HomeMy WebLinkAbout04-Public Works "...... n.\IIu.~ I r'l" ""un"... A"-' IIUN FileNo, 1.14-9 '-....; CITY OF SAN BERNIUtUINU - ~t: Public Works/Engineering Approval of Change Order No. TWO Subject: and Approval & Acceptance of REC'D.~AOf.lIH. Or~ork --Relocation of Sewer ~ Facilities for Construction 0 ISBa DEe 21 PH 2: 3JS:>ute 30, from Highland Avenue to uHu Street, per PLAN NO. 711 ---BONADIMAN-McCAIN, INC. Froml ROGER G. HARDGRAVE ..,......., Date: 12-20-88 Synopsis of Previous Council action: 09-08-87 Resolution No. 87-314 adopted authorizing execution of Utilities Agreement No. 8384 with State. 09-08-87 Finding made that relocation of sewers is needed for health and safety reasons. 09-21-87 Plans approved and authorization granted to advertise for bids. 11-02-87 Resolution No. 87-393 adopted, m~arrling a contract for the low bid price of $422,859.00. 09-19-88 Change Order No. One approv<'l". authorizing the Contractor to perform additional undtrground relocations increasing the contract price by $7,344.82, from $422,859.00 to $430,203.82. 2. That Change Order No. TWO to the contract with Bonadiman- McCain, Inc., for the relocation of sewer facilities for construction of Route 30, from Highland Avenue to uHu Street, in accordance with Plan No. 7116, be approved; authorizing the Contractor to perform additional under- ground relocations for a net increase in the contract price of $22,516.13, from $430,203.82 to $452,719.95. That the work performed by the Contractor be approved & accepted; and that final payment be authorized at the ex- piration of the lien period. L' ., /' // '/ /~/ . ~,',~///~ Signature Recommended mot1()J1: 1. -- cc: Jim Robbins Jim Richardson Andy Green Con tact person: Roger G. Hardgrave Phone: 5025 Supporting data attached: Staff Rpt. - c.c.o. #2 Ward: 5 & 6 Source: (Acct. No.) $22,516.13 245-365-57725 FUNDING REQUIREMENTS: Amount: (Acct. DescriPtion) Freeway, from Highland Avenue to uHu St. Sewer Relocation, Route 30 Finance:~~"'" ~~.. , ~ ~ /1 /. ,/ /. ,./' -7. -, b "'ounci! Notes: /7..jq, //'///1' /<2 tJ /0./ d - 75-0262 Agenda Item No. 1/ CITY OF SAN BERNODINO - REQUEST Fca COUNCIL ACTION STAFF REPORT - The relocation of sewer facilities is being performed under an agreement with Caltrans in order to facilitate the con- struction of the Route 30 extension. During construction, utilities were encountered and as required to match existing construction operations. numerous unknown underground revisions to the plans were made field conditions and Cal trans I The cost for extra work, authorized by Change Order No. Two (due to plan revisions and unidentified underground util- ities) is $22,516.13, as determined on a time and material basis in accordance with Section 3-3 of the Standard SpeGification~. The total estimated project cost includes an amount of $65,641.00 for contingencies, which can be used to finance the additional costs incurred for this extra work. Caltrans is reimbursing the City for all costs incurred under this contract. The state has been invoiced for 90% of the project cost, including Change Order No. One, and has remitted to date, 68% of the construction costs. We recommend that Change Order No. Two be approved. All work was satisfactorily completed as of 12-13-88. The project was awarded for the low bid price of $422,859.00. Contract Change Orders No's One and Two increased the contract price to $452,719.95. Due to the actual quantities underrunning the estimated quantities in the bid documents for various minor items, the actual final contract price is $443,095.04, which is 9% below the budgeted construction funds. We recommend that the work be approved and accepted, and that final payment be authorized at the expiration of the lien period. 12-20-88 - 75-0264 ,.E-".. .~- ..-..., V RELOCATION OF SEWER FACILITIES FOR Project: CONSTRUCTION OF ROUTE 30, FROM HIGHLANO AVE. TO "H" ST. .- '-' Plan No. 7116 ,~"" Date: 12-15-88 File No. 3.14-9 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. I!dlL (Change necessitated because of field conditions) TO: BONADIMAN MCCAIN, INC. P.O. BOX 6444 SAN BERNARDINO, CA 92412 Gentlemen: -- You are hereby authorized and directed to perform the items of extra work, in accordance with Section 9-1.03 of the Standard Specifications for the State of California, on a time and material basis, as listed on Page Two of this Change Order No. Two. Total extra work cost added to contract .............................$ 22.516.13 Previous Contract Price .............................................$430,203.82 Amended Cos t Pri ce .................................................. $ 452 ,719. 95 Additional time to complete contract due to change order ............As required to proJect completion CONTRACTOR: CITY OF SAN BERNARDINO: '-' By: Title: By: ROGER G. HARDGRAVE Director of Public Works/City Engr. Arr..ntl." DatI!: Approved Date: 1"'" '--' ~." -..."" - Plan No. 7116 12-20-BB CHANGE ORDER NO. TWO Page 2 1. Relocate Sewer Laterals on "I" Street south of (Daily Reports - 3/29, 4/14, 4/25, 4/26, 4/2B, ------ $ 27th Street. 4/29, 4/29) 5,208.10 2. Repair Sewer Laterals on Davidson St. South of Colima St. (Daily Reports - 5/11, 5/11, 5/11,) ---- $ 2,790.48 3. Relocate Laterals on Davidson St. north of 30th Street (Daily Reports - 7/27, 7/27, 7/2B) ------ $ 2,305.67 4. Install Pipe Cradles to Grade on "H" St. Bridge (Daily Reports - B/02, B/03, B/04, B/05, B/10, B/25) ------- $ 4,615.46 5. Relocate Lateral at Gardena & 2Bth Street (Daily Reports - B/9, B/9, B/10) ----- $ 2,873.86 6. Revise 14" Dip Skids in "H" Street Bridge (Daily Reports - B/l1, B/12) $ 1,422.73 -- 7. Repair Lateral at Davidson & Colima Streets (Daily Report B/16) ----------------- $ 189.43 B. Relocate Laterals on Davidson Street north of 30th St. (Daily Reports 8/30, 9/13, 9/13) ------ $ 1,561.90 9. Replace Manholes at "H" Street Bridge (Daily Reports 10/lB, 10/19) --------- $ 1,548.50 TOTAL $ 22,516.13 ...", -