CITY OF SAN BERN'CDINO - REQU~~! N!92~OUNCIL ACTION
:rom: ROGER G. HARDGRAVE
S b' . Approval of Contract Change Order
u Ject. No. 6 - Improvement of Tippecanoe
Avenue, .C. Street and Del Rosa
Drive, per Plan No. 9053 --
MATICH CORPORATION
,lept: Public Works/Engineering
late: 11-23-94
;ynopsis of Previous Council action:
10-04-93 -- Resolution No. 93-382 adopted authorizing the Mayor to
execute application to the Economic DevelopMent Agency
for a grant.
Plans approved and authorization granted to advertise
for bids.
Resolution No. 94-68 adopted authorizing execution of
approval and award of grant.
Resolution No. 94-107 adopted authorizing execution of
Second Amendment to Agreement with URS Consultants,
Inc., for provision of construction staking services.
(Continued on second page)
01-24-94
03-21-94
)I'l11JV
05-02-94
:"'F.I.'LCf
1\~V 9< '0\: 33
lecommended motion:
cc:
That Change Order No. 6 to the contract with Matich Corporation,
for the construction of Street Improvements on Tippecanoe Avenue,
"C" St. (Sheppard Blvd.) and Del Rosa Drive, in accordance with
Plan No. 9053, be approved: to authorize the Contractor to replace
the existing deteriorated water gate valves located throughout the
project area, at an increase in the contract price not to exceed
'6;;~~:::;;~:~::A'4'523'299"7 to '4~~~
Barbara Pachon Ignature
ontact person: Roqer G. Hardqrave
Phone:
~O?"
upporting data attached: Staff Report. CCO #6
Ward:
1
UNDING REQUIREMENTS:
Amount: $60,000
fFpneral EDA Grant & IVDA)
Source: (Acct. No.)
242-362-57291
(Acct. DescriPtion)
Stree't Improvements - Tippecanoe
Finance//~~
Avenue, "C" St. & Del Rosa Drive
::luncil Notes:
..0262
Agenda Item No /7
CiT~ OF SAN BERN~DINO - REQUEST FOe COUNCIL ACTION
STAFF REPORT
~
During the excavation for the installation of the new
backbone utilities, it was discovered that many of the existing
gate shutoff valves were in poor condition. When these valves
were exercised, they would ei ther leak or the valve stem would
break off entirely. The Contractor was asked to quote a price to
rehabilitate these valves. During the investigation, it was
determined that the parts necessary to repair the valves could
not be located. Additionally, many of the valves were in such
poor condition that they could not be repaired.
~
The Contractor was asked to provide a cost estimate for
the replacement of the existing valves. This quote was from
$920.00 for a 4-inch gate valve up to $1,388.00 for a 10-inch
gate valve. The Water Department wa contacted and has reviewed
the price quotes received from the Co tractor and stated that the
prices were fair and reasonable for t e amount of work to be per-
formed.
it
the
the
has
While the replacement of thes
is suggested that the Contractor
street paving operation taking
replacement of these valves at a
been paved and the replacement co
water valves is optional,
eplace the valves prior to
lace. This will eliminate
later date when the street
ts would be much higher.
The total project cost includ d an amount of $845,000.00
for contingencies, which can be used to finance the cost of this
additional work. Funds to finance t increase of $60,000.00 in
the contract price, from $4,523,299.8 to $4,583,299.87, will be
provided from the following sources:
Federal Economic Development dministration Grant -- 75%
Inland Valley Development Agency ------------------- 25%
No City funds will be used to finance the cost of this extra
work.
This work has been discussed with the project representative from
the Economic Development Administration, and has received concept
approval. A copy of Contract Change Order No. Six has been faxed
to this representative, and we are striving to secure a verbal
approval.
All costs will be charged to Account No. 242-362-57291
We recommend that Revised Contract Change Order No. Six
be approved.
11-23-94
_n~J::Jl
c
.:)
Public Works
File No. 1.291
SYNOPSIS OF PREVIOUS COUNCIL ACTION (Continued)
06-06-94 --
Resolution No. 94-130
Matich Corporation
$4,113,313 .
adopted awarding a contract to
for the low bid price of
08-15-94 -- Change Orders No. 1 &
moving 11 trees at a cost
water lines at a cost not
2 approved, to authorize
of $104,500 and relocating
to exceed $30,000.
09-06-94 -- Change Order
installation of
of $95,486.87.
No. 3 approved to authorize
ATS communication conduit at a cost
08-15-94 --
Change Orders No. IS 1 &
moving 11 trees at a
relocating water lines
$30,000.
2 approved, to authorize
cost of $104,500.00 and
at a cost not to exceed
09-06-94 -- Change Order
installation of
of $95,486.87.
No. 3 approved to authorize
ATS communication conduit at a cost
09-19-94 -- Change Orders Nos. 4 & 5 approved to authorize
relocation and repair of the existing street
lighting system at a cost not to exceed $25,000.00
and to modify the existing telephone vaults, at a
cost not to exceed $80,000.00.
10.-17-94 -- Change Order No. 2 (Revised)
re-location of additional
estimated cost of $75,000.00.
approved to authorize
water lines, at an
/""".
v
."'"'
.~
FEDERAL PROJECT NO. 07-49-02680
CONTRACT CHANGE
ORDER NO.
6
DATE:
11/22/94
Aqreement Date: 2/7/94
NAME OF PROJECT:
NORTON AIR FORCE BASE STREET IMPROVEMENTS
OWNER:
CITY OF SAN BERNARDINO
CONTRACTOR:
MATICH CORPORATION
The followinq chanqes are hereby made to the CONTRACT DOCUMENTS:
Replacement of the existinq water qate valves located
throuqhout the project area, the qate valves vary in sizes from 4
to 10 inches.
Justification:
While installinq the new utilities on Tippecanoe, "C" Street
and 6th Street, the existinq water qate valves were found to be in
poor condition. When the contractor tried to exercise the valves
by shuttinq them off and turninq them on aqain, the stem of the
valves would either brake off or the valve seats would start to
leak. The contractor was asked to provide a quote to repair the
valves, however, it was determined that the replacement parts were
not available, additionally, many of the valves were hiqhly
corroded and could not be serviced. Therefore, it was determined
that the best action was to replace the valves while there was easy
access to the valves.
This work would most probably have to be performed in the near
future anyway, and it is far more reasonable to replace these
defective valves at this time, further, if the valves are left in
place there is a potential problem with the water leaks and the
undermininq of the new street pavement.
Chanqe to CONTRACT PRICE:
Oriqinal CONTRACT PRICE:
$ 4.113.313.00
Current CONTRACT PRICE adjusted by previous CHANGE ORDER
$ 4.523.299.87
paqe 1
c
"-".
'-'
The CONTRACT PRICE due to this CHANGE ORDER will be increased by:
$ 60.000.00
The new CONTRACT PRICE includinq this CHANGE ORDER will be
$ 4.583.299.87
Chanqe to CONTRACT TIME:
The CONTRACT TIME will be increased by (to be determinedl calendar
days.
The date for completion of all work will be (revised date to be
determinedl.
Approvals Required:
To be effective, this Order must be approved by the Federal aqency
if it chanqes the scope or objective of the PROJECT, or as may
otherwise be required by the SUPPLEMENTAL GENERAL CONDITIONS.
Accepted by:
Katich Corporation
Date
Requested by:
Steven Enna, Construction Enqineer
Date
Reco_ended by:
William Bopf, Inland Val. Dev. Aqcy.
Date
Approved by:
Roqer G. Hardqrave
Director of Public Works/city Enqineer
Date
Economic Development Administration
Approved by:
Date
Page 2