HomeMy WebLinkAboutR05-Economic Development Agency '"'""' u ----, --.J c DEVELOPMENT DEPARTMENT OF THE CITY OF SAN BERNARDINO REQUEST FOR COMMISSION/COUNCIL ACTION From: Roger G. Hardgrave, Dir. Subject: of Public Works/City Engr. Date: 5-03-93 Approval of Contract Change Order No. 3 - Rehabilitation of perris Hill SWimming Pool , Bathhouse, per Plan No. 8843 CALIFORNIA POOLS, INC. Synopsis of Previous Commission/Council/Committee Action: 06-18-92 - Resolution No. 92-218 adopted authorizing execution of an Agreement with Kenneth R. King for professional en- gineering design services. 11-16-92 - Plans approved and authorization granted to advertise for bids. 03-08-93 - Resolution No. 93-60 adopted awarding a contract for low bid price of $928,600. Recommended Motion: c That Change Order No. 3 to the contract with California Pools, for Rehabilitation of Perris Hill Swimming Pool & Bathhouse; in accordance with Plan No. 8843, be approved; to authorize Contrac- tor to provide a new electrical main panel and switchgear, at an estimated increase in the contract price of $ 0.00; from $1,037,378.00 to $1,062,378.00. Roger G. intlaus, Agency Administrator cc: K. Henderson Timothy ----------------------------------------------------------------- Contact Person: Roqer G. Hardgrave Phone: 5025 Project Area: None Ward (s) : Staff Report, CCO #3 2 Supporting Data Attached: Special Grant Source: from HUD FUNDING REQUIREMENTS: Amount: $ 25,000.00 Budget Authority: Acct. No. 100-80407 ----------------------------------------------------------------- Commission/Council Notes: c Agenda Item No.: .:5 c c c o ~ -....J DEPARTMENT OF PUBLIC WORKS STAFF REPORT Approval of Contract Chanqe Order No. 3 Rehabilitation of perris Hill Swimminq Pool and Bathhouse During the remodeling of the Perris Hill Swim Center, the existing electrical switchgear had to be shut down to enable the demolition of the existing structure. The Electrical Contractor raised a question about the safety and condition of the existing electrical main switchgear. A meeting was held at the job site with the Electrical Engineer, Southern California Edison and a high voltage electrician. It was their opinion that the existing switchgear, which is over 50 years old, could present a safety hazard, and should be replaced. It was pointed out that the old oil base switches can explode when actuated, if there is any moisture present in the canisters. Southern California Edison will replace the existing transformer, in order to provide proper voltage to the new switchgear. This will be done at their cost, except for the new cables which will be billed to the City. The estimated cost of $1,000 for new cables is included in the total estimated cost of $25,000. The total estimated project cost included an amount of $58,550 for contingencies, under Account No. 100-80407, which will be used to finance the cost for this extra work. We recommend that Change Order No. 3 be approved. 5-03-93 5 c c c o ,-, -.....J CITY OP SAB BBRBARDIBO DBPARTMBBT OP PUBLIC WORKS BBGIBBBRIBG DIVISIOB project: SWIM CENTER AT PERRIS HILL PARK Pile Bo.: 6.14-2-4 Plan Bo.: 8843 Date: 4/23/93 COBTRACT CDlfGB ORDBR 110. TBRBB TO: CALIFORNIA POOLS AND SPAS 623 W. Foothill Boulevard Glendora, CA 91740 Gentlemen: You are hereby authorized and directed to perform the following work: 1) Disconnect and replace the existing switchgear and main electrical panel, and install all additional conduit and wiring, as indicated on the revised plans and directed by the Resident Engineer, at an estimated cost of $25,000.00. Total Extra Work Cost added fro. Contract .......$ 25.000.00 Previous Contract Price .......................... 1.037.378.00 Amended Cost Price ............................... 1.062.378.00 Addi tional time to complete Contract due to Cbanqe Order To Be Determined COBTRACTOR CITY OP SAM BBRBARDIBO Accepted By: Reco_ended By: Title: ROGBR G. BARDGRAVB DATB Director of Public Works/City Bnqr Date: c:::