RESOLUTION NO. 2008-60
1
RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING
2 AMENDMENT NO. 2 TO AGREEMENT FOR PROFESSIONAL SERVICES
3 WITH TV LIN INTERNATIONAL FOR THE PREPARATION OF A PROJECT
STUDY REPORTIPROJECT REPORT FOR THE UNIVERSITY
4 PARKWAYIINTERSTATE 215 INTERCHANGE LOOP ENTRANCE RAMP
PROJECT (SS04-19).
5
6
7 Resolution No. 2004-383 approving Agreement for Professional Services in the amount
WHEREAS, on December 6, 2004, the Mayor and Common Council adopted
8 of $249,050.00 with TY Lin International to provide a Project Study ReportJProject
9 Report and the supporting studies and documents for the University Parkway/Interstate
10 215 Interchange Southbound Loop entrance ramp project hereinafter called "Project";
11
12
13
and
WHEREAS, on July 16, 2007, the Mayor and Common Council adopted
14 Resolution No. 2007-257 approving Amendment No. I to Agreement for Professional
15
16
17
18
Services with TY Lin International in the amount of $180,329.00 to provide additional
design, environmental and traffic engineering services for the Project; and
WHEREAS, changes have occurred that were beyond the control of TY Lin
International and require TY Lin International to perform additional work and incur
19
20
additional costs not anticipated at the time of execution of the original Agreement for
Professional Services; and
21
22
23
24
25
26
27
28
WHEREAS, staff concurs that the additional work was not included in the
original Agreement for Professional Services.
/11
11/
RESOLUTION ... APPROVING AMENDMENT NO.2 TO AGREEMENT
1 FOR PROFESSIONAL SERVICES WITH TY UN INTERNATIONAL FOR THE
2 PREPARATION OF A PROJECT STUDY REPORTIPROJECT REPORT FOR
THE UNIVERSITY PARKWAYIINTERSTATE 215 INTERCHANGE LOOP
3 ENTRANCE RAMP PROJECT (SS04-19).
4
5
6
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF
THE CITY OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. TY UN International, 198 N. Arrowhead, Suite "I", San
7 Bernardino, California 92408, has performed adequately under the terms of the original
8 Agreement for Professional Services.
9
10
11
12
13
14
15
16
17
18
III
19
20
21
22
23
24
25
26
SECTION 2. The City Manager is hereby authorized and directed to execute the
attached Amendment No. 2 to said Agreement for Professional Services with TY Lin
International to provide additional services for the Project in the amount of $37,681.00,
said Amendment being attached hereto as Exhibit "A" and made a part hereof.
SECTION 3. The Director of Finance is hereby authorized and directed to issue a
Purchase Order for this work to TY UN International in the total amount of $467,060.00.
SECTION 4. The authorization to execute the above-referenced Agreement is
rescinded if it is not executed within sixty (60) days of the passage of this Resolution.
III
27
28
2
18
19
20
21
22
1 RESOLUTION ... APPROVING AMENDMENT NO.2 TO AGREEMENT
FOR PROFESSIONAL SERVICES WITH TY UN INTERNATIONAL FOR THE
2 PREPARATION OF A PROJECT STUDY REPORTIPROJECT REPORT FOR
3 THE UNIVERSITY PARKWAYIINTERSTATE 215 INTERCHANGE LOOP
ENTRANCE RAMP PROJECT (SS04-19).
4
5
I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the
Mayor and Common Council of the City of San Bernardino at a joint regular
6
7 meeting thereof, held on the 19th day of February, 2008, by the following vote, to
8
wit:
9 Council Members:
10 ESTRADA
AYES
NAYS
ABSTAIN ABSENT
x
11 BAXTER
12
13
x
x
BRINKER
x
x
x
~
~/h.~
Rachel Clark, City Clerk
The foregoing Resolution is hereby approved this c:2..Is,- day of
February, 2008.
~~
atrick J. Morris, yor
City of San Bernardino
23
24
25
6 JAMES F. PENMAN,
2 City Attorney
27
28
Approved as to Form:
3
2008-60
AMENDMENT NO.2
TO AGREEMENT FOR PROFESSIONAL SERVICES
This AMENDMENT is made and entered into this 19th day of February
2008, by and between the CITY OF SAN BERNARDINO, California, a municipal
corporation, hereinafter referred to as the "City" and TY Lin International, hereinafter
referred to as "Consultant."
WITNESSETH:
A. WHEREAS, on December 6, 2004, the Mayor and Common Council
adopted Resolution No. 2004-383 approving Agreement for Professional Services in the
amount of $249,050.00 with Consultant to provide a Project Study Report/Project Report
and the supporting studies and documents for the University ParkwaylInterstate 215
Interchange Southbound Loop entrance ramp project hereinafter referred to as "Project";
and
B. WHEREAS, on July 16, 2007, the Mayor and Common Council adopted
Resolution No. 2007-257 approving Amendment No.1 to Agreement for Professional
Services in the amount of $180,329.00 with Consultant to provide additional design,
environmental and traffic engineering services for the Project; and
C. WHEREAS, changes to the scope of services have occurred that were
beyond the control of Consultant and the City and will require Consultant to perform
additional work and incur additional costs not anticipated at the time of execution of the
original Agreement for Professional Services; and
D. WHEREAS, staff concurs that the additional work was not included in
the original Agreement for Professional Services;
NOW THEREFORE, the parties hereto agree as follows:
1. Section 1 "Scope of Services" of said Agreement for Professional Services is
amended to add the following:
A. Consultant shall perform a Value Analysis (V A) for the Project in accordance
with letter proposal from Consultant dated January 17, 2008, attached hereto and
incorporated herein as Attachment "1".
B. Caltrans V A methodology shall be followed as outlined in the Chapter 19,
"Value Analysis" of the Project Development Procedures Manual (PDPM) and
-1-
2008-60
Amendment No.2 to Agreement for Professional Services with TY Lin International.
detailed in the Caltrans VA Teant Guide and Report Guide - Third Edition, April
2003.
2. Section 5 "Compensation" of said Agreement for Professional Services is antended to
add the following:
AI. The City shall compensate the Consultant for actual costs (including labor costs,
employee benefits, overhead, profit, other direct and indirect costs) incurred by
the Consultant in the performance of work authorized by Amendment No.2 for
an additional cost not-to-exceed $37,681.00.
A2. The total not-to-exceed compensation to date for this Consultant Agreement is as
follows:
Totals
Amount
$ 249,050.00
$ 180,329.00
$ 37,681.00
$ 467 060.00
3. All other terms and conditions of said Agreement for Professional Services approved
by Resolution No. 2004-383 and Resolution No. 2007-257 shall remain unchanged.
III
III
-2-
2008-60
Amendment No.2 to Agreement for Professional Services with TY Lin International.
AMENDMENT NO.2
TO AGREEMENT FOR PROFESSIONAL SERVICES
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on
the date first shown above.
by:
TV UN INTERNATIONAL
on, City Manager
an Bernardino
by: ~a~
/ Si ature
6/1/!-Y ANTtJNVa..{ Ivp
Print Namerritle '
ATTEST:
Bre~lP. ~
Rae I Clark, City Clerk
Approved as to form:
James F. Penman
City Attorney
/II
/1/
-3 -
2008-60
ATTACHMENT "1"
TYLININTERNATIONAL
January 17, 2008
City of San Bernardino
300 North "D" Street
San Bernardino, CA 92418-0001
Attention:
Mr. Robert Eisenbeisz, P.E.
Subject:
University Pkwy/l-215 Interchange Project
Scope and Fee to conduct a Value Analysis (VA)
Dear Robert:
T.Y. Lin International is pleased to submit this proposal to provide professional engineering
services to conduct a Value Analysis (VA) Study for the above referenced project.
Background:
Caltrans and FHW A require that a VA study be conducted on projects that are $ 20 Million
in total cost of more. The University Pkwy /1-215 Interchange project is currently estimated
at $24.2 Million therefore a VA study is required. Also, as dictated by Caltrans/FHW A
guidelines, the cost to conduct the VA study is the responsibility of the lead agency, in this
case the City of San Bernardino.
A VA Study is completed to comply with NHS VE mandate. It needs to follow the Caltrans
V A methodology as outlined in the Chapter 19, "Value Analysis" of the Project Development
Procedures Manual (PDPM) and detailed in the Caltrans VA Team Guide and Report Guide
- Third Edition, April 2003. The purpose of a V A study is to identify and evaluate
alternative project solutions and provide recommendations to decision-makers.
Scope of Work and Fee:
T.Y. Lin (Support and Coordination including 2 meetings,
2 presentations to the team, a field review with the team,
and a review of the VA report) $ 3,400.00
Value Management Strategies, Inc (Conduct, Prepare and Distribute VA,
see attached scope and fee for details) $ 34,281.00
TOTAL
$ 37,681.00
3550 Vine Street, Suite 120 I Riverside, California I T 951. 788.4688 I F 951.788.4988 I www.tylin.com
2008-60
ATTACHMENT "I"
Mr. Robert Eisenbeisz,
City of San Bernardino
January 17, 2008
Page 2 of 2
It is assumed that the City will provide a suitable meeting room to conduct the study . We
appreciate the opportunity to provide engineering services on this project.
Please call if any questions should arise after reviewing this proposal.
Very truly yours,
T.Y. Lin International
. /;,L1~~.>'c/;:/
1/ . ____ //{//
! ' /
Rodrigo Gonzalez, P.E.
Project Manager
Enclosures
cc:File
'. ,
2008-60
ATTACHMENT "I"
City of San Bernardino 1-215/University Parkway Interchange
TASK ORDER - SCOPE OF SERVICES
January 16,2007
Value Management Strategies, Inc.
I. Project Description
The Contractor shall assist with preparing and distributing a Value Analysis (V A) study
of the project described below:
1-215 University Parkway, City of San Bernardino
II. Team Authority and Coordination:
VA Study to comply with NHS VE mandate and follow the Caltrans VA methodology as
outlined in the Chapter 19, "Value Analysis" of the Project Development Procedures
Manual (PDPM) and detailed in the Caltrans VA Team Guide and Report Guide - Third
Editions, April 2003. V A studies identify and evaluate alternative project solutions and
provide recommendations to decision-makers.
Study Coordination:
R. Terry Hays, Project Manager, Value Management Strategies, Inc.
Anthony Roberts, District 8, Caltrans
City of San Bernardino
TY Lin
III. Study Participants and Schedule
The VA Study is to follow the activities as defined in the Caltrans VA Activity Chart.
The list of VA Study participants will be developed by Caltrans. The study will be five
days, in 2008. A pre-study meeting will be scheduled typically 30 days prior to to the
start of the study to finalize the study organization. Once the Draft report has been
reviewed the project stakeholders and implementation meeting will be conducted to
resolve the disposition of the V A Alternatives presented in the report.
IV. Period of Performance
TY Lin shall provide the Contractor with written approval prior to commencement of any
work.
Work under this Task Order shall begin on a date TBD or upon final approval of this
Task Order. Pre-study, data collection and dissemination shall begin on a date TBD.
V. Scope of Services
The required services are to lead a V A study of the above-described project. The scope
of the work shall inClude but is not limited to the following:
· Provide a qualified, independent Certified Value Specialist (CVS) team leader to lead
a VA study in accordance with Caltrans value methodology.
· Provide VA study documentation in accordance with the Caltrans VA Report Guide
and this task order.
P.ge 1 013
~ '.
2008-60
ATTACHMENT "1"
City of San Bernardino 1-215/University Parkway Interchange
. Provide the following technical team members for the following disciplines:
~ None to be provided by VMS.
. Conference rooms will be provided by TY Un or Caltrans.
. Ensure that applicable data and correspondence, any other relevant information
necessary for the VA study is collected, developed and distributed.
. Facilitate V A Team Meetings.
VI. VA Deliverables
The V A Team Leaders are responsible for the following:
. Leading pre-study meeting/so Attendance should include representatives Caltrans, TY
Un, the Caltrans DV AC, project manager and key project development team staff,
key outside project stakeholders (local transportation agencies, local government, and
permitting agencies) and any known VA team members.
. Develop in conjunction with Caltrans the draft V A study charter (Attachments A, B
and C per the Caltrans Team Guide).
. Complete the Preliminary VA Report with input/review of V A Team and technical
reviewers in accordance with the VA Report Guide - Third Edition and with the
following items:
. A distribution list for the VA reports must be developed with the Project
Manager.
. Submit Preliminary VA Report; no more than 2-weeks following Initial VA
Presentation, as specified in the report distribution list.
. The preliminary report distribution will be electronic (pdt). Copies of the reports
should be distributed to the V A team, key technical reviewers and the project
stakeholders.
. Coordinate with TY Un and Caltrans on the project stakeholders responses to the
preliminary V A report and prepare for an implementation meeting to resolve the
disposition of the V A alternatives, finalize the VA study reportables (costs,
performance and value indices).
. Submit Final VA Report as specified in Caltrans VA Report Guide - Third Edition.
Report should be submitted no more than 3 weeks following VA Final Presentation.
Final VA report will also be an electronic copy in PDF format of the entire report.
VII. Reports and/or Meetings
The Contractor shall submit progress reports, and meet with TY Un, as needed, to
discuss progress on the study.
The Contractor shall schedule and facilitate an implementation meeting at a date and time
to be determined by the TY Un and Caltrans Project Manager.
Page 2 oU
VA Study Budget
IWD
PRESTUDY
Program Manager
Team Leader
Clerical Support
Project Coordinator
Administrative Assistant
VA Study
Team leader
VA Preliminary Report
Team Leader
Clerical Support
Project Coordinator
Administrative Assistant
QA/QC
2008-60
ATTACHMENT "}"
.HiI.msl.
.I:fmu:a .BiWl ~ IlI1al
4 $268.56 $1,074.24
24 $190.00 $4,560.00
4 $64.81 $259.24
4 $113.26 $453.04
2 $72.03 $144.06
Total PRESTUDY $6,49O.SB
50 $190.00 $9,500.00
Total VA Study: $9,500.00
Hays
TBD
Combs
Kramer
Northrop
TBD
24 $190.00 $4,560.00
24 $64.81 $1,555.44
2 $113.26 $226.52
2 $72.03 $144.06
16 $89.12 $1,425.92
Total SEGMENT Ja2 - VA Preliminary Report :
TBD
Combs
Kramer
Northrop
Parker
$7,9JJ.94
Implementation Meeting
Team Leader TBD 12 $190.00 $2,280.00
Total SEGMENT 3 - Coordination and _tlng : $2,280.00
Final VA Report
Team leader TBD 14 $190.00 $2,660.00
Clerical Support Combs 16 $64.81 $1,036.96
Project Coordinator Kramer 2 $113.26 $226.52
Administrative Assistant Northrop 2 $72.03 $144.06
QA/QC Parker 16 $89.12 $1,425.92
Total SEGMENT 3 - Final VA Report: $5,493.46
Labor SUbTotal: 531.&75.0.
Other Direct Costs
C.IItllYlGrv WI Numb.r .BiWl ~ IlI1al
Airfare each 3 $500.00 $1,500.00
Airport Shuttle each 2 $90.00 $180.00
Meals and Incidentals Day 5 $40.00 $200.00
lod9ln9/Hotels Day 5 $130.00 $650.00
Parking Day 5 $15.00 $75.00
Personal Car MI 0 $0.505 $0.00
Total: $2,605.00
Miscellaneous Direct Costs
Shipping
Reproduction
Conference Room
Miscellaneous Supplies
LS
LS
Day
EA
o
o
o
o
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Total Misc. ODC:
$0.00
ODC SubTotal:
S2_litJ~.0IJ
Total Task 0nNr:
S34.2BtJ.OII
Page 3 013