HomeMy WebLinkAbout22-Public Works
'CITY' OF SAN BERtQRDINO - REQU~~! N~~ 1~~7UNCIL ACTION
Report of Bids - Replacement of
From: ROGER G. HARDGRAVE Subject: Sewer Line in -D- Street, from 7th
to 9th Street, per Plan No. 8587
De~: Public Works/Engineering --- INSITUFORM SOUTHWEST
Date: 12-17-91
Synopsis of Previous Council action:
June, 1991 - Sewer Line Construction Fund Budget for 1991/92 approved.
09-16-91 Approval of transfer of $78,000 from Sewer Line
Construction Fund, "Installation of Sewer in Cajon,"
to "D Street Sewer Replacement, from 7th to 9th St."
10-21-91 Approval of plans and authorization to advertise for
Recommended motion:
Option No. One -- 1. That the transfer of $27,0<:0, from Acct. No.
245-365-57704, "City's share of Sewer Extensions," to Acct. No.
245-365-57886, "Replacement of Sewer Main -'D' St." be approved.
2. Adopt resolution. OR
Option No. Two --That the bid for-replacement of the sewer line in
"D" Street, from 7th St. to 9th St., in accordance with Plan No.
8587, be rejected, and the Dir. of P W/City Engr. be authorized to
re-advertise for alternate bids to replace or reline the sewer line.
OR
Option No. Three - That the bid for replacement of the sewer line in
"D" Street, from 7th St. to 9th St., in accordance ,~ith Plan No.
8587, be rejected, and the Dir. of P W/City Engr. authorized to re-
advertise for bids to remove the protruding laterals and materials
from laterals.
cc: Shauna Clark
Andy Green
Manuel Moreno
Jim Penman
Contact person: Roger G. Hardgrave Phone: 5025
Staff Report, Report of
Supporting data attached: Bids, Resolution Ward: 1
Option No. One
FUNDING REQUIREMENTS: Amount: $105.000 lSipwpr Line Construction Fund)
Source: (Acct. No.) 245-365-57886
in "D" St.. from 7th to 9th St.
Finance:
I
,
Acct. Descri lacement of
Council Notes:
dnClonrb ltpm Nn
.~ ,..,L
CITY OF SAN BERl;ARDINO - REQUEST O>R COUNCIL ACTION
STAFF REPORT
Page 1 of 2
Bids for the replacement of the sewer line in "0" Street,
from 7th Street to 9th Street, were opened at 2:00 p.m., Tuesday,
12-10-91.
Only one bid was received, in the amount of $75,365.60.
The bid of $75,365.60 is 44.9% over the Engineer's Estimate of
$52,000.00.
Below is an estimate of the total project cost, based upon
the actual low bid price.
Construction Contract
Engineering & Inspection (W.O. #1941)
Sub-Total
Contingencies (15%)!
TOTAL ESTIMATED PROJECT COST
$ 75,365.50
16,000.00
$ 91,365.50
13,634.50
$ 105,000.00
An amount of $78,000 has been allocated, under Account No.
245-365-57886, to finance the costs incurred for this project.
The plans and specifications were prepared to direct the
Contractor to install a liner in the existing pipe, by one of the
5 methods allowed in our standard specifications. This method
was selected in order to achieve a lower cost and minimize dis-
ruption to traffic. The project was discussed with the bidder
and another contractor. However, the bidder I s price was much
higher than indicated and the other contractor didn 't submit a
bid due to having just been awarded two large contracts.
Two video tapes have been made of this sewer line, one
about a year ago by a contractor and the other recently by City
Forces. Both tapes show some protruding laterals, a rag stuck in
a lateral just north of 8th Street (east side), but in general
the pipe is in surprisingly good shape.
There are 3 basic options open to the City. These options
are:
Option No.1 -- Allocate supplemental funds in the amount of
$27,000, and award a contract to the sole bidder.
Option No.
Works/City
placing or
$78,000.
2 -- Reject the bid and direct the Director of Public
Engineer to re-advertise for alternate bids for re-
relining the sewer line - Estimated Total Cost -
Option No.3 -- Reject the bid and direct the Director of Public
Works/City Engineer to advertise for bids for removing the pro-
truding laterals and rag (in the lateral north of 8th Street) -
Estimated Total Cost - $15,000.
12-17-91
75.0264
CITY OF SAN BERCARDINO - REQUEST Q)R COUNCIL ACTION
STAFF REPORT
Page 2 of 2
We feel that the sole bid received is not competitive and,
therefore, are unable to recommend Option No. 1. Readvertising
for alternate bids, Option No.2, is expected to result in a
lower bid price. Option No. 3 is a minimum cost alternative that
would address the immediate problem of backups.
12-17-91
75-0264
o
z
is
a:
e
z
a:
III
III
Z
e
III
II.
o
~
U
~-"f
ft.
5!\b
~
~ ~~lo
::l -6:1II
o ti -
U~L!:(
~!C~ib
~a:~.
~.......ilJ
o !!! c:i.-9l
u!... Z
Q2a: 0
ZOO -
eeL ...
III 0..
a::~a: ii:
0_.. U
>ul:; II)
:$ulIJ LIJ
""~-. Q
uOal Q
Oa::::l -
~"-II) aI
!;(
Q
Cl
~
Z
1IJ
0..
o
Q
aI
r
~~
~
19
Iii "l P
_lSI
P ~
f-- ~
" 1::1
0
iii c;
II. ~
0
... l.S
z
;:)
0
2
e
:
!
Q
Z '>
0
aI
~
51 ~
- ~ ~
>
aI
Q
au
\. a::
~
ro LIJ
lE ~~~ a::
0..
;
a: ~'
III 181
a: Q ~ "
1IJ Q r;:>
aI ai ~f- fBl
~ "- -
::l ~ ~
Z 0
Z 1IJ
~
~ ~~ !;(
a: ~
0 tf I i=
""""""- , II)
Z LIJ
0 t- Cl
~ . Z
U t:S a::
ii: I~ LIJ
LIJ
(3 I .... N ~I Z
au I ... on ID ... <Xl en C> .... N ~ ... on Cl
fut .... .... .... .... .... ....
Z
I I , , LIJ
19
\J
~
:J-
1 c
...-=
Z
::l
o
~
e
Q
ai
~
...J
...
Z
1IJ
a::
~
0..
<
I
:>
aI
Q
LIJ
Q
a:
0 Cl
U Z
1IJ ~
a::
II) "
"
Q a:
ai :>
...
c
0
a:
z
"'
C
..J
0
Cl
..
Z
"'
:I
..
a:
C(
...
"'
c
"
z
iL
"'
..J
ii:
c
iD
>
a:
C(
z
C(
"
:> z
aI 0
Q -=
C(
LIJ a:
U ..
Z <II
::l i
0 ~
Z
Z C(
<
"'
Q ..
Z i
<
Q
1IJ Z
Z 0
1IJ -=
0.. :>
0 III
II) i<
Q ..
<II
co a
::!E
<
Z
~
a::
ii:
Di
aI
U
Z
LIJ
Z
::l
,
i
d
Z
...
Z
::l
o
(,)
(,)
<
o
o
1
RESOLUTION NO.
2 RESOLUTION OF THE CITY OF SAN BERNARDINO AWARDING A
CONTRACT TO INSITUFORM SOUTHWEST FOR SEWER PIPELINE
3 REHABILITATION IN "D" STREET, FROM SEVENTH STREET TO NINTH
STREET.
4
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE
5 CITY OF SAN BERNARDINO AS FOLLOWS:
6
7
SECTION 1.
lowest
Insituform
Southwest
is
the
responsible bidder
for: Sewer Pipeline Rehabilitation
in tin"
8 Street, from Seventh Street to Ninth Street, per Plan No. 8587.
9 A contract is awarded accordingly to said bidder for the total
10 amount of $75,365.60, but such award shall be effective only upon
11 the contract being fully executed by the parties. All other
12 bids, therefore, are hereby rejected. The Mayor is hereby
13 authorized and directed to execute said contract on behalf of the
14 City; a copy of the contract is on file in the office of the City
15 Clerk and incorporated herein by reference as fully as though set
16 forth at length.
17 SECTION 2. This contract and any amendment or modi fica-
18 tions thereto shall not take effect or become operative until
19 fully signed and executed by the parties and no party shall be
20 obligated hereunder until the time of such full execution. No
21 oral agreements, amendments, modifications or waivers are
22 intended or authorized and shall not be implied from any act or
23 course of conduct of any party.
24
SECTION 3. This resolution is rescinded if the parties
25 to the contract fail to execute it within sixty (60) days of the
26 passage of this resolution.
27 / / / /
28 / / / /
12-17-91
-
RESO:
AWARDING CONTRACT TO
PIP~E REHABILITATION
NIN'l\o.J.3TREET.
INSITUFORM SOUTHWEST
IN "DOTREET, FROM
FOR SEWER
SEVENTH TO
1
I HEREBY CERTIFY that the foregoing resolution was duly
2 adopted by the Mayor and Common Council of the City of San
3 Bernardino at a
meeting thereof, held on the
4
day of
, 1991, by the following vote, to-wit:
5 Council Members:
AYES
NAYS
ABSTAIN
ABSENT
6 ESTRADA
7 REILLY
8 HERNANDEZ
9 MAUDSLEY
10 MINOR
11 POPE-LUDLAM
12 MILLER
13
14
15
16
17
18
19
20
21
22
Rachel Krasney, City Clerk
The foregoing resolution is hereby approved this
day of
, 1991.
W. R. Holcomb, Mayor
City of San Bernardino
Approved as to form
and legal content:
James F. Penman
City Attorney
"\
,
23 By. 4-"'~'
24 {/
25
26
27
28
~
-;
/
J c- '_, _',___
- 2 -
0
z -.
Ci
.
e
z
15
..
z
~
II.
0
= ~
a 0
"
z
Z
LIJ
l1.
0
0
iii
ClI-'f
I,
S!\b
~
...J '"
t.l !:)!J
z ....~
:;:) -~
0.1;;
t.lOLU
z...2
oeo
~I!!~'
~III'"
0-
t.ll!.... Z
02. 0
Z CI it -l-
Ce-
'" l1.
11:=. it:
o_~ t.l
>ut.l Ul
~ '.LIJ LIJ
..~.., 0
..0= 0
011::;:) -
'-Io.Ul =
.
""
h.
..
r
iil ci I~I 0
;s - 1.9
~ ~
" ~
G
CI ~
ii
II.
CI
.... I
Z
::l I :@
CI
2
e
iii
i ~
I-
Z
0 LIJ
II:
Z '> ~
0
= l1.
C
-S;
51 ~
- ~ 1
iii
0
LIJ
\. II:
~
G:) LIJ
Ul II:
a::l - l1.
II: 'JQI
LIJ H ISlI
II: 0 ;
LIJ ~ I"] -
=
~ ~ ]1 - ~"
:;:)
z ~
z
:s ill
l1. ~
II: ~
0 I ~
, Ul
Z LIJ
0 ] -t- "
~ Z
t.l ;-j II:
~ LIJ
~I LIJ
t.l , ... N ~ It> '" ... ~
LIJ , ... '" CI ... N ~ ~ It> "
~l ... ... ... ... ... ...
Z
I I , LIJ
...
I
>-
=
0
LIJ
0
II:
~ 0 <:I
C t.l z
LIJ ~
Z II:
~ Ul :z:
u
II: 0 II:
~ iii ::l
...
Q
Q
II:
Z
..
Q
...
Q
<:I
..
Z
..
:I
..
II:
C
...
..
Q
"
z
i:
..
...
ci ii:
= Q
t.l iii
Z
LIJ >-
Z II:
:;:) C
z
! c
i u
i >- z
I = 0
;:
I 0 C
LIJ II:
t.l ..
Z ..
:;:) z
0 ~
z
z c
c ..
0 ..
z i
c
ci 0
Z LIJ Z
Z Q
I- LIJ ;:
Z l1. i
:;:) 0
0 Ul i
t.l 0 ..
<.J ..
C co is