DEVELOP.E.r DEPAar.E.r
OP rm: crn OP lWr ___avnDO
-IT POR COIMISSIOB'/COlJlICIL AC'rIOB'
From:
~LIl J. IIBIDIRSOK
Executive Director
Subject: 201 IOJmI .... IxltU"X
BUILDIlIG Jl)DInc:&rIOIIS
Date:
Janaury 2, 1992
SYnoDal. of PreylD1lll r...-f ..1GllJ6mn..lllc.-f ttee .A.etlonl a '):
On December 19, 1991 the aedevelopaent Committee recommended approval
of remedial corrective actions within the 201 Korth .1" Street Office
Buildill&.
Ree~~ed ROtlont.l:
(C-tt:v Develo-ent C__fssion)
Jl)rIOB'
rhat the Community Developaent Commission authorize the
Executive Director to execute contracts for (i) the
installation of modifications to the 201 Korth "I" Street
office buildiD&'s air cODditionill& controls and
distribution system in an amount not to exceed $66,000;
(ii) the installation of LPA retrofit equipaent to the
bulldill& . s centralized BVAC Chiller system in an mount
not to exceed $16,500; and (iii) the modifications to the
Bia 5 tenant facilities consistill& of the installation of
the LPA retrofit equipaent for the BVAC syatem and
electrical utility meters in an mount not to exceed
$12,900.
Admr::fator
~
becutive Director
Contact Person(s):
Ken Benderson/Jim SharD
Phone:
S08l
Project Area(s): Ward(s):
Supportill& Data Attached: Staff ReDort
FUMlIKG RlQUIRBMBlftS:
Amount: $
Source:
Budaet Authority:
~~f..lftftJrJmM..ll 80t..:
JCJB:SMK:laa:03661
COI!MISSIO. ftII.I..UIfti AGDDA
.eetiD& Date: 1/6/1992 /1
Agenda It_ __ber: ~
o
o
o
o
o
DIVILOPRllr DIPARrRI.r
01" TIll CIn 01" SAIl -AIInIllO
SrAFP REPORT
201 BOrth -E" Street Bui14fn. RodificatiGDa
The purpose of this request is to identif) specific problem areas and
recolllllend remedial corrective actions within the 201 Borth "I" Street
Office Building. The attached report, dated October 29, 1991, quantifies
in detail the above referenced .concerns. Following is a brief s_ry of
the analysis and recommendations.
I. -&'I'IIG. VEln'n.A'I'TOIl AIm AIR COIlnITIOIlIIG (HVACl RODIFrCA'I'IOIS
Previous and current HVAC tenant improvements have not been designed
or installed in accordance with consideration of intended
engineerinc parBlleters or tenant occupancy. The existing conditions
are therefore wholly inadequate. Staff proposes the installation of
aodifications to the second and third floor HVAC distribution and
control networks (for full details of the analysis and
recolllllendations, see paaes 10, 11 and 12 of Chapter IV of the
attached report). The proposed improvements would provide
economical and energy efficient environmental control of the office
space. The estimated cost of these proposed t.provements is $59,000.
II.
LIOlJID _limn: AIIl'LIl"ICA'UOIl (LPAl RITIOl"I'I'
Based upon staff's review of the monthly electrical costs to operate
the bui1diD& (approximately $10,000 per month), staff secured the
assistance of a mechanical engineering firm to lnvestiaate avenues
of creatiD& efficiencies in the building's mechanical system. It
has been determined that the best and most cost effective
modification is the installation of LPA Retrofit equipment (for full
details cODcerning this and the energy savings pro formas, see paaes
14 throuah 18, Chapter V, of the attached report). The estimated
cost of these proposed improvements is $16,500. Based upon the
financial analysis of this installation, the pay-back period will be
11.4 months, with a future annual savings of approxiute1y $17,000
per year.
III. BIG l"IVl!: TI!IIAII'I' RODIl"ICA'I'rOlS
Based on review of the lease obliaations for the Bia 5 tenant space,
staff recommends the installation of modifications to the Bia 5
mechanical aystems. These improvements would consist of the
installation of LPA equipment, which would increase our savings
-------
KJB:SMM:laa:03661
COIIIISSIOJI DBrIIG AGIIDA
Reet1Da Date: 1/6/1992
Aaenda It. ~er: L
o
o
o
o
DBVELOl'IIIIIr DBPAhn.ou SUIT IIPORr
201 Borth "I- Street BulldiD& lIodificati0D8
Dec-.ber 20, 1991
Pace B1aber -2-
o
and decreaae our equipment maintenance coats. In addition, staff
proposes the installation of electric monitorina meters which
would allow the Aaency aa landlord to backcharae the tenant their
actual electric consumption. The eatimated coat of the propoaed
improvements 18 approximately $12,900, with an anticipated payback
period of approximately thirteen (13) months.
IV . JHJuC:lrr nwDPSIS
A synopa1a of the total coat of the above three (3) propoaala 1a
as follows:
I. BVAC Modificationa
$59,000
$16,500
h2.900
II. LPA Retrofit
III. Bia 5 Modificationa
torAL
*88.400
IlECOMME1lDATIOll'
Staff recommends adoption of the form motion.
J.
Develo.-ent
, Executive Director
t
-------
IJB:SMM:laa:0366B
COIIIISSIOII IUUr.Ufi AGBlIDA
lIeetiD& Date: 1/6/1992
Aaenda It_llumber: L
o
o
O?-
DIVILOPIIDr DlPDlIwn
OF DB Clrr OF 8AB IIWIDlBO
201 BOlD "B" ':lUD" 1'IOJBC'l ASSISSIIIIr
PROPOSAL
Deceaber 3, 1991
0)
o
11
c5J
- _.' .
o
o
o
o
P.IPACI
The intent of thl8 doclaent 18 to addre.. areal of b1IUdiDa operation
VhJ.ch vould enhance the buUdina lh'ina envirOllllent and operatina
effic1end.l. the follovina Chaptera vill brief1~ dueriN each area.
POllovina .ach delcription an anal~lil a lolution viII be dilculled vith
· propolell budan for the actual illpl_ent.tion. the lut Chapter of
W. doclaent eontline C cOIlprehenah'. it_bed budaet for the propol.d
b1prov-.nte. the ..jori~ of all the propoled COUI lie", alrea~ been
bid, therefore, thq are reld~ for i_ediate i.pl_entation.
I encouraa. the individual r.ader to tak. the Ubert~ of .ulna c~entl
In the ..raine of the text for future dl8cula1on and/or clarification.
Ii.,
o
~
Vi
PUFACI
CBAPrlI I.
CBAPrII II.
CBAPrlI III.
o
CHAPTEI IV.
CIfAP1'EI V.
6
o
IBDIX
BVAC Iledwaica1 Dealp lIII4 ~Ia.
BVAC SecODd UIIl 1h1rd noor leUofit l'roaru.
Retrofit of 8ulldiDa UIIllledwaical for lIlerg
S..iDaa.
81a PlY. Leue 8Jnopala.
'ropea" DeYelo..mt 8l1daet.
1L
C)
6;
e
o
o
CRA'I'II I
BVAC De.ip ADa17.la for '.cOll4 uad rlalrd noor
1'_t 'pac..
.BCTtO.. "A" CllllUIIT STAms:
After cOllpleUIlI the laproveaent. and takllll occupanC7 of the third floor
tenant are. It ha. been found that the ul.UIII WAC a.chanlca11U)' have
.ome .eriou. deflclencle.. ria. inablllt7 for the exl.tllll d..lan to
.d.qu.teI7 provide teapered .lr and/or control ov.r tha volga. of .lr
d.llv.~ h.. b.en utr...17 illu.tr.ted durllll the perioda of hot
. v..th.r. A.. cone.quanc., It v.. d...-d D.C....~ to proc..d vlth .
d'.ian prolrea that would quantlt,r the buildlna b... a'chanlc.l .7.tea
and ...... the .t.tua of the on-floor dl.trlbuUon controla. ria. currant
.tatue on the ..~~~ floor 1. .. folloVlI
rlae prevlou. lIIproveaent. on the ..cOll4 floor have b.en inad.qu.t. iD
.ddr...llll the orillnal bulldilll daalp aec:haDlc.1 requlreaent. ria.
followllll reJ.ct. tha current .... built" c0ll41tione:
1. Th. "Jodt7 of the lDterlor air box control. are the Yroq tn. for
the aec:haDlc:al 87.tea. AI. cone.queDe., th... control box.. are
"blown" open uad .re runDlna wild without ~ control.
2. rlae ut.rlor sone. (liven the ui.tilll int.rior 1.7out.) are
lnadequ.t..
3.
B.cau.. of conatrueUon on the third floor there haa b.en
Ilan1fleant d..... to the e.111111 ey.t.. .t both the ...t uad .outh
porUone of tha offle. .re... rlaie i. .1lovllll a eoneld.r.bl.
eaoUllt of t.....r.d air to d.pre..vb. frea the floor .p.c. and
r.turn frOll the aec:haDle.1 87.tea UDD.e....rl17.
4. rlaer. .re DO control. to turn off of the .eeond floor '7.t.. when
not in ue..
rlae third floor eOll4itiona i. .. followal
1. Th. ul.UIII aec:haDic.1 iaproveaent. ar. lneon.latent vlth the ba..
bulldilll l7.t.. uad control..
2. Th. e.paclt7 of the .uppl7 duct. frea the ..In aanifold. on the
int.rlor uad ext.rlor wh.r. nev.r eqln..red or d..lan.d prop.rI7,
th.refor., the7 .r. lnadequ.te17 .laed.
3. Th. .uPP17 real.t.r. .. lnat.lled ar. ineorr.et, th.refor., th.7 are
extr..e17 DOl87 and Inefficient.
if')
&
0)
o
4.
The contr~xe. fr~ the ..In aanlfold. t~be dl.trlbutlon
netvorkl of tbe office. .re of tbe vrona tJPe. Therefore. tbe
maJorlt, of the time tbey are locked eltber complete1, open or
clo.ed vitbout IDJ modulation.
5.
Ko conllderation va. taken aa to the de.ian of the exterior zone..
A. a cOnlequenee. the balance and capacit)' on all of the exterior
zone. i. c~pletel, deficient.
6. There va. no cOnllderatlon of "return air" for tbe individual
office.. Therefore. When 'OIIe office door. are clo.ed the)' cet
botter becau.e the conditioned air i. not alloved to exchanae
properl, .
SBCTJOII ..." Oll.Tllll'l'TVl!:
The obYiOnl objective I. to contract tbrOUlb a .eChanlcal
de.lcnlcontr.ctlna flra which viII be able to antl,ze the exl.tlna
condltlonl. the deficienel.. and atrenathe of tbe buUdbla qat_. Then
provide a r.a.on.ble and .conomlcal altemltlve for r.ctlt.rina the
diatrlbutlon and control probl....
SI:CTIOa we- ncm..KRuJ.nftn!
In tbe coura. of aollcltbla Idtl. for tbe antl,.ia of the lXi.tina
buildlna I)'It_. I VI' Ibl. to extrapolat. a apeclflc criteria for the
deaian and eneineerina. The dedan vould encompa.. the follovtna
perimeter.:
1. The correctlJ enalneered dl.trlbutlon zone. and conduit. for the
interior air conditionlna q.t...
2. The deaian of control. and plac..ent of thermo. tat. in zon.. vhich
would aCCoaaodata tha actual u.e and deaand lolda of .paclfic
offica. and are...
3. The eneineered and deaian capaelti.. for return air veat. for each
office and ar....
4. The dealan of the overall third floor control network thet would
enhance the orlclnal bulldina de.lan.
5. All 1lIIIIediate controllable feature for the 1I0lation of the .ecODd
floor .,at_. In the lYent the .econd floor area 11 not beina u.ed
ve would be able to ahut off the third floor. Therefor.. removina
load and .nlna aer.,. on the .echanlcal qat...
If
n
c.ri
o;~
o
SICTIOW -D- I~DD COST:
o
Purauant to the attached propoaala and requlaltlon a dealan fl~ baa been
aele~ted. There were three (3) lnalneerlna flrma aoll~lted and the beat
dealan and ~oat wea provided by 'DICI aeaUna end Air CondlUonlna
Contra~tora for a total coat of *5,000.
Aa of the date of thll dOCUlDeDt, thll work he. been contra~ted for and
been ~olDpleted.
L/-
I')
~
'-J,)
o;~
o
o
o
CBAPtl. II
BVAC llec:Jaaalcal S"ata for tIl. t....t Are..
.eCOlld ad 1'h1rd noon
SECTIOII -.A.- Lu..D..-r ft.A.ftJS!
To expad upon the comment. .. noted In the preYlou. referenced Chapter
IIlIIlber III, Dedp And,..1I the Current SUtu. of the Second ad third
Floor. .r. .. followa:
SICTIOB 1. - SICOID FLOOR:
A. The ulltllll contro18 .. lut.lled .r. incorrect for the ba..
bulldllll .,..t... AI a couequenc., the ""orlt1 of the control
box.. .re either functlonlq In . full open or full clo..d .ode.
B. T-Bar ce1l1lll add qat_ hu been d.atroyed In ~ .na. of
tile floor. Apparent1"... n.ult of the coutructlon on the
third floor.
C. Ther. are DO d..lp accommodatlou allovllll the control
(OD/off) of the .echanlcal l7.t.. for the entlr. ..coDd floor.
SICTIOII 2. - mID FLOOR:
A. Th. ubt1lll 1IIproy..ent. of the air had11lll end dbtrlbutlon
qet.. .n on . whol. inadeQuat.. JIG 'Ccommodatlon va. ..d. In
the qlD.ar1lll, d.dp and lutallatlon of the dbtributlon
Dltvork for 1DdiYldual offic. and/or .r.a. u.e..
B.
110 proYbiou v.re ..d. for the de.11Il ad iUUll.tlon of
.deQUlt. r.tUrD .ir for ID7 of the offic. .r....
The v.r. DO d..ip conalderatlou for the .pproprl.te zone
control..
C.
D.
Th. ubt1lll dbtrlbutlon network frOll tIl. zon. control box..
to the t....t .r... v.n DOt d.dlllH for yol.e ad/or
c.pacit7. .
The int.rior zone. l.ck heat1lll of .11 .Ir.
I.
..
-.
The cxterior zon.. vera on.inally delllne4 for treau.ent. of
the curtaill vall 0D1y. Thq are DOV bellll ued for the full
temp.rllll aDd tr.ataent of lDdiYidual offlc. air condltlonllll
(which I. inadeQuate).
.KC!'IOII ... GB.J'Zm'nnr r
To .dequatel7 de.11Il aDd lutall . bulldllll air coDdltlonl1ll control
.,..t.., which would accolDOdat. the .pecinc lDdhidual UII. and control
nece..ar" to provide . r.llonabl. controlled enYlronment ill the tenant
.re...
if
I')
A.
B.
C.
D.
6'
"
'j I.
r.
G.
tS
e
SIC'l'IOR "C" ~.nOllSt
o
the followlna r.coamendatloaa ar. ba.ed upon the prel1alaar.r aaa11.1. and
de.lana proYlded b1 contr.ctor. In the prevlou. Ch.pter III, "De.lcn
Ana11a1." .
SECTIOR 1. - SECORD FLOOI:
A. lep.lr exl.tlnc T-Bar celllna. ther.for., provldlna .ddltlon.l
control and balance In the .ulte .rl..
B. AdJu.t .11 control boxe. to .ccoamod.te .axl.u. aupp11 of tempered
air.
C. thl laat.ll.tlon of control box.. .t the prl..ry dl.trlbutlon point
on the .econd floor. thla would .llow the lnatall.Uon of . control
n.twork that turn the floor "on" or "off" wilen occupl.d or Y.cant.
SICTIOR 2. - DIID FLOOI:
II-.nclna.r the dl.trlbutlon of teeperld .Ir to accGBlOd.t. for zone
u..C"
leeoY.l of exlat1D& zone control box.. and lnat.ll.Uon of new
"dlclt.l" boxl..
Inat.ll.tlon of new dlclt.l control thereo.t.t..
Iuta11.tion of new 'UPPl1 cr11l1 .t '.ch offJ.c..
De.lan and lut.ll.tlon of new rlturn .Ir r.cl.t.r. In the
.pproprl.t. .r....
Iut.ll.tlon of ~t.r control" network to coordinat. all int.rlor
thereo.tat..
De.lan and iutall.tlon of dlcltlze ClUor. for ba.e bulldlna
.'chanlcal I1It.. to interface with "coad and third floor ...ter
controller..
IBCTIO. 3. - DIIIOLITIOlf, IIfIOVAL AID OPAlI or ClILIRG:
D-lition. r"oval, rcpa!.: of cc~Una t11c, cleanup and protecUon ha.
baen rlllOved frOll the contract acope of work for the third floor. tbl.
w.. done to ...In in the bid proce.. and .llow are.t.r control over the
CO!latrucUon work wIl.. in proar.... It la e.Uuted that the work on the
third floor will takl approxlutel1 three U) to four (4) weaka dependlna
on the ".fter houra" .chedul... th.re wUl be an additional .lloc.tion
in the budaet for thl. work to b. perforeed b1 another contr.ctor.
4a
6J....
. ?
- ,
6:1
e
'BCTIO. "D" - Qnu.ftD COSTS t
o
the follovina proJeeted eatt.&tea are baaed upon ealeulation provided by
the Ileehanieal eontraetor tIICI. '!'he)' ara .. followa,
1. Seeond floor aeope of work Caa d.aerlbed
in the previoue Seetion "C") approxiaetely
$ ',000
2. Seope of york for third floor Caa deaeribed
in Seetion "C")
$52,000
3. Cleanup and repair of eeillna and
inatallation of return air arilla
, 6.000
TOTAL
1"_000
tf9t'
~
~.'
&
6
o CBAPTIIIIIO
letroflt of lul1d!Da lIeclwdcal for berg laY!Da.
SICTtOR ".l" ClJRII~ IT.lms
At the tl.a of publication of thla docuaent a .eaorandua va. coapleted
and I..uad to 111'. Stafford 'arker re,ardlna the aboye referenced
project. In an affort to ell.Inate dupllclt~, I haye attached a CO" of
.aid ...orand_ a. the bod)' of thie Chapter.
A. a ,eneral nota: The conclualona and racOBlendatlona of thl. analy.I.
ie Ilot, at thie tiae a hlah priority beca,..a of the reduced daand for
air condltionlna durlna the vlntar aontha It would lie rac_anded that
thia propo.al lIa approyad for lapleaentation In March or April, 1992.
lts
c:
o
o
~
o
CRA'T.. IV
Bi& Fi.. L.... IJDopai.
o
IECTIOII -A- CIIII_ S'I'A'l'DS
At the tiae of public.tion of thi. document the analy.i. of the Bl& 5
Spc:rUna I:ood. 1.... h.. b.en compl.ted. nerefore In .n .ffort to
e~edite thb r.port .tt.ched and follovlna. pl.... find . cop)' of the
October 15. 1991 n..elopaent nep.rtment Meaorandua to St.fford W. P.rker
for your raYln.
lf2
0-:
i
I
01
o
ill:.
-L
~
o CRAP1'.. v 0
Propoaed Dnelo...t Bud,et
SEC'I'IO. -A- emr_ S'l'AmB
In an effort to UDderatlDd the eeonoalc l~act of the rec~endatlODa.
the follovlna la a Bud.et Summary vlth projected coat eat~tea 11.ted In
total fon:
CJL\P1'IR BUDGETS
One 1'1llle
In.tallatlon Caata
Chapter 1 Title
Chapter 2 Title
Chapter 3 Title
Chapter 4 Title
* -0-
* 66,000
* 16,500
i 12.~OO
1'OUL COSt' OF ALL DlPl:Il..........S
'95.4M
Slucerel,.,
4312B
v. Sharp, ProJec
o.....t De
Annual
Savina.
* 17,000
* 1~...16-
j!6..16
L./~