicated that the building inspectors
were currently performing at or near the medium service level in all categories.
24
Table 4A.
BUILDING INSPECTION SERVICES
Effective Service Levels for Building Inspectors
Goals:
To ensure that building improvements within the City of San Bernardino are constructed and maintained in compliance
with the city's adopted Health and Safety Codes, Energy Efficiency Standards,Accessibility Regulations and any other
building requirements of the City of San Bernardino, in a timely,efficient and effective manner.
Objectives Quality Characteristics Performance Measures Service Levels
Timely Service Quick inspection Time to complete Inspection requests response time:
process. inspections High:24 hour
Medium: Next day*
Low:48 hour
Missed inspections return time:
High:AM next day
Medium: Preference next day
Low:24 hours
Efficient Service Carry out inspections in Number of inspections per Inspections rate:
an efficient and timely day High: 15+/day
manner to meet the Medium: 12-15/day
needs of and schedules Low: 10/day
of builders. Inspections per Unit
High:7-9
Medium: 10-13
Low: Less than 7 or 13+
Effective Service Detailed inspections by Thorough and accurate Missed items:
knowledgeable inspections High:0
inspectors Medium:0
Low:2+
Correct responses:
High:All
Medium: Once/week research needed
Low: Incorrect information used during
inspections.
Note:For inspections to be scheduled on the next day they should be called-in before 2:00 PM on the previous day.
Conclusion
Any analysis of the reasonableness of building inspection fees to be charged to permit applicants should
take into account the services that are offered, the level of services that are intended to be provided, and whether or
not the services or service levels are at their intended level or need to be improved. If during analysis of building
services it is determined that either the quantity or quality of building inspection services is lacking, additional time
and fees should be allocated in the future to provide proper inspection services and resources. At the conclusion of
this study it was determined that services were at least at a minimum acceptable level and considered adequate
such that no adjustments to inspection times was necessary. However, it is the Division's goal to strive to improve
25
the delivery, breadth, and quality of services provided to the development community and to develop and maintain a
competitive edge, in comparison to other jurisdictions. This is in line with and supportive of the City's goals of
community improvement through business creation and retention,job creation, and improvement and expansion of
the built environment.
26
CHAPTER 5- BUILDING SERVICES DIVISION COST/REVENUE ANALYSIS
Introduction
A multi-year cost/revenue analysis can be done to look for patterns of excess cost recovery or under
recovery. The Total Cost/Total Revenue Methodology is used here as a test of the reasonableness of the
Building Division's fees.
The cost data contained in these tables was obtained from the City of San Bernardino's Budget
Summaries for fiscal years 1998-99 through 2007-08. Revenue data was obtained from reports generated
from the Department's PermitsPlus Database.
TABLE 5A. COSTS VS.REVENUE
COMBINED-BUILDING INSPECTION AND PLAN REVIEW
Fiscal Division Department General City Total Costs Total Shortfall %Over or
Year Budget Actual Overhead Overhead Revenue or Under
Surplus Break Even
Point
1998-99 $ 817,065 $ 147,346 $ 249,397 $ 1,213,808 $868,634 1-1 -28.4
1999-00 $ 778,511 $ 152,348 $ 240,720 $ 1,171,579 $860,719 ! ! ?i -26.5
2000-01 $ 730,716 $ 167,397 $ 232,252 $ 1,130,365 $919,271 -18.7
2001-02 $ 842,517 $ 182,522 $ 265,075 $ 1,290,114 $1,051,134 -18.5
2002-03 $ 1,001,339 $ 161,868 $ 300,805 $ 1,464,012 $1,235,800 12l -15.6
2003-04 $ 961,892 $ 109,661 $ 277,104 $ 1,348,657 $1,266,569 5 5 i -6.1
2004-05 $ 1,103,422 $ 176,146 $ 330,896 $ 1,610,464 $1,913,092 $302,628 18.8
2005-06 $ 1,266,975 $ 197,045 $ 378,596 $ 1,842,616 $2,059,631 $217,015 11.8
2006-07 S 1,357,396 S 218,130 S 407,431 $ 1,982,957 $1,924,589 -2.9
2007-08* $ 1,643,115 $ 180,598 $ 471,612 $ 2,295,325 $1,368,000 ` ,%.''?i -40.4
Ten Year
Average: -12.7
27
TABLE 5B. COST VS.REVENUE
PLAN REVIEW
Fiscal Division Department General City Total Costs Total Shortfall or %Over or
Year Budget Actual Overhead Overhead Revenue Surplus Under
Break Even
Point
1998-99 $ 310,613 $ 8,939 $ 95,566 $ 465,118 $238,667 2j .a !'! -48.7
1999-00 $ 300,151 $ 60,939 $ 93,378 $ 454,468 $274,832 17 ,! t? -39.5
2000-01 $ 256,458 $ 55,799 $ 80,750 $ 393,007 $257,688 1' I -34.4
2001-02 $ 248,433 $ 60,841 $ 79,978 $ 389,252 $323,320 (56�.�+ '_i -16.9
2002-03 $ 358,767 $ 53,956 $ 106,730 $ 519,453 $379,146 (S 140,10, -27.0
2003-04 $ 325,496 $ 36,554 $ 93,626 $ 455,676 $417,558 I I ; -8.4
2004-05 S 415,832 $ 58,715 $ 122,718 $ 597,265 $558,579 ' .(1 1 -6.5
2005-06 $ 417,491 S 57,954 $ 122,950 $ 598,395 $813,207 $214,812 35.9
2006-07 $ 306,215 $ 60,592 $ 94,856 $ 461,663 $644,222 $182,559 39.5
2007-08* $ 412,451 $ 50,166 $ 119,633 $ 582,250 $503,000 �- !�i -13.6
Ten Year Average -12.0
TABLE 5C. COST VS.REVENUE
BUILDING INSPECTION
Fiscal Division Department General City Total Costs Total Shortfall or %Over or
Year Budget Actual Overhead Overhead Revenue Surplus Under
Break Even
Point
1998-99 $ 506,452 $ 88,408 $ 153,831 $ 748,691 $ 629,967 1 1S,7-14) -15.9
1999-00 $ 478,360 $ 91,409 $ 147,342 $ 717,111 $ 585,887 (51,1,??-1) -18.3
2000-01 $ 474,258 $ 111,598 $ 151,502 $ 737,358 $ 658,555 (ti-1 S'S0,) -10.7
2001-02 $ 594,084 $ 121,682 $ 185,097 $ 900,863 $ 720,029 -20.1
2002-03 S 642,572 $ 107,912 S 194,075 $ 944,559 $ 847,447 "- I I' -10.3
2003-04 $ 636,396 $ 73,107 $ 183,477 $ 892,980 $ 854,295 -4.3
2004-05 $ 687,590 $ 117,431 $ 208,178 $ 1,013,199 $ 1,354,514 $341,315 33.7
2005-06 $ 849,484 $ 139,090 $ 255,645 $ 1,244,219 $ 1,246,424 $2,205 0.2
2006-07 $ 1,051,181 $ 157,538 $ 312,575 $ 1,521,294 $ 1,280,367 -11'.. 1 -1 -15.8
2007-08* $ 1,230,664 $ 130,432 $ 351,979 1 $ 1,713,075 1 $ 865,000 ('�-l.ti.(17 ) -49.5
*Projected as of 3131108 Ten Year Average -11.1
Notes: 1. Dept OIH is computed as the ratio of divisional employees to departmental employees multiplied by the administrative budget amount.
2. General City Overhead-(Div.Budget+Dept OIH)X.2586
3. Total Divisional Costs=Div.Budget+Dept OIH+City OIH
28
As noted in the above tables, with the exception of two years of peak construction activity, revenues
have been below cost recovery in eight of the past ten years. During the two peak years increased inspection
demand and a staffing shortage resulted in excess revenues.
To determine the Building Division's proportional share of department overhead the department's
administrative expenditures are multiplied by the ratio of divisional employees to departmental employees and
is summarized in the following table.
Table 5D DEPARTMENT OVERHEAD ATTRIBUTABLE TO THE COMBINED DIVISION
Fiscal Year • of Division - • Admin. Budget Dept. Overhead
Employees •
1998-99 15 90 $ 884,078 $ 147,346
1999-00 15 89 $ 903,934 $ 152,348
2000-01 15 88 $ 982,063 $ 167,397
2001-02 15 91 $ 1,107,303 $ 182,522
2002-03 15 92 $ 992,788 $ 161,868
2003-04 15 91.25 $ 667,103 $ 109,661
2004-05 15 67.5 $ 792,658 $ 176,146
2005-06 17 74.25 $ 860,622 $ 197,045
2006-07 18 79.25 $ 960,376 $ 218,130
2007-08* 1 18 1 81.25 1 $ 815,200 t $ 180,598
`Projected as of 3131108
Notes: 1.Dept O/H is computed as the ratio divisional employees to departmental employees multiplied by the Admin.Division costs.
General City Overhead costs noted in Tables 5A—5C represent the Building Division's portion of the
City's administration cost (i.e. city management, city attorney, payroll, risk management, etc). The portion
attributable to the Building Inspection Division is calculated by multiplying the overhead factor(0.2586) by the
sum of the Building Division budget plus department overhead. The overhead factor of 0.2586 was
determined in the City's Cost Allocation Plan and provided by the City Manager's Office.
Conclusion
The cost and revenue figures shown in Tables 5A-5C in this chapter illustrate that neither costs nor
revenues remain constant from one year to another. The balance between costs and revenues fluctuates from
year to year based primarily on two factors, 1) The ebb and flow of construction activity, and 2) fluctuations in
costs due to the City's efforts to adjust resources to meet changing inspection demand.
29
i
CHAPTER 6— NEW RESIDENTIAL TIME AND COST STUDY
Introduction
Since 2001, and with the exception of the last 2 quarters, housing construction has been a significant
portion of overall construction activity in the City. Residential housing construction takes three forms; new
tract homes, new infill homes, and additions or alterations to existing homes. In order to arrive at a fee
structure for residential construction that is based on estimated reasonable costs, a review of each of these
forms of residential construction is undertaken in this chapter.
Tract Home Inspection Times
The Division's building inspectors complete a daily activity log which includes arrival and departure
times for inspections. In addition, they currently complete a scantron form after each inspection which is used
to upload the inspection results into the PermitsPlus database. Scantron forms also include elapsed time
entries. The data for the tables compiled in this chapter was collected from these two sources.
In addition to inspection times, other labor time necessary to the inspection process must be
accounted for and recorded. For example, "non-variable constant time" (as noted in the tables) represents
indirect activities that are needed to perform building inspections and includes "drive time". Drive time is the
product of the average time needed to complete a trip from the inspector's office to an inspection site or from
one site to another, multiplied by the number of trips necessary to complete the inspection process for the
structure. Both the average trip time and average number of trips per home were determined. Both surveys
are contained in Addendum B at the end of the report.
The building inspections that are required for new homes are listed in the tables along with their
average times. In addition, the average "re-inspection"time is included. When an inspector finds deficiencies
on a jobsite he/she is required to issue a Correction Notice and the work must be reinspected at a later date
once the corrections are made by the builder. "Additional Contingency &Average Reserve Time" is taken from
the Paladin Report. The last item is also an allowance for extraordinary or atypical amounts of time that are
occasionally required during building inspections but that do not routinely occur. This item was taken from the
Paladin Report prepared by Dick McCarthy of Paladin Group resulting from discussions with local building
officials in the San Bernardino area, received June 13, 2005 by the City of San Bernardino. At the bottom of
each table all direct and indirect time measurements required for the building inspection process are totaled.
These represent average times derived from the sample sets.
The average total inspection times calculated in these tables is used later in this study to calculate the
cost of providing inspection services and to develop a fee schedule for tract homes.
30
I
6
TABLE 6A
Building Inspection Times for Tract Homes - 1600-1800 Sq. Ft.
NON-VARIABLE CONSTANT TIME Minutes Equiv't Hours
Drive Time* 24 0.42
INSPECTION TYPE:
Building Final 12 0.20
Plumbing Final 5 0.08
Mechanical Final 6 0.10
Excavation/Forms/Steel/Footing 14 0.23
Underground Plumbing 8 0.13
Building Slab Grade 6 0.10
Roof Sheathing 16 0.27
Shear Nail 26 0.43
Combo: Framing/Ventilation 19 0.32
Rough HVAC Mechanical 8 0.13
Rough Electrical 7 0.12
Rough Plumbing/Vents 7 0.12
Elect LIFER 0 0
Insulation Certification 10 0.17
Stucco Mesh Exterior Siding 11 0.18
Stucco Scratch Coat 5 0.08
Stucco Brown Coat 5 0.08
Sewer/Sewage Disposal 2 0.03
Water Service 2 0.03
Roofing Application 16 0.27
Drywall Nailing 17 0.28
Gas Line Test 5 0.08
Electric Service 11 0.18
Electrical Final 12 0.20
Re-inspections** 13 0.22
Additional Contingency &Average Reserve 60 1.00
Total Inspection Time 327 5.45
Drive Time:3 Trips X 7.98 Minutes per Trip=24 Minutes.
"Re-inspection Time was taken from the inspection time study performed earlier and contained in the addendum of this report.The re-inspection
time is equal to 13 minutes.
31
TABLE 6B
Building Inspection Times for Tract Homes - 1800-2000 Sq. Ft.
NON VARIABLE
CONSTANT TIME Minutes Equiv't Hours
Drive Time Reserve 24 0.40
INSPECTION TYPE:
Building Final 13 0.22
Plumbing Final 7 0.12
Mechanical Final 7 0.12
Excavation/Forms/Steel/Footing 12 0.20
Underground Plumbing 8 0.13
Building Slab Grade 8 0.13
Roof Sheathing 16 0.27
Shear Nail 20 0.33
Combo: Framing/Ventilation 13 0.22
Rough HVAC Mechanical 7 0.12
Rough Electrical 6 0.10
Rough Plumbing/Vents 6 0.10
Elect UFER 0 0
Insulation Certification 7 0.12
Stucco Mesh Exterior Siding 12 0.20
Stucco Scratch Coat 6 0.10
Stucco Brown Coat 6 0.10
Sewer/Sewage Disposal 5 0.08
Water Service 4 0.07
Roofing Application 16 0.27
Drywall Nailing 12 0.20
Gas Line Test 5 0.08
Electric Service 9 0.15
Electrical Final 11 0.18
Re-inspection Time 17 0.25
Additional Contingency and Average Reserve 60 1.00
Total Inspection Time 317 5.28
'Driving Time-Average 3 Trips x 7.98 Minutes per Trip=24 minutes.
"Re-inspection Time was taken from the inspection time study performed earlier and contained in the addendum of this report.The re-inspection
time is equal to 17 minutes.
32
TABLE 6C
Building Inspection Times for Tract Homes - 2000-2200 Sq. Ft.
NON-VARIABLE CONSTANT TIME Minutes Equiv't Hours
Drive Time Reserve 24 0.40
INSPECTION TYPE:
Building Final 14 0.23
Plumbing Final 7 0.12
Mechanical Final 7 0.12
1 Excavation/Forms/Steel/Footing 13 0.22
Underground Plumbing 8 0.13
Building Slab Grade 6 0.10
Roof Sheathing 17 0.28
Shear Nail 28 0.47
Combo: Framing/Ventilation 19 0.32
Rough HVAC Mechanical 9 0.15
Rough Electrical 9 0.15
Rough Plumbing/Vents 9 0.15
Elect LIFER 0 0
Insulation Certification 10 0.17
Stucco Mesh Exterior Siding 12 0.20
Stucco Scratch Coat 8 0.13
Stucco Brown Coat 6 0.10
Sewer/Sewage Disposal 2 0.03
Water Service 2 0.03
Roofing Application 16 0.27
Drywall Nailing 18 0.30
Gas Line Test 9 0.15
Electric Service 18 0.30
Electrical Final 11 0.18
Re-inspection Time 35 0.58
Additional Contingency and Average Reserve 60 1.00
Total Inspection Time 377 6.29
'Driving Time-Average 3 Trips x 7.98 minutes per Trip=24 Minutes.
"Re-inspection Time was taken from the inspection time study performed earlier and contained in the addendum of this report.The re-inspection
time is equal to 35 minutes.
33
TABLE 6D
Building Inspection Times for Tract Homes -2200-2400 Sq. Ft.
NON-VARIABLE CONSTANT TIME Minutes Equiv't Hours
Drive Time Reserve 24 0.40
INSPECTION TYPE:
Building Final 20 0.33
Plumbing Final 9 0.15
Mechanical Final 9 0.15
Excavation/Forms/Steel/Footing 16 0.27
Underground Plumbing 10 0.17
Building Slab Grade 7 0.12
Roof Sheathing 21 0.35
Shear Nail 31 0.52
Combo: Framing/Ventilation 21 0.35
Rough HVAC Mechanical 10 0.17
Rough Electrical 10 0.17
Rough Plumbing/Vents 10 0.17
Elect UFER 0 0
Insulation Certification 11 0.18
Stucco Mesh Exterior Siding 14 0.23
Stucco Scratch Coat 10 0.17
Stucco Brown Coat 6 0.10
Sewer/Sewage Disposal 3 0.05
Water Service 4 0.07
Roofing Application 16 0.27
Drywall Nailing 18 0.30
Gas Line Test 9 0.15
Electric Service 18 0.30
Electrical Final 12 0.20
Re-inspections" 32 0.53
Additional Contingency and Average Reserve 60 1.00
Total Inspection Time 411 6.85
`Driving Time-Average 3 Trips x 7.98 Min per Trip=24 Minutes.
"Re-inspection Time was taken from the inspection time study performed earlier and contained in the addendum of this report.The re-inspection
time is equal to 32 minutes.
34
i
TABLE 6E
Building Inspection Times for Tract Homes - 2400-2600 Sq. Ft.
NON-VARIABLE CONSTANT TIME Minutes Equiv't Hours
Drive Time 24 0.40
INSPECTION TYPE:
Building Final 16 0.27
Plumbing Final 8 0.13
Mechanical Final 9 0.15
Excavation/Forms/Steel/Footing 13 0.22
Underground Plumbing 8 0.13
Building Slab Grade 7 0.12
Roof Sheathing 18 0.30
Shear Nail 30 0.50
Combo: Framing/Ventilation 20 0.33
Rough HVAC Mechanical 10 0.17
Rough Electrical 10 0.17
Rough Plumbing/Vents 10 0.17
Elect UFER 0 0
Insulation Certification 13 0.22
Stucco Mesh Exterior Siding 13 0.22
Stucco Scratch Coat 8 0.13
Stucco Brown Coat 7 0.12
Sewer/Sewage Disposal 4 0.07
Water Service 4 0.07
Roofing Application 16 0.27
Drywall Nailing 20 0.33
Gas Line Test 7 0.12
Electric Service 20 0.33
Electrical Final 12 0.20
Re-inspections" 41 0.68
Additional Contingency and Average Reserve 60 1.00
Total Inspection Time 408 6.80
I
Driving Time-Average 3 Trips @ 7.98 Min per Trip=24 Minutes
"Re-inspection Time was taken from the inspection time study performed earlier and contained in the addendum of this report.The re-inspection
time is equal to 41 minutes.
35
The chart below illustrates growth in average inspection times compared to changes in home sizes for
the fairly narrow overall floor area range of 1600 to 2600. The overwhelming majority of homes built in recent
years fell within this overall size range. Thus, it was not feasible to create sample sets of larger and smaller
homes since an adequate sample size was not available.
FIGURE 6-F— Inspection Time Deviation Based on Size—Tract Homes
Inspection Hours
7.00 6.85 6.80
6:29 --
6.00 5.45 5.28
5.00
4.00
3.00 MInspection Hours
2.00
1.00
0.00
1600- 1800- 2000- 2200- 2400-
1800 2000 2200 2400 2600
Home Size Ranges
The first inspection time (5.45 hours) and the last (6.80 hours) were used to calculate the change in
inspection times as home sizes changed.
Table 6F below lists the incremental change in inspection times based on incremental changes in
structure square footage for tract homes. The table was laid-out with home sizes divided into 100 square foot
increments. The 100 square foot increments are considered to be the minimum change in structure size
required to change the amount of effort needed to inspect the additional square footage.
The following steps were used to analyze the changes in inspection times:
Step 1. A deviation in inspection times was calculated by subtracting the minimum home inspection
hours (5.45) from the maximum home inspection hours (6.80), taken from Figure 6-1. The difference in the
maximum inspection time compared to the minimum inspection time is 1.35 hours.
Step 2. The 1.35 hour deviation in inspection times was divided by the number 8 (the number of 100 sf
increments from the midpoint of the first sample range(1700) to the midpoint of the last(2500))to calculate the
incremental change in inspection times for each increase in home size. The product of this calculation is
0.16875 of an hour.
36
Step 3. The 2100 square foot home size, with an indicated 6.29 hour inspection time, was chosen as a
beginning point.
Step 4. As the square footage increased or decreased by 100 square feet, 0.16875 of an hour was
added to or subtracted from the previous figure, until a minimum of 1400 square foot and maximum of 6100
square foot had been reached.
TABLE 6G
INSPECTION TIME BY SIZE - TRACT HOMES
SQ.FT.- Hours SQ.FT.- Hours SQ.FT.- Hours
1400-5.11 3000- 7.81 4600- 10.51
1500-5.28 3100-7.98 4700- 10.68
1600-5.45 3200-8.15 4800- 10.85
1700-5.62 3300-8.32 4900- 11.02
1800-5.78 3400-8.48 5000- 11.18
1900-5.95 3500-8.65 5100- 11.35
2000-6.12 3600-8.82 5200- 11.52
2100-6.29 3700-8.99 5300- 11.69
2200-6.46 3800-9.16 5400- 11.86
2300-6.63 3900-9.33 5500- 12.03
2400-6.80 4000-9.50 5600- 12.20
2500-6.97 4100-9.66 5700- 12.37
2600-7.13 4200-9.83 5800- 12.53
2700 - 7.30 4300- 10.00 5900- 12.70
2800-7.47 4400- 10.17 6000 - 12.87
2900-7.64 4500- 10.34 6100- 13.04
In-fill (custom) Home Inspection Times:
Building inspections for single family residences built on in-fill lots (i.e. custom homes) have been
analyzed separately from tract home building inspections. Certain economies of scale exist for tract homes
that result in lower inspection time, and ultimately lower inspection costs, as compared to in-fill homes. For
example, a typical instance where economies of scale come into play is with a series of tract home building
inspections involving multiple gas line tests performed at one time. During gas line tests, an inspector will
check one pressure meter to be sure the system has 10 pounds of pressure in it. Then the inspector will walk
to the next house, repeating this process of verifying the pressure for as many times as he can and still be
back at the first meter within 15 minutes. He then verifies that the gas system has held its pressure for the
required 15-minute period. If 5 meters can be read in 15 minutes the inspector has only spent 3 minutes per
meter. However, unlike the tract homes where it is convenient to walk from one to the other, in-fill homes are
typically blocks or miles apart. Therefore, for in-fill homes each meter takes the full 15 minutes to read. If the
inspector has nothing else that he can inspect while he is waiting for the 15-minutes to pass there are no
economies of scale available. Likewise, driving times spent in route to and from tracts is allocated to multiple
37
units, as opposed to single in-fill buildings, where driving time from one property to the next is the sole burden
of the single in-fill building. Finally, an economy of scale exists when an inspector has becomes familiar with a
tract home's floor plan and is able to perform repeated inspections of additional homes of the same model. As
he becomes familiar with a set of plans, his preparatory time spent reviewing the plans prior to each inspection
declines. It is a common assumption within the building industry that tract homes, on a per home basis overall,
require less time to inspect and, therefore, have a lower inspection cost than do homes on in-fill lots. This
analysis has verified the validity of this assumption.
Tables 6H to 6K summarize the data collected regarding building inspection times for infill homes.
The data used in this portion of the study is for the period from January 1, 2000 to October 15, 2005. The On-
site Inspection Time Study worksheets are contained in Addendum D located at the end of this report.
The Drive Time listed in the tables below("non-variable constant time,") was significantly greater for
infill homes. The average number of trips was 31 and the average trip time was 7.98 minutes. Thus, total
average drive time was 247.38 minutes (31 Trips X 7.98 minutes).
The market for new homes controls both the size and quality of homes that builders are willing to
construct. Most of the available in-fill lots within the City over the past few years have been located in older
areas that on par result in lower sales prices than tract homes. Thus, due to economic conditions, infill homes
built during this period on average tended to be smaller than tract homes. As a consequence, there was a
lack of data available to construct sample sets for many of the larger home sizes studied in the tract home
section of this report. Of the four sample sets constructed, only the 1200-1400 square foot and the 1400-1600
square foot size sample sets had enough data to include twenty-five homes in each set. In the 1600-2400
square foot sample set only twenty records were found. Finally, in the 2600+-sample set only seven records
were found.
38
i
a
Table 6H
Building Inspection Time— Infill Homes - 1200-1400 SQ.FT.
NON-VARIABLE CONSTANT TIME Minutes Equiv't Hours
Drive Time* 247 4.12
I
INSPECTION TYPE:
Building Final 18 0.30
Plumbing Final 9 0.15
Mechanical Final 9 0.15
Excavation/Forms/Steel/Footing 23 0.38
Underground Plumbing 20 0.33
Building Slab Grade 9 0.15
Roof Sheathing 16 0.27
Shear Nail 22 0.37
Combo: Framing/Ventilation 23 0.38
Rough HVAC Mechanical 13 0.22
Rough Electrical 11 0.18
Rough Plumbing/Vents 11 0.18
Insulation Certification 12 0.20
Stucco Mesh Exterior Siding 13 0.22
Stucco Scratch Coat 9 0.15
Stucco Brown Coat 9 0.15
Sewer/Sewage Disposal 10 0.17
Water Service 8 0.13
Roofing Application 16 0.27
Drywall Nailing 12 0.20
Gas Line Test 17 0.28
Electric Service 15 0.25
Electrical Final 11 0.18
Building Other 0 0
Re-inspections** 136 2.27
Additional Contingency &Average Reserve 60 1.00
Total Inspection Time 759 12.65
"Re-inspection Time was calculated by totaling each individual property's inspection time and dividing that figure by the number of inspections in
the data set.
39
Table 61
Building Inspection Time— Infill Homes - 1400-1600 Sq.Ft.
NON-VARIABLE CONSTANT TIME Minutes Equiv't Hours
Drive Time 247 4.12
INSPECTION TYPE:
Building Final 18 0.30
Plumbing Final 7 0.12
Mechanical Final 9 0.15
Excavation/Forms/Steel/Footing 23 0.38
Underground Plumbing 15 0.25
Building Slab Grade 10 0.17
Roof Sheathing 16 0.27
Shear Nail 21 0.35
Combo: Framing/Ventilation 15 0.25
Rough HVAC Mechanical 8 0.13
Rough Electrical 7 0.12
Rough Plumbing/Vents 9 0.15
Insulation Certification 11 0.18
Stucco Mesh Exterior Siding 12 0.20
Stucco Scratch Coat 10 0.17
Stucco Brown Coat 10 0.17
Sewer/Sewage Disposal 11 0.18
Water Service 9 0.15
Roofing Application 16 0.27
Drywall Nailing 17 0.28
Gas Line Test 14 0.23
Electric Service 20 0.33
Electrical Final 11 0.18
Building Other 25 0.42
Re-inspection Time 130 2.17
Additional Contingency and Average Reserve 60 1.00
Total Inspection Time 761 12.68
"Re-inspection Time was calculated by totaling each individual property's inspection time and dividing that figure by the number of inspections in
the data set.
40
Table 6J
Building Inspection Time— Infill Homes - 1600-2600 Sq.Ft.
NON-VARIABLE CONSTANT TIME Minutes Equiv't Hours
Drive Time 247 4.12
INSPECTION TYPE:
Building Final 17 0.28
Plumbing Final 8 0.13
Mechanical Final 8 0.13
Excavation/Forms/Steel/Footing 24 0.40
Underground Plumbing 13 0.22
Building Slab Grade 11 0.18
Roof Sheathing 24 0.40
Shear Nail 33 0.55
Combo: Framing/Ventilation 24 0.40
Rough HVAC Mechanical 11 0.18
Rough Electrical 12 0.20
Rough Plumbing/Vents 12 0.20
Insulation Certification 12 0.20
Stucco Mesh Exterior Siding 11 0.18
Stucco Scratch Coat 10 0.17
Stucco Brown Coat 12 0.20
Sewer/Sewage Disposal 15 0.25
Water Service 11 0.18
Roofing Application 16 0.27
Drywall Nailing 17 0.28
Gas Line Test 14 0.23
Electric Service 20 0.33
Electrical Final 11 0.18
Building-Other 18 0.30
Re-inspection Time 172 2.87
Additional Contingency and Average Reserve 60 1.00
Total Inspection Time 843 14.05
"Re-inspection Time was calculated by totaling each individual property's inspection time and dividing that figure by the number of inspections in
the data set.
41
Table 6K
Building Inspection Time— Infill Homes - 2600 Sq.Ft. and up
NON-VARIABLE CONSTANT TIME Minutes Equiv't Hours
Drive Time 247 4.12
INSPECTION TYPE:
Building Final 35 0.58
I Plumbing Final 14 0.23
Mechanical Final 14 0.23
Excavation/Forms/Steel/Footing 38 0.63
Underground Plumbing 20 0.33
Building Slab Grade 15 0.25
Roof Sheathing 21 0.35
Shear Nail 44 0.73
Combo: Framing/Ventilation 24 0.40
Rough HVAC Mechanical 12 0.20
Rough Electrical 12 0.20
Rough Plumbing/Vents 11 0.18
Elect LIFER 0
Insulation Certification 17 0.28
Stucco Mesh Exterior Siding 20 0.33
Stucco Scratch Coat 11 0.18
Stucco Brown Coat 15 0.25
Sewer/Sewage Disposal 22 0.37
Water Service 0
Roofing Application 16 0.27
Drywall Nailing 27 0.45
Gas Line Test 9 0.15
Electric Service 25 0.42
Electrical Final 41 0.68
Building-Other 4 0.07
Miscellaneous Plmg, Mech, and Elect. 5 0.83
Re-inspection Time 213 3.55
Additional Contingency and Average Reserve 60 1.00
Total Inspection Time 992 16.53
"Re-inspection Time was calculated by totaling each individual property's inspection time and dividing that figure by the number of inspections in
the data set.
42
The chart below illustrates growth in average inspection 'times as the home size ranges increase.
FIGURE 6-L— Inspection Time Deviation Based on Size— Infill Homes
Inspection Time Hours
18.00 16.53
16.00 0�
14.00 12.65 12.69
12.00
10.00 ❑Inspection Time Hours
8.00
6.00
4.00
2.00
0.00 -- - - - - - --
1200-14001400-16001600-2600 2600+
Home Square Footage
Table 6M below shows the incremental change in inspection times based on incremental changes in
structure square footage for in-fill homes.
The following steps were used to analyze the changes in inspection times.
Step 1. Incremental changes in inspection times were calculated by subtracting the minimum home
inspection time (12.65 hours) from the maximum home inspection time (16.53 hours) indicated in Tables 6G
through 6J. The difference in the minimum inspection time and the maximum inspection time is 3.88 hours.
Step 2. The deviation in inspection times was divided by the number of home sizes (13), between the
1300 square foot point (the midpoint of the 1200 to 1400 square foot range) and the 2600 square foot point on
the chart below. This calculation provides an increment of 0.2985 hours change in inspection time for every
100 square foot change in home size.
Step 3. The 1300 square foot home size was chosen as a beginning point with the 12.65 hour
inspection time for that size home, indicated by the previous inspection time survey, used as the bench mark
inspection time.
Step 4. M Increments of 0.2985 of an hour were added as the home sizes increased and subtracted
as the home sizes decreased.
43
TABLE 6M - INSPECTION TIME BY SIZE - INFILL HOMES
SQ.FT.- Hrs SQ.FT.- Hrs SQ.FT.- Hrs SQ.FT.- Hrs
1200- 12.35 2900- 17.43 4600-22.50 6300-27.58
1300- 12.65 3000- 17.72 4700-22.80 6400-27.87
1400- 12.95 3100- 18.02 4800-23.10 6500-28.17
1500 - 13.25 3200- 18.32 4900-23.40 6600-28.47
1600- 13.55 3300- 18.62 5000-23.69 6700-28.77
1700- 13.84 3400- 18.92 5100-23.99 6800-29.07
1800- 14.14 3500- 19.22 5200-24.29 6900-29.37
1900- 14.44 3600- 19.52 5300-24.59 7000-29.66
2000- 14.74 3700- 19-81 5400-24.89 7100-29.96
2100- 15.04 3800-20.11 5500-25.19 7200-30.26
2200- 15.34 3900-20.41 5600-25.49 7300-30.56
2300- 15.64 4000-20.71 5700-25.78 7400-30.86
2400- 15.93 4100-21.01 5800-26.08 7500 -31.16
2500- 16.23 4200-21.31 5900-26.38 7600-31.45
2600- 16.53 4300-21.61 6000-26.68 7700-31.75
2700- 16.83 4400-21.90 6100-26.98 7800-32.05
2800- 17.13 4500-22.20 6200-27.28 7900-32.35
Residential Additions
To arrive at a reasonable cost recovery charge (permit fee) for residential room additions, room
addition permits records were reviewed. Inspection times required to complete the building inspection process
were collected and analyzed. An average per square foot cost was computed separately for additions without
plumbing and those with a bathroom and/or kitchen. This data is included in Addendum E.
The City's percentage and dollar gain or loss was calculated from the sample set by subtracting the
cost of performing the inspections from the fees collected. This analysis revealed that the City averaged a
loss of three hundred eighty-two dollars per addition inspected, equal to a forty nine percent recovery rate for
the cost of building inspection services.
The findings indicate that the most reasonable fee structure for recovering the City's costs of
inspection services is to establish a fee of$1.39 per square foot for additions without baths and $1.54 per
square foot for room additions with a bath and/or kitchen, and to set a minimum inspection fee of three
hundred dollars. Very large room additions will likely require the level of inspections as that of a new infill
home. Therefore, it is appropriate to harmonize the fee structure for large room additions with the fee
structure for new infill homes. Therefore, in the case of room additions of 1200 square feet and larger the
suggested fee should be congruent with the fees charged for an infill home of equivalent size.
44
Conclusion
In this chapter the associated inspection times for residential construction were documented for all
required inspections. The next step involved in calculating the suggested building permit fees is to calculate
the fully burdened hourly rate (FBHR) for building inspectors, which is the subject of the next chapter. The fee
determination process culminates in the fee tables in Chapter 8. The fees included in the tables represent the
product of the indicated inspection times for each home size multiplied by the FBHR.
45
CHAPTER 7 - FULLY BURDENED HOURLY RATE
Introduction
The hourly cost of building inspection services, typically expressed as the Fully Burdened Hourly
Rate (FBHR)I, takes into account the direct and indirect costs of the Building Division, the Development
Service's Department overhead costs, and the city's administrative overhead.
The Building Division's administrative costs consist of the costs associated with the administration
of the division, also referred to as indirect administrative costs of providing building inspection services. The
Development Services Department overhead consists of the department's administrative costs attributable
to Building Inspection. City overhead consists of the proportion of administrative costs incurred by the
City's Administration Department and other support departments (i.e. City Attorney, Finance, Fleet, etc)
attributable to Building Inspection.
Annual Available Hours - Building Inspection
The number of hours actually spent performing building inspections or plan examinations are
referred to in this report as the "Annual Available Inspection Hours". These consist of the "total possible
hours" (the number of workdays in a year times the number of hours in a workday), minus "Support Hours"
(sick, travel, holiday, meeting and training, office, and jury duty time). Once the annual available inspection
hours have been calculated they are used to calculate the Fully Burdened Hourly Rate (FBHR) for the
building inspectors and plans examiners.
Interns and employees still within their six-month probationary period are not eligible for sick leave,
vacation leave, holiday leave, or jury duty leave and have not been included on the worksheets for these
categories of leave. Three of the building division staff members, the Building Official, Building Inspection
Supervisor, and Secretary, are not included on the Support Hours worksheets because their time will be
accounted for by adding the cost of their services to the direct labor costs of the building inspectors and
plan examiners.
Sick Leave. The "Sick Leave Worksheet," presented in the addendum of this report, contains
actual sick leave hours, taken from the Building Official's daily attendance log. The sample sets contained
in the worksheets consist of each eligible employee's hours of sick leave taken over three one-year periods
by the building inspectors and plans examiners. Sick leave for administrative staff(Joe Lease, Brenda
Leggitt, and Jack Masters) was not included in the annual average sick leave hours because they do not
perform inspections and the value of their services are accounted for in the expense portion of this report.
The annual totals are averaged to arrive at an average sick leave time per building inspector or plans
examiner and are shown in Table 7A.
' The "Fully Burdened Hourly Rate" (FBHR) for either the Building Inspection Division or the Plan
Examination Division is calculated by dividing the Cost of Building Inspection Services by the
Division's Annual Available Hours (DAAH) .
46
Table 7A Three-year Sick Leave Table
Building Inspectors Plan Examiners
FY 2002/2003 91.04 40.05
FY 2003/2004 83.89 63.22
FY 2004/2005 76.26 96.00
Total 251.19 199.27
3 Year Average 83.73 66.42
Vacation Leave. The "Vacation Leave Worksheet," presented in the addendum of this report,
contains actual vacation leave hours, taken from the building official's daily attendance log. The sample
sets contained in the worksheets consist of each eligible employee's hours of vacation leave taken over
three one-year periods by the building inspectors and plans examiners. The annual totals are averaged to
arrive at an average vacation-leave time per building inspector or plans examiner as depicted in Table 7B.
Table 7B Three-year Vacation Leave Table
Building Inspectors Plan Examiners
FY 2002/2003 120.50 110.86
FY 2003/2004 125.98 89.50
FY 2004/2005 114.73 74.11
Total 361.21 274.47
3 Year Average 120.40 91.49
Holiday Leave. Holiday Leave Time taken by building inspectors and plans examiners is separate
from vacation time given to city employees in accordance with the General Unit Employees' Memorandum
of Understanding. Employees receive ninety-six (96) holiday hours each year.
Meeting and Training Leave. The "Meeting and Training Time Worksheet," presented in the
addendum of this report, contains actual meeting and training hours, taken from the Building Division's
annual training schedules and the building inspector's or plans examiner's daily job logs over three one-
year periods by the building inspectors and plans examiners. The annual totals are averaged to arrive at
an average meeting and training time per building inspector or plans examiner as depicted in Table 7C.
Table 7C Three-year Meeting and Training Table
Building Inspectors Plan Examiners
FY 2002/2003 110.22 148.19
FY 2003/2004 110.62 110.00
FY 2004/2005 113.71 107.30
Total 334.55 365.49
3 Year Average 111.52 121.83
47
Administrative/Compensation/Jury Duty Leave. The "Administrative/Compensation/Jury Duty
Worksheet" contained in the addendum was used to calculate average times for Administrative Leave
Time, Compensation Leave Time and Jury Duty Leave Time as a group due to the infrequence of their use.
This worksheet contains actual hours, taken from the building official's daily attendance log. The annual
totals are averaged to arrive at an Average Administrative/Compensation/Jury Duty Times per building
inspector or plans examiner and are depicted in Table 32.
Table 7D Three-year AdminlComplJury DutylTable
Building Inspectors Plan Examiners
FY 2002/2003 12.50 10.50
FY 2003/2004 3.60 10.00
FY 2004/2005 13.90 11.44
Total 30.00 39.94
3 Year Average 10.00 13.31
Total Leave Time before Office Hours. The leave hours presented above were used to calculate
the "Total Leave Time before Office Hours." The Total Leave Time before Office Hours was then
subtracted from the Yearly Total Possible Hours to calculate the Annual Available Hours Before Office
Time. This total was used to calculate the Office Time figure used in this report.
The building inspector's job requires that inspectors spend time in the office both in the morning
and in the evening. In the mornings, they organize inspections for the day, and in the evening, they file
documents and perform code research, answer and return phone calls, and record and file forms filled out
during the day.
Office Time. Data used to calculate the average daily office time were taken from the inspector's
daily logs and inserted into the Office Hours Worksheets in order to calculate three one-year average daily
office time per inspector figures.
The average office time required by building inspectors was derived by totaling the building
inspectors' daily office hours for each year of a three-year period and dividing them by the number of days
for which office hours were reported. The averages were compared to arrive at a "final average daily office
time"for building inspectors. For Fiscal Year 2002/2003 the average daily office time was 2.51 hours. For
Fiscal Year 2003/2004 the average daily office time was 2.24 hours. For Fiscal Year 2004/2005 the
average daily office time was 1.98 hours. The average daily office time per inspector of 1.98 hours was
rounded to 2 hours per day and then multiplied by 0.5 to adjust for time savings in the future resulting from
technology upgrades resulting in an estimated one hour per day of office time per inspector. The one hour
per day figure was then multiplied by 207 days (the number of days in an average inspector's work year)to
arrive at the office hours per year for an average inspector.
48
Approximately 32 percent of the plans examiners' available time is consumed with administrative
support activities, such as customer service at the counter, response to generic telephone calls, routing
plans to vendors and other divisions, and similar activities. Since this time is not directly attributable to any
specific projects, it is considered administrative support time and results in a reduction to the available
annual plan review hours.
Table 7E Annual Available Hours— Building Inspection
Annual Total Possible Hours 2,080
Minus:
Sick Leave Hours 83.73
Vacation Hours 120.40
Meeting/Training Time 111.52
Holiday Leave Hours 96.00
Admin/Comp/J Duty Hours 10.00
Total Leave Time Before Office Hours -421.65
Annual Available Hours before Office Time 1,658.35
Office Time: 1,658.35 Hrs/8 Hrs/Day = 207 days
207 days x (2.00 x .5) = 207.00 Office Hrs/Yr. -207.00
Total Annual Available Hours (per inspector) 1451.35
Total Annual Available Hours — Building Inspection In order to calculate the Total
Annual Available Hours for the building inspection section as a whole, the annual available
hours per inspector(1,451.35 hours) were multiplied by the number of inspectors (9
inspectors) estimated to be actively making inspections. The total equates to 1,451.35 x 9 =
13,062. This equals the Building Division's Annual Available Hours (BDAAH). The number of
building inspectors positions is shown in Table 7F.
Table 7F Building Inspection Staffing Number
Of Staff
Position
Building Inspector 1 4
Building Inspector II 3
Building Inspector III 2
Total Building Inspection Staff 9*
—;-T-he contract inspector for the Stater Bros. Project was not included here, since it was paid out of
contractual service account, which was not included in the cost calculation for the FBHR.
49
t
l
i
Table 7G Annual Available Hours—Plan Check
Annual Total Possible Hours 2,080
Minus:
Sick Leave Hours 66.42
Vacation Hours 91.49
Meeting/Training Time 121.83
Holiday Leave Hours 96.00
Admin/Comp/J Duty Hours 13.31
Total Leave Time Before Office Hours -389.05
1,690.95
Less Counter Service/indirect admin.time(31 percent) -524.19
Annual Available Hours for Plan Review 1166.76
Table 7H BUILDING INSPECTION SERVICES COSTS—FY 2006107
Personnel Services: $880,908
Minus:
Building Official's Salary(50%) 65,372
Mobile Home Inspector's Salary(100%) 73,541
Total: -138,913
Subtotal: 741,995
Maintenance&Operations:04105 Actual 23,910
Minus:
Costs of MHP activies -2,391
21,519
Internal Service Charges: 53,597
Minus:Costs of MHP Activities 15,359
Total 48,238
Net Division Costs: 811,752
Plus: Dev Srvcs Department Overhead
(960,376—79,163)X 13/68 168,467
980,219
Plus:General City Overhead
(980,219 X.2586) 253,485
Fully Burdened Cost of Bldg Inspection Function(w/o MHP): $1,233,704
50
Fully Burdened Hourly Rate Calculation
The Fully Burdened Hourly Rate is computed as follows:
FBHR =1,233,704 Fully Burdened Cost = $94.45
13,062 Annual Hours
TABLE 71 PLAN CHECK DIVISION COSTS - FY 2006107
Personnel Services: $265,319
Plus:
Building Official's Salary(50%) 65,372
Maintenance&Operations: 8,896
Contractual Services: 1,772
Internal Service Charges 30,228
Net Division Costs: 371,587
Plus: Dev Srvcs Department Overhead
(960,376—79,163)X 5168 64,795
436,382
Plus: General City Overhead
(436,382 X.2586) 112,848
Fully Burdened Cost of Plan Check Function : $549,230
Fully Burdened Hourly Rate Calculation- Plan Check
The Fully Burdened Hourly Rate is computed as follows:
Annual Hours = 1166.76 X 5 plans examiners = 5833.8 hours
FBHR = 549,230 Fully Burdened Cost = $94.15
5833.8 Annual Hours
Conclusion
The Fully Burdened Hourly Rates calculated above represents the hourly cost, to the City of San
Bernardino, of field inspection and plan review. The FBHR is used to develop the fee tables in Chapter 8.
51
CHAPTER 8 -PROPOSALS FOR FEES FOR RESIDENTIAL CONSTRUCTION
Building Permit Fee Tables for Residential Construction
Proposed fee schedules have been developed based on the previously determined average
inspection times and fully burdened hourly rate for building inspection. Building permit fees for tract homes
and infill homes (Tables 8A and 8B), were determined by multiplying the building inspection time (BIT) by
the fully burdened hourly rate (FBHR).
52
Table 8A. Building Permit Fees - Tract Homes
Square Feet Insp.Time(hr) Permit Fee Square Feet. Insp.Time(hr.) Permit Fee.
to 1200 4.77 $451
1300 4.94 $467
1400 5.11 $483
1500 5.28 $499
1600 5.45 $515 4600 10.51 $993
1700 5.62 $531 4700 10.68 $1,009
1800 5.78 $546 4800 10.85 $1,025
1900 5.95 $562 4900 11.02 $1,041
2000 6.12 $578 5000 11.18 $1,056
2100 6.29 $594 5100 11.35 $1,072
2200 6.46 $610 5200 11.52 $1,088
2300 6.63 $626 5300 11.69 $1,104
2400 6.80 $642 5400 11.86 $1,120
2500 6.97 $658 5500 12.03 $1,136
2600 7.13 $673 5600 12.2 $1,152
2700 7.30 $689 5700 12.37 $1,168
2800 7.47 $706 5800 12.53 $1,183
2900 7.64 $722 5900 12.7 $1,200
3000 7.81 $738 6000 12.87 $1,216
3100 7.98 $754 6100 13.04 $1,232
3200 8.15 $770 6200 13.21 $1,248
3300 8.32 $786 6300 13.38 $1,264
3400 8.48 $801 6400 13.55 $1,280
3500 8.65 $817 6500 13.71 $1,295
3600 8.82 $833 6600 13.88 $1,311
3700 8.99 $849 6700 14.05 $1,327
3800 9.16 $865 6800 14.22 $1,343
3900 9.33 $881 6900 14.39 $1,359
4000 9.50 $897 7000 14.56 $1,375
4100 9.66 $912 7100 14.73 $1,391
4200 9.83 $928 7200 14.9 $1,407
4300 10.00 $945 7300 15.06 $1,422
4400 10.17 $961 7400 15.23 $1,438
4500 10.34 $977 7500 15.4 $1,455
Notes: 1.The indicated fees include building,electrical,plumbing and mechanical inspection fees.
2.The indicated fees do not include plan review,issuance or other aplicable fees.
3.The indicated fees include a standard 2-car garage.
4.For homes larger than 7500 sq.ft.,use the following formula: $1455+(size-7500)1100 X 15.94.
5.This table applies to tract homes built in phases of 5 or more.
53
Table 8B. Buildinq Permit Fees - Infill Homes
Insp. Square Insp.
Square Feet Time(hr) Permit Fee Feet. Time(hr.) Permit Fee.
to 1200 12.35 $1,166
1300 12.65 $1,195
1400 12.95 $1,223
1500 13.25 $1,251
1600 13.55 $1,280 4600 22.50 $2,125
1700 13.84 $1,307 4700 22.80 $2,153
1800 14.14 $1,336 4800 23.10 $2,182
1900 14.44 $1,364 4900 23.40 $2,210
2000 14.74 $1,392 5000 23.69 $2,238
2100 15.04 $1,421 5100 23.99 $2,266
2200 15.34 $1,449 5200 24.29 $2,294
2300 15.64 $1,477 5300 24.59 $2,323
2400 15.93 $1,505 5400 24.89 $2,351
2500 16.23 $1,533 5500 25.19 $2,379
2600 16.53 $1,561 5600 25.49 $2,408
2700 16.83 $1,590 5700 25.78 $2,435
2800 17.13 $1,618 5800 26.08 $2,463
2900 17.43 $1,646 5900 26.38 $2,492
3000 17.72 $1,674 6000 26.68 $2,520
3100 18.02 $1,702 6100 26.98 $2,548
3200 18.32 $1,730 6200 27.28 $2,577
3300 18.62 $1,759 6300 27.58 $2,605
3400 18.92 $1,787 6400 27.87 $2,632
3500 19.22 $1,815 6500 28.17 $2,661
3600 19.52 $1,844 6600 28.47 $2,689
3700 19.81 $1,871 6700 28.77 $2,717
3800 20.11 $1,899 6800 29.07 1 $2,746
3900 20.41 $1,928 6900 29.37 $2,774
4000 20.71 $1,956 7000 j 29.66 $2,801
4100 21.01 $1,984 7100 29.96 $2,830
4200 21.31 $2,013 7200 30.26 $2,858
4300 21.61 $2,041 7300 30.56 $2,886
4400 21.90 $2,068 7400 30.86 $2,915
4500 22.20 $2,097 7500 31.16 $2,943
Notes: 1.The indicated fees, include building, electrical, plumbing and mechanical inspection fees.
2.The indicated fees do not include plan review, issuance or other aplicable fees.
3.The indicated fees include a standard 2-car garage.
4. For homes larger than 7500 sq.ft., use the following formula: $2943+(size-7500)/100 X 28.19.
5.This table applies to infill, custom, and tract homes built in phases of 4 or less.
54
Building Construction Valuations
The Division currently uses building construction valuation data published in 1991, and which is outdated
and not reflective of current construction cost. The most current published data should be used and should
be updated at least annually to stay current with market conditions. Table 8C, Building Construction
Valuations is derived from the Square Foot Construction Cost" data published by the International Code
Council in the January-February edition of the Building Safety Journal.
55
Table 8C. Building Construction Valuations
(Construction costs per square foot($))
Group(2006 International Building Code) Type of Construction
IA IB IIA IIB IIIA IIIB IV VA VB
A-1 Assembly,theaters,with stage 196.11 189.78 185.37 177.60 167.20 162.27 171.92 152.56 146.94
A-1 Assembly,theaters,without stage 177.62 171.29 166.88 159.10 148.75 143.82 153.43 134.10 128.49
A-2 Assembly, nightclubs 149.94 145.74 142.04 136.49 128.53 124.91 131.71 116.50 112.58
A-2 Assembly,restaurants,bars,banquet halls 148.94 144.74 140.04 135.49 126.53 123.91 130.71 114.50 111.58
A-3 Assembly,churches 180.72 174.39 169.98 162.21 151.82 146.89 156.54 137.18 131.57
A-3 Assembly,general,community halls,libraries, 152.81 146.48 141.07 134.30 122.33 118.97 128.63 108.26 103.65
museums
A-4 Assembly,arenas 176.62 170.29 164.88 158.10 146.75 142.82 152.43 132.10 127.49
B Business 154.16 148.70 144.00 137.27 125.07 120.41 131.97 109.81 105.37
E Educational 166.52 160.91 156.34 149.52 140.14 132.98 144.59 123.34 118.69
F-1 Factory and industrial,moderate hazard 92.68 88.42 83.70 80.93 72.45 69.29 77.68 59.67 56.50
F-2 Factory and industrial,low hazard 91.68 87.42 83.70 79.93 72.45 68.29 76.68 59.67 55.50
H-1 High Hazard,explosives 86.84 82.58 78.86 75.09 67.79 63.63 71.84 55.02 N.P.
H234 High Hazard 86.84 82.58 78.86 75.09 67.79 63.63 71.84 55.02 50.85
H-5 HPM 154.16 148.70 144.00 137.27 125.07 120.41 131.97 109.81 105.37
1-1 Institutional,supervised environment 152.30 147.08 143.14 137.34 128.24 124.73 138.61 116.09 111.54
1-2 Institutional,hospitals 256.26 250.80 246.11 239.38 226.55 N.P. 234.08 211.31 N.P.
1-2 Institutional,nursing homes 179.18 173.72 169.02 162.30 150.51 N.P. 157.00 135.27 N.P.
1-3 Institutional,restrained 174.99 169.52 164.83 158.10 147.16 141.52 152.80 131.92 125.48
1-4 Institutional,day care facilities 152.30 147.08 143.14 137.34 128.24 124.73 138.61 116.09 111.54
M Mercantile 111.44 107.24 102.53 97.99 89.62 87.00 93.21 77.59 74.67
R-1 Residential,hotels 154.24 149.02 145.08 139.28 129.95 126.44 140.32 117.80 113.25
R-2 Residential,multiple family 129.33 124.11 120.17 114.37 105.16 101.65 115.53 93.01 88.46
R-3 Residential,one-and two-family 122.11 118.76 115.86 112.68 108.62 105.77 110.77 101.74 95.91
R-4 Residential,care/assisted living facilities 152.30 147.08 143.14 137.34 128.24 124.73 138.61 116.09 111.54
S-1 Storage,moderate hazard 85.84 81.58 76.86 74.09 65.79 62.63 70.84 53.02 49.85
S-2 Storage,low hazard 84.84 80.58 76.86 73.09 65.79 61.63 69.84 53.02 48.85
U Utility,miscellaneous 65.15 61.60 57.92 55.03 49.70 46.33 51.94 39.23 37.34
Notes: (Source:Building Safety Journal Jan-Feb 2008)
a. Private Garages use Utility,miscellaneous
b.Unfinished basements(all use group)=$15.00 per sq.ft.
c.For shell only buildings deduct 20 percent.
d.N.P.=not permitted
56
mill
CHAPTER 9 - ELECTRICAUPLUMBING/MECHANICAL PERMIT FEES
Introduction
Electrical/Plumbing/Mechanical (EPM) permits are issued by the Division for the installation,
replacement, or alteration of electrical, plumbing and mechanical systems or their component parts.
Examples of these types of permits are those issued for such items as water heater installations or
replacements, heating and air conditioning system installations or replacements, electrical service
upgrades, the addition of electrical wiring, or re-roofing a structure, to name a few.
Inspection data was organized into sample sets of twenty-five permits per category, with the
exception of the electrical category which consisted of fifty permits. Each category was analyzed to
determine if the cost/revenue equation resulted in a net gain, a net loss, or was at the cost recovery point.
EPM permits were broken down into ten subcategories consisting of Mechanical (M), Electrical (E),
Plumbing (P), Mechanical/Plumbing (MP), Electrical/Mechanical (EM), Electrical/Plumbing (EP), and
Electrical/Plumbing/Mechanical (EPM) permits, and three of the most common permits - lawn sprinklers,
200 Amp electric panels and water heaters.
In order to determine the reasonableness of the City's current fees the "total inspection time"was
multiplied by the fully burdened hourly rate to determine the City's inspection cost. The total inspection
time for EPM permits consisted of the sum of individual inspections (including reinspections), the drive time
required to commute to the inspection site, and four minutes of contingency time. Contingency time was
added to account for varying, miscellaneous tasks related to the inspection process. The City's inspection
cost was then subtracted from the current fees charged (typically the minimum fee of$43.00) to determine
the extent of any gain or loss from the inspections. The individual gains and losses were then aggregated
to arrive at an overall gain or loss for each group of permits and the average gain or loss was computed.
Since the overwhelming majority of EPM permits default to the minimum fee, the minimum fee is
set at the average break-even point. The average, median, maximum and minimum inspection costs, and
the thirty-third and sixty-sixth percentile points were calculated for each subcategory of permits. The
average inspection time and costs were calculated as indicators of reasonable fees. Typically the closer
the median of a sample set is to the average, the more accurately the average represents the sample. The
median inspection times and costs were calculated in order to determine whether or not an extreme high or
low number had skewed a sample's average. Minimum and maximum inspection costs and times were
calculated to illustrate the dispersion between the highest and lowest data points and the sample average.
The number of data points less than, greater than, or equal to both the average inspection time and current
minimum inspection fee were calculated to illustrate whether significant numbers of the inspection or cost
totals were grouped above or below those benchmarks.
57
The following list contains the computed minimum fee levels for each sub-category.
TABLE 9A EPM FEE SUMMARY
Permit Sub-category Computed
Minimum Fee
Electrical $61.09
Plumbing $61.37
Mechanical $49.86
Electrical/Plumbing $67.24
Electrical/Mechanical $91.94
Mechanical/Plumbing $47.87
Electrical/Mechanical/Plumbing $73.92
Water Heaters Only $49.55
Lawn Sprinklers Only $45.30
200 Amp Panel Upgrades $55.39
Since all of the subcategories were not highly differentiated, it is recommended that the minimum
EPM fee be set at the average of$60.00. The summary information listed in the table above was taken
from the individual EPM Permit Tables in Addendum D.
58
Chapter 10—Concluding Remarks
This study represents the Division's first in-depth review of many of the fees it charges for building
inspection and plan review services. It is not complete in scope, since a review of every individual fee
charged could not be completed given the limitations of time and resources. The study was completed
over the course of two years and consumed over 2600 labor hours during a period of historically high
construction activity, which made the process extremely difficult to manage. Also, it is necessary to
understand that this report represents a snapshot in time, and ultimately its conclusions will become less
relevant as time passes. Thus it should be viewed as the beginning of an ongoing process of fee analysis
and adjustment necessary to maintain a fee structure that comports to the spirit and intent of the applicable
laws.
In light of this, it is suggested that an annual review and analysis of total costs/total revenues be
undertaken and that an in-depth analysis and adjustment of fees be completed on a triennial basis. The
Division is currently automating a number of processes that should make the data collection and analysis
much more efficient and feasible in the future.
59
ADDENDUM A
BUILDING INSPECTION DESCRIPTIONS
The various required building inspections that comprise the inspection process are described below.
During these inspections the building inspector is required to verify that the items listed in each inspection
are properly installed and located, are of the proper materials, and sizes, and that their installation complies
with any and all building standards or codes adopted by the City:
• "Excavation/Forms Steel and Footings Inspection"
Footings, rebar(reinforcing steel), special bolting or hardware, and hold-down bolts or anchoring
hardware.
• °UFER (electrical ground rod) Inspection"
Verification of the length and type of approved grounding electrode.
• "Underground Plumbing Inspections"
Water pipes and fittings, sleeved through footings, grade slope, cleanouts, water and sewer pipe
separations and trenches.
• "Concrete Slab Inspection"
Slab grade, compaction, thickness, mono pour if required, Hold-down and anchor bolts, additional
hardware, pre-manufactured shear panel hardware, pre-manufactured shear panels, and bolts
installed prior to placement of concrete, reinforcement steel (rebar), etc.
• "Roof Sheathing Inspection"
Nailing, sheathing, rafters, roof framing, plywood grade, span index, etc.
• "Shear Nail Inspection"
Lumber grade and sizing, framing and bottom plate anchorage, nailing, hardware, shear transfer, (floor
and roof), sill plates, framing members, anchor bolts, shear wall dimensions, etc.
• "Combination Inspection"— Rough framing, mechanical, electric and plumbing.
• "Framing Inspection"
Framing, bracing, fireblocking, draft stopping and anchoring devices, walls, partitions, floors,
floor/ceiling and roof/ceiling assemblies. Rooms, spaces, corridors, accessibility areas and doorways,
sleeping rooms, emergency egress openings. Attic and crawl space ventilation, concealed electrical,
plumbing, gas and mechanical components, energy code features, safety glazing, natural light and
ventilation, etc.
60
• "Rough Mechanical Inspection"
Ducting, duct connections, supports, flex extensions, radiuses, registers, return air plenums,
equipment platforms, accesses, drip pan overflow protection, vent material and installation. Fireplace
and chimney, combustion air, gas piping, venting,joints, supports, and clearances, condensation drain
piping and supports, energy code requirements, gas appliances, space ventilation, heating system,
duct insulation, etc.
• "Rough Electrical Inspection"
Wiring, dedication of electrical circuits, grounds and bond connections, outlet location, wire sizing and
supports, lights or receptacles in attic and exterior, etc.
• "Rough Plumbing"
Fittings, drains, venting, cutting, notching and boring of framing, required accesses, nail guards, and
supports. Gas lines, dissimilar metals, water pressure, water heater venting systems and combustion
air systems, tub stalls and pans, and fixtures, etc.
• "Insulation Inspection"
Insulation type and installation, fenestration products, window ratings, etc.
• "Exterior Lath Nailing Inspection"
Lath and lath attachments, lath backing, weather resistive barrier, lath lapping, weep screed, corner
aids, window flashing, etc.
• "Stucco Scratch Coat Inspection"
Sufficiency of material and pressure to fill all openings in the lath, scratch coat scoring and thickness,
stucco's moist curing, hardness, etc.
• "Stucco Brown Coat Inspection"
Stucco rodding, roughness, thickness, stucco coat's moist curing, interval between applications, and
finish.
• "Sewer/Sewage Disposal Inspection"
Piping, fittings, cleanouts, grade, and pipe bedding, cover, etc.
• " Water Service Inspection"
• Piping, trench depths, material,joints, etc.
"Drywall Inspection"
61
Fastener types, size and spacing, shear nailing if required, etc.
• "Gas Test Inspection"
Gas piping and system's ability to hold pressure.
• "Electrical Service Inspection"
Grounding electrode connections, gas and water pipe bonds, labeling of circuits, circuit breakers size
and compatibility, conductor sizing and connections, etc.
• "Final Electrical Inspection"
Grounding, operation of ground fault and arc-fault circuit interrupters, exterior receptacles, kitchen
circuits, appliance connections, electrical system polarity, lighting fixtures, low efficacy fixtures, etc.
• "Final Inspections" (the building, plumbing, mechanical, and electrical final inspections)
Complete review of all required elements.
• "Final Plumbing Inspection"
Gas test connectors, hose bibs, clean-out boxes and caps, backflow preventers, and water pressure
regulator.
• "Final Mechanical Inspection"
Fireplace spark arrester, cap, clearance, vent caps and vents, condensing unit disconnect, roof A/C
screen, platform, furnace, thermostat, etc.
• "Final Electric Inspection"
• GFIs, weather-covers, entry lights, receptacles, electrical system polarity, the laundry circuit, and
dedicated 20-amp circuits.
r
62
ADDENDUM B
DRIVING TIME ANALYSIS
Driving Time
Number of Trips per Tract Dwelling Unit
Trip Worksheet
Address Tract/Lot
Builder Permit Number TOTAL
1 1972 W 16th St 0269-142-31 1.82
GFC Dev B0402199
2 2048 W 16th St 0269-142-39 1.41
GFC Dev 80402199
3 2085 W 16th St 0269-144-02 2.47
GFC Dev B0402197
4 2045 W 16th St 0269-144-06 1.44
GFC Dev B0402192
5 1957 W 16th St 0269-144-14 1.84
Stones Edge Rnch B0302922
6 1614 N California 0269-145-09 1.90
Stones Edge Rnch
7 1619 N Arizona 0269-145-12 2.68
Stones Edge Rnch B0400393
8 2859 W Meyers Tr 13-572-07 3.75
Pacific Crst Coms B0401291
9 6637 Lynn Ct Tr 13-572-12 4.11
Pacific Crst Coms B0401293
10 6638 Lynn Ct Tr 13-572-16 4.64
s Pacific Crst Coms B0401304
11 6658 Windsong Tr 13-572-26 3.55
Pacific Crst Coms B0401290
12 2815 W Irvington Av Tr 15-407-04 4.62
Cent Crowell Coms B0301165
13 2755 W Irvington Av Tr 15-407-09 3.64
EDA/GFR Ent B0203120
63
14 2724 W Melissa St. Tr 15-407-14 2.33
GFR Ent B0300980
15 2846 W Melissa St. Tr 15-407-24 1.69
Cent Crowell Coms B0301152
16 6016 N Gregory St Tr 15-407-91 2.64
GFR Ent B0301007
17 6679 N Darling Tr 13-630-03 5.89
Hardwood Homes B0402903
18 3215 W. Meyers Tr 13-630-27 6.34
Hardwood Homes B0402912
19 1232 W 44th Tr 14-715-14 2.46
Gardner Const 60303289
20 1161 W 45th Tr 14-715-22 2.79
Gardner Const B0303260
Average 3.10
Median 2.66
04
J
a
z
Q
Uw
� f=
o w
z >
U a .�
ow
� J
Q W
W
O
J
d
W
U
0
U
a�
ca
F-
0)
c
o
0
a>
(D
0
CD c) �Iv
o,0 0 0 o rnl� O 0 0 x!00
O O M N M LOT III Q) - CO OO M
O LCD Ln L.0 p L
O ti O O,CA, c O N t�- O)
LO LO� i I it �
Cl) I p
t1 O CV nj O O to O O CO O
I = O
M 0
lA
a 0 � O;m O Q O CO O I�
Q 00 Q "' 00
W
ED LU
o M N m N CO N O N sT' O (n
Z Z z Z
CL-
CD Lo o C-i N W.� -0 O O tt O W I C/)
�i
O � U�
C I
Z3 tf) W
O c) Z
LO
O
o'O c0 Z O'O
CD U w
LLj 0-
Cf) Z
Lu
a Z _
IOIO Z ja� W
O 0-
W
L
g r
f= o
0 0
o rn w Y Y
N
I Q'¢
a� w Z Z
O O co z M Z Z
Lo
o I i LU (W9
ui
O CZ) Cl)
Lo
CD i
U
U �
O O LU CC 0
Z N
O
I
I
O
Z i0'O N Z O O
O I
I
5
O °'O) CD Z °r° O
CD
C
C n
VO CV Z O co
� I
y O
cc
4)
C..) Q O O N Z O O
O
N
L
Q 10 0 Iw O
O Z M O 000 N C)
U) r- M CD `� Cl)
_ 0 0) 00 1- N 10
U
o c
m w Qo u�i a> x000000 T
r > v) 0 O N (C 0 y y N N N >
U Q co � 2 �Im mNM Q
y � �I U a� -2 2 0 o O
Y 'O t N N N
p Cl)
U U U',
I- cn m CD � � 0'C� r-°
°'o _ rn LO
�.,�;O Imo? OI �..0 1A m LO N pp N LO
O CEO C", p F_ N U
co
O? O Lq LO
le 0 0 0 0 c O M O Cl)
O O
d'
C? O
0
C?
O �
A LO 00>. V — `U W
Z Z Z Cn
Z
Cl) W IX 'IT W W
C? °D o 0 0 0 d a 0 0 O �- p. d
Q UJ } Q L Q
M Z Z o Z Z
C) o0'a) Lq � � MOOO QQ
J V J J
cn
O O N N O N O Q>
a� Z,Z Z Z
tL Z Z Q
Q Q Q
q ( �QQ WU'
c OINCAO O Lb W C D Cl w W
M
N M
O O co U O N O O M O co O
N M
O O
> CD NM O ONV NO
O Z
z
I
Cl)
O
O p O N p 0 v 0 0 0 0
O O
N Cl)
O O
Q M p N p a 0) O� O O
O N
U) N
i
N
O
O O � O O O CA O O M co
Q i Q
CU M O 0 0j 3 M 0 0 0 0
5 75
CCf
J
c
O
1C W ti W n
V
O
R Q � Q � C
U W N
W N. C N J O C
O4O
N Z t O = U) O $ y S d N 7
O
V 0,U C, d j = F_ ��',U CO y 7 2
U fC
U
F- Q O U N-� O O O U �7> m 8 W' F- m CD d
F-
M v
P M
ca LQ 04 -
O O CO N
O �
0
C
7 O O
O
4—�
CD O U U
W W
Cf) Z
a LLJ W
Q cMwO as
`n L1J Ui
CD
H D
j Z Z
M o
O
� .-
0
N Q J
tLj C:) N OI Z
O Z Q
W W
C� U
m Ln Q Q
2
7 01 p � U'
O N W
o �-- Q Q
U
0 0 0
O
>
Z O LO N 07
O
I
I
U
Q CD C>
CD
0
LO
d
C� Co m O Cj
v
O
O Ln
C � N
O
C
0 �
> o
M M O O I '.(Ell'C 9? NIA
ca O
a) ',.O Lo 4 IO
J C14 N — iM
cc
C �
O
W
c
> w m I �o 0 o m
N Z oO'' C j `I �'.�jN N >co
_ ' o
Q (7,L =i, IN N N M
f4 U C v
0
N 00 N M
N I- co 00
O N O O) co O m m O N co 00 � O_ C's
p �- iO10) f-I p N
F-
M V
C? C? O O O O
00 00 00 C — — e- 00 �
p � p
W
O
?. co 00 00 cc 00 O O >. 00 00 c0 00 00 O U cz
cz a
a �'CL
cn U) U)'cn
Cl) Z Z
� z
° o o 0 0 o Wa - a ao cc co ao m d a
a W'U) Q W }
- o
F-
0
C7 o U i C7
ao -0a000 .0 Z ? a000coN Z'z
z z z
m vvccc0i z ooaowcc H �
- ( W W U- W W
o a o
� 00 '-;r V 00 CO 00 Z Z C 00 00 O 00 Z Z
'7 Q Q Q Q
N QLLQ M QQ
9 00 00 0o CO co co � W � O co O O j W
O Q Q Q Q
O O
> 00100 ao co Cp o > 100 c0 CO c0
z z
i
N M
0 0 0 0 0 0 C O O O 00
O O
N co
N N CN N N ca- N N
Cn
co
CD CD O
6� co w 00 cD 00 co CO 07 07
Q j Q
F—
c O O O O 00 O C' Cp 00 00 00
z z
tll z Lo z
Q 0 Q
Q' y U) U y
K. O' c C _ O Q. O c c N
U co u"pi = u' So y O C c CR in
a' �Ulc� m �' � w _ � mv � c°'a �' Y =
W U C6 W c c L
c9 W 'Z3 0) p'._ N N 0 W 7 O U
F- 2 m (Dor- (7 mF- mU � � U' ON
C�C, N N N N N
Lo
C
O O O O O O
O ICI
i
cn j Q O
co co 00 GO co 00 ~ ~LLJ
O W d
z Z
Z —
o ao m co ao a d
° g w
_ � o
o'o'o of co o Z Z
LO Z —
o —
a�
Z CD
u
co O co Go co co Z
H
LO W W UJ
J
J
M =)
CO co co co qT co Z Z
`n Z Z
O Q Q
W W
CD
U
D O O co p co W W
O Q Q
> j
O
Z CO co V co 00
V
O i
U
0 CO co 00 CD �
v
O
Cn O O N O
C V
O
C
O
V m
CL) Q co co CD pp W
E
CD
C I
7 co cc o ao
v
� o
CA N
_ CO O) C M r
N
M r
_Z
ai Z `o Z c
ca c, cOn d 0 C O O O N
Q 00' N .5 o Co O `-
c t Co co N C7) N N N N >
U Z a�, `° v' 2 J °) ca aTi p o m o Cl) o Q
cts —
°> � i'V � m -Nd 0 0 0
- C C L O 0) T N N N M
CR o 0 FO— Cn FO-
Lq � �i0 N O
O O cNO O N N in cD at
i
M V
O O
!Lc) O Cl O0 O O O O O
I
M li O 0 0
O O O O O U (,) N 0 0 0 0 Cl
U V
oo- � w a
z z z z
— z _
M Q� Q —
Q O O M-, 0 0 d d a 0 0 0 O'O d d
a U } Q W }
a
o it o it
0 0 0 0 0 o 0 0 0 0 M
`
cu
� ° p o 0
o 00 o 00
a oO�c, CD Uv OoOOO UU
Z
LL QO QQ
cM Q
0 0 0 0 0 M = O O O O O =) :D
Z Z co Z Z
Q'Q Q Q
cv QUQ' WU' co
U0000ico ww 6 OOOOO
p > p W w (V
N M
O O
> O O O O O > O O O O O
Z Z
N M
O O
OO O O O O O O O O O O
C
<C N M
O O
O c:) O O O O O O O
i
M
O CD C?
U 10-0 O O O' p) O O O O C)
d Q Q
CC
d
J o Mo
0) 0 0 0 0 0 0 0 o rn
m _
L
yJ
cn
E j j cn
p o p o p
Q 72 U 72 V C
o- 00 C l C a 8 C C
v O o m in v� O L o m y v>
= N N = N y a
C1 Z m U N 2 Z V f06 p 7 C
IC p 5 mill
0 V N � p p d 0 v N �
F° rn l C=) °I rn,l�
i
LO
0
� lobo of of
� I
C? p O
0
> 0 0 o CO
w LLJ
a
z z
o
LL o00 o awa
Q w U)
LO ~ p
O O I O O =
= Ci0
o �� O 0
ii oo04 ZiZ
� D
L Q Q
o Q Q
c o o o o
Z Z
Q Q
w
o I Cw')
p w w
C i Q Q
r_= v I
o
U
o 0 0 0 0
z
0
o 0 0 0
O
c
CC v
C?
E aci rn o 0 0
1- Cf)
O C)
i
U
a� Q
Jv
C?
0 0 0 0
4 �°nccoo $iI °o °o
w -
N I I�
C
ca
C C O �{
C CI N ONI I C O O O
cn c boo °o `tea
F— c o p fa y N N 7 N N CV
d cV c0 y �'� 2i O O O
C C t O,t cal N N 04
U_ Ch
H
L m'U' R
ADDENDUM D
INSPECTION TIME ANALYSIS
Please see the following Tables D1 to D10.
74
i
ADDENDUM D
INSPECTION TIME ANALYSIS
Table D1. 1600— 1800 Square foot Tract Home Inspection Time
Bldg Size. Property Property Property Property Property
1600-1799 1 2 3 4 5
Sq. Ft. Living Area 1718 1756 1718 1718 1718
ID Number 6092 LL 6072 LL 6052 LL 6139 LL 6029 LL
Tr 13-572/15-407 Permit#- B03: 01170 01197 1 01171 01189 01174
INSPECTION TYPE ID# ITi me Min Time-Min Time-Min IT ime-Min Time-Min
Combo:
Final Inspection 350 8 12 12 7 12
Final Plumbing 290 4 6 6 4 6
Final Mechanical 300 4 6 6 4 6
Excav/Forms/Steel/Ft 30 5 12 12 35 10
Underground Plmbg 50 4 6 6 10 10
Bldg-Slab Grade 40 4 10 10 4 5
Temp Power Pole 70
Roof Sheathing 115 15 13 13 14 20
Shear Nail 130 35 25 25 30 29
Combo:
FramingNentilation 140 16 7 20 15 16
Rough HVAC(mech) 150 8 3 10 7 8
Rough Electrical 160 8 3 10 7 8
Rough PlmbgNents 170 8 3 10 7 8
Insulation/Certification 180 13 10 11 5 24
Stucco Mesh Extr Sd 190 14 8 11 12 15
Stucco Scratch Coat 200 4 6 3 4 5
Stucco Brown Coat 210 3 5 3 3 3
Sewer/Sewage Dispsl 220 1 2 2 2 2
Water Service 230 1 1 1 1 1
Drywall Nailing 240 15 24 50 11 15
Gas Line Air Test 260 6 8 5 5 5
Electdcal Service 275 21 12 12 9 12
Final Electrical 280 4 6 6 16 6
Total 201 188 244 212 226
Total Hours 3.35 3.13 4.07 3.53 3.77
Number of Re-inspections 5 2 3 1 1
Total Re-inspection Time 36 0 25 0 0
Average Re-inspection Time 7 0 8 0 i 0
75
L
t
s
d
e
Table D1. 1600— 1800 Square foot Tract Home Inspection Time (continued)
Bldg Size.-1600—1799 Property 6 Property Property Property Property 10 Property
Tr 13-572/15407 7 8 9 11
Sq.Ft. Living Area 1718 1718 1756 1718 1600 1600
ID Number 6136 LL 6089 LL 6063 LL 6049 LL 6058 Lo 6028 Lo
Permit# 01169 01172 01199 1 01173 00975 00974
INSPECTION TYPE Time-Min Time-Min Time-Min Time-Min Time-Min Time-Min
Combo:
Final Inspection 3 15 12 12 12 10
Final Plumbing 2 7 5 6 6 5
Final Mechanical 2 8 5 6 6 5
Excav/Forms/Steel/Ft 5 16 10 10 17 17
Underground Plmbg 4 7 10 10 8 9
Bldg-Slab Grade 6 4 7 4 7 5
Roof Sheathing 16 16 13 13 15 15
Shear Nail 35 23 38 25 25 35
Combo:
FramingNentilation 12 18 16 16 12 28
Rough HVAC(mech) 6 9 8 8 6 13
Rough Electrical 6 9 8 8 6 14
Rough PlmbgNents 6 9 8 8 6 5
Insulation/Certification 11 4 7 10 16 8
Stucco Mesh Extr Sd 9 10 12 12 2 15
Stucco Scratch Coat 4 4 4 4 6 7
Stucco Brown Coat 3 6 8 5 5 3
Sewer/Sewage Dispsl 8 8 2 2 1 1
Water Service 8 8 1 1 1 1
Drywall Nailing 9 20 15 15 6 9
Gas Line Air Test 5 5 5 4 4
Electrical Service 5 12 12 12 6 12
Final Electrical 10 8 13 6 12 12
Total 175 226 219 198 185 233
Total Hours 2.92 3.77 3.65 3.30 3.08 3.88
Number of Re-inspections 1 0 1 8 3 2
Total Re-inspection Time 1 0 0 22 21 9
Avg Re-inspection Time 1 0 0 3 7 5
76
Table D1. 1600—1800 Square foot Tract Home Ins tion Time (continued
Bldg Size.-1600—1799 Property 12 Property 13 Property 14 Property 15 Property 16 Property 17
Tr 13-572/15-407
Sq. Ft. Living Area 1718 1718 1718 1718 1718 1718
ID Number 6084 Lo 6128 Lo 6136 Lo 6125 Lo 6095 Lo 6077 Lo
Permit#- 01175 1 01176 01177 01178 01179 01180
INSPECTION TYPE Time Min Time Min Time-Min Time-Min Time-Min Time-Min
Combo:
Final Inspection 18 15 18 5 21 21
Final Plumbing 4 3 4 2 4 4
Final Mechanical 4 3 4 3 5 5
Excav/Forms/Steel/Ft 16 10 10 20 16 16
Underground Plmbg 16 4 5 6 10 10
Bldg-Slab Grade 5 5 5 8 8 8
Roof Sheathing 15 15 15 15 15 15
Shear Nail 20 13 27 25 25 30
Combo:
FramingfVentilation 30 27 36 24 18 19
Rough HVAC(meth) 7 6 8 6 —4 -5
Rough Electrical 7 6 8 5 4 4
Rough Plmbg/Vents 6 6 8 5 4 4
Insulation/Certification 8 6 10 5 10 10
Stucco Mesh Extr Sd 15 1 7 14 12 4
Stucco Scratch Coat 5 5 5 5 5 5
Stucco Brown Coat 4 4 4 4 4 4
Sewer/Sewage Dispsl 1 2 1 1 —1 -2
Water Service 1 2 1 1 1 1
Drywall Nailing 13 19 20 20 15 12
Gas Line Air Test 4 5 —5 -4 4 4
Electrical Service 15 10 10 10
Final Electrical 6 4 4 20 30 60
Total 220 181 215 208 216 243
Total Hours 3.67 3.02 3.58 3.47 3.60 4.05
Number of Re-inspections 2 1 1 0 1 1
Total Re-inspection Time 15 10 10 0 —5 -5
Average Re-inspection Time 8 10 10 0 5 5
77
Table D1. 1600—1800 Square foot Tract Home Inspection Time(continued)
Bldg Size.-1600—1799 Property Property Property Property Property Property
Tr 13-572/15-407 18 19 20 21 22 23
Sq. Ft. Living Area 1600 1763 1718 1718 1763 1718
ID Number 6076 NL 2869 WI 2852 WM 2856 WM 2868 WM 2874 WM
Permit#- 00967 01146 01166 01168 01155 01167
INSPECTION TYPE Time-Min Time-Min Time-Min Time-Min Time-Min Time-Min
Combo:
Final Inspection 1 10 14 18 14 14
Final Plumbing 9 5 7 9 7 7
Final Mechanical 8 5 7 9 7 7
Excav/Forms/Steel/Ft 10 24 10 10 10 10
Underground Plmbg 5 13 10 10 10 10
Bldg-Slab Grade 5 6 6 6 6 7
Roof Sheathing 25 20 18 14 15 14
Shear Nail 35 35 27 21 26 21
Combo:
FramingNenfilation 33 18 22 25 14 14
Rough HVAC(mech) 8 9 11 12 7 7
Rough Electrical 7 9 11 12 7 7
Rough PlmbgNents 7 9 11 12 7 7
Insulation/Certification 6 13 5 5 13 13
Stucco Mesh Extr Sd 20 12 10 10 10 10
Stucco Scratch Coat 8 5 5 5 5 5
Stucco Brown Coat 7 7 5 5 3 5
Sewer/Sewage Dispsl 2 7 1 1 1 1
Water Service 1 6 1 1 1 1
Drywall Nailing 20 20 13 23 23 17
Gas Line Air Test 6 7 4 4 4 4
Electrical Service 5 12 20 10 10
Final Electrical 9 10 7 9 7 7
Total 232 255 217 241 207 198
Total Hours 3.87 4.25 3.62 4.02 3.45 3.30
Number of Re-inspections 1 0 5 6 6 4
Total Re-inspection Time 0 0 29 56 15 20
Average Re-inspection Time 0 0 6 9 3 5
78
Table D1. 1600—1800 Square foot Tract Home Inspection Time(continued)
Bldg Size.-1600—1799 Property Property
Tr 13-572/15-407 24 25
Sq. Ft. Living Area 1600 1688 Average
ID Number 6116 NL 116145 Inspn
Permit#- 00977 03260 Time
INSPECTION TYPE Time-Min Time-Min (Minutes)
Combo:
Final Inspection 20 8 12
Final Plumbing 10 4 5
Final Mechanical 10 4 6
Excav/Forms/Steel/Ft 14 14 14
Underground Plmbg 8 5 8
Bldg-Slab Grade 10 10 6
Temp Power Pole
Roof Sheathing 20 10 16
Shear Nail 20 10 26
Combo:
FramingNentilation 18 8 19
Rough HVAC(mech) 8 4 8
Rough Electrical 9 4 7
Rough PlmbgNents 8 4 7
Insulation/Certification 3 17 10
Stucco Mesh Extr Sd 11 5 11
Stucco Scratch Coat 5 5 5
Stucco Brown Coat 4 12 5
Sewer/Sewage Dispsl 2 3 2
Water Service 1 2 2
Drywall Nailing 10 5 17
Gas Line Air Test 3 7 5
Combo:
Electrical Service 8 11
Final Electrical 10 12 12
Total 204 161 212
Total Hours 3.40 2.68 3.54
Number of Re-inspections 1 4 2.40
Total Re-inspection Time 15 37 13
Average Re-inspection Time 15 9 1 5
79
Table D2. 1800 -2000 Square foot Tract Home Inspection Time
Bldg Size 1800-1999 Property Property Property Property Property
1 2 3 4 5
Sq. Ft.Living Area 1804 1804 1804 1804 1993
ID Number 6064 N 6034 NN 6108 NN 6128 NN 123244
Permit#- B04: 300981 300984 300986 300987 303289
INSPECTION TYPE ID# Time-Min Time-Min Time-Min Time-Min I Time-Min
Combo: 14-715-14
Final Inspection 350 20 21 18 12 7
Final Plumbing 290 10 10 9 5 4
Final Mechanical 300 10 10 9 6 4
Excav/Forms/Steel/Ft 30 7 10 10 9 10
Underground Plmbg 50 8 10 10 5 7
Bldg-Slab Grade 40 5 6 10 8 10
Roof Sheathing 115 16 20 20 21 10
Shear Nail 130 26 25 20 22 10
Combo:
FramingNentilation 140 14 14 15 2 10
Rough HVAC(meth) 150 7 7 8 2 5
Rough Electrical 160 7 7 7 2 5
Rough PlmbgNents 170 7 7 7 2 5
Insulation/Certification 180 6 10 3 2 10
Stucco Mesh Extr Sd 190 12 2 10 20 2
Stucco Scratch Coat 200 1 1 6 5 4 4
Stucco Brown Coat 210 4 5 3 3 30
Sewer/Sewage Dispsl 220 1 2 2 1 4
Water Service 230 1 1 1 1 4
Drywall Nailing 240 10 20 10 12 10
Gas Line Air Test 260 4 6 3 3 4
Electrical Service 275 7 7 g g 7
Final Electrical 280 13 16 9 24 5
Total 205 232 198 175 177
Total Hours 3.42 3.87 3.30 2.92 2.95
Number of Re-inspections 3 1 1 1 3
Total Re-inspection Time 29 11 15 6 31
Average Re-inspection Time 10 11 15 6 10
80
Table D2. 1800 .2000 S uare foot Tract Home Ins tion Time (continued
Bldg Size 1800- 1999 Property Property Property Property Property Property
6 7 8 9 10 11
Sq. Ft.Living Area 1804 1804 1804 1993 1835 1993
ID Number 2724 WM 2763 WI 2735 WM 1256 46 138 EK 4412 WC
Permit#- 300980 203119 300996 303304 1 402424 303297
INSPECTION TYPE Time-Min T- Min Time Min Time Min Time Min Time-Min
Combo: 15-407-14 15-407-08 15407-A7 14-715-57 135-291-42 14-715-36
Final Inspection 16 18 16 10 10 16
Final Plumbing 8 9 8 6 5 8
Final Mechanical 8 9 8 7 5 8
Excav/Forms/Steel/Ft 19 30 25 2 15 12
Underground Plmbg 4 23 6 2 8 8
Bldg-Slab Grade 5 7 20 8 4 20
Roof Sheathing 15 26 20 3 20 25
Shear Nail 22 70 30 5 20 12
Combo:
FramingNentilation 24 22 18 8 14 12
Rough HVAC(mech) 12 11 9 4 7 6
Rough Electrical 12 11 9 -4 -7 6
i
Rough PlmbgNents 12 11 9 4 7 6
Insulation/Certification 5 12 5 10 1 5
Stucco Mesh Extr Sd 12 26 30 10 4 6
Stucco Scratch Coat 10 20 4 -6 -8 6
Stucco Brown Coat 8 -5 -3 5 10 6
Sewer/Sewage Dispsl 1 3 5 1 5 2
Water Service 1 3 = 10 5 3
Drywall Nailing 15 20 30 30 7 6
Gas Line Air Test 8 6 5 9 5 5
Electrical Service 8 26 9 3 14 10
Final Electrical 8 9 8 10 20 8
Total 233 377 281 157 201 196
Total Hours 3.88 6.28 4.68 2.62 3.35 3.27
Number of Re-inspections 2 0 1 4 6 2
Total Re-inspection Time 27 0 22 42 40 29
Average Re-inspection Time 14 -0i 22 11 7 15
81
Table D2. 1800 -2000 Square foot Tract Home Inspectio n Time continued
Bldg Size 1800-1999 Property Property Property Property Property Property
12 13 14 15 16 17
Sq. Ft. Living Area 1993 1804 1804 1835 1835 1835
ID Number 4473 NO 6041 NL 6073 NN 144 EK 147 E2 131 E2
Permit#- 303295 300989 300991 402425 402423 402422
INSPECTION TYPE Time-Min Time-Min Time-Min Time-Min Time-Min Time-Min
Combo: 14-715-32 15-407-95 15-407-98 135-291-41 135-291 40 135-291-37
Final Inspection 19 14 25 9 7 7
Final Plumbing - 7 13 5 4 4
Final Mechanical 7 7 12 5 4 4
Excav/Forms/Steel/Ft 28 11 11 7 18 17
Underground Plmbg 8 1 6 8 12 9
Bldg-Slab Grade 15 7 8 5 4 5
Roof Sheathing 30 12 12 20 20 20
Shear Nail 18 30 27 9 9 9
Combo:
FramingNentilation 6 18 18 8 14 14
Rough HVAC(mech) 3 9 9 4 7 7
Rough Electrical 3 9 9 4 7 7
Rough Plmbg/Vents 3 9 9 4 7 7
Insulation/Certification 7 15 10 5 10 10
Stucco Mesh Extr Sd 28 10 11 5 5 5
Stucco Scratch Coat 9 5 5 8 8 4
Stucco Brown Coat 6 3 4 10 4 4
Sewer/Sewage Dispsl 5 2 2 10 10 5
Water Service 3 1 1 4 10 5
Drywall Nailing 28 10 11 4 4 5
Gas Line Air Test 5 15 = 5 5 5
Electrical Service 14 4 4 4
Final Electrical 11 20 12 5 5 5
Total 263 224 229 148 178 162
Total Hours 4.38 3.73 3.82 2.47 2.97 2.70
Number of Re-inspections 0 1 0 3 6 6
Total Re-inspection Time 0 7 0 29 22 21
Avg Re-inspection Time 0 7 0 10 4 4
82
Table D2. 1800 -2000 S uare foot Tract Home Inspection Time (continued
Bldg Size 1800- 1999 Property Property Property Property Property Property
18 19 20 21 22 23
Sq. Ft.Living Area 1917 1917 1917 1993 1993 1993
ID Number 2536 YC 2514 YC 2527 YC 2740 RC 2697 WS 2649 WS
Permit#- 200434 200436 200440 201781 201812 201813
INSPECTION TYPE Time-Min Time-Min Time-Min Time-Min Time-Min Time-Min
Combo: 141-551-06 141-551-08 141-551-10 266-761-09 266-771-12 266-781-22
Final Inspection 18 13 8 7 10 11
Final Plumbing 9 6 4 4 5 5
Final Mechanical 9 6 4 3 5 5
Excav/Forms/Steel/Ft 6 7 5 10 9 11
Underground Plmbg 5 5 10 5 6 5
Bldg-Slab Grade 3 7 2 10 5 5
Roof Sheathing 16 18 14 16 8 8
Shear Nail 24 26 21 20 12 12
Combo:
FramingNentilation 20 14 16 12 8 8
Rough HVAC(mech) 10 10 8 6 4 4
Rough Electrical 10 10 8 6 4 4
Rough PlmbgNents 10 10 8 6 4 4
Insulation/Certification 10 7 - - 5 5
Stucco Mesh Extr Sd 4 18 19 5 5 5
Stucco Scratch Coat 2 2 5 5 5 5
Stucco Brown Coat 6 6 6 5 5 5
Sewer/Sewage Dispsl 5 5 10 7 7 2
Water Service 4 4 4 8 8 2
Drywall Nailing 20 12 12 5 5 5
Gas Line Air Test 6 6 2 7
Electrical Service 11 8 8
Final Electrical 15 12 16 7 12 12
Total 221 213 198 172 145 136
Total Hours 3.68 3.55 3.30 2.87 2.42 2.27
Number of Re-inspections 0 1 1 1 2 0
Total Re-inspection Time 0 13 4 4 10 0
Avg Re-inspection Time 0 13 4 4 5 0
83
(
(
Table D2. 1800 -2000 uare foot Tract Home Ins ction Time (continued)
Bldg Size 1800-1999 Property 24 Property
25
Sq.Ft.Living Area 1993 1993
ID Number 2605 SR 4554 WC Average
Permit#- 200229 303300 Inspn
INSPECTION TYPE Time Min Time-Min Time
Combo: 15 977 31 14 715 45 (Minutes)
Final Inspection 5 12 13
Final Plumbing 2 6 7
Final Mechanical 3 6 7
Excav/Forms/Steel/Ft 10 9 12
Underground Plmbg 8 15 8
Bldg-Slab Grade 13 6 8
Roof Sheathing 8 6 16
Shear Nail 12 9 20
Combo:
Framing/Ventilation 2 6 13
Rough HVAC(mech) 1 3 7
Rough Electrical 1 3 6
Rough Plmbg/Vents 1 3 6
Insulation/Certification 5 5 7
Stucco Mesh Extr Sd '2 6 12
Stucco Scratch Coat 5 10 6
Stucco Brown Coat 5 3 6
Sewer/Sewage Dispsl 5 15 5
Water Service 2 2 4
Drywall Nailing 5 6 12
Gas Line Air Test 5 1 5
Electrical Service 10 9
Final Electrical 3 15 11
Total 122 157 200
Total Hours 2.03 2.62 3.33
Number of Re-inspections 1 5 2
Total Re-inspection Time 5 63 17
Average Re-inspection Time 5 13 7
84
Table D2. 1800 -2000 Square foot Tract Home Inspection Time (continued)
Bldg Size 1800-1999 Average Benchmark
INSPECTION TYPE Time(Min) D. McCarthy
Combo: Per Inspcn
Final Inspection 13 25
Final Plumbing 7
Final Mechanical 7
Excav/Forms/SteeVFt 12 25
Underground Plmbg 8 10
Bldg-Slab Grade 8
Roof Sheathing 16 18
Shear Nail 20 28
Combo:
Framing/Ventilation 13 43
Rough HVAC(mech) 7
Rough Electrical 6
Rough Plmbg/Vents 6
Insulation/Certification 7 0
Stucco Mesh Extr Sd 12 10
Stucco Scratch Coat 6 0
Stucco Brown Coat 6 0
Sewer/Sewage Dispsl 5 5
Water Service 4 5
Drywall Nailing 12 10
Gas Line Air Test 5
Electrical Service 9
Final Electrical 11 10
Total Minutes(From Above) 200 189
Total Hours 3.33 3.15
Number of Re-inspections 2.04 3
Total Re-inspection Time 17 10
Average Re-inspection Time 7.46 30
85
Table D3. 2000 -2200 Square foot Tract Home Inspection Time
Bldg Size-2000-2199 Property Property Property Property Property
1 2' 3 4 5
Sq.Ft. Living Area 2066 2176 2066 2176 2176
ID Number 6628 WS 2915 WM 6601 LC 6625 LC 6661 LC
TR 13-572/15-407 Permit#- B04: 01284 01939 01280 1 01286 01287
INSPECTION TYPE ID# Time-Min Time-Min Time-Min Time-Min Time-Min
Combo:
Final Inspection 350 30 35 10 19 24
Final Plumbing 290 7 17 5 9 12
Final Mechanical 300 7 17 5 9 12
Excav/Forms/Steel/Ft 30 17 3 10 1 9
Underground Plmbg 50 7 3 10 5 9
Bldg-Slab Grade 40 7 3 7 7 5
Roof Sheathing 115 15 26 20 20 24
Shear Nail 130 25 39 30 30 36
Combo:
FramingNentilation 140 24 17 20 20 26
Rough HVAC(meth) 150 12 8 10 10 13
Rough Electrical 160 12 8 10 10 13
Rough PlmbgNents 170 10 8 10 10 13
Insulation/Certification 180 10 9 8 10 20
Stucco Mesh Extr Sd 190 20 11 12 13 15
Stucco Scratch Coat 200 8 18 2 6 8
Stucco Brown Coat 210 5 7 3 7 2
Sewer/Sewage Dispsl 220 4 2 2 2 2
Water Service 230 3 2 2 2 2
Drywall Nailing 240 20 19 10 20 18
Gas Line Air Test 260 15 15 10 13 30
Electrical Service 275 16 9 33 15 35
Final Electrical 280 7 16 5 10 11
Total 281 292 234 248 339
Total Hours 4.68 4.87 3.90 4.13 5.65
Number of Re-inspections 2 2 3 3 2
Total Re-inspection Time 20 17 47 44 19
Avg. Re-inspection Time 10 9 16 15 10
TOTAL MINUTES 301 309 281 292 358
86
Table D3. 2000 -2200 Square foot Tract Home Inspection Time (continued)
Bldg Size-2000-2199 Property Property Property Property Property Property
6 7 8 9 10 11
Sq.Ft. Living Area 2176 2066 2066 2176 2066 2013
ID Number 6626 LC 6614 LC 6651 LC 6658 WS 6628 WS 2846 WM
TR 13-572/15-407 Permit#- 01288 01281 01283 01290 01284 01152
INSPECTION TYPE Time-Min Time-Min Time-Min Time-Min Time-Min Time-Min
Combo:
Final Inspection 20 28 18 11 8 17
Final Plumbing 10 13 9 5 7 9
Final Mechanical 9 13 10 6 7 9
Excav/Forms/Steel/Ft 20 17 13 12 17 20
Underground Plmbg 7 7 10 11 7 20
Bldg-Slab Grade 5 5 7 6 7 6
Roof Sheathing 25 22 16 18 15 16
Shear Nail 25 33 24 30 25 24
Combo:
FramingNentilation 28 18 20 33 24 22
Rough HVAC(mech) 14 9 10 16 12 11
Rough Electrical 14 10 10 16 12 11
Rough PlmbgNents 14 9 10 10 12 11
Insulation/Certification 7 18 24 14 10 5
Stucco Mesh Extr Sd 13 15 10 10 20 10
Stucco Scratch Coat 5 5 10 8 8 5
Stucco Brown Coat 5 5 6 6 5 17
Sewer/Sewage Dispsl 2 2 2 2 2 1
Water Service 2 2 4 2 5 1
Drywall Nailing 30 25 18 30 20 15
Gas Line Air Test 16 10 3 4 8 4
Electrical Service 10 23 16 16 7
Final Electrical 9 13 21 24 14 13
Total 263 267 278 290 261 254
Total Hours 4.38 4.45 4.63 4.83 4.35 4.23
Number of Re-inspections 7 2 3 2 2 11
Total Re-inspection Time 201 15 75 86 18 89
Avg.Re-inspection Time 29 8 25 43 9 8
TOTAL MINUTES 464 282 353 376 279 343
87
Table D3. 2000 -2200 Square foot Tract Home Inspection Time continued
Bldg Size-2000-2199 Property Property Property Property Property Property
12 13 14 15 16 17
Sq.Ft. Living Area 2016 2016 2016 2013 2016 2016
ID Number 2896Wm 6114 LL 6084 LL 6064 LL 6644 LL 6115 LL
TR 13-572/15-407 Permit#- 01184 01186 1 01187 01156 01188 01190
INSPECTION TYPE Time Min Time-Min Time-Min Time Min Time-Min Time-Min
Combo:
Final Inspection 8 10 7 12 12 6
Final Plumbing 4 5 3 6 6 3
Final Mechanical 4 5 4 6 6 3
Excav/Forms/Steel/Ft 10 5 4 12 16 16
Underground Plmbg 10 4 3 6 7 7
Bldg-Slab Grade 17 6 4 6 4 4
Roof Sheathing 20 20 20 13 14 14
Shear Nail 20 35 25 40 28 30
Combo:
FramingNentilation 16 15 15 7 20 18
Rough HVAC(meth) 8 8 8 3 10 9
Rough Electrical 8 8 8 4 10 9
Rough PlmbgNents 8 7 7 2 10 9
Insulation/Certification 10 5 10 2 5 7
Stucco Mesh Extr Sd 10 14 12 13 8 18
Stucco Scratch Coat 5 8 8 3 4 4
Stucco Brown Coat 5 4 3 6 4 4
Sewer/Sewage Dispsl 1 1 2 1 1 1
Water Service 1 1 2 1 2 2
Drywall Nailing 11 10 12 12 16 18
Gas Line Air Test 4 6 6 9 9 15
Electrical Service 22 20 22 9
Final Electrical 4 5 4 6 6 16
Total 206 202 189 170 198 222
(Total Hours 3.43 3.37 3.15 2.83 3.30 3.70
Number of Re-inspections 2 5 2 2 1 1
Total Re-inspection Time 26 50 37 30 0 0
Avg. Re-inspection Time 13 10 19 15 0 0
TOTAL MINUTES 232 252 226 200 198 222
88
Table D3. 2000-2200 S uare foot Tract Home Inspection Time (continued)
Bldg Size-2000-2199 Property Property Property Property Property Property
18 19 20 21 22 23
Sq. Ft. Living Area 2016 2016 2016 2016 2016 2042
ID Number 6097 LL 6069 LL 6108 LL 6133 LL 6081 LL 6055 LL
TR 13-572/15-407 Permit#- 01191 1 01198 01192 01193 01194 00982
INSPECTION TYPE Time-Min Time-Min Time Min Time Min Time-Min Time-Min
Combo:
Final Inspection 8 13 14 4 16 16
Final Plumbing 4 6 7 2 8 8
Final Mechanical 4 6 7 2 8 8
Excav/Forms/Steel/Ft 13 17 20 20 16 17
Underground Plmbg 8 10 8 6 10 8
Bldg-Slab Grade 4 5 5 8 8 6
Roof Sheathing 14 11 15 15 15 17
Shear Nail 24 28 20 17 24 20
Combo:
FramingNentilation 18 14 14 16 13 16
Rough HVAC(meth) 9 7 7 8 7 8
Rough Electrical 9 7 7 8 7 8
Rough PlmbgNents 9 7 7 8 6 8
Insulation/Certification 7 6 8 6 10 8
Stucco Mesh Extr Sd 15 16 7 12 11 14
Stucco Scratch Coat 8 3 5 8 8 6
Stucco Brown Coat 5 6 4 4 4 4
Sewer/Sewage Dispsl 1 1 1 1 2 1
Water Service 2 1 1 1 1 1
Drywall Nailing 15 18 17 15 16 25
,Gas Line Air Test 15 9 4 4 4 4
Electrical Service 10 11 23
Final Electrical 20 7 7 2 30 10
Total 222 198 196 190 224 213
Total Hours 3.70 3.30 3.27 3.17 3.73 3.55
Number of Re-inspections 1 2 1 0 1 1
Total Re-inspection Time 18 11 0 8 8
Avg.Re-inspection Time 0 9 11 0 8 8
TOTAL MINUTES 222 216 207 190 232 221
89
Table D3. 2000 -2200 Square foot Tract Home Inspection Time continued
Bldg Size-2000-2199 Property Property Property Property
24 25 26 27
Sq. Ft.Living Area 2042 2042 2042 2138 Average
ID Number 6027 LL 6046 LL 6008 NG 6679 ND Inspn
TR 13-572/15-407 Permit#- 00983 00985 00988 02903 Time
INSPECTION TYPE Time-Min Time-Min Time-Min (Minutes)
Combo:
Final Inspection 25 24 18 11 16
Final Plumbing 9 5 9 5 7
Final Mechanical 9 5 9 5 7
Excav/Forms/Steel/Ft 8 10 11 15 13
Underground Plmbg 8 10 8 5 8
Bldg-Slab Grade 6 6 7 6 6
Roof Sheathing 17 17 12 20 17
Shear Nail 20 30 30 45 28
Combo:
FramingNentilation 18 30 18 12 19
Rough HVAC(meth) 9 7 9 6 9
Rough Electrical 9 7 9 6 9
Rough Plmbg/Vents 9 6 9 6 9
Insulation/Certification 10 15 11 20 10
Stucco Mesh Extr Sd 8 10 13 17 13
Stucco Scratch Coat 8 6 10 39 8
Stucco Brown Coat 4 6 6 15 6
Sewer/Sewage Dispsl 1 2 2 8 2
Water Service 1 1 1 15 2
Drywall Nailing 18 30 20 20 18
Gas Line Air Test 4 4 9 15 9
Electrical Service 20 18
Final Electrical 7 6 20 6 11
Total 208 237 241 317 246
Total Hours 3.47 3.95 4.02 5.28 3.98
Number of Re-inspections 0 1 3 2 Average
Total Re-inspection Time 0 0 36 44 Average
Avg. Re-inspection Time 0 0 12 22 Avg/Insp
TOTAL MINUTES 208 237 277 361
90
Table D3. 2000-2200 S uare foot Tract Home Inspection Time (continued)
Bldg Size-2000-2199 Average
INSPECTION TYPE Time-Min
Combo: Per Inspcn
Final Inspection 14
Final Plumbing 7
Final Mechanical 7
Excav/Forms/SteeVFt 13
Underground Plmbg 8
Bldg-Slab Grade 6
Roof Sheathing 17
Shear Nail 28
Combo:
FramingNentilation 19
Rough HVAC(mech) 9
Rough Electrical 9
Rough PlmbgNents 9
Insulation/Certification 10
Stucco Mesh Extr Sd 13
Stucco Scratch Coat 8
Stucco Brown Coat 6
Sewer/Sewage Dispsl 2
Water Service 2
Drywall Nailing 18
Gas Line Air Test 9
Electrical Service 18
Final Electrical 11 Hrs
Total 243 4.10
Total Hours 5.37
Number of Re-inspections Average 2.37
Total Re-inspection Time 35 23
Avg. Re-inspection Time Avg/Insp 11.34
TOTAL MINUTES 268
TOTAL Hrs wdh Re-inspection 4.47
91
i
Table N. 2200 -2400 Square foot Tract Home Ins ction Time
Bldg Size 2200-2399 Property Property Property Property Property
1 2 3 4 5
Sq.Ft.Living Area 2281 2281 2281 2281 2284
6649 LC 6638 LC 6675 WS 6640 WS 6022 NL
Permit#-B04: 1 01303 01304 01305 1 01306 01004
INSPECTION TYPE ID# Time-Min Time-Min Time-Min Time-Min Time-Min
Combo:
Final Inspection 350 25 22 46 30 19
Final Plumbing 290 12 11 15 4 10
Final Mechanical 300 13 11 15 5 10
Excav/Forms/Steel/Ft 30 12 10 17 17 8
Underground Plmbg 50 5 9 11 10 8
Bldg-Slab Grade 40 5 5 6 7 6
Roof Sheathing 115 24 20 15 17 20
Shear Nail 130 36 25 20 30 20
Combo:
FramingNentilation 140 20 24 34 25 14
Rough HVAC(meth) 150 10 12 8 12 7
Rough Electrical 160 10 12 8 13 7
Rough PlmbgNents 170 10 12 8 12 7
Insulation/Certification 180 10 10 15 10 10
Stucco Mesh Extr Sd 190 12 13 14 30 14
Stucco Scratch Coat 200 7 10 12 12 6
Stucco Brown Coat 210 1 1 5 5 5
Sewer/Sewage Dispsl 220 4 4 2 3 2
Water Service 230 4 6 4 4 1
Drywall Nailing 240 25 30 30 18
Gas Line Air Test 260 25 7 4 8 9
Combo:
Electrical Service 275 14 10 14 10
Final Electrical 280 21 11 21 5 19
Total 298 270 324 289 230
Total Hours 4.97 4.50 5.40 4.82 3.83
Number of Re-inspections 6 2 2 1 1
Re-inspection time 91 23 23 14 10
Average Re-inspection Time 15 12 12 14 10
92
Table D4. 2200 -2400 Square foot Tract Home Inspection Time (continued)
Bldg Size 2200-2399 Property Property Property Property Property Property
6 7 8 9 10 11
Sq. Ft. Living Area 2398 2398 2398 2284 2284 2284
6122 NL 6032 NL 6133 NL 6032 LL 6043 LL 6058 NL
Permit#- 01209 1 01210 01212 01002 01003 01005
INSPECTION TYPE Time-Min Time-Min Time-Min Time-Min Time-Min Time-Min
Combo:
Final Inspection 12 18 6 14 32 18
Final Plumbing 6 9 3 7 9 9
Final Mechanical 6 9 3 7 9 9
Excav/Forms/SteeVFt 5 12 23 17 8 20
Underground Plmbg 4 6 22 8 8 20
Bldg-Slab Grade 6 10 4 3 6 7
Roof Sheathing 17 24 18 25 20 20
Shear Nail 35 35 30 31 25 20
Combo:
FramingNentilation 6 16 18 23 14 15
Rough HVAC(mech) 3 8 9 11 7 7
Rough Electrical 3 8 9 12 7 8
Rough PlmbgNents 3 7 9 2 7 7
Insulation/Certification 9 1 8 11 8 6
Stucco Mesh Extr Sd 14 18 14 12 8 10
Stucco Scratch Coat 4 5 5 4 7 6
Stucco Brown Coat 7 3 5 8 5
Sewer/Sewage Dispsl 1 1 1 1 1 2
Water Service 1 2 1 1 1 1
Drywall Nailing 2 23 18 5 15 25
Gas Line Air Test 6 5 15 4 4 9
Combo:
Electrical Service 10 25 10
Final Electrical 6 9 20 7 10 9
Total 166 267 249 210 214 233
Total Hours 2.77 4.45 4.15 3.50 3.57 3.88
Number of Re-inspections 9 0 1 6 0 6
Re-inspection time 34 0 3 73 0 94
Average Re-inspection Time 4 0 3 12 0 16
93
Table D4. 2200-2400 Square foot Tract Home Inspection Time continued
Bldg Size 2200-2399 Property 12 Property 13 I Property 14 Property 15 Property 16 Property
Sq. Ft. Living Area 2284 2284 2284 2280 2284 2281
6082 NL 6016 NG 5996 NG 3215 MR 2755 WI 3016 WA
Permit#- 01006 01007 01008 402912 203120 400424
INSPECTION TYPE Time-Min Time-Min Time-Min Time-Min Time-Min Time-Min
Combo: 13-630-27 15-407-09 15-538-09
Final Inspection 16 20 20 19 24 22
Final Plumbing 8 9 9 9 12 11
Final Mechanical 8 9 9 10 12 11
Excav/Forms/Steel/Ft 10 11 11 48 18 15
Underground Plmbg 10 10 10 13 12 23
Bldg-Slab Grade 5 7 7 8 10 21
Roof Sheathing 21 22 22 30 26 16
Shear Nail 35 23 23 30 70 20
Combo:
FramingNentilation 22 20 20 30 18 14
Rough HVAC(meth) 11 10 10 15 9 8
Rough Electrical 11 10 10 15 9 7
Rough PlmbgNents 11 10 10 15 9 7
Insulation/Certification 5 10 9 20 12 7
Stucco Mesh Extr Sd 10 10 10 4 24 6
Stucco Scratch Coat 5 8 9 25 6 5
Stucco Brown Coat 4 9 4 11 5 16
Sewer/Sewage Dispsl 2 2 2 5 3 1
Water Service 1 1 1 5 3 2
Drywall Nailing 20 10 10 18 20 6
Gas Line Air Test 9 15 9 10 6 5
Electrical Service 21 26
Final Electrical 9 20 12 10 12 11
Total 233 246 227 371 346 234
Total Hours 3.88 4.10 3.78 6.18 5.77 3.90
Number of Re-inspections 2 1 1 0 0 1
Re-inspection time 28 0 0 0 0 5
Average Re-inspection Time 14 0 0 0 0 5
94
Table D4. 2200 -2400 Square foot Tract Home Inspection Time (continued)
Bldg Size 2200-2399 Property Property Property Property Property Property
18 19 20 21 22 23
Sq. Ft. Living Area 2293 2293 2280 2334 2747 2280
6819 HD 6833 NM 6665 ND 6693 ND 3305 MR 6680 ND
Permit#- 402584 401672 402930 1 401673 402916 402910
INSPECTION TYPE Time-Min Time-Min Time-Min Time-Min Time-Min Time-Min
Combo: 14-352-44 14-352-13 13-630-02 13-630-04 13-630-32 13-630-10
Final Inspection 18 17 12 10 25 19
Final Plumbing 9 8 6 5 12 9
Final Mechanical 9 9 6 5 12 9
Excav/Forms/Steel/Ft 7 7 30 15 30 19
Underground Plmbg 1 10 30 5 5 6
Bldg-Slab Grade 4 5 6 6 7 7
Roof Sheathing 30 40 25 1 24 2?
Shear Nail 20 20 50 50 36 31
Combo:
FramingNentilation 26 32 24 32 30 34
Rough HVAC(mech) 13 16 12 16 15 17
Rough Electrical 13 16 12 16 15 17
Rough Plmbg/Vents 13 16 12 16 15 12
Insulation/Certification 14 10 16 20 26 18
Stucco Mesh Extr Sd 14 10 9 34 13 10
Stucco Scratch Coat 9 13 10 10 34 16
Stucco Brown Coat 5 4 9 9 11 8
Sewer/Sewage Dispsl 4 4 3 1 8 8
Water Service 25 4 10 1 15
Drywall Nailing 11 10 29 25 25 23
Gas Line Air Test 8 10 15 15 10 2
Electrical Service 12 33 20 20 21 19
Final Electrical 9 9 7 5 13 12
Total 274 303 353 317 391 332
Total Hours 4.57 5.05 5.88 5.28 6.52 5.53
Number of Re-inspections 6 3 0 5 4 6
Re-inspection time 35 155 0 20 6 77
Average Re-inspection Time 6 52 0 4 2 13
95
Table D4. 2200-2400 Square foot Tract Home Inspection Time (continued)
Bldg Size 2200-2399 Property Property
24 25
Sq.Ft. Living Area 2284 2284
2761 WM 6082 NN
Permit# 301009 301006 Average Benchmark
INSPECTION TYPE Time-Min Time-Min Time(Min) D.McCarthy
Combo: 15-407-A4 15-407-86 Per Inspcn
Final Inspection 25 16 20 25
Final Plumbing 16 8 9
Final Mechanical 16 8 9
Excav/Forms/Steel/Ft 11 15 16 25
Underground Plmbg 5 5 10 10
Bldg-Slab Grade = 5 7
Roof Sheathing 17 21 18
Shear Nail 30 35 31 28
Combo:
FramingNentilation 2 22 21 43
Rough HVAC(mech) 2 11 10 -
Rough Electrical 2 11 10 -
Rough PlmbgNents 2 11 10 -
Insulation/Certification 2 5 11 0
Stucco Mesh Extr Sd 16 20 14 10
Stucco Scratch Coat 5 5 10 0
Stucco Brown Coat 3 4 6 0
Sewer/Sewage Dispsl 2 3 5
Water Service 4 1 4 5
Drywall Nailing 14 20 18 10
Gas Line Air Test 5 9
Combo:
Electrical Service 18
Final Electrical 24 19 12 10
Total 211 253 281 189
Total Hours 3.52 4.22 4.56 3.15
Number of Re-inspections 8 2 2.92 3
Re-inspection time 93 28 32.48 10
Average Re-inspection Time 12 14 8.69 30
Bldg-Other 0.00 3.65
Misc P/M/E 0.00
Total with Re-inspections 5.07 4.68 4.58
96
Table D5. 2400 -2600S uare foot Tract Home Inspection Time
Bldg Size 2400 -2599 Property Property Property Property Property
1 2 3 4 5
Sq. Ft.Living Area 2458 2458 2458 2458 2458
ID Number 6616 WS 6639 WS 2859 MR 6613 LC 6637 LC
Tr 13-572/15-407 Permit# B04: 01299 01296 01291 01292 01293
INSPECTION TYPE ID# Time-Min Time-Min Time-Min Time-Min Time Min
Combo:
Final Inspection 350 30 22 36 5 25
Final Plumbing 290 6 15 18 3 12
Final Mechanical 300 6 15 18 3 12
Excav/Forms/Steel/Ft 30 8 13 10 8 2
Underground Plmbg 50 12 5 20 5 5
Bldg-Slab Grade 40 7 6 6 7 8
Roof Sheathing 115 16 17 2 20 24
Shear Nail 130 24 40 33 30 36
Combo:
FramingNentilation 140 27 26 24 28 20
Rough HVAC(mech) 150 14 12 12 14 10
Rough Electrical 160 14 12 12 14 10
Rough PlmbgNents 170 10 11 12 14 10
Insulation/Certification 180 15 20 9 16 20
Stucco Mesh Extr Sd 190 15 10 20 12 12
Stucco Scratch Coat 200 18 10 5 8 8
Stucco Brown Coat 210 9 6 5 8 1
Sewer/Sewage Dispsl 220 8 6 3 2 4
Water Service 230 8 6 3 2 4
Drywall Nailing 240 20 20 15 20 20
Gas Line Air Test 260 15 12 10 13 13
Electrical Service 275 16 68 17 15 12
Final Electrical 280 6 16 33 19 19
Total 304 368 323 266 287
Total Hours 5.07 6.13 5.38 4.43 4.78
Number of Re-inspections 7 3 1 3 4
Re-inspection time 160 81 18 66 54
iAvg Re-inspection Time 23 27 18 22 14
97
I
t
Table D5. 2400 -2600 Square foot Tract Home Inspectio%2556 continued
Bldg Size 2400 -2599 Property Property Property rty Property Property
6 7 g 10 11
Sq. Ft.Living Area 2458 2458 2458 2504 2468
ID Number 6650 LC 6639 WS 6616 WS 2882WM 6144 NL 6062 NN
Trl3-572115-407 Permit# 01294 01296 01299 010
01196 01185 18
INSPECTION TYPE Time-Min Time-Min Time-Min Time-Min Time-Min Time-Min
Combo:
Final Inspection 10 15 10 10 4 20
Final Plumbing 10 15 5 5 2 9
Final Mechanical 10 15 5 5 2 9
Excav/Forms/Steel/Ft 9 13 8 10 5 10
Underground Plmbg 9 5 12 10 4 10
Bldg-Slab Grade 5 6 7 7 6 5
Roof Sheathing 25 17 16 20 16 20
Shear Nail 25 20 24 30 25 20
Combo:
Framing/Ventilation 25 24 27 16 14 22
Rough HVAC(meth) 12 13 14 5 7 11
Rough Electrical 12 13 14 5 7 11
Rough PlmbgNents 11 11 10 4 7 11
Insulation/Certification 16 20 15 10 11 6
Stucco Mesh Extr Sd 12 10 15 10 13 10
Stucco Scratch Coat 10 10 18 5 4 6
Stucco Brown Coat 1 6 9 5 2 5
Sewer/Sewage Dispsl 2 3 4 1 1 2
Water Service 2 3 4 1 1 1
Drywall Nailing 20 20 20 11 17 30
Gas Line Air Test 15 12 15 15 15 10
Electrical Service 10 58 16 20 9
Final Electrical 10 29 5 5 17 10
Total 261 338 273 210 189 238
Total Hours 4.35 5.63 4.55 3.50 3.15 3.97
Number of Re-inspections 3 3 3 3 1 1
Re-inspection time 104 72 69 38 3 25
Avg Re-inspection Time 35 24 23 13 3 25
98
Table D5. 2400 -2600 Square foot Tract Home Ins ction Time continued]
Bldg Size 2400 -2599 Property Property Property Property Property Property
12 13 14 15 16 17
Sq. Ft. Living Area 2458 2468 2398 2458 2458 2468
ID Number 2943 MR 2747 WI 6032 LL 3005 WA 3053 WA 2741 WM
Tr 13-572/15-407 Permit#1 01940 203121 400422 400422 400420 301022
INSPECTION TYPE Time-Min Time-Min Time-Min Time-Min Time Min Time Min
Combo: 15-407-10 15-407-43 15-538-13 15-538-03 15-407-A6
Finallnspection 24 24 18 22 14 16
Final Plumbing 12 12 9 11 7 8
Final Mechanical 12 12 9 12 7 8
Excav/Forms/Steel/Ft 5 24 12 11 15 20
Underground Plmbg 5 16 6 8 8 6
Bldg-Slab Grade 3 10 10 - 5 20
Roof Sheathing 24 26 24 30 18 15
Shear Nail 25 80 35 45 27 35
Combo:
Framing/Ventilation 6 26 16 17 20 18
Rough HVAC(meth) 6 13 8 9 10 9
Rough Electrical 6 13 8 8 10 9
Rough Plmbg/Vents 6 13 7 9 10 9
Insulation/Certification 4 12 18 29
Stucco Mesh Extr Sd 10 18 15 11 25
Stucco Scratch Coat 19 6 5 5 4
Stucco Brown Coat 6 5 7 7 36 3
Sewer/Sewage Dispsl 5 6 2 17 1 2
Water Service 4 4 1 18 2 2
Drywall Nailing 19 20 23 42 20 25
Gas Line Air Test 15 6 5 18 5 5
Electrical Service 10 20
Final Electrical 15 12 9 12 7 8
Total 241 353 232 364 267 247
Total Hours 4.02 5.88 3.87 6.07 4.45 4.12
Number of Re-inspections 1 2 0 1 0 1
Re-inspection time 9 38 0 20 0 22
Avg Re-inspection Time 9 19 0 20 0 22
99
s
I
I
Table D5. 2400 -2600 Square foot Tract Home Ins c 1 n Time (continued)
Bldg Size 2400 -2599 Property Property Property Property Property Property
18 19 20 21 22 23
Sq.Ft.Living Area 2454 2454 2454 2468 2468 2468
ID Number 2733 MR 2705 MR 6513 YL 6113 NN 6062 NN 2796 WM
Tr 13-572/15-407 Permit#1 200232 200235 301021 301108 301014
INSPECTION TYPE Time-Min Time Min Time Min Time-Min Time-Min Time-Min
Combo: 14-193-02 14-193-05 14-193-48 15-407-A2 15-407-84 15-407-20
Final Inspection 16 11 8 12 19 12
Final Plumbing 6 4 6 9 6
Final Mechanical 6 4 6 9 6
Excav/Forms/Steel/Ft 14 15 14 10 15 10
Underground Plmbg 5 14 5 9 5 4
Bldg-Slab Grade 15 5 4 8 5 5
Roof Sheathing 13 13 12 1 c 20 16
Shear Nail 20 20 18 30 20 30
Combo:
FramingNenfilation 9 9 12 16 26 26
Rough HVAC(mech) 4 4 6 8 13 13
Rough Electrical 4 4 6 8 13 13
Rough PlmbgNents 4 4 6 8 13 13
Insulation/Certification 7 12 5 15 6 10
Stucco Mesh Extr Sd 5 5 10 8 10 20
Stucco Scratch Coat 5 5 3 5 6 3
Stucco Brown Coat 6 5 5 7 5 4
Sewer/Sewage Dispsl 5 7 10 2 2 2
Water Service 5 4 5 1 1 2
Drywall Nailing 6 6 10 20 30 15
Gas Line Air Test 3 3 11 5 1� 8
Electrical Service 8 8
Final Electrical 12 12 4 12 8 6
Total 183 178 162 214 245 224
Total Hours 3.05 2.97 2.70 3.57 4.08 3.73
Number of Re-inspections 2 2 1 2 1 2
Re-inspection time 33 20 10 6 20 13
Avg Re-inspection Time 17 10 10 3 20 7
100
Table D5. 2400 -2600 Square foot Tract Home Inspection Time (continued)
Bldg Size 2400 -2599 Property Property
24 25
Sq. Ft.Living Area 2468 2468 F=
ID Number 2764 WM 2731 NI
Tr 13-572/15-407 Permit# 301013 301011 Average
INSPECTION TYPE Time Min Time-Min Time-Min
Combo: 15-407-18 15-407-12 Per Inspcn
Final Inspection 12 14 16
Final Plumbing 6 7 8
Final Mechanical 6 7 9
Excav/Forms/Steel/Ft 49 6 13
Underground Plmbg 4 2 8
Bldg-Slab Grade 5 10 7
Roof Sheathing 16 10 18
Shear Nail 30 16 30
Combo:
FramingNentilation 22 28 20
Rough HVAC(meth) 11 14 10
Rough Electrical 11 14 10
Rough PlmbgNents 11 14 10
Insulation/Certification 9 20 13
Stucco Mesh Extr Sd 15 13
Stucco Scratch Coat o 8 8
Stucco Brown Coat 6 5 7
Sewer/Sewage Dispsl 1 6 4
Water Service 1 4 4
Drywall Nailing 15 40 20
Gas Line Air Test 8 6 10
Combo:
Electrical Service 8 20
Final Electrical 12 12 12
Total 266 256 268
Total Hours 4.43 4.27 4.58
Number of Re-inspections 7 2 1 2.24
Re-inspection time 93 45 41
Avg Re-inspection Time 13 23 16
101
Table D6. 2600 -2800 Square foot Tract Home Inspection Time
Bldg Size 2600-2799 Property Property Property Property Property
1 2 3 4 5
Sq. Ft.Living Area 2762 2762 2762 2660 2660
ID Number 6096 NL 6112 NL 6109 NL 6063 NL 6094 NN
Permit#- 1304:1 01214 1 01215 01204 1 01017 1 01019
INSPECTION TYPE ID# Time-Min Time-Min Time-Min Time-Min Time-Min
Combo:
Final Inspection 350 14 12 12 3 22
Final Plumbing 290 7 6 2 2 11
Final Mechanical 300 7 6 3 2 12
Excav/Forms/Steel/Ft 30 20 10 20 17 10
Underground Plmbg 50 3 4 6 8 10
Bldg-Slab Grade 40 10 5 8 5 10
Roof Sheathing 115 17 18 25 20 17
Shear Nail 1301 22 28 25 33 23
Combo:
FramingNentilation 140 18 16 18 14 18
Rough HVAC(mech) 150 9 8 9 7 9
Rough Electrical 160 9 8 9 7 9
Rough PlmbgNents 170 9 8 9 7 8
Insulation/Certification 180 8 7 13 8 15
Stucco Mesh Extr Sd 190 15 15 12 13 20
Stucco Scratch Coat 200 5 5 15 5
Stucco Brown Coat 210 4 4 4 4 4
Sewer/Sewage Dispsl 220 1 1 1 1 2
Water Service 230 1 1 1 1 1
Drywall Nailing 240 15 5 20 17 20
Gas Line Air Test 260 4 5 4 4 10
Electrical Service 275 7 9 11
Final Electrical 280 14 18 21 18 12
Total 219 199 233 206 248
Total Hours 3.65 3.32 3.88 3.43 4.13
Number of Re-inspections 1 2 1 3 10
Re-inspection time 7 21 4 25 69
Avg 7 11 4 8 7
102
Table D6. 2600 -2800 Square foot Tract Home Inspection Time (continued)
Bldg Size 2600 2799 Property 6 Property 7 Property 8 Property 9 Property 10 Property 11
Sq.Ft.Living Area 2762 2762 2762 2660
ID Number 6158 NL 6111 NL 6041 NL 5992 NG
Permit#- 01201 01203 01213 01020
INSPECTION TYPE Time-Min Time-Min Time-Min Time-Min Time-Min Time-Min
Combo:
Final Inspection 4 6 14 25
Final Plumbing 2 3 7 12
Final Mechanical 2 3 7 13
Excav/Forms/Steel/Ft 5 11 10 11
Underground Plmbg 4 8 10 7
Bldg-Slab Grade 6 4 6 7
Roof Sheathing 20 20 9 20
Shear Nail 23 24 13 35
Combo:
FramingNentilation 18 20 16 22
Rough HVAC(meth) 9 10 8 11
Rough Electrical 9 10 8 11
Rough PlmbgNents 9 10 8 11
Insulation/Certification 14 8 20 15
Stucco Mesh Extr Sd 15 10 15 10
Stucco Scratch Coat 4 8 3 10
Stucco Brown Coat 2 5 4 4
Sewer/Sewage Dispsl 1 10 1 2
Water Service 1 10 1 1
Drywall Nailing 11 15 21 10
Gas Line Air Test 15 15 6 15
Electrical Service 7 12
Final Electrical 15 18 7 17
Total 196 240 194 269 0 0
Total Hours 3.27 4.00 3.23 4.48 0.00 0.00
Number of Re-inspections 2 1 1 1
Re-inspection time 17 4 0 13
Avg 9 4 0 13
103
t
i
t
i
I
Table D6. 2600 - 2800 Square foot Tract Home Inspection Time (continued)
Sq. Ft. Living Area 2600-2799
ID Number
Permit#- Average
INSPECTION TYPE Time-Min
Combo: Per Inspcn
Final Inspection 12
Final Plumbing 6
Final Mechanical 6
Excav/Forms/Steel/Ft 13
Underground Plmbg 7
Bldg-Slab Grade 7
Roof Sheathing 18
Shear Nail 25
Combo:
FramingNentilation 18
Rough HVAC(mech) 9
Rough Electrical 9
Rough PlmbgNents 9
Insulation/Certification 12
Stucco Mesh Extr Sd 14
Stucco Scratch Coat 7
Stucco Brown Coat 4
Sewer/Sewage Dispsl 2
Water Service 2
Drywall Nailing 15
Gas Line Air Test 9
Electrical Service 9
Final Electrical 16
Total 228
Total Hours 3.68
Number of Re-inspections 2
Re-inspection time 3.08
Avg 7
Total with Re-inspections 4.01
104
Table D7. 1200-1400 Square Foot In-fill Home Inspection Times
Bldg Size Property Property Property Property Property Property
1200-1400 1 2 3 4 5 6
Sq.Ft.Living Area 1237 1237 1398 1398 1377 1263
Infill Homes 137-032-06 137-121-12 137-063-23 138-071-05 138-071-12 138-072-24
Permit#- B0: 200895 100396 401836 400933 402485 202967
INSPECTION TYPE ID# Time-Min Time-Min Time-Min Time-Min Time-Min Time-Min
Final Inspection 350 29 2 13 34 24
Final Plumbing 290 14 2 6 11 12
Final Mechanical 300 14 2 6 12
Excav/Forms/Steel/Ft 30 37 8 20 28 23 5
Underground Plmbg 50 17 23 15 28 9 2
Bldg-Slab Grade 40 4 2 3 3 3
Roof Sheathing 115 14 2 12 9 12 6
Shear Nail 130 21 15 18 12 39 7
Combo:
FramingNentilation 140 20 28 10 40 5
Rough HVAC(mech) 150 10 5 14 5 8 3
Rough Electrical 160 10 5 10 5 8 2
Rough PlmbgNents 170 10 5 14 6 9 2
Insulation/Certification 180 3 7 14 5 10 14
Stucco Mesh Extr Sd 190 17 8 9 51 9 11
Stucco Scratch Coat 200 5 5 10 8 6 12
Stucco Brown Coat 210 2 27 4 7 28 10
Sewer/Sewage Dispsl 220 10 25 4 5 26 3
Water Service 230 10 _ 5
Drywall Nailing 240 18 7 7 14 11
Gas Line Air Test 260 5 2 3 45 53
Electrical Service 275 5 7 115 15
Final Electrical 280 15 11 2 6 12
Bldg-Other
Misc P/M/E 460
Total 290 259 215 241 377 232
Total Hours 4.83 4.32 3.58 4.02 6.28 3.87
No.of Re-inspections 17 17 7 5 5 14
Re-inspection Time 126 113 89 54 85 192
Avg Re-inspection Time 7 7 13 11 1 17 14
Total WI Re-inspections 6.93 6.20 5.07 4.92 7.70 7.07
105
Table D7. 1200—1400 Square Foot In-fill Home Inspection Times (continued)
Bldg Size Property Property Property Property Property Property
1200-1400 7 8 9 10 11 12
1277 1263 1215 1351 1320 1270
Sq. Ft. Living Area 138-141-08 138-144-09 138-181-42 138-291-12 139-051-06 139-091-30
Permit#-BO: 202968 202966 301874 301404 303000 302774
INSPECTION TYPE Time-Min Time-Min Time-Min Time-Min Time-Min Time-Min
Final Inspection 7 4 8 5 24 4
Final Plumbing 3 7 4 2 12 2
Final Mechanical 4 7 4 2 12 2
Excav/Forms/SteeVFt 12 9 12 14 14 34
Underground Plmbg 31 1 15 14 16 10
Bldg-Slab Grade 2 5 21 5 24 11
Roof Sheathing 9 5 27 46 9 13
Shear Nail 14 8 36 48 13 58
Combo:
Framing/Ventilation 2 8 27 30 21 21
Rough HVAC(mech) 2 4 7 14 11 11
Rough Electrical 2 4 6 14 11 11
Rough PlmbgNents 2 3 9 14 10 10
Insulation/Certification 11 13 _ 26 10 6
Stucco Mesh Extr Sd 16 16 7 13 19 21
Stucco Scratch Coat 3 6 6 3 9
Stucco Brown Coat 8 9 - 4 7
Sewer/Sewage Dispsl 0 9 '0 8
Water Service F 6
Drywall Nailing 17 17 17 13 19 21
Gas Line Air Test 53 36 12 4 4
Electrical Service 15 15 12 5 5
Final Electrical 36 7 4 3 12 3
Bldg-Other
Misc P/M/E
Total 267 202 272 297 301 281
Total Hours 4.45 3.37 4.53 4.95 5.02 4.68
No.of Re-inspections 9 9 23 8 5 9
Re-inspection Time 87 142 312 106 167 82
Avg Re-inspection Time 10 16 14 13 33 9
Total W/Re-inspections 5.90 5.73 9.73 6.72 7.80 6.05
106
Table D7. 1200— 1400 Square Foot In-fill Home Inspection Times (continued
Bldg Size Property Property Property Property Property Property
1200-1400 13 14 15 16 17 18
Sq. Ft. Living Area 1398 1376 1388 1260 1337 1376
139-121-54 139-174-62 139-231-72 144-081-04 145-121-09 146-043-08
Permit#-60: 302530 300789 301678 402491 303161 101708
INSPECTION TYPE Time-Min Time-Min Time-Min 1145 W 19 680 W 16 2080 N MV
Final Inspection 14 17 32 20 20 6
Final Plumbing 14 8 5 10 3
Final Mechanical 14 8 5 10 3
Excav/Forms/Steel/Ft 17 10 15 35 11 60
Underground Plmbg 25 32 27 40 37 20
Bldg-Slab Grade 4 3 4 10 7 10
Roof Sheathing 15 6 39 18 17 42
Shear Nail 26 10 16 26 25 28
Combo:
FramingNentilation 15 31 21 55
Rough HVAC(mech) 18 19 25 11 27 13
Rough Electrical 18 10 25 11 27 1
Rough PlmbgNents 18 11 26 10 27 11
Insulation/Certification 6 10 10 10 39
Stucco Mesh Extr Sd 6 10 3 6 7 20
Stucco Scratch Coat 3 7 31 20 9 10
Stucco Brown Coat 10 8 11 6 y
Sewer/Sewage Dispsl 9 5 10
Water Service 5 5 8
Drywall Nailing 6 6 4 7 8 12
Gas Line Air Test 12 10 7 3 7 15
Electrical Service 10 5 30 25
Final Electrical 16 9 16 10 10 3
Bldg-Other
Ivlisc P/M/E
Total 287 247 370 294 378 381
Total Hours 4.78 4.12 6.17 4.90 6.30 6.35
No.of Re-inspections 9 3 12 3 8 4
Re-inspection Time 144 61 190 15 307 154
Avg Re-inspection Time 16 20 16 5 38 39
Total W/Re-inspections 7.18 1 5.13 9.33 5.15 11.42 8.92
107
Table D7. 1200—1400 Square Foot In-fill Home Inspection Times (continued)
Bldg Size Property Property Property Property Property Property
1200-1400 19 20 21 22 23 24
Sq. Ft. Living Area 1283 1242 1368 1395 1311 1348
146-104-14 146-133-29 152-074-02 154-201-20 268-134-05 268-441-12
Permit#-BO: 401122 200183 300133 300546 402144 203010
INSPECTION TYPE 1650 N S 138 W M 3598 N S 4575 S A 1795 W D 1712 W 30
Final Inspection 11 10 20 20 46 20
Final Plumbing 5 4 4 10 56 11
Final Mechanical 5 5 4 10 56 11
Excav/Forms/Steel/Ft 17 10 28 51 46 31
Underground Plmbg 6 13 _ 47 16 10
Bldg-Slab Grade 10 6 20 27
Roof Sheathing 9 9 18 21 10 15
Shear Nail 14 17 27 30 15 23
Combo:
Framing/Ventilation 14 12 12 42 31 30
Rough HVAC(mech) 7 6 6 46 16 15
Rough Electrical 7 6 6 23 10 15
Rough PlmbgNents 7 6 6 23 5 15
Insulation/Certification 6 10 15 3 15 21
Stucco Mesh Extr Sd 10 10 '3 5 12
Stucco Scratch Coat 4 9 15 12 20
Stucco Brown Coat 5 6 9 10 10
Sewer/Sewage Dispsl 5 0 10
Water Service 15 11 8
Drywall Nailing 10 10 16 4 12 12
Gas Line Air Test 7 - 34
Electrical Service 57 16
Final Electrical 5 5 4 10 46 4
Bldg-Other
Misc P/M/E
Total 199 199 287 446 508 353
Total Hours 3.32 3.32 4.78 7.43 8.47 5.88
No.of Re-inspections 7 0 3 18 6 9
Re-inspection Time 138 0 27 365 89 235
Avg Re-inspection Time 20 0 9 20 15 26
Total W/Re-inspections 5.62 3.32 5.23 13.52 9.95 9.80
108
Table D7. 1200—1400 Square Foot In-fill Home Inspection Times (continued)
Bldg Size Property
1200-1400 25
Sq. Ft. Living Area 1350 Average
269-323-07 Time(Min)
Permit#-B0: 302325 Per
INSPECTION TYPE 1827_NA Inspection
Final Inspection 32 18
Final Plumbing 4 9
Final Mechanical 4 9
Excav/Forms/Steel/Ft 26 23
Underground Plmbg 19 20
Bldg-Slab Grade 15 9
Roof Sheathing 8 16
Shear Nail 11 22
Combo:
Framing/Venfilation 22 23
Rough HVAC(mech) 17 13
Rough Electrical 13 11
Rough PlmbgNents 13 11
Insulation/Certification 18 12
Stucco Mesh Extr Sd 19 13
Stucco Scratch Coat 4 9
Stucco Brown Coat 8 9
Sewer/Sewage Dispsl 5 10
Water Service 5 8
Drywall Nailing 20 12
Gas Line Air Test 18 17
Electrical Service 9 15
Final Electrical 5 11
Bldg-Other
Misc P/M/E
Total 295 300
Total Hours 4.92 4.99
No.of Re-inspections 8 8.72
Re-inspection Time 123 136
Avg Re-inspection Time 15 16.10
Total W/Re-inspections 6.97 6.58
109
Table D7. 1200- 1400 Square Foot In-fill Home Inspection Times (continued)
Bldg Size
1200-1400
Average
Time(Min) Benchmark
INSPECTION TYPE Per Inspcn D.McCarthy Mode Median
Final Inspection 18 25 20 18
Final Plumbing 9 4 7
Final Mechanical 9 4 7
Excav/Forms/Steel/Ft 23 25 28 17
Underground Plmbg 20 10 15 17
Bldg-Slab Grade 9 3 7
Roof Sheathing 16 18 9 12
Shear Nail 22 28 15 18
Combo:
Framing/Ventilation 23 43 23 22
Rough HVAC(meth) 13 11 11
Rough Electrical 11 10 10
Rough Plmbg[Vents 11 10 10
Insulation/Certification 12 0 10 10
Stucco Mesh Extr Sd 13 10 13 11
Stucco Scratch Coat 9 0 9 9
Stucco Brown Coat 9 0 9 9
Sewer/Sewage Dispsl 10 5 10 10
Water Service 8 5 8 8
Drywall Nailing 12 10 12 12
Gas Line Air Test 17 17 15
Electrical Service 15 15 15
Final Electrical 11 10 4 9
Bldg-Other
Misc P/M/E
Total Minutes(From Above) 300 189 287 287
Total Hours(From AE 33) 4.99 3.15 4.78 4.78
No.of Re-inspections 8.72 3 9 8
Re-inspection Time 136 10 89 123
Avg Re-inspection Time(Min) 16.10 30 10 14.83
Total with Re-inspections 6.58 #N/A 6.93
Driving Time 239
Contingient Time 60 25
Total 12.24 4.07
110
Table D8. 1400— 1600 Square Foot In-fill Home Inspection Times
Property Property Property Property Property Property
Bldg Size—1401 -1600 1 2 3 4 5 6
Sq.Ft.Living Area 1422 1524 1404 1427 1456 1427
Infill Homes 135-132-38 135-292-09 137-022-20 138-063-09 137-022-20 138-071-06
Permit#- B0: 400367 402165 302408 101756 302409 400934
INSPECTION TYPE ID 453 NL 183 E K 1206 W B 656 N J 1208 W B 955 W 7
Final Inspection 350 28 22 29 30 26
Final Plumbing 290 8 11 12 - 17 13
Final Mechanical 300 8 11 12 15 13
Excav/Forms/Steel/Ft 30 8 30 23 38 23 18
Underground Plmbg 50 12 17 8 12 8 6
Bldg-Slab Grade 40 5 10 10 10 7
Roof Sheathing 115 28 34 18 4 34 11
Shear Nail 130 41 51 20 6 27 16
Combo:
FramingNentilation 140 15 28 14 2 12 15
Rough HVAC(mech) 150 9 14 7 1 6 8
Rough Electrical 160 9 14 7 1 6
Rough PlmbgNents 170 9 14 7 1 6 9
Insulation/Certification 180 17 18 4 12 4 7
Stucco Mesh Extr Sd 190 ._ 14 4 11 4 7
Stucco Scratch Coat 200 15 17 3 14 3 6
Stucco Brown Coat 210 15 4 8 15 8 6
Sewer/Sewage Dispsl 220 3 12 9 9
Water Service 230 3 12
Drywall Nailing 240 15 23 59 14 29 14
Gas Line Air Test 260 5 55 17 17 3
Electrical Service 275 8 13 20 _ 10
Final Electrical 280 8 11 12 17 13
Bldg-Other 460 50
Misc P/M/E
Total 281 435 312 291 314 236
Total Hours 4.68 7.25 5.20 4.85 5.23 3.93
No.of Re-inspections 13 10 4 10 4 4
Re-inspection time 255 179 56 163 36 64
Avg Re-inspection Time 20 18 14 16 9 16
Total W/Re-inspections 8.93 10.23 6.13 7.57 5.83 5.00
111
Table D8. 1400- 600 Square Foot In-fill Home Inspection Times (continued)
Property Property Property Property Property Property
Bldg Size-1400—1600 7 8 9 10 11 12
Sq. Ft. Living Area 1513 1477 1580 1441 1448 1445
145-051-15 145-121-26 145-161-04 149-041-24 150 023-02 150-332-01
Permit#- 401251 300278 401148 303103 201190 400514
INSPECTION TYPE 687 W-21 624_W1 6 1580 N G 813WC 2925 NG 2325 NL
Final Inspection 5 24 7 41 8 10
Final Plumbing 2 7 7 4 4 5
Final Mechanical 18 7 7 5 4 5
Excav/Forms/Steel/Ft 17 20 11 55 22 15
Underground Plmbg 32 42 15 8 15
Bldg-Slab Grade 17 2 30 4 9 7
Roof Sheathing 12 51 7 12 30 10
Shear Nail 8 16 45 18 74 10
Combo..
FramingNentilation 10 16 35 23 24 15
Rough HVAC(mech) 5 3 6 12 8
Rough Electrical 5 8 3 6 12 8
Rough PlmbgNents 33 8 3 12 12 7
Insulation/Certification 13 6 3 10 10 20
Stucco Mesh Extr Sd 7 5 15 6 18 8
Stucco Scratch Coat 10 10 3 14 15 7
Stucco Brown Coat 15 15 9 7 15 11
Sewer/Sewage Dispsl 12 3 5 _ 12
Water Service 9
Drywall Nailing 7 5 18 6 18 16
Gas Line Air Test - 15 20 4
Electrical Service 18 15 25 8
Final Electrical 19 13 5 4 10
Bldg-Other
Misc P/M/E
Total 271 302 312 297 360 220
Total Hours 4.52 5.03 5.20 4.95 6.00 3.67
No.of Re-inspections 12 13 14 24 2 5
Re-inspection time 198 131 188 347 60 64
Avg Re-inspection Time 17 10 13 14 30 13
Total W/Re-inspections 7.82 7.22 8.33 10.73 7.00 4.73
112
Table D8. 1400-1600 Square Foot In-fill Home Inspection Times (continued)
Property Property Property Property Property Property
Bldg Size-1400—1600 13 4 15 16 17 18
Sq. Ft.Living Area 1575 1442 1422 1546 1473 1473
151-053-36 268-131-01 268-422-13 273-181-11 274-024-20 274-024-03
Permit#- 402562 400370 500176 300908 301843 301845
INSPECTION TYPE 614 W 33 3005 N C 2691 N P 1246 N C 1510 W W 1520 W W
Final Inspection 5 10 15 17 10
Final Plumbing 2 3 5 8 10 10
Final Mechanical 3 5 10 10 10
ExcavlForms/Steel/Ft 33 20 30 34 19 15
Underground Plmbg 29 10 47 20 10 9
Bldg-Slab Grade 11 10 3 6 5
Roof Sheathing 40 18 12 7 6 6
Shear Nail 52 31 18 10 8 8
Combo:
Framing/Ventilation 13 18 34 4 12 12
Rough HVAC(mech) 6 9 36 3 6 6
Rough Electrical 6 9 10 3 6 6
Rough PlmbgNents 7 9 36 3 6 6
Insulation/Certification 9 33 4 9 14 4
Stucco Mesh Extr Sd 21 32 8 2 30 37
Stucco Scratch Coat 11 6 20 7 9 9
Stucco Brown Coat 9 6 14 4 6 6
Sewer/Sewage Dispsl 16 17 _ 12 12
Water Service 16 17 8 =
Drywall Nailing 13 11 25 23 30 37
Gas Line Air Test 3 - 3 5 29 28
Electrical Service 15 34 50 26 25
Final Electrical 35 3 5 7 9 10
Bldg-Other 16 6
Misc P/M/E
Total 355 337 402 218 306 286
Total Hours 5.92 5.62 6.70 3.63 5.10 4.77
No.of Re-inspections 3 10 6 12 6 8
Re-inspection time 29 244 105 143 123 144
Avg Re-inspection Time 10 24 18 12 21 18
Total with Re-inspections 6.40 9.68 8.45 6.02 7.15 7.17
113
Table D8. 1400—1600 Square Foot In-fill Home Inspection Times (continued)
Bldg Size-1400—1600 Property Property Property Property Property Property
19 20 21 22 23 24
Sq. Ft.Living Area 1556 1406 1406 1406 1539 1539
1200-181-01 142-282-24 142-282-19 142-282-23 141-163-07 141-163-06
Permit#- 301633 300300 300302 300301 302545 302546
INSPECTION TYPE 3657 E A 1633 W B 1673 W B 1641 W B 863 S M 869 S M
Final Inspection 40 13 21 12 12 12
Final Plumbing 3 7 6 6 3 8
Final Mechanical 14 9 6 8 3 8
Excav/Forms/Steel/Ft 3 35 12 12 26 27
Underground Plmbg 12 4 5 9 9
Bldg-Slab Grade 2 19 34 8
Roof Sheathing 11 6 8 8 9 10
Shear Nail 17 12 9 12 12 10
Combo:
FramingNentilation 16 8 8 8 12 9
Rough HVAC(mech) 8 4 4 4 5 4
Rough Electrical 8 4 4 3 5 5
Rough PlmbgNents 8 4 5 3 5 5
Insulation/Certification 15 7 10 6 6 5
Stucco Mesh Extr Sd 8 _ 7 3 -2 3
Stucco Scratch Coat - 6 5 10 11 8
Stucco Brown Coat 20 19 16 3 6 6
Sewer/Sewage Dispsl 7 12 10 10
Water Service 8 a g 2
Drywall Nailing 8 6 5 3 11 5
Gas Line Air Test 5 19 3 9 -
Electrical Service 40 7 9
Final Electrical 3 19 6 6 25 9
Bldg-Other 29
Misc P/M/E
Total 269 262 206 185 233 199
Total Hours 4.48 4.37 3.43 3.08 3.88 3.32
No.of Re-inspections 12 5 3 4 19 10
Re-inspection time 149 33 30 36 142 85
Avg Re-inspection Time 12 7 10 9 7 9
Total W/Re-inspections 6.97 1 4.92 3.93 1 3.68 1 6.25 1 4.73
114
Table D8. 1400—1600 Square Foot In-fill Home Inspection Times (continued)
Bldg Size- 1400-1600 Property
25
Sq. Ft. Living Area 1496
141-152-11
Permit#- 402241 Average
INSPECTION TYPE 841 S M Time(Min)
Final Inspection 11 18
Final Plumbing - 7
Final Mechanical 9
Excav/Forms/Steel/Ft 34 23
Underground Plmbg 15
Bldg-Slab Grade 3 10
Roof Sheathing 5 16
Shear Nail 5 21
Combo:
FramingNentilation 20 15
Rough HVAC(mech) 10 8
Rough Electrical 10 7
Rough PlmbgNents 9 9
Insulation/Certification 20 11
Stucco Mesh Extr Sd 22 12
Stucco Scratch Coat 10
Stucco Brown Coat 10
Sewer/Sewage Dispsl 11
Water Service 9
Drywall Nailing 23 17
Gas Line Air Test - 14
Electrical Service 20
Final Electrical 11
Bldg-Other 25
Misc P/M/E
Total 289 308
Total Hours 4.82 4.79
No.of Re-inspections 9 8.88
Re-inspection time 241 130
Avg Re-inspection Time 27 14.91
Total W/Re-inspections 8.83 6.95
115
Table D8. 1400—1600 Square Foot In-fill Home Inspection Times (continued)
Bldg Size-1400-1600 Average
Time(Min)
Per Benchmark
INSPECTION TYPE Inspection D. McCarthy Mode Median
Final Inspection 18 25 10 15
Final Plumbing 7 7 7
Final Mechanical 9 9 9
Excav/Forms/Steel/Ft 23 25 30 22
Underground Plmbg 15 10 15 12
Bldg-Slab Grade 10 10 10
Roof Sheathing 16 18 12 11
Shear Nail 21 28 8 16
Combo:
FramingNentilation 15 43 12 14
Rough HVAC(mech) 8 6 6
Rough Electrical 7 6 6
Rough PlmbgNents 9 9 7
Insulation/Certification 11 0 4 9
Stucco Mesh Extr Sd 12 10 12 8
Stucco Scratch Coat 10 0 10 10
Stucco Brown Coat 10 0 6 9
Sewer/Sewage Dispsl 11 5 12 12
Water Service 9 5 9 9
Drywall Nailing 17 10 23 14
Gas Line Air Test 14 14 14
Electrical Service 20 20 20
Final Electrical 11 10 11 10
Bldg-Other 25 25 23
Misc P/M/E
Total Minutes(From Above) 308 189 255 289
Total Hours(From AE 33) 5.14 3.15 4.25 4.82
Number of Re-inspections 8.88 3 10 9
Re-inspection time 130 10 36 131
Average Re-inspection Time 14.91 30 9 14
Total W/Re-inspections 6.95 #REF! #REF!
Driving Time 239 239
Indirect Time(Admin.,ect) 60 60
Total 12.29 4.65
116
Table D9. 1600 to 2400 Square Foot In-fill Home Inspection Times
Bldg Sq. Ft. Property Property Property Property Property Property
1600-2400 1 2 3 4 5 6
Sq. Ft.Living Area 1600 1616 1688 1694 1699 1705
Infill Homes 139-233-37 266-261-01 152-184-02 152-081-07
Permit#- 80: 401316 403398 200048 400207 202421 300758
INSPECTION TYPE IID# Time-Min Time-Min Time-Min Time-Min Time-Min Time Min
Combo:
Final Inspection 350 40 21 10 25 15 23
Final Plumbing 290 4 13 5 12 7 8
Final Mechanical 300 4 14 5 13 7 8
Excav/Forms/Steel/Ft 30 14 19 11 30 11 18
Underground Plmbg 50 19 6 4 11 20 16
Bldg-Slab Grade 40 5 4 28
Roof Sheathing 115 18 21 8 74 15 14
Shear Nail 130 26 32 12 74 21 21
Combo:
FramingNentilation 140 25 21 12 35 21 13
Rough HVAC(mech) 150 13 10 6 17 15 2
Rough Electrical 160 12 11 6 18 16 2
Rough PlmbgNents 170 12 11 6 18 15 1
Insulation/Certification 180 15 8 10 8 20 14
Stucco Mesh Extr Sd 190 15 10 10 5 10 9
Stucco Scratch Coat 200 10 13 10 4 20
Stucco Brown Coat 210 15 20 5 4 5 5
Sewer/Sewage Dispsl 220 13 1 15 12
Water Service 230 15 3 12
Drywall Nailing 240 10 10 10 6 10 20
Gas Line Air Test 260 3 20 15 15 43
Electrical Service 275 35 5 37
Final Electrical 280 5 14 10 14 6 12
Bldg-Other 460 10
Misc P/M/E
Total 330 317 201 426 298 338
Total Hours 5.50 5.28 3.35 7.10 4.97 5.63
Number of Re-inspections 5 4 1 11 4 26
Re-inspection time 128 70 5 349 60 397
Avg Re-inspection Time 26 18 5 32 15 15
Total with Re-inspections 5.93 5.58 3.43 7.63 5.22 5.89
117
i
Table D9. 1600 to 2400 Square Foot In-fill Home Inspection Times (continued
Bldg Size.-1600-2400 Property Property Property Property Property Property
7 8 9 10 11 12
Sq. Ft.Living Area 1722 1735 1826 1822 1853 1875
143-301-13 152-161-27 137-022-19 151-053-35 270-051-38
Pen-nit#-BO: 303084 300431 300298 403829 402559 002076
INSPECTION TYPE Time-Min Time-Min Time-Min Time-Min Time-Min
Combo:
Final Inspection 21 10 10 5 15 20
Final Plumbing 19 4 5 2 8 1
Final Mechanical 11 4 5 3 8 1
Excav/Forms/Steel/Ft 12 31 20 23 33 37
Underground Plmbg 4 15 13 7 29 13
Bldg-Slab Grade 17 25 7 9 11 10
Roof Sheathing 22 14 20 20 35 24
Shear Nail 33 21 28 30 53 36
Combo:
Framing/Ventilation 26 10 20 48 36 24
Rough HVAC(meth) 13 5 4 8 18 12
Rough Electrical 13 5 10 25 18 12
Rough Plmbg/Vents 11 5 10 23 18 12
Insulation/Certification 14 11 6 4 8 20
Stucco Mesh Extr Sd 11 10 6 4 16
Stucco Scratch Coat 18 9 10 20
Stucco Brown Coat 14 19 8 9 15 50
Sewer/Sewage Dispsl 10 10 12 46 25
Water Service 4 5 12 46 13
Drywall Nailing 21 15 10 15 13 60
Gas Line Air Test 14 19 3 3 12
Electrical Service 19 11 20
Final Electrical 11 4 23 11 30 3
Bldg-Other 18 15 25
Misc P/M/E
Total 356 288 273 294 499 451
Total Hours 5.93 4.80 4.55 4.90 8.32 7.52
Number of Re-inspections 8 16 7 6 3 10
Re-inspection time 101 199 75 116 43 324
Avg Re-inspection Time 13 12 1 11 19 14 32
Total with Re-inspections 6.14 5.01 4.73 5.22 8.56 1 8.06
118
Table D9. 1600 to 2400 Square Foot In-fill Home Inspection Times continued
Bldg Size. Property Property Property Property Property Property
1600-2400 13 14 15 16 17 18
Sq. Ft. Living Area 1920 1973 2010 2010 2010 2299
139-113-29 152-161-27 271-513-01
Permit#-B0: 400607 300431 40006 40007 40008 101846
INSPECTION TYPE Time-Min Time-Min Time-Min 1694 Crt 1704 Crt 1585 W Edn
Combo:
Final Inspection 29 10 17 8 8 15
Final Plumbing 19 4 4 4 12
Final Mechanical 19 4 4 4 12
Excav/Forms/Steel/Ft 21 23 63 30 25 18
Underground Plmbg 15 20 14 8 12
Bldg-Slab Grade 8 7 5 5 5 17
Roof Sheathing 8 14 33 22 30 19
Shear Nail 14 21 48 33 33 28
Combo:
FramingNentilation 10 8 10 15 16 60
Rough HVAC(mech) 11 5 5 8 8 17
Rough Electrical 13 5 5 8 8 17
Rough Plmbg/Vents 14 5 4 7 8 17
Insulation/Certification 11 11 10 10 10 10
Stucco Mesh Extr Sd 10 10 15 11 18 10
Stucco Scratch Coat 7 4 5 4 10
Stucco Brown Coat 5 19 4 4 4 12
Sewer/Sewage Dispsl 10 15 20
Water Service 5 4 4 4 11
Drywall Nailing 8 15 15 10 19 24
Gas Line Air Test 3 15 15 15 .'
Electrical Service 5 30
Final Electrical 4 20 4 4 15
Bldg-Other 21
Misc P/M/E 33
Total 319 239 348 256 270 400
Total Hours 5.32 3.98 5.80 4.27 4.50 6.67
Number of Re-inspections 10 16 14 2 5 10
Re-inspection time 163 178 533 15 134 266
Avg Re-inspection Time 16 11 38 8 27 27
Total with Re-inspections 5.59 4.17 6.43 4.39 4.95 7.11
119
Table D9. 1600 to 2400 Square Foot In-fill Home Inspection Times (continued)
Bldg Size. Property Property
1600-2400 19 20
2537 2506
Sq. Ft.Living Area 154-061-54
Permit#-60: 300218 403283 Average
INSPECTION TYPE 5395 N Gv 2276 W KL Time(Min)
Combo: Per Inspcn
Final Inspection 29 12 17
Final Plumbing 14 14 8
Final Mechanical 14 14 8
Excav/Forms/Steel/Ft 24
Underground Plmbg 18 5 13
Bldg-Slab Grade 11
Roof Sheathing 36 35 24
Shear Nail 53 50 33
Combo:
Framing/Ventilation 36 24 24
Rough HVAC(mech) 24 12 11
Rough Electrical 24 12 12
Rough PlmbgNents 24 12 12
Insulation/Certification 27 14 12
Stucco Mesh Extr Sd 18 13 11
Stucco Scratch Coat 5 11 10
Stucco Brown Coat 9 15 12
Sewer/Sewage Dispsl 11 12 15
Water Service 11
Drywall Nailing 20 27 17
Gas Line Air Test 11 15 14
Electrical Service 20
Final Electrical 14 12 11
Bldg-Other 18
Misc P/M/E
Total 453 375 348
Total Hours 7.55 6.25 4.92
Number of Re-inspections 10 5 7.90
Re-inspection time 1 217 1 68 1 158
Avg Re-inspection Time 22 14 16.92
Total with Re-inspections 7.91 6.48 5.78
120
i
Table D9. 1600 to 2400 Square Foot In-fill Home Inspection Times (continued)
Bldg Size.-1600-2400 Average-
INSPECTION TYPE Time(Min) Benchmark
Combo: Per Inspcn D.McCarthy Mode Median
Final Inspection 17 25 10 15
Final Plumbing 8 4 8
Final Mechanical 8 4 8
Excav/Forms/SteeVFt 24 25 11 23
Underground Plmbg 13 10 13 13
Bldg-Slab Grade 11 11 11
Roof Sheathing 24 18 14 21
Shear Nail 33 28 21 31
Combo:
FramingNentilation 24 43 10 21
Rough HVAC(mech) 11 5 11
Rough Electrical 12 12 12
Rough PlmbgNents 12 12 12
Insulation/Certification 12 0 10 11
Stucco Mesh Extr Sd 11 10 10 10
Stucco Scratch Coat 10 0 10 10
Stucco Brown Coat 12 0 5 9
Sewer/Sewage Dispsl 15 5 15 15
Water Service 11 5 11 11
Drywall Nailing 17 10 10 15
Gas Line Air Test 14 15 14
Electrical Service 20 20 20
Final Electrical 11 10 4 11
Bldg-Other 18
Misc P/M/E
Total Minutes(From Above) 348 189 #N/A 325
Total Hours(From AE 33) 5.80 3.15 #N/A 5.41
Number of Re-inspections 7.90 3 10 8
Re-inspection time 158 10 #N/A 131
Avg Re-inspection Time(Min) 16.92 30 #N/A 15.78
Total with Re-inspections 5.78 5.94 #N/A 5.74
Driving Time 239 239
Indirect Time(Admin.,ect.) 60.00 60
Total 13.42 4.65
121
Table D10. 2600+ Square Foot In-fill Home Inspecti n Times
Bldg Size Property Property Property Property Property Property
2600+Sq. Ft. 1 2 3 4 5 6
Sq. Ft.Living Area 2649 3128 3284 3391 4018 7895
Parcel Number 153-121-32 261-041-27 348-101-78 139-131-25 155-021-08
Permit#-B04: 401019 202932 400598 302427 400659 401969
INSPECTION TYPE 1ID# Time-Min Time-Min Time-Min Time-Min Time-Min Time-Min
Combo:
Final Inspection 350 6 14 41 26 74 49
Final Plumbing 290 3 7 20 3 37 14
Final Mechanical 300 3 7 21 4 37 14
Excav/Forms/Steel/Ft 30 37 32 80 36 26 18
Underground PImbg 50 30 14 12 20 25 17
Bldg-Slab Grade 40 12 11 20 17 9 18
Temp Power Pole 70
Roof Sheathing 115 8 18 34 19 15 30
Shear Nail 130 15 60 52 36 15 83
Combo:
FramingNentilation 140 15 45 20 16 24
Rough HVAC(mech) 150 5 17 20 10 6 12
Rough Electrical 160 5 17 20 11 6 12
Rough PimbgNents 170 14 4 20 10 6 12
Insulation/Certification 180 10 20 23 12 21 -
Stucco Mesh Extr Sd 190 50 - 13 6 5
Stucco Scratch Coat 200 7 9 7 19 12
Stucco Brown Coat 210 9 22 27 12 4
Sewer/Sewage Disps] 220 21 16 32 20 19
Water Service 230 0
Drywall Nailing 240 50 19 19 8 45 20
Gas Line Air Test 260 3 3 3 17 20
Elect Srvc 10 26 18 55 18
Final Electrical 280 20 53 5 6 38 124
Bldg-Other 460 15 10
Misc PImbg/Mech/Elect 30
Total 378 435 512 375 468 552
Total Hours 6.30 7.25 8.53 6.25 7.80 9.20
Re-inspection Number 12 13 8 14 14 5
Re-inspection Time 97 421 153 258 257 91
jAverage Re-inspection Time 8 32 19 18 18 18
122
Table D10. 2600+ S uare Foot In-fill Home Inspection Times (continued)
Bldg Size 2600+Sq. Ft Average
Time-Min
INSPECTION TYPE Per Insptcn
Combo:
Final Inspection 35
Final Plumbing 14
Final Mechanical 14
Excav/Forms/Steel/Ft 38
Underground Plmbg 20
Bldg-Slab Grade 15
Temp Power Pole 0
Roof Sheathing 21
Shear Nail 44
Combo:
FramingNentilation 24
Rough HVAC(mech) 12
Rough Electrical 12
Rough PlmbgNents 11
Insulation/Certification 17
Stucco Mesh Extr Sd 20
Stucco Scratch Coat 11
Stucco Brown Coat 15
Sewer/Sewage Dispsl 22
Water Service 0
Drywall Nailing 27
Gas Line Air Test 9
Elect Srvc 25
Final Electrical 41
Bldg-Other 4
Misc Plmbg/Meth/Elect 5
Total 453
Total Hours 7.23
Re-inspection Number 11
Re-inspection Time 213
Average Re-inspection Time 19
Driving Time 239
Addl Contgny&Avg Resry 60
16.09
123
ADDENDUM E
TIME/COSTS FOR ROOM ADDITIONS
Please see the following Tables E1 to E3 .
124
O I-- 5T—(D O O N 00 CA M M O 1,- cwt (D f- I,- 00 N t` 00 LO m O (D N I- O
Ln O N (D (D L() f-- f-- fl- (D LO (D N (D Cl) N (D f- LO 00 M M Ln I-- M M �t Nt N 00 (D N LD
M O r r r M C) 0 0 0 0 0 0 C) 0 C) 0 0 0 0 0 0 0 C) 0 0 0 0 0 0 0 0 Co
0) — C) 0 d' fA '44' (A f- Il- O (D Cl) M N M r � CO N It lqt (D N O N O O (D N O O
N M 00 -t LO CM CO M N O (D O N tM h r r CO O 00 O (D r CO M r- O 00 O M (D M Cl)
Cr) r N LO LO (D '-T 'T "T Lo N ,T N N M CD "It r-- It co 00 I- 'IT IT f` f- 00 LO I r (D
• 69 (A (fl6969 -696969 E1) 6A6964 69E4 696ek (A64H9EA696969EA690A61), 69 EH 6969 -
E9 U,
0 co co co N r CD O) I,- co O N Lo r O O U') r M 'T r co fl- V LO M fl- N co r O CO r
000 ►•. V Invl` f- CAmNLOU•) 000OLn I-q 'IT wU') 0Iq ON00CN CDNcov
N r CO M O N N N N M co r M M .' M U•) N N Ln M M M I, to (D co M O
• r" r
• CO CO CO r r r O O CO I- r Cl Lo LD CD I- M r O 'T O 1- M N I- M M r Q r O M M
•
r r N r r r r r N r r r r r N
•
M ti N r 0 0 00 r r O 00 N In r f` CD I- M LO (D �- M r- CD r N r 0 LO N O I- O
r lz 00 r N M W f- O O M M O . r O d' O M f- CD (D 0 O N CO M r LO 'IT N 'IT 00
r N N fl r r N r r N N r r N M N M r r N .T N N M N N ti
O O O O O O O co �T
M p) C cn
O O O O O O O QJ "6 C X C_
>
Q
O O O O (D (D (D O
N N C N
O O O O O O O I� 1C)i C:) � C M
Z
W o Q.�
= 0000 000 rA
U n C
Y O O O O N O O N fl- 00 O I� O I` O O r- O
N N N r r I r U) O
It
O CO
(T
U O O O O IO O O O > Lf1
CD r ¢ U)
Q N O O Iqt M O O CD O 00 (D f— r c} 00 Op (D 00
Ill C u r r r r r 00
F- E S6
0 O O 00 O LO N O �t O O H r O LO LO O O M (D O LO N
r (V I M r r r U) r r r
= fli
O O O U) O O O co tO M r
O r I N co r U) (D X
Cl) . 4) M
Z Cl Cl 0 0 M O O O CD r O LO r 1 r N (V LO
N (D N r N ti N M r M 'T (D C
O � � C
O M f� O U7 M O lf) lO O O "- r-1,4, M LO V, O U, O U, O N (D CA r
Q N M ct r N M (O t` O f� 00 M N �t I� N N (D N > LO
C N r r r N Q = �-
m
LO O O O In O O LO r O Lf) M LL O
Q N LO � M r r
O (°h
Ln O O r M LO O v LO Il- O N r LO O N (D V) O O O N N f— C �A
r N N LO N CM (V N M (D CD O O N M Cf"t (D N d' CO CO r II
r U C
W OOOO COO O 00 LO N f� L.L ` p
W M N r fv a+
J & Q
In Q 0 0 0 0 (C V N O O N 0 Q
H " �
O O O LO 0 r M 0 to Ln LO C) 'IT (D LO N N 00 C_ C O
N LO (D r LO LO N r C) � M N ti LO LL C O O
r r G U
Q V
Cl 0 LO LO O O O O O O LO M r 0 N M O (n a
N CD (D M CO r N r " r LO M M C fn w
CD
O O to CD r O (D r (D LO O I� O O LO M CO r LO O M Ln O N O O M I` C 0)
Ln r r N M N N M N N r r �- tT M M M r r N M f- N (M > C m C_ LL
Q
N O (i U) N O r M (D O M LO LO qq I- N <- O r N O M O N O M O 00 O r- N 00 Q m
Cl) LO (D N M 04 N q Ln N N CM C) CO CO O r N N M CA O LO O O V co O 00 Cl) O
r- •- N N N N M M M M CO M M cT �T LO tD (D t` M lI) M LO O C
r r Q
�
Ln
wtzo
cr
cL
cu
F �ill. ��� il�9 , �■ : �
LL
LU
ca
LU
LL:
co N (n 0 t-- O O O O M "T CO M tl- - N LO N N 0
t- ((7 'Q. M M t- M U N t-- t- N LO N M - (A (D r- M
O O O O O O O O O O O O O O O O O O O O M
CD O 00 Cl) OD r- q (f) M IqT U) N 00 (D d' (D r r V-
IT � O Nr O LO co rl- O Cl) N tl- M 00 tl- M O r" V' Nr--
O OD (D (D 00 M t` O (D d (D CD Cl) rl- O CO ti (D N (D
�-6') A (A 6F9 -6H 6-# 69 - -6,1 -6H -: v) fA EA 69 �
E9 6A 69 (A ;; EA 6R 69
f` � M f- t, .T M (D O O O I�r (D r- O O OD (O 00 V
N 00 t- V (n � Cl) r- N M O (D t- (D N to (A IT (n (D
t.- LO cl V LOO () OD O O - q;t (A r- M IT �-
It O to 0) 't 0) .- O (D t- M 00 0) L() N V LO (D LO ' 00
N N - - N (V N M N - N M r- cM N (V N M
O q co O O (O - (D t-- Lo M M 00 t-- N O (O 0) (D 00
M V O - (D 0) 00 Lr) - Co r- O T tl- CO (f) O LO 00 M
CO N N (V U) CV V Cl) (V ti t` N LO N �t N Cl) N f--
U) C
'IT (0
> Q C X
Q
O
N
M N N co O LL
N CD m N co
fA
(n N N O
Z U
W Q
M M C) 00 O LO tf)
= M N N fn
U � �
LO
Y N
c
O _
O U r r - O
N N 00 W)
Cn O •• O
N
2 (n O 60) -
c OO Imo .- O t.- t-- coO O
m M - r r �- r r r II II
L.. CL700001-- 00 'C O O d
cn
CL m MOO (D O O M m M Lo N 07(D O 00
O M r r M .- N r (D M �- (n O > CA
(n .� (T(n Q O
C • t` qT O OD O co LO O M ti 00 co O t7 >
Q •• (f) "T O (A M CO O w V Cl) (D (D LO Q
U) r - -
(1) �- N t-_ OD
T N LO X
Q U_
N (D O a0 O (D N N O M (A N CD O u7 M 3 co
O Ct N P- CO (O r- LO .-- N (D fl- t.() M I' O N C m c
(Od co(DOLo Mu N C() >cm
cr ti O
N 'D ti co O N N Q> _ )
W m �
W LL EA C
J O
m In to 00 U
Q M �-
� Y
co O M t` N M V 00 OO co O0 ti O
N O0 (O O (`M co N M C) (C) UL
N r r r cn
O
tl � � �
co O (D 00 O N (0 O r (n cr O) O
•• (O r- N N CO N M (n C O C
N U E
C
LO tD r N (n O O O OO r- t� O (6 @ Q cn
00 co N (n N M N M f� O CON N �- O X (n
.- > (D N
Q 2 2i 2 O 0)
a
N (D O (A O) O CO r- N O CO N O (D O co OD (0 O co 00 0 m a)
CDLO (D - N LOLO (OO 'T - 0M - NOw O Mao
LO O (D r-- I,- fl- I,- r-- w M O m O O O V' Ln NT N 0)
- - - N (N > > C)
Q Q
Addendum F
Electrical/Plumbing/Mechanical Permit Data Tables
Table F1. EPM Building Permits-Sub-Type Electrical
Cntng Drive Inspctn Total Fee City's Gain
# Permit# Task Time Time Min Min $ Cost$ Loss
1 B0600046 200 Amp Panel 4.00 7.95 63 74.95 43.00 107.80 -64.80
2 B0600051 Bus Was 4.00 7.95 20 31.95 43.00 45.95 -2.95
3 B0600082 200 Amp Panel 4.00 7.95 37 48.95 43.00 70.41 -27.41
4 B0600103 Temp Pwr PI 4.00 7.95 24 35.95 43.00 51.71 -8.71
5 B0600105 200 Am Panel 4.00 7.95 19 30.95 43.00 44.52 -1.52
6 IB0600116 Temp Pwr PI 4.00 7.95 30 41.95 43.00 60.34 -17.34
7 IB0600130 200 Amp Panel 4.00 7.95 137 148.95 43.00 214.24 -171.24
8 B0600138 Rec is 4.00 7.95 21 32.95 43.00 47.39 4.39
9 B0600149 Temp Pwr PI 4.00 7.95 17 28.95 43.00 41.641 1.36
10 B0600156 200 Amp PaneVMeter Reset 4.00 7.95 55 66.95 43.00 96.30 -53.30
11 B0600164 200 Amp Panel 4.00 7.95 13 24.95 43.00 35.891 7.11
12 80600179 1000 Am Panel 4.00 7.95 10 21.95 43.00 31.57 11.43
13 B0600188 Generator-Tent Sale 4.00 7.95 25 36.95 43.001 53.15 -10.15
14 B0600189 200 Amp Panel 4.00 7.95 1 13 24.95 43.00 35.89 7.11
15 80600212 200 Amp Panel 4.00 7.95 25 36.95 43.00 53.15 -10.15
16 B0600624 200 Am Panel 4.00 7.95 25 36.95 43.00 53.15 -10.15
17 B0600269 200 Amp Panel/Fxtrs/Ttl Rewire 4.00 7.95 106 117.95 43.00 169.65 -126.65
18 B0600291 200 Amp Panel 4.00 7.95 30 41.95 43.001 60.34 -17.34
19 B0601064 200 Amp Panel 4.00 7.95 10 21.95 43,001 31.57 11.43
20 B0601065 200 Amp Panel 4.00 7.95 13 24.95 43.00 35.891 7.11
21 B0600306 200 Amp Panel 4.00 7.95 18 29.95 43.00 43.08 -0.08
22 B0600326 Temp Pwr PI 4.00 7.95 20 31.95 43.00 45.95 -2.95
23 B0600334 Meter Reset 4.00 7.95 68 79.95 43.00 114.99 -71.99
24 B0600359 200 Amp Panel 4.00 7.95 16 27.95 43.00 40.20 2.80
25 60600360 200 Amp Panel 4.00 7.95 22 33.95 43.00 48.83 -5.83
26 B0600383 2-200 Amp Panel 4.00 7.95 32 43.95 43.00 63.21 -20.21
27 B0600399 200 Amp Panel 4.00 7.95 14 25.95 43.00 37.32 5.68
28 B0600409 Rece t/Swtch/Outlet 4.00 7.95 13 24.95 43.001 35.89 7.11
29 60600642 200 Amp Panel 4.00 7.95 13 24.95 43.001 35.89 7.11
30 B0600416 100 Amp Panel 4.00 7.95 62 73.95 43.001 106.36 -63.36
31 B0601077 2 Outlets/4 Lt Fixtures 4.00 7.95 27 38.95 43.001 56.02 -13.02
32 60600443 100 Amp Panel 4.00 7.95 31 42.95 43.001 61.78 -18.78
33 80600452 200 Amp Panel 4.00 7.95 12 23.95 43.001 34.45 8.55
34 B0600473 Rece t/Swtch/Outlet 4.00 7.95 16 27.95 43.001 40.20 2.80
35 B0600479 200 Amp Panel 4.00 7.95 18 29.95 43.001 43.08 -0.08
36 B0600483 200 Amp Panel 4.00 7.95 10 21.95 43.001 31.57 11.43
37 B0600487 New Meter Reset 4.00 7.95 41 52.95 43.00 76.16 -33.16
38 B0600490 1200 Amp Panel 4.00 7.95 34 45.95 43.00 66.09 -23.09
39 80600500 11000 Amp Panel 4.00 7.95 26 1 37.95 48.50 54.58 -6.08
128
40 B0600515 200 Amp Panel 4.00 7.95 15 26.95 43.001 38.76 4.24
41 80600523 200 Am Panel 4.00 7.95 34 45.95 43.001 66.09 -23.09
42 B0600533 200 Amp Panel 4.00 7.95 20 31.95 43.001 45.95 -2.95
43 B0600540 200 Amp Panel 4.00 7.95 40 51.95 43.001 74.72 -31.72
441B0600543 200 Amp Panel 4.00 7.95 13 24.95 43.00 35.89 7.11
45 B0600559 200 Amp Panel 4.00 7.95 10 21.95 43.00 31.57 11.43
46 B0600579 200 Amp Panel 4.00 7.95 31 42.95 43.00 61.78 -18.78
47 B0600602 200 Amp Panel 4.00 7.95 43 54.95 43.00 79.04 -36.04
48 B0601095 200 Amp Panel 4.00 7.95 17 28.95 43.00 41.64 1.36
49 B0601111 I Meter Reset 4.00 7.95 106 1 117.95 43.00 169.65 -126.65
50 B0600623 Rece t/Swtch/Outlet, Rf Cvr, RR 4.00 7.95 15 1 26.95 43.00 38.76 4.24
Total Gain or Loss -$904.55
Average Gain or Loss Per Inspection -$18.09
City's Costs T Min Prcntl Count If Number
Average Inspection $61.20 42.55 33rd 41.64 0-33rd 18
Median Inspection $48.11 33.45 66th 60.34 34-66th 16
Max Inspection $214.24 148.95 67-100th 16
Min Inspection $31.57 21.95
Count If less than Average 34
Count If>or=to Average 16
Count If less than$43.00 18
Count If>or=to$43.00 32
Minimum Charge+Average Loss 43.00 + 18.09 = $61.09
129
Table F2. EPM Building Permits-Sub-Type Plumbing
EPM Building Permits-Sub-Type Plumbing
# Cntng Drive Insp Total Fee Citys Gain
Permit# Task Time Time Min Min $ Cost$ Loss
1 B0502736 Wtr Htr 4.00 7.95 50 61.95 43.00 89.10 -46.10
2 B0600062 4 Fxtrs/Trps 4.00 7.95 15 26.95 43.00 38.76 4.24
3 B0502845 Copper Repi Main&Res. 4.00 7.95 53 64.95 43.001 93.42 -50.42
4 B0600153 1 Fxtr, Sewer Line 4.00 7.95 16 27.95 43.001 40.20 2.80
5 B0600178 12 Fxtr, Re pipe 4.00 7.95 57 68.95 43.001 99.17 -56.17
6 B0502865 Copper Re i Main&Wtr Htr 4.00 7.95 54 65.95 43.001 94.86 -51.86
7 B0503012 Cppr Re pipe Bath/Kitch/Wtr Htr 4.00 7.951 22 33.95 43.00 48.83 -5.83
8 B0600233 Wtr Htr 4.00 7.951 18 29.95 43.00 43.08 -0.08
9 B0600386 Demo, instl Bld Trailer&Swr 4.00 7.95 21 32.95 43.00 47.39 -4.39
10 B0600389 Wtr Htr 4.00 7.95 17 28.95 43.00 41.64 1.36
11 B0600526 Wtr Htr 4.00 7.95 20 31.95 43.001 45.95 -2.95
12 B0600583 Wtr Htr 4.00 7.95 13 24.95 43.001 35.89 7.11
13 B0600585 Wtr Htr 4.00 7.95 11 22.95 43.001 33.01 9.99
14 B0600668 Wtr Htr 4.00 7.95 18 1 29.95 43.001 43.08 -0.08
15 B0600677 Wtr Htr 4.00 7.95 13 1 24.95 43.001 35.89 7.11
16 B0503023 Replace Sewerline 4.00 7.95 32 43.95 43.001 63.21 -20.21
17 60600806 Wtr Htr 4.00 7.95 22 33.95 43.001 48.83 -5.83
k 18 B0500725 Wtr Htr 4.00 7.95 45 56.95 43.001 81.91 -38.91
19 B0500712 Wtr Htr 4.00 7.95 43 54.95 43.00 79.04 -36.04
20 B0501023 Gas Pipe Undrgmd to Garg 4.00 7.95 8 19.95 43.00 28.69 14.31
21 B0501016 Swr Cnct, Bldg Tdr Swr 4.00 7.95 87 98.95 43.00 142.32 -99.32
22 B0503337 Relocate Wtr Htr 4.00 7.95 24 35.95 43.00 51.71 -8.71
23 B0502320 1 Drain Vent, Relo Fir Snk 4.00 7.95 37 48.95 43.001 70.41 -27.41
24 B0502355 Wtr Htr 4.00 7.951 22 33.95 43.00 48.83 -5.83
25 B0502735 Wtr Htr 4.00 7.95 50 61.95 43.001 89.10 -46.10
Total Gain or Loss - $459.34
Avera a Gain or Loss per Inspection -$18.37
City's T Prcnfl Count If Number
Cost Min
Average Inspection $61.37 42. 33rd $43.08 0-33rd 9
67
Median Inspection $48.83 33. 66th $70.29 34-66t' 7
95
Max Inspection $142.3 98. 67-1001h 9
2 95
Minlnspection $28.69 19.
95
Count If Less than Average 15
Count If>or=Average 10
Count If less than$43.00 7
Count If>or=$43.00 18
Minimum Charge+Average Loss 43.00 18. _ $61.37
37
130
Table F3. EPM Building Permits-Sub-Type Mechanical
EPM Building Permits-Sub-Type Mechanical
Cntng Drive Insp Total Fee City's Gain
# Permit# Task Time Time Min Min $ Cost; Loss
1 B0600098 Sus /Wall/Flr Htr 4.00 7.95 11 22.95 43.00 33.01 9.99
2 B0600191 Sus /Wall/Flr Htr 4.00 7.95 27 38.95 43.00 56.02 -13.02
3 B0600192 Sus /WaIVFlr Htr 4.00 7.95 17 28.95 43.00 41.64 1.36
4 B0600271 Fum to 100K,3 Ton 4.00 7.95 15 26.95 43.00 38.76 4.24
5 IB0600496 Htn /Ref/C Unit 4.00 7.95 53 64.95 43.00 93.42 -50.42
6 B0600506 3 Evap Coolers 4.00 7.95 15 26.95 43.00 38.76 4.24
7 B0600524 To 100K Htn /Ref, Dual Pack 4.00 7.95 99 110.95 43.00 159.58 -116.58
8 B0600525 Sus /Wall/Flr Htr 4.00 7.95 33 1 44.95 43.00 64.65 -21.65
9 B0600527 Sus /Wall/Flr Htr 4.00 7.95 31 42.95 43.00 61.78 -18.78
10 80600599 To 100K Htn /Ref 4.00 7.95 10 21.95 43.00 31.57 11.43
11 B0600628 To 100K Hfi /Ref 4.00 7.95 42 53.95 43.00 77.60 -34.60
12 B0600661 Htn /Ref/C Unit 4.00 7.95 15 26.95 43.00 38.76 4.24
13 BO600662 2-Htn /Ref/C Units 4.00 7.95 15 1 26.95 43.00 38.76 4.24
14 BO600663 Htn /Ref/C Unit 4.00 7.95 15 26.95 43.00 38.76 4.24
15 BO600802 Susp/Wall/Flr Htr 4.00 7.95 10 21.95 43.00 31.57 11.43
16 B0600271 Change AC 4.00 7.95 15 26.951 43.00 38.761 4.24
17 80600897 Sus /WaIVFlr Htr 4.00 7.95 11 22.95 43.00 33.01 9.99
18 B0600901 Sus Mall/Flr Htr 4.00 7.95 13 24.95 43.00 35.89 7.11
19 B0600977 Hfi /Ref/C Unit 4.00 7.95 17 28.95 43.00 41.64 1.36
20 80601055 Sus /Wall/Flr Htr 4.00 7.95 29 40.95 43.00 58.90 -15.90
21 60601137 >100K 5 Ton 4.00 7.95 31 42.951 43.00 61.78 -18.78
22 B0601174 Htn /Ref/C Unit 4.00 7.95 27 38.951 43.00 56.02 -13.02
23 B0601220 Htn /Ref/C Unit 4.00 7.95 16 27.95 43.00 40.20 2.80
24 B0600192 Change Wall Htr 4.00 7.95 17 28.95 43.00 41.64 1.36
25 B0601273 Hfi /Ref/C Unit 4.00 7.95 14 25.95 43.00 37.32 5.68
26 60601343 15 H -500K,< 100K BTU Fum 4.00 7.95 14 25.95 43.00 37.32 5.68
27 B0601808 < 100K BTU 4.00 7.95 11 22.95 43.00 33.01 9.99
28 B0600471_Chang HVAC 4.00 7.95 13 24.95 43.00 35.891 7.11
Total Gain or Loss -$192.05
Average Gain or Loss per Inspection -$6.86
City's Costs T Min Prcntl Count If Number
Average Inspection $49.86 34.66 33rd $38.76 0-33rd 9
Median Inspection $38.76 26.95 66th $41.64 34-66th 10
Max Inspection $159.58 110.95 67-100th 9
Min Inspection $31.57 21.95
Count If less than Average 19
Count If>or=Average 9
Count If less than$43.00 19
Count If>or=$43.00 9
Minimum Charge+Average Loss 43.00 + 6.86 = $49.86
f
131
Table F4. EPM Building Permits-Sub-Type Electrical and Plumbing
EPM Building Permits-Sub-Type ElectricaUPlumbin
Cntng Drive Inspctn Total Fee City's Gain
# Permit# Task Time Time Min Min ; Cost; (Loss)!
1 B0601970 Lwn S mklr 4.00 7.95 12 23.95 43.00 34.45 8.55
2 IB0601362 Lwn S mklr, Recp 4.00 7.95 7 18.95 43.00 27.26 15.74
3 IB0601361 Elect Timer 4.00 7.95 7 18.95 43.00 27.26 15.74
4 IB0601336 <600V-200A 4.00 7.95 66 77.95 43.00 112.12 -69.12
5 B0600549 2 FxtrsfTrps 4.00 7.95 1 25 36.95 43.00 53.15 -10.15
6 B0600514 1 FxtrfTrp,Wtr Pp 4.00 7.95 59 70.951 43.00 102.05 -59.05
7 B0504153 Wtr Htr 4.00 7.95 13 24.95 43.00 35.89 7.11
8 B0504125 1 Fxtr,GP, Ot Lt 4.00 7.95 22 33.95 43.00 48.83 -5.83
9 IB0504013 Lwn S mklr 4.00 7.95 30 41.95 43.00 60.34 -17.34
10 1 80503886 Lwn S mklr 4.00 7.95 26 37.95 43.00 54.58 -11.58
111B0503615 Wtr Trtmnt, DmNnt, Pp 4.00 7.95 45 56.95 43.00 81.91 -38.91
12 B0503551 Wtr Htr/Dm 4.00 7.95 30 41.95 43.00 60.34 -17.34
13 B0503046 Wtr Htr, G P, <600 V-200 A 4.00 7.95 98 109.95 43.00 158.14 -115.14
14 B0502938 G P 4.00 7.95 58 69.95 43.00 100.61 -57.61
15 B0502430 Lwn S mklr 4.00 7.95 22 33.95 43.00 48.83 -5.83
16 80403445 Lwn S mklrs W/Elect 4.00 7.95 191 30.95 43.00 44.52 -1.52
17 B0502108 Lwn S mklr 4.00 7.95 24 35.95 43.00 51.71 -8.71
18 B0502107 Lwn S mklr,Timer 4.00 7.95 10 21.95 43.00 31.57 11.43
19 B0502105 Lwn S mklr, Timer 4.00 7.95 9 20.95 43.00 1 30.13 12.87
20 B0502021 Bldg/Tdr Swr, <600V-200 A 4.00 7.95 55 66.95 43.00 96.30 -53.30
21 B0403412 Elect Wtr Htr/Floor&Bar Sinks 4.00 7.95 12 23.95 43.00 34.45 8.55
22 B0403354 Relo 4 Outlets/4-30 Amp Outlets 4.00 7.95 86 97.95 43.00 140.88 -97.88
23 80403045 Irrigation S st/Timer 4.00 7.95 15 26.95 43.00 38.76 4.24
24 B0501092 Wtr Htr,<600 V-200 A 4.00 7.95 79 90.95 43.00 130.82 -87.82
25 B0501093 Lwn S mklr, 1 Rece t Swtch OL 4.00 7.95 41 52.95 43.00 76.16 -33.16
Total Gain or Loss -$606.05
Average Gain or Loss per Inspection -$24.24
City's Cost T Min Prcnb Count If Number
Average Inspection $67.24 46.75 33rd $44.51 0-33rd 12
Median Inspection $53.15 36.95 66th $75.91 34-66th 7
Max Inspection $158.14 109.95 67-100th 6
Min Inspection $27.26 18.95
Count If less than Average 18
Count If>or=Average 7
Count If less than$43.00 8
Count If>or=$43.00 17
Minimum Charge+Average Loss 43.00 + 24.24 = $67.24
132
Table F5. EPM Building Permits-Sub-Type Electrical and Mechanical
EPM Building Permits-Sub-Type Electrical/Mechanical
Cntng Drive lnsptn Total Fee City's Gain
# Permit# Task Time Time Min Min $ Cost$ Loss
1 B0601797 Chn FAU add Condensor 4.00 7.95 141 152.95 43.00 219.99 -176.99
2 IB0601481 Move A/C 4.00 7.95 15 26.95 43.00 38.76 4.24
3 80601464 Upgrd Panel, Replace FAU 4.00 7.95 26 37.951 43.00 54.58 -11.58
4 80601117 FAU/AC 4.00 7.95 29 40.95 43.00 58.90 -15.90
5 B0600295 New FAU 4.00 7.95 169 180.95 43.00 260.27 -217.27
6 B0600293 New HVAC 4.00 7.95 10 21.95 43.00 31.57 11.43
7 B0503124 Chng FAU&A/C, add switch 4.00 7.95 76 87.95 43.00 126.50 -83.50
8 B0202793 Chng PNL/New AC&Ducts 4.00 7.95 62 73.95 43.00 106.36 -63.36
9 80502159 Upqrd Panel, Chng FAU &A/C 4.00 7.95 117 128.95 43.00 185.47 -142.47
10 B0202298 Chn A/C&Circuit 4.00 7.95 15 26.95 43.00 38.76 4.24
111B0502014 Upgrd Panel, Chng HVAC 4.00 7.95 20 31.95 43.00 45.95 -2.95
12 BO202199 New Attic A/C, Pnl, Fxtr, Dscnct 4.00 7.95 55 66.95 43.00 96.30 -53.30
13 80501252 Add A/C to FAU 4.00 7.95 25 36.95 43.00 53.15 -10.15
14 B0501024 Upgrd Panel add A/C 4.00 7.95 44 55.95 43.00 80.47 -37.47
15 B0501008 Upqrd Panel add A/C 4.00 7.95 70 81.95 44.00 117.87 -73.87
16 B0202185 A/C, FAU, E-Meter Upgrd 4.00 7.95 40 51.95 43.00 74.72 -31.72
17 60403319 Spray Booth 4.00 7.95 105 116.95 43.00 168.21 -125.21
181B0402525 Chng FAU add Condensor/Coil 4.00 7.95 35 46.95 43.00 67.53 -24.53
19 BO402521 Chng Twin Pack, Upgrd Wiring 4.00 7.95 35 46.95 43.00 67.53 -24.53
20 B0402443 Chn A/C Condensor&Discnct 4.00 7.95 16 27.95 43.00 40.20 2.80
21 B0402435 Intall S lit S st 4.00 7.95 29 40.95 43.00 58.90 -15.90
22 B0402336 Upqrd Pnl/New FAU/Cndsr/GLn 4.00 7.95 14 25.95 43.00 37.32 5.68
23 80301491 Replace A/C, FAU, E-PNL 4.00 7.95 50 61.95 43.00 89.10 -46.10
24 BO401002 HVAC W/Elect 4.00 7.95 27 38.95 43.00 56.02 -13.02
25 BO401339 U rd PNL&HVAC 4.00 7.95 75 86.95 43.00 125.06 -82.06
Total Gain or Loss -$1,223.54
Average Gain or Loss per Inspection -$48.94
City's Costs T Min Prcntl Count If Number
Average Inspection $91.98 63.95 33rd $56.02 0-33rd 8
Median Inspection $67.53 46.95 66th $96.18 34-66th 6
Max Inspection $260.27 180.95 67-100th 11
Min Inspection $31.57 21.95
Count If less than Average 16
Count If>or=Average 9
Count If less than$43.00 5
Count If>or=$43.00 20
Minimum Charge+Average Loss 43.00 + 48.94 = $91.94
1
133
Table F6. EPM Building Permits-Sub-Type Mechanical and Plumbing
EPM Building Permits-Sub-Type Mechanical/Plumbing
Cntng Drive Inspctn Total Fee City's Gain
# Permit# Task Time Time Min Min $ Cost$ Loss
i 1 IB0601265 Wtr Htr,Wall Fum 4.00 7.95 19 30.95 43.00 44.52 -1.52
2 B0503967 Wtr Htr,Wall Fum 4.00 7.95 25 36.95 43.00 53.15 -10.15
3 B0503667 PImbq Fxtrs, Hood Vent 4.00 7.95 13 24.95 43.00 35.89 7.11
4 B0501411 Wtr Htr,Wall Fum 4.00 7.95 11 22.95 43.00 33.01 9.99
5 B0500893 Install heating and air 4.00 7.95 44 55.95 43.00 80.47 -37.47
6 IB0500891 Intall FAU, G-Line, Cndnsr 4.00 7.95 20 31.95 43.00 45.95 -2.95
7 IB0500738 Re lance FAU,Wtr Htr 4.00 7.95 26 37.95 43.00 54.58 -11.58
8 B0403655 Wtr Htr,Wall Fum 4.00 7.95 14 25.95 43.00 ;43.08 5.68
9 B0300200 Wall Htr/2 Tub Shwr/Wst, Ovrflws 4.00 7.95 25 36.95 57.00 3.85
10 B0402879 HVAC, 2 Plm Fxtrs 4.00 7.95 12 23.95 43.00 8.55
11 B0402157 Wtr Htr,Wall Fum 4.00 7.95 37 48.95 43.00 -27.41
12 BO402141 FAU,Wtr Htr 4.00 7.95 18 29.95 43.00 -0.08
13 B0402026 Wall Htr 4.00 7.95 10 21.95 43.00 11.43
14 B0402020 Wall Htr 4.00 7.95 1 12 23.95 43.00 34.45 8.55
15 B0402018 Wtr Htr, FAU 4.00 7.95 26 37.95 43.00 54.58 -11.58
16 B0402013 Wtr Htr, FAU 4.00 7.95 31 42.95 43.00 1 61.78 -18.78
17 BO401932 Wtr Htr 4.00 7.95 10 21.95 43.00 31.57 11.43
18 60401682 Wtr Htr, 2 WI Htr 4.00 7.95 12 23.95 43.00 34.45 8.55
19 B0303233 3 Overhead Heaters 4.00 7.95 1 82 93.95 43.00 135.13 -92.13
20 B0302241 Wtr htr,WC,WI Fum 4.00 7.95 10 21.95 43.00 31.57 11.43
21 B0301485 2 WI Fum 4.00 7.95 20 31.95 43.00 45.95 -2.95
22 B0301302 Wall Htr,WI Fum 4.00 7.95 20 31.95 43.00 45.95 -2.95
23 B0301301 Wtr Htr,WI Htr 4.00 7.95 15 26.95 43.00 38.76 4.24
24 80300478 Wtr Htr, DL Wall Htr 4.00 7.95 16 27.95 43.00 40.20 2.80
25 BO300389 Wtr Htr,WI Htr, 3 Fxtrs 4.00 7.95 15 26.95 43.00 38.76 4.24
Total Gain or Loss -$121.72
Average Gain or Loss per Inspection -$4.87
City's Costs T Min Prcnti Count If Number
Average Inspection $48.43 33.67 33rd $37.32 0-33rd 8
Median Inspection $43.08 29.95 66th $45.95 34-66th 6
Max Inspection $135.13 93.95 67-100th 11
Min Inspection $31.57 21.95
Count If less than Average 17
Count If>or=Average 8
Count If less than$43.00 12
Count If>or=$43.00 13
Minimum Charge+Average Loss 43.00 + 4.87 = $47.87
t
134
Table F7. EPM Building Permits-Sub-Type Electrical, Mechanical and Plumbing
EPM Building Permits-Sub-Type Electrical/MechanicaUPlumbin
Cntng Drive Insp Total Fee City's Gain
# Permit# Task Time Time Min Min $ Cost$ Loss
1 B0600736 Gas and Water Pipe 4.00 7.951 66 77.95 43.001 112.12 -69.12
2 B0600665 Demo old put in news lit AC 4.00 7.95 65 76.95 43.00 110.68 -67.68
3 B0600502 Gas and Water Pipe, new HVAC 4.00 7.95 15 26.95 43.00 38.76 4.24
4 130503314 New AC 4.00 7.95 15 26.95 43.00 38.76 4.24
5 B0503313 Split HVAC 4.00 7.95 14 25.95 43.00 37.32 5.68
6 B0503311 Split HVAC 4.00 7.95 36 47.95 43.00 68.97 -25.97
7 B0502747 New AC, Unit 3 4.00 7.95 11 22.95 43.00 33.01 9.99
8 80502746 Chnq HVAC 4.00 7.951 38 49.95 43.00 71.84 -28.84
9 B0502679 New Twin Pack 4.00 7.95 55 66.95 43.00 96.30 -53.30
10 B0501452 Attic AC 4.00 7.95 12 23.95 43.00 34.45 8.55
11 130501433 Condncr,Attic AC, Elect, G-Line 4.00 7.95 22 33.95 43.00 48.83 -5.83
12 B0501391 Attic FAU, Elect, G-Line, Cndncr 4.00 7.95 39 50.95 43.00 73.28 -30.28
13 B0403855 Relo BR Fxtrs 4.00 7.95 216 227.95 43.001 327.87 -284.87
14 130401011 Install FAU W/AC 4.00 7.95 14 25.95 43.00 37.32 5.68
15 80400845 New Split HVAC 4.00 7.95 15 26.95 43.00 38.76 4.24
16 B0400810 New Attic FAU/Cndncr/GLn/Rec 4.00 7.95 18 29.95 43.00 43.08 -0.08
17 B0400059 Chn -out Wall Fum 4.00 7.95 45 56.95 43.00 81.91 -38.91
18 60301872 New HVAC Unit 4.00 7.95 66 77.95 43.00 112.12 -69.12
19 B0301114 New Attic FAU 4.00 7.95 30 41.95 43.00 60.34 -17.34
20 B0300566 Install Washer/Dryer in Shed 4.00 7.95 29 40.95 43.00 58.90 -15.90
21 B0300370 Chn FAU&Cndnsr 4.00 7.95 55 66.95 43.00 96.30 -53.30
22 B0300322 Install Washer/Dryer in Shed 4.00 7.95 17 28.95 43.00 41.64 1.36
23 B0202774 New Split A/C, Ducts,G-Ln Elect 4.00 7.95 55 66.95 43.00 96.30 -53.30
24 B0201450 Install 2 Roof Evap Clrs 4.00 7.95 20 31.95 43.00 45.95 -2.95
25 80201332 Roof To Twin Pack 4.00 7.95 18 29.95 43.00 43.08 -0.08
Total Gain or Loss -$772.90
Average Gain or Loss -$30.92
Note: Twin Pack and Dual Pack are AC and FAU combined and are roof mounted.
City's Cost T Min Prcntl Count If Number
Average Inspection $73.92 51.39 33rd $43.08 0-33rd 10
Median Inspection $58.90 40.95 66th $73.26 34-66th 6
Max Inspection $327.87 227.95 67-100th 9
Min Inspection $33.01 22.95
Range Min to Max $295.86 206.00
Mode $38.76 26.95
Count If less than Average 17
Count If>or=Average 8
Count If less than$43.00 8
Count If>or=$43.00 17
Minimum Charge+Average Loss 43.00 + 30.92 = $73.92
13�
Table F8.Water Heaters Only
Water Heaters Only
Cntng Drive Inspctn Total Fee City's Gain
Permit# Task Time Time Min Min $ Cost$ Loss
MP IB0401932 Water Heater 4.00 7.95 10 21.95 43.00 31.57 11.43
P B0600233 Water Heater 4.00 7.95 18 29.95 43.00 43.08 -0.08
P B0600389 Water Heater 4.00 7.95 17 28.95 43.00 41.64 1.36
P B0600526 Water Heater 4.00 7.95 20 1 31.95 43.00 45.95 -2.95
P B0600583 Water Heater 4.00 7.95 13 24.95 43.00 35.89 7.11
P IB0600585 Water Heater 4.00 7.95 11 22.95 43.00 33.01 9.99
P B0600668 Water Heater 4.00 7.95 18 29.95 43.00 43.08 -0.08
P B0600677 Water Heater 4.00 7.95 13 24.95 43.00 35.89 7.11
P B0600806 Water Heater 4.00 7.95 22 33.95 43.00 48.83 -5.83
P B0500725 Water Heater 4.00 7.95 45 56.95 43.00 81.91 -38.91
P B0500712 Water Heater 4.00 7.95 43 54.95 43.00 79.04 -36.04
P B0502355 Water Heater 4.00 7.95 22 33.95 43.00 48.83 -5.83
P B0502735 Water Heater 4.00 7.95 50 61.95 43.00 89.10 A6.10
EP B0504153 Water Heater 4.00 7.95 13 24.95 43.00 35.89 7.11
Total Gain or Loss -$91.71
Average Loss per Inspection -$6.55
City's Costs T Min Prcnb Count If Number
Average Inspection $49.55 34.45 33rd $37.80 0-33rd 5
Median Inspection $43.08 29.95 66th $47.85 34-66th 4
Max Inspection $89.10 61.95 67-100th 5
Min Inspection $31.57 21.95
Count If less than Average 11
Count If>or=Average 3
Count If less than$43.00 6
Count If>or=$43.00 8
Minimum Charge+Average Loss 43.00 + 6.55 = $49.55
136
Table F9. Lawn Sprinklers
LAWN SPRINKLERS
Cntng Drive Inspctn Total Fee City's Gain
Permit# Task Time Time Min Min $ Costa Loss
EP IB0601970 Lwn S mkir 4.00 7.95 12 23.95 43.00 34.45 8.55
EP IB0601362 Lwn S mkir, Recp 4.00 7.95 7 18.95 43.00 27.26 15.74
EP IB0504013 Lwn S mkir 4.00 7.95 1 30 41.951, 43.00 60.34 -17.34
EP IB0503886 Lwn S mkir 4.00 7.95 26 37.95 43.00 54.58 -11.58
EP IB0502430 Lwn S mkir 4.00 7.95 22 33.95 43.00 48.83 -5.83
EP IB0502108 Lwn S mkir 4.00 7.95 24 35.95 43.00 51.71 -8.71
EP B0502107 Lwn S mkir, Timer 4.00 7.95 10 21.95 43.00 31.57 11.43
EP B0502105 Lwn S mkir, Timer 4.00 7.95 9 20.95 43.00 1 30.13 12.87
EP B0501093 Lwn S mkir, 1 Rece t Swtch OL 4.00 7.95 41 52.95 43.00 76.16 -33.16
EP 80403445 Lwn S mklrs W/Elect 4.00 7.95 19 30.95 43.00 44.52 -1.52
EP IB0403045 Irrigation S st/Timer 4.00 7.95 15 26.95 43.00 38.76 4.24
Total Gain or Loss 346.45 498.31 -25.31
Average Gain or Loss per Inspection 31.50 45.30 -2.30
City's Costs T Min Prcnti Count If Number
Average Inspection $45.30 31.50 33rd $35.88 0-33rd 4
Median Inspection $44.52 30.95 66th $50.73 34-66th 3
Max Inspection $76.16 52.95 67-100th 4
Min Inspection $27.26 18.95
Count If less than Average 6
Count If>or=Average 5
Count If less than$43.00 5
Count If>or=$43.00 6
Minimum Charge+Average Loss 43.00 + 2.30 = $45.30
137
Table F10.200 AMP Panel Upgrades
200AMP PANEL UPGRADES
Cntng Drive Inspctn Total Fee City's Gain
# Permit# Task Time Time Min Min $ Cost$ Loss
E 60600046 200 Amp Panel 4.00 7.95 63 74.95 43.00 107.80 -64.80
E IB0600082 200 Amp Panel 4.00 7.95 37 48.95 43.00 70.41 -27.41
E IB0600105 200 Amp Panel 4.00 7.95 19 30.95 43.00 44.52 -1.52
E IB0600130 200 Amp Panel 4.00 7.95 137 148.95 43.00 214.24 -171.24
E B0600540 200 Amp Panel 4.00 7.95 40 51.95 43.00 74.72 -31.72
E B0600164 200 Amp Panel 4.00 7.95 13 24.95 43.00 35.89 7.11
E B0600189 200 Amp Panel 4.00 7.95 13 24.95 43.00 35.89 7.11
E B0600212 200 Amp Panel 4.00 7.95 25 36.95 43.00 53.15 -10.15
E B0600624 200 Am Panel 4.00 7.95 25 36.95 43.00 53.15 -10.15
E IB0600543 200 Amp Panel 4.00 7.95 13 24.95 43.00 35.89 7.11
E IB0600291 200 Amp Panel 4.00 7.95 30 41.95 43.00 60.34 -17.34
E IB0601064 200 Amp Panel 4.00 7.95 10 21.95 43.00 31.57 11.43
E B0601065 200 Amp Panel 4.00 7.95 13 24.95 43.00 35.89 7.11
E B0600306 200 Amp Panel 4.00 7.95 18 29.95 43.00 43.08 -0.08
E B0600359 200 Amp Panel 4.00 7.95 16 27.95 43.00 40.20 2.80
E B0600360 200 Am Panel 4.00 7.95 22 33.95 43.00 48.83 -5.83
E B0600399 200 Amp Panel 4.00 7.95 14 25.95 43.00 37.32 5.68
E B0600642 200 Am Panel 4.00 7.95 13 24.95 43.00 35.89 7.11
E B0600452 200 Am Panel 4.00 7.95 12 23.95 43.00 34.45 8.55
E B0600479 200 Amp Panel 4.00 7.95 18 29.95 43.00 43.08 -0.08
E B0600483 200 Am Panel 4.00 7.95 10 21.95 43.00 31.57 11.43
E 60600490 200 Amp Panel 4.00 7.95 34 45.95 43.00 66.09 -23.09
E B0600515 200 Amp Panel 4.00 7.95 15 26.95 43.00 38.76 4.24
E B0600523 200 Amp Panel 4.00 7.95 34 45.95 43.00 66.09 -23.09
E 80600533 200 Am Panel 4.00 7.95 20 31.95 43.00 45.95 -2.95
Total Gain or Loss -$309.76
Average Gain or Loss pei Inspection -$12.39
City's Costs T Min Prcntl Count If Number
Average Inspection $55.39 38.51 33rd $37.32 0-33rd 23
Median Inspection $43.08 29.95 66th $53.08 34-66th 1
Max Inspection $214.24 148.95 67-100th 1
Min Inspection $31.57 21.95
Count If less than Average 18
Count If>or=Average 7
Count If less than$43.00 11
Count If>or=$43.00 14
Minimum Charge+Average Loss 43.00 + 12.39 = $55.39
{
138
REFERENCES
Barratt American, Inc. v. City of Ranch Cucamonga (2005)
S117590, In the Supreme Court of California. Internet.
Available from http: //caselaw. 1p. findlaw.com/data2/
californiastatecases/sll7590 .doc; accessed 2 January 2006.
Bouse Michael W. , (1998) . Establishing Building Permit Fees.
Whittier: International Conference of Building Officials.
Cantellano, Sam, "Personal interview, " 2005, San Bernardino,
CA.
City of Dublin v. County of Alameda (1993) App. 1 Dist. 1993;
17 Cal.Rptr.2d 845, 14 Cal. App. 4th 264, review denied.
City of San Bernardino, CA. "General Unit Employees' Memorandum
of Understanding, " San Bernardino, CA 2005 .
County of Fresno V. State of California (1991) 53 Cal. 3d 482
County of Palcer V. Corin (1980) 113 Cal. App. 3d 443, 448, 451.
International Conference of Building Officials . "Handbook To
The Uniform Building Code, " Whittier, CA, May 1998 .
League of California Cities (1991, September 4) . A "How To"
Guide for Assessing Effective Service Levels in California
Cities. Sacramento: Author.
Legislative Council of California (letter of July 21, 1997) .
Building Inspection Permit Fees - #12478 .
McCarthy, Dick, -Personal interview, " August 4, 2005, Palm
Springs, CA.
Mikesell, John L. , Fiscal Administration Analysis and
Applications for the Public Sector, Sixth Edition,
Wadsworth/Thompson Learning, Belmont , CA
Mills v. Trinity County (1980) 166 Cal.Rptr. 674, 108 C.A. 3d
656.
McDonald, William F. , Judge, Minute Order, Superior Court of
California, County of Orange Central Justice Center, Barratt
American, Inc. VS County of Orange 814037 related to 01CC04025 .
Sept 28, 2001.
139
O' Bannon, Robert, E. Building Department Administration,
International Conference of Building Officials, Printed in the
United States of America, April 2004 .
O'Malley, Marianne, The Legislative Analyst' s Office of the
State of California, Understanding Proposition 218, Dec. 1996.
Available on the World Wide Web at httr- : //www. -! oa . ca.crov/ .
Retrieved 3/25/06.
Opinion of the Attorney General of California, Volume 76
(1994) . Op.Atty.Gen. 4, 3-9-93. New York: Mathew Bender and
Co. , Inc.
Osborn, D. , and Gabler, T. (1992) . Reinventing Government. New
York: Addison - Wesley Publishing Company, Inc.
Schnetz Frank, "Personal interview, " December 2005, San
Bernardino, CA.
San Diego Area Chapter, International Conference of Building
Officials (1994, February 3) . A Guide for Justifying Building
Department Fees. Paper presented at the meeting of California
Building Officials, Santa Barbara, California.
So, Frank S. et al, The Practice of Local Government Planning,
Second Edition, International City/County Management
Association, Washington D.C. , 2000 .
Social Research Methods
Strange, Colin, "Personal interview, " December 2005, San
Bernardino, CA.
West' s Publishing Company (1983) . West's Annotated California
Codes: Government Code, Volumes 36 - 36C. St. Paul: Author.
140