Loading...
HomeMy WebLinkAbout17-Public Works . - CITY OF SAN BERN'CDINO - REQU~~! N!92~OUNCIL ACTION :rom: ROGER G. HARDGRAVE S b' . Approval of Contract Change Order u Ject. No. 6 - Improvement of Tippecanoe Avenue, .C. Street and Del Rosa Drive, per Plan No. 9053 -- MATICH CORPORATION ,lept: Public Works/Engineering late: 11-23-94 ;ynopsis of Previous Council action: 10-04-93 -- Resolution No. 93-382 adopted authorizing the Mayor to execute application to the Economic DevelopMent Agency for a grant. Plans approved and authorization granted to advertise for bids. Resolution No. 94-68 adopted authorizing execution of approval and award of grant. Resolution No. 94-107 adopted authorizing execution of Second Amendment to Agreement with URS Consultants, Inc., for provision of construction staking services. (Continued on second page) 01-24-94 03-21-94 )I'l11JV 05-02-94 :"'F.I.'LCf 1\~V 9< '0\: 33 lecommended motion: cc: That Change Order No. 6 to the contract with Matich Corporation, for the construction of Street Improvements on Tippecanoe Avenue, "C" St. (Sheppard Blvd.) and Del Rosa Drive, in accordance with Plan No. 9053, be approved: to authorize the Contractor to replace the existing deteriorated water gate valves located throughout the project area, at an increase in the contract price not to exceed '6;;~~:::;;~:~::A'4'523'299"7 to '4~~~ Barbara Pachon Ignature ontact person: Roqer G. Hardqrave Phone: ~O?" upporting data attached: Staff Report. CCO #6 Ward: 1 UNDING REQUIREMENTS: Amount: $60,000 fFpneral EDA Grant & IVDA) Source: (Acct. No.) 242-362-57291 (Acct. DescriPtion) Stree't Improvements - Tippecanoe Finance//~~ Avenue, "C" St. & Del Rosa Drive ::luncil Notes: ..0262 Agenda Item No /7 CiT~ OF SAN BERN~DINO - REQUEST FOe COUNCIL ACTION STAFF REPORT ~ During the excavation for the installation of the new backbone utilities, it was discovered that many of the existing gate shutoff valves were in poor condition. When these valves were exercised, they would ei ther leak or the valve stem would break off entirely. The Contractor was asked to quote a price to rehabilitate these valves. During the investigation, it was determined that the parts necessary to repair the valves could not be located. Additionally, many of the valves were in such poor condition that they could not be repaired. ~ The Contractor was asked to provide a cost estimate for the replacement of the existing valves. This quote was from $920.00 for a 4-inch gate valve up to $1,388.00 for a 10-inch gate valve. The Water Department wa contacted and has reviewed the price quotes received from the Co tractor and stated that the prices were fair and reasonable for t e amount of work to be per- formed. it the the has While the replacement of thes is suggested that the Contractor street paving operation taking replacement of these valves at a been paved and the replacement co water valves is optional, eplace the valves prior to lace. This will eliminate later date when the street ts would be much higher. The total project cost includ d an amount of $845,000.00 for contingencies, which can be used to finance the cost of this additional work. Funds to finance t increase of $60,000.00 in the contract price, from $4,523,299.8 to $4,583,299.87, will be provided from the following sources: Federal Economic Development dministration Grant -- 75% Inland Valley Development Agency ------------------- 25% No City funds will be used to finance the cost of this extra work. This work has been discussed with the project representative from the Economic Development Administration, and has received concept approval. A copy of Contract Change Order No. Six has been faxed to this representative, and we are striving to secure a verbal approval. All costs will be charged to Account No. 242-362-57291 We recommend that Revised Contract Change Order No. Six be approved. 11-23-94 _n~J::Jl c .:) Public Works File No. 1.291 SYNOPSIS OF PREVIOUS COUNCIL ACTION (Continued) 06-06-94 -- Resolution No. 94-130 Matich Corporation $4,113,313 . adopted awarding a contract to for the low bid price of 08-15-94 -- Change Orders No. 1 & moving 11 trees at a cost water lines at a cost not 2 approved, to authorize of $104,500 and relocating to exceed $30,000. 09-06-94 -- Change Order installation of of $95,486.87. No. 3 approved to authorize ATS communication conduit at a cost 08-15-94 -- Change Orders No. IS 1 & moving 11 trees at a relocating water lines $30,000. 2 approved, to authorize cost of $104,500.00 and at a cost not to exceed 09-06-94 -- Change Order installation of of $95,486.87. No. 3 approved to authorize ATS communication conduit at a cost 09-19-94 -- Change Orders Nos. 4 & 5 approved to authorize relocation and repair of the existing street lighting system at a cost not to exceed $25,000.00 and to modify the existing telephone vaults, at a cost not to exceed $80,000.00. 10.-17-94 -- Change Order No. 2 (Revised) re-location of additional estimated cost of $75,000.00. approved to authorize water lines, at an /""". v ."'"' .~ FEDERAL PROJECT NO. 07-49-02680 CONTRACT CHANGE ORDER NO. 6 DATE: 11/22/94 Aqreement Date: 2/7/94 NAME OF PROJECT: NORTON AIR FORCE BASE STREET IMPROVEMENTS OWNER: CITY OF SAN BERNARDINO CONTRACTOR: MATICH CORPORATION The followinq chanqes are hereby made to the CONTRACT DOCUMENTS: Replacement of the existinq water qate valves located throuqhout the project area, the qate valves vary in sizes from 4 to 10 inches. Justification: While installinq the new utilities on Tippecanoe, "C" Street and 6th Street, the existinq water qate valves were found to be in poor condition. When the contractor tried to exercise the valves by shuttinq them off and turninq them on aqain, the stem of the valves would either brake off or the valve seats would start to leak. The contractor was asked to provide a quote to repair the valves, however, it was determined that the replacement parts were not available, additionally, many of the valves were hiqhly corroded and could not be serviced. Therefore, it was determined that the best action was to replace the valves while there was easy access to the valves. This work would most probably have to be performed in the near future anyway, and it is far more reasonable to replace these defective valves at this time, further, if the valves are left in place there is a potential problem with the water leaks and the undermininq of the new street pavement. Chanqe to CONTRACT PRICE: Oriqinal CONTRACT PRICE: $ 4.113.313.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDER $ 4.523.299.87 paqe 1 c "-". '-' The CONTRACT PRICE due to this CHANGE ORDER will be increased by: $ 60.000.00 The new CONTRACT PRICE includinq this CHANGE ORDER will be $ 4.583.299.87 Chanqe to CONTRACT TIME: The CONTRACT TIME will be increased by (to be determinedl calendar days. The date for completion of all work will be (revised date to be determinedl. Approvals Required: To be effective, this Order must be approved by the Federal aqency if it chanqes the scope or objective of the PROJECT, or as may otherwise be required by the SUPPLEMENTAL GENERAL CONDITIONS. Accepted by: Katich Corporation Date Requested by: Steven Enna, Construction Enqineer Date Reco_ended by: William Bopf, Inland Val. Dev. Aqcy. Date Approved by: Roqer G. Hardqrave Director of Public Works/city Enqineer Date Economic Development Administration Approved by: Date Page 2