HomeMy WebLinkAbout12-Public Works
-
-
-
-
'CiTY' OF SAN BERNlOblNO - 'REQUESTNp003COUNCIL ACTION
From:
ROGER G. HARDGRAVE
. ._f.....
,~..y\'.o.. ~.Request for Waiver of Requirement
,,-:.C"0,-""Subj~t;.t~'2, Connect to Sewer System --
.' .J'._\~.\ -Co 'Construction of two Single Family
~,. Houses E. Side of Severance
Ave., S. of 40th St. (APN 271-052-
8 & 9) --Sewer Waiver No. 91-01
Applicant: Lockwood Enqineerinq
OWner: R.L. Construction
Dept:
Public Works/Engineering
Date:
6-06-91
Synopsis of Previous Council action:
None.
Recommended motion:
That Sewer Waiver Request No. 91-01, for construction of two
Single Family houses on existing lots of record located on the
east side of Severance Avenue, south of 40th Street (APN 271-
052-8 & 9), requesting a waiver of requirement to connect to the
sewer system, be approved.
cc: Shauna Edwins
Jim Penman
Larry Reed
R. L. Construction
Signature
Supporting date atteched:
Ward:
5025
4
Contect person:
Roger G. Hardgrave
Staff Report, Letter
& Map
Phone:
FUNDING REQUIREMENTS:
Amount:
N/A
Source: (Acct. No.)
(Acct, DescriDtion)
Finance:
Council Notes:
75-0262
Agenda Item No
I~
. CiTY OF SAN BERNADINO - REQUEST Fa COUNCIL ACTION
STAFF REPORT
A request has been received from Lockwood Engineering, on
behalf of R. L. Construction, by letter dated 5-28-91 (copy
attached - Exhibit "A"), for a waiver of the requirement to
connect to the City's sewer system. This request is for two
single family houses to be constructed on two adjacent existing
lots of record, located on the east side of Severance Avenue
south of 40th Street (See Attached map - Exhibit "B").
The nearest sewer main to the site is located in 40th
Street at Severance Avenue, but is not available due to adverse
grades and a conflicting water main. An analysis by Lockwood
Engineering (Exhibit" A") concluded that it is impractical to
extend the sewer from 40th Street. The nearest available sewer
is located at the intersection of 38th Street and Mountain View
Avenue and would require an extension of approximately 2300 feet
(See Exhibit "C").
Ordinance No. MC-663 authorizes the Mayor and Common
Council to waive the requirement to connect to the sewer system
for residential development of 4 or fewer units which qualify as
in-fill projects. We feel this project qualifies as in-fill,
which requires that at least 75% of the block has structures and
none are connected to the sewer system. Granting a waiver of
the requirement to connect to the City's sewer system will not
be considered permission to install a septic tank. The
applicant will be required to apply to the Building Division for
a permit to install a septic tank.
The administrative fee of $500.00 for processing this
sewer waiver request has been paid as evidenced by Receipt
#641761.
We recommend approval of this request for waiver of
requirement to connect to the City's sewer system.
6-06-91
75-0264
o
o
1101.. ~,~a A"""", . II. '. Joe
,....,,,, ,,,,,.,,.,
,.~. '7\ 4' " 1~. "'llll!!
~ A' : f14' M . ", "r..' ,
CA'lItlto.. W 1", ......."
CIYI~ tNCo."'l'" "' I jl...
C.'Hro..", W L . .......",
r. >j.t ""'lo'''' , . 'f '"
LOCKWOOD ENGINEERING Be SUPlVEYING COMPANY. INC
:lao WIIU f'OOlHIU 80UI.I....dtD. SUITF ,
1It1.LTC. CALll'n"""tA 12376
May 28, 1991
1111 .C~~.. j'I16 -I ""'1" TO
Severance Avenue Sewer
city of San Bernardino
Department of Public Works/Enqineerinq
300 North "0" Street
San Bernardino, CA 92418
Attention Roger Hargrave
...:,i,..........;;....,.
Dear Roger:
our office prepared a sewer improvement plan for Severance
Avenue, south of 40th Street, in north San B~rnardino. The city
performed the plan check for the plan and it was approved on
February 18, 1991.
The owner, R.L. Construction Company, contracted a pipeline
company to install the sewer line and trenching beqan this past
week. While trenchinq, the top of the 30-inch water line shown on
the plans was encountered at a depth of 6.1 feet. The 30-inch
water line is in direct conflict with the proposed sewer line. The
City of San Bernardino Water Department estimated the depth of the
30-inch water line to be approximately 30-inches below finish
surface.
Our office has studies alternative designs to eliminate this
conflict. Raising the sewer line over the 30-inch water line is
impractical because at the point of connection for the two n.....
houses, the sewer woulcl be too shallo.... for connections. Relocatinq
the 30-inch water line is impractical since the proposed .ewer is
'1:0 serve on1:y.~'twcP'new'''homes. The most reasonabledesign.to sewer ,,-.'...,,".,
Severance Avenue is to desiqn the sewer main from the south. That
is the natural fall of the land. our proposed sewer is desiqned to
"buck" the street grade, making it impossible to extencl to the
south for future connections. We feel that there is no practical
solution for the Severance Avenue sewer from 40th Street.
Therefore, we recommend that the installation of the Severance
Avenue sewer from 40th Street be abandon.d.
R. L. construction company feels that any additional fees to
be paid in exchange for the abandonment woulcl be unreasonable.
They have already incurred several thousand of dollars attempting
to install the sewer connection to 40th Street; including design
fees, plan ohecking fees, contractor mobilization costs, and se....er
materials costs. They feel that the city could have prevented the
EM'6IT~~
5ew ~ NO. 91-01
o
o
conflict throuqh the plan checld.nq phase. In addition, percolation
test fees and septic tank/seepage pit installation costs will now
be spent.
In sUJl\1llary, it is impractical, from an el\qineerinq stand
point, to connect the Severance Street .ewer to 40th Street. It is
unreasona~le to demand an additional cash outlay to the city when
so much effort was already put into complyinq with the sewer
installation request.
Your timely cons:l.deration of t.h:l.s unfortunate situation is
appreciated. Please don't hesitate to give our office a call if
any questions or comments arise.
~i ly ~~
1. .
, _;tU!>~C""..
Carleton .. Lockwood, r.
sr
c: John Young, R.L. Construction Company
~~~:;,--:.
~~'iJ'.;~"';~:::.o,':'::,~,~~. .
EXHI/!J,T A"
...........',.. "
.....' ':."".c.~~': "
.t:;;;,~i:,'~
IIlll
1IU
JL
I
-
"'"
~
9
,
.-"-
..
,
o
o
>,
-
<3
00
oS Q)
~~
~q:-
~:!~ \?s
Q) 0 "'-
lD Q;: -
0
5 )(- -----r-
(f) ~~
~ ~ a y 03/1t1 ~ :--
..." 'I.. - l..
-? l1J J.. ?a-'
~ ~ I @ I-
~(.O @ -- ~
~~ . .:;>3" ~
. @ @
. @
/6 (/)
- _-43 ~ @
(\I. @
. Q) .
IX) ~:
:e : If)
f',.: ~ ~ ~ .. q
. N
. I't) ~ ~
lDl'C') .~ " @ lIl>
4_ (\J ~ "l @ .
u t?
o ~ ! If) ~ ~ Cll III II .. ... =
~~ 0.1 " " 0.1
... @ Ie)
-
~ ~~ .-
.
en ~ I @ I
eJ::
. }~'\. 01 i - 0.1
'"-en IC) If) I If) . .
afe
'"- ~@ I I t
~~ "1-- Q- ......
t 0'" ~ I-:
-ec: ...12 (/)
:;'0 I I I e :0
-g-e ~@ ~ @I e @ G> @ I
....
U):;, I I
.Q --~ 3nN3/1t1 ~ 30NtlH3/13S ~---:
-gOJ ~o :0
-~
Cb"tJ @ @ <ID @ @ @ @ @ ~
~g ~ ~ ~ .. @~ ~
..
~i ~ , 0
'~ 13"-
<(0 'it ~
to;. , oi @'\
\.' '"-
- -
1. "- ' ,'J'~.
IO~ ..,
~ ~ ~ \ \.
<1 L_- V) 0 ~ " .
J / . Q:
~ \
~ ~
'q ~
\l.l ~
:::iI! ~
V ~
<1 ~ ~
~
-- -
~.
"
' 27"
~~O'
.>; ~ #
~ :~
~ ~\
i ~
~ ~\ J -
~
Vi ~I
::
,,~l! -
::, ~9TH S
"5s."b~ .5tIwer /f4znSI'()J'/
.fO SlrV~ s, Ye.,.
CAPPR.Dx, 2~OO ') ~
~
~
.. "
i2fHltJrr C
-
.5eNeR. l.V.4/~ NO. q 1-0 I I
~ 38TH
/ ~
, A~~~,
_ WG""'D
THOMPSON \
I~_. .
PL-