File No. 6.44/14.40-63
- REQUEST c30R COUNCIL ACTION
From: ROGER G. HARDGRAVE
. Approval of Amended Five Year
Su~~: Project List and TWenty Year
Transportation Plan - One-Half
Cent Sales Tax Funds per Measure
"I't .
Dept: Public Works
Date: 3-29-91
Synopsis of Previous Council action:
07-17-89 -- Transportation Improvement Program Expenditure Plan,
for the funds from half-cent sales tax measure,
approved.
10-17-89 -- Resolution No. 89-427 adopted approving a Five-Year
Project List and Twenty-Year Transportation Plan to be
financed with Measure "I" 1/2<:: sales taxes.
05-07-90 -- City Clerk and City Engineer authorized to proceed
with establishment of assessment district for widening
South "E" Street Bridge.
Recommended motion:
Adopt resolution.
cc: Shauna Edwins
Jim Penman
)
Contact person:
Roger G. Hardgrave
Staff Report, Amended
Program & Resolution
Phone:
5025
Ward:
1\11
Supporting data attached:
FUNDING REQUIREMENTS:
Amount:
N/A
Source: IAcct. No.!
IAcct. DescriPtion)
Finance:
Council Notes:
75-0262
-.......
. .... "'<ri~
CITY OF SAN BB~RDINO - RBQUBSTOOR COUNCIL ACTION
STAFF REPORT
Page 1 of 2
A Five-Year Project List of transportation projects, to
be financed with l/2~ sales taxes, was approved at the Council
meeting of 10-16-89, as required by Measure "I" to secure
approval from the State Legislature. These project lists from
the various cities were used in the successful campaign.
SANBAG is in the process of developing a program for the
expenditure of funds under the arterial program. They envision
financing Federal-Aid Urban projects that are ready to go, but
were not funded due to a shortage of funds, and some projects
from the Measure "I" arterial program.
Plans, specifications and estimate for widening the
south "E" Street Bridge, over the Santa Ana River, have been
completed and submitted to Caltrans for approval. This is
necessary since the cost for preparation of these items was
financed with Federal-Aid Urban funds.
An indication has been given that $1 Million in bond
proceeds will be allocated to finance about 25% of the total
estimated cost of $4.1 Million. The amended Five-Year Project
List designates $2 Million for the South "E" Street Bridge
Widening Project. It is proposed that the remaining balance of
$1.1 Million be provided through an assessment district on
properties in the vicinity of the bridge that would receive a
special benefit.
The following projects were deleted in the Amended Five-
Year List:
Street
Limits
Description
of Work
Widen Bridge $
Widen & Rehab.
Const.Box Culv.
Wid. to 4 Lanes
Inst. Traffic
Signals
Amount
"H" Street
Santa Ana River
Pepper to Rancho
Devil's Canyon
36th St. to "H"
Ln. @ Commercenter
East
500,000
300,000
450,000
650,000
Waterman Ave.
Rialto Ave.
Kendall Dr.
Hospitality
100,000
TOTAL
$2,000,000
These projects will, of necessity, be deferred or
financed with other funds. The South "E" Street Bridge Project
will be ready to go as soon as the plans are approved by
Caltrans and the assessment district established. No work has
been started on the above listed projects, except for traffic
signals at Hospitality Lane and Commercenter East, which' are
proposed to be installed under another assessment district.
3-29-91
75-0264
CITY OF SAN BB~RDINO - RBQUBSTOOR COUNCIL ACTION
STAFF REPORT
Page 2 of 2
If the $2 Million in Measure "I" arterial funds is not
provided at this time, the entire cost could be financed from
this source in the future
URGENCY CLAOSE:
SANBAG is in the process of developing a program for releasing
some Measure "I" arterial funds, and expect it to be approved
in about 30 days. Our amended list needs to be submitted as
soon as possible in order that it can be incorporated into
their program.
3-29-91
75-0264
-
-
o
o
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21 / / / /
<n////
23////
24 / / / /
RESOLUTION NO.
RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING AN
AMENDED FIVE-YEAR PROJECT LIST AND TWENTY-YEAR TRANSPORTATION
PLAN TO BE FINANCED PURSUANT TO MEASURE "I" TO LEVY A ONE-HALF
CENT SALES TAX WITHIN SAN BERNARDINO COUNTY FOR FUNDING
TRANSPORTATION PROJECTS.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE
CITY OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. The Five-Year Project List, of transportation
improvements to be financed from the one-half cent sales tax to
be levied pursuant to Measure "I" , marked Exhibit "A", a copy
which is attached hereto and incorporated herein as fully as
though set forth at length herein, is approved.
SECTION 2.
The Twenty-Year Program, consisting of
transportation improvements, such as street widening, pavement
rehabilitation, installation of street lights and traffic
signals, to be made in accordance with the Circulation Element of
the current City's General Plan, is approved.
SECTION 3. The Director of Public Works/City Engineer is
hereby authorized to file copies of the amended Five-Year List
and Twenty-Year
with
Program
Bernardino
San
Associated
Governments.
25 / / / /
26 / / / /
27 / / / /
28 / / / /
3/29/91
RESO: APPROVING AMENDED FIVE-YEAR PROJECT LIST AND TWENTY-YEAR
TRA(::ORTATION PLAN. (:J
1 I HEREBY CERTIFY that the foregoing resolution was duly
2 adopted by the Mayor and Common Council of the City of San
3 Bernardino at a
4 day of
5 Council Members:
6 ESTRADA
7 REILLY
8 FLORES
9 MAUDSLEY
10 MINOR
meeting thereof, held on the
11
12 MILLER
13
14
15
16
17
18
POPE-LUDLAM
, 1991, by the following vote, to-wit:
AYES
NAYS
ABSTAIN
City Clerk
The foregoing resolution is hereby approved this
day of
19
20
21
22
23
24
25
26
27
28
Approved as to form
and legal content:
James F. Penman
City Attorney
By~J- ~
(/
, 1991.
w. R. Holcomb, Mayor
Ci ty of San Bernardino
- 2 -
Street
South "E" St.
Mt. Vernon Ave.
Mill Street
Waterman Avenue
Arden Avenue
Piedmont Dr.
Sierra Way
40th Street
9th Street
Lynwood Drive
Pepper Avenue
Redlands Blvd.
-
o
o
3-29-91
FIVE YEAR PROGRAM OF PROJECTS
MBASURE I SALES TAX PROPOSAL
Limits
Santa Ana River
2nd to 4th St.
"E" St. to
Sierra Way
Baseline to
Highland
Baseline to
Pacific
@ Baldridge Cr.
@ 16th Street
Kendall to
Electric
"E" St. to
Tippecanoe
Del Rosa to
Victoria
Randall to Mill
Hunts Lane to
E.C.L.
Description
of Work
Widen Bridge
Replace Bridge
(Local Match)
Widen
Rehabilitate
Pavement
Const. Street &
Bridge
Const. Bridge
Install Signals
Acquire R.O.W.
& Widen(City's
share)
Rehabilitate
Pavement
Rehabilitate
Pavement
Rehabilitate
Pavement
Rehabilitate
Pavement
EXHIBIT -A-
Preliminary
Estimated
Cost
$2,000,000
800,000
250,000
300,000
750,000
300,000
100,000
750,000
250,000
250,000
100,000
450,000