From:
KENNETH J. HENDERSON
Executive Director
Subject:
URBAII GARDEII - ~RTB-
WEST CORIIER OF FIFTH
AIID "E" STREETS
Date:
October 17, 1991
--------------------------------------------------
SvnoDsis of Previous r.~ission/Cnnnri1/en__ittee Action(s}:
On October 16, 1991, the Redevelopment Committee considered this matter
and forwarded same to the Community Development Commission without a
recommendation.
Recomm~~ed IIotion(s}:
(C.-nnitv DevelolBent C--ission)
KOTIOR:
That the Community Development Commission approve the concept
of an Urban Garden at the northwest comer of Fifth and "E"
Streets, authorize the preparation of plans and
specifications, and authorize staff to solicit bids based upon
said plans and specifications.
Ad111&trator
~DSOR
Executive Director
Contact person(s):
5081
Ken Henderson
Phone:
Project Area(s):
Central Citv (CC)
Ward(s):
One (1)
Supporting Data Attached:
FUNDING REQUIREMENTS:
Amount: * R/A
Source:
Budget Authority:
-------------------------------------------------------------------------------
Commission/Council lIotes:
-------------------------------------------------------------------------------
KJH:lab:0230E
COIMISSIOII IlEETING AGEllDA
lIeeting Date: 10/21/1991
Agenda Itea IIuIIIber:
~
o
o
o
J.
-
-
o
o
?
DBVBLOPMBIIT DBPARTMBIIT
OF TIlE CIn OF SAIl BBlllWlDIIIO
STAFF REPORT
Urban Garden - 1I0rthwest Corner of Fifth ....d "En Streets
The Department has received from Greenstreets L.A., and opinion of
probable construction costs totalling $202,464 in connection with the
installation of an urban garden at the northwest comer of Fifth and "E"
Streets. The estimate conducted by Greenstreets L.A., was requested by
the Economic Development Agency Administrator at the request of the
Mayor's office.
Previously, the Department had entered into an Exclusive Right to
Negotiate (ERN) agreement with Elderly Development Corporation for the
purpose of developing approximately one-hundred, fifty (150) to
two-hundred (200) units of housing for seniors and for frail and elderly
seniors. At a recent meeting involving the Mayor, the Executive
Director, the Acting Housing Manager and the developer regarding the
status of the senior housing project, the subject site and several
alternatives were discussed. At the conclusion of the meeting, it was
agreed that the developer would identify other, more viable sites within
the Central Business District, preferrably a site that assisted in the
elimination of blight. The developer was also assured of continued City
support.
As a result of the availability of the subject site, it has been
determined that, in conjunction with the City'S landscaping and
beautification programs, the development of this site as an urban garden
would contribute significantly to the habitability and attractiveness of
the City's downtown core. The garden would not have benches and would be
designed in such a fashion as to deter vagrancy and other unwanted
activities.
At the October 16, 1991 Redevelopment Committee meeting, the Committee
discussed this matter and forwarded same to the Community Development
Commission without a recommendation.
Based upon the foregoing, staff recommends adoption of the form motion.
JUml'UIT1I J. 011, Executive Director
Development D par~ent
-------------------------------------------------------------------------------
KJH:lab:0230E
COIlKISSIOII IIBBTIBG AGBJIDA
Meeting Date: 10/21/1991
Agenda Itea JImIber:
R
~
~..:;';'~..,..-
-
ij.
-
~
c:.- - ..., - \,_.... ~ g. (J. I J v I
1'-'\,...........
-'
GAEE fTAEETJ; L.A.
LAnD ARCHITECTURE. PLAflnlnG . DEJIGn
'---
September 24, 1991
City of San Bernardino
Economic Development Agency
300 North D Street
San Bernardino, CA 92418
ATT: Timothy C. Steinhaus, Agency Administrator
RE: Downtown Urban Park - 5th and E Street
OPINION OF PROBABLE CONSTRUCTION COSTS
ITEM DESCRIPl'ION UNIT UNIT PRICE TOTAL
SITEWORI
1. Traffic Control & Safety Lump Sum 6000.00
0 2. Electrical Underground &
Meter L.S. 2000.00
3. Water Meter Up-grade L.S. 1500.00 '/
4. Demoltion of Existing
City Sidewalk 5184 sf 1.50 7776.00 '/
SUBTOTAL 17,276.00
EARTIIWORI
5. R~u8h'GridiD8'&':Compattion 44,018 sf .15 6603.00
~l..,...- .
.. ...:.-
6. Clearing & Grubbing 44,018 sf .08 3521.00
7. Miscellaneous Drainage
Structures L.S. 1700.00
SUBTOTAL 11,824.00
HARDSCAPE
8. 6" Wide Poured Concrete
Curb 1164 If 6.00 6984.00
0 9. Concrete Curb & Gutter 664 If 11.00 7304.00
P.O BOX 317 . 844 JAGERHORn. LAKE ARRaJJHEAD. CA. 92352
[714J 336-5703
J - ~
...,.--- 0
0
OPINION OF PROBABLE Page Two
>' CONSTRUDTION COSTS - Continued
0
10. Exposed Aggregate
Walks w/ Integral Color 6863 sf 4.00 27452.00
11. Asphaltic Concrete &
Stripping - Parking LOt 9738 sf 2.15 20937.00
12. New Concrete City Sidewalk 5184 sf 3.00 15552.00
SUBTOTAL 78,229.00
IRRIGATION
12. Estimate 16 Valves 16 ea 400 .00 6400.00
Inclusive
SUBTOTAL 6400.00
PLANTING
13. Fine Grading 27417 sf .03 823.00
14. Soil Amendments & testing 27417 sf .08 2193.00
15. Weed Abatement 27417 sf .03 823.00
0 16. Trees - 24" box 42 ea 250.00 10500.00
17. Transplant 4 palms (20':1:) 4 ea 2100.00 8400 .00
18. Shrubs - 5 gallon 1113 ea 22.00 24486.00
19. Ground Cover - flats 500 ea 17.00 8500.00
SUBTOTAL 55,725.00
MAINTENANCE/PLANT ESTABLISMENT
20. 90 Calender Days 44018 sf .05 6602.00
SUBTOTAL 6602.00
GRAND TOTAL $176,056.00
15% CONTIN. 26,408.00
$202,464.00
,
,