Loading...
HomeMy WebLinkAboutS06-Public Works """"~ ~ ~ ':~ITY OF SAN BERNc:JIblNO Pile No. 1. 330 - REQUEST lOR COUNCIL ACTION From: ROGER G. HARDGRAVE Subject: Approval of Plane & Authorization to Advertise for Bids - Widening 40th Street (South Side), from Third Avenue to Cottage Drive, per Plan No. 8433 Dept: Public Works/Engineering Dete: 5-14-91 Synopsis of Previous Council action: Transfer of $30,500, to Account No. 242-362-57330, widening 40th Street, from Third Avenue to Acre Lane, approved, and authorization granted to negotiate an Agreement with the County. Allocation of $75,000 approved in 1990/91 Traffic SysteMS Fee Construction Fund, under Account No. 250- 670--57478. Resolution No. 91-30 adopted authorizing execution of an agreement with County for development of final construction plans. Resolution No. 91-96 adopted creating Underground Utility District No. 20 along 40th Street, from Kendall Drive to Palm Drive. 04-02-90 -- June, 1990 01-23-91 03-18-91 -- Recommended motion: 1) That the plans for widening 40th Street, from Third Avenue to Cottage Drive, in accordance with Plan No. 8433, be approved: and the Director of Public Works/City Engineer be authorized to advertise for bids. That the transfer of $21,500, from Account No. 250-670-57483, "Tippecanoe Avenue - Redlands Boulevard to Victoria Avenue," tb Account No. 250-670-57478, "40th Street - Fill-in Sections of Curb & Gutter," be approved. 0Il.~~ Shauna Edwins ~ Andy Green ign ure 2) cc: Contact person: Roqer G. Hardqrave Phone: ')02') Supporting data ettached: Staff Report Ward: 4 & 5 FUNDING REQUIREMENTS: Amount: $96,500 (Traffic Sys~ems Fee Fund) Source: (Acct. No,) 250-670-57478 of Curbs & Gutters. Finance: --Fill-in Sections CL..w D r'- (Acct. Descriotion) 40th Street Council Notes: 75-0262 Agenda Item No s-~ .- . ~ITY OF SAN 8ERN~DINO - REQUEST It)R COUNCIL ACTION STAFF REPORT Page 1 of 2 Plans for widening the south side of 40th Street, from Third Avenue to Cottage Drive, have been prepared by the Engi- neering Division, and the project is ready to be advertised for bids. The project consists of installing curb and gutter, and in-fill paving, adjacent to two parcels and the Flood Control Basin, from the west boundary to Cottage Drive, in order to provide two continuous eastbound traffic lanes. The owners of the two parcels have dedicated the necessary additional right-of-way, and the Flood Control District has verbally indicated that they will sell the 22 feet, between the existing street right-of-way line and their fence, for the amount of $4,200. This will provide a parkway of 6 feet, which is proposed to be landscaped under our streetscape beautification program. Underground Utility District No. 20 was created on 3-18- 91. The various utility companies that have overhead utilities along this section of 40th Street are designing their under- ground structures. Installation of these facilities will not be completed for at least a year. The major overhead lines are located on the north side of 40th Street. The City and County have entered into a Cooperative Agreement relative to preparation of plans and acquisition of the necessary additional right-of-way. Acquisition of the additional right-of-way is expected to take up to a year. The project for widening 40th Street, between Third Avenue and Acre Lane, will necessarily be delayed for at least a year, in order to allow for acquisition of right-of-way and removal of overhead utility facilities. However, the south side of 40th Street, from Third Avenue to Cottage Drive, can be widened at this time. Below is an estimate of the total project cost: $ 72,952 7,295 80,247 11,753 92,000 4,500 Construction Contract Engineering & Inspection (W.O. #1923) Sub-Total Contingencies (15)t TOTAL ESTIMATED CONSTRUCTION COST $ $ Acquisition of Right-of-Way TOTAL ESTIMATED PROJECT COST $ 96,500 5-14-91 75-0264 - . ~ITY OF SAN BERNOIDINO - REQUEST lOR COUNCIL ACTION STAFF REPORT File 1.330 Page 2 of 2 An amount of $75,000 has been allocated, under Account No. 250-670-57478, to finance the cost incurred for this widening. Supplemental funds in the amount of $21,500 will, therefore, be needed to fully finance the total estimated project cost. We recommend that $21,500 be transferred from Account No. 250-670-57483, "Tippecanoe - Redlands Boulevard to Victoria Avenue," to Account No. 250-670-57478, "40th Street, Fill-in Sections of Curb and Gutter." A Notice of Exemption from the provisions of the California Environmental Quality Act will be filed. We recommend that the plans be approved and authorization granted to advertise for bids. URGENCY CLAUSE: An application for development has been submitted on one of the parcels that voluntarily dedicated the additional right-of-way. Installation of the curbs and gutters adjacent to this parcel needs to be done as soon as possible, in order to avoid conflict with the proposed development. 5-14-91 75-0264