- REQUEST MR COUNCIL ACTION
File No. 2.119
. Approval of Change Order No.
Subject: ~Ili & Approval & Acceptance
REC'O.- ADH1l'f UFFWork ---Construction of
19QD DEe 21 ~lf!i ?ijtation in Tri-City Cor-
Oil ~:r'1i~l::! Complex, per Plan No.
7270 ---MARTIN JASKA, INC.
from: ROGER G. HARDGRAVE
lrept: Public Works/Engineering
Date: December 21, 1988
-:3Y~
Synopsis of Previous Council action:
05-19-86 Resolution No. 86-185 adopted authorizing execution of
an Agreement with Kurt Meyer for architectural services.
Report on preliminary results of geotechnical investi-
gation by Geofon, Inc., accepted and filed.
Status report on total estimated cost overrun of
$165,000 referred to Legislative Review Committee.
Finding made that construction of fire station is needed
for health and safety reasons.
08-03-87---- Negative declaration certified.
08-03-87 --- Plans approved and authorization granted to advertise
for bids (Continued on second page)
09-23-86
11-17-86
07-06-87
Recommended motion:
1. That Change Order No. SIX to the contract with Martin Jaska,
Inc., for the construction of a Fire Station at Tri-City
._. Complex, in accordance with Plan No. 7270, be approved; auth-
~ orizing the Contractor to install 2 street light conduits (60
L.F. each) for an increase in contract price of $858.00, from
$833.687.00 to $834,545.00.
2. That the work performed by the Contractor be approved
accepted, and that final payment be authorized at the
tion of the lien period.
cc: Jim Robbins
Jim Richardson
Andy Green
Contact person:
Roqer G. Hardqrave
Phone:
5025
Supporting data attached:
Staff Rpt. & CCO No. Six
Ward:
1
FUNDING REQUIREMENTS:
Amount: $858.00 CCO *6; $83,454.50 Retention
Source: (Acct. No.)
251-644-53925
( Acct. Description I
Tri-City Fire Station
Finance: ~ fj rv--__.
-
___:ouncil Notes:
Ao"nrla Item No.
3
.-.
/.......
~
'-"
-
SYNOPSIS OF PREVIOUS COUNCIL ACTION continued:
11-19-87
Resolution No. 87-378 adopted awarding contract to
Martin Jaska, Inc. for the low bid price of
$869,000.00.
11-19-87 --- Change Order No. ONE approved, reducing the contract
price by $87,487.00, from $869,000.00 to $781,513.00.
01-04-88 --- Change Order No. Two approved, authorizing the Con-
tractor to install various items of work increasing
the contract price by $3,118.00, from $781,513.00 to
$784,631.00.
03-21-88 -- Change Order No. Three approved, authorizing the
Contractor to install seven solid block wall sections
increasing the contract price by $2,200.00 from
$784,631.00 to $786,831.00.
04-18-88 -- Change Order No. Four approved, authorizing the
Contractor to install aluminum jambs on the roll-up
doors of the apparatus room for an increase in contract
price of $1,859.00, from $786,832.00 to $788,690.00.
05-04-88 -- Change Order No. Five approved, authorizing the Con-
tractor to install a 5,000 gallon fuel tank, for an
'- increase in contract price of $44,997.00, from
$788,690.00 to $833,687.00.
12-21-88
-
CITY OF SAN BERNQlDINO - REQUEST ICR COUNCIL ACTION
STAFF REPORT
'-'
The plans prepared by the Architect called for the re-
location of an existing street light in front of the new Fire
Station. However, the existing street lighting system was the
older, direct burial street light conductor. The Contractor
agreed to install a new, City-furnished street light in lieu of
relocating the existing light, which would bring the
installation up to current standards. In order to provide
electrical service, the installation of two conduits was
required beneath the new driveway approach. The Contractor
performed this work on a time and material basis for a total
cost of $858.00. Contract Change Order No. Six will authorize
the Contractor to install these conduits, increasing the
contract price by $858.00, from $833,687.00 to $834,545.00.
The contract was awarded
$869,000.00. Change Order No's One
decrease in the price to $834,545.00.
price is $834,545.00.
for the low bid price of
through Six authorize a net
The final actual contract
We recommend that the work be approved and accepted, and
that final payment be authorized at the expiration of the lien
period.
.-
12-21-88
-
75-0264
-
'-'
project: FIRE STATION NO. 11 in Tri-City
Corporate Center
8
Date: 12-20-88
- Plan No.
File No. 2.119
-
7270
ENGINEERING DIVISION
DEPARTMENT OF PUBLIC WORKS
CITY OF SAN BERNARDINO. CALIFORNIA
CONTRACT CHANGE ORDER NO. ~
(Change necessitated because of field conditions)
TO: MARTIN J. JASKA, INC.
4761 ARROW HIGHWAY
MONTCLAIR, CA. 91763
Gentlemen:
You are hereby authorized and directed to install 2 ea. 2"
rigid steel conduits, 60 LF. each, beneath the driveway
approach, on a time and material basis, for the net cost
of $858.00.
-
Total extra work cost added to contract .............................$
858.00
Previous Contract Price .............................................$833,687.00
Amended Cost Price ..................................................$834,545.00
Additional time to complete contract due to change order ............ -0-
CONTRACTOR:
CITY OF SAN BERNARDINO:
-
By:
Title:
By:
ROGER G. HARDGRAVE
Director of Public Works/City Engr.
Accepted Date:
Approved Date: