HomeMy WebLinkAbout28-Water Department
.
....
...........
...... .
,
o
o
CITY OF SAN BERNARDINO
MUNICIPAL WATER DEPARTMENT
WATER RATE STUDY
DECEMBER, .1990
dt?'
~
o
.
~
..
RMI
IftRODUC'rIOIf.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .... 1
ANALySIS........
RECOMMElfDATIOIfS.
o
INDEX
................................................................. ..
.............................................................. ..
-1-
.15
-
9
~
.
-
o
o
LIST OF SCHEDULES
~
SCHEDULE 1-A Water Fund - Analysis of Revenue and
Expense-Based on Current Rate.............
SCHEDULE 1-B Water Fund - Analysis of Revenue and
Expense-Based on Proposed Rate...........5
SCHEDULE 2 Water Fund - Projected Income and Expense
FY 1988/89 through FY 1990/91............6
-11-
--- _U
..
-
-
.L
~
o
o
LIST OF EXHIBITS
U&I
EXHIBIT 1 Proposed 1990/91 Water Rates, Rule
and Regulation Ito. 21..................... 16
EXHIBIT 2 Proposed Fire Service Rates, Rule
and Regulation 110. 14..................... 19
EXHIBIT 3-A Revenue Projections Based Upon
Current Water Rate........................ 21
EXHIBIT 3-B Revenue Projections Based Upon
Proposed Water Rate....................... 22
EXHIBIT 4 Water Rate Survey..........................25
EXHIBIT 5 Summary Report - Capital Improvement
Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31
EXHIBIT 6 Projected Captial Revenue and Expense
Schedule - FY 1989/90 - 1999/2000..........34
-Hi -
--
.
..1-
4
-
I
o
o
INTRODUCTION
CITY or SAlI BBR1fARDINO KUlIICIPAL WATER DEPAR'1'MD'1'
PROPOSED WATER RATE AND ACQUISITION or SERVICE CHARGE INCREASES
The San Bernardino Municipal Water Department has provided its
customers with high quality, ade~ate water service at reasonable
prices since 1904. The Water Department's sources of revenue are
customer payments for water usage, service charges, and reimburse-
ment for construction services. The Department does not derive any
revenue from the general or special tax base. The cost of water
is established through approved water rates. Water sales revenue
and service charges are used for the fOllowing purposes:
1. To fund the acquisition of equipment and/or
capital items, i.e., reservoirs, transmission
lines, construction equipment, wells, and
wellhead treatment equipment.
2. To meet annual operating expenses, including
system maintenance and employee wages.
3. To maintain intracity transfer of 10' of all
water sales revenue to the City's general fund
as authorized by the Charter of the City of San
Bernardino.
In July, 1989, the Water Department had 36,100 active services.
There are currently 37,000 active services in the water system, a
2.49' increase over the 1989 level. In order to maintain a quality
water system, the water rates, the acquisition of service charges,
and water main installation charges must be adjusted periodically
to produce sufficient revenue to meet the Department's operating
costs. These rates also cover the costs of constructing new
sources of supply, additional storage capacity to meet peak demand,
and the maintenance of the entire system.
In 1990, the Department updated the Water System Master Plan as
re~ired by the City's General Plan to determine future growth and
the capital expenditures required to meet current and future water
demand. The recommendations of the completed Master Plan, a
summary of water rates and service charges of several surrounding
water agencies, and the recommendations for water rate and ac~isi-
tion of service charge adjustments are included as an attachment
to this report.
The State of California, specifically Southern California, has
experienced a drought condition during the past five (5) years.
This lack of rainfall which recharges the groundwater a~ifer from
which 95' of our water supply is derived has caused a dramatic
1
4.- --_
... .
u.
--
..L.
o
o
change in the operation of the water system. To compensate for
the declining water table in San Bernardino, the Department has
maximized its production and boosting from the artesian pressure
zone. Pressure zone water is currently being produced and pumped
into the higher elevation pressure zones of our distribution
system. However, additional wells, transmission mains, and
boosting facilities are necessary to produce and transfer suffi-
cient quantities of water from the pressure zone to meet the City's
future water demand. During the past four years, the overall
production capability of our sources of supply have been reduced
by 40% due to groundwater contaminants and a steady decline in
water levels. As the water table continues to fall, the City's
wells must be reequipped annually to produce water from deeper
levels. The reequipping is expensive, i.e., $1.2 million in 1989-
1990, and adds additional costs to the operation due to increased
power costs. Much of the water production from the high elevation
wells cannot be recovered by reequipping due to the shallow depth
of the aquifer.
The Water Department has completed the construction of two (2) air
stripping treatment facilities to remove volatile organic chemicals
(TCE/PCE) from the groundwater. These facilities, funded from
grants from the State of California, Department of Health Services,
Toxic Substances Control Program were essential in order for the
Water Department to meet peak summer demand. The treatment
facility at the Newmark well field is designed to treat 8.6 million
gallons per day, and the facility at the Waterman plant is designed
to treat 14.4 million gallons per day. A granular activated carbon
treatment plant was constructed at 17th an Sierra Way which
recovers 4.5 million gallons per day of production capacity.
Altogether 27.5 million gallons per day of production capacity was
gained back through the installation of aeration and carbon
adsorption wellhead treatment units on ten (10) City wells.
Through the groundwater contamination cleanup efforts and an
aggressive program of rehabilitating existing wells, the Department
was able to meet the 1990 peak water demand; however, we do not
have any water production facilities (wells) in reserve. The
groundwater contaminants are continuing to spread through the
basin, and during 1990 we lost two (2) additional wells at 19th and
California Street as well as two (2) wells at 23rd and 27th and "E"
Streets. The declining water table, increased water demand, and
the loss of water production capacity to groundwater contamination
are a combination of conditions that have never before been
experienced in San Bernardino.
The comprehensive analysis of the water system (Master Plan update)
completed in September, 1990 analyzed our current and future water
demands, and determined what capital improvements were needed
through the year 2010. The Water Department, in participation with
the West San Bernardino County Water District and the City of
Rialto, formed a joint powers agency capable of selling revenue
2
_--JJ
.
-
--
..L
-
o
o
bonds to fund the required capital improvements.
A detailed listing of the 5-year Capital Improvement Program (CIP)
which includes new well, booster station, storage, and transmission
main requirements is attached to this report. The 5-year CIP
requires the expenditure of approximately $13.4 million per year
for capital water system projects over the next five (5) years.
The current water rates were approved on October 16, 1989 and
became effective November 1, 1989. An analysis of the Department I s
financial needs was completed by Bartle Wells Associates in
November, 1990. The study recommended increases in both water
rates and the acquisition of service charges to generate the
additional $3.9 million per year to fund the annual debt retirement
for the 5-year, $67 million schedule of water system capital
improvement projects.
3
A-
.
6
4.
B lli
L.
o
SCHEDULE 1- A
o
BASED ON CURRENT RATE - ANALYSIS OF REYEJUE AND EIPENSE
FISCAL YEAR
1987/88
FISCAL YEAR
198818'1
FISCAl YEAR
1'18'1190
FISCAl YEAR
1"0191
OPERATING REVEIllES
Niter Sales 7,444,727 9,707,196 Ul,042,613 tl2,378,820
Service ClI.1rges 28,792 30,956 30,423 31,944
----------..... ------............- ......._-............- ------..._----
Subtotal 7,473,519 9,738,152 11,073,036 12,410,764
leIS I
Nrite-Offl 14,m 37,340 16,477 20,000
101 Trinsfer to City 684,477 923,245 1,043,982 1,237,882
------------ ------------ ....--............--- ----.....-......._-
NET 0PIl. REVEIllE 6,774,217 8,777,567 tlO,012,577 S11,152,882
OTHER REVENUE
Opr. Costs Cipitilized 385,285 452,287 672,413 672,413
Other IncOlf . reilburiible
Sltrvices 837,803 629,829 630,"4 576,688
------------ ------------ ...----------- ----...-----_...
TOTAl OTHER REVENUE 1,223,088 1,082,116 1,303,407 1,249,101
---..........--- ------------ --------...- -------..._-
TOTAl 0PIl. . OTIER REVEIllE 7,"7,305 9,859,683 11,315,984 12,401,983
OPERATlN6 ElPENSES
Plint Production 2,013,320 2,313,882 2,451,262 2,8'19,769
Cost of Purchised Nitlr 24,"1 69,313 271,005 300 ,000
Other Plint Ficilities 205,415 262,783 483,921 548,650
Distribution 5yst.. Costs 702,032 930,717 1,035,241 1,080,038
6tntril Strvicts 2,214,014 2,546,948 2,771,137 3,049,059
6tntril Ad.in. . Overheid 2,294,263 2,304,115 3,003,825 3,075,228
Contingency 100,000
------------ -------..._--- ---------- -----------
TOTAl OPERATIN6 COSTS 7,454,035 8,427,758 10,016,391 11,052,744
------------ ------------ ..-..-------- ----------
NET llPERATlI6 REVEIlUE 543,270 1,431,925 1,299,593 1,349,239
NON-lIPElIATlI6 REVENUE
Contributions in Aid of
Construction 2,240,523 3,337,362 3,887,744 3,842,000
...-..---...---- 00______----- ------------ ---------
!lET OPERATlOI . CAPITAl INClIIIE 2,783,793 4,769,287 5,187,337 5,191,239
IlON-lIPElIATlI6 EXPENSES
Dtpreciition 1,106,688 1,193,954 1,335,246 1,468,771
Cipitil I.pravelents 2,833,624 2,274,161 6,249,216 3,842,000
Debt Service 336,634 0 2,079,000
...----------- ------------ ------------ -----------
TOTAl IlON-OPERATlI6 ElPENSE 4,276,946 3,468,115 7,584,462 7,389,771
---..------- ------------ ------------ ----------
NET GAIN OR lOSS 11,493,1531 1,301,172 (2,397,1251 12,198,5321
C:s8:r.l:a::l&Us ..:::sn::u a.=:a::::.:_ ...zz===z===
-4-
- -
IU
.
.
-
- -
-
o
SCHEDULE 1- B
o
BASIl) 01 PIOPOSID un - WLYSIS Of UYIIUI DB IIPOSl
fiSCAL JW
1987/88
fiSCAL JW
1988189
fiSCAL JW
1989/90
fiSCAL JW
1890/91
------------------------------------------------------------------------------------------------
OPlU!IIG IDIIUIS
later Sal.. 7.444,727 9,707,198 $11,042,813 $14,884,882
Sanlee CIIuI" 28,792 30,958 30,423 31,944
------...---- ---...------...... -------..---... ------............-
S1Illtohl 7,473,519 9,738,152 11,073,038 14,918,828
te..:
Irite-offe 14,825 37,340 18,477 20,000
101 !ruefer to Citr 884,477 923,245 1,043,182 1,488,488
......_-_........-...-... ------------ ----.....-...---- -------...----
II! OPI. UYIIUI 8, m,m 8, TTT ,587 $10,012,577 $13,408,158
O!IIIIIIYIIUI
Opr. eoete Ca,lhlhed 385,285 452,287 872,413 872,413
Other IIlCCIM . reiBareellle
Sanleee 837,803 829,829 830,914 578,888
..----......----.. ......--..------... --..------- -----..----
!OnL O!IIIIIIYIIUI 1,223,088 1,082,118 1,303,407 1,249,101
----..-----... -------...---- -------.......-- ...-----..---
!O!&!. OPI. . O!IIII mJIUI 7,997,305 9,859.883 11,315,984 14,857,259
OPW!IIG lIPOSIS
Plut Prod1cUOI 2,013,320 2,313,882 2,451,282 2,899,789
Colt of Parc1leeed later 24,991 89,313 271,005 300,000
Other Plut rael11tlee 205,415 282,783 483,121 548,850
Diatrlll1Uol Sreu. Coate 702,032 930, T1T 1,035,241 1,080,038
_reI Sanleel 2,214,014 2,548,948 2,m,l37 3,049,059
_raI &dill. . Oyer.... 2,294,283 2,304,115 3,003,125 3,075.228
CoaulltlCr 100,000
_........._---...-- _.........-............-... -----...---- --..._---...-..--
mAL Opm!IIG com 7,454,035 8,427.758 10.018,391 11,052, T44
-----...------ ----......-...--- ----------...- -----------
m OPwnlG IIDIUI 543,270 1,431,125 1,299,593 3.804,515
IOI-GPW!IIG IIYIIUI
eo.trllllUou b lid of
CoutncUOI 2,240,523 3,331 ,382 3,887, T44 3,842,000
------------ --------..-..- ---....--........... -----...-.........
m oPlUnOl . CAPItAL IIClIlI 2,783,793 4,789.287 5,187.337 7,448,515
1OI-oPII&!IIG lIPOSIS
DepreclaUol 1,108,888 1,193,954 1,335,248 1,488. TT1
Ca,l hI !.pl'Oftlllte 2,833,824 2,274,181 8,249,218 3,842,000
Dellt Sanlee 338,834 0 2,079,000
----------..... ...----...--...-- ........-................-- ........--............-...-
mAL IOI-OPIU!IIG IIPDSI 4,278,948 3,488,115 7,584,482 7,389.771
------..---- -...--------- ----...-.....--- -..--.....------
m Gill 01 LOSS (1,493,153) 1,301,172 (2,397,125) 58,744
---...------- -.......-...----- ---...-----...- ...-...---......--
--...-..-----...- -..--------... ----...------- ...-.........--..-
-5-
.
..;,l.
.
~
.
Ji
o
SCHEDULE 2
o
Iliii I~ ~i .. il ~ ~ iilliii ~
-
.. - ...
....~ .... .. ..
8888g :t.:c:: ;i.n ;i .00 ... ..; ..no.n.n.ncN ..;.
-- - -
-----
1 , , 1 1
.
, ~~ ...... Ii
1 :8:
,
, :.: !
,...0
':8'"
I . '"!. ~
]- . ... ...
. - - -
11 ,
!I ~ .. IE!!!iH ~
-
... 0
.E- ii - fi .. .. .. .. .. .. .. ~
==1:it,..a:!:I
;:I; .... _N____
... ..; -
Ii li!!i 183 9Hl 51 ii I e i5~li~a :=
....ID ..
- ~--= - ...
~ ..I: .n~":o:i ~:S ...- ... ";fi : - ..o"';"';=.o~""; -
Ii ~& --... - 1 - ... I"" _n -
1 , 1
- .. -
e ... i'" fa'" .. .... :u~ Sl
-....
ID ~....Il ...... -... ...
... "';=0": "_ -:if ~
~ !~ e-o ......, ...- s:.
~""""N ~
Ii:: ... - - -
.... - - - -
IE iU: - = E!!i!!i! ...
I- =: ...
...
- ...:...: :i - O.ftNS":ri=i =
1:1 ...
~Hi 0 .0. e-
m ... ... ....C"I_....__ c:.
... ..; -
-
;:I;1li!Ill5!~ Iii;; ...... ...
!Ii .. ... .... on :g~ g
.. .. .. .. .. .. s~ i:if !
I ::11 ===!:
.... - - ....
.... ..: ..: ..: ..:
... 1-
- .. .. I I!! =!HU!i!i!~ ...
I ... ....- ...
-.. .. 0-
;j= fi ! .. .. .. . .. .. .. i
=~.:!:.=:
_N_ __
... ...
~
-
o.
I --
- .
...-
_ 0
II.! .
.. II 1:
... g
I -1"
- o .. !..
.
.- =.-
...- &!
.. .zo -j.
= .: ~ ..:
:: "1 -
... - .
- !i .. - .e .to:=
Co> =u:=
- ...
I ii~ ).11:;11
il
Ii --
... -== .. 31
I ...... 1.3--1-
..
..:... ~~I:~il"'~
... . _3! 81):-= 1:!
... -'0
. ....
!I .. .- li!Ii: 11&~JI"!
I lB. ~ &i
. ~".Ifl"'"
:!l ... t I
...... - 0 -"I
. z....... · !.i ,!I.j 1=1-=
= t,S'" , := t~
... -"=1 I:'! ... ... .. - I: B ...... II
Co> al ...... .. - .....-.:-.)1:....
.....31:-=jJl ii B a .....-c:....( o:.:!ti ,S'"
- ...
13..;::8 ~ JI t I illl-= -=......z...Jll...&
.. .z is
0 0 l!l
-6-
.-
.
iii iii i
.oeD"; .0.00 to
... ""'0')_"'"
Iii!
agi
~
-
1:::2=
.......
.; .; :!"
....-
...
U!I:
......:
C:"':.n
, -
,
iil
=~:S
2"-
fS~~
:ii
leIS E
a;i~ !
x......
l!Ii~=
...
Ii:
CD.. ...
==-
.,;..:..
....--
... ...
o
is
...
I
i
!I
8~
...
=
~
...
-
E
"":
...
~...
-
R
~
-
...
...
=
-
..:
~
: ..._11:
o I. 1: .!l
~ ;::1 J !
~ .::1 I i -
i II ~ ! i
li~ ;! i is. !
oS:J is :I _ -
__I ...- ~ S
~I- Z:" 2.. i ::
JiJ~.! :!.'"
... .. _.... = ~ I
.!i 3 3 I..!'; :::1 .ill -: i::
... :::n,;; =-=1 t
.::1-.... o-;:.....t 1....S"1!
_'::0__: 0.._.;1:.1
ill)~~~il::-!lil~-
j_ II, zi:!1o:::Z:E
dI.1ItlI ...._ 8 ...
, ,
I :: '
,... I
, "'
'CD ,
,- ,
,... ,
, .,
, .. ,
, ,
~
:
..;
-
.
-
.
~
SCHEDULE 2 CONTINUED
o
ti
..;
-
~.~~~~~
o...n~~c>>o
-
iliiiiii
si,jN2.ft.ft::i
,
~:!:R5::0!:"'~"'E!22l:8~=5!
C"oI~lNa:::i.,=r- in~._..._a;
ci~fi';::i'; ~si:i:i::!";fi
C"'e__.... as....
liiiijiil
';O-n.n.n';N
I __N.......
,- ,
IPH! -= -= = I
_:i:l:8:SliOA_
...;1............. ...
- ~-~...-
, ,
:;
-
-
....
'":.
...
;;::!fiE!~5!~"''''I:::!e'''I:::~=
......,.....e-ii5.... .ii5N~2lioo
~co_.:c:c:.; 00';"':0';.
CIIN_...., """0_""
---.... ........
~
...
.;
-
...
N
...-!5!5!......-.....!I!~--l:i!2
~=c;;s=f;;;;: ~as_~S;niG5
';_';';~';.n ";";';";':.n_
J:!:::3 =ta_ ..,=N:::: .....
II
iiiils ~
O';'OO.A COol
... --
eii!!UI!
.00';00.0
_0 _4'lf_
...... -
iii~1
"':"':"':N.D
... ~~...
.
":R"'::!li!
J.l...:...:3
on!",; C:m
- -
... -
=.....;..,.
...;;IDC::::=
i;i:!"=
I
-
o
-
-
Ii.! 1i !
! ~~i !J ~
~~ !. - I~
i 8. *~i i! l ilj
& 1 Ii" I.! r _.. ;;:::: ..
. 1~1 ~. -J.#.
"11 lR . . "'::331 3c:..==
.- a . 0 -. = I-.~
.~ ~ :~Z:h.::. S~_~=2lil
~N ~ --~ ~- I =--.~~-.=
i ": . i -,- 31;; - I!'.'::.i ~.. : li 1 g
.. .! . 51._iI I! 101- . ...
~. - ~ --.:: .--3 ~
~:!~~I.!! ~i1!.: ~!il!i=i.11.;1:
1Z:~~i.5i!1!~ ]"iE-,,---
i!!#jii!~~i~3i ~.== ~i]i;
J~~&_-.S&&~lJ~ II ~=-~-
-]-
11
i:::
.-
=
;;
-
....
....
...
N
...
-
.,;
-
:s
...
~
,,;
i
CD
...
...
~
~
...
-
-
CD
..
.;
-
...
.,;
-
on
&l
i
,,;
.
-
N
-
-
.;
-
~
i
N
.
-
.
8
-
.
-
-
~
.f
-
-
-
l!.
mw-.
I
-
...
....
""
i
i
...
~
....
-
,
:s
-
.;
..
~
-
""
....
...
~
-
l!
i
ti
l!
I
I
I
I
-
~
"'I
..
-
...
..
-
-
It
..
..
i
.!.:
_ 0
..~
..
I.:
0_
oO
'l::!
.!i
1:8
co
-
III
I
!
I
o
..
-
..
...
fii
~
fii
~
..
-
..
...
....
ID
....
ID
""
...
~
o
.
.
~
SCHEDULE 2 CONTINUED
~
...
Ii
-
1111 III
.00.00 OON
...
,
ii
..;
-
ID
..
!!!Eii
...:tilid"
- -
!
-
o
Iii!
~=i.:j
, .,
ill
=~:i
..~
""--
.... ""
---
illi
:i~:-
---
it:
.ft..:
e-'"
I
-
-
t'
I
E
-
.!
I 1 -
.:I
:I .. _
.. i ~.1
jll= ill !
-.. . I ... I! j
a:::I:;I~:~~I~
!Ii -=1000- II
liiJ ~~~Jij
-
:Ii
...
-
~
-
I!Eii
..4~r.ir.i
- -
...
~
8
~
-
R=WS
_Ift:l5N
":i==
- -
r!l
-
$
,
gl
;xo
-
...
fii
~
&1
i~
..
~ 8~
- 09
...
-
o
:f
-
,
II!
- - ,
~Hi !
. ,
- I
~
..
.:
-
,
..om'
:I_I
- - I
ii,
- I
A
~
-
..
-
~=
;or;;
":N
"" ..
-
I!
~~
...~
~E
_0
o..i
-
Ii
Nft
.. ..
~c::.
""~
Iii
- . ,
Iii:
.- :
"" ,
,
II
==
-
=1
:'fi
.... ..
";-:3.
Hi
.. ..
.aN
,-
-
1:;=
co ..
~;(
--
-
"':lI:
~a;;
~=
~-:.
--
-
~
s
I
= II
! fiEi Ie
j =Si I~
i I!!i Ii
~ lfi =8 Ii!
- .=s il-E Ell!
! ~I ~!i al
1= I!i iB
-8-
=s
E
...
il
......
o
I
:i
-
...
,
III
"
"
."
6"
"
..
- ..
""..
..
"
II
;0
...
-
-
,
-..
!..
..
..
-..
.. ..
....
-"
-"
..
..
..
- ..
on
Iii!
a..
..
..
J
-
.I
!!
~
-
...
-
I::
e
=
=s
I
I
-
Ei
.
.J
IlIJ ~
--
~
~
1 _
...
o
o
ANALYSIS
Schedule 1 shows Water Fund Revenue and Expenditures for three
years. Projections for FY 1990-1991 are shown on Schedule 2.
Based on the current rate structure, a revenue shortfall of $2.2
million is anticipated in the current fiscal year. Without
adjustment to the water rates, shortfalls in revenue exist which
do not allow for expenditures for required capital replacements and
improvements.
A water rate survey was conducted of the water agencies in the
surrounding area. The full results of the survey are shown in the
Appendix of this report. In order to make a meaningful comparison
of the cost of water service to the residential customer, certain
assumptions were made. These assumptions are as follows:
Billing Period.... ......... ....... .... ...30 Days
Heter Size........ ...... . .. ..... .........5/8" X 3/4"
*Water Usage.............................2200 Cubic Feet
*Based upon average residential water usage in San Bernardino
-9-
-
.
~
o
o
ANALYSIS OF SURROUNDING AGENCIES WATER RATES
BASED ON CURRENT RATES
Single family
Usage:
Meter size:
dwelling
2200 cubic feet
5/8" x 3/4"
BAST VALLEY WATER DISTRICT
Minimum monthly rate
Usage
22 hef @ $0.65
FONTANA WATER DISTRICT
Minimum monthly rate
Usage - first 3 hef
- over 3 hef
3 hef @ $0.544
19 hef . $0.741
TRA-86 sureredit
PUC surcharge
$0.020201 x total
$0.015000 x total
LOHA LINDA MUNICIPAL WATER DEPARTMBNT
Minimum monthly rate
Usage - first 5 hef
- over 5 hef
17 het @ $0.649
LOS ANGELES - DEPARTHBNT OF WATER AND POWER
Minimum monthly rate
Usage
22 hef 8$0.7375
Rate - summer $0.805
- winter $0.670
Average = $0.7375
-10-
'"
$6.00
14.30
$20.30
$6.16
1.63
14.08
21.87
0.44
0.33
$22.64
$6.05
0.00
11.03
$17.08
$2.40
16.23 *
$18.63
-
J!I.
~
o
o
PASADENA MUNICIPAL WATER DEPARTMENT
Minimum monthly rate
Use,ae
Rate - Summer Average $0.357
First 15 hef . $0.375
Over 15 hef . $0.804
- Winter Average $0.766
First 15 hef . $0.339
Over 15 hcf . $0.728
15 hef . $0.357
7 hef . $0.766
REDLANDS MUNICIPAL WATER DEPARTMENT
Minimum monthly rate
Usage - first 5 hef
- over 5 hef
5 hef . $0.27
17 hef . $0.60
RIALTO MUNICIPAL WATER DEPARTMENT
Minimum monthly usage
Usage - first 5 hef
- next 25 hef
5 hef @ $0.40
17 hef . $0.63
RIVERSIDE MUNICIPAL WATER DEPARTMENT
Minimum monthly rate
Usage - first 15 hef
- over 6 hef
* Average of summer & winter rate
15 hef . $0.38
7 hef . $0.665
RUNNING SPRINGS WATER DISTRICT
Minimum monthly rate
Usage
-11-
22 hef . $1. 77
$5.32
5.36
5.36
$16.04
$5.45
1.35
10.20
$17.00
$4.66
2.00
9.45
$16.11
$3.00
5.70
4.66 *
$13.36
$8.00
36.94
$46.94
111 ~
~
- .
o
o
SAN BERNARDINO MUNICIPAL WATER DEPARTMENT
Minimum monthly rate
Usage - first 5 hef
- over 5 hef
17 hef fl $0.60
UPLAND MUNICIPAL WATER DEPARTMENT
Minimum monthly rate
Usage - first 5 hef
- over 5 hef
17 hef fl $0.76
WEST SAN BERNARDINO COUNTY WATER COMPANY
Minimum water rate
Usage
22 hef @ $0.63
YUCAIPA VALLEY WATER DISTRICT
Minimum monthly rate
Usage - first 15 hef
- over 15 hef
Minimum monthly rate
Usage - first 15 hef
- over 15 hef
Minimum monthly rate
Usage - first 15 hef
- over 15 hef
-12-
15 hef fl $0.562
7 hef @ $0.70
15 hef @ $0.447
7 hef @ $0.70
15 hef @ $0.63
7 hef @ $0.70
.
4.
$5.50
0.00
10.20
$15.70
$2.50
0.00
12.92
$15.42
$3.65
13.86
$17.51
YUCAIPA
$5.00
8.43
4.90
$18.33
CALI MESA
$5.00
6.71
4.90
$16.61
WILDWOOD
$5.00
9.45
4.90
...
.
lL
4 -
---
..
o
o
ANALYSIS OF SAN BlRNARDINO PROrosBD WATER RATE VERSUS CURRINT RATE
Single fUlily dwellina
Ueaae: 2200 cubic feet
Meter size: 518" x 3/4"
Single faaily
tfinillula aonthly rate
Ueaae - first 5 hef
- over 5 hef
tillti-fuily
tfiniaa monthly rate
Usage - first 9 hef
- over 9 hef
Multi-fUlily dRelling
Ueaae: 2800 cubic feet
Meter size: 3/4" x 3/4"
Triplex
CURRBNT
17 hef . $0.60
$5.50
0.00
10.20
$15.70
19 hef . $.060
$11. 75
0.00
11.40
$23.15
-13-
PROrosBD
17 hef . $0.72
19 hef . $0.72
$6.60
0.00
12.24
$18.64
$14.30
0.00
13.68
$27.98
.
-
--
~
.
.
~
o
o
RANKING OF SURROUNDING COMMUNITIES WATER RATES
Listed below, in order of cost to the residential customer,
are the results of applying the assumption to the various
agencies' current water rates.
Existing Rates
1. Running Springs Water District............... $46.94
2. Fontana Water District....................... 22.64
3. East Valley Water District................... 20.30
4. City of San Bernardino....................... 18.84 **
5. City of Los Angeles.......................... 18.63
6. Yucaipa Valley County Water District......... 18.33
7. West San Bernardino County Water District.... 17.51
8. City of Loma Linda........................... 17.08
9. City of Redlands............................. 17.00
10. City of Rialto............................... 16.11
11. City of Pasadena............................. 16.04
12. City of San Bernardino....................... 15.70 *
13. City of Upland............................... 15.42
14. City of Riverside............................ 13.36
* Based on current water rate
** Based on proposed water rate.
-14-
..
-
-
- -
.
o
o
RECOHHENDATIONS
Based upon the analysis of the financial statements of the Water
Department and anticipated expenditure levels for the current
fiscal year, it is recommended that the water rates established
under Rule and Regulation No. 21 be increased. The proposed water
rates are shown on Exhibit (1).
The new schedule will:
Maintain the monthly allowance included in the m1n1mum
charge at 500 cubic feet for single family dwelling units
and the first unit of a multiple family dwelling.
Maintain a minimum monthly charge per unit for multiple
family dwelling units which includes a 200 cubic foot
usage allowance per unit after the 1st unit.
Maintain commercial and industrial rates based on meter
size and usage.
Maintain current rate structure for Delmann Heights
users.
Increase the minimum monthly rate for each meter size and
increase the usage charge from $.60 per one hundred cubic
feet of water usage to $.72, a $.12 increase.
Establish a municipal usage rate of $.288 per one hundred
cubic feet of water usage.
Establish an outside city rate for all new services
installed after February 1, 1991 at 1.5 times the rate
charged for water use within the incorporated boundaries
of the city.
Establish a flat rate charge for water to be used during
the construction phase of new buildings.
It is further recommended that Fire Service rates established under
Rule and Regulation No. 14, Section (b) be increased. This revised
rate schedule is shown on Exhibit (2). This schedule reflects an
increase of $1.00 per inch per month.
Hul tiple factors contribute to the recommended rate increases,
however, the largest factors are the drastic increases in the lost
production capacity, increased regulatory program requirements and
essential capital expenditures needed to meet the water demand.
-15-
-
.
o
o
EXHIBIT "I"
PROPOSED 1990/91 WATER RATES
San Bernardino Municipal Water Department
300 North "0" Street
San Bernardino, California
WATER RATES
RULE AND REGULATION NO. 21
GENERAL WATER SERVICE
The following rates shall be charged for all water furnished for
either domestic, commercial, or industrial use within the City of
San Bernardino, or for any other purposes for which no other rate
is specified:
A. SINGLE FAMILY DWELLING UNIT
MINIMUM MONTHLY CUBIC FOOT
METER SIZE CHARGE ALLOWANCE
5/8" $ 6.60 500
3/4 " 8.80 500
1" 10.55 500
1-1/2" 18.90 500
2" 26.40 500
3" 44.90 500
4" 76.25 500
6" 137.30 500
8" 205.90 500
10" 257.40 500
12" 308.90 500
All in excess of 500 cu. ft. per month... ...$.72 per 100 cu. ft.
B. MULTIPLE FAMILY DWELLING UNITS - Includes duplexes, triplexes,
apartments, mobile home parks, condominiums, and town homes
served by one or more master meters.
1. Minimum Monthlv Charqe:
1st unit shall be the same as A, each additional unit
served by meter shall be $2.75 per unit per month.
2. Cubic Foot Allowance:
1st unit shall be the same as A, each additional unit
served by meter shall be 200 cu. ft. per month.
_1~_
.4
~
o
EXHIBIT "1" CONTINUED
o
3. All usage in excess of allowance per month shall be $.72
per 100 cu. ft.
4. Water furnished for municipal use within the City of San
Bernardino shall be $.288 per 100 cu. ft.
C. COMMERCIAL, LANDSCAPE AND INDUSTRIAL USERS:
MINIMUM MONTHLY
CHARGE
METER SIZE
5/8"
3/4"
1"
1-1/2"
2"
3"
4"
6"
8"
10"
12"
$
6.60
8.80
10.55
18.90
26.40
44.90
76.25
137.30
205.90
257.40
308.90
All usage per month............ ............ .$.72 per 100 cu. ft.
Water furnished for municipal use with the City of San Bernardino
shall be $.288 per 100 cu. ft.
D. SURCHARGE - AREA OUTSIDE CITY
All new services installed after 2-1-91 outside the incor-
porated territory of the City shall be the amount computed at
the minimum monthly charge, and the consumption charge as set
forth in this rule and regulation multiplied by 1.5.
E. UNMETERED CONSTRUCTION RATE (RESIDENTIAL ONLY)
A jumper shall be installed (in place of water meter) at the
beginning of house construction for a maximum period of 120
days or until the lot landscaping begins or house is finished,
whichever comes first. Thereafter, the water meter shall be
installed and subject to all charges as listed in Section A
of this regulation. Water used for tract grading and jetting
of trenches is not covered in the above charge. The charge
is hereby established at the rate of $25.00 per service.
-17-
.
o
o
EXHIBIT "I" CONTINUED
F. DELHANN HEIGHTS USERS:
(Customers formerly serviced by Southern California Water
Company) .
METER SIZE
5/8"
3/4"
1"
1-1/2"
2"
3"
4"
6"
8"
MINIMUM MONTHLY
CHARGE
$
4.60
5.50
8.80
13.80
14.90
26.60
35.00
58.50
84.00
USAGE CHARGE:
First 300 cu. ft............................ $.70 per 100 cu. ft.
All usage over 300 cu. ft.... ......... ......$.844 per 100 cu. ft.
Approved:
Board of Water Commissioners:
Mayor and Common Council:
Effective:
December 18,
January
February 1,
1990
1991
1991
-18-
~
o
o
EXHIBIT "2"
PROPOSED FIRE SERVICE RATES
San Bernardino Municipal Water Department
300 North "0" Street
San Bernardino, California
FIRE SERVICE CONNECTION
RULE AND REGULATION NO. 14
a. When a fire service connection for private fire protection is
installed, the identical installation charge as set forth in
Rule and Regulation No. 5 shall apply. Upon the completion
and installation, the valve governing same will be closed and
sealed, and remain so until a written order is received from
the owner of the premises to have the water turned on. After
the water is turned on, the Board shall not be liable for
damages of any kind whatsoever that may occur to the premises
served by reason of the installation, maintenance, use,
fluctuation of pressure, or interruption of supply.
b. The monthly rates to be charged and collected for service used
for fire protection purposes shall be as follows:
2" Pipe or Less $ 8.00
3" Pipe 12.00
4" Pipe 16.00
6" Pipe 24.00
8" Pipe 32.00
10" Pipe 40.00
12" Pipe 48.00
Said monthly rates shall be due and payable in accordance with
the identical terms, conditions, and penalties as set forth
in Rule and Regulation No.6 entitled "Payment of Bills".
c. If water is used through a fire service connection for any
other purpose than extinguishing of fires, the Board shall
have the right to place a meter on the fire service connection
at the owner's expense, or shut off the entire water supply
from such premises. Upon installation of such meter, the
water rates as prescribed in Rule and Regulation No. 21 herein
shall apply, in addition to the service charge as hereinbefore
set forth in Rule and Regulation No. 14, Paragraph (b).
d. The Board shall have the right to take a domestic, commercial,
or industrial service connection from the fire service
connection at the curb to supply the same premises as those
to which the fires service connection belongs. The Board
shall also have the right to determine the proportion of the
installation costs properly chargeable to each service
connection, if such segregation of cost shall become neces-
sary.
-1Q-
L
.
o
EXHIBIT "2" CONTINUED
o
e. The Board reserves the right to install on all fire service
connections a check valve of a type approved by the National
Board of Fire Underwr i ters , and to equip the same with a
bypass meter; such installation shall be at the expense of the
owner of the property, and the regular domestic water rates
as set forth in Rule and Regulation No. 21 hereof shall apply
for all water used through such service except for fire
protection purposes only.
Approved:
Board of Water Commissioners:
Mayor and Common Council:
Effective:
December 18,
January
February 1,
1990
1991
1991
-20-
o
EXHIBIT "3-A"
J;.
o
I191III PIOJICTIOIS IASID U!OI CUDII! lAm Uti
COIIIIICIlL/IlSClLLlDlOS
IISIDIITIlL
..---------------------...-----------...--------------------------------------------------------------------------------------
IIJ.IIIII
10. of llete,.
I
I
I
I
1o.~Ir :
..".u:
hailer
of
llete,.
Ilia.
1o.~Ir 1o.~Ir
CIIup .."...
....r
of
llete,.
I
I
Ii.a. :
Ioa~I, Ioat~l,:
CWp .."...:
S1I&1. Be1U 10te1-&11
lleter SIll '1111, '1111, ...I".tl.1
11.a.
"~1,
CWp
______________________________________________________-______1______-------------------______1..._____---------____________1
5/8 .
3/4 .
1 .
11/2 .
2 .
3 .
4
I .
I .
10 .
12 .
21,489 1,171 29.115 $5.50 $110.401 1,541 $5.50 $1,514 712 ".10 $3.505
1.302 411 1.713 US 13.105 457 US 3.358 5.50 0
731 215 1.001 1.10 1,109 711 UO 1.311 3 1.10 21
II 211 229 15.75 3,107 429 15.75 1.757 1 13.10 14
4 14 81 22.00 1,4" 504 22.00 11.018 5 14.10 75
32 32 31.40 1,187 145 37.40 5,423 21.10 0
19 19 13.55 1.207 10 13.55 3,113 35.00 0
7 7 114040 101 14 114040 1.102 51.50 0
10 10 171.10 1,718 5 171.10 151 14.00 0
0 214.50 0 1 214.50 215 0
0 257.40 0 1 251.40 257 0
------------------------------- ---______1______--- ------------- -------- -.....-...-- I
I I
29,549 2.715 32.314 $192,345 : 3.812 "1,204 : m $3.120 I
!ote1luHr of Deem., Il1l1t. 50,110
....r of ...ld..UI1 llet.,. 32.314
--......-----
hc," of lat OIit 18,341
boa1 later Uaap
Leu: "ll"'t1l1.11_
Iac~ &ddlUou1l1alt
Ilelllu-.... to C.. . $.70
Ilelllu-nb to C.. . '.144
Iulclpa1
Otur Iallcll.
Golf CoVII
SBIIID
ScHola
fill Senlcl
u.... S1Ib~lct to c-dlt, em..
OIUlL IIYII\lI
Iol...UI1...lI. lit OIit
Iol...UI1...lI. Iac~ &ddlUou1 hit
DllIIu - .1Ia.
Dllaua - ~U, cw..
c-rcll1-ai.a.
..ter leap - IteDdvd rate
Iluicipa1
Golf CoVII
SBMD
OtUr lalacil.
'irs SenlC1 - .1IlaB
fln SenlC1 - ~1t, cUr..
ScHoll
17,m ,470 ICf
1,931.840 IJ (5 IJ allOlllCl per .11&11 fll1lJ)
440.304 ICf (21Cf .11_ IIC~ uU "Ir 1)
27 . 751 ICf ('Dr flnt 3 1ICf)
249,940 ICf
813.201 ICf
50,149 ICf
114,432 ICf
151.551 ID
455.411 ID
1.701 ID
13.574,123 Ie,
$2.308.142
414,334
43,431
230,379
571,443
1.144,474
113,981
21._
23.321
8.174
109,111
4,021
259,811
-21-
!OW. PINIC'lD 11m SALIS ImIUI '12,378,120
--.......-.....--
_......--......._--
o
EXHIBIT "3-B"
.
o
IIVIIUI noncTlOIIASD O!OI PIOPOSID lAm lAB
ClIIIDCllL/IIISCII.I.l-
IISIDllTIIL
DIJ.IIUI
-----------------------..--------------------------------------------------------------------------------------------------
I I
I I
___________________________________________ 11.1111 :....., llalala ....., Il.laIa :
SlaIl. 11m fotal-All IoaUlr IoaW,: of Io.m, Io.Ulr of loam, Io.m,:
llta, Sill r.11, r_l, le.l..U.l CWp re-: lltaPl Qu.. ....... I lltaPl Qu.. Ie".:
_____________________________________________________________1______-------------------------:------------------_________.
5/8. 2'1,489 1,118 21,115 ".10 1112,489 1,541 ".10 110,217 : 112 ".10 13,505
3/4. 1,302 411 1,713 1.10 15,. 451 1.10 4,022 : 5.50 0
l' 738 215 1,001 10.55 10,581 111 10.55 1,515 : 3 1.10 28
1 1/2 . II 211 22t 1...0 4,321 42t 1...0 1,101 1 18.10 14
2. 4 14 II 28.40 1,115 504 21.40 13,301 5 14.10 75
3 . 32 32 44.10 1,437 145 44.10 1,511 28.10 0
4 . 18 18 78.25 1,448 10 11.25 4,515 35.00 0
8 . 7 1 137.30 811 14 137.30 1,122 58.50 0
I . 10 10 205.10 2,059 5 205.10 1.010 84.00 0
10 . 0 257.40 0 1 257.40 257 0
12 . 0 301.90 0 1 301.90 308 0
10. of lit".
29,548 2,115 32,314
---------.---------
8230,189: 3,112
-------------,---------
157,131 : 171
..-..------.
13,120 :
fotll ....., of IIIllla, O.lb 50,110
1aabI, of Ie.l...tl.l IIt.PI 32,314
he... of lit hit
ba,1l lat" Uaap
Leu: ...l"'tlal allo1uce
Iac~ IddlUOIll Ualt
Dtlaw-nb. to e~' '.10
Dtlaau-nb to ~ . '.144
haleipal
OtH, &paci..
Golf eovll
SBVID
Sc_la
fiPl Sanlce
UIIp Sab~lCt to c-dlt, Qu..
_AI. ....
leli..UIl-.la. lit hit
lelida.UIl-ala. lack Additionl Ualt
Dtlaw - alalala
Dtlaw - e~tr ew..
C-rcill-alalala
I.t" ..... - Itudard rat.
haieipal
Golf eovll
SIIVIID
OtH, &paci..
rin Sanie. - a1alaIa
fiPl Sanicl - c-.li\, ew..
Scllaola
11,348
11,m,470 ICf
1,831,1(0 ICf (5 ICf all_ ", llaIla fllilr)
440,304 a (2 a a11_ lIC~ llit "" 1)
21,158 a (ror tint 3 a)
241,MO a
113,201 a
50,141 a
114,432 a
158,551 ICf
455,488 a
1,701 ICf
13,574,123 ICf
82,189,227
105,411
43,438
230,318
89a,1II
9,173,_
181,182
21,311
1'1,320
21,514
145,488
4,825
311,539
-22-
IODL PIOBC!ID lUll SALIS.... 114,114,112
----------
...---------
o
EXHIBIT "]-B" CONTINUED
o
RESIDENTIAL ACCOUNTS
32,314 . 5 hcf allowance
18,346 . 2 hcf allowance
Consumption subject to commodity charge
TOTAL CONSUMPTION - RESIDENTIAL
Residential accounts - 32,314 . minimum
Multi-family accounts - 18,346 . $2.75
Residential - commodity charge @ $0.72
RESIDENTIAL - REVENUE
DELHANN - RESIDENTIAL
771 @ 3 hcf
Consumption subject to commodity charge
TOTAL CONSUMPTION - DELHANN
Residential account - 771 @ minimum
Residential - commodity charge @ $0.70
Residential - commodity charge @ $0.844
COMHERCIAL/MISCELLANEOUS ACCOUNTS
3,882 accounts - no allowance @ minimum
Commodity charge @ $0.72
MUNICIPAL - commodity charge. $0.286
($0.72 x 40~ - $0.288)
GOLF COURSE - commodity charge. $0.11
SBVMD - commodity charge. $0.43
OTHER AGENCIES - commodity charge @ $0.43
FIRE SERVICE
482 accounts - no allowance @ minimum
Commodity charge @ $0.72
SCHOOLS - commodity charge. $0.68
($0.72 X 95~ = $0.68)
-2]-
CONSUMPTION REVENUE
1,938,840 HCF
440,304 HCF
8,946,239 HCF
-----------
11,325,383 HCF
$2,769,228
605,418
6,441,292
-------------
$9,815,938
27,756 HCF
249,940 HCF
-----------
277,696 HCF
$43,440
19,429
210,949
-------------
$273,819
$693,972
4,627,884 HCF 3,332,076
683,201 HCF 196,762
194,432 HCF 21,388
156,558 HCF 67,320
50,149 HCF 21,564
145,488
6,701 HCF 4,825
455,466 HCF 311,539
----------- -------------
17,777,470 HCF $14,884,690
----------- -------------
----------- -------------
o
o
EXHIBIT "3-B" CONTINUED
PROPOSED REVENUE - FIRE SERVICE
METER NUMBER OF MINIMUM PROJECTED PROJECTED
SIZE METERS MONTHLY MONTHLY INCOME YEARLY INCOME
($4.00 p/in)
2 " 7 $8.00 $56
3 " 3 12.00 36
4 " 86 16.00 1376
6 " 236 24.00 5,664
8 " 127 32.00 4,064
10 " 22 40.00 880
12 " 1 48.00 48
---------
$12,124
$145,488
--------------
--------------
-24-
CitylDistrict
East Valley
Water District
Fontana Water
Company
o
EXHIBIT "4"
WATER RATE SURVEY
Residential - General
Monthly Rate
5/8"
3/4"
1"
1 1/2
2"
3"
4"
6"
8"
Flat Rate
Commodity Charge
Monthly Rate
5/8 x 3/4"
3/4"
1"
1 1/2"
2"
3"
4"
6"
8"
10"
Commodity Charge
First 300 cf
Over 300 cf
TRA-86 Surcredit
PUC Surcharge
-25-
o
$6.00
7.75
11.25
24.00
34.50
60.50
100.50
196.00
294.00
25.00
Per 100 CF
$0.65
$6.16
7.17
10.29
13.59
18.21
35.32
46.38
77.20
113.60
134.60
Per 100 CF
Fire Service
$4.00 per inch
Fire Service
$3.30 per inch
$0.544
0.741
0.020201 x Total Bill
0.015000 x Total Bill
Loma Linda
City of Los Angeles
o
EXHIBIT "4" CONTINUED
o
Bi-Monthly Minimum Quantity & Charae
---------------- ---------------------------
Inside City Fire Service
----------- --------------
5/8 x 3/4"
1"
1 1/2"
2"
3"
4"
6"
8"
10"
Commodity Charge
1,000 cf
6,000 cf
8,000 cf
20,000 cf
40,000 cf
60,000 cf
80,000 cf
90,000 cf
100,000 cf
Excess of min. to 19,000 cf
From 20,000 to 39,900 cf
Allover 40,000 cf
Monthly Rate-Domestic
Commercial & Industrial
1" & smaller
1 1/2"
2"
3"
4"
6"
8"
10"
12"
Commodity Charge
Per 100 cf
Summer $0.805
Winter 0.670
Minimum Charae
Per Meter $5.30
$2.40
8.50
12.00
30.00
47.00
84.00
165.00
198.00
254.00
-26-
$12.10
56.02
56.02
130.45
263.67
406.03
548.37
619.54
690.73
$0.649
0.696
0.745
2"
3"
4"
6"
8"
10"
12"
$4.64 per inch
Bi-monthly
Fire Service
$12.00
30.00
43.00
74.00
135.00
178.00
224.00
Commodity Charge
Summer
Winter
$0.74
$0.74
City of Pasadena
City of Redlands
o
EXHIBIT "4" CONTINUED
Monthly Rate
o
Fire Service
------------
---------------------------
With
Detector Check
5/8"
3/4"
1"
1 1/2"
2"
3"
4"
6"
8"
10"
12"
$5.32 Without
5.32 Detector Check
10.11
20.41 4"
47.89 6"
117.06 8"
180.90 10"
276.68 12"
452.26
558.60
665.00
Commodity Charae
----------------
Summer rate - 5/8" - 1"
First 15 hcf $0.375
Over 15 hcf 0.804
Winter rate - 5/8" - 1"
First 15 hcf $0.339
Over 15 hcf 0.728
Bi-Monthly Rate
----------------
Inside City
5/8 x 3/4"
3/4"
1"
1 1/2"
2"
3"
4"
$10.90
13.60
18.70
31.10
44.40
74.50
113.20
206.20
302.30
6"
8"
Commodiy Charge Per 100 CF
---------------- ----------
First 1,000 cf $0.27
Over 1,000 cf 0.60
-27-
$26.21
39.28
52.38
78.54
104.74
2"
3"
4"
6"
8"
10"
12"
$45.40
84.89
152.59
224.31
298.04
Fire Service
$25.38
25.38
25.38
33.76
46.42
72.10
78.59
o
EXHIBIT "4" CONTINUED
City of Rialto
Monthly Rate
------------
3/4"
1"
1 1/2"
2"
3"
4"
6"
8"
$4.66
7.44
15.34
24.64
53.94
93.00
212.97
367.81
Commodity Charge Per 100 CF
----------------
o - 500 cf
501 - 2500 cf
2501 - 3000 cf
Over 6,000
$0.40
0.63
1.00
1.23
o
City of Riverside Multi-family, Commercial & Industrial
Monthly Rate
5/8 x 3/4"
1"
1 1/2"
2"
3"
4"
6"
8"
10"
12"
3.00
5.00
10.00
16.00
30.00
50.00
100.00
160.00
230.00
280.00
Commodity Charge
----------------
Per 100 cf
Summer $0.61
Winter $0.47
Single Family Dwellings
-----------------------
5/8 x 3/4"
1"
1 1/2"
2"
$3.00
5.00
10.00
16.00
-28-
4"
6"
8"
10"
12"
Fire Service
$6.00 per inch
Fire Service
$11.00
16.50
22.00
27.50
33.00
Riverside-cont.
Runnins Sprinse
Ci ty of Upland
West San
Bernardino
County Water
o
EXHIBIT "4" CONTINUED
Commodity Charge Per 100 CF
First 1.500 cf
Next 5.500 cf
Allover 7.000 cf
Monthly Rate
5/8 x 3/4"
1"
1 1/2"
2"
o
Summer Winter
$0.38
0.70
0.78
$8.00
16.00
48.00
72.00
Commodity Charge Per 100 CF
All usage $1.77
Monthly Rate
5/8 x 3/4"
1"
1 1/2"
2"
3"
4"
6"
8"
Commodity Charge
$2.50
3.80
5.40
8.60
17.30
27.00
54.00
86.40
Excess of 500 cf minimum
Multiple units/1st unit
Each additional unit
Bi-monthly Minimum
5/8 x 3/4"
1"
1 1/2"
2"
3"
4"
6"
8"
Commodity Charge
All usage
-29-
$0.38
0.63
0.71
Per 100 CF
$0.76
$2.50
0.65
$7.30
10.00
14.60
20.10
29.20
38.25
58.40
78.48
Per 100 CF
$0.63
Fire Service
None
Fire Service
Up to 4" - $10.00
Over 4" - $2.00/in.
Fire Service
$2.75 per inch
. ,
Yucaipa Valley
County Water
District
o
EXHIBIT "4" CONTINUED
Bi-monthly Rate
5/8 :It 3/4"
1"
1 1/2"
2"
3"
4"
6"
Multiple unite - 1st unit
Each additional unit
o
$10.00
20.00
40.00
64.00
130.00
220.00
440.00
$10.00
7.50
Commodity Charge Per 100 CF
Fire Service
Monthly Service
demand charse
assignable to
the size of the
bypass meter.
Water usage
billed at two
times domestic
rate.
Yucaipa Calimesa Wildwood Canyon
First 3,000 cf
Over 3,000 cf
$0.562 $0.447
0.700 0.700
-30-
$0.630
$0.700
, .
-'. ,I
. ..
o
EXHIBIT "5"
o
SUMMARY OF RECOMMENDED CAPITAL CHARGES .
,- ......... .
....... . .
-31-
o EXHIBIT "5" CONTINUED 0
.. '. #I
Capital Projects
In 1981, a water system master plan was prepared to identify necessary water
system improvements for the citY's service area. Continued rapid growth in the
number of customers, combined with expansion of the service area and signifi-
cant changes in available water system, made it necessuy to update the 1981
Water System Master Plan. Camp, Dresser &: McKee (COM) completed a master
plan update in September 1990. This update uses a planning hOrizon of 2010
and provides cost and phasing information for the firSt five years.
Service Area: The service area of the San Bernardino municipal water depart-
ment is bounded on the north !>r the San Bernardino NatioD8l Forest and on
the east by East Valley Water District, Norton Air Force Base, Victoria Farms
Mutual Water Company, and South San Bernardino County Water District. It
is bounded on the south l?r the cities of Loma Linda and Colton, and on the
west by West San Bernardino County Water District, the City of Rialto, and the
Muscoy Mutual Water Company. The service area of approximately 4S square
miles 15 divided into 18 pressure zones, which range in ground elevation from
approximately 1,000 to 2,500 feet.
Water J)Pnumd..: The total existing maximum day dPmAnd in 1989190 was
approximately 61,000 gallons per minute (gpm), while the projected future
maximum day demand in 2010 was estimated at 93,000 gpm.
Water Supply: The city currently obtains most of its water from groundwater
wells. A Sinall amount of surface water (approximately 800 gpm) is currently
treated at the Devil Canyon filter plant and Used in the 1720 Zone. No State
Water Project (SWP) water has ever been used directly by the city.
The city must rely on its existing storage capacity and suJlplementa1 SWP
water imported through San Bernardino Valley Municipal Water District for
groundwater recharge in order to meet the existing mSIYimum day dPmAnd...
During the summer, the northwestern portion 0 the service area can marginally
meet existing maximum day dPmAnd, 8nd does not have sufficient production
capacity to meet future maximum day demand. The U~ Zone has major
problems for existing and future conditions due to production restrictions on
wells with trace pollutants. The Lower Zone region bas some excess produc-
tion capacity under existing conditions; however, present production levels
cannot meet the projected future demand.
Water System Analysis: The water system analysis was performed by COM.
The analysis found that the major overall system deficiencies were the inade-
quacy of the existing pumping capability and tp.....mmon mains to move
water from the lower-elevation zones to the higher-elevation zones. Also,
several of the Upper Zone's existing production wells may exceed the action
levels of some regulated organic pollutants in the near future.
Based on the identified deficiencies, an overall system alternative was defined
for the city's water system. The resultant backbone system is shown graphic-
ally on the system map ~ge 22).
=-:'==~o~oC:~:=: =;;;;::~~=:
struction of the recommended water system improvements to correct existing
-32-
o
EXHIBIT "5" CONTImO
... t to-
,
.,
deficiencies and provide orderly expansion of the water system to meet future
demands. A detailed capital improvement pro~ was developed for the
major supply, storage, pumping, and transmissIon main improvements needed
for the CIty'S overall system during the period from 1991 to 1995.
A cost summary of the proposed water system improvements for the first phase
to be constructed throughout 1991-1995 totals $67.0 million and is shoWn in
Table 15. An allowance of 15 percent for engineering and 20 percent for con-
tingencies was added to the construction costs to determine total capital costs.
The costs are based on a Los Angeles ENR Construction Cost Index of S800
and include an inflation factor of 4 percent per year to the recommended
start -of -construction date.
TABLE 15 . CITY OF SAN BERNARDINO
FIVE-YEAR 1990 IMPROVEMENT PlAN - PROJECT SUMMARY ($000)
Tran~ission Lines
12" Hnes
16" 1i nes
20" Hnes
24" Hnes
30" Hnes
36" lines
Total transmission
Land Acquisition
Upper Zone
lower Zone
Elevated Zone
1913' Zone
2500' Zone
Total land acquisition
Storage
9 Reservoirs (30.9 MG) - various locations
PlIIIp Stations
lower tank site (future)
ugper tank site (future)
4 th Street & Sepulveda
Foothill Boulevard & 4th Street
Myers Canyon
2300' tank site (future)
Total pumping
Supply
9 Wells - various locations
Well-head treatment - 19th Street plant
Well-head treatment - 25th a 27th Streets plant
Supply - Lytle Creek
Total supply
Grand total
$ 538
431
6,390
3,403
2,267
l2tl~~
$ 1,050
440
270
220
n:m
$23,679
$ 1,460
1,519
964
393
5(\5
l 5,U3
$ 2,801
3,424
3,986
a
$66,967
Source: COM Septelllber 1990 llaster Plan Update.
-33-
.
.
.
=
=
i:
M_
-~
~!
::1-
e;E
-=
--
1:=
~ii
!>ij
I!=
~i
!ro
a_
-
-~
-=
11-
-.
=::1
=-e
-.
0"
:<:1:3
.--
.. u.
I
-
!i
-
-
~
::
-
-
:;;:
-
::
-
-
-
-
-
::
-
-
:;;
-
::
-
:!::
~
-
::
~
-
:;;:
-
::
-
;:;
-
::
~
:!::
M
-
::
M
-
:::
-
::
:!::
-
-
::
-
:!::
::
::
~
~
a:::
ii
=
III
C :=
-.lI
BElli
=BI
i
--
--
--
--:-
:l!:
--
--
~-
~
~
--
--
~-
~
~
--
--
":-
-
~
--
--
~-
~
--
--
:;-
~
--
--
~-
:;:
=:
--
-
~
--
--
--
.;
~
--
--
--
::
-
-
-
:;;
" -.....
li~;
::
-
;i.
--
II __
::-:
:1 -
"
"
"
"
"
"
11
Ii
"
"
"
::
"
li
"
"
::
"
"
"
::
"
lj
::
"
"
::
"
~
"
"
"
"
!!
::
::
::
"
"
"
"
!l
"
"
"
"
"
"
"
"
"
"
::
!!
::
!!
::
~
"
::
~
~
"
"
"
"
"
"
"
"
"
5
"
~
H
.
-
-
-
~
~
-
-
-
oft
~
-
-
":
-
~
-
-
-
~
-
-
-
:i
-
=
~
-
-
~
~
-
-
-
-
~
--
--
--
-
~
" .
:,:1, i
=t
!! ~1
:: ~ ~
55j
" u
"
,,~-
ill
===B
~~I
ale
-~
o
--
--
--
~
-
--
--
-~
-
--
--
-~
-
-
--
--
--
~
-
--
--
--
~
-
--
--
_M
.;
-
--
--
--
..
-
M_
--
--
..
-
-
=
-
---
---
~~~
~=~
--:.~-
~-
-
-
-
-
-
-
-
..
-
---
---
~~::
-~-
~~~
-
-
-
~
:::
---
---
~~-:.
_M_
-~-
""':.~-
~-
-
-
~
M
:::
~
-
---
---
-:.c:.~
---
~--
r:~-
-~
-
-
-
~
:J:
:::
---
---
-:.~~
__M
_M_
~""":.-
-~
-
-
-
-
~
..
-
---
---
-:.-:.~
---
_M~
~c:.-
~~
-
-
-
-
-
::
-
---
---
c:.c:.-:.
~-~
---
--;.r;,-
~-
-
-
-
..
~
-
-
-
---
---
---
o..~
---
r-:.~"
--
-
-
-
5
~
-
---
---
---
..;.:..;
M__
_M_
...;...
-
-
-
.;
-
~
-
---
---
---
r:.:_
--~
::::::-
o
u
-
.:
.
-
.!
-
-
i'
-
--
i a=
~ --
~!-
I ~~
- ..--
- ---
el: '"'~:
~!!lt=::
=aa~~
5=
u_
- ....--
EXHIBIT "6"
~ I
;:ili
1:
::
?
::
"
"
"
~
::
::
"
"
"
"
"
"
"
"
~
!!
::
"
-
-
-
-
-
-
:;;
- -
~::
::-
::
--
--
--
--
-
::
-
-
-
:i
-
-'
-
--
--
--
--
-
::
-
-
-
-
-
=
--
-~
--
--
::
-
-
-
~
-
-
--
~=
--
-
::
-
-
~
-
-
..;
-
--
--
--
--
::
-
-
-
..;
-
-
..;
-
--
--
-~
~-
-
::
-
-
;;
:::
..;
-
--
--
--
--
-
::
--
--
--
:: ::::-
~ :;
"
"
::
j1
"
r:
"
"
"
"
"
!!
"
::
~
~
~
::
"
:
"
J
aii
I:; =
- "
~ :
is
-
-
-
..;
-
'":
-
-
-
-
-
..;
:::
~
-
--
--
--
--
-
::
=:
--
--
-
::
- -
1:11
::loll
i~
o
~
.
~
..
Ii
. iii
:: s
" -
5 Ii
"
" ..
!i E
:: ==
" u
-
-
=
'"
;
g
-
-
:::
-
-
-
-
~
-
-
-
-
:::
-
-
~
-
::::
-
-
-
~
-
~
...;
-
-
-
-
~
-
-
-
-
-'
=:
-
---
---
c:.~c:.
:::::::
-r;,~
--
-
-
-
..
::
~
~
-
:0;.
-
..
~
-
-
-
":
"1
-
-
-
-
~
-
-
-
-
:=
"1
-
-
-
-
;
-
-
-
-
5
-
---
---
-:.-:.c:.
---
---
~~~
---
=
-
o
co c.___
-----
c::.-:.~e:.c:.
...--....--
t- _........._
--:.-:.c::.-.....
__M
-
-
-
-
-
-
--:
----
----
~-=:.-:.-:.
.....-....-
....-........
-:.-:c:.-
---
-
-
-
-
-
--:
----
----
-:.c:.-:.-:.
.....---
....--....
-:.-:.-:.-
__M
-
::
-
-
----
----
-=:.-:.-:-:.
....-....-
....-........
-:.""":.~-
__M
-
-
~
-
-
::
--
--
~~
--
--
--:.""":.
--
-
-
~
-
-
'":
--
--
~~
--
--
:::::;
---
---
~-:.~
-~-
---
~--:--:.
_M_
-11---------
;::IJ5j5JJJjj
u
-
-
.
---:--:-!!:-
~:;~~~~~:;~~~
-----------
----------.
""':.ro:.~__:.~__:.__:.~~~~
-----------
- - --- -
-------....---
~~~~~~~~~~~
110- _ __
. ::::1':::1'==-:- -:-
."'-"'-"'-""lI. ~
--"-i-"- ......
~~ .~o t! lI.;~-_"i:;
;;: f"'. . T If. ~-
-;;:';';"';';"';"';';:::W! I!
.._..______J,:...~
"""Il11"lIlI.'j=:l!:=
...u.::i,->>~.::i~v v-v
..-------....---
::~~~~~~!"~a:t:_;:
- .:.1.:
13
ii
-
&::l
~.
--....--------
-----------
g
~
-
~
-
-
=
-
:::
::
-
-
-:
-
-
-
-
-
~
M
"1
-
-
-
-
-
~
-
-
-
-
:;
-
~
-
-
-
-
-
..:
:::
=
-
-
-
.;
:;;
-
-
-
c_
l~
, -
i_
:-
-
-
-
~
::
-
~
-
-
-
oft
=
-
1:1
ii
ij
~
E
;;
..
fi
M
M
=
~
~
~
-
:;i
=
-
-
..
~
~
-
-
-
-
..
:;;
..
-
-
-
~
-
-
-
..
-
-
-
-
..
5
-
-
-
:;
:J:
..
-
-
-
-
-
::::
..
-
-
-
-
-
~
.;
-
-
-
..
..
-
'"
-
-
-
-
-
s
.;
-
-
-
~
.
~
:l!:
-
.
-
-
~
"i
-
..
o
-
-
.
-
~
u
-
~
=
.
- ,-
-.. -
::~.B
-~~
---
---
-....
-
---
---
II:
i
=::!=
~
-
.
-
~
'---'
CITY OF ;
SAN BERNARDINO
MUNICIPA'L
WATER DEPARTMENT
I
WATER QUALITY REPORT 1991
Olrvc9.~
CALIFO
OURW
California is experiencing its fifth
consecutive year of critically low
rainfall levels. The State's lakes and
streams are drying up and water
agencies are wondering how they
will meet this summer's demand
for water.
San Bernardino Rainfall 1981-1991
35
"30
"
G 25
z
~ 20
1000YearAverage
R3infall - 16.2"
-<"
< I
2:10
~ : t ~ j J~ ~tt.~
81 82 83 84 85 86 87 88 89 90 91..1
Water Year (Oct. 1 - Se 1. 30)
In coastal areas such as Los
Angeles, the water shortage has
become critical. In San Bernardino
we have local water supplies to
meet our current needs. However,
the drought has caused the levels
of the underground water table to
drop. Along with a growing need
to treat and improve the quality of
our groundwater supplies, it is
becoming more expensive and
difficult to deliver water to all
parts of our service area.
WHERE DOES YOUR
WATER COME FROM?
A typical San Bernardino family
home with 2-3 residents uses about
550 gallons of water per day
(900 gpd in the summer). Approx-
imately95% ofthe 70 million gallons
per day (MGD) used throughout
the City comes from 36 wells that
pump water from underground.
The remaining 5% of our water
comes from a stream located in
Devil Canyon behind California
State University San Bernardino.
The well water is pumped from
underground basins filled by
water draining down from snow-
melt and rainfall in the mountains.
The San Bernardino Municipal
Water Department operates a
number of storage reservoirs where
the water is held before we
distribute it to our customers.
Surface water from Devil Canyon
is filtered, treated, and blended
with the chlorinated well water.
The water is treated to be free of
viruses and bacteria and is then
piped to you for use in your home
or business.
'~l.,~ ,.!' ,,,-'~
WHAf HAS THE
DROUGHT DONE?
One of the main costs of
delivering water is the cost of
pumps and electricity to raise the
groundwater from about 100 to
200 feet below the ground surface.
This cost has greatly increased as
more expensive pumps and more
electricity are needed to lift water
from more than 200 to 300 feet
below ground. The drought has
caused the water levels to drop
and our costs to rise.
But pumping water from deeper
below ground does not alone solve
our water supply problems. In a
few wells, water has dropped to
where it can no longer be eco-
nomically pumped. Other wells
are being affected by serious
groundwater contamination from
long-forgotten military operations
and an abandoned airport in the
north end of San Bernardino.
v
CONTAMINATION FROM AB ONEDI
AIRPORT AND MILITARY OPERATIONS
During World War II, Camp Ono
(located near the University, east
of 1-215) was a major weapons and
ammunition depot. Military engine
repair work was performed,
under a contract with Norton AFB,
at the old San Bernardino
Municipal Airport, northeast of
Kendall Drive. At both of these
facilities, gasoline, oils, and
industrial solvents were dumped
either in pits or on the ground
surface. Over the years, these
contaminants have slowly seeped
into our groundwater supplies and
are now showing up in a number
of our wells. The map below
shows the movement and extent
of the contaminants from these
locations as well as others that
will soon be major problems.
\
NORTHP4RK
~..
San Bernardinds Water Depart-
ment has been one of California's
most aggressive agencies in clean-
ing up groundwater contamination
To date, three water treatment
plants have been built with state
grant monies . . . and more are
planned. As a result, the water
source from several polluted wells
is being cleaned up and these
J
1
ROUTfJO
...... HIGHlANDA.VE
.....
"
,
,
,
\ BASEllNfAVf
CITY OF SAN BERNARDINO
\
"'~'.
~Q~.
n,
~
~...:,\"""
"'", .....
~.\ "
",. \
~,
. "'4};.:'\J
1}<$',
fOOTHill AVE
MILlST
\ NORTON
/ ,PLUME
\
\
\
,
\
I
I
.
.
z
.
~
~
, "
"
"
1-10-----
I
I
-- /
--.....
wells have been put back into
service. These treatment plants are
costly to operate and will be with
us well into the future to treat the
contaminants as they migrate
through the groundwater basins.
A
30% OF OUR WATER
SUPPLY IMPACTED
Together, the drought and
groundwater contamination have
reduced the City's current water
production by about 30%. Although
we have the ability to supplement
our supply with Northern Califor-
nia water, this source is costly and
may not be available this year due
to the drought.
u
THE BUNKER HILL BASIN
Fortunately, San Bernardino has a
less expensive, higher quality
water source that we can rely on to
increase our production and meet
our demands. The Bunker Hill
Artesian Pressure Zone underlies
the area south of Base Line Avenue
and east of 1-215. Nearly all of the
snowmelt flowing down from the
San Bernardino Mountains re-
plenishes this basin. In wet years,
water has actually risen above
ground (artesian condition) causing
basement flooding problems for
buildings at the south end of the
city.
To further tap this supply, we
are drilling additional wells in the
pressure zone and building addi-
tional pipes and pumping stations
to distribute the water from the
pressure zone to where it is
needed. This investment in new
facilities will provide our customers
with a reliable water source for
the current, and most foreseeable
drought conditions.
~,,-'f
Pumping, treating, and distrib-
uting our local water supply to
meet drought constraints and
water quality standards, and to
provide our customers with a reli-
able source of water requires that
we implement a 1991 increase in
our water rates. The largest part of
this average $3.24 per month resi-
dential rate increase is needed for
RECLAIMING OUR USED WATER
Have you ever wondered where
your water goes after you have
washed your dishes, taken a
shower, or flushed the toilet?
After it is collected in our sewer
system, it is treated in our water
reclamation (wastewater) plant.
The treated water is then piped to
the Santa Ana River where it flows
downstream. The Santa Ana
River, which flows mostly under-
ground to Orange County, is cap-
tured, put into the groundwater
basins, pumped out and treated,
and reused as a domestic water
supply.
HOW CLEAN MUST
WATER FROM OUR
RECLAMATION PLANT BE?
Since our reclaimed water eventu-
ally is used again when it becomes
part of the Santa Ana River flow,
the Environmental Protection
Agency (EPA) and the Santa Ana
Regional Water Quality Control
Board (RWQCB) require us to meet
23 strict biological, chemical and
mineral standards for the treated
water.
The RWQCB has upgraded the
classification of the stretch of
improvements to our pumping
and distribution system (and will
vary by amount of water used). To
ensure that new homes pay their
fair share of the cost of our water
system, developers are currently
charged a fee of $2,700 per home
for water service. This connection
fee is projected to increase to
$6,390 by 1999.
Santa Ana River which includes
the outflow from our water recla-
mation plant. As a result, they are
now requiring that our plant meet
more strict standards to allow
potential uses such as fishing and
swimming.
The Air Quality Management
District is another regulatory agency
that is enforcing tougher stand-
ards on our industry. To meet new
standards that provide for improved
air quality, we are installing and
rebuilding engines at the reclama-
tion plant to burn cleaner fuels
and release cleaner emissions.
r,~
L
THE COST OF "CLEANER"
WATER
To achieve these higher water
quality standards for protection of
the river and to meet stricter air
quality standards, San Bernardino,
Highland, and Lorna Linda
residents must invest an estimated
$210 million in our reclamation
plant by 1995. If we don't, we may
face fines as high as $25,000/day.
This investment in new facilities
will require an initial $3.80 per
month increase in the residential
sewer rates and a range of increases
for businesses (dependent upon
type). The San Bernardino City
Council will hold public hearings
to discuss approval of the increases
later this year.
WATER QUALITY TESTING
For every current measure of
water quality, the San Bernardino
Municipal Water Department's 1990
water supply met or exceeded
federal and even stricter State
standards for protection of public
health. The 1990 water quality test
results are provided on the follow-
ing table. The standards shown
for the State and Federal require-
ments are measured in parts per
million, parts per billion, and now
for reclaimed wastewater param-
eters-parts per trillion. To put
these amounts in perspective,
'.
.
..
consider that one part per million
is equal to a pinch of salt in 416
bags of potato chips and a part per
million is equal to a pinch of salt
in 84 tons of chips.
The IJprimary" standards are
designed to ensure that the water
would not harm a person after 70
years of continuous consumption.
Some of these standards are as
strict as parts per billion. The
"secondary" standards are
designed to insure the water is of
acceptable taste, odor, and clarity.
Our water supply meets or exceeds
all primary and secondary stand-
ards; therefore, the need for
additional treatment at the home
is not necessary.
In cooperation with the State
Department of Health Services,
we encourage our customers who
are landlords, employers, or school
administrators to share this infor-
mation with those who use water
at your location. We will be
happy to provide you with
additional copies.
(
'-
G
1990 WATER QUALITY TEST RESUITS
PRIMARY STANDARDS-Mandatory Health-Related Standards
Parameter Federal MCL Slate MCL Ground Water Surface
Source Water SBMWD Range Water (b)
Average (a) Low/High
CLARITY
Turbidity (NTU) (Surlace Water) 1.0 0.5 0.28 (0.04-0.48)
(Ground Water) 5.0 5.0 0.7 0.10-1.20
MICROBIOLOGICAL
Coliform Bacteria (% Tests Positive) 10 10 0.01 0.0-0.5 ND
ORGANIC CHEMICALS (mg/I)
Atrazine **0.003 0.003 NO NO NO(l)
Bentazon NS 0.D18 NO NO ND(l)
Benzene 0.005 0.001 NO NO NO(l)
Carbofuran *0.04 '0.018 ND NO NAR
Carbon Tetrachloride 0.005 0.0005 NO NO NO(l)
Chlordane '0.002 *0.0001 ND NO NAR
2,4-0 0.1 ('0.07) 0.100 NO NO NO(l)
Oibromochloropropane (OBCP) '0.0002 0.0002 ND NO NO(l)
para-Dichlorobenzene (p-DCP) 0.075 0.005 NO NO ND(l)
l,l-Oichloroethane NS '0.005 NO NO NO(l)
1,2-Dichloroethane 0.005 0.0005 NO NO NO (I)
1,1-Dichloroethylene 0.007 0.006 NO ND NO(l)
cis-l,2-Dichloroethylene '0.07 '0.006 NO (d) NO NO(l)
Trans-l,2-Dichloroethylene "'0.1 '0.01 NO NO ON(l)
l,2-Dichloropropane '0.005 '0.005 NO NO ND(l)
1,3-Dichloropropene NS 0.0005 NO ND NO (I)
Oi (2-ethylhexyl) Phthalate (OEPH) NS '0.0004 NAR NAR NAR
Endrin 0.0002 0.0002 ND NO NO(l)
Ethylbenzene *0.7 0.680 NO NO NO(l)
Ethylene Oibromide (EOB) '0.00005 0.00002 NO NO NO(l)
Glyphosate NS *0.7 NO NO NO (I)
Heptachlor '0.0004 '0.00001 NO NO NAR
Heptachlor Epoxide '0.0002 '0.00001 NO NO NAR
Lindane 0.004 ('0.0002) 0.004 ND NO NO(l)
Methoxychlor 0.1 ('0.4) 0.100 NO NO ND(l)
Molinate NS 0.020 NAR NAR NAR
Monochlorobenzene "'0.1 0.030 NO ND NO(l)
Simazine NS 0.010 NO NO NO(l)
1,1,2,2- Tetrachlorethane NS 0.001 NO NO NO(l)
Tetrachloroethylene (PCE) '0.005 0.005 ND (c) (d) ND-0.0135 (d) ND(l)
Thiobencarb NS 0.070 NAR NAR NAR
Total Trihalornethanes 0.100 0.100 0.00112 ND-0.0097 ND(I)
Toxaphene 0.005 0.005 ND ND ND(l)
2,4,5-TP (Silvex) 0.01 ('0.05) 0.010 ND NO ND(l)
1,1, 1-Trichloroethane (1,1, 1-TCA) 0.200 0.200 NO ND ND(l)
1, 1,2-Trichloroethane (1, 1,2-TCA) NS 0.032 ND ND NO(l)
Trichloroethylene (TCE) 0.005 0.005 ND(d) ND-0.0041 ND(I)
TrichlorofIuoromethane (Freon 11) NS '0.15 ND(d) ND ND(l)
1,1,2-Trichloro-l,2,2-trifIuroethane (Freon 113) NS *1.2 ND ND ND(l)
Vinyl Chloride 0.002 0.0005 ND ND ND(l)
Xylenes '10 1.750 ND ND ND(l)
ABBREVIATIONS & FOOTNOTES
MCL Maximum Contaminant Level < less than
NA Not Analyzed ND Monitored for but Not Detected-detection limits are
NTU Nephelometric Turbidity (suspended material) Units available upon request
umho/cm micromhos per centimeter mg/L milligrams per liter (parts per million)
NAR No Analysis Required, System Not Vulnerable pCilL Picocuries per liter
for Contaminant NS No Standard
L
v
Parameter Federal MCL Stale MCL Ground Water Surface
Source Water SBMWD Range Water (b)
Average (a) LowlHigh
INORGANIC CHEMICALS (mgIL)
Aluminum NS 1.000 NAR NAR NAR
Arsenic 0.050 0.050 <0.01 (e) <0.010 (e) < 0.010 (e)
Barium 1 ('5.0) 1.000 <0.10 (e) <0.10 (e) <0.100 (e)
Cadmium om ('0.005) 0.010 <0.001 (e) <0.001 (e) <0.001 (e)
Chromium 0.05 ('0.1) 0.050 <0.010 (e) <0.010 (e) < 0.010 (e)
Fluoride 4.0 ('2.0) 1.4-2.4 0.240 0.09-0.70 0.08
Lead 0.05 ('0.005) 0.050 <0.010 (e) < 0.010 <0.010 (e)
Mercury 0.002 0.002 <0.001 (e) <0.010 <0.001 (e)
Nitrate (as NOJ) 45.0 45.0 22.5 4.2-42.8 (c) (d) 3.1
Selenium 0.01 ('0.05) 0.01 <0.005 (e) <0.005 <0.005 (e)
Silver 0.05 ('NS) 0.050 <0.010 (e) < 0.010 <0.010 (e)
RADIONUCLlDES (pCiIL)
Gross Alpha 15 15 1.9 0.0-5.0 NAR
Gross Beta NS 50 NAR NAR NAR
Radium 226 5 5 NAR NAR NAR
Radium 228 5 5 NAR NAR NAR
Strontium.90 8 8 NAR NAR NAR
Tritum 20,000 20,000 NAR NAR NAR
Uranium NS 20 NAR NAR NAR
SECONDARY STANDARDS-AesIhetic Standards
Parameter Federal Met State MeL Ground Water Surface
Source Water SBMWD Range Water (b)
A verage (a) LowlHigh
CHEMICAL PARAMETERS (mglL)
Chloride (mglL) 250 **250 28.0 2.8-79.0 74.0
Color (units) 15 15 <5 0-<5 NA
Copper (mglL) 1.0 ('1.3) 1.00 0.010 0.00-0.019 ND
Foaming Agents (MBAS) (mglL) 0.50 0.50 <0.02 <0.01-<0.02 NA
Iron (mgIL) 0.30 0.30 0.017 <0.1-0.141 NO
Manganese (mg/L) 0.05 0.05 0.008 <0.03-0.03 <.03
Odor-Threshold (units) 3 3 1 ND-l <1
pH (units) 6.5-8.5 NS 7.8 7.07-8.00 7.8
Specific Conductance (umhofcm) NS **900 597 380-720 620
Sulfate (mgIL) 250 **250 101 33-200 66
Total Dissolved Solids (mg/L) 500 **500 357 234-510 363
Zinc (mgIL) 5 5 <0.05 <0.05 NO
ADDITIONAL PARAMETERS
Calcium (mglL) NS NS 77.9 53-105 72.0
Hardness (mglL as CaCO,) NS NS 260.0 174-408 250
Magnesium (mgIL) NS NS 14.5 3.6-22.0 17.0
Potassium (mgIL) NS NS 3.8 0.04-4.90 4.8
Sodium (mgIL) NS NS 23.2 11.0-55.0 21.0
ABBREVIATIONS & FOOTNOTES (continued)
proposed standard (e) Isolated high value, subsequent testing indicated values within MCts.
I recommended maximum level (d) Water from sources which equal or exceed the Met for this
la) Data are yearly averages of all supplies in mg/t constituent are reliably treated or blended before entering the
unless otherwise noted. distribution system to meet the Met.
(b) Data are from filtered surface water. Ranges shown Ie) No 1990 testing required, value from 1988 used.
only when more than one analysis was made. (0 Value from 1989 used.
(
~
'-'
MESSAGE FROM OUR PRESIDENT
AND GENERAL MANAGER
The San Bernardino Municipal
Water Department has been pro-
viding our customers with a safe
and reliable water supply since
1904. We and our staff are com-
mitted to protecting public health
and safety, our precious water
supply, and the environment of
the Santa Ana River. To continue
meeting our commitment, we will
be implementing a number of new
projects over the next few years.
First, everyone knows a drought
is affecting California's water sup-
plies. To deal with the drought's
impact, we are drilling more wells
and adding larger pumps to exist-
ing wells to bring groundwater up
from levels that have been dropping
due to the drought. We are expand-
ing our delivery system to transfer
groundwater from the Artesian
Pressure Zone to other areas in
the City where water levels are
dropping.
Secondly, our water supply cur-
rently meets or exceeds all Federal
and State-established water quality
standards. To keep it that way, we
are constructing and operating a
number of groundwater treatment
WATER DEPARTMENT
CITY HALL
300 N. "0" STREET 92418
P.O. BOX 71092404
SAN BERNARDINO, CALIFORNIA
(714) 384-5141
BOARD OF \VATER COMMISSIONERS
PRESIDENT
MJr);Mlot II. Ch,mdll'T
COMMISSIONERS
[{oN'rIBiwns
EmiJi"G....:i..
)Jml'sH. Ural.l
IIdT"ldW Wi1li~
RI'Tn,lrdC J<..rs,>v
GENERAL MANAGER
Chl'rvIA. F10wns
ASSISTANT GENERAL MANAGER
Joseph F. Sll'jsl...ll
DIRECTOR. ENG1NEEr.:ING-
CONSIRUO"[ON-MAINTEr\:ANCE
DlhmI'R.[\;<>rton
DIREtTOR, WATER RECLAMATION
plants to remove contaminants thai
have migrated through the soils.
The combined cost of pumping
water from lower levels and operat-
ing these treatment plants, have
increased and will continue to
increase the cost of providing you
with a safe and reliable supply.
The impact this year alone to our
residential customers will be about
$3.24 per month. Although sub-
stantial, this cost is much less
than the drought alone will cost
many other California cities.
Finally, our treated and reclaimed
wastewater is piped to the Santa
Ana River where it eventually flows
downstream, through Riverside
and Orange Counties. The potential
uses of the riverl such as swim-
ming and fishing have led to increas-
ingly strict standards being placed
on the quality of this water. To meet
the new standards, we will be
required to spend nearly $210 million
over the next ten years. These
costs will result in an estimated
$3.80 increase in residential sewer
bills each month during 1991.
We have prepared this 1991
report, our second annual, to pro-
vide you with the results of our
water testing and monitoring that
we completed during 1990. As we
report herein, our water supply
meets our exceeds all current
standards. We are continuing to
improve our system to meet both
supply demands and future
quality standards.
We believe that a long-term plan
for enhanced environmental pro-
tection, at minimal cost, is feasible.
To avoid financial hardship, the
treatment facilities we need to
meet state and federal drinking
water standards must be constructed
over a period of years. While we
are constructing these needed
facilities, we hope you will join
with us to begin to use our water
resources wisely and efficiently to
ensure our long-term supply.
~J1J~
Margaret H. Chandler, President
Board of Water Commissioners
b~f7--
General Manager
PRESORTED
mST CLASS MAIL
us POSTAGE
PAID
SAN6ERNARDINO, CA
Permit No 126