HomeMy WebLinkAbout20-Public Works 'CITY OF SAN BERNCtblNO - REQUEST N~4COUNCIL ACTION From: ROGER G. HARDGRAVE REC'O. - ADMIH.sn~: Public Works/Engineer~ijQ AOO 2 ~ wn 5 PI! 3: 36 4-25-91 Approval of Change Order No. ONE -- Construction of Storm Drain in Morgan Road, Windsor to Kendall Drive, per Plan NO. 8133 STANLEY F. YELICU, J:NC. Dept: 0lIte: Synopsis of Previous Council action: June, 1989 Allocation of $450,000 in 1989/90 Storm Drain Construction Fund Budget approved. 09-17-90 Plnn~ approved and authorization granted to advertine for bids. 11-19-90 Transfer of $70,000 to Mill Street Storm Drain, Account No. 248-368-57832, approved. 11-19-90 Resolution No. 90-45 adopted, awarding a contract for the low bid price of $257,151.50. 04-01-91 Tr'lnsfer of $12,000, to Account No. 248-368-57875, approved. Recommended motion: That Change Order No. One to the contract with Stanley F. Ye1ich, Inc., for the construction of storm drain in Morgan Road, in accordance with Plan No. 8133, authorizing the placement of additional asphalt pavement on Morgan Road, be approved, increasing the contract price by $9,780.00, from $257,151.50 to $266,931.50. cc: Shauna Edwins . Andy Green Contact penon: Supporting dllta *ltached: Gene R. Klatt Staff Report, ceo .1 Phone: 5125 Ward: 5 FUNDING REQUIREMENTS: Amount: $9.780 (Storm Drain. Construction Fund) Source: (Acct. No.1 248-368-57833 Finance: an Rd., Council N01lls: 75.0262 Agenda Item No c:;.,O -- . CiTY OF SAN _RNg.DINO - REQUEST ,Q. COUNCIL ACTION STAFF REPORT The plans installed about 6 paving was to be stallation of the direct the Morgan Road Storm Drain to be feet from the south curb and gutter. Permanent placed over the trench excavated to allow in- storm drain. During removal of the pavement over the trench, it became evident that the existing 6 feet of pavement between the storm drain and south curb was badly deteriorated. The pavement was broken so badly that it was impossible to remove the pavement on a true line. This condi tion precluded placing the permanent paving over the trench in an acceptable manner. In order to obtain a good permanent patch over the trench, the Contractor was.directed to remove the approximate 6 feet of pavement, and place new pavement in this area. An additional 208 tons of asphalt concrete was placed due to this action. The cost for this additional work, based upon actual costs incurred, is $9,780.00. Costs were accrued on a time and material basis, in accordance with Section 3.3 of the Standard Specifications. The total estimated project cost, based upon the actual low bid price, contained an amount of $41,248.50 for contingen- cies. Approval has been granted to transfer $12,000 to the storm drain in Waterman Avenue, from Wier Road to Commercial Road. The balance of $29,249.50 will be more than sufficient to cover the cost of Change Order No. One.. We recommend that Change Order No. One be approved. 4-25-91 75-02'" .' ProJect: "an No. Storm Drain in~organ Road I: '--;' ,-.....-........ 8133 o FUe 10. 4.42-12 ENlIIEERING DIYISION DEPARlIDT OF PUBLIC WORICS CITY OF SAIl IERURDUIO. CALIFORNIA comACT. CHM&E ORDER NO. 2!!- To: Stanley P. Yelich, Inc. P. O. Box 246 Sierra Madre, CA 91024 Gentlemen: You are hereby authorized and directed to place 208 tons of asphal t concrete pavement over existing portions of pavement which have failed, and to resurface relocated telephone and storm drain trenches, on a time and material basis, in accordance with Section 3.3 of the standard specifications, for an increase in the contract price of $9,780.00. Total extra work cost added to contract .............................$ 9,780.00 Previous Contract PricI _......................~~.......-..~................S 257.151.50 ~ndld COst Price ..................................................$ 266,931.50 Additional ti_ to CClIIPlete contract due to chang. order ............ -0- CONTRACTOR: CITY OF SAN BERNARDINO: . Recomnended By: Roger G. Hardgrave Date Director of Public WOrks/City Engr. Accepted By: Titl.: Date Approved By: Shauna Edwins City Administrator Date