CITY OF SAN BEIOARDINO
File No. 1.653
_ REQUES1()OR COUNCIL ACTION
From: ROGER G. HARDGRAVE
Dept: Public Works/Engineering
Approval of Plans - Widen Exist-
Subject: ing Bridge on South -E- Street
over Santa Ana River, per Plan
No. 8347
Date:
8-19-91
Synopsis of Previous Council action:
07-87 Amount of $250,000 budgeted in 1987/88 Budget to
finance preliminary engineering costs.
12-87 Authorization granted to nominate widening for FAU
funding.
07-18-88 Resolution No. 88-271 adopted authorizing the
execution of an Agreement with Moffatt & Nichol for
engineering design services.
01-07-91 Negative Declaration adopted.
04-01-91 Resolution No. 91-110 adopted approving an amended
Five-Year Project List for Measure "In 1/2 Cent
Arterial Funds.
08-07-91 -- Authorization granted to advertise for bids.
Recommended motion:
That the plans for widening the South "En Street Bridge over the
Santa Ana River, in accordance with Plan No. 8347, be approved.
cc: Shauna Clark
Andy Green
Tim Steinhaus
o~w~c/'
SIgn re
Contact person:
Roger G. Hardqrave
Phone:
5025
Supporting data attached:
Staff Report
Ward:
3
FUNDING REQUIREMENTS:
Amount: $5.167.000 (Measure "I" Arterial & Bond
Proceeds)
Source: (Acct. No.!
129-309-57842
(Acct. DescriDtion I
South "E" Street Bridqe over
( .
Finance: (^'~.~ (.)~
Santa Ana River
Council Notes:
'7l;_n?,,"
Agenda Item No.
JiL
-
-
Jl
-
-
CITY OF SAN BER~RDINO - REQUESTQDR COUNCIL ACTION
STAFF REPORT
Plans for the widening of the South "E" Street Bridge over
the Santa Ana River have been prepared by a consulting engineer,
and the project can be advertised for bids as soon as they are
approved by Caltrans. The project includes widening the existing
bridge to provide two traffic lanes in each direction and a left
turn lane, and traffic signals at the intersection of Fairway
Drive.
Below is an estimate of the total project cost:
Construction Contract
Construction Engineering & Insp. (W.O..
Sub-Total
Contingencies (10%)t
TOTAL ESTIMATED PROJECT COST
$ 4,472,335
225,000
$ 4,697,335
469,665
$ 5,167,000
No amount is included in the above estimate for prelim-
inary engineering, since this phase of the project was done as a
Federal-Aid Urban Project, under Account No. 242-362-57653. This
is the reason the plans must be reviewed and approved by
Caltrans.
The SANBAG Board has approved up to $4.2 Million in
Measure "I" Valley Arterial Funds for the project. Additional
funds in the amount of $1 Million are to be provided from bond
proceeds. An item allocating these funds is scheduled to be on
the Community Development Commission I s agenda of 9-3-91, which
will make $ 5.2 Million available to finance the total costs
incurred for this project.
We recommend that the plans be approved.