Loading...
HomeMy WebLinkAbout28-Water Department . .... ........... ...... . , o o CITY OF SAN BERNARDINO MUNICIPAL WATER DEPARTMENT WATER RATE STUDY DECEMBER, .1990 dt?' ~ o . ~ .. RMI IftRODUC'rIOIf.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .... 1 ANALySIS........ RECOMMElfDATIOIfS. o INDEX ................................................................. .. .............................................................. .. -1- .15 - 9 ~ . - o o LIST OF SCHEDULES ~ SCHEDULE 1-A Water Fund - Analysis of Revenue and Expense-Based on Current Rate............. SCHEDULE 1-B Water Fund - Analysis of Revenue and Expense-Based on Proposed Rate...........5 SCHEDULE 2 Water Fund - Projected Income and Expense FY 1988/89 through FY 1990/91............6 -11- --- _U .. - - .L ~ o o LIST OF EXHIBITS U&I EXHIBIT 1 Proposed 1990/91 Water Rates, Rule and Regulation Ito. 21..................... 16 EXHIBIT 2 Proposed Fire Service Rates, Rule and Regulation 110. 14..................... 19 EXHIBIT 3-A Revenue Projections Based Upon Current Water Rate........................ 21 EXHIBIT 3-B Revenue Projections Based Upon Proposed Water Rate....................... 22 EXHIBIT 4 Water Rate Survey..........................25 EXHIBIT 5 Summary Report - Capital Improvement Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31 EXHIBIT 6 Projected Captial Revenue and Expense Schedule - FY 1989/90 - 1999/2000..........34 -Hi - -- . ..1- 4 - I o o INTRODUCTION CITY or SAlI BBR1fARDINO KUlIICIPAL WATER DEPAR'1'MD'1' PROPOSED WATER RATE AND ACQUISITION or SERVICE CHARGE INCREASES The San Bernardino Municipal Water Department has provided its customers with high quality, ade~ate water service at reasonable prices since 1904. The Water Department's sources of revenue are customer payments for water usage, service charges, and reimburse- ment for construction services. The Department does not derive any revenue from the general or special tax base. The cost of water is established through approved water rates. Water sales revenue and service charges are used for the fOllowing purposes: 1. To fund the acquisition of equipment and/or capital items, i.e., reservoirs, transmission lines, construction equipment, wells, and wellhead treatment equipment. 2. To meet annual operating expenses, including system maintenance and employee wages. 3. To maintain intracity transfer of 10' of all water sales revenue to the City's general fund as authorized by the Charter of the City of San Bernardino. In July, 1989, the Water Department had 36,100 active services. There are currently 37,000 active services in the water system, a 2.49' increase over the 1989 level. In order to maintain a quality water system, the water rates, the acquisition of service charges, and water main installation charges must be adjusted periodically to produce sufficient revenue to meet the Department's operating costs. These rates also cover the costs of constructing new sources of supply, additional storage capacity to meet peak demand, and the maintenance of the entire system. In 1990, the Department updated the Water System Master Plan as re~ired by the City's General Plan to determine future growth and the capital expenditures required to meet current and future water demand. The recommendations of the completed Master Plan, a summary of water rates and service charges of several surrounding water agencies, and the recommendations for water rate and ac~isi- tion of service charge adjustments are included as an attachment to this report. The State of California, specifically Southern California, has experienced a drought condition during the past five (5) years. This lack of rainfall which recharges the groundwater a~ifer from which 95' of our water supply is derived has caused a dramatic 1 4.- --_ ... . u. -- ..L. o o change in the operation of the water system. To compensate for the declining water table in San Bernardino, the Department has maximized its production and boosting from the artesian pressure zone. Pressure zone water is currently being produced and pumped into the higher elevation pressure zones of our distribution system. However, additional wells, transmission mains, and boosting facilities are necessary to produce and transfer suffi- cient quantities of water from the pressure zone to meet the City's future water demand. During the past four years, the overall production capability of our sources of supply have been reduced by 40% due to groundwater contaminants and a steady decline in water levels. As the water table continues to fall, the City's wells must be reequipped annually to produce water from deeper levels. The reequipping is expensive, i.e., $1.2 million in 1989- 1990, and adds additional costs to the operation due to increased power costs. Much of the water production from the high elevation wells cannot be recovered by reequipping due to the shallow depth of the aquifer. The Water Department has completed the construction of two (2) air stripping treatment facilities to remove volatile organic chemicals (TCE/PCE) from the groundwater. These facilities, funded from grants from the State of California, Department of Health Services, Toxic Substances Control Program were essential in order for the Water Department to meet peak summer demand. The treatment facility at the Newmark well field is designed to treat 8.6 million gallons per day, and the facility at the Waterman plant is designed to treat 14.4 million gallons per day. A granular activated carbon treatment plant was constructed at 17th an Sierra Way which recovers 4.5 million gallons per day of production capacity. Altogether 27.5 million gallons per day of production capacity was gained back through the installation of aeration and carbon adsorption wellhead treatment units on ten (10) City wells. Through the groundwater contamination cleanup efforts and an aggressive program of rehabilitating existing wells, the Department was able to meet the 1990 peak water demand; however, we do not have any water production facilities (wells) in reserve. The groundwater contaminants are continuing to spread through the basin, and during 1990 we lost two (2) additional wells at 19th and California Street as well as two (2) wells at 23rd and 27th and "E" Streets. The declining water table, increased water demand, and the loss of water production capacity to groundwater contamination are a combination of conditions that have never before been experienced in San Bernardino. The comprehensive analysis of the water system (Master Plan update) completed in September, 1990 analyzed our current and future water demands, and determined what capital improvements were needed through the year 2010. The Water Department, in participation with the West San Bernardino County Water District and the City of Rialto, formed a joint powers agency capable of selling revenue 2 _--JJ . - -- ..L - o o bonds to fund the required capital improvements. A detailed listing of the 5-year Capital Improvement Program (CIP) which includes new well, booster station, storage, and transmission main requirements is attached to this report. The 5-year CIP requires the expenditure of approximately $13.4 million per year for capital water system projects over the next five (5) years. The current water rates were approved on October 16, 1989 and became effective November 1, 1989. An analysis of the Department I s financial needs was completed by Bartle Wells Associates in November, 1990. The study recommended increases in both water rates and the acquisition of service charges to generate the additional $3.9 million per year to fund the annual debt retirement for the 5-year, $67 million schedule of water system capital improvement projects. 3 A- . 6 4. B lli L. o SCHEDULE 1- A o BASED ON CURRENT RATE - ANALYSIS OF REYEJUE AND EIPENSE FISCAL YEAR 1987/88 FISCAL YEAR 198818'1 FISCAl YEAR 1'18'1190 FISCAl YEAR 1"0191 OPERATING REVEIllES Niter Sales 7,444,727 9,707,196 Ul,042,613 tl2,378,820 Service ClI.1rges 28,792 30,956 30,423 31,944 ----------..... ------............- ......._-............- ------..._---- Subtotal 7,473,519 9,738,152 11,073,036 12,410,764 leIS I Nrite-Offl 14,m 37,340 16,477 20,000 101 Trinsfer to City 684,477 923,245 1,043,982 1,237,882 ------------ ------------ ....--............--- ----.....-......._- NET 0PIl. REVEIllE 6,774,217 8,777,567 tlO,012,577 S11,152,882 OTHER REVENUE Opr. Costs Cipitilized 385,285 452,287 672,413 672,413 Other IncOlf . reilburiible Sltrvices 837,803 629,829 630,"4 576,688 ------------ ------------ ...----------- ----...-----_... TOTAl OTHER REVENUE 1,223,088 1,082,116 1,303,407 1,249,101 ---..........--- ------------ --------...- -------..._- TOTAl 0PIl. . OTIER REVEIllE 7,"7,305 9,859,683 11,315,984 12,401,983 OPERATlN6 ElPENSES Plint Production 2,013,320 2,313,882 2,451,262 2,8'19,769 Cost of Purchised Nitlr 24,"1 69,313 271,005 300 ,000 Other Plint Ficilities 205,415 262,783 483,921 548,650 Distribution 5yst.. Costs 702,032 930,717 1,035,241 1,080,038 6tntril Strvicts 2,214,014 2,546,948 2,771,137 3,049,059 6tntril Ad.in. . Overheid 2,294,263 2,304,115 3,003,825 3,075,228 Contingency 100,000 ------------ -------..._--- ---------- ----------- TOTAl OPERATIN6 COSTS 7,454,035 8,427,758 10,016,391 11,052,744 ------------ ------------ ..-..-------- ---------- NET llPERATlI6 REVEIlUE 543,270 1,431,925 1,299,593 1,349,239 NON-lIPElIATlI6 REVENUE Contributions in Aid of Construction 2,240,523 3,337,362 3,887,744 3,842,000 ...-..---...---- 00______----- ------------ --------- !lET OPERATlOI . CAPITAl INClIIIE 2,783,793 4,769,287 5,187,337 5,191,239 IlON-lIPElIATlI6 EXPENSES Dtpreciition 1,106,688 1,193,954 1,335,246 1,468,771 Cipitil I.pravelents 2,833,624 2,274,161 6,249,216 3,842,000 Debt Service 336,634 0 2,079,000 ...----------- ------------ ------------ ----------- TOTAl IlON-OPERATlI6 ElPENSE 4,276,946 3,468,115 7,584,462 7,389,771 ---..------- ------------ ------------ ---------- NET GAIN OR lOSS 11,493,1531 1,301,172 (2,397,1251 12,198,5321 C:s8:r.l:a::l&Us ..:::sn::u a.=:a::::.:_ ...zz===z=== -4- - - IU . . - - - - o SCHEDULE 1- B o BASIl) 01 PIOPOSID un - WLYSIS Of UYIIUI DB IIPOSl fiSCAL JW 1987/88 fiSCAL JW 1988189 fiSCAL JW 1989/90 fiSCAL JW 1890/91 ------------------------------------------------------------------------------------------------ OPlU!IIG IDIIUIS later Sal.. 7.444,727 9,707,198 $11,042,813 $14,884,882 Sanlee CIIuI" 28,792 30,958 30,423 31,944 ------...---- ---...------...... -------..---... ------............- S1Illtohl 7,473,519 9,738,152 11,073,038 14,918,828 te..: Irite-offe 14,825 37,340 18,477 20,000 101 !ruefer to Citr 884,477 923,245 1,043,182 1,488,488 ......_-_........-...-... ------------ ----.....-...---- -------...---- II! OPI. UYIIUI 8, m,m 8, TTT ,587 $10,012,577 $13,408,158 O!IIIIIIYIIUI Opr. eoete Ca,lhlhed 385,285 452,287 872,413 872,413 Other IIlCCIM . reiBareellle Sanleee 837,803 829,829 830,914 578,888 ..----......----.. ......--..------... --..------- -----..---- !OnL O!IIIIIIYIIUI 1,223,088 1,082,118 1,303,407 1,249,101 ----..-----... -------...---- -------.......-- ...-----..--- !O!&!. OPI. . O!IIII mJIUI 7,997,305 9,859.883 11,315,984 14,857,259 OPW!IIG lIPOSIS Plut Prod1cUOI 2,013,320 2,313,882 2,451,282 2,899,789 Colt of Parc1leeed later 24,991 89,313 271,005 300,000 Other Plut rael11tlee 205,415 282,783 483,121 548,850 Diatrlll1Uol Sreu. Coate 702,032 930, T1T 1,035,241 1,080,038 _reI Sanleel 2,214,014 2,548,948 2,m,l37 3,049,059 _raI &dill. . Oyer.... 2,294,283 2,304,115 3,003,125 3,075.228 CoaulltlCr 100,000 _........._---...-- _.........-............-... -----...---- --..._---...-..-- mAL Opm!IIG com 7,454,035 8,427.758 10.018,391 11,052, T44 -----...------ ----......-...--- ----------...- ----------- m OPwnlG IIDIUI 543,270 1,431,125 1,299,593 3.804,515 IOI-GPW!IIG IIYIIUI eo.trllllUou b lid of CoutncUOI 2,240,523 3,331 ,382 3,887, T44 3,842,000 ------------ --------..-..- ---....--........... -----...-......... m oPlUnOl . CAPItAL IIClIlI 2,783,793 4,789.287 5,187.337 7,448,515 1OI-oPII&!IIG lIPOSIS DepreclaUol 1,108,888 1,193,954 1,335,248 1,488. TT1 Ca,l hI !.pl'Oftlllte 2,833,824 2,274,181 8,249,218 3,842,000 Dellt Sanlee 338,834 0 2,079,000 ----------..... ...----...--...-- ........-................-- ........--............-...- mAL IOI-OPIU!IIG IIPDSI 4,278,948 3,488,115 7,584,482 7,389.771 ------..---- -...--------- ----...-.....--- -..--.....------ m Gill 01 LOSS (1,493,153) 1,301,172 (2,397,125) 58,744 ---...------- -.......-...----- ---...-----...- ...-...---......-- --...-..-----...- -..--------... ----...------- ...-.........--..- -5- . ..;,l. . ~ . Ji o SCHEDULE 2 o Iliii I~ ~i .. il ~ ~ iilliii ~ - .. - ... ....~ .... .. .. 8888g :t.:c:: ;i.n ;i .00 ... ..; ..no.n.n.ncN ..;. -- - - ----- 1 , , 1 1 . , ~~ ...... Ii 1 :8: , , :.: ! ,...0 ':8'" I . '"!. ~ ]- . ... ... . - - - 11 , !I ~ .. IE!!!iH ~ - ... 0 .E- ii - fi .. .. .. .. .. .. .. ~ ==1:it,..a:!:I ;:I; .... _N____ ... ..; - Ii li!!i 183 9Hl 51 ii I e i5~li~a := ....ID .. - ~--= - ... ~ ..I: .n~":o:i ~:S ...- ... ";fi : - ..o"';"';=.o~""; - Ii ~& --... - 1 - ... I"" _n - 1 , 1 - .. - e ... i'" fa'" .. .... :u~ Sl -.... ID ~....Il ...... -... ... ... "';=0": "_ -:if ~ ~ !~ e-o ......, ...- s:. ~""""N ~ Ii:: ... - - - .... - - - - IE iU: - = E!!i!!i! ... I- =: ... ... - ...:...: :i - O.ftNS":ri=i = 1:1 ... ~Hi 0 .0. e- m ... ... ....C"I_....__ c:. ... ..; - - ;:I;1li!Ill5!~ Iii;; ...... ... !Ii .. ... .... on :g~ g .. .. .. .. .. .. s~ i:if ! I ::11 ===!: .... - - .... .... ..: ..: ..: ..: ... 1- - .. .. I I!! =!HU!i!i!~ ... I ... ....- ... -.. .. 0- ;j= fi ! .. .. .. . .. .. .. i =~.:!:.=: _N_ __ ... ... ~ - o. I -- - . ...- _ 0 II.! . .. II 1: ... g I -1" - o .. !.. . .- =.- ...- &! .. .zo -j. = .: ~ ..: :: "1 - ... - . - !i .. - .e .to:= Co> =u:= - ... I ii~ ).11:;11 il Ii -- ... -== .. 31 I ...... 1.3--1- .. ..:... ~~I:~il"'~ ... . _3! 81):-= 1:! ... -'0 . .... !I .. .- li!Ii: 11&~JI"! I lB. ~ &i . ~".Ifl"'" :!l ... t I ...... - 0 -"I . z....... · !.i ,!I.j 1=1-= = t,S'" , := t~ ... -"=1 I:'! ... ... .. - I: B ...... II Co> al ...... .. - .....-.:-.)1:.... .....31:-=jJl ii B a .....-c:....( o:.:!ti ,S'" - ... 13..;::8 ~ JI t I illl-= -=......z...Jll...& .. .z is 0 0 l!l -6- .- . iii iii i .oeD"; .0.00 to ... ""'0')_"'" Iii! agi ~ - 1:::2= ....... .; .; :!" ....- ... U!I: ......: C:"':.n , - , iil =~:S 2"- fS~~ :ii leIS E a;i~ ! x...... l!Ii~= ... Ii: CD.. ... ==- .,;..:.. ....-- ... ... o is ... I i !I 8~ ... = ~ ... - E "": ... ~... - R ~ - ... ... = - ..: ~ : ..._11: o I. 1: .!l ~ ;::1 J ! ~ .::1 I i - i II ~ ! i li~ ;! i is. ! oS:J is :I _ - __I ...- ~ S ~I- Z:" 2.. i :: JiJ~.! :!.'" ... .. _.... = ~ I .!i 3 3 I..!'; :::1 .ill -: i:: ... :::n,;; =-=1 t .::1-.... o-;:.....t 1....S"1! _'::0__: 0.._.;1:.1 ill)~~~il::-!lil~- j_ II, zi:!1o:::Z:E dI.1ItlI ...._ 8 ... , , I :: ' ,... I , "' 'CD , ,- , ,... , , ., , .. , , , ~ : ..; - . - . ~ SCHEDULE 2 CONTINUED o ti ..; - ~.~~~~~ o...n~~c>>o - iliiiiii si,jN2.ft.ft::i , ~:!:R5::0!:"'~"'E!22l:8~=5! C"oI~lNa:::i.,=r- in~._..._a; ci~fi';::i'; ~si:i:i::!";fi C"'e__.... as.... liiiijiil ';O-n.n.n';N I __N....... ,- , IPH! -= -= = I _:i:l:8:SliOA_ ...;1............. ... - ~-~...- , , :; - - .... '":. ... ;;::!fiE!~5!~"''''I:::!e'''I:::~= ......,.....e-ii5.... .ii5N~2lioo ~co_.:c:c:.; 00';"':0';. CIIN_...., """0_"" ---.... ........ ~ ... .; - ... N ...-!5!5!......-.....!I!~--l:i!2 ~=c;;s=f;;;;: ~as_~S;niG5 ';_';';~';.n ";";';";':.n_ J:!:::3 =ta_ ..,=N:::: ..... II iiiils ~ O';'OO.A COol ... -- eii!!UI! .00';00.0 _0 _4'lf_ ...... - iii~1 "':"':"':N.D ... ~~... . ":R"'::!li! J.l...:...:3 on!",; C:m - - ... - =.....;..,. ...;;IDC::::= i;i:!"= I - o - - Ii.! 1i ! ! ~~i !J ~ ~~ !. - I~ i 8. *~i i! l ilj & 1 Ii" I.! r _.. ;;:::: .. . 1~1 ~. -J.#. "11 lR . . "'::331 3c:..== .- a . 0 -. = I-.~ .~ ~ :~Z:h.::. S~_~=2lil ~N ~ --~ ~- I =--.~~-.= i ": . i -,- 31;; - I!'.'::.i ~.. : li 1 g .. .! . 51._iI I! 101- . ... ~. - ~ --.:: .--3 ~ ~:!~~I.!! ~i1!.: ~!il!i=i.11.;1: 1Z:~~i.5i!1!~ ]"iE-,,--- i!!#jii!~~i~3i ~.== ~i]i; J~~&_-.S&&~lJ~ II ~=-~- -]- 11 i::: .- = ;; - .... .... ... N ... - .,; - :s ... ~ ,,; i CD ... ... ~ ~ ... - - CD .. .; - ... .,; - on &l i ,,; . - N - - .; - ~ i N . - . 8 - . - - ~ .f - - - l!. mw-. I - ... .... "" i i ... ~ .... - , :s - .; .. ~ - "" .... ... ~ - l! i ti l! I I I I - ~ "'I .. - ... .. - - It .. .. i .!.: _ 0 ..~ .. I.: 0_ oO 'l::! .!i 1:8 co - III I ! I o .. - .. ... fii ~ fii ~ .. - .. ... .... ID .... ID "" ... ~ o . . ~ SCHEDULE 2 CONTINUED ~ ... Ii - 1111 III .00.00 OON ... , ii ..; - ID .. !!!Eii ...:tilid" - - ! - o Iii! ~=i.:j , ., ill =~:i ..~ ""-- .... "" --- illi :i~:- --- it: .ft..: e-'" I - - t' I E - .! I 1 - .:I :I .. _ .. i ~.1 jll= ill ! -.. . I ... I! j a:::I:;I~:~~I~ !Ii -=1000- II liiJ ~~~Jij - :Ii ... - ~ - I!Eii ..4~r.ir.i - - ... ~ 8 ~ - R=WS _Ift:l5N ":i== - - r!l - $ , gl ;xo - ... fii ~ &1 i~ .. ~ 8~ - 09 ... - o :f - , II! - - , ~Hi ! . , - I ~ .. .: - , ..om' :I_I - - I ii, - I A ~ - .. - ~= ;or;; ":N "" .. - I! ~~ ...~ ~E _0 o..i - Ii Nft .. .. ~c::. ""~ Iii - . , Iii: .- : "" , , II == - =1 :'fi .... .. ";-:3. Hi .. .. .aN ,- - 1:;= co .. ~;( -- - "':lI: ~a;; ~= ~-:. -- - ~ s I = II ! fiEi Ie j =Si I~ i I!!i Ii ~ lfi =8 Ii! - .=s il-E Ell! ! ~I ~!i al 1= I!i iB -8- =s E ... il ...... o I :i - ... , III " " ." 6" " .. - .. "".. .. " II ;0 ... - - , -.. !.. .. .. -.. .. .. .... -" -" .. .. .. - .. on Iii! a.. .. .. J - .I !! ~ - ... - I:: e = =s I I - Ei . .J IlIJ ~ -- ~ ~ 1 _ ... o o ANALYSIS Schedule 1 shows Water Fund Revenue and Expenditures for three years. Projections for FY 1990-1991 are shown on Schedule 2. Based on the current rate structure, a revenue shortfall of $2.2 million is anticipated in the current fiscal year. Without adjustment to the water rates, shortfalls in revenue exist which do not allow for expenditures for required capital replacements and improvements. A water rate survey was conducted of the water agencies in the surrounding area. The full results of the survey are shown in the Appendix of this report. In order to make a meaningful comparison of the cost of water service to the residential customer, certain assumptions were made. These assumptions are as follows: Billing Period.... ......... ....... .... ...30 Days Heter Size........ ...... . .. ..... .........5/8" X 3/4" *Water Usage.............................2200 Cubic Feet *Based upon average residential water usage in San Bernardino -9- - . ~ o o ANALYSIS OF SURROUNDING AGENCIES WATER RATES BASED ON CURRENT RATES Single family Usage: Meter size: dwelling 2200 cubic feet 5/8" x 3/4" BAST VALLEY WATER DISTRICT Minimum monthly rate Usage 22 hef @ $0.65 FONTANA WATER DISTRICT Minimum monthly rate Usage - first 3 hef - over 3 hef 3 hef @ $0.544 19 hef . $0.741 TRA-86 sureredit PUC surcharge $0.020201 x total $0.015000 x total LOHA LINDA MUNICIPAL WATER DEPARTMBNT Minimum monthly rate Usage - first 5 hef - over 5 hef 17 het @ $0.649 LOS ANGELES - DEPARTHBNT OF WATER AND POWER Minimum monthly rate Usage 22 hef 8$0.7375 Rate - summer $0.805 - winter $0.670 Average = $0.7375 -10- '" $6.00 14.30 $20.30 $6.16 1.63 14.08 21.87 0.44 0.33 $22.64 $6.05 0.00 11.03 $17.08 $2.40 16.23 * $18.63 - J!I. ~ o o PASADENA MUNICIPAL WATER DEPARTMENT Minimum monthly rate Use,ae Rate - Summer Average $0.357 First 15 hef . $0.375 Over 15 hef . $0.804 - Winter Average $0.766 First 15 hef . $0.339 Over 15 hcf . $0.728 15 hef . $0.357 7 hef . $0.766 REDLANDS MUNICIPAL WATER DEPARTMENT Minimum monthly rate Usage - first 5 hef - over 5 hef 5 hef . $0.27 17 hef . $0.60 RIALTO MUNICIPAL WATER DEPARTMENT Minimum monthly usage Usage - first 5 hef - next 25 hef 5 hef @ $0.40 17 hef . $0.63 RIVERSIDE MUNICIPAL WATER DEPARTMENT Minimum monthly rate Usage - first 15 hef - over 6 hef * Average of summer & winter rate 15 hef . $0.38 7 hef . $0.665 RUNNING SPRINGS WATER DISTRICT Minimum monthly rate Usage -11- 22 hef . $1. 77 $5.32 5.36 5.36 $16.04 $5.45 1.35 10.20 $17.00 $4.66 2.00 9.45 $16.11 $3.00 5.70 4.66 * $13.36 $8.00 36.94 $46.94 111 ~ ~ - . o o SAN BERNARDINO MUNICIPAL WATER DEPARTMENT Minimum monthly rate Usage - first 5 hef - over 5 hef 17 hef fl $0.60 UPLAND MUNICIPAL WATER DEPARTMENT Minimum monthly rate Usage - first 5 hef - over 5 hef 17 hef fl $0.76 WEST SAN BERNARDINO COUNTY WATER COMPANY Minimum water rate Usage 22 hef @ $0.63 YUCAIPA VALLEY WATER DISTRICT Minimum monthly rate Usage - first 15 hef - over 15 hef Minimum monthly rate Usage - first 15 hef - over 15 hef Minimum monthly rate Usage - first 15 hef - over 15 hef -12- 15 hef fl $0.562 7 hef @ $0.70 15 hef @ $0.447 7 hef @ $0.70 15 hef @ $0.63 7 hef @ $0.70 . 4. $5.50 0.00 10.20 $15.70 $2.50 0.00 12.92 $15.42 $3.65 13.86 $17.51 YUCAIPA $5.00 8.43 4.90 $18.33 CALI MESA $5.00 6.71 4.90 $16.61 WILDWOOD $5.00 9.45 4.90 ... . lL 4 - --- .. o o ANALYSIS OF SAN BlRNARDINO PROrosBD WATER RATE VERSUS CURRINT RATE Single fUlily dwellina Ueaae: 2200 cubic feet Meter size: 518" x 3/4" Single faaily tfinillula aonthly rate Ueaae - first 5 hef - over 5 hef tillti-fuily tfiniaa monthly rate Usage - first 9 hef - over 9 hef Multi-fUlily dRelling Ueaae: 2800 cubic feet Meter size: 3/4" x 3/4" Triplex CURRBNT 17 hef . $0.60 $5.50 0.00 10.20 $15.70 19 hef . $.060 $11. 75 0.00 11.40 $23.15 -13- PROrosBD 17 hef . $0.72 19 hef . $0.72 $6.60 0.00 12.24 $18.64 $14.30 0.00 13.68 $27.98 . - -- ~ . . ~ o o RANKING OF SURROUNDING COMMUNITIES WATER RATES Listed below, in order of cost to the residential customer, are the results of applying the assumption to the various agencies' current water rates. Existing Rates 1. Running Springs Water District............... $46.94 2. Fontana Water District....................... 22.64 3. East Valley Water District................... 20.30 4. City of San Bernardino....................... 18.84 ** 5. City of Los Angeles.......................... 18.63 6. Yucaipa Valley County Water District......... 18.33 7. West San Bernardino County Water District.... 17.51 8. City of Loma Linda........................... 17.08 9. City of Redlands............................. 17.00 10. City of Rialto............................... 16.11 11. City of Pasadena............................. 16.04 12. City of San Bernardino....................... 15.70 * 13. City of Upland............................... 15.42 14. City of Riverside............................ 13.36 * Based on current water rate ** Based on proposed water rate. -14- .. - - - - . o o RECOHHENDATIONS Based upon the analysis of the financial statements of the Water Department and anticipated expenditure levels for the current fiscal year, it is recommended that the water rates established under Rule and Regulation No. 21 be increased. The proposed water rates are shown on Exhibit (1). The new schedule will: Maintain the monthly allowance included in the m1n1mum charge at 500 cubic feet for single family dwelling units and the first unit of a multiple family dwelling. Maintain a minimum monthly charge per unit for multiple family dwelling units which includes a 200 cubic foot usage allowance per unit after the 1st unit. Maintain commercial and industrial rates based on meter size and usage. Maintain current rate structure for Delmann Heights users. Increase the minimum monthly rate for each meter size and increase the usage charge from $.60 per one hundred cubic feet of water usage to $.72, a $.12 increase. Establish a municipal usage rate of $.288 per one hundred cubic feet of water usage. Establish an outside city rate for all new services installed after February 1, 1991 at 1.5 times the rate charged for water use within the incorporated boundaries of the city. Establish a flat rate charge for water to be used during the construction phase of new buildings. It is further recommended that Fire Service rates established under Rule and Regulation No. 14, Section (b) be increased. This revised rate schedule is shown on Exhibit (2). This schedule reflects an increase of $1.00 per inch per month. Hul tiple factors contribute to the recommended rate increases, however, the largest factors are the drastic increases in the lost production capacity, increased regulatory program requirements and essential capital expenditures needed to meet the water demand. -15- - . o o EXHIBIT "I" PROPOSED 1990/91 WATER RATES San Bernardino Municipal Water Department 300 North "0" Street San Bernardino, California WATER RATES RULE AND REGULATION NO. 21 GENERAL WATER SERVICE The following rates shall be charged for all water furnished for either domestic, commercial, or industrial use within the City of San Bernardino, or for any other purposes for which no other rate is specified: A. SINGLE FAMILY DWELLING UNIT MINIMUM MONTHLY CUBIC FOOT METER SIZE CHARGE ALLOWANCE 5/8" $ 6.60 500 3/4 " 8.80 500 1" 10.55 500 1-1/2" 18.90 500 2" 26.40 500 3" 44.90 500 4" 76.25 500 6" 137.30 500 8" 205.90 500 10" 257.40 500 12" 308.90 500 All in excess of 500 cu. ft. per month... ...$.72 per 100 cu. ft. B. MULTIPLE FAMILY DWELLING UNITS - Includes duplexes, triplexes, apartments, mobile home parks, condominiums, and town homes served by one or more master meters. 1. Minimum Monthlv Charqe: 1st unit shall be the same as A, each additional unit served by meter shall be $2.75 per unit per month. 2. Cubic Foot Allowance: 1st unit shall be the same as A, each additional unit served by meter shall be 200 cu. ft. per month. _1~_ .4 ~ o EXHIBIT "1" CONTINUED o 3. All usage in excess of allowance per month shall be $.72 per 100 cu. ft. 4. Water furnished for municipal use within the City of San Bernardino shall be $.288 per 100 cu. ft. C. COMMERCIAL, LANDSCAPE AND INDUSTRIAL USERS: MINIMUM MONTHLY CHARGE METER SIZE 5/8" 3/4" 1" 1-1/2" 2" 3" 4" 6" 8" 10" 12" $ 6.60 8.80 10.55 18.90 26.40 44.90 76.25 137.30 205.90 257.40 308.90 All usage per month............ ............ .$.72 per 100 cu. ft. Water furnished for municipal use with the City of San Bernardino shall be $.288 per 100 cu. ft. D. SURCHARGE - AREA OUTSIDE CITY All new services installed after 2-1-91 outside the incor- porated territory of the City shall be the amount computed at the minimum monthly charge, and the consumption charge as set forth in this rule and regulation multiplied by 1.5. E. UNMETERED CONSTRUCTION RATE (RESIDENTIAL ONLY) A jumper shall be installed (in place of water meter) at the beginning of house construction for a maximum period of 120 days or until the lot landscaping begins or house is finished, whichever comes first. Thereafter, the water meter shall be installed and subject to all charges as listed in Section A of this regulation. Water used for tract grading and jetting of trenches is not covered in the above charge. The charge is hereby established at the rate of $25.00 per service. -17- . o o EXHIBIT "I" CONTINUED F. DELHANN HEIGHTS USERS: (Customers formerly serviced by Southern California Water Company) . METER SIZE 5/8" 3/4" 1" 1-1/2" 2" 3" 4" 6" 8" MINIMUM MONTHLY CHARGE $ 4.60 5.50 8.80 13.80 14.90 26.60 35.00 58.50 84.00 USAGE CHARGE: First 300 cu. ft............................ $.70 per 100 cu. ft. All usage over 300 cu. ft.... ......... ......$.844 per 100 cu. ft. Approved: Board of Water Commissioners: Mayor and Common Council: Effective: December 18, January February 1, 1990 1991 1991 -18- ~ o o EXHIBIT "2" PROPOSED FIRE SERVICE RATES San Bernardino Municipal Water Department 300 North "0" Street San Bernardino, California FIRE SERVICE CONNECTION RULE AND REGULATION NO. 14 a. When a fire service connection for private fire protection is installed, the identical installation charge as set forth in Rule and Regulation No. 5 shall apply. Upon the completion and installation, the valve governing same will be closed and sealed, and remain so until a written order is received from the owner of the premises to have the water turned on. After the water is turned on, the Board shall not be liable for damages of any kind whatsoever that may occur to the premises served by reason of the installation, maintenance, use, fluctuation of pressure, or interruption of supply. b. The monthly rates to be charged and collected for service used for fire protection purposes shall be as follows: 2" Pipe or Less $ 8.00 3" Pipe 12.00 4" Pipe 16.00 6" Pipe 24.00 8" Pipe 32.00 10" Pipe 40.00 12" Pipe 48.00 Said monthly rates shall be due and payable in accordance with the identical terms, conditions, and penalties as set forth in Rule and Regulation No.6 entitled "Payment of Bills". c. If water is used through a fire service connection for any other purpose than extinguishing of fires, the Board shall have the right to place a meter on the fire service connection at the owner's expense, or shut off the entire water supply from such premises. Upon installation of such meter, the water rates as prescribed in Rule and Regulation No. 21 herein shall apply, in addition to the service charge as hereinbefore set forth in Rule and Regulation No. 14, Paragraph (b). d. The Board shall have the right to take a domestic, commercial, or industrial service connection from the fire service connection at the curb to supply the same premises as those to which the fires service connection belongs. The Board shall also have the right to determine the proportion of the installation costs properly chargeable to each service connection, if such segregation of cost shall become neces- sary. -1Q- L . o EXHIBIT "2" CONTINUED o e. The Board reserves the right to install on all fire service connections a check valve of a type approved by the National Board of Fire Underwr i ters , and to equip the same with a bypass meter; such installation shall be at the expense of the owner of the property, and the regular domestic water rates as set forth in Rule and Regulation No. 21 hereof shall apply for all water used through such service except for fire protection purposes only. Approved: Board of Water Commissioners: Mayor and Common Council: Effective: December 18, January February 1, 1990 1991 1991 -20- o EXHIBIT "3-A" J;. o I191III PIOJICTIOIS IASID U!OI CUDII! lAm Uti COIIIIICIlL/IlSClLLlDlOS IISIDIITIlL ..---------------------...-----------...-------------------------------------------------------------------------------------- IIJ.IIIII 10. of llete,. I I I I 1o.~Ir : ..".u: hailer of llete,. Ilia. 1o.~Ir 1o.~Ir CIIup .."... ....r of llete,. I I Ii.a. : Ioa~I, Ioat~l,: CWp .."...: S1I&1. Be1U 10te1-&11 lleter SIll '1111, '1111, ...I".tl.1 11.a. "~1, CWp ______________________________________________________-______1______-------------------______1..._____---------____________1 5/8 . 3/4 . 1 . 11/2 . 2 . 3 . 4 I . I . 10 . 12 . 21,489 1,171 29.115 $5.50 $110.401 1,541 $5.50 $1,514 712 ".10 $3.505 1.302 411 1.713 US 13.105 457 US 3.358 5.50 0 731 215 1.001 1.10 1,109 711 UO 1.311 3 1.10 21 II 211 229 15.75 3,107 429 15.75 1.757 1 13.10 14 4 14 81 22.00 1,4" 504 22.00 11.018 5 14.10 75 32 32 31.40 1,187 145 37.40 5,423 21.10 0 19 19 13.55 1.207 10 13.55 3,113 35.00 0 7 7 114040 101 14 114040 1.102 51.50 0 10 10 171.10 1,718 5 171.10 151 14.00 0 0 214.50 0 1 214.50 215 0 0 257.40 0 1 251.40 257 0 ------------------------------- ---______1______--- ------------- -------- -.....-...-- I I I 29,549 2.715 32.314 $192,345 : 3.812 "1,204 : m $3.120 I !ote1luHr of Deem., Il1l1t. 50,110 ....r of ...ld..UI1 llet.,. 32.314 --......----- hc," of lat OIit 18,341 boa1 later Uaap Leu: "ll"'t1l1.11_ Iac~ &ddlUou1l1alt Ilelllu-.... to C.. . $.70 Ilelllu-nb to C.. . '.144 Iulclpa1 Otur Iallcll. Golf CoVII SBIIID ScHola fill Senlcl u.... S1Ib~lct to c-dlt, em.. OIUlL IIYII\lI Iol...UI1...lI. lit OIit Iol...UI1...lI. Iac~ &ddlUou1 hit DllIIu - .1Ia. Dllaua - ~U, cw.. c-rcll1-ai.a. ..ter leap - IteDdvd rate Iluicipa1 Golf CoVII SBMD OtUr lalacil. 'irs SenlC1 - .1IlaB fln SenlC1 - ~1t, cUr.. ScHoll 17,m ,470 ICf 1,931.840 IJ (5 IJ allOlllCl per .11&11 fll1lJ) 440.304 ICf (21Cf .11_ IIC~ uU "Ir 1) 27 . 751 ICf ('Dr flnt 3 1ICf) 249,940 ICf 813.201 ICf 50,149 ICf 114,432 ICf 151.551 ID 455.411 ID 1.701 ID 13.574,123 Ie, $2.308.142 414,334 43,431 230,379 571,443 1.144,474 113,981 21._ 23.321 8.174 109,111 4,021 259,811 -21- !OW. PINIC'lD 11m SALIS ImIUI '12,378,120 --.......-.....-- _......--......._-- o EXHIBIT "3-B" . o IIVIIUI noncTlOIIASD O!OI PIOPOSID lAm lAB ClIIIDCllL/IIISCII.I.l- IISIDllTIIL DIJ.IIUI -----------------------..-------------------------------------------------------------------------------------------------- I I I I ___________________________________________ 11.1111 :....., llalala ....., Il.laIa : SlaIl. 11m fotal-All IoaUlr IoaW,: of Io.m, Io.Ulr of loam, Io.m,: llta, Sill r.11, r_l, le.l..U.l CWp re-: lltaPl Qu.. ....... I lltaPl Qu.. Ie".: _____________________________________________________________1______-------------------------:------------------_________. 5/8. 2'1,489 1,118 21,115 ".10 1112,489 1,541 ".10 110,217 : 112 ".10 13,505 3/4. 1,302 411 1,713 1.10 15,. 451 1.10 4,022 : 5.50 0 l' 738 215 1,001 10.55 10,581 111 10.55 1,515 : 3 1.10 28 1 1/2 . II 211 22t 1...0 4,321 42t 1...0 1,101 1 18.10 14 2. 4 14 II 28.40 1,115 504 21.40 13,301 5 14.10 75 3 . 32 32 44.10 1,437 145 44.10 1,511 28.10 0 4 . 18 18 78.25 1,448 10 11.25 4,515 35.00 0 8 . 7 1 137.30 811 14 137.30 1,122 58.50 0 I . 10 10 205.10 2,059 5 205.10 1.010 84.00 0 10 . 0 257.40 0 1 257.40 257 0 12 . 0 301.90 0 1 301.90 308 0 10. of lit". 29,548 2,115 32,314 ---------.--------- 8230,189: 3,112 -------------,--------- 157,131 : 171 ..-..------. 13,120 : fotll ....., of IIIllla, O.lb 50,110 1aabI, of Ie.l...tl.l IIt.PI 32,314 he... of lit hit ba,1l lat" Uaap Leu: ...l"'tlal allo1uce Iac~ IddlUOIll Ualt Dtlaw-nb. to e~' '.10 Dtlaau-nb to ~ . '.144 haleipal OtH, &paci.. Golf eovll SBVID Sc_la fiPl Sanlce UIIp Sab~lCt to c-dlt, Qu.. _AI. .... leli..UIl-.la. lit hit lelida.UIl-ala. lack Additionl Ualt Dtlaw - alalala Dtlaw - e~tr ew.. C-rcill-alalala I.t" ..... - Itudard rat. haieipal Golf eovll SIIVIID OtH, &paci.. rin Sanie. - a1alaIa fiPl Sanicl - c-.li\, ew.. Scllaola 11,348 11,m,470 ICf 1,831,1(0 ICf (5 ICf all_ ", llaIla fllilr) 440,304 a (2 a a11_ lIC~ llit "" 1) 21,158 a (ror tint 3 a) 241,MO a 113,201 a 50,141 a 114,432 a 158,551 ICf 455,488 a 1,701 ICf 13,574,123 ICf 82,189,227 105,411 43,438 230,318 89a,1II 9,173,_ 181,182 21,311 1'1,320 21,514 145,488 4,825 311,539 -22- IODL PIOBC!ID lUll SALIS.... 114,114,112 ---------- ...--------- o EXHIBIT "]-B" CONTINUED o RESIDENTIAL ACCOUNTS 32,314 . 5 hcf allowance 18,346 . 2 hcf allowance Consumption subject to commodity charge TOTAL CONSUMPTION - RESIDENTIAL Residential accounts - 32,314 . minimum Multi-family accounts - 18,346 . $2.75 Residential - commodity charge @ $0.72 RESIDENTIAL - REVENUE DELHANN - RESIDENTIAL 771 @ 3 hcf Consumption subject to commodity charge TOTAL CONSUMPTION - DELHANN Residential account - 771 @ minimum Residential - commodity charge @ $0.70 Residential - commodity charge @ $0.844 COMHERCIAL/MISCELLANEOUS ACCOUNTS 3,882 accounts - no allowance @ minimum Commodity charge @ $0.72 MUNICIPAL - commodity charge. $0.286 ($0.72 x 40~ - $0.288) GOLF COURSE - commodity charge. $0.11 SBVMD - commodity charge. $0.43 OTHER AGENCIES - commodity charge @ $0.43 FIRE SERVICE 482 accounts - no allowance @ minimum Commodity charge @ $0.72 SCHOOLS - commodity charge. $0.68 ($0.72 X 95~ = $0.68) -2]- CONSUMPTION REVENUE 1,938,840 HCF 440,304 HCF 8,946,239 HCF ----------- 11,325,383 HCF $2,769,228 605,418 6,441,292 ------------- $9,815,938 27,756 HCF 249,940 HCF ----------- 277,696 HCF $43,440 19,429 210,949 ------------- $273,819 $693,972 4,627,884 HCF 3,332,076 683,201 HCF 196,762 194,432 HCF 21,388 156,558 HCF 67,320 50,149 HCF 21,564 145,488 6,701 HCF 4,825 455,466 HCF 311,539 ----------- ------------- 17,777,470 HCF $14,884,690 ----------- ------------- ----------- ------------- o o EXHIBIT "3-B" CONTINUED PROPOSED REVENUE - FIRE SERVICE METER NUMBER OF MINIMUM PROJECTED PROJECTED SIZE METERS MONTHLY MONTHLY INCOME YEARLY INCOME ($4.00 p/in) 2 " 7 $8.00 $56 3 " 3 12.00 36 4 " 86 16.00 1376 6 " 236 24.00 5,664 8 " 127 32.00 4,064 10 " 22 40.00 880 12 " 1 48.00 48 --------- $12,124 $145,488 -------------- -------------- -24- CitylDistrict East Valley Water District Fontana Water Company o EXHIBIT "4" WATER RATE SURVEY Residential - General Monthly Rate 5/8" 3/4" 1" 1 1/2 2" 3" 4" 6" 8" Flat Rate Commodity Charge Monthly Rate 5/8 x 3/4" 3/4" 1" 1 1/2" 2" 3" 4" 6" 8" 10" Commodity Charge First 300 cf Over 300 cf TRA-86 Surcredit PUC Surcharge -25- o $6.00 7.75 11.25 24.00 34.50 60.50 100.50 196.00 294.00 25.00 Per 100 CF $0.65 $6.16 7.17 10.29 13.59 18.21 35.32 46.38 77.20 113.60 134.60 Per 100 CF Fire Service $4.00 per inch Fire Service $3.30 per inch $0.544 0.741 0.020201 x Total Bill 0.015000 x Total Bill Loma Linda City of Los Angeles o EXHIBIT "4" CONTINUED o Bi-Monthly Minimum Quantity & Charae ---------------- --------------------------- Inside City Fire Service ----------- -------------- 5/8 x 3/4" 1" 1 1/2" 2" 3" 4" 6" 8" 10" Commodity Charge 1,000 cf 6,000 cf 8,000 cf 20,000 cf 40,000 cf 60,000 cf 80,000 cf 90,000 cf 100,000 cf Excess of min. to 19,000 cf From 20,000 to 39,900 cf Allover 40,000 cf Monthly Rate-Domestic Commercial & Industrial 1" & smaller 1 1/2" 2" 3" 4" 6" 8" 10" 12" Commodity Charge Per 100 cf Summer $0.805 Winter 0.670 Minimum Charae Per Meter $5.30 $2.40 8.50 12.00 30.00 47.00 84.00 165.00 198.00 254.00 -26- $12.10 56.02 56.02 130.45 263.67 406.03 548.37 619.54 690.73 $0.649 0.696 0.745 2" 3" 4" 6" 8" 10" 12" $4.64 per inch Bi-monthly Fire Service $12.00 30.00 43.00 74.00 135.00 178.00 224.00 Commodity Charge Summer Winter $0.74 $0.74 City of Pasadena City of Redlands o EXHIBIT "4" CONTINUED Monthly Rate o Fire Service ------------ --------------------------- With Detector Check 5/8" 3/4" 1" 1 1/2" 2" 3" 4" 6" 8" 10" 12" $5.32 Without 5.32 Detector Check 10.11 20.41 4" 47.89 6" 117.06 8" 180.90 10" 276.68 12" 452.26 558.60 665.00 Commodity Charae ---------------- Summer rate - 5/8" - 1" First 15 hcf $0.375 Over 15 hcf 0.804 Winter rate - 5/8" - 1" First 15 hcf $0.339 Over 15 hcf 0.728 Bi-Monthly Rate ---------------- Inside City 5/8 x 3/4" 3/4" 1" 1 1/2" 2" 3" 4" $10.90 13.60 18.70 31.10 44.40 74.50 113.20 206.20 302.30 6" 8" Commodiy Charge Per 100 CF ---------------- ---------- First 1,000 cf $0.27 Over 1,000 cf 0.60 -27- $26.21 39.28 52.38 78.54 104.74 2" 3" 4" 6" 8" 10" 12" $45.40 84.89 152.59 224.31 298.04 Fire Service $25.38 25.38 25.38 33.76 46.42 72.10 78.59 o EXHIBIT "4" CONTINUED City of Rialto Monthly Rate ------------ 3/4" 1" 1 1/2" 2" 3" 4" 6" 8" $4.66 7.44 15.34 24.64 53.94 93.00 212.97 367.81 Commodity Charge Per 100 CF ---------------- o - 500 cf 501 - 2500 cf 2501 - 3000 cf Over 6,000 $0.40 0.63 1.00 1.23 o City of Riverside Multi-family, Commercial & Industrial Monthly Rate 5/8 x 3/4" 1" 1 1/2" 2" 3" 4" 6" 8" 10" 12" 3.00 5.00 10.00 16.00 30.00 50.00 100.00 160.00 230.00 280.00 Commodity Charge ---------------- Per 100 cf Summer $0.61 Winter $0.47 Single Family Dwellings ----------------------- 5/8 x 3/4" 1" 1 1/2" 2" $3.00 5.00 10.00 16.00 -28- 4" 6" 8" 10" 12" Fire Service $6.00 per inch Fire Service $11.00 16.50 22.00 27.50 33.00 Riverside-cont. Runnins Sprinse Ci ty of Upland West San Bernardino County Water o EXHIBIT "4" CONTINUED Commodity Charge Per 100 CF First 1.500 cf Next 5.500 cf Allover 7.000 cf Monthly Rate 5/8 x 3/4" 1" 1 1/2" 2" o Summer Winter $0.38 0.70 0.78 $8.00 16.00 48.00 72.00 Commodity Charge Per 100 CF All usage $1.77 Monthly Rate 5/8 x 3/4" 1" 1 1/2" 2" 3" 4" 6" 8" Commodity Charge $2.50 3.80 5.40 8.60 17.30 27.00 54.00 86.40 Excess of 500 cf minimum Multiple units/1st unit Each additional unit Bi-monthly Minimum 5/8 x 3/4" 1" 1 1/2" 2" 3" 4" 6" 8" Commodity Charge All usage -29- $0.38 0.63 0.71 Per 100 CF $0.76 $2.50 0.65 $7.30 10.00 14.60 20.10 29.20 38.25 58.40 78.48 Per 100 CF $0.63 Fire Service None Fire Service Up to 4" - $10.00 Over 4" - $2.00/in. Fire Service $2.75 per inch . , Yucaipa Valley County Water District o EXHIBIT "4" CONTINUED Bi-monthly Rate 5/8 :It 3/4" 1" 1 1/2" 2" 3" 4" 6" Multiple unite - 1st unit Each additional unit o $10.00 20.00 40.00 64.00 130.00 220.00 440.00 $10.00 7.50 Commodity Charge Per 100 CF Fire Service Monthly Service demand charse assignable to the size of the bypass meter. Water usage billed at two times domestic rate. Yucaipa Calimesa Wildwood Canyon First 3,000 cf Over 3,000 cf $0.562 $0.447 0.700 0.700 -30- $0.630 $0.700 , . -'. ,I . .. o EXHIBIT "5" o SUMMARY OF RECOMMENDED CAPITAL CHARGES . ,- ......... . ....... . . -31- o EXHIBIT "5" CONTINUED 0 .. '. #I Capital Projects In 1981, a water system master plan was prepared to identify necessary water system improvements for the citY's service area. Continued rapid growth in the number of customers, combined with expansion of the service area and signifi- cant changes in available water system, made it necessuy to update the 1981 Water System Master Plan. Camp, Dresser &: McKee (COM) completed a master plan update in September 1990. This update uses a planning hOrizon of 2010 and provides cost and phasing information for the firSt five years. Service Area: The service area of the San Bernardino municipal water depart- ment is bounded on the north !>r the San Bernardino NatioD8l Forest and on the east by East Valley Water District, Norton Air Force Base, Victoria Farms Mutual Water Company, and South San Bernardino County Water District. It is bounded on the south l?r the cities of Loma Linda and Colton, and on the west by West San Bernardino County Water District, the City of Rialto, and the Muscoy Mutual Water Company. The service area of approximately 4S square miles 15 divided into 18 pressure zones, which range in ground elevation from approximately 1,000 to 2,500 feet. Water J)Pnumd..: The total existing maximum day dPmAnd in 1989190 was approximately 61,000 gallons per minute (gpm), while the projected future maximum day demand in 2010 was estimated at 93,000 gpm. Water Supply: The city currently obtains most of its water from groundwater wells. A Sinall amount of surface water (approximately 800 gpm) is currently treated at the Devil Canyon filter plant and Used in the 1720 Zone. No State Water Project (SWP) water has ever been used directly by the city. The city must rely on its existing storage capacity and suJlplementa1 SWP water imported through San Bernardino Valley Municipal Water District for groundwater recharge in order to meet the existing mSIYimum day dPmAnd... During the summer, the northwestern portion 0 the service area can marginally meet existing maximum day dPmAnd, 8nd does not have sufficient production capacity to meet future maximum day demand. The U~ Zone has major problems for existing and future conditions due to production restrictions on wells with trace pollutants. The Lower Zone region bas some excess produc- tion capacity under existing conditions; however, present production levels cannot meet the projected future demand. Water System Analysis: The water system analysis was performed by COM. The analysis found that the major overall system deficiencies were the inade- quacy of the existing pumping capability and tp.....mmon mains to move water from the lower-elevation zones to the higher-elevation zones. Also, several of the Upper Zone's existing production wells may exceed the action levels of some regulated organic pollutants in the near future. Based on the identified deficiencies, an overall system alternative was defined for the city's water system. The resultant backbone system is shown graphic- ally on the system map ~ge 22). =-:'==~o~oC:~:=: =;;;;::~~=: struction of the recommended water system improvements to correct existing -32- o EXHIBIT "5" CONTImO ... t to- , ., deficiencies and provide orderly expansion of the water system to meet future demands. A detailed capital improvement pro~ was developed for the major supply, storage, pumping, and transmissIon main improvements needed for the CIty'S overall system during the period from 1991 to 1995. A cost summary of the proposed water system improvements for the first phase to be constructed throughout 1991-1995 totals $67.0 million and is shoWn in Table 15. An allowance of 15 percent for engineering and 20 percent for con- tingencies was added to the construction costs to determine total capital costs. The costs are based on a Los Angeles ENR Construction Cost Index of S800 and include an inflation factor of 4 percent per year to the recommended start -of -construction date. TABLE 15 . CITY OF SAN BERNARDINO FIVE-YEAR 1990 IMPROVEMENT PlAN - PROJECT SUMMARY ($000) Tran~ission Lines 12" Hnes 16" 1i nes 20" Hnes 24" Hnes 30" Hnes 36" lines Total transmission Land Acquisition Upper Zone lower Zone Elevated Zone 1913' Zone 2500' Zone Total land acquisition Storage 9 Reservoirs (30.9 MG) - various locations PlIIIp Stations lower tank site (future) ugper tank site (future) 4 th Street & Sepulveda Foothill Boulevard & 4th Street Myers Canyon 2300' tank site (future) Total pumping Supply 9 Wells - various locations Well-head treatment - 19th Street plant Well-head treatment - 25th a 27th Streets plant Supply - Lytle Creek Total supply Grand total $ 538 431 6,390 3,403 2,267 l2tl~~ $ 1,050 440 270 220 n:m $23,679 $ 1,460 1,519 964 393 5(\5 l 5,U3 $ 2,801 3,424 3,986 a $66,967 Source: COM Septelllber 1990 llaster Plan Update. -33- . . . = = i: M_ -~ ~! ::1- e;E -= -- 1:= ~ii !>ij I!= ~i !ro a_ - -~ -= 11- -. =::1 =-e -. 0" :<:1:3 .-- .. u. I - !i - - ~ :: - - :;;: - :: - - - - - :: - - :;; - :: - :!:: ~ - :: ~ - :;;: - :: - ;:; - :: ~ :!:: M - :: M - ::: - :: :!:: - - :: - :!:: :: :: ~ ~ a::: ii = III C := -.lI BElli =BI i -- -- -- --:- :l!: -- -- ~- ~ ~ -- -- ~- ~ ~ -- -- ":- - ~ -- -- ~- ~ -- -- :;- ~ -- -- ~- :;: =: -- - ~ -- -- -- .; ~ -- -- -- :: - - - :;; " -..... li~; :: - ;i. -- II __ ::-: :1 - " " " " " " 11 Ii " " " :: " li " " :: " " " :: " lj :: " " :: " ~ " " " " !! :: :: :: " " " " !l " " " " " " " " " " :: !! :: !! :: ~ " :: ~ ~ " " " " " " " " " 5 " ~ H . - - - ~ ~ - - - oft ~ - - ": - ~ - - - ~ - - - :i - = ~ - - ~ ~ - - - - ~ -- -- -- - ~ " . :,:1, i =t !! ~1 :: ~ ~ 55j " u " ,,~- ill ===B ~~I ale -~ o -- -- -- ~ - -- -- -~ - -- -- -~ - - -- -- -- ~ - -- -- -- ~ - -- -- _M .; - -- -- -- .. - M_ -- -- .. - - = - --- --- ~~~ ~=~ --:.~- ~- - - - - - - - .. - --- --- ~~:: -~- ~~~ - - - ~ ::: --- --- ~~-:. _M_ -~- ""':.~- ~- - - ~ M ::: ~ - --- --- -:.c:.~ --- ~-- r:~- -~ - - - ~ :J: ::: --- --- -:.~~ __M _M_ ~""":.- -~ - - - - ~ .. - --- --- -:.-:.~ --- _M~ ~c:.- ~~ - - - - - :: - --- --- c:.c:.-:. ~-~ --- --;.r;,- ~- - - - .. ~ - - - --- --- --- o..~ --- r-:.~" -- - - - 5 ~ - --- --- --- ..;.:..; M__ _M_ ...;... - - - .; - ~ - --- --- --- r:.:_ --~ ::::::- o u - .: . - .! - - i' - -- i a= ~ -- ~!- I ~~ - ..-- - --- el: '"'~: ~!!lt=:: =aa~~ 5= u_ - ....-- EXHIBIT "6" ~ I ;:ili 1: :: ? :: " " " ~ :: :: " " " " " " " " ~ !! :: " - - - - - - :;; - - ~:: ::- :: -- -- -- -- - :: - - - :i - -' - -- -- -- -- - :: - - - - - = -- -~ -- -- :: - - - ~ - - -- ~= -- - :: - - ~ - - ..; - -- -- -- -- :: - - - ..; - - ..; - -- -- -~ ~- - :: - - ;; ::: ..; - -- -- -- -- - :: -- -- -- :: ::::- ~ :; " " :: j1 " r: " " " " " !! " :: ~ ~ ~ :: " : " J aii I:; = - " ~ : is - - - ..; - '": - - - - - ..; ::: ~ - -- -- -- -- - :: =: -- -- - :: - - 1:11 ::loll i~ o ~ . ~ .. Ii . iii :: s " - 5 Ii " " .. !i E :: == " u - - = '" ; g - - ::: - - - - ~ - - - - ::: - - ~ - :::: - - - ~ - ~ ...; - - - - ~ - - - - -' =: - --- --- c:.~c:. ::::::: -r;,~ -- - - - .. :: ~ ~ - :0;. - .. ~ - - - ": "1 - - - - ~ - - - - := "1 - - - - ; - - - - 5 - --- --- -:.-:.c:. --- --- ~~~ --- = - o co c.___ ----- c::.-:.~e:.c:. ...--....-- t- _........._ --:.-:.c::.-..... __M - - - - - - --: ---- ---- ~-=:.-:.-:. .....-....- ....-........ -:.-:c:.- --- - - - - - --: ---- ---- -:.c:.-:.-:. .....--- ....--.... -:.-:.-:.- __M - :: - - ---- ---- -=:.-:.-:-:. ....-....- ....-........ -:.""":.~- __M - - ~ - - :: -- -- ~~ -- -- --:.""":. -- - - ~ - - '": -- -- ~~ -- -- :::::; --- --- ~-:.~ -~- --- ~--:--:. _M_ -11--------- ;::IJ5j5JJJjj u - - . ---:--:-!!:- ~:;~~~~~:;~~~ ----------- ----------. ""':.ro:.~__:.~__:.__:.~~~~ ----------- - - --- - -------....--- ~~~~~~~~~~~ 110- _ __ . ::::1':::1'==-:- -:- ."'-"'-"'-""lI. ~ --"-i-"- ...... ~~ .~o t! lI.;~-_"i:; ;;: f"'. . T If. ~- -;;:';';"';';"';"';';:::W! I! .._..______J,:...~ """Il11"lIlI.'j=:l!:= ...u.::i,->>~.::i~v v-v ..-------....--- ::~~~~~~!"~a:t:_;: - .:.1.: 13 ii - &::l ~. --....-------- ----------- g ~ - ~ - - = - ::: :: - - -: - - - - - ~ M "1 - - - - - ~ - - - - :; - ~ - - - - - ..: ::: = - - - .; :;; - - - c_ l~ , - i_ :- - - - ~ :: - ~ - - - oft = - 1:1 ii ij ~ E ;; .. fi M M = ~ ~ ~ - :;i = - - .. ~ ~ - - - - .. :;; .. - - - ~ - - - .. - - - - .. 5 - - - :; :J: .. - - - - - :::: .. - - - - - ~ .; - - - .. .. - '" - - - - - s .; - - - ~ . ~ :l!: - . - - ~ "i - .. o - - . - ~ u - ~ = . - ,- -.. - ::~.B -~~ --- --- -.... - --- --- II: i =::!= ~ - . - ~ '---' CITY OF ; SAN BERNARDINO MUNICIPA'L WATER DEPARTMENT I WATER QUALITY REPORT 1991 Olrvc9.~ CALIFO OURW California is experiencing its fifth consecutive year of critically low rainfall levels. The State's lakes and streams are drying up and water agencies are wondering how they will meet this summer's demand for water. San Bernardino Rainfall 1981-1991 35 "30 " G 25 z ~ 20 1000YearAverage R3infall - 16.2" -<" < I 2:10 ~ : t ~ j J~ ~tt.~ 81 82 83 84 85 86 87 88 89 90 91..1 Water Year (Oct. 1 - Se 1. 30) In coastal areas such as Los Angeles, the water shortage has become critical. In San Bernardino we have local water supplies to meet our current needs. However, the drought has caused the levels of the underground water table to drop. Along with a growing need to treat and improve the quality of our groundwater supplies, it is becoming more expensive and difficult to deliver water to all parts of our service area. WHERE DOES YOUR WATER COME FROM? A typical San Bernardino family home with 2-3 residents uses about 550 gallons of water per day (900 gpd in the summer). Approx- imately95% ofthe 70 million gallons per day (MGD) used throughout the City comes from 36 wells that pump water from underground. The remaining 5% of our water comes from a stream located in Devil Canyon behind California State University San Bernardino. The well water is pumped from underground basins filled by water draining down from snow- melt and rainfall in the mountains. The San Bernardino Municipal Water Department operates a number of storage reservoirs where the water is held before we distribute it to our customers. Surface water from Devil Canyon is filtered, treated, and blended with the chlorinated well water. The water is treated to be free of viruses and bacteria and is then piped to you for use in your home or business. '~l.,~ ,.!' ,,,-'~ WHAf HAS THE DROUGHT DONE? One of the main costs of delivering water is the cost of pumps and electricity to raise the groundwater from about 100 to 200 feet below the ground surface. This cost has greatly increased as more expensive pumps and more electricity are needed to lift water from more than 200 to 300 feet below ground. The drought has caused the water levels to drop and our costs to rise. But pumping water from deeper below ground does not alone solve our water supply problems. In a few wells, water has dropped to where it can no longer be eco- nomically pumped. Other wells are being affected by serious groundwater contamination from long-forgotten military operations and an abandoned airport in the north end of San Bernardino. v CONTAMINATION FROM AB ONEDI AIRPORT AND MILITARY OPERATIONS During World War II, Camp Ono (located near the University, east of 1-215) was a major weapons and ammunition depot. Military engine repair work was performed, under a contract with Norton AFB, at the old San Bernardino Municipal Airport, northeast of Kendall Drive. At both of these facilities, gasoline, oils, and industrial solvents were dumped either in pits or on the ground surface. Over the years, these contaminants have slowly seeped into our groundwater supplies and are now showing up in a number of our wells. The map below shows the movement and extent of the contaminants from these locations as well as others that will soon be major problems. \ NORTHP4RK ~.. San Bernardinds Water Depart- ment has been one of California's most aggressive agencies in clean- ing up groundwater contamination To date, three water treatment plants have been built with state grant monies . . . and more are planned. As a result, the water source from several polluted wells is being cleaned up and these J 1 ROUTfJO ...... HIGHlANDA.VE ..... " , , , \ BASEllNfAVf CITY OF SAN BERNARDINO \ "'~'. ~Q~. n, ~ ~...:,\""" "'", ..... ~.\ " ",. \ ~, . "'4};.:'\J 1}<$', fOOTHill AVE MILlST \ NORTON / ,PLUME \ \ \ , \ I I . . z . ~ ~ , " " " 1-10----- I I -- / --..... wells have been put back into service. These treatment plants are costly to operate and will be with us well into the future to treat the contaminants as they migrate through the groundwater basins. A 30% OF OUR WATER SUPPLY IMPACTED Together, the drought and groundwater contamination have reduced the City's current water production by about 30%. Although we have the ability to supplement our supply with Northern Califor- nia water, this source is costly and may not be available this year due to the drought. u THE BUNKER HILL BASIN Fortunately, San Bernardino has a less expensive, higher quality water source that we can rely on to increase our production and meet our demands. The Bunker Hill Artesian Pressure Zone underlies the area south of Base Line Avenue and east of 1-215. Nearly all of the snowmelt flowing down from the San Bernardino Mountains re- plenishes this basin. In wet years, water has actually risen above ground (artesian condition) causing basement flooding problems for buildings at the south end of the city. To further tap this supply, we are drilling additional wells in the pressure zone and building addi- tional pipes and pumping stations to distribute the water from the pressure zone to where it is needed. This investment in new facilities will provide our customers with a reliable water source for the current, and most foreseeable drought conditions. ~,,-'f Pumping, treating, and distrib- uting our local water supply to meet drought constraints and water quality standards, and to provide our customers with a reli- able source of water requires that we implement a 1991 increase in our water rates. The largest part of this average $3.24 per month resi- dential rate increase is needed for RECLAIMING OUR USED WATER Have you ever wondered where your water goes after you have washed your dishes, taken a shower, or flushed the toilet? After it is collected in our sewer system, it is treated in our water reclamation (wastewater) plant. The treated water is then piped to the Santa Ana River where it flows downstream. The Santa Ana River, which flows mostly under- ground to Orange County, is cap- tured, put into the groundwater basins, pumped out and treated, and reused as a domestic water supply. HOW CLEAN MUST WATER FROM OUR RECLAMATION PLANT BE? Since our reclaimed water eventu- ally is used again when it becomes part of the Santa Ana River flow, the Environmental Protection Agency (EPA) and the Santa Ana Regional Water Quality Control Board (RWQCB) require us to meet 23 strict biological, chemical and mineral standards for the treated water. The RWQCB has upgraded the classification of the stretch of improvements to our pumping and distribution system (and will vary by amount of water used). To ensure that new homes pay their fair share of the cost of our water system, developers are currently charged a fee of $2,700 per home for water service. This connection fee is projected to increase to $6,390 by 1999. Santa Ana River which includes the outflow from our water recla- mation plant. As a result, they are now requiring that our plant meet more strict standards to allow potential uses such as fishing and swimming. The Air Quality Management District is another regulatory agency that is enforcing tougher stand- ards on our industry. To meet new standards that provide for improved air quality, we are installing and rebuilding engines at the reclama- tion plant to burn cleaner fuels and release cleaner emissions. r,~ L THE COST OF "CLEANER" WATER To achieve these higher water quality standards for protection of the river and to meet stricter air quality standards, San Bernardino, Highland, and Lorna Linda residents must invest an estimated $210 million in our reclamation plant by 1995. If we don't, we may face fines as high as $25,000/day. This investment in new facilities will require an initial $3.80 per month increase in the residential sewer rates and a range of increases for businesses (dependent upon type). The San Bernardino City Council will hold public hearings to discuss approval of the increases later this year. WATER QUALITY TESTING For every current measure of water quality, the San Bernardino Municipal Water Department's 1990 water supply met or exceeded federal and even stricter State standards for protection of public health. The 1990 water quality test results are provided on the follow- ing table. The standards shown for the State and Federal require- ments are measured in parts per million, parts per billion, and now for reclaimed wastewater param- eters-parts per trillion. To put these amounts in perspective, '. . .. consider that one part per million is equal to a pinch of salt in 416 bags of potato chips and a part per million is equal to a pinch of salt in 84 tons of chips. The IJprimary" standards are designed to ensure that the water would not harm a person after 70 years of continuous consumption. Some of these standards are as strict as parts per billion. The "secondary" standards are designed to insure the water is of acceptable taste, odor, and clarity. Our water supply meets or exceeds all primary and secondary stand- ards; therefore, the need for additional treatment at the home is not necessary. In cooperation with the State Department of Health Services, we encourage our customers who are landlords, employers, or school administrators to share this infor- mation with those who use water at your location. We will be happy to provide you with additional copies. ( '- G 1990 WATER QUALITY TEST RESUITS PRIMARY STANDARDS-Mandatory Health-Related Standards Parameter Federal MCL Slate MCL Ground Water Surface Source Water SBMWD Range Water (b) Average (a) Low/High CLARITY Turbidity (NTU) (Surlace Water) 1.0 0.5 0.28 (0.04-0.48) (Ground Water) 5.0 5.0 0.7 0.10-1.20 MICROBIOLOGICAL Coliform Bacteria (% Tests Positive) 10 10 0.01 0.0-0.5 ND ORGANIC CHEMICALS (mg/I) Atrazine **0.003 0.003 NO NO NO(l) Bentazon NS 0.D18 NO NO ND(l) Benzene 0.005 0.001 NO NO NO(l) Carbofuran *0.04 '0.018 ND NO NAR Carbon Tetrachloride 0.005 0.0005 NO NO NO(l) Chlordane '0.002 *0.0001 ND NO NAR 2,4-0 0.1 ('0.07) 0.100 NO NO NO(l) Oibromochloropropane (OBCP) '0.0002 0.0002 ND NO NO(l) para-Dichlorobenzene (p-DCP) 0.075 0.005 NO NO ND(l) l,l-Oichloroethane NS '0.005 NO NO NO(l) 1,2-Dichloroethane 0.005 0.0005 NO NO NO (I) 1,1-Dichloroethylene 0.007 0.006 NO ND NO(l) cis-l,2-Dichloroethylene '0.07 '0.006 NO (d) NO NO(l) Trans-l,2-Dichloroethylene "'0.1 '0.01 NO NO ON(l) l,2-Dichloropropane '0.005 '0.005 NO NO ND(l) 1,3-Dichloropropene NS 0.0005 NO ND NO (I) Oi (2-ethylhexyl) Phthalate (OEPH) NS '0.0004 NAR NAR NAR Endrin 0.0002 0.0002 ND NO NO(l) Ethylbenzene *0.7 0.680 NO NO NO(l) Ethylene Oibromide (EOB) '0.00005 0.00002 NO NO NO(l) Glyphosate NS *0.7 NO NO NO (I) Heptachlor '0.0004 '0.00001 NO NO NAR Heptachlor Epoxide '0.0002 '0.00001 NO NO NAR Lindane 0.004 ('0.0002) 0.004 ND NO NO(l) Methoxychlor 0.1 ('0.4) 0.100 NO NO ND(l) Molinate NS 0.020 NAR NAR NAR Monochlorobenzene "'0.1 0.030 NO ND NO(l) Simazine NS 0.010 NO NO NO(l) 1,1,2,2- Tetrachlorethane NS 0.001 NO NO NO(l) Tetrachloroethylene (PCE) '0.005 0.005 ND (c) (d) ND-0.0135 (d) ND(l) Thiobencarb NS 0.070 NAR NAR NAR Total Trihalornethanes 0.100 0.100 0.00112 ND-0.0097 ND(I) Toxaphene 0.005 0.005 ND ND ND(l) 2,4,5-TP (Silvex) 0.01 ('0.05) 0.010 ND NO ND(l) 1,1, 1-Trichloroethane (1,1, 1-TCA) 0.200 0.200 NO ND ND(l) 1, 1,2-Trichloroethane (1, 1,2-TCA) NS 0.032 ND ND NO(l) Trichloroethylene (TCE) 0.005 0.005 ND(d) ND-0.0041 ND(I) TrichlorofIuoromethane (Freon 11) NS '0.15 ND(d) ND ND(l) 1,1,2-Trichloro-l,2,2-trifIuroethane (Freon 113) NS *1.2 ND ND ND(l) Vinyl Chloride 0.002 0.0005 ND ND ND(l) Xylenes '10 1.750 ND ND ND(l) ABBREVIATIONS & FOOTNOTES MCL Maximum Contaminant Level < less than NA Not Analyzed ND Monitored for but Not Detected-detection limits are NTU Nephelometric Turbidity (suspended material) Units available upon request umho/cm micromhos per centimeter mg/L milligrams per liter (parts per million) NAR No Analysis Required, System Not Vulnerable pCilL Picocuries per liter for Contaminant NS No Standard L v Parameter Federal MCL Stale MCL Ground Water Surface Source Water SBMWD Range Water (b) Average (a) LowlHigh INORGANIC CHEMICALS (mgIL) Aluminum NS 1.000 NAR NAR NAR Arsenic 0.050 0.050 <0.01 (e) <0.010 (e) < 0.010 (e) Barium 1 ('5.0) 1.000 <0.10 (e) <0.10 (e) <0.100 (e) Cadmium om ('0.005) 0.010 <0.001 (e) <0.001 (e) <0.001 (e) Chromium 0.05 ('0.1) 0.050 <0.010 (e) <0.010 (e) < 0.010 (e) Fluoride 4.0 ('2.0) 1.4-2.4 0.240 0.09-0.70 0.08 Lead 0.05 ('0.005) 0.050 <0.010 (e) < 0.010 <0.010 (e) Mercury 0.002 0.002 <0.001 (e) <0.010 <0.001 (e) Nitrate (as NOJ) 45.0 45.0 22.5 4.2-42.8 (c) (d) 3.1 Selenium 0.01 ('0.05) 0.01 <0.005 (e) <0.005 <0.005 (e) Silver 0.05 ('NS) 0.050 <0.010 (e) < 0.010 <0.010 (e) RADIONUCLlDES (pCiIL) Gross Alpha 15 15 1.9 0.0-5.0 NAR Gross Beta NS 50 NAR NAR NAR Radium 226 5 5 NAR NAR NAR Radium 228 5 5 NAR NAR NAR Strontium.90 8 8 NAR NAR NAR Tritum 20,000 20,000 NAR NAR NAR Uranium NS 20 NAR NAR NAR SECONDARY STANDARDS-AesIhetic Standards Parameter Federal Met State MeL Ground Water Surface Source Water SBMWD Range Water (b) A verage (a) LowlHigh CHEMICAL PARAMETERS (mglL) Chloride (mglL) 250 **250 28.0 2.8-79.0 74.0 Color (units) 15 15 <5 0-<5 NA Copper (mglL) 1.0 ('1.3) 1.00 0.010 0.00-0.019 ND Foaming Agents (MBAS) (mglL) 0.50 0.50 <0.02 <0.01-<0.02 NA Iron (mgIL) 0.30 0.30 0.017 <0.1-0.141 NO Manganese (mg/L) 0.05 0.05 0.008 <0.03-0.03 <.03 Odor-Threshold (units) 3 3 1 ND-l <1 pH (units) 6.5-8.5 NS 7.8 7.07-8.00 7.8 Specific Conductance (umhofcm) NS **900 597 380-720 620 Sulfate (mgIL) 250 **250 101 33-200 66 Total Dissolved Solids (mg/L) 500 **500 357 234-510 363 Zinc (mgIL) 5 5 <0.05 <0.05 NO ADDITIONAL PARAMETERS Calcium (mglL) NS NS 77.9 53-105 72.0 Hardness (mglL as CaCO,) NS NS 260.0 174-408 250 Magnesium (mgIL) NS NS 14.5 3.6-22.0 17.0 Potassium (mgIL) NS NS 3.8 0.04-4.90 4.8 Sodium (mgIL) NS NS 23.2 11.0-55.0 21.0 ABBREVIATIONS & FOOTNOTES (continued) proposed standard (e) Isolated high value, subsequent testing indicated values within MCts. I recommended maximum level (d) Water from sources which equal or exceed the Met for this la) Data are yearly averages of all supplies in mg/t constituent are reliably treated or blended before entering the unless otherwise noted. distribution system to meet the Met. (b) Data are from filtered surface water. Ranges shown Ie) No 1990 testing required, value from 1988 used. only when more than one analysis was made. (0 Value from 1989 used. ( ~ '-' MESSAGE FROM OUR PRESIDENT AND GENERAL MANAGER The San Bernardino Municipal Water Department has been pro- viding our customers with a safe and reliable water supply since 1904. We and our staff are com- mitted to protecting public health and safety, our precious water supply, and the environment of the Santa Ana River. To continue meeting our commitment, we will be implementing a number of new projects over the next few years. First, everyone knows a drought is affecting California's water sup- plies. To deal with the drought's impact, we are drilling more wells and adding larger pumps to exist- ing wells to bring groundwater up from levels that have been dropping due to the drought. We are expand- ing our delivery system to transfer groundwater from the Artesian Pressure Zone to other areas in the City where water levels are dropping. Secondly, our water supply cur- rently meets or exceeds all Federal and State-established water quality standards. To keep it that way, we are constructing and operating a number of groundwater treatment WATER DEPARTMENT CITY HALL 300 N. "0" STREET 92418 P.O. BOX 71092404 SAN BERNARDINO, CALIFORNIA (714) 384-5141 BOARD OF \VATER COMMISSIONERS PRESIDENT MJr);Mlot II. Ch,mdll'T COMMISSIONERS [{oN'rIBiwns EmiJi"G....:i.. )Jml'sH. Ural.l IIdT"ldW Wi1li~ RI'Tn,lrdC J<..rs,>v GENERAL MANAGER Chl'rvIA. F10wns ASSISTANT GENERAL MANAGER Joseph F. Sll'jsl...ll DIRECTOR. ENG1NEEr.:ING- CONSIRUO"[ON-MAINTEr\:ANCE DlhmI'R.[\;<>rton DIREtTOR, WATER RECLAMATION plants to remove contaminants thai have migrated through the soils. The combined cost of pumping water from lower levels and operat- ing these treatment plants, have increased and will continue to increase the cost of providing you with a safe and reliable supply. The impact this year alone to our residential customers will be about $3.24 per month. Although sub- stantial, this cost is much less than the drought alone will cost many other California cities. Finally, our treated and reclaimed wastewater is piped to the Santa Ana River where it eventually flows downstream, through Riverside and Orange Counties. The potential uses of the riverl such as swim- ming and fishing have led to increas- ingly strict standards being placed on the quality of this water. To meet the new standards, we will be required to spend nearly $210 million over the next ten years. These costs will result in an estimated $3.80 increase in residential sewer bills each month during 1991. We have prepared this 1991 report, our second annual, to pro- vide you with the results of our water testing and monitoring that we completed during 1990. As we report herein, our water supply meets our exceeds all current standards. We are continuing to improve our system to meet both supply demands and future quality standards. We believe that a long-term plan for enhanced environmental pro- tection, at minimal cost, is feasible. To avoid financial hardship, the treatment facilities we need to meet state and federal drinking water standards must be constructed over a period of years. While we are constructing these needed facilities, we hope you will join with us to begin to use our water resources wisely and efficiently to ensure our long-term supply. ~J1J~ Margaret H. Chandler, President Board of Water Commissioners b~f7-- General Manager PRESORTED mST CLASS MAIL us POSTAGE PAID SAN6ERNARDINO, CA Permit No 126