HomeMy WebLinkAbout17-Development Services ORIGINAL CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION From: Valerie C. Ross, Director Subject: Resolution approving Agreement for Professional Design Services with Hall & Dept: Development Services Foreman, Inc. for realignment of an existing 1-215 Freeway Frontage Road northwesterly Date: January 16, 2008 of Little League Drive and extending 0.73 mile northwesterly from its existing terminus to Dement Street(SS07-29). MCC Date: January 22, 2008 Synopsis of Previous Council Action: 01/08/07 Director of Finance authorized to amend the FY 2006-2007 budget to appropriate a total of $300,000 for project SS07-29 with $250,000 to be a reimbursement from EDA and $50,000 to be transferred from SS-C (129-367-5504-7156). 08/20/07 Adopted FY 2007-2008 Capital Improvement Program(CIP). Recommended Motion: 1. Authorize the Director of Finance to amend the FY 2007-2008 budget by deleting project SS07-29 from the '/2-cent Sales and Road Tax Fund in the amount of$497,700 (Account Number 129-367-5504-7732) and budget project SS07-29 in the Street Construction Fund in the amount of$297,700 with funding for the project being transferred from the EDA Loan Debt Service Fund(Fund 308). 2. Adopt Resolution. Valerie C. Ross Contact Person: Robert Eisenbeisz,Acting City Engineer Phone: 5019 Supporting data attached: Staff Report, Map, Reso, Exhibit"A" (Agreement), Exhibit"B"RFP Ward: 5 FUNDING REQUIREMENTS: Amount: $297,700 Source: (Acct.Nos) EDA Loan Debt Service Fund 308 Acct.Description: Construct New Road between Little League Drive and Devore Road(SS07-29) Finance: Council Notes: � Agenda Item No. CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT Subject: Resolution approving Agreement for Professional Design Services with Hall & Foreman, Inc. for realignment of an existing 1-215 Freeway Frontage Road northwesterly of Little League Drive and extending 0.73 mile northwesterly from its existing terminus to Dement Street in Devore (SS07- 29). Background: On August 20, 2007, the Mayor and Common Council approved the FY 2007/08 Capital Improvement Program (CIP) allocating a total amount of $497,700 for this project from a combination of%2-cent sales tax (Measure I) fund and developer contribution through EDA for the design of a new road between Little League Drive and Devore Road(SS07-29). Since the early 1980's the Verdemont area has experienced heavy growth southeasterly of Little League Drive. Development in the area northwest of Little League Drive has been hampered by lack of adequate access. The Development Code requires that all subdivision development in the City provide two standard means of access. Each means of access, at a minimum, is required to be paved and dedicated and designed to provide two traffic lanes, one in each direction. Century Crowell Communities is proposing a residential subdivision northwesterly of Little League Drive along the I-215 Frontage Road. The Frontage Road was built by the State in the 1950's as part of the I-215 Freeway. The geometric design of the road is not adequate to support additional traffic and it dead-ends 1.28 miles northwest of Little League Drive. In order for Century Crowell Communities to develop its subdivision, the Frontage Road must be realigned and extended approximately 0.73 miles to Dement Street near Devore Road. In meetings between City staff, EDA staff and the developer, it was agreed that the City would assume responsibility for design of the extension of the road. On February 26, 2007, the City issued a request for proposals (RFP) to provide professional design services for the project. Copies of the RFP were sent to 15 consultants including firms located in the City Limits of San Bernardino who have indicated interest in performing work for the City. Three proposals were received, but none were from local firms. In general, the work required by the RFP consists of designing the realignment and extension of the I-215 Frontage Road between Little League Drive and Dement Street, including preliminary environmental review and acquisition of right-of-way. The scope of services for this work is further described in further detail in the attached copy of the RFP. The proposals were reviewed (Phase I) and the consultants interviewed (Phase II) in accordance with the consultant selection process approved by the Mayor and Common Council on September 2, 2003. The Phase I rating system included such factors as past experience with similar types of projects, adequacy and experience of staff, completeness of proposal, past experience working with the consultant and understanding the requirements of the project. Based on review of proposals and interviews with the three consultants, the staff reviewers/evaluators selected the 2 01/16/2008 3:36 PM CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT—Continued team of Hall & Foreman, Inc. based on their qualifications and staff's previous experience with the firm, completeness of the proposal, understanding of the project, and other criteria. The reviewers/evaluators feel that the proposal submitted by Hall & Foreman, Inc. best meets the needs of the City and recommends award of a design contract to Hall & Foreman, Inc. Proposed fees for services were as follows: Company Per Proposal Potholing Cost TY Lin International $759,062 $800 per hole. Hall & Foreman, Inc. $281,805 $863 per hole. AEI-CASC $777,737 Not stated se aratel Hall & Foreman, Inc. has extensive experience in local land development. The firm is currently under contract to the City to provide on-call plan review services and has performed satisfactorily under terms of that contract. The proposal submitted by Hall & Foreman, Inc. offers the lowest proposed consultant fee and was determined to be clearly superior by the rating panel based on a consideration of all the rating factors and it offers the lowest proposed consultant fee. Hall & Foreman, Inc. estimates that the design services under terms of the Agreement can be completed within 6 months. However, other constraints related to environmental review, right-of- way acquisition, and resource agency review (Corps of Engineers, County Flood Control, State Department of Fish and Game, Water Quality Control Board, etc.) will likely extend the project to late-2008. The estimated total cost of this Agreement is as follows: Fixed Fee $281,805.00 Potholing(approximately 10 holes $8,630.00 Subtotal for Consultant Agreement only $290,435.00 Estimated Staff Cost $7,265.00 Estimated Total Project Cost $297,700.00 Financial Impact: The funding source will consist of banked funds for payback of an EDA loan for Verdemont Infrastructure. EDA is processing a companion item to forgo payback of the loan in order to facilitate development of the area. Approximately $247,700 in Measure I funds are currently allocated to this project. Those funds will no longer be needed and can be reallocated to other projects in the upcoming fiscal year. 3 01/17/2008 9:14 AM CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT—Continued Recommendation: 1. Authorize the Director of Finance to amend the FY 2007-2008 budget by deleting project SS07-29 from the %2-cent Sales and Road Tax Fund in the amount of $497,700 (Account Number 129-367-5504-7732) and budget project SS07-29 in the Street Construction Fund in the amount of $297,700 with funding for the project being transferred from the EDA Loan Debt Service Fund (Fund 308). 2. Adopt Resolution. 4 01/16/2008 3:39 PM I II OF----=;31208ft Sant*re st Caw a y '46,0 m ,fit •�. v` Al Guhin Garb 0 2007 MADQuest,Inc 7 NAVTEQ LOCATION MAP I-215 FRONTAGE ROAD BETWEEN LITTLE LEAGUE DRIVE AND DEMENT STREET i COPY 1 RESOLUTION NO. 2 RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING AN 3 AGREEMENT FOR PROFESSIONAL DESIGN SERVICES WITH HALL & FOREMAN, INC. FOR REALIGNMENT OF AN EXISTING I-215 FREEWAY 4 FRONTAGE ROAD GENERALLY BETWEEN LITTLE LEAGUE DRIVE AND DEMENT STREET, INCLUDING PRELIMINARY ENVIRONMENTAL REVIEW AND 5 ACQUISITION OF RIGHT-OF-WAY, WHICH MAY INCLUDE DECERTIFICATION 6 OF EXISTING OPERATING STATE R/W(SS07-29). 7 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: 8 SECTION 1. Hall & Foreman, Inc., 9130 Anaheim Place, Suite 120, Rancho, 9 Cucamonga, CA 91730, is competent, experienced and has provided the most advantageous and 10 11 best proposal to provide civil engineering design services for the realignment of an existing I-215 12 Freeway Frontage Road northwesterly of Little League Drive and extension 0.73 mile 13 northwesterly from its existing terminus to Dement Street (SS07-29), including environmental 14 approval and acquisition of right-of-way, which may include decertification of existing operating 15 State R/W, pursuant to the Agreement for Services, attached hereto and incorporated herein as 16 Exhibit "A", for the not-to-exceed amount of$281,805.00 plus $863.00 per hole for potholing, 17 18 based on the Proposal dated March 26, 2007, Attachments "1", "2", and "3" to Exhibit "A" and 19 incorporated herein, and the Request for Proposal (RFP), attached hereto and incorporated herein 20 as Exhibit "B." Pursuant to this determination, the Purchasing Manager is hereby authorized and 21 directed to issue Purchase Orders for said services to said firm which references this Resolution. 22 SECTION 2. The City Manager is hereby authorized and directed to execute said 23 Agreement on behalf of the City. 24 25 SECTION 3. The authorization to execute the above referenced Agreement is rescinded 26 if it is not executed within sixty(60) days of the passage of this resolution. 27 in 28 - 1 - 1 RESOLUTION . . . APPROVING AN AGREEMENT FOR PROFESSIONAL 2 DESIGN SERVICES WITH HALL & FOREMAN, INC. FOR REALIGNMENT OF AN EXISTING I-215 FREEWAY FRONTAGE ROAD GENERALLY BETWEEN LITTLE 3 LEAGUE DRIVE AND DEMENT STREET, INCLUDING PRELIMINARY ENVIRONMENTAL REVIEW AND ACQUISITION OF RIGHT-OF-WAY, WHICH 4 MAY INCLUDE DECERTIFICATION OF EXISTING OPERATING STATE R/W (SS07- 5 29). 6 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and 7 Common Council of the City of San Bernardino at a meeting thereof, held 8 on the day of , 2008, by the following vote, to wit: 9 Council Members: AYES NAYS ABSTAIN ABSENT 10 ESTRADA 11 BAXTER 12 13 BRINKER 14 DERRY 15 KELLEY 16 JOHNSON 17 MC CAMMACK 18 19 20 Rachel Clark, City Clerk - 21 The foregoing resolution is hereby approved this day of 52008. 22 23 Patrick J. Morris, Mayor 24 City of San Bernardino Approved as to form: 25 JAMES F. PENMAN, 26 City Attorney 27 By. 28 - 2 - EXHIBIT "Afy AGREEMENT FOR SERVICES FOR THE REALIGNMENT OF AN EXISTING I-215 FREEWAY FRONTAGE ROAD AND EXTENSION NORTHWESTERLY 0.73 MILES FROM ITS EXISTING TERMINUS TO DEMENT STREET, INCLUDING PRELIMINARY ENVIRONMENTAL REVIEW AND ACQUISITION OF RIGHT-OF-WAY, WHICH MAY INCLUDE DECERTIFICATION OF EXISTING OPERATING STATE R/W (SS07-29). THIS AGREEMENT is made and entered into this day of , 2008 ("Effective Date"), by and between the CITY OF SAN BERNARDINO, a charter city ("City"), and Hall&Foreman, Inc. ("Consultant"). WITNESSETH : A. WHEREAS, City proposes to have Consultant provide Professional Civil Engineering Design Services for the Realignment and Extension of an Existing 1-215 Freeway Frontage Road from Little League Drive to Dement Street described herein below; and B. WHEREAS, Consultant represents that it has that degree of specialized expertise contemplated within California Government Code, Section 37103, and holds all necessary licenses to practice and perform the services herein contemplated; and C. WHEREAS, City and Consultant desire to contract for specific services in connection with the project described below (the "Project") and desire to set forth their rights, duties and liabilities in connection with the services to be performed; and D. WHEREAS, no official or employee of City has a financial interest, within the provisions of California Government Code, Sections 1090-1092, in the subject matter of this Agreement. NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows: 1.0. SERVICES PROVIDED BY CONSULTANT 1.1. Scope of Services. Contractor shall provide Professional Civil Engineering Design Services for the realignment of an existing 1-215 Freeway Frontage Road northwesterly of Little League Drive and extension 0.73 mile northwesterly from its existing terminus to Dement Street (SS07-29). The project includes environmental approval and acquisition of right-of-way, which may include decertification of existing operating State R/W, in accordance with the City's standards and Consultant's proposal dated March 26, 2007, attached hereto and incorporated herein as Attachment"I". 1.2. Professional Practices. All professional services to be provided by Consultant pursuant to this Agreement shall be provided by personnel experienced in their respective fields and in a manner consistent with the standards of care, diligence and \\Sierra\DS\_Public Works\RFCA's\2008 A]1\01-22-08\Extension of I-215 Frontage Road-Award of Agreement to HFI\Standard Agreement Extension of I-215 Frontage Road 10-15-07.doc 1 EXHIBIT "P." skill ordinarily exercised by professional consultants in similar fields and circumstances in accordance with sound professional practices. Consultant also warrants that it is familiar with all laws that may affect its performance of this Agreement and shall advise City of any changes in any laws that may affect Consultant's performance of this Agreement. 1.3. Warranty. Consultant warrants that it shall perform the services required- by this Agreement in compliance with all applicable Federal and California employment laws including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers' compensation insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys' fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant's performance under this Agreement. 1.4. Non-discrimination. In performing this Agreement, Consultant shall not engage in, nor permit its agents to engage in, discrimination in employment of persons because of their race, religion, color, national origin, ancestry, age, physical handicap, medical condition, marital status, sexual gender or sexual orientation, or any other category protected by law, except as permitted pursuant to Section 12940 of the Government Code. Violation of this provision may result in the imposition of penalties referred to in Labor Code, Section 1735. 1.5 Non-Exclusive Agreement. Consultant acknowledges that City may enter into agreements with other consultants for services similar to the services that are subject to this Agreement or may have its own employees perform services similar to those services contemplated by this Agreement. 1.6. Delegation and Assignment. This is a personal service contract, and the duties set forth herein shall not be delegated or assigned to any person or entity without the prior written consent of City. 1.7. Business License: The Consultant shall obtain and maintain a valid City Business Registration Certificate during the term of this Agreement. 1.8. Duty of Loyalty/Conflict of Interest: The Consultant understands and agrees that as the City's consultant, Consultant shall maintain a fiduciary duty and a duty of loyalty to the City in performing Consultant's obligations under this Agreement. Consultant, in performing its obligations under this Agreement, is governed by California's conflict of interest laws, Government Code Section 87100 et seq., and Title 2, California Code of Regulations Section 18700 et seq. S:\_,Public Works\IZFCA's\2005 All\01-22-OS\Extension of 1-214 Frontage Road-Award of Agreement to HF1\Standard Agreement Extension of 1-215 Frontage.Road 10-15-0;.dix 2 EXUAH&IT "A" 2.0. COMPENSATION AND BILLING 2.1. Compensation. Over the term of this Agreement, Contractor shall be compensated for such services for the fixed amount of $281,805.00 plus $863.00 per hole for potholing as indicated in Attachment "2" attached and made a part hereof. 2.2. Additional Services. Consultant shall not receive compensation for any services provided outside the scope of services specified in this Agreement unless the City, prior to Consultant performing the additional services, approves such additional services in writing. It is specifically understood that oral requests and/or approvals of such additional services or additional compensation shall be barred and are unenforceable. 2.3. Method of Billing. Consultant may submit invoices to the City Engineer for approval on a progress basis, but no more often than monthly. Said invoice shall be based on the total of all of Consultant's services, which have been completed to City's sole satisfaction. City shall pay Consultant's invoice within forty-five (45) days from the date City receives said invoice. Each invoice shall describe in detail, the services performed and the associated time for completion. Any additional services approved and performed pursuant to this Agreement shall be designated as "Additional Services" and shall identify the number of the authorized change order, where applicable, on all invoices. '�wr✓ 2.4. Records and Audits. Records of Consultant's services relating to this Agreement shall be maintained in accordance with generally recognized accounting principles and shall be made available to City or its City Engineer for inspection and/or audit at mutually convenient times for a period of three (3) years from the Effective Date. 3.0. TIME OF PERFORMANCE 3.1. Commencement and Completion of Work. The professional services to be performed pursuant to this Agreement shall commence within five (5) days from the Effective Date of this Agreement. Said services shall be substantially completed within six (6) months unless otherwise approved by the City Engineer. Failure to commence work in a timely manner and/or diligently pursue work to completion may be grounds for termination of this Agreement. It is recognized that some services, such as right-of-way acquisition and decertification of existing operating State R/W, may take longer. Such services shall be pursued to completion. 3.2. Excusable Delays. Neither party shall be responsible for delays or lack of performance resulting from acts beyond the reasonable control of the party or parties. Such acts shall include, but not be limited to, acts of God, fire, strikes, material shortages, compliance with laws or regulations, riots, acts of war, or any other conditions beyond the reasonable control of a party. S:\-Public:Works\RFC_'\'s\2008.''1I1\01-22-08\Extensitni of I-215 Frontage Road-Award of Agreement its HIT,Standard Agreement Extension of 1-215 Frontage.Road 10-15-07.dcn 3 EXHIBIT "A" 4.0. TERM AND TERMINATION 4.1. Term. This Agreement shall commence on the Effective Date and continue until satisfactory completion of all work contemplated herein. All work shall be completed within the timeframe and in accordance with the schedule as provided by the City. 4.2. Notice of Termination. The City reserves and has the right and privilege of canceling, suspending or abandoning the execution of all or any part of the work contemplated by this Agreement,with or without cause, at any time, by providing written notice to Consultant. The termination of this Agreement shall be deemed effective upon receipt of the notice of termination. In the event of such termination, Consultant shall immediately stop rendering services under this Agreement unless directed otherwise by the City. 4.3. Compensation. In the event of termination, City shall pay Consultant for reasonable costs incurred and professional services satisfactorily performed up to and including the date of City's written notice of termination. Compensation for work in progress shall be prorated as to the percentage of work completed as of the effective date of termination in accordance with the fees set forth herein. In ascertaining the professional services actually rendered hereunder up to the effective date of termination of this Agreement, consideration shall be given to both completed work and work in progress, to complete and incomplete drawings, and to other documents pertaining to the services contemplated herein whether delivered to the City or in the possession of the Consultant. 4.4 Documents. In the event of termination of this Agreement, all documents prepared by Consultant in its performance of this Agreement including, but not limited to, finished or unfinished design, development and construction documents, data studies, drawings, maps and reports, shall be delivered to the City within ten (10) days of delivery of termination notice to Consultant, at no cost to City. Any use of uncompleted documents without specific written authorization from Consultant shall be at City's sole risk and without liability or legal expense to Consultant. 5.0. INSURANCE 5.1. Minimum Scope and Limits of Insurance. Consultant shall obtain and maintain during the life of this Agreement all of the following insurance coverages: (a) Comprehensive general liability, including premises-operations, products/completed operations, broad form property damage, blanket contractual liability, independent contractors, personal injury with a policy limit of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. \\Sierra\DS\_Public Works\RFCA's\2008 All\01-22-08\Extension of I-215 Frontage Road-Award of Agreement to HFI\Standard Agreement Extension of I-215 Frontage Road 10-15-07.doc 4 w EXHIBIT "A" (b) Automobile liability for owned vehicles, hired, and non-owned vehicles, with a policy limit of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. (c) Workers' compensation insurance as required by the State of California. (d) Professional,errors and omissions ("E&O") liability insurance with policy limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. Consultant shall obtain and maintain, said E&O liability insurance during the life of this Agreement and for three years after completion of the work hereunder. 5.2. Endorsements. The comprehensive general liability insurance policy shall contain or be endorsed to contain the following provisions: (a) Additional insureds: "The City of San Bernardino and its elected and appointed boards, officers, agents, and employees are addition- al insureds with respect to this subject project and contract with City." (b) Notice: "Said policy shall not terminate, nor shall it be cancelled, nor the coverage reduced, until thirty (30) days after written notice is given to City." (c) Other insurance: "Any other insurance maintained by the City of San Bernardino shall be excess and not contributing with the insurance provided by this policy." 5.3. Certificates of Insurance. Consultant shall provide to City certificates of insurance showing the insurance coverages and required endorsements described above, in a form and content approved by City, prior to performing any services under this Agreement. 5.4. Non-limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property. 6.0. GENERAL PROVISIONS 6.1. Entire Agreement. This Agreement constitutes the entire Agreement between the parties with respect to any matter referenced herein and supersedes any and all other prior writings and oral negotiations. This Agreement may be modified only in writing, and signed by the parties in interest at the time of such modification. The terms \\Sierra\DS\_Public Works\RFCA's\2008 All\01-22-08\Extension of I-215 Frontage Road-Award of Agreement to HFI\Standard Agreement Extension of I-215 Frontage Road 10-15-07.doc 5 EXHIBIT "H" of this Agreement shall prevail over any inconsistent provision in any other contract document appurtenant hereto, including exhibits to this Agreement. 6.2. Representatives. The Director of Development Services or her designee shall be the representative of City for purposes of this Agreement and may issue all consents, approvals, directives and agreements on behalf of the City, called for by this Agreement, except as otherwise expressly provided in this Agreement. Consultant shall designate a representative for purposes of this Agreement who shall be authorized to issue all consents, approvals, directives and agreements on behalf of Consultant called for by this Agreement, except as otherwise expressly provided in this Agreement. 6.3. Project Managers. City shall designate a Construction Engineer to work directly with Consultant in the performance of this Agreement. Consultant shall designate a Project Manager who shall represent it and be its agent in all consultations with City during the term of this Agreement. Consultant or its Project Manager shall attend and assist in all coordination meetings called by City. 6.4. Notices. Any notices, documents, correspondence or other communications concerning this Agreement or the work hereunder may be provided by personal delivery, facsimile or mail and shall be addressed as set forth below. Such communication shall be deemed served or delivered: a) at the time of delivery if such communication is sent by personal delivery; b) at the time of transmission if such communication is sent by facsimile; and c) 48 hours after deposit in the U.S. Mail as reflected by the official U.S. postmark if such communication is sent through regular United States mail. IF TO CONSULTANT: IF TO CITY: Mr. Jon E. Bourgeois, P.E. Valerie C. Ross Hall& Foreman, Inc. Director of Development Services 9130 Anaheim Place, Suite 120 300 North "D" Street Rancho Cucamonga, CA 91730 San Bernardino, CA 92418 Fax: (909) 919-7800 Fax: 909-384-5080 Tel: (909) 919-7801 Tel: 909-384-5357 6.5. Attorneys' Fees. In the event that litigation is brought by any party in connection with this Agreement, the prevailing party shall be entitled to recover from the opposing party all costs and expenses, including reasonable attorneys' fees, incurred by the prevailing party in the exercise of any of its rights or remedies hereunder or the enforcement of any of the terms, conditions, or provisions hereof. The costs, salary and expenses of the City Attorney and members of his office in enforcing this contract on behalf of the City shall be considered as "attorneys' fees" for the purposes of this paragraph. \\Sierra\DS\_Public Works\RFCA's\2008 A11\01-22-08\Extension of I-215 Frontage Road-Award of Agreement to HFI\Standard Agreement Extension of I-215 Frontage Road 10-15-07.doc 6 EXHIBIT "A" 6.6. Governing Law. This Agreement shall be governed by and construed under the laws of the State of California without giving effect to that body of laws pertaining to conflict of laws. In the event of any legal action to enforce or interpret this Agreement, the parties hereto agree that the sole and exclusive venue shall be a court of competent jurisdiction located in San Bernardino County, California. 6.7. Assignment. Consultant shall not voluntarily or by operation of law assign, transfer, sublet or encumber all or any part of Consultant's interest in this Agreement without City's prior written consent. Any attempted assignment, transfer, subletting or encumbrance shall be void and shall constitute a breach of this Agreement and cause for termination of this Agreement. Regardless of City's consent, no subletting or assignment shall release Consultant of Consultant's obligation to perform all other obligations to be performed by Consultant hereunder for the term of this Agreement. 6.8 Indemnification and Hold Harmless. Consultant shall protect, defend, indemnify and hold harmless City and its elected and appointed officials, officers, and employees from any and all claims, liabilities, expenses, including attorney fees, damage to property or injuries to or death of any person or persons or damages of any nature including, but not by way of limitation, all civil claims or workers' compensation claims, arising out of or in any way connected with the intentional or negligent acts, errors or omissions of Consultant, its employees, agents or subcontractors in the performance of this Agreement. 6.9. Independent Contractor. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall secure, at his expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. 6.10 Ownership of Documents. All findings, reports, documents, information and data including, but not limited to, computer tapes or discs, files and tapes furnished or prepared by Consultant or any of its subcontractors in the course of performance of this Agreement, shall be and remain the sole property of City. Consultant agrees that any such documents or information shall not be made available to any individual or organization without the prior consent of City. Any use of such documents for other projects not contemplated by this Agreement, and any use of incomplete documents, shall be at the sole risk of City and without liability or legal exposure to Consultant. City shall indemnify and hold harmless Consultant from all claims, damages, losses, and expenses, including attorneys' fees, arising out of or resulting from City's use of such documents for other projects not contemplated by this Agreement or use of incomplete documents furnished by Consultant. Consultant shall deliver to City any findings, reports, documents, information, data, in any form, including but not limited to, computer tapes, discs, files audio tapes or any other Project related items as requested by City or its authorized representative, at no additional cost to the City. \\Sierra\DS\_Public Works\RFCA's\2008 A11\01-22-08\Extension of I-215 Frontage Road-Award of Agreement to HFI\Standard Agreement Extension of I-215 Frontage Road 10-15-07.doc 7 EXHIBIT "A" 6.11 Public Records Act Disclosure. Consultant has been advised and is aware that all reports, documents, information and data including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code Section 6250 et. seq.). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code Section 6254.7, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court. 6.12. Responsibility for Errors. Consultant shall be responsible for its work and results under this Agreement. Consultant, when requested, shall furnish clarification and/or explanation as may be required by the City's representative, regarding any services rendered under this Agreement at no additional cost to City. In the event that an error or omission attributable to Consultant occurs, then Consultant shall, at no cost to City, provide all necessary design drawings, estimates and other Consultant professional services necessary to rectify and correct the matter to the sole satisfaction of City and to participate in any meeting required with regard to the correction. 6.13. Prohibited Employ. Consultant will not employ any regular employee of City while this Agreement is in effect. 6.14. Order of Precedence. In the event of an inconsistency or conflict in this Agreement and any of the attached Exhibits or Attachments, the terms set forth in this Agreement shall prevail. 6.15. Costs. Each party shall bear its own costs and fees incurred in the preparation and negotiation of this Agreement and in the performance of its obligations hereunder except as expressly provided herein. 6.16. No Third Party Beneficiary Rights. This Agreement is entered into for the sole benefit of City and Consultant and no other parties are intended to be direct or incidental beneficiaries of this Agreement and no third party shall have any right in, under or to this Agreement. 6.17. Headings. Paragraphs and subparagraph headings contained in this Agreement are included solely for convenience and are not intended to modify, explain or to be a full or accurate description of the content thereof and shall not in any way affect the meaning or interpretation of this Agreement. 6.18. Construction. The parties have participated jointly in the negotiation and drafting of this Agreement. In the event an ambiguity or question of intent or interpretation arises with respect to this Agreement, this Agreement shall be construed as \\Sierra\DS\_Public Works\RFCA's\2008 A]1\01-22-08\Extension of I-215 Frontage Road-Award of Agreement to I IFI\Standard Agreement Extension of I-215 Frontage Road 10-15-07.doc 8 i EXHIBIT "A" if drafted jointly by the parties and in accordance with its fair meaning. There shall be no presumption or burden of proof favoring or disfavoring any party by virtue of the authorship of any of the provisions of this Agreement. 6.19 Amendments. Only a writing executed by the parties hereto or their respective successors and assigns may amend this Agreement. 6.20. Waiver. The delay or failure of either party at any time to require performance or compliance by the other of any of its obligations or agreements shall in no way be deemed a waiver of those rights to require such performance or compliance. No waiver of any provision of this Agreement shall be effective unless in writing and signed by a duly authorized representative of the party against whom enforcement of a waiver is sought. The waiver of any right or remedy in respect to any occurrence or event shall not be deemed a waiver of any right or remedy in respect to any other occurrence or event, nor shall any waiver constitute a continuing waiver. - 6.21. Severability. If any provision of this Agreement is determined by a court of competent jurisdiction to be unenforceable in any circumstance, such determination shall not affect the validity or enforceability of the remaining terms and provisions hereof or of the offending provision in any other circumstance. 6.22. Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original. All counterparts shall be construed together and shall constitute one agreement. 6.23. Corporate Authority. The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said parties and that by doing so, the parties hereto are formally bound to the provisions of this Agreement. \\Sierra\DS\_Public Works\RFCA's\2008 All\01-22-08\Extension of I-215 Frontage Road-Award of Agreement to HFI\Standard Agreement Extension of I-215 Frontage Road 10-15-07.doc 9 EXHIBIT "A," AGREEMENT FOR SERVICES FOR THE REALIGNMENT OF AN EXISTING I-215 FREEWAY FRONTAGE ROAD AND EXTENSION NORTHWESTERLY 0.73 MILES FROM ITS EXISTING TERMINUS TO DEMENT STREET, INCLUDING PRELIMINARY ENVIRONMENTAL REVIEW AND ACQUISITION OF RIGHT-OF-WAY, WHICH MAY INCLUDE DECERTIFICATION OF EXISTING OPERATING STATE R/W (SS07-29). IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their respective authorized officers, as of the date first above written. CITY OF SAN BERNARDINO, CONSULTANT A Municipal Corporation, Hall & Foreman, Inc. By Fred Wilson, City Manager Signature Name and Title Approved as to form: James F. Penman, City Attorney By [/ Now \\Sierra\DS\_Public Works\RFCA's\2008 All\01-22-08\Extension of I-215 Frontage Road-Award of Agreement to HFI\Standard Agreement Extension of 1-215 Frontage Road 10-15-07.doc 10 I Attachment "1" � 7.T March 26,2007 Mr.Michael Grubbs,P.E. Engineering Manager/Field Engineer Development Services Department 300 North T"Street San Bernardino,CA 92418-0001 Subject: Realignment of Existing I-215 Freeway Frontage Road and Extension Northwesterly 0.73 Miles From its Existing Terminus to Dement Street,Including Environmental Approval and Acquisition of Right of Way,Which May Include Decertification of Existing Operating State R/W(SS07-29) Dear Mr. Grubbs: Hall&Foreman, Inc.(HFI) is an excellent choice for the realignment project that the City of San Bernardino is undertaking. HFI specializes in these type of projects and is currently working on Century Vintage Homes'adjoining residential development tract and on the Glen Helen Parkway project across from I-215.The team members proposed for this project were selected for their expertise and knowledge of the project site and the issues/concerns involved.They are in constant communication with the developers and agencies currently involved and have the City's best interests at heart. As HFI understands it, the immediate need is to assemble a qualified team who can investigate realignment alternatives; prepare all the construction documents; identify and acquire the proper right of way; prepare title, engineering,eminent domain,and CEQA documents; can obtain agency approvals and permits; provide potholing of existing underground utilities;and who can meet with City staff,as needed, to ensure project continuity.This effort is to commence one week upon the Notice to Proceed(NTP)with an updated schedule showing timing and progress every two weeks.The City's desire is to have the completed design in hand within six months of the NTP. The Daily Points of Contact for City of San Bernardino's project is: Don Bierman,P.E.,Project Manager Per Hernholm,Secondary Project Manager Hall&Foreman,Inc. 9130 Anaheim Place,Suite 120, Rancho Cucamonga,CA 91730 Phone:(909)919-7800,Fax:(909)919-7801 E-mail:dbierman @hfinc.eom,phernholm @hfinc.eom HFI would like to draw the City of San Bernardino's attention to these key benefits: ■ Proven Street Alignment Project Success HFI has proven street improvement/realignment experience as attested to in Section 4"Relevant Experience."Project highlights include the City of San Bernardino's Site Road Alignment Study for the frontage road along the I-215 freeway,City of Yucaipa's Yucaipa Boulevard Street Rehabilitation Project for the Chapman Heights residential development,City of Brea's Carbon Canyon Reconstruction/Road Widening Project to alleviate traffic for the adjoining Olinda Heights residential development tract,and Antonio Parkway Street Widening for the prestigious Ladera Ranch development in Orange County. ■ Familiarity With City and County of San Bernardino Standards&Procedures HFI is currently providing on-call services for the City and the County of San Bernardino. HFI is familiar with City of San Bernardino staff and the standards, policies,and procedures involved ensuring effective team communication and timely delivery of products. It$S 1 .. .._..r. .... .• _ .. .... t... 4 (t !.. .... .... .41:..:iS..... .1.... ..r._.. Ir_IIIII.1 ■ The City of San Bernardino Can Rely on HFI's Project Manager Expertise HFI's assigned Project Managers Don Bierman, P.E.,and Per Hernholm collectively have over 65 years of civil engineering experience in the management,engineering,and design of site development and street improvement projects for both public and private projects. Mr. Bierman is currently the Project Manager for the City of San Bernardino's On-Call Plan Check Review projects as well as the County of San Bernardino's On-Call Engineering Contract,Mr. Hernholm is currently the Project Manager for the adjoining Century Vintage Homes'residential development project site and has developed the Site Plan and preliminary alignment concepts enclosed within the RFP documents and Addendum No. 1 (Exhibits"1,"2".and"Y and the Bice Property&SBCFC District Acreage Disposition Map). ■ Project Site Subconsultant Team Members HFI will be using the services of for Leighton&Associates for geotechnical;Solution Strategies, Inc.and ECORP Consulting, Inc. for environmental;Arrowhead Mapping Corporation for aerial photography, and SAF- r-DIG Utility Surveys, Inc.for utility locating and potholing services. Solution Strategies,Inc.and ECORP Consulting,Inc. is teaming together to provide environmental services on the adjacent project site working with local agency ties,coordinating permits,and providing cultural and biological resources services including submitting the delineation reports to the affected agencies.Their knowledge of the project site as well as their agency affiliations should create seamless communication and expedited services on behalf of the City of San Bernardino SAF-r-DIG Utility Surveys, Inc. is certified minority owned,small,and women-owned business enterprise and Arrowhead Mapping Corporation is a certified small and women-owned business enterprise should this help the City meet any WBE/MBE goals. Please see Section 6"Subconsultants"and Section 2"Project Team"for further subconsultant team information and responsibilities. ■ Established Quality Assurance/Quality Control(QA/QC)Program HFI has a proven in-house QA/QC Program,which addresses the stages of formal reviews. HFI's philosophy and culture is focused on Senior Management involvement and Client satisfaction. HFI looks at each assignment as a partnering arrangement with the Clients and the other agencies/municipalities involved. HFI will provide a written outline of the QA/QC measures customized for the City of San Bernardino, if they so choose.The City of San Bernardino is encouraged to contact the references provided regarding past project experience and performance. HFI acknowledges Addendum No. 1 dated March 1,2007 regarding Bice Property&SBCFC District Acreage Disposition Map indicating a change in the proposed alignment and Addendum No. 2 dated March 20,2007 regarding establishing existing conditions as a separate line item. HFI's proposal dated March 26, 2007 shall remain valid for a period of not less than 90 days. Choosing HFI for this project will satisfy the City with a consultant team that understands street realignment projects, the project site area,the agencies involved, and puts the City foremost in their plan. HFI appreciates this opportunity to be of service to the City of San Bernardino. If City staff has any questions, please do not hesitate to call us directly at(909)919-7800. Sincerely, Hall&Foreman,Inc. Jon E.Bourgeois,P.E. Don Bierman,P.E. President-Inland Empire Division/Principal Project Manager SECTION 1 Scope of Services................................4 Project Understanding.......................................4 Scope of Services.............................................5 SECTION 2 Project Team....................................15 Organizational Chart.......................................15 Project Team Resumes/Experience..................15 SECTION 3 Project Schedule.........................45 SECTION 4 Relevant Experience.........................46 SECTION 5 Staff Availability................................51 SECTION 6 Subconsultants........................52 SECTION 7 Comments/Suggestions/ Expectations.................................54 M Section 1 Project Understanding Scope of The City of San Bernardino is seeking the engineering and surveying services of a Services consulting team to provide the design, right-of-way,and environmental approval for the realignment of an existing frontage road and extension of a roadway along the northeast side of the I- 215 Freeway from Little League Drive to the intersection of Dement Street and Cable Canyon Road.The existing roadway alignment is adjacent to Cable Creek and within Caltrans right-of-way.The roadway will be designed as a City collector street with ' r a 60 feet of right-of-way; 40 feet curb face to curb face. A traffic signal will need to be Y designed for the intersection of the proposed roadway and Little League Drive One of the main issues with the proposed roadway alignment is that the roadway is IIA r adjacent to Cable Creek. Recent storm events,following the Grand Prix and Old fires, + a 1 have created substantial amounts of debris flow.The design of the roadway will have to take into account that the elevation of the roadway surface needs tone above the flooded water surface elevations to provide an all weather road and the protection of the roadway with rip-rap to prevent erosion of the side slopes. HFI plans to utilize information gained from the design of the Rolling Hills Rancho development to assist in the design of the road surface elevations and roadway slope protection. K' Another issue is the acquisition of right-of-way from both public agencies and private owners to accommodate the most efficient alignment.A significant proportion of the roadway will be in Caltrans right-of-way. A 24-inch water line is to be designed and plan checked for approval as well as a 12-inch sewer line from Little League Drive to the Rolling Hills Ranch subdivision's main entryway approximately 1,000 If (See Exhibits at the end of this section). Hydrology and hydraulic calculations for Cable Creek Road are presently being done to ensure adequate protection for the subdivision (Rolling Hills Ranch Tract 34747).These calculations can be adopted for the protective design of the road from the northwest corner of the subdivision to Cable Canyon Road(Dement Road). HFI has through its preliminary studies, research,and meetings with San Bernardino's Redevelopment Agency and San Bernardino County Flood Control District(SBCFCD)for the adjacent subdivision gained an in-depth understanding of the problems and solutions liy affecting the road design. Problems including the horizontal and vertical alignment,flood ` control,and protection of the roadway have presented themselves. Environmental constraints have also been discussed in detail. In order for the Tentative Tract 34747 to not be subject to mitigation, the suggested design and construction of the road project should be done in no less than two phases. Phase 1 would include construction of Little League Drive to the northwest corner of the subdivision. Phase 2 should be from the northwest corner to Dement Road. It is anticipated that the construction of a temporary access road will be built from Little League Drive to the existing Frontage Road,as necessary to give access to the existing pet cemetery and residential homes(See Exhibits at the end of this section). Trappings were completed for this project area in the year 2004. However, because two years have passed,Agency may request new biological surveys. MINsm"M n7er_o_nnn i i I Section 1 Scope of Services Scope of Services PHASE A:PRELIMINARY DESIGN Task 1-Meetings The HFI team will arrange a kick-off meeting within one week of the notice to proceed. HFI will meet with the City staff during the preliminary design phase to resolve issues and ensure continuity with City standards and preferences(we will plan for a minimum of one meeting a week)During the Engineering phase, the team will meet with the City on a bi-weekly basis for updates on the project progress,concerns III problems and accomplishments Task 2- Project Schedule HFI will prepare an updated project schedule for presentation and discussion at the kick-off meeting within one week of the notice to proceed.The-project schedule will indicate the design tasks and projects timing from stat to submittal of final PS&E. HFI will provided the City with an updated schedule every two weeks indicating progress and the effect on the proposed milestones. Task 3-Utility Research HFI will conduct utility research and identify the location and depth of all existing utilities as identified by Underground Service Alert(USA)within the limits of the project. HFI will contact all utilities indicted by USA by written correspondence to make the company aware of the proposed project, request their drawings to determine existing utility fine locations and inquire about any plans for any future utility work. HFI will provide research as required to complete any removal, relocation,or adjustment to any existing utility facilities where conflicts are anticipated.All existing utility facilities as shown on drawings provide by the utility `"" companies drawings will be shown on the roadway drawings. Copies of all written communications and copies of drawings provided by the utility companies will be provided to the City. Task 4-Right-of-Way Research HFI will conduct the necessary research to determine the existing public right-of-way and identify the required right-of-way needed to construct the proposed improvements. PHASE B:ENGINEERING HFI will provide surveying and engineering services to prepare and complete required construction documents, including plans,specifications,and cost estimates'for the following items: Task 1-Roadway Design,Signing and Striping,Street Light (from Little League Drive to Dement Street/Cable Canyon Road) Task 1B-Design Survey Design of the proposed collector road to eliminate the substandard reverse curve northwest of the intersection with Little League Drive, including necessary modifications to the intersection. Design of the proposed collector road through the proposed subdivision ELII I t^MIN Section 1 Design of the proposed collector road from the northwest end of the proposed Scope of subdivision, near the existing residence, to the end of Dement Street at Cable Services Canyon Road. Task 2-Drainage Design of drainage facilities(protection walls, berms)to protect the roadway along reach "a"described above from storm events causing flooding in Cable Creek. Prepare hydrology and hydraulics studies and calculations necessary to determine the design of the drainage facilities. Task 3-Traffic Signal Design Design of a traffic signal for the intersection of the proposed collector road with Little League Drive. .. y HFI will prepare the improvement plans, specifications,and cost estimates for the project in conformance with City of San Bernardino standards, Caltrans standards, and the requirements of the Manual of Uniform Traffic Control Devices(MUTCD)and California Supplement, latest edition. Plans,specifications,and estimate shall conform to the following requirements: a) The plans will be prepared at a scale of 1 inch = 40 feet on standard 24"by 36"sheets, using the City of San Bernardino standard title block. b) The plans will clearly show existing conditions, including but not limited to, the location and type of signing and striping, pavement markings, storm drain facilities and street condition. c) HFI will be responsible for survey, research and other data or work needed to establish existing topography,lines and grades. Information readily available from City files will be made available to the consultant at no charge. d) Street improvement plans will clearly indicate the type and location of existing and proposed storm drain and street improvements, including but not limited to curbs,gutters,curb ramps,cross gutters,and streetlights. e) A separate signing and striping plan sheet will be included showing the type and location of existing and proposed signing and striping, including but not limited to lane striping,stop bars,cross walks,pavement markings, raise pavement markers and any other traffic control devices.The signing and striping plan sheet will be drawn to a scale of 1" = 40"on a 24"x 36" sheet, which will include a Standard title block of the City of San Bernardino. f) All improvements will be designed in compliance and accordance with the Americans with Disabilities Act(ADA). g) The street improvement plans will include, but not be limited to,curbs, gutters, berms, and curb ramps. Limits of pavement,sawcuts, removals and construction should also be shown. Improvements,which are intended to be completed in the future,will be clearly identified as"Future Improvements". ,,,,,, Section 1 h) The plans, specifications and cost estimates will be signed and sealed by a Scope of civil engineer licensed to practice civil engineering in the State of California. Services Task 4- Right-of-Way Identify need for additional right-of-way for the extension of the proposed collector road both for the alignment near Little League Drive and southeast of Dement Street/ Cable Canyon Road. HFI will prepare legal descriptions, plats,and secure title reports for the right-of-way to be acquired. aw■N Acquire right-of-way and permits from public agencies. Communication with and acquisition of the right-of-way from private property owners will be the responsibility of the City. If condemnation becomes necessary, HFI will provide necessary title documents, engineering documents, communication,etc. necessary to support the eminent domain process Task 5-Environmental Documents,Approvals,and Permits This Scope of Services is based on the following assumptions: ■ The proposed Project will require a Section 404 permit from the U.S. Army Corps of Engineers. ■ The proposed Project will require a Section 401 certification from the Regional Water Quality Control Board. ■ The proposed Project will require a Streambed Alteration Agreement from the California Department of Fish and Game. ■ As part of the processing of the Section 404 permit application,a Section 7 consultation between the Corps of Engineers and the U.S. Fish and Wildlife Service will be required. ■ No state ESA compliance will be needed. SSI's Scope of Services will consist of the following: Aid in Defining Project Solution Strategies,Inc. (SSI)will review project design and provide comments to ensure that the project is feasible to permit. Aid in CEQA Compliance SSI will review and comment on technical studies relevant to permit processing issues and attend meetings with the City and its consultants,when requested. Analysis of State and Federal ESA Requirements SSI will aid in determining any requirements for the project pursuant to the state and/or federal ESAs. SSI, with the aid of the biological consultant, will prepare any supplemental information that may be necessary. SSI will oversee the processing of any ESA compliance documents. Analysis of Mitigation Requirements SSI will aid in determining the mitigation proposal(s)for permits and ESA issues. SSI will work with the revegetation/restoration or biological consultant to prepare the habitat mitigation and monitoring plans by reviewing and commenting on such documents. 1 v J Section 1 Collect Needed Documentation Scope Of SSI will collect the necessary documentation to compile and process the permit Services applications. Where the information/documentation is not available, SSI will work with the Client and team to select the appropriate consultant and develop a suitable scope of work to supply the information/documentation. Prepare and File Regulatory Permit Applications SSI will obtain current application forms from the USACOE, RWQCB,and the CDFG websites SSI will collect all relevant information to complete the data fields.This collection also may require a site visit for observation, field notes,and/or photography. SSI will draft the applications and coordinate with a consultant of Client's choice for the preparation of required exhibits, if any. Client Review of Applications Applications will be reviewed by Client prior to submittal. SSI will meet with Client to present the draft applications and answer any immediate questions.After review of draft documents, necessary changes will be made. Submit Applications to Respective Agencies SSI will submit the applications in the agency-preferred formats with the necessary exhibits.A copy of each application will be supplied to Client. Extra copies can be provided on request. SSI will communicate the agency fee requirements to Client approximately one week prior to submittal. SSI does not advance the application fees on behalf of Client. Coordinate Agency Review and Processing of Project SSI will communicate with the agency staff(s)to follow-up on the processing after granting an approximately four-week grace period. By that time,the documents should have moved up the processing line and should be on the"radar screens"of the regulators.Contact would be for the purpose of verbally framing the application in the minds of the staff members and for the purpose of attempting to spur the process along.SSI will continue coordination with the agencies until the permits are received. ECORP Consulting, Incas Scope of Services will consist of the following: Based on previous experiences with the area,focused surveys for coastal California gnatcatcher(Polioptila californica californica),San Bernardino kangaroo rat (Dipodomys merriami parvus),various listed/sensitive plants,and a wetland delineation survey will likely be required for CEQA documentation and permitting associated with the road alignment and extension.The ECORP Team will implement the tasks necessary to implement and complete the California Environmental Quality Act(CEQA)consultation process with the California Department of Fish and Game (CDFG)and National Environmental Policy Act(NEPA)consultation process with the U.S.Army Corps of Engineers(ACOE)and the U.S. Fish and Wildlife Service (USFWS).The services that will be provided under this task include: ■ assistance with project-related negotiations; ■ a literature review, biological reconnaissance survey,and biological technical report of findings; ■ focused wildlife and plant surveys; ■ jurisdictional delineation and report;and, Section 1 ■ preparation of a preliminary draft, draft, and final draft of the Biological Scope of Assessment and incorporation of Client,Team, and Agency comments into Services these documents. The following paragraphs describe these services in more detail. Assistance with Project-Related Negotiations The ECORP Team will assist the Client with all project related negotiations by aiding in the preparation of client position statements, in gathering intelligence related to the project, in the management of the political climate in relation to the project,and in participating in negotiations with the resources agencies and other stakeholders. As necessary, various members of the ECORP Team will attend meetings with Hall& Foreman and the various stakeholders/interested parties that will become active at some point in the process of gaining approvals for the I-215 Realignment and Extension Project. The actual number of meetings required for this task is unknown but we will assume the following number of hours will be provided by ECORP. Literature Review and Biological Reconnaissance Survey and Report Prior to conducting a biological survey of the project, ECORP will conduct a literature review of the California Natural Diversity Data Base and the California Native Plant Society's Electronic Inventory to identify listed and/or sensitive plant and wildlife species that have previously been recorded on or in the vicinity of the site. In addition, ECORP will review any known previous biological reports that were written for the site. Following the literature review, ECORP will conduct a biological reconnaissance survey of the site for the purpose of documenting existing biological conditions and determining the potential for listed and/or sensitive plant and wildlife species to occur. ECORP's biologists will walk the proposed realignment area and document the plant and wildlife species observed during the survey. In addition,the biologists will map the vegetation communities that occur on site and will take photographs for the purpose of documenting the current conditions. Following the completion of the survey, ECORP will prepare a technical report of findings.The report will document the existing biological conditions and, based on the existing conditions,determine the potential for listed or sensitive species to occur on the site.The report will contain approximately 25 pages of text and approximately 10 graphics(including location,vicinity,vegetation maps,and site photographs). Focused Coastal California Gnatcatcher Surveys In the event that suitable habitat for the coastal California gnatcatcher(CAGN)is identified during the biological reconnaissance survey,focused surveys would be conducted in order to determine presence/absence of this federally threatened bird species. Protocol-level CAGN surveys would be conducted during the 2007 breeding season (March 15 to June 30)in areas that are determined to have suitable sage scrub habitat.A notification letter would be prepared and submitted to USFWS at least 10 days prior to starting focused surveys. Six(6)weekly surveys would be conducted by a biologist that has a 10(a)(1)(A) permit for surveying for CAGN. Surveys would be conducted between 0600 and 1200. No more than 80 acres of suitable habitat would be surveyed per biologist per day and surveys would not be conducted during unsuitable weather conditions(=550F, no excessive fog,wind, rain, heat).Surveys would consist of slowly walking various routes throughout suitable habitat within 300'of proposed construction activities.The surveyor(s)would play a i . 11� Illl 11 Section 1 taped recording of gnatcatcher vocalizations at regular intervals to illicit a response. Scope of The biologist(s) would scan all potential habitat with binoculars for the presence of Services CAGN while e li stenin for r vocal I responses ons es to the taped recording. Any locations of CAGN that are identified during the surveys would be identified by taking GPS coordinates and noting the locations on maps and field forms. A technical report of findings will be prepared and 1 copy of the report will be submitted to U.S. Fish and Wildlife Service within 45 days of completion of the final survey per 10(a)(1)(A)permitting requirements. Results of the CAGN focused surveys will be summarized in the biological reconnaissance report and the CAGN technical report will be included as an appendix. San Bernardino Kangaroo Rat Trapping Surveys If sign of kangaroo rats is observed during the reconnaissance survey or if the habitat seems particularly suitable for San Bernardino kangaroo rats(SBKR), subsequent trapping surveys would be conducted to determine presence/absence of this federally endangered mammal species.Trapping would follow the existing protocol,consisting of 5 consecutive nights with Sherman 12-inch live traps set in locations with the highest likelihood of capturing target species.Trapping can occur any time of year since this species is active year round. But trapping would be conducted when the ground conditions would be dry and, ideally, later in the year when the majority of annual grasses and forbs have died back(April -September). Following completion of the trapping surveys,a technical report of findings will be prepared in accordance with 10(a)(1)(A)permitting requirements. Results of the P` trapping surveys will be summarized in the biological reconnaissance report and the m2 SBKR technical report will be included as an appendix. Focused Plant Surveys In the event that potential habitat for listed and/or sensitive plant species is identified during the biological reconnaissance survey, focused plant surveys would be conducted to determine the presence or absence of these species. Surveys would focus on any federal-listed,state-listed,or CNPS List 1A, 16, 2, and 3 species with potential to occur on the project site.The focused plant surveys will provide 100% coverage of the project area in accordance with the California Native Plant Society Botanical Survey Guidelines.The surveys would be conducted during the blooming period of listed and/or sensitive plant species that are determined to have potential to occur on site in order to maximize detection and identification of these species. Results of the focused plant surveys will be summarized in the biological reconnaissance report Jurisdictional Delineation and Report ECORP will conduct a jurisdictional delineation of the existing frontage road, proposed realignment area,and the area where the road extension will be placed. The delineation will identify the current boundaries of U.S.Army Corps of Engineers (ACOE)and California Department of Fish and Game(CDFG)jurisdictions.The field assessment will include evaluating the habitats, soils,and hydrology in the drainages and mapping of the ACOE and CDFG jurisdiction in each of the drainages. The dominant vegetation type in the drainages and soil delineations of potential streambed/wetland areas will be discussed in a delineation report. The report will include a hydrology analysis in relationship to state and federal requirements and jurisdictional determinations in acreage. In addition, the direct and indirect impacts r-- Section 1 of the proposed project on streambed/wetlands will be determined and an evaluation Scope Of of the perceived cumulative biological impacts, if any, to streambed/wetlands Services associated with the project will be made. Results of the jurisdictional delineation will be summarized in the biological reconnaissance report and provided to the client as a separate report(as required for permit applications). Biological Assessment If focused surveys determine the presence of federally listed plant or wildlife species at the project site, members of the ECORP team will attend an Informal Consultation meeting with USFWS to discuss the agency's concerns and the plan for moving ahead with a Section 7 Consultation. Based on the outcome of this meeting,the ECORP Team will investigate potential mitigation options that will offset the impacts of the development of the I-215 Realignment and Extension Project.The ECORP Team will work closely with HFI to determine the content of the Project Description for the Biological Assessment.A draft of the Project Description will be provided to the Client for review and comment. If applicable,this Project Description can be provided to the USFWS during Informal Consultation to determine whether changes need to be made prior to the initiation of Formal Consultation.The Project Description will become part of the Biological Assessment. The ECORP Team will prepare a Biological Assessment for the impacts to federally listed plant or wildlife species that are determined to occur on site.The format of the Biological Assessment(BA) will follow the U.S. Fish and Wildlife Service's Endangered Species Consultation Handbook.The BA will include the following sections: Introduction,History of Coordination with the Agencies, Project Description, General Environmental Setting, Listed Species and Assessment of Habitat, Impact Assessment,Conclusion and Determination, References, List of Preparers,and Appendices.The ECORP team will work closely with the Client in the preparation of the BA.The BA will likely contain approximately 30 to 50 pages of text and 5 to 10 graphics.In addition, it will contain approximately 60 pages of appendices. ECORP will provide the Client and the Team with five copies(3 to the Client and 2 to Solution Strategies)of a preliminary draft of the BA for review and comment. ECORP will then incorporate the comments from the Team into the Draft BA that will be submitted to the Corps of Engineers and USFWS. ECORP will provide the Client with five copies of the Draft BA prior to the submittal to ACOE and FWS. If necessary, ECORP will also prepare a Final Draft of the BA that incorporates comments from both the ACOE and USFWS. Five copies of the Final Draft BA will be provided to the Client. Task 6-Potholes Pothole existing underground utilities where a high probability for conflict exists. M Compensation for potholing will be on a per pothole basis and is be stated separately from the design fee * r Task 7-Alternative Alignments (intersection of Dement Road and Santa Fe Street or Devore Road)Investigate 7 .� alternatives for the realignment of Dement Street for an improved intersection with Santa Fe Road or Devore Road.A maximum of three alternatives will be investigated. An alternatives study will be prepared comparing the alignments,the cost, right-of- RtF , _ way issues, utility alignment issues and benefits of each alternative.The alternative study will be discussed with the stakeholders and an agreed upon alternative will be selected. -��+ h•� I � I I l o�+(,tl'.,`\t{ .II %. � _ ..,���.f�'� � .- �1..1.11�'11 `I .` o N� •j I I (ICI� ';j .�,�_ �' \ \ \ , 1 r�' \ g I''+i I/, lI i ,•�'il ; .r•��"./^�' .�-/` it 1' \ `, I ' ' • Xif '11� ( ! jI 1a 11ti1 ! �.il 1 i1• d }� iti' I\.I .�_ t' L 1�1 :b:!. 1 �,; '(. l' 11 /rill I C, ....... _ .. . - __ - - •``';_.;:::�� �,, !�-'� JI 5. j I is I I ,{' � • # I I ; � �` ' 1' 1 %•' 7.4 5co" Y,,i ! r `''?' �� I/ 1�� � ��-- -----� '•'�. __ -'' `�\ I L ' 14.,1 4 ' I II,.'� 1 Ii�:i !1 J. I `•,�. \ i wr7,�,�•1 j-�•1-`'�.� � �I:�i/ I°� r•t �1 I`y 111' 7. I '� .e .-� , ->•..- � � .� 'i;� I�'`�� I f rl ds , 1• If I \ 1. i I r' I IIyI IfA;I\ j Qyotiss3� \ \\ ' 4••;.1 1 x A- •: �•.; ��',�°# I\ f j�' � •I it` ��\ �� '' � i '. �\ I ��•,..� i'f � 1,,1 1 \ CD CD O i iy,l i pI('I \I I i ` ��.l. ...,.. ..✓-� t . . ATM' *` j'le\ /f -:77 err ,.%I ''IV Cl I ' r. � „ 1 � 1.,y � �,Y s�y � l • {i�{ L y?1?„�--aa, ���F.�` , 'I{ff •�C'A 4l�'� !� t � �s x�4 "�� t 19 CZN g 8F Sf�rA�vC y��J Pip CI !• ..1��." 1. rts� ••9q,�� � c > X.. 4f Y` )t' f'` '�% �.lip •� . el l�f Aiii fp' �l �.. .P i fi+E�i •'sy j A , �F .� S• �� 4r � a an a � •� .tai '(f 'f :` v .'�' „F • � sPr u ��f w' ,' lVr/.}..��. it y �« �••� ..• L{�'F�'�.'t •t 70 CD COG CD 0 � .Y' ��• t �: S.�� y .. CLZ (Q (D I� CD d X cr m d Ul m r �j AT U ov J y } t �. ' ui E` M> . IN Am ;7��'Ft r 1 t k 1 1S' �'�4• M, t to <, 44f, �s a st qg < yt a r� / va CD •s h Eti a 1 �Y ^Q CD Iy CD cn Z (D CL T� 1 •. 1 1 l i' tf. Y-Y 7♦ i'S1lw ij CD 0 CD CD nI 4 2r X 4 d Section Organizational Project Team i . I I mint\ t Jon E. Bourgeois, P.E. Quality Assurance/ Secondary Quality Control Project Manager/ Per Hernholm Surveying/ I Stakin Mapping/ Street Design/ Traffic En meerin Geotechnical c Ral h Domn9uei, Right of Way Signing & Stri in g g Leighton & Associates p g Susan Wilson, PE D,ck Bowman, �E.g Rob Kilpatrick, Srva SrvaUiasan, Ph.D. Subconsultanl Field Surveying Hydrology/ Utility Research/ Environmental Crew Hydraulics Coordination Solution Strategies, Inc. AS Needed R,ta Escobar E.LL Dolores Moreira Subconsultant Vrvran Chen, E.LT. Sharon Lockhart Linda Mrtrovich Water Quality ECORP Consulting, Inc. Management Subconsultant Jaques Andres Mari Schroeder Roger Mason, Ph.D., R.P.A. Aerial Photography Arrowhead Mapping Corporation Subconsultant Steve Dillon Potholing Saf-R-Dig Utility Surveys, Inc. Subconsultant Donald Whitman Section 2 DON BIERMAN, P.E. Project Team Project Manager Education&Registrations California State University at Los Angeles, B.S. -Civil Engineering Licensed Civil Engineer,California -#26421 Member American Society Civil Engineers Professional Experience Mr. Bierman has over 35 years of civil engineering experience in the management and engineering of drainage projects,site development,freeway and airport drainage projects,commercial, industrial and residential site improvements. He recently managed and designed projects for the Cities of Ontario, Upland,Rialto,and Fontana; and the San Bernardino County Flood Control District, Mr. Bierman's experience includes design of plans for sewers,streets,storm drains,water conveyance and grading;development of Master Plans of Drainage;and drainage systems designs. Project Experience 9th Street Reconstruction, Upland: (Project Manager) HFI was contracted for this east/west directional transportation corridor that carries approximately 8,500 vehicles per day and serves as a truck route through the City of Upland. HFI provided professional civil engineering and design services for the street reconstruction and water infrastructure improvements for 9th Street between San Antonio Avenue and Euclid Avenue(Route 83). The project includes a water line replacement in 9th Street from Garnet Way to Euclid Avenue, upgrades to curb returns to meet ADA approved requirements,and permits and review by Caltrans for right-of-way.Specifically HFI's work included a topographic survey; geotechnical investigation; preparation of street improvement plans and profiles,water main improvement plans and profiles,signing and striping plans, traffic control plans,and special provisions to meet City standards; preliminary and final engineer's cost estimates, and preparation of as-built plans upon project completion. Citrus Avenue Widening,Fontana:(Project Manager)Provided engineering services for approximately one mile of street widening at Citrus Avenue, a showcase project due to its location as an off ramp for the new Route 210 freeway.The project included improve- ments for widening the roadway from two to four lanes, storm drains, landscaping, lighting,traffic signals,and sewers.The scope of work also included the design of drive- ways;preparation of right-of-way acquisition documents for adjacent residential proper- ties that were impacted by the increase in right-of-way width; and sewer laterals to homeowners adjacent to the project who are presently on septic tank systems.The total construction for the project was approximately$3.5 million. "A"Street, Upland: (Project Manager) Mr. Bierman served as the Project Manager for the design of this Metrolink station frontage street.The project included roadway rehabili- tation,street widening,and an at-grade railroad crossing for approximately 1,500 feet of street.The work also included station parking improvements,design of a drop off area, landscaping and cross walk pavement enhancement. State Route 30,SANBAG/Caltrans:(Project Manager) Responsibilities for hydrology/ hydraulic studies,storm drain design,quantity estimates and specifications for offsite drainage facilities within several segments of this freeway. Design included large diameter pipes carrying storm water under the depressed freeway. Section 2 Cherry Avenue,County of Los Angeles: (Project Manager) Mr. Bierman was respon- Project Team sible for the design of one mile of arterial highway through two cities and the county. The design included street widening, utility relocations, and a 60-inch storm drain with the associated laterals and catch basins. Coordination with adjacent property owners, which included the redesign of driveways and additional right-of-way requirements, presented challenges in this assignment. Inverness Drive,La Canada/Flintridge: (Project Manager)Project includes a slope failure on Inverness Drive. Intense rains from the storms of 2004/2005 caused two sections of the road to fall away. One section was 90'and one section was 40. HFI was responsible for the analyses and research for providing recommendations to the City along with design of the roadway and utility replacement and PS&E. HFI also provided laser scanning services and forensic investigation to determine damage and to minimize safety hazards. Project is ongoing and the cost is approximately$1 million. Santa Ana Avenue, Rialto: (Project Manager)Responsible for on-site hydrology study, storm drain design and design of Santa Ana Avenue adjacent to the City of Rialto's treatment plant. Riverside Drive Sidewalk Project Between Clover Lane and Colony High School, Ontario:(Project Manager)The City needs to provide protection for High School students by providing sidewalk improvements along the south side of Riverside Drive from the Colony High School west to Clover Lane.A recent accident in the City of Fontana in which a car hit a student as she walked along the edge of the roadway made the need for a sidewalk very clear. Uncontrolled mid-block pedestrian crossings needed to be discouraged by providing safe access to a signalized intersection.The land use adjacent to this road- way is dairy pens and sheds. HFI investigated sidewalk alternatives.All alternatives will take into account the existing storm drain inlets near the edge of pavement, existing poles adjacent to the roadway,driveways that serve adjacent properties,and areas where bushes intrude into the walkway. Public Works Plan Review Services,San Bernardino: (Project Manager)HFI was selected in 2006 to provide plan checking services for the City of San Bernardino on an on- call basis.The project requires coordination with the City and County. Plan checking services for the City include, but are not limited to; research and review of street,sewer and storm drain improvement plans; rough and precise grading plans; hydrology/hydrau- lics reports; retaining wall and other structural design calculations;tract and parcel maps; right of way and easement documents;traffic signal plans and studies.After the review, HFI prepares correction letters and logs containing necessary corrections to make the maps acceptable for recording. On-Call Engineering Services,County of San Bernardino: (Project Manager)HFI is providing County of San Bernardino staff with on-call services for Capital Improvement Projects(CIP).The scope of services includes street and trails construction/design,traffic signal design,signing and striping,water quality management,sanitary sewer design/ waterlines,surveying and mapping,geotechnical,grading,street design,storm drain design,potholing, aerial photography, landscape design,and community outreach as needed.Services also include coordination of projects with other public agencies and utility companies. Engineering fees are based on an hourly rate schedule. Section 2 JON E. BOURGEOIS, P.E. Project Team Principal Education&Registrations Northern Arizona University, B.S.—Civil Engineering Professional Licensed Civil Engineer,—CA- #30242 Professional Experience Mr. Bourgeois'career spans over 25 years in public works engineering. His responsibilities entail project management,design and plan checking activities for diverse public works projects,and principal-in-charge/quality control efforts. Mr. Bourgeois'broad-based experience in project management,design of public works projects, preparation of project specifications and bid documents,cost estimates, right-of-way engineering,and contract administration and inspection allows him to function with technical hands-on leadership. His extensive experience more specifically includes streets, highways,storm drains, sewer, and water facilities,and other public works infrastructure components. Project Experience Carbon Canyon Road(SR 142)Road Reconstruction/Widening,Brea:(Principal in Charge)Prepared plans and cost estimates for the reconstruction of Carbon Canyon Road within a 120-foot-wide right of way from Valencia Avenue to 5,000 feet East of Valencia Avenue in the City of Brea.The project was completed to supplement Developer improvements for Olinda Heights residential tract. Project included four phases of construction including traffic control plans,construction staging plans and traffic signal modification plans for each phase.The pavement section included treated permeable base and sub-drain systems.This project also included relocation of transmission lines for Southern California Edison, preparation of plans for 4,800 feet of an 18-inch water main and 78-inch, 1,400-foot-long storm drain. Yucaipa Boulevard Street Rehabilitation,Yucaipa: (Principal in Charge)HFI prepared street rehabilitation plans for improvements to three miles of the eastbound traffic lanes for Yucaipa Boulevard,a major arterial street, from 7th Street to 11th Street including improvements to the Yucaipa Boulevard and Oak Glen Road intersection.The project was completed to supplement Developer improvements to the westbound traffic lanes constructed at the same time for the Chapman Heights Development. HFI's services included field review to identify areas of major distress and cracking requiring removals of the existing roadway pavement section versus those that would require a two-inch asphaltic concrete overlay only.Construction plans were produced using existing street improvement plans. HFI's efforts also included coordination with local street contractors to obtain competitive bids and review of the Contractor bids for completeness. HFI also provided support staff to assist the City Street Superintendent for inspection of the final street improvements. Antonio Parkway Street Widening/Resurfacing,County of Orange: (Principal in Charge)Prepared final plans for widening and resurfacing of a one-mile segment of Antonio Parkway adjacent to the planned community of Ladera Ranch.Widening consisted of adding split-level roadway section with a 20 foot,landscaped median to widening the existing four-lane roadway to a 6-lane divided major arterial. Field survey services were provided to identify as-built conditions for the existing roadway in order to accommodate a resurfacing of the existing pavement. Other improvements included:storm drain,OCTA bus bays,signing and striping plans,and a signal plan for the future Covenant Hills Road intersection. f Section 2 Chase Drive Phase III Street Improvements,Corona: (Principal in Charge)Project Project Team includes 1,700 feet of street improvement from Garrettson Avenue to Sonrisa Drive. Improvements include removal and replacement of AC pavement, removal of existing parkway culverts,addition of curb and gutter, bike path,parkway landscaping, relocation of adult palm trees on south side of the roadway, and a storm drain line to connect with the existing drainage system at the intersection of Garrettson Avenue and Chase Drive. Landscape improvements will extend to the property line of each resident. Improvements also include relocation of existing electrical poles on the north side of the roadway, relocation,or removal and replacement,of existing 35 mph speed limit sign, and the removal of existing citrus trees and shrubs within the right of way. Clearglen Avenue Rehabilitation, Los Angeles County Department of Public Works: (Principal in Charge)This rehabilitation project entailed three phases including preparation of a Materials Report recommending alternatives based upon field test data. HFI conducted topographic and design surveys; prepared a Project Design Concept Report (PDC)to describe the costs,schedule,details,and limits of the road improvements; prepared PS&E for roadway and traffic rehabilitation improvements to be used for obtain- ing contract bids; provided construction services,as requested,for BFI's and plan and quantity changes;and prepared"as-built"plan revisions to reflect all changes made during construction. Field review of the project was conducted in accordance with DPW guidelines and rehabilitation improvements to include drainage; removal of slotted cross gutters and parkway culverts; repair/replacement of concrete sidewalk,curb and gutter, ADA ramps,and driveways; replacement/upgrade of guard rails and signal heads; re- striping of traffic lanes; bus pads;and other miscellaneous items. Brea Boulevard,Brea:(Project Manager)Prepared the widening of a 3-mile street segment,including right-of-way engineering,significant private property modifications, major utility relocation,Edison under-grounding of transmission and distribution lines, railroad crossing improvements and improved track crossing material, eight new signal- ized intersections, landscape and hardscape including colored concrete intersection improvements.To meet the Caltrans design standards,the street storm drain system was expanded.Caltrans was involved in the approval process for the intersection improve- ments at Imperial Highway,State Route 90. (Construction Manager)responsible for the major task of implementing the construction staging to maintain adequate traffic flow, maintain access to the local businesses,and maintain utility services during construction. All projects were successful in meeting design and construction deadlines and costs were maintained within the approved budgets. Imperial Highway,Brea:(Project Manager)Prepared the widening of a one-mile segment through downtown.As lead consultant, responsible for coordination with Caltrans Project Management Section,preparation of the State Partnership Agreement, right-of- way engineering, appraisal and acquisition services, in accordance with Caltrans guide- lines, project study report, project report and fact sheets, plan and specification prepara- tion in accordance with Caltrans requirements,geotechnical investigation,and pavement reconstruction requirements. Project spanned 10 years from conceptual studies to funding appropriations from Caltrans, Brea Redevelopment Agency, Measure M Funds and other City sources. Included widening from four to six lanes with dual left turn pockets,OCTA bus turnouts, replacement of Orange County Flood Control culvert with a quad 12'x14' RCB, replacement of City water,sewer and storm drain facilities,traffic signals, and street lights. Managed the construction engineering and inspection of this$8 million improve- ment project,which was completed in 10 months. Section 2 PER HERNHOLM Project Team Secondary Project Manager Education&Registrations Cal Poly Pomona, CA-Civil Engineering Coursework Norwegian Air Force-Photographic Coursework Professional Experience Mr. Hernholm has 24 years of civil engineering experience as a designer, project manager and principal. His expertise in land development is exemplified by his role in the design of a 650-acre resort and golf course community in Rancho Santa Fe, a 1,200-acre residential and golf community course in Lake Elsinore,a 400-lot subdivision in Castaic and a 100-lot hillside subdivision in Santa Clarita. He is skilled in grading, street,sewer and drainage design,hydrology studies and conceptual design. Project Experience Century Vintage Homes,San Bernardino: (Project Manager) 100+acre site for a 295 lot residential development for Century Crowell Communities. HFI prepared lot studies, road alignment studies, hydrology and hydraulic studies for Cable Creek,and cost esti- mates. HFI also prepared the site road alignment studies for the frontage road along the I- 215 freeway.The project includes coordination with the Client,the City of San Bernardino Redevelopment Agency,San Bernardino County Flood Control District,and other governing agencies. Summit Heights II,Fontana: (Project Manager)HFI provided design services for a 530 lot subdivision, built concurrently,for Centex and Lennar. HFI developed close relationships with Client representatives and provided them with responsive,thorough,precise design, and surveying services ensuring successful completion of the project Coyote Canyon,Fontana:(Project Manager)HFI provided engineering services for Centex Homes Tracts 16325, 16325-1, 16325-2,and 16326 accommodate 302 lots including sewer,storm drain,street,and water plans as well as surveying and construction staking.. Rolling Meadows at Tejon Ranch, Los Angeles County:(Project Engineer)HFI provided the conceptual engineering and feasibility study stage for this master plan project.The project evolved into a 24,000-unit master plan with commercial,employment, park,and institutional land uses on approximately 6,000 acres. Services included master plans for major infrastructure,grading studies,cost estimates, and overall project coordi- nation.The project is now in the entitlement phase. Crosby Estates, Rancho Santa Fe: (Project Engineer/Grading Designer)HFI designed all the sewer,road,and storm drain alignments for this project. HFI also designed all the lot grading for single-family homes,condominium homes,a golf course club house,major access roads to the project,and a one mile "spine"road through the project area. Hilicrest,Castaic:(Project Manager)Project was constructed for Larwin Development Company. Mr.Hernholm was responsible for all the grading, road,sewer,water,and storm drain design plans and he coordinated all submittals through the County of Los Angeles. He was also responsible for survey and construction coordination. I Section 2 Stevenson's Ranch Area,Santa Clarita: (Project Manager)Project was constructed Project Team for Larwin Development Company. Mr. Hernholm was responsible for all the grading,road, sewer, water,and storm drain design plans and he coordinated all submittals through the County of Los Angeles. He was also responsible for survey and construction coordination. Coto de Caza,Orange County: (Project Manager)This project is a 5,000 acre master planned community in Orange County. Mr. Hernholm provided conceptual and horizontal design studies for all major and minor roads throughout the project and conceptual design studies for future major roads(highways) to and around the project site. He also provided earthwork and cost analysis studies �t < Section 2 RALPH ,O P.L.S. Project Team Surveying/Staking Education&Registrations Professional Licensed Land Surveyor,CA- #5425 Certified Party Chief Rio Hondo Community College Whittier,CA- Engineering Professional Experience With an extensive background that spans 31 years, Mr. Dominguez works with both public and private sectors. Mr. Dominguez is responsible for managing and coordinating all aspects of the field survey and office support team section. He provides direct supervision to the firm's surveyors for reference plan review, methods of measurements required,scheduling, horizontal control establishment,production and safety. Mr. Dominguez brings the experience to manage the many different types of projects requested of the survey section. Mr. Dominguez acquired his experience in virtually all aspects of the surveying discipline. He has directed and surveyed as both party chief and field supervisor in boundary establishment and retracement,aerial control,design topography and ALTA surveys,utilizing both conventional and GPS surveying equipment and procedures. Mr. Dominguez also has extensive experience monitoring settlement monuments and utilizing GPS equipment on several active landslides in Southern California. Project Experience Carbon Canyon Road(SR 142)Road Reconstruction/Widening,Brea:(Survey Manager)Prepared plans and cost estimates for the reconstruction of Carbon Canyon Road within a 120-foot-wide right of way from Valencia Avenue to 5,000 feet East of Valencia Avenue in the City of Brea.The project was completed to supplement Developer improvements for Olinda Heights residential tract. Project included four phases of construction including traffic control plans,construction staging plans and traffic signal modification plans for each phase.The pavement section included treated permeable base and sub-drain systems.This project also included relocation of transmission lines for Southern California Edison,preparation of plans for 4,800 feet of an 18-inch water main and 78-inch, 1,400-foot-long storm drain. Yucaipa Boulevard Street Rehabilitation,Yucaipa:(Survey Manager)HFI prepared street rehabilitation plans for improvements to three miles of the eastbound traffic lanes for Yucaipa Boulevard,a major arterial street,from 7th Street to 11th Street including improvements to the Yucaipa Boulevard and Oak Glen Road intersection.The project was completed to supplement Developer improvements to the westbound traffic lanes constructed at the same time for the Chapman Heights Development. HFI's services included field review to identify areas of major distress and cracking requiring removals of the existing roadway pavement section versus those that would require a two-inch asphaltic concrete overlay only. Construction plans were produced using existing street improvement plans. 9th Street Reconstruction&Water Main Replacement,Upland:(Survey Manager)HFI was contracted for this east/west directional transportation corridor that carries approximately 8,500 vehicles per day and serves as a truck route through the City of Upland. HFI provided professional civil engineering,surveying,and design services for the street and water infrastructure improvements for 9th Street between San Antonio Avenue and Euclid Avenue(Route 83).The project includes a water line replacement in 9th Street from Garnet Way to Euclid Avenue, upgrades to curb returns to meet ADA Section 2 approved requirements,and permits and review by Caltrans for right-of-way. Specifically Project Team HFI's work will include topographic survey; geotechnical investigation; preparation of street improvement plans and profiles, water main improvement plans and profiles, signing and striping plans, traffic control plans, and special provisions to meet City standards; preliminary and final engineer's cost estimates,and preparation of as-built plans upon project completion. Antonio Parkway Street Widening/Resurfacing,County of Orange: (Survey Manager)Widening and resurfacing of a one-mile segment of Antonio Parkway adjacent to the planned community of Ladera Ranch.Widening consisted of adding split-level roadway section with a 20 foot, landscaped median to widening the existing four-lane roadway to a 6-lane divided major arterial. Field survey services were provided to identify as-built conditions for the existing roadway in order to accommodate a resurfacing of the existing pavement. Other improvements included:storm drain,OCTA bus bays,signing and striping plans,and a signal plan for the future Covenant Hills Road intersection. Cajon Boulevard Improvements,San Bernardino:Boundary retracement,design and construction surveys. Project involved right-of-way retracement and research, engineering design,aerial and conventional ground surveying. Amethyst Road Improvements,Victorville:Boundary retracement,design and construction surveys. Project involved right-of-way retracement and research,engineering design,aerial and conventional ground surveying. ICU Atlantic Boulevard Widening,Monterey Park:Aerial engineering,utility and road- way,design survey,right-of-way,and research/calculations. Padua Avenue Widening,Claremont:Aerial engineering,utility and roadway,design survey, right-of-way,and research/calculations. Mission Center Drive,I-8 Ramp Widening,San Diego:Right-of-way establishment, aerial survey,and engineering design services. On-Call Surveying Services,County of San Bernardino:(Survey Manager)HFI is providing County of San Bernardino staff with on-call surveying services for Capital Improvement Projects(CIP).Specific services include control surveys,topographic surveys,data collection, bondary surveys,construction check surveys, right-of-way surveys,monumentation,traffic control, high definition surveys,subdivision map checking, and record of surveys. On-Call Surveying and Subdivision Map Checking Services,City of Fontana: (Survey Manager) HFI is providing the City of Fontana with on-call surveying services for Capital Improvement Projects(CIP).Specific services include tie out of existing survey monuments, filing of corner records,topographic surveys,cross-sections,construction staking, GPS surveys, right of way,control surveys,base maps, review of mapsheets, review of boundary retracement,coordination and monitoring responses to civil engineers and land surveyors, review of storm drain,sewer, street, maintenance of plan check files, written recommendations, and review of design principals and calculations. Section 2 SUSAN WILSON, P.L.S. Project Team Mapping/Right of Way Education&Registrations Rancho Santiago Canyon College Registered Professional Land Surveyor,CA- #8145 Professional Experience Ms.Wilson has over five years experience in surveying for private and public works projects. Ms. Wilson has worked on many commercial, residential,and infrastructure projects. She is trained in the use of surveying software and currently provides survey analysis in support of the firm's Inland Empire division. Project Experience Public Works Plan Review Services,City of San Bernardino:(Right of Way/Mapping Manager) HFI was selected in 2006 to provide plan checking services for the City of San Bernardino on an on-call basis The project requires coordination with the City and County. Plan checking services for the City include,but are not limited to; research and review of street,sewer and storm drain improvement plans; rough and precise grading plans; hydrology/hydraulics reports; retaining wall and other structural design calculations;tract and parcel maps; right of way and easement documents; traffic signal plans and studies. After the review, HFI prepares correction letters and logs containing necessary corrections to make the maps acceptable for recording. On-Call Surveying Services,County of San Bernardino: (Right of Way/Mapping Manager) HFI is providing County of San Bernardino staff with on-call surveying services for Capital Improvement Projects(CIP). Specific services include control surveys,topo- graphic surveys,data collection, boundary surveys,construction check surveys, right-of- way surveys,monumentation,traffic control, high definition surveys,subdivision map checking,and record of surveys. On-Call Surveying and Subdivision Map Checking Services,City of Fontana:(Right of Way/Mapping Manager)HFI is providing the City of Fontana with on-call surveying services for Capital Improvement Projects(CIP). Specific services include tie out of existing survey monuments,filing of corner records,topographic surveys,cross-sections, construction staking,GPS surveys, right of way, control surveys, base maps, review of mapsheets, review of boundary retracement,coordination and monitoring responses to civil engineers and land surveyors, review of storm drain,sewer, street, maintenance of plan check files, written recommendations, and review of design principals and calcula- dons Slope Failure,La Canada Flintridge:(Project Surveyor)Coordinating with the City for the preparation of the legal and plat for a slope easement along Inverness Drive after slope failure. Coyote Canyon,Fontana: (Project Surveyor)Centex Homes Tracts 16325, 16325-1, 16325-2,and 16326 accommodate 302 lots. Prepared legal description and plats for utility companies. Utility Research, Los Angeles:Compiled comprehensive list of all utilities adjacent to or crossing Highway 101 stretching from downtown Los Angeles to the Los Angeles/ Ventura County line for review of proposed expansion of Highway 101. i Section 2 -- DICK BOWMAN, P.E. Project Team Street Design/Signing & Striping Education&Registrations University of Michigan- B.S. -Civil Engineering California State University Long Beach,-M.S. - Civil Engineering University of California,Irvine Extension, -Certificate in Management Practice for Engi- neering and Technical Professionals Professional Licensed Civil Engineer, -CA- #24573 Professional Licensed Civil Engineer, -NV- #15193 Professional Experience Mr. Bowman has over 33 years of extensive experience in public works and land develop- ment projects. He has prepared plans,specifications and estimates(PS&E)for over a dozen cities and public agencies and improvement and grading plans for state,city,and private sectors. He has created hillside and flatland grading plans and feasibility studies and supervised preparation of a wide variety of plans from freeways, highways, streets, storm drains,sewers, park sites, land fills, large mass grading,commercial, and industrial development. His experience includes plan check of improvement plans and implementa- tion of ADA and Title 24 regulations. Project Experience Summit Avenue,Fontana:(Project Engineer)Supervised the preparation of plans, specifications,and estimates for 2.2 miles of new streets and sewer. Coordinated storm drain design,traffic signals and interconnect plans with other engineers.This construction will provide infrastructure for a variety of new development for the fast growing northern area of the city. Beach Boulevard,La Habra:(Project Manager and Project Engineer) Prepared metric plans and cross-sections for widening over one half mile of winding state highway. Coordinated sewer,water, and storm drain design with City,Water District,Orange County,and Caltrans.This project is a portion of a 224-unit apartment complex. Baseline Avenue,Fontana: HFI prepared plans for.75 mile of a 10-ft. by 8-ft rein- forced box in Baseline Avenue.Also coordinated project through City and San Bernardino County processed box is"third barrel"adding to an existing double barrel box that joins the San Sevaine Channel.The addition will upsize the box from a 25-year to a 100-year facility. 210 Freeway,Glendale/Pasadena:(Project Engineer)Prepared plans,specifications and estimates(PS&E)for several miles of two new freeways including the 210 Freeway through the hills of Glendale(10.2 million cubic yards of earthwork)and a mile of the 210 through Pasadena, paralleling the Rose Parade route. Both projects required design of many detours of existing streets that crossed the new freeway.The Pasadena project also entailed coordination of a railroad down the middle of the freeway. HFI also prepared PS&E for several miles of street improvements and widening of the Hollywood Freeway in Hollywood and the 710 Freeway through several cities. Street Plans,Various Tract Streets: (Project Manager/Project Engineer) Prepared hundreds of streets from extremely Flat to very steep(15%maximum). Prepared street plans with 2:1 slopes in the median on a winding hillside tract. Prepared street plans,with varying widths and multiple stationing,for independent horizontal and vertical alignment on each side. a �4 T Section 2 Project Team Hydrology/ Education&Registrations California State Polytechnic University Pomona, B.S.-Civil Engineering E.I.T- CA Professional Experience Ms. Escobar is responsible for the engineering and design preparation of a variety of public works projects including storm drain plans, bike trail plans,street widening plans, quantity and construction cost estimates,and hydrology and hydraulics reports. Project Experience 9th Street Reconstruction, Upland:(Project Engineer) HFI was contracted for this east/west directional transportation corridor that carries approximately 8,500 vehicles per day and serves as a truck route through the City of Upland. HFI provided professional civil engineering and design services for the street reconstruction and water infrastructure improvements for 9th Street between San Antonio Avenue and Euclid Avenue(Route 83). The project includes a water line replacement in 9th Street from Garnet Way to Euclid Avenue, upgrades to curb returns to meet ADA approved requirements,and permits and review by Caltrans for right-of-way. Specifically HFI's work included a topographic survey; geotechnical investigation; preparation of street improvement plans and profiles,water main improvement plans and profiles,signing and striping plans,traffic control plans,and special provisions to meet City standards; preliminary and final engineer's cost estimates, ` and preparation of as-built plans upon project completion. Citrus Avenue Widening,Fontana:(Staff Engineer)Provided engineering services for approximately one mile of street widening at Citrus Avenue,a showcase project due to its location as an off ramp for the new Route 210 freeway.The project included improve- ments for widening the roadway from two to four lanes,storm drains, landscaping, lighting,traffic signals,and sewers.The scope of work also included the design of drive- ways; preparation of right-of-way acquisition documents for adjacent residential proper- ties that were impacted by the increase in right-of-way width; and sewer laterals to homeowners adjacent to the project who are presently on septic tank systems.The total construction for the project was approximately$3.5 million. Riverside Drive Sidewalk Project Between Clover Lane and Colony High School, Ontario: (Project Engineer)The City needs to provide protection for High School students by providing sidewalk improvements along the south side of Riverside Drive from the Colony High School west to Clover Lane.A recent accident in the City of Fontana in which a car hit a student as she walked along the edge of the roadway made the need for a sidewalk very clear. Uncontrolled mid-block pedestrian crossings needed to be discouraged by providing safe access to a signalized intersection.The land use adjacent to this road- way is dairy pens and sheds. HFI investigated sidewalk alternatives.All alternatives will take into account the existing storm drain inlets near the edge of pavement, existing poles adjacent to the roadway,driveways that serve adjacent properties, and areas where bushes intrude into the walkway. SR 91/La Sierra Avenue, Riverside:(Staff Engineer)Assisted in the preparation of Preliminary Hydrology and Hydraulics report for SR-91 at La Sierra Avenue Improvements. T Section 2 Day Street Improvements,Riverside: (Staff Engineer)Prepared street widening Project Team plans, storm drain improvement plans, and hydrology report. Spring Road Improvements,Moorpark:(Staff Engineer)Prepared Plans and engi- neering estimate for the widening of Spring Road. Public Works Plan Review Services,San Bernardino:(Plan Checker)HFI was selected in 2006 to provide plan checking services for the City of San Bernardino on an on- call basis.The project requires coordination with the City and County. Plan checking services for the City include, but are not limited to; research and review of street,sewer and storm drain improvement plans; rough and precise grading plans; hydrology/hydrau- lics reports; retaining wall and other structural design calculations;tract and parcel maps; right of way and easement documents; traffic signal plans and studies.After the review, HFI prepares correction letters and logs containing necessary corrections to make the maps acceptable for recording. On-Call Engineering Services,County of San Bernardino:(Project Engineer)HFI is providing County of San Bernardino staff with on-call services for Capital Improvement Projects(CIP).The scope of services includes street and trails construction/design,traffic signal design,signing and striping,water quality management,sanitary sewer design/ waterlines,surveying and mapping,geotechnical, grading,street design,storm drain design, potholing,aerial photography, landscape design,and community outreach as needed.Services also include coordination of projects with other public agencies and utility companies. Engineering fees are based on an hourly rate schedule. , Inland Empire Bike Trail Design Phase II,Upland:(Staff Engineer)Prepared geomet- ric plans for the design of Bike Lane Phase II in the City of Upland. Maureen Lane Storm Drain Design,Moorpark:(Staff Engineer)Prepared storm drain plan and profiles and hydrology and hydraulics report. Oasis Homes-Tract No. 16563,Fontana:(Staff Engineer)Prepared Hydrology report for Tract No. 16553 located on the southwest corner of Walnut Avenue and Cypress Avenue. Section 2 Project Team Education&Registrations University of California at Los Angeles, B.S.-Civil Engineering Registered Engineer in Training,CA Professional Experience Ms. Chen is responsible for the engineering and design preparation of a variety of public works projects including storm drain plans, bike trail plans,street widening plans,quantity and construction cost estimates,and hydrology and hydraulics reports. Project Experience 9th Street Reconstruction, Upland: (Project Engineer) HFI was contracted for this east/west directional transportation corridor that carries approximately 8,500 vehicles per day and serves as a truck route through the City of Upland. HFI provided professional civil engineering and design services for the street reconstruction and water infrastructure improvements for 9th Street between San Antonio Avenue and Euclid Avenue(Route 83). The project includes a water line replacement in 9th Street from Garnet Way to Euclid Avenue, upgrades to curb returns to meet ADA approved requirements,and permits and review by Caltrans for right-of-way.Specifically HFI's work included a topographic survey; geotechnical investigation; preparation of street improvement plans and profiles,water main improvement plans and profiles,signing and striping plans,traffic control plans,and ` special provisions to meet City standards; preliminary and final engineer's cost estimates, and preparation of as-built plans upon project completion. Street Slope Failure,La Canada/Flintridge:(Staff Engineer)Project areas include a slope failure on Inverness Drive that took out an important roadside and a crib wall failure on Foothill Blvd. From the beginning there were challenges to these projects that required creative and innovative technology.Inverness Drive is a residential street that connects hillside residents with the City.The intense rain caused two sections of the road to fall away.The sections included one 90'section and one 40'section,which left the road impassable by any vehicles.The road is located on a steep slope surrounded by hills and valley that made it extremely difficult to access the areas of failure for investigation and surveying.Another challenge to both City projects has been the involvement of the com- munity.Several residents have portions of their land that are affected by the storm damage.This project is ongoing has proven to be both a challenge and a reward to HFI's team. Riverside Drive Sidewalk Project Between Clover Lane and Colony High School, Ontario:(Project Engineer)The City needs to provide protection for High School students by providing sidewalk improvements along the south side of Riverside Drive from the Colony High School west to Clover Lane.A recent accident in the City of Fontana in which a car hit a student as she walked along the edge of the roadway made the need for a sidewalk very clear. Uncontrolled mid-block pedestrian crossings needed to be discouraged by providing safe access to a signalized intersection.The land use adjacent to this road- way is dairy pens and sheds. HFI investigated sidewalk alternatives.All alternatives will take into account the existing storm drain inlets near the edge of pavement,existing poles adjacent to the roadway, driveways that serve adjacent properties,and areas where bushes intrude into the walkway. fq nL, Section 2 Public Works Plan Review Services,San Bernardino:(Lead Plan Checker) HFI was Project Team selected in 2006 to provide plan checking services for the City of San Bernardino on an on call basis.The project requires coordination with the City and County. Plan checking services for the City include, but are not limited to; research and review of street, sewer and storm drain improvement plans; rough and precise grading plans; hydrology/hydrau- lics reports; retaining wall and other structural design calculations; tract and parcel maps; right of way and easement documents;traffic signal plans and studies.After the review, HFI prepares correction letters and logs containing necessary corrections to make the maps acceptable for recording. On-Call Engineering Services,County of San Bernardino:(Project Engineer)HFI is providing County of San Bernardino staff with on-call services for Capital Improvement Projects(CIP).The scope of services includes street and trails construction/design,traffic signal design,signing and striping,water quality management,sanitary sewer design/ 3 waterlines,surveying and mapping,geotechnical,grading,street design,storm drain design,potholing,aerial photography, landscape design,and community outreach as needed. Services also include coordination of projects with other public agencies and utility companies. Engineering fees are based on an hourly rate schedule. Yorba Linda Water District Sewer System Evaluation,S&S Development: (Staff Engineer)Evaluation includes study of existing sewer system,sewer flow analysis calcula- tions,capacity and replacement analysis and improvements cost estimates. East Yorba Linda Sewer Crossing Study at Imperial Highway:(Staff Engineer) Study includes sewer modifications to enable the construction of the proposed reinforced concrete box and preparing sewer capacity calculations. Brighton Place II Development Project,City of Montclair:(Staff Engineer)Prepared existing development hydrology map and hydrology calculations.Sized the proposed channel using Flow Master. Prepared hydraulic calculations for existing and proposed storm drain facilities. Colorado Lagoon Water Quality Investigative Report,City of Long Beach:Report includes study of various scenarios of improving the water quality of Colorado Lagoon. Analyzing dry season sewer diversion scenario,filtration and passive disinfection scenario, and active filtration/disinfection scenario.Prepared cost estimates for water quality controls. Installation of CDS Unit,City of Long Beach: Designed plans and profile for BMP debris separator(CDS Unit)and the existing storm drain facilities. Prepared hydraulic studies for BMP debris separators. Reviewed construction submittals. Water Main Replacement Project,City of Ontario: Prepared water main improve- ment plans and calculated fire-Flow analysis using H2ONet. Modified special provisions and prepared cost estimates. i z Section 2 Project Team Water Quality Management Education&Registrations University of Riverside, B.S., Environmental Engineering University of Riverside, M.S.,Chemical and Environmental Engineering University of Riverside, M.S.,Chemistry- Pending California Registered Engineer in Training, #XE0870351993 Hazwoper Certification,40 hour Professional Experience Mr. Andre has more than 14 years experience in the field of water management. He has over one and a half years of experience in the field of land development and SWPPP/ WQMP preparation. He has extensive experience in the field providing sampling, water treatment and management practices, hydrology,storm drain design,-and sewer system design. Mr.Andre also has seven years of experience in environmental engineering and six years in the instruction of chemical and environmental engineering coursework. His responsibilities as environmental engineer range from supervising field crews to construc- tion and start up equipment. Project Experience Hydrology,Storm Drain and Sewer for 47th Street,Palmdale: Project involved 36 acres for a commercial development in Palmdale. Preparation involved determining hydrology for site,designed the storm drain system, and sewer system and coordinating submittal to the City of Palmdale SWPPP Preparation for Century Vintage Homes,Gavilin Hill:Prepared SWPPP for Planned Community on approximately 70 acres. SWPPP preparation involved research and compliance with orders within the Santa Ana River Watershed and coordinating submittal to the Santa Ana River Water Quality Control Board (Region 8). WQMP Preparation for Lewis Retail Development, Murrieta:Prepared WQMP. Project involved 85 acres for a mixed-use development in Murrieta. Preparation involved research and compliance with orders and coordinating submittal to the Santa Ana River Water Quality Control Board(Region 8)and the City of Murrieta. SWPPP and WQMP Preparation for Wal-Mart, Baldwin Park:Assisted in the SWPPP preparation for Wal-Mart's expansion to a super Wal-Mart. Site is approximately 17 acres. SWPPP preparation involved research and compliance with orders within the San Gabriel River Watershed and coordinating submittal to the Los Angeles Water Quality Control Board(Region 4). SWPPP and WQMP Preparation for Wal-Mart, Pico Rivera:Assisted in the SWPPP preparation for Wal-Mart's expansion to a super Wal-Mart. Site is approximately 12 acres. SWPPP preparation involved research and compliance with orders within the San Gabriel River Watershed and coordinating submittal to the Los Angeles Water Quality Control Board(Region 4). SWPPP and WQMP Preparation for Hopkins Development, Mira Loma: Prepared SWPPP for commercial development on a site of approximately 49 acres. SWPPP prepara- tion involved research and compliance with orders within the Santa Ana River Watershed and coordinating submittal to the Santa Ana River Water Quality Control Board(Region 8). t. Section 2 SWPPP and WQMP Preparation for Lowe's, Mira Loma: Prepared SWPPP report for Project Team Lowe's in Mira Loma. Site is approximately 17 acres. SWPPP preparation involved re- search and compliance with orders within the Santa Ana River Watershed and coordinat- ing submittal to the Santa Ana River Water Quality Control Board (Region 8). WQMP Preparation for Wal-Mart,Apple Valley: Prepared WQMP for a Super Wal- Mart. Project involved 35 acres for development of a Super Wal-Mart in the high desert. Preparation involved research and compliance with orders and coordinating submittal to the Lahontan Water Quality Control Board (Region 6)and the City of Apple Valley. WQMP Preparation for Wal-Mart, Victorville: Prepared WQMP for a Super Wal-Mart. Project involved 42 acres for development of a Super Wal-Mart in the high desert. Prepa- ration involved research and compliance with orders and coordinating submittal to the Lahontan Water Quality Control Board(Region 6)and the City of Victorville. WQMP Preparation for Wal-Mart, Riverside: Prepared WQMP for a Super Wal-Mart. Project involved 31 acres for development of a Super Wal-Mart in Riverside County. Preparation involved research and compliance with orders within the Santa Ana River Watershed and coordinating submittal to the Santa Ana River Water Quality Control Board (Region 8)and the City of Riverside. WQMP Preparation for CarMax, Riverside: Prepared WQMP for a CarMax location in Riverside County. Project involved 27 acres for development. Preparation involved re- search and compliance with orders within the Santa Ana River Watershed and coordinat- ing submittal to the Santa Ana River Water Quality Control Board (Region 8)and the City of Riverside WQMP Preparation for Wal-Mart,Ontario:Assisted with preparation of a WQMP for Super a Wal-Mart. Project involved 21 acres for development. Preparation involved research and compliance with orders within the Santa Ana River Watershed and coordi- nating submittal to the Santa Ana River Water Quality Control Board(Region 8)and the City of Ontario. WQMP,SWPPP and Hydrology Preparation, Designed Storm drain system for Mathis Brothers Furniture,Ontario:Preparation the WQMP and SWPPP for Mathis Brothers Furniture. Project involved 19 acres for development of a commercial Center. Preparation involved determining hydrology for the site,designed the storm drain system, and involved research and compliance with orders within the Santa Ana River Watershed and coordinating submittal to the Santa Ana River Water Quality Control Board(Region 8) and the City of Ontario. WQMP,SWPPP and Hydrology Preparation, Designed Storm drain system for Bass Pro Shops, Rancho Cucamonga: Preparation the WQMP and SWPPP for Bass Pro Shops. Project involved 17 acres for development of a commercial center. Preparation involved determining hydrology for the site,designed the storm drain system, and involved research and compliance with orders within the Santa Ana River Watershed and coordi- nating submittal to the Santa Ana River Water Quality Control Board(Region 8)and the City of Rancho Cucamonga. Water Analysis,Various Clients: (Chemist) Performed the EPA 8260, 8015 and 8020 chemical analyses of samples on air and water samples. Performed various water quality analyses on samples. - Section 2 . O: Project Team Traffic Engineering Education&Registrations California State Polytechnic University,Pomona- B.S. -Civil Engineering Registered Professional Engineer#42386 Registered Traffic Engineer#1573 Professional Experience Mr. Kilpatrick has over 26 years of experience in the civil and transportation engineering fields. His areas of expertise include street,water,grading plans, transportation services, traffic impact analysis,traffic signal design,and traffic operations. Mr. Kilpatrick has been involved in a diverse range of projects including public infrastructure and traffic related projects. He has extensive experience in the preparation and processing of traffic engi- neering services. Project Experience "I"Avenue Reconstruction,Hesperia: (Project Manager) Project involved the design of street improvements,striping,and drainage improvement plans and included a concrete arch structure and traffic analysis for the"I"Avenue realignment.The firm performed the design surveying and prepared the improvement plans and specifications for 12,000 feet(2.3 miles)of roadway to be removed and reconstructed with various storm drain improvements.The project also involved the realignment of"I"Avenue and traffic signal modifications at Bear Valley Road. Peach Avenue Improvements,Hesperia: (Project Manager)Project involved the reconstruction and design of street and drainage improvement plans.The firm performed the design surveying and prepared the improvement plans and specifications for 1,200 feet of roadway to be removed and reconstructed including a 12 by 36 foot pre-cast reinforced concrete arch with headwalls. Traffic Signal Projects on Main Street,Hesperia:(Project Manager) Provided the design of traffic signals at various locations on Main Street including for the City of Hesperia at the intersections of"G"Avenue,"C"Avenue,Maple Avenue,Topaz Avenue, Mountain Vista, Key Pointe,and Cataba. Various Traffic Signal Projects,High Desert: (Project Manager) Provided design of over 30 traffic signal plans for various City agencies throughout the high desert including Victorville,Apple Valley, Lancaster,and Palmdale. Nisqualli Road Widening,Victorville:(Project Manager)HFI provided traffic signal, striping,traffic control,and detour plans for four new intersections along Nisqualli Road. Project involved the widening of four miles from two to four lanes on Nisqualli Road in the City of Victorville. Work on Segment 1 was completed and the project is currently due to bid for construction. Highway 18/Apple Valley Road,Apple Valley:(Project Manager)Conducted a traffic study and design engineering to widen Highway 18 and provide an east to southeast right turn lane to ease rush hour traffic at this major intersection. Project design was completed and the City is currently bidding for construction. Section 2 DOLORES Project Team Utility Research/Coordination Education/Registration Rio Hondo College,Whittier,CA Professional Experience Ms. Moreira is accomplished in the areas of utility research, field studies, documentation of as-built plans and working with utility owners to obtain all required information to produce error free plans. Ms. Moreira is a team player who works well with utility representatives, municipal and agency staff. She has knowledge of easement documentation and requirements.She has coordinated construction bid processes,cost proposals, preconstruction meetings and construction schedules. Project Experience Utility Coordination • Sierra Avenue,SR-210 to Summit Avenue, Fontana,California • Jurupa/Mulberry Improvements, Fontana,California • Railroad and State Street, Los Angeles, California • Sunset Avenue Relocation,City of Industry,California • Colonies Crossroads, Upland,California • Alexander Communities,Upland,California • Cable Airport Business Park, Upland,California Highway/Street Improvements • Baseline Avenue Improvements, Fontana,California • Sierra Avenue,SR-210 to Summit Avenue, Fontana,California • Jurupa/Mulberry Improvements,Fontana,California • South Highland Avenue&Juniper Sewer, Fontana,California • Interstate 10/Riverside Avenue Interchange,Rialto,California • 26th Street Extension,Vernon,California • Interstate 15/6th Street, Rancho Cucamonga,California • State Route 101,Los Angeles County,California • Avenue'T'Improvements,Palmdale,California • Civic Center Park Improvements, Fontana, California • Bear Valley Road,Victorville,California Airports • Ontario Airport Master Plan,Ontario,California • Cable Airport, Upland,California • LAX Drainage, Los Angeles,California Y } Section 2 Project Team Geotechnical,, Leighton & Associates, Subconsultant Education&Registrations PhD, Civil Engineering, University of California, Davis MS,Civil Engineering, University of California,Davis BS,Civil Engineering, University of Peradeniya,Sri Lanka Registered Geotechnical Engineer/California/2708 Registered Civil Engineer/California/63185 Professional Experience Drr. Sivathasan brings more than it years of geotechnical engineering design and con- struction experience. He has managed geotechnical observation and testing and special inspection and materials testing of several bridge and roadway improvement projects. He is experienced in performing deep and shallow foundation,slope stability, retaining structures,and site response analyses as well as liquefaction potential assessments. Project Experience I-15/Cantu-Galleanu Ranch Road Interchange,Mira Loma:(Project Manager/ Project Engineer) Responsible for geotechnical observation and testing and special inspection and materials testing during construction of the new interchange.The improve- ments would include the construction of Cantu/Galleano Ranch Road from Hamner Road through the interchange area to approximately 150 meters west of Wineville Road, construction of the interchange ramps,and signalization of the ramp terminal.The project is ongoing.Construction to be completed in May 2007.Approximate Cost is$47.4 million. Beaumont Avenue Bridge,Loma Linda:(Project Manager/Engineer)Geotechnical observation and testing and materials testing for the replacement of the Bridge in Loma Linda, which is part of the larger San Timoteo Creek Flood Control Project.Testing included compaction,Proctor,and R-value testing of the roadway embankment,structure materials,and aggregate base;AC paving testing of asphalt concrete;and concrete cylinder and unit weight testing of structural concrete.All work has been performed under Caltrans specifications and test methods. Project was started in December 2005 and completed in December 2006.Approximate cost was$1 million. K.Hovnanian Bridges,Beaumont:(Project Manager/Project Engineer)Geotechnical investigation to develop recommendations for the design and construction of four pro- posed bridges across Potrero Creek within the Four Seasons at Highland, an active adult residential development.These bridges are proposed to be single span bridges with two abutments.Also providing geotechnical observation and testing and special inspection and materials testing of the bridge construction. Responsible for review and analysis of relevant geotechnical reports and lab data,coordination of subsurface exploration that included drilling, logging, and seven hollow-stem auger boring samples, soils testing and report preparation. Wineville Extension Recycled Water Pipeline,Fontana/Ontario:(Project Manager/ Engineer)Provided geologic hazard review for this project which consisted of three segments of pressurized pipeline in city streets.There is two 16-inch-diameter pipelines up to 4,500 feet long and a 12-in-diameter pipeline at 18,900 feet long. Performed review of all pertinent regional geologic maps and reports, and historic and aerial photographs of the site,an investigation of the site to observe the existing surface conditions,and pre- pare a report summarizing our findings and recommendations. Section 2 LOCKHART Project Team SHARON Environmental, Solution Strategies, Inc.,, Subconsultant Education/Registrations Pacific Coast University Law School, Long Beach, Juris Doctor with Honors,Valedictorian, Horn Book Scholar Louisiana State University, Baton Rouge, Ph.D.Candidate, National Science Foundation Trainee. Major: Marine Science. Minor: Botany. Southwest Missouri State University,Springfield, M.A.- Biology. Southwest Missouri State University,Springfield, B.S. - Biology. Minor: Political Science. Professional Experience Sharon Lockhart is a biologist with over 30 years of experience in solving complex natural resource issues. She has extensive experience in project and team management,project design and engineering,strategic planning, and environmental assessment, as well as client and community relations. Her responsibilities have included providing input into a project's design to meet environmental compliance requirements; identifying required Federal and State permits; developing wetland and habitat restoration plans, including the development of revegetation plans, monitoring programs, performance standards and success criteria; preparing summaries of biological baseline information and impact assessments for environmental documents; preparing endangered species biological assessments and habitat conservation plans; preparing permit applications; and develop- ing special condition compliance documents. Ms. Lockhart has also developed strategies for processing such entitlements as Clean Water Act, Endangered Species Act,and Coastal Commission permits and has taken an active role in processing these permits/entitlements with the regulatory agencies.An exceptional communicator, Ms. Lockhart also prepares technical and policy information on wetlands and endangered species for State and local agencies and environmental and professional groups. Project Experience Rolling Hills Ranch,San Bernardino:(Environmental)ECORP Consulting,Inc.along with Solution Strategies, Inc.'s Land Use Division provided strategic counsel,assistance with negotiations,and permitting assistance for Century Vintage Homes'Rolling Hills Ranch project in San Bernardino,California.The team conducted meetings with Century Vintage Homes,the City of San Bernardino,the County Flood Control District,and other community groups to obtain concurrence on the project from all interested parties. In addition,the team conducted a jurisdictional delineation to determine the drainage areas that fall under the jurisdiction of the U.S. Army Corps of Engineers and the California Department of Fish and Game. ECORP prepared the Biological Assessment in support of the Section 7 Consultation with the U.S. Fish and Wildlife Service for impacts to the San Bernardino kangaroo rat and the coastal California gnatcatcher and impacts to designated Critical Habitat for these species.The team conducted meetings and assisted with the negotiations for the permits under Sections 404 and 401 of the Clean Water Act and Section 1602(Streambed Alteration Agreement)of the State Fish and Game Code.The team prepared the permit applications,conducted meetings with the agencies, and obtained the permits for the project. Cajon Creek,San Bernardino: (Environmental)The Vulcan Materials Cajon Creek Project provides for the production of aggregate materials,the development of a light industrial project,and the preservation of six miles of Cajon Creek. In-stream mining was designed to maintain stream equilibrium.Following mining,the mined areas were re- Section 2 stored using suitable native plant species.A mitigation bank was established on areas not Project Team required to offset project related impacts.This project preserved, enhanced,and restored approximately six miles of the creek. The project site provides habitat for twenty-two sensitive species and serves as a vital habitat link into the San Bernardino Mountains. SSI's principals aided in processing applications for Section 404 permit, including a Section 7 consultation,Section 401 certification,and the Streambed Alteration Agreement. The Section 7 consultation was for state and federal listed plants and animals. A major responsibility was overseeing the preparation of the Biological Assessment and negotiating the conditions incorporated in the Section 7 Biological Opinion.The project also included the development of memoranda with the state and federal agencies for the long-term management of a conservation bank(the Cajon Creek Habitat Conservation Management Area)for 22 sensitive species established as part of the environmental review process. This effort included working with the community and environmental groups. Playa Vista, Los Angeles: (Environmental)The Playa Vista Project is a multiuse project in the central portion of coastal Los Angeles County. As part of the original project vision, a habitat restoration project was proposed to restore the coastal dunes, tidal wetlands, and adjacent coastal sage scrub habitat and create a freshwater marsh and two-mile riparian corridor. Approximately half the site would be retained as habitat open space in a highly urbanized area.The vision was to initiate the creation of a habitat corridor linkage from the sea to the Baldwin Hills that included both regionally important passive recre- ational and educational opportunities.A SSI Land Use principal oversaw the environmental approvals of the initial project phase.Tasks included overseeing the design of habitat restoration projects; identifying required federal,state,and local permits; developing and implementing processing strategies for Clean Water Act,Endangered Species Act and California Coastal Act permits; preparing environmental documents;and developing special condition compliance documents.Tasks also included coordinating not only with the client and technical experts involved in the document preparation but also with personnel from the Army Corps of Engineers,U.S. Environmental Protection Agency, U.S. Fish and Wildlife Service,California Department of Fish and Game and National Marine Fisheries Service. In addition,the principal was responsible for coordinating with environmental groups and the public on biological resource issues and doing other public outreach. State of California's Acquisition of Coal Canyon:(Environmental)Located at the edge of a region epitomizing urban sprawl,Coal Canyon is a remnant of California's coastal sage scrub ecosystem,widely recognized as one of the most biologically diverse and threatened ecosystems in the continental U.S.The area is home to many species, including mountain lion,bobcat, deer, and the endangered California gnatcatcher, and is a vital link in the biological corridor extending from the Mexican border,through Orange County's Great Park region,and into Ventura County. SSI coordinated and directed the complex process necessary to complete the State of California's acquisition of Coal Canyon on behalf of the property owner.The process was also linked to securing entitlements for a project in Yorba Linda.Therefore, SSI's work included creating a successful entitlement and mitigation strategy for the Yorba Linda project,seeking state appropriations and other funding to acquire Coal Canyon,addressing stakeholder concerns,coordinating with agencies for document approval and escrow,and even planning the celebration event. Throughout the acquisition process, SSI worked with a broad range of stakeholders and developers, including the State of California's Department of Transportation,Department of Parks&Recreation, and Department of Fish&Game; the U.S. Department of Interior, Fish and Wildlife Service, Forest Service, Department of Agriculture,and Army Corps of Engineers;conservation organizations including Hills for Everyone,The Wildlands Conser- vancy, Friends of Tecate Cypress,and the Mountain Lion Foundation;and the City of Anaheim,City of Yorba Linda,and Orange County. - . .. M. Section 2 LINDA MITROVICH Project Team Environmental, Solution Strategies, Inc., Subconsultant Education/Registrations Whittier College, B.S, Political Science Professional Experience Linda Mitrovich is the co-founder of Solution Strategies,Inc., which has been helping private and public sector Clients resolve conflicts and create solutions for community, environmental,and economic issues since 1991.A former City Councilmember and Deputy Mayor,she has an in-depth understanding of politics at the city,county,and state levels as well as the impact national policies have on local governments. Ms. Mitrovich has extensive experience in the environmental regulatory arena at both the state and federal levels,including the Endangered Species Act, Clean Water Act,and Clean Air Act,and has been instrumental in creating model environmental agreements. She is the co-creator of the Endangered Species Permitting Game, which has assisted various planning associations, including the Association of Environmental Professionals, to help their members better understand the intricacies of deal-making in the regulatory arena. She has a unique talent and capability to balance the interests of diverse and often conflicting stakeholders,and she is widely recognized as a specialist in policy negotiations, strategy development,coalition building,dispute resolution,and team coordination.Her ability to see the big picture and then to create focus and momentum for project teams has enabled those teams to reach successful outcomes that others deemed impossible. Project Experience Rolling Hills Ranch,San Bernardino:(Environmental)ECORP Consulting,Inc.along with Solution Strategies,Incas Land Use Division provided strategic counsel,assistance with negotiations,and permitting assistance for Century Vintage Homes'Rolling Hills Ranch project in San Bernardino,California.The team conducted meetings with Century Vintage Homes,the City of San Bernardino,the County Flood Control District,and other community groups to obtain concurrence on the project from all interested parties. In addition,the team conducted a jurisdictional delineation to determine the drainage areas that fall under the jurisdiction of the U.S.Army Corps of Engineers and the California Department of Fish and Game. ECORP prepared the Biological Assessment in support of the Section 7 Consultation with the U.S. Fish and Wildlife Service for impacts to the San Bernardino kangaroo rat and the coastal California gnatcatcher and impacts to designated Critical Habitat for these species.The team conducted meetings and assisted with the negotiations for the permits under Sections 404 and 401 of the Clean Water Act and Section 1602(Streambed Alteration Agreement) of the State Fish and Game Code.The team prepared the permit applications,conducted meetings with the agencies, and obtained the permits for the project. Cajon Creek,San Bernardino: (Environmental)The Vulcan Materials Cajon Creek Project provides for the production of aggregate materials,the development of a light industrial project,and the preservation of six miles of Cajon Creek. In-stream mining was designed to maintain stream equilibrium. Following mining,the mined areas were re- stored using suitable native plant species.A mitigation bank was established on areas not required to offset project related impacts.This project preserved, enhanced,and restored approximately six miles of the creek.The project site provides habitat for twenty-two sensitive species and serves as a vital habitat link into the San Bernardino Mountains. principals aided in processing applications for Section 404 permit.including a Section i I ` Section 2 7 consultation,Section 401 certification, and the Streambed Alteration Agreement.The Project Team Section 7 consultation was for state and federal listed plants and animals. A major responsibility was overseeing the preparation of the Biological Assessment and negotiating the conditions incorporated in the Section 7 Biological Opinion.The project also included the development of memoranda with the state and federal agencies for the long-term management of a conservation bank(the Cajon Creek Habitat Conservation Management Area)for 22 sensitive species established as part of the environmental review process. This effort included working with the community and environmental groups. Playa Vista, Los Angeles:(Environmental)The Playa Vista Project is a multiuse project in the central portion of coastal Los Angeles County. As part of the original project vision, a habitat restoration project was proposed to restore the coastal dunes,tidal wetlands, and adjacent coastal sage scrub habitat and create a freshwater marsh and two-mile riparian corridor.Approximately half the site would be retained as habitat open space in a highly urbanized area.The vision was to initiate the creation of a habitat corridor linkage from the sea to the Baldwin Hills that included both regionally important passive recre- ational and educational opportunities.A SSI Land Use principal oversaw the environmental approvals of the initial project phase.Tasks included overseeing the design of habitat restoration projects; identifying required federal,state,and local permits;developing and implementing processing strategies for Clean Water Act,Endangered Species Act and California Coastal Act permits; preparing environmental documents;and developing special condition compliance documents.Tasks also included coordinating not only with the client and technical experts involved in the document preparation but also with person- nel from the Army Corps of Engineers, U.S. Environmental Protection Agency, U.S. Fish and Wildlife Service,California Department of Fish and Game and National Marine Fisher- ies Service. In addition,the principal was responsible for coordinating with environmental groups and the public on biological resource issues and doing other public outreach. State of California's Acquisition of Coal Canyon:(Environmental)Located at the edge of a region epitomizing urban sprawl, Coal Canyon is a remnant of California's coastal sage scrub ecosystem,widely recognized as one of the most biologically diverse and threatened ecosystems in the continental U.S.The area is home to many species, including mountain lion, bobcat, deer,and the endangered California gnatcatcher,and is a vital link in the biological corridor extending from the Mexican border,through Orange County's Great Park region,and into Ventura County.SSI coordinated and directed the complex process necessary to complete the State of California's acquisition of Coal Canyon on behalf of the property owner.The process was also linked to securing entitle- ments for a project in Yorba Linda.Therefore,SSI's work included creating a successful entitlement and mitigation strategy for the Yorba Linda project,seeking state appropria- tions and other funding to acquire Coal Canyon,addressing stakeholder concerns,coordi- nating with agencies for document approval and escrow,and even planning the celebra- tion event. Throughout the acquisition process, ECOI worked with a broad range of stakeholders and developers, including the State of California's Department of Transporta- tion, Department of Parks&Recreation,and Department of Fish&Game; the U.S. Department of Interior, Fish and Wildlife Service, Forest Service, Department of Agricul- ture,and Army Corps of Engineers;conservation organizations including Hills for Every- one,The Wildlands Conservancy, Friends of Tecate Cypress, and the Mountain Lion Foundation; and the City of Anaheim,City of Yorba Linda,and Orange County.The acquisi- tion was completed in November 2000. Reflecting SSI's extraordinary ability to bring together diverse stakeholders,the Coal Canyon acquisition provides a model of how typically adversarial organizations can cooperate to the benefit of each other,the public, and the environment. i I Section 2 MARISCHROEDER Project Team i , , Consulting, Inc., Subconsultant Education/Registrations M.S., Environmental Studies,California State University, Fullerton B.S.,Zoology,California State Polytechnic University, Pomona Habitat Evaluations Procedures Certificate,USFWS Mohave Ground Squirrel CHIEF Analysis,CDFG California Gnatcatcher Workshop,the Wildlife Society Desert Tortoise Handling Workshop California Gnatcatcher/Least Bell's Vireo Permit No.TE-781217(pending renewal) Professional Experience Ms. Schroeder has more than 18 years of experience in managing projects and conducting biological surveys in California. She is a wildlife biologist with specific expertise in assess- ing avian resources and conducting nest monitoring surveys in coastal sage scrub and riparian habitats. Prior to becoming a Project Manager, Ms. Schroeder conducted general biological surveys and focused surveys for California gnatcatchers,least Bell's vireos, desert tortoises and other sensitive wildlife species. In addition,she prepared biological technical reports and biological sections of CEQA and NEPA documents. Ms. Schroeder now serves as a Program Manager for large clients and is responsible for client relations, quality control of clients'documents,and delegation of projects to ECORP's Project Managers and staff.She specializes in managing large,complex projects involving CEQA/NEPA and biological resources,sensitive and listed species,and habitat restoration issues.She has extensive experience in consultations with the resources agencies,including the U.S. Fish and Wildlife Service(USFWS),California Department of Fish and Game(CDFG), U.S.Army Corps of Engineers(Corps),and Regional Water Quality Control Board(RWQCB). In addition,she specializes in developing mitigation strategies that take into account the client's needs as well as the resource agencies' wants.She oversees the biological technical studies and develops mitigation strategies designed to enhance and restore habitat for endangered species and to support the justification for establishing habitat mitigation banks. Project Experience Biological Support for Joint Environmental Impact Report/Environmental Impact Statement(EIR/EIS),Devers-Palo Verde SOOkV No.2 Transmission Line Project, San Bernardino and Riverside Counties:Aspen Environmental for the California Public Utilities Commission.The Southern California Edison project included construction of a new 230-mile 500 kV electric transmission line from the Devers Substation in California to the Harquahala Generating Substation in Arizona and upgrades to 48.2 miles of 230 kV transmission lines in California. Responsibilities included: reviewing the existing biological documents and databases and determining the needs for additional biological surveys; reviewing federal,state, and local planning documents that would be addressed in the analysis;determining potential for occurrence of listed and sensitive species; preparing the affected environment section and determining the impacts of the project and three alternatives; determining the cumulative impacts on the biological resources; and re- °` sponding to public comments on the Draft EIR/EIS. Biological Assessment,Biological Surveys and Technical Report,Focused Sur- veys for California Gnatcatcher and Quino Checkerspot,Wetlands Delineation, Permitting,and Section 7 Consultation for the 258-Acre Yorba Linda Heights Project,Orange County, Pulte Home Corporation:As Program Manager, responsible Section 2 for overseeing all aspects of this project,including extensive coordination and consultation Project Team with the various resource agencies. Conducted a literature review, reconnaissance-level biological survey,and focused surveys for sensitive plant and wildlife resources at this site. Resources identified on the site were documented and mapped. Focused surveys were conducted for the coastal California gnatcatcher and Quino checkerspot butterfly. Also conducted an extensive wetlands delineation of the drainages on the site. Prepared the Biological Assessment under Section 7 of the Federal Endangered Species Act and partici- pated in all of the negotiations with the U.S. Fish and Wildlife Service, U.S. Army Corps of Engineers,California Department of Fish and Game,and Regional Water Quality Control Board.The resulting mitigation was the purchase of the Coal Canyon property, which constituted the last mountain lion movement corridor between the Santa Ana Mountains and the Chino-Puente Hills.This property was incorporated into Chino Hills State Park and the underpass under the 91 Freeway was removed to facilitate wildlife movement. Habitat Resources Management Plan,Biological Surveys and Technical Report, Focused Surveys for California Gnatcatcher and Riverside Fairy Shrimp,Wet- lands Delineation,Permitting,Mitigation Monitoring,and Habitat Restoration for the 113-Acre Santiago Canyon Estates Project,Orange County,Santiago Partners/Beazer Homes:As Program Manager, responsible for overseeing all aspects of this project, including extensive coordination and consultation with the various re- sources agencies. Conducted a literature review,reconnaissance-level biological survey, and focused surveys for sensitive plant and wildlife resources at this site. Resources identified on the site were documented and mapped. Focused surveys were conducted for the coastal California gnatcatcher and Riverside fairy shrimp.Also conducted an extensive wetlands delineation of the drainages on the site. Prepared the Habitat Resources Man- agement Plan that provided all of the specifications and mitigation measures for protecting the sensitive resources during the construction phase of the project and for conducting the habitat restoration on the site. Implemented the restoration of coastal sage scrub,ripar- ian,wetland,and oak woodland habitats and is currently monitoring the maintenance and success of the restoration.The restoration at this site has been signed off by the re- sources agencies as being successful. Biological Resources Assessment of the Woodcrest Property in Riverside, Riverside County,Ion Communities:Project Manager responsible for coordinating the biological resources survey and preparation of a report for a 65-acres site in Riverside. This report was prepared in such a way as to adhere to the guidelines and requirements in the Western Riverside County Multi-Species Habitat Conservation Plan(MSHCP).The site was surveyed for common and sensitive species of plants and wildlife, as well as for the presence of potential wildlife movement corridors. In addition, recommendations were given for further focused surveys for listed species of wildlife that required additional surveys under the MSHCP. Focused surveys were conducted on the site for burrowing owls. Biological Resources Assessment for the Chapman Heights Property,City of Yucaipa,Odle and Associates:As Principal Wildlife Biologist, responsible for conduct- ing and overseeing surveys for common, listed,and/or sensitive species of wildlife and plants.The site consisted of approximately 1,500 acres of Riversidian Alluvial Fan Sage Scrub, Coastal Sage Scrub, non-native grasslands,and orchards.At issue were the potential presence of the California gnatcatcher,San Bernardino Merriam's kangaroo rat, Los Angeles pocket mouse,and slender-horned spineflower. Surveys were conducted using agency accepted protocols. v EEL- Section 2 Project Team Education/Registrations Ph.D.,Anthropology(Archaeology), University of Texas at Austin B.A.,Anthropology,University of Washington Registered Professional Archaeologist(RPA)(originally certified by SOPA 1990) Orange County Certified Archaeologist Riverside County Qualified Archaeologist Professional Experience Dr. Mason has been professionally involved with cultural resources management in southern California since 1983. Dr. Mason is the author of over 150 reports dealing with cultural resource surveys,evaluations,and mitigation programs in all southern California counties.Section 106 experience includes successful nomination of the San Antonio Terrace Archaeological District on Vandenberg AFB to the NRHP and preparing a Historic Preservation Plan for the District. Dr. Mason was also Principal Investigator for the data recovery and construction monitoring program for the San Joaquin Hills Transportation Corridor, a Section 106 project reviewed by Caltrans. Dr. Mason was the Principal Investi- gator for the Newport Coast Archaeological Project in coastal Orange County. This project was the largest privately funded cultural resources mitigation program on the West Coast and involved data recovery excavations at 35 sites. Dr. Mason has also prepared numerous cultural resources sections for CEQA documents and was a consultant to the California Energy Commission and the California High Speed Rail Authority. He has also completed test and data recovery programs in San Diego, Orange, Riverside,and Ventura Counties. Several of these projects satisfied the requirements of both CEQA and Section 106 when 404 permits were required from the Corps of Engineers. In addition to comprehensive knowledge of cultural resource management activities, he is adept in the management of many types of projects,supervision and coordination of subconsultants,supervision and training of employees,Client relations,federal/state/tribal liaison activities,federal contracting,and proposal and bid preparation. Project Experience SR-60 and Moreno Beach Drive Interchange Project,Riverside County, Par- sons/City of Moreno Valley: Principal Investigator and Report Author for cultural resources reports required by Caltrans for the replacement of the interchange on State Route 60 and Moreno Beach Drive and improvements to the Nason Street Overcrossing.A cultural resources survey and Native American consultation were documented in an Historic Property Survey Report(HPSR),and Archaeological Survey Report(ASR).One archaeological site from the historic period was identified and was evaluated as ineligible for the NRHP. Third Party Review of Martin Ranch EIR,City of San Bernardino: Reviewed Cultural Resources and Paleontological Resources EIR Sections and Technical Studies as part of the third-party review of an EIR prepared by another consultant as an extension of the City of San Bernardino staff.The EIR was prepared for the Martin Ranch project,a Planned Residential Development consisting of 342 single-family residential lots, two park sites, three water reservoir sites, and private streets on 352.8 acres.The project site was in a hillside area, adjacent to the San Bernardino National Forest,and was subject to the City's Hillside Management Overlay District requirements.The proposed project and plans were reviewed to ensure consistency with City, State, and Federal cultural resources regulations. Section 2 Cultural Resources Surveys,Ion Communities:Principal Investigator and Report Project Team Author for records searches and field surveys for properties proposed for residential development in Perris, French Valley, and Woodcrest in Riverside County,Castaic in Los Angeles County,and Victorville and Apple Valley in San Bernardino County. California High Speed Train Program EIR/EIS,Parsons Brinckerhoff/California High Speed Rail Authority:As Cultural Resources Project Manager, coordinated and reviewed the work of five regional teams(Bay Area,Sacramento-Bakersfield, Bakersfield- Los Angeles,Los Angeles-Oceanside-San Diego,and Los Angeles-Riverside-San Diego) who wrote technical reports containing impacts analyses based on records searches and literature reviews for cultural and paleontological resources for the various alternative routes.Summarized the technical reports and wrote the cultural resources section of the program EIR/EIS. Cottonwood Hills Archaeological Test Program,Lake Elsinore,Riverside County Pardee Homes: Principal Investigator and Report Author for archaeological test and evaluation programs at five prehistoric sites and one historic site on a property proposed for residential development in the City of Lake Elsinore, Riverside County. One large residential base or village was evaluated as eligible for the CRHR and NRHP and preserva- tion in open space was recommended.The other sites were evaluated as not eligible.The reports were reviewed by the Corps of Engineers and the SHPO because a 404 permit was required for the project.The SHPO did not object to the determinations of eligibility made by the Corps based on the evaluations in the reports. Historic Property Survey Reports for Street Widening Projects,Various Cities: Cultural Resources Manager-Was author or co-author for Historic Property Survey Reports(HPSRs)and Archaeological Survey Reports(ASRs)using Caltrans Section 106 guidelines.These were for Caltrans local assistance street widening projects in Victorville, Fontana,Rancho Cucamonga,Perris,Upland,Inglewood, Santa Ana, Huntington Beach, and San Juan Capistrano. Olinda Archaeological Test and Data Recovery Program,Brea,Orange County, SunCal Companies:Principal Investigator and Report Author for test programs at one prehistoric site and two historic sites,as well as data recovery at the prehistoric site.The sites were located on land proposed for residential development in the former Olinda oil fields in Brea,Orange County,California.The prehistoric site was a temporary camp from the Milling Stone Period.The historic sites were part of the former oil company town of Olinda. Pacific Highlands Ranch Data Recovery and Indexing Program,San Diego, Pardee Construction Company: Principal Archaeologist- Directed data recovery at four prehistoric sites and"indexing"at five sites that were to be preserved in open space,as required by the project EIR for the Pacific Highlands Ranch project north of Carmel Valley in the City of San Diego.The subsurface boundaries of concentrations of cultural material within each site slated for data recovery were defined by excavating a total of 252 system- atically spaced shovel test probes(STPs) in several phases of work.As required by the City, the data recovery program consisted of hand excavation of 78 1 by 1 meter units comprising a five percent sample of each concentration within each site. Statistical analysis showed that additional excavation would only produce redundant data.A report was completed that provides an interpretation of activities carried out at these sites which were occupied during the early part of the La Jolla Complex(circa 9,000 to 6,000 BP). Subsequently, when a 404 permit was needed for the project,the report was accepted by the Corps of Engineers in satisfaction of the Section 106 process. Section 2 Project Team STEVE DILLON Mapping Aerial Photography, Subconsultant, Arrowhead Education&Registrations California Polytechnic State University, San Luis Obispo, CA- B.S., Mechanization in Agriculture and Agriculture Engineering San Bernardino Valley Junior College,CA, Remote Sensing using Aerial Photography, American Society of Photogrammetry, San Antonio,TX, Photogrammetric Close Range Applications California State University Fresno,CA,Analytical Photogrammetry Professional Experience Mr. Steve Dillon, is a principal of Arrowhead Mapping Corporation. Mr. Dillon has experi- ence in aerial photography, map compilation,digital topographic mapping,and citywide mapping for Geographical Information System (G.I.S.)and Land Information System (L.I.S.). He has been the Project Manager on several California Department of Transporta- tion(Caltrans)projects involving digital mapping. He has helped set up standards for digital mapping firms and cities in Southern California.Additionally,he has aided in the development of Digital Ortho Photography software,procedures and standards. Project Experience In his 25 years of experience,Steve Dillon has been responsible for the following projects: ■ LA Metro Rail ■ City of Industry ■ San Bernardino County and East LA County Thomas Bros. Maps ■ Annual contract for Army Corp.of Engineers/Navy ■ Eastern Transportation Corridor Route 241 ■ San Joaquin Hills Transportation Corridor Route 73 ■ City of Corona Water Reclamation Line ■ City of Redlands Sewer Refurbish project ■ Hook Creek -Old Fire-San Bernardino ■ Victorville Line G01 On-Call Surveying Services,County of San Bernardino:(Aerial Photographer)The County has many surveying projects scheduled to commence in the next several years. In order to eliminate unnecessary project delays, the County outsourced surveying services for peak volume workloads.Specific work includes: boundary surveys, records of survey, corner maps, map preparation procedures,GPS surveys, pavement management, topographic surveys,construction staking,high-definition laser scanning,and map/plan checking. On-Call Surveying Services,Cucamonga Valley Water District: (Aerial Photographer)HFI is currently providing on-call surveying services for various CIP projects throughout the District's service area which includes Rancho Cucamonga, Upland,Ontario, Fontana, and some unincorporated areas of San Bernardino County. The District serves approximately 170,000 customers within a 47 square mile area including approximately 45,000 water connections and 35,000 sewer connections. Specific work includes topographic surveys,cross-sections, aerial photography, base sheets,ALTA surveys, construction staking, utility research,potholes, and obtaining permits.To date, HFI has finished one project for the District and is proposing on three others. Project deliverables are prepared to meet District anbd local agency requirements as required. lug+ Section 2 DONALD WHITMAN Project Team Potholing, Subconsultant, • Utility Surveys, Inc. Education&Registrations Ground Penetrating Radar, Certified 40-hr hazmat training&Confined Space safety training, City of San Diego Work Zone traffic Control. Professional Experience Mr. Whitman has over seven years experience with subsurface utility designating and locating. His Project Management skills include planning and coordination with utility companies, railroad, local. state and federal agencies is inherent in Saf-r-Dig's Utility Surveys'daily functions and protocol. His experience includes project coordination; field quality control; traffic control, permits; OSHA field safety meetings and practical on the job experience. Mr. Whitman recently provided services to Caltrans Distirct 8 potholing on State Route 138 and Caltrans District 7 and Los Angeles County Design Engineers on the Highway 30 Extension Project. Non destructive,damage prevention,air/vacuum soil-extraction process was used for utility records research, designating, locating,exposing existing subsurface utilities and documenting, or otherwise, mapping the underground utilities. Project Experience Caltrans SR-138,San Bernardino:(Project Manager)Subconsultant Utility Conflict Assessment,location and documentation;and potholing. Dubes/Tasks/Work Performed: Subconsultant Utility Conflict Assessment,location and documentation;and potholing. State Route 60, Los Angeles:(Project Manager) Provided extensive utility location duties for this pipeline relocation project. Duties/Tasks/Work Performed:Subconsultant utility conflict assessment, location and documentation. On-Call Surveying Services,County of San Bernardino:(Potholing/Utility Location) The County has many surveying projects scheduled to commence in the next several years. In order to eliminate unnecessary project delays,the County outsourced surveying services for peak volume workloads.Specific work includes: boundary surveys, records of survey,corner maps, map preparation procedures,GPS surveys,pavement management, topographic surveys,construction staking, high-definition laser scanning,and map/plan checking. On-Call Surveying Services,Cucamonga Valley Water District: (Potholing/Utility Location) HFI is currently providing on-call surveying services for various CIP projects throughout the District's service area which includes Rancho Cucamonga, Upland, Ontario, Fontana,and some unincorporated areas of San Bernardino County.The District serves approximately 170,000 customers within a 47 square mile area including approximately 45,000 water connections and 35,000 sewer connections.Specific work includes topographic surveys,cross-sections,aerial photography, base sheets,ALTA surveys,construction staking, utility research, potholes,and obtaining permits.To date, HFI has finished one project for the Distiict and is proposing on three others. Project deliverables are prepared to meet District anbd local agency requirements as required. CSU Fullerton,Fullerton: (Project Manager)Subconsultant Utility Conflict Assessment, location and documentation; and potholing. Dudes/Tasks/Work Performed: Subconsultant Utility Conflict Assessment, location and documentation;and potholing. n ZI Q v 9 Ul m � « z c 3 :°• m ° w w m m - f z z H � H m I • _ S L 1 _ y 6 _ 6 � 1 d C �� O Oi rn r ;x N H h rn u! - � N o o P Q N N N N V a Ip3 O O N ' ' V V V y y Oy O V y y y V O N P N � � V � � � N -• � C C C N C � 0 =� � - y y y V O O O O Oy O O Q O O � V Wl - -1 Wi O O mom m 0 U)NI CD Z I� U) 0Qm �£ m o mi Jir N !N m Ip�� Nr i h I f �_ io y Y Section 4 Century Vintage Homes-Rolling Hills Ranch Relevant Century Crowell Communities Experience Description: 100+ acre site for a 295 lot residential development for Century Crowell Hall&Foreman,Inc. Communities. HFI has already prepared lot studies, road alignment studies, hydrology and hydraulic studies for Cable Creek, and cost estimates. HFI also prepared the site road alignment studies for the frontage road along the I-215 freeway.The project is ongoing and includes coordination with the Client,the City of San Bernardino Redevelopment Agency,San Bernardino County Flood Control District,and other governing agencies. Client:Century Vintage Homes/Century Crowell Communities Contact: Mike Reed, 1535 South D Street,Suite 200,San Bernardino, CA 92408, (909) 381-6007 Start Date: 2006 Completion Date:Ongoing Project Cost: n/a Yucaipa Boulevard Street Rehabilitation City of Yucaipa Description: HFI prepared street rehabilitation plans for improvements to three miles of 10 the eastbound traffic lanes for Yucaipa Boulevard,a major arterial street,from 7th Street to 11th Street including improvements to the Yucaipa Boulevard and Oak Glen Road —,Am intersection.The project was completed to supplement Developer improvements to the westbound traffic lanes constructed at the same time for the man Heights Chapman . services included field review to identify p Development HFI's -� fy areas of major distress an cracking requiring removals of the existing roadway d Liu would require a two-inch asphaltic concrete overlay only. Construction plans were that produced using existing street improvement plans. HFI's efforts also included coordination with local street contractors to obtain competitive bids and review of the Contractor bids for completeness. HFI also provided support staff to assist the City Street Superintendent for inspection of the final street improvements. Client:City of Yucaipa Contact: Mr.Jordan Schmidt,Street Superintendent, City of Yucaipa,34272 Yucaipa Boulevard,Yucaipa,CA 92399-9950,(909)797-2489 Start Date: May 1998 Completion Date:June 2002 Project Cost: $300,000 Carbon Canyon Road(SR 142)Road Reconstruction/Widening City of Brea/CalTrans District#12 Description: Prepared plans and cost estimates for the reconstruction of Carbon Canyon Road within a 120-foot-wide right of way from Valencia Avenue to 5,000 feet East of Valencia Avenue in the City of Brea.The project was completed to supplement Developer improvements for Olinda Heights residential tract. Project included four phases hw__1�Z' of construction including traffic control plans,construction staging plans and traffic signal modification plans for each phase.The pavement section included treated permeable base and sub-drain systems.This project also included relocation of transmission lines Section 4 for Southern California Edison, preparation of plans for 4,800 feet of an 18-inch water Relevant main and 78-inch, 1,400-foot-long storm drain. Experience Client: City of Brea Contact:John Hogan,Assistant City Engineer, 1 Civic Center Circle, Brea, CA 92821, (714)990-7657 Start Date: 1999 Completion Date:2003 `= Project Cost: $5,000,000 Antonio Parkway Street Widening/Resurfacing County of Orange r Description: Prepared final plans for widening and resurfacing of a one-mile segment of Antonio Parkway adjacent to the planned community of Ladera Ranch. Widening consisted of adding split-level roadway section with a 20 foot, landscaped median to r¢ widening the existing four-lane roadway to a 6-lane divided major arterial. Field survey - services were provided to identify as-built conditions for the existing roadway in order to accommodate a resurfacing of the existing pavement.Other improvements included: storm drain,OCTA bus bays, signing and striping Ian p g p s, and a signal plan for the future Covenant Hills Road intersection. 'yt Client: Orange County Contact:Grant Anderson, Orange County PF&RD, P.O. Box 4048,Santa Ana, CA 92702- 4048, (714)834-5034 Start Date: 2000 Design Completion Date:2002 Construction Cost: $1,300,000 Chase Drive Phase III Street Improvements City of Corona Description: Project includes 1,700 feet of street improvement from Garrettson Avenue to Sonrisa Drive.Improvements include removal and replacement of AC pavement, removal of existing parkway culverts,addition of curb and gutter, bike path,parkway f� landscaping, relocation of adult palm trees on south side of the roadway, and a storm drain line to connect with the existing drainage system at the intersection of Garrettson i;;, •r y! Avenue and Chase Drive. Landscape improvements will extend to the property line of each resident.Improvements also include relocation of existing electrical poles on the no s rt ide of the roadway, relocation,or removal and replacement, of existing 35 mph speed limit sign,and the removal of existing citrus trees and shrubs within the right of way. Client: City of Corona 7 Contact:Steve Enna,Associate Engineer,400 South Vacentia,Suite 100, Corona,CA 92882-3238,(951) 739-4815 Start Date: 2003 Design Completion Date:2004 Construction Cost:est. $600,000 �y x Section 4 Soledad Canyon Road Widening and Rehabilitation Relevant Los Angeles County Department of Public Works Experience Description: Widening and rehabilitation for six miles of the regional transportation corridor that also serves as a relief facility for the Antelope Valley Freeway. Soledad Canyon Road is a major arterial passing through the center of the City of Santa Clarita. 7" t ' It is immediately adjacent to the Union Pacific/Metrolink line for much of its length. Client: Los Angeles County Contact: Farhad Agahi,Supervising Civil Engineer, 900 S. Fremont Ave., 11th Floor Alhambra,CA 91803-1331, (626)458-7871 Start Date:July 2002 Completion Date: May 2003 - Project Cost: $600,000 .4• y yy A Clearglen Avenue Rehabilitation Los Angeles County Department of Public Works Description:This rehabilitation project entailed three phases including preparation of a Materials Report recommending alternatives based upon field test data. HFI conducted topographic and design surveys;prepared a Project Design Concept Report(PDC)to describe the costs,schedule,details,and limits of the road improvements; prepared PS&E for roadway and traffic rehabilitation improvements to be used for obtaining contract bids; c.• provided construction services,as requested,for RFI's and plan and quantity changes;and prepared "as � -� -built"plan revisions to reflect all changes made during construction. Field y;v t review of the project was conducted in accordance with DPW guidelines and rehabilitation improvements to include drainage; removal of slotted cross gutters and parkway culverts; repair/replacement of concrete sidewalk,curb and gutter,ADA ramps,and driveways; I replacement/upgrade of guard rails and signal heads; re-striping of traffic lanes; bus pads; and other miscellaneous items. Client: Los Angeles County Contact: Farhad Agahi, Supervising Civil Engineer, 900 S. Fremont Ave., 11th Floor Alhambra,CA 91803-1331, (626)458-7871 Start Date: March 2002 Completion Date:July 2002 Project Cost: $39,550 Skyline Drive Street Reconstruction County of Orange Description:Prepared final plans, specifications,and estimates for 0.50 mile portion of Skyline Drive in Lemon Heights, unincorporated Orange County. Improvements included the addition of 78" RCP storm drain line,AC removal and replacement, addition of curb and gutter, hydrology and hydraulic analysis,and close coordination with affected utility agencies. Client:County of Orange Contact: Denise Weaver, Project Engineer, PF&RD., P.O. Box 4048,Santa Ana, CA 92702- 4048,(714)567-6289 Start Date: 2002 Design Completion Date: 2003 Construction Cost:$650,000 QI IN Section 4 I-15/Cantu-Galleano Ranch Road Interchange Relevant City of Mira Loma Experience Description: Leighton&Associates performed this work for the project named for the historic Galleano Winery in Mira Loma,Cantu-Galleano Ranch Road will soon become an Leighton& important link between Interstate 15 and this latest burgeoning region of the Inland Associates Empire.The$47.4-million interchange will be located approximately 1.5 miles south of the I-15/State Route 60(I-15/SR 60) interchange in the Mira Loma area of western Riverside County. Once operational, it will help alleviate increasing traffic flow problems, effectively separating commercial truck traffic from commuter corridors and residential areas. Currently estimated to complete in May 2007,the I-15/Cantu-Galleano Ranch Road interchange will play a significant role in the overall development and economic success of Mira Loma.Serving in a subconsultant role, Leighton is performing geotechnical and construction materials testing for the project, which includes the construction of a new 6- lane interchange bridge on Cantu-Galleano Ranch Road, between Hamner and Wineville, extensions to those connecting roads,and new connecting ramps.The new interchange and associated improvements will improve current traffic operation and address future mobility by: Relieving regional congestion on nearby SR 60 and I-15 interchanges; Accommodating planned growth in the surrounding community; Distributing traffic in a more balanced manner-providing additional access to I-15 and relieving the need for truck traffic on local roads outside warehouse facilities; Providing detours to alternative routes under accident situations; and Providing additional subregional east-west roadway access between Ontario and Western Riverside County communities. Client: City of Mira Loma Contact: Laurie Dobson Correa, Riverside County Transportation Dept, 951-955-6880 Wael Faqih, PE, Harris&Associates, Inc. (prime),909-987-7220 Project Engineer:Siva K.Sivathasan, Ph.D., P.E.,G.E. Start Date:2006 Design Completion Date:2007 Construction Cost: n/a ECORP Consulting, Biological,Regulatory,and Permitting Assistance,Rolling Hills Ranch Inc.&Solution San Bernardino,San Bernardino County(Century Vintage Homes) Strategies,Inc. Description: ECORP Consulting,Inc.along with Solution Strategies,Inc. Land Use Division provided strategic counsel,assistance with negotiations,and permitting assistance for Century Vintage Homes'Rolling Hills Ranch project in San Bernardino,California. ECORP's team conducted meetings with Century Vintage Homes,the City of San Bernar- dino,the County Flood Control District,and other community groups to obtain concurrence on the project from all interested parties. In addition, ECORP conducted a jurisdictional delineation to determine the drainage areas that fall under the jurisdiction of the U.S. Army Corps of Engineers and the California Department of Fish and Game. ECORP pre- pared the Biological Assessment in support of the Section 7 Consultation with the U.S. Fish and Wildlife Service for impacts to the San Bernardino kangaroo rat and the coastal California gnatcatcher and impacts to designated Critical Habitat for these species. The ECORP Team conducted meetings and assisted with the negotiations for the permits under Sections 404 and 401 of the Clean Water Act and Section 1602 (Streambed Alteration Agreement)of the State Fish and Game Code.The team prepared the permit applications, conducted meetings with the agencies, and obtained the permits for the project. Section 4 Client: Century Vintage Homes/Century Crowell Communities Relevant Contact:Sharon Merritt/Mike Reed,Century Vintage Homes, 1535 S. "D"Street,Suite Experience 200,San Bernardino,CA 92408,909-381-600 Start Date: March 2006 Design Completion Date: Estimated June 2008 Construction Cost: $$124,700.00 Cajon Creek City of San Bernardino Solution Strategies, Description:The Vulcan Materials Cajon Creek Project provides for the production of Inc, aggregate materials,the development of a light industrial project,and the preservation of six miles of Cajon Creek. In-stream mining was designed to maintain stream equilibrium. Following mining, the mined areas were restored using suitable native plant species.A mitigation bank was established on areas not required to offset project related impacts. This project preserved, enhanced,and restored approximately six miles of the creek.The project site provides habitat for twenty-two sensitive species and serves as a vital habitat link into the San Bernardino Mountains.SSTs principals aided in processing applications for Section 404 permit, including a Section 7 consultation,Section 401 certification,and the Streambed Alteration Agreement.The Section 7 consultation was for state and federal listed plants and animals.A major responsibility was overseeing the preparation of the Biological Assessment and negotiating the conditions incorporated in the Section 7 Biologi- cal Opinion.The project also included the development of memoranda with the state and federal agencies for the long-term management of a conservation bank(the Cajon Creek Habitat Conservation Management Area)for 22 sensitive species established as part of the environmental review process.This effort included working with the community and environmental groups. Client:Vulcan Materials Company Contact:Doug Sprague, Manager,Special Projects,Vulcan Materials Company, 3200 San Fernando Road, Los Angeles,CA 90065, (323)474-3215 Start Date: permitting began in the 1990's Design Completion Date: permitting was approved in 1994,project is still ongoing Fee: $200,000 } �r i Section 5 Staff Availability/Previous Obligations Staff HFI's team is 100%committed and available to provide the services for the City of San Availability Bernardino's project on a first-priority basis at the time the contract is executed. Regardless of current and anticipated workload, HFI has the resources,experience, knowledge,and staff available to meet the project deadlines and milestones. HFI has a staff of over 220 professionals located in six Southern California offices.This depth of resources allows the firm the ability to cross-platform work to meet and/or beat deadline commitments. Current and anticipated pubic works projects from HFI's assigned project team members includes: 1.City of San Bernardino On-Call Plan Check Services Start Date: 2006. Anticipated Workload:As needed. Five projects completed. 2.City of La Quinta On-Call Plan Check Services Start Date: 2007.Anticipated Workload:As needed. One project completed. 3.County of San Bernardino On-Call Engineering Services Start Date: 2005.Anticipated Workload: As needed.Two projects completed. 4.Cucamonga Valley Water District On-Call Surveying Services Start Date: 2007.Anticipated Workload:As needed.One project completed. S.County of San Bernardino On-Call Surveying Services Start Date: 2007. Anticipated Workload:As needed. Section 6 Leighton &Associates-Geotechnical Subconsultants Leighton&Associates will be supporting HFI's team with geotechnical feasibility and due diligence studies;geologic and seismic hazard assessments; and interactive planning sessions with the City. Leighton and Associates has provided innovative design solutions and field support for construction projects for more than four decades.They use background information from many years of practice in the field to evaluate the conditions at project sites quickly and accurately. At Leighton&Associates,their focus is on the successful completion of the City's project and Client satisfaction. HFI and Leighton&Associates have teamed together on multiple public works projects similar in nature. HFI and Leighton&Associates have worked together on similar road improvement projects.This working relationship should ensure the City of effective and smooth team communication and cohesion. Strategic Solutions,Inc.-Strategic Counsel/Negotiations/Permitting Solution Strategies, Inc. (SSI)is a strategy development company created to solve problems in arenas that include a high degree of risk,vulnerability, and complexity.The company,through its proven methods,enables Clients to take an objective view and set a course for success.The company has created successful strategies used in land use entitlements,negotiations,crisis management,conflict resolution, litigation avoidance, settlement, and goal attainment programs.The firm's services have been used by company presidents,Tribal council members,executive directors,chief financial officers, general managers, board members, police chiefs,school superintendents, city managers,elected officials,and many others. SSI's diverse background means that,while most firms are limited to specific areas of expertise,SSI is able to understand all sides of an issue from the environmental to the technical and political.SSI is able to successfully seek entitlements, build grass roots support,and work with agency personnel at the local,state,and federal levels.As a result,SSI is faster and more efficient in helping Clients save time and money. This broad base of understanding makes SSI's Land Use Division uniquely qualified to address complex and/or controversial land use issues.SSI has successfully assisted many companies to entitle projects throughout central and Southern California. Particular to this project,SSI's principals have been working with the Army Corps of Engineers and California Department of Fish and Game regulatory programs since the mid-1970s.SSI has worked on many projects from development to restoration, public works,and permit compliance. SSI has always been able to have the required permits issued to meet Clients'objectives in a timely and cost-effective manner. SSI has similar experience working with the state and federal Endangered Species Acts. SSI has secured compliance with these Acts for many projects, has served as an expert witness in Endangered Species Act litigation,and has developed an Endangered Species Acts compliance game to teach others. Through their knowledge of environmental compliance, federal and state lobbying, appropriations,funding programs,and economic and community development,the SSI Land Use Team members are able to provide insight and recommendations to help guide the decision making process towards a project that can ultimately be completed.A project that not only addressees the technical issues, but also anticipates the environmental, political, funding,and community issues. Section 6 ECORP Consulting,Inc.-Agency Coordination/Environmental Reports/ Subconsultants Documentation/Permitting(Biological/Cultural) ECORP has assisted public and private land owners with environmental regulation compliance since 1987.The corporation,originally named Sugnet Consulting, was purchased by its employees in 1998 and incorporated as ECORP Consulting in November of 1998. ECORP offers full service capability, from initial baseline environmental studies through environmental planning review, permitting negotiation, liaison to obtain legal agreements, mitigation design,construction supervision,and monitoring and compliance reporting. ECORP brings together an experienced team of CEQA/NEPA specialists, engineers, hydrologists,biologists, wetland specialists,environmental analysts, archaeologists, and geographic information system specialists. ECORP is a certified small business in the State of California and under many federal NAICS and SIC codes. ECORP has a total of 70 employees,conducting environmental analysis for federal, state, regional,and local government and private clients. ECORP has a demonstrated capacity of well-trained staff to perform the required services. ECORP has established professional working relationships with federal and state regulatory agencies, based on technical excellence and a thorough understanding of regulatory processes. ECORP is experienced with the National Historic Preservation Act(NHPA),Sections 106 and 110; the California Environmental Quality Act(CEQA); California Fish and Game Code,Section 1600;the regulatory requirements of the federal Clean Water Act(CWA), Sections 401,402, and 404;the National Environmental Policy Act(NEPA); the federal Endangered Species Act(ESA),Sections 7 and 10; the California Endangered Species Act(CESA); and the Coastal Zone Management Act(CZMA). HFI,Solutions Strategies,Inc.,and ECORP Consulting, Inc.are currently teaming together on the Rolling Hills Ranch project adjacent to the I-215 Realignment Project due for completion in June of 2008. Arrowhead Mapping Corporation-Aerial Mapping/Photogrammetry HFI will be utilizing the services of Arrowhead Mapping Corporation for aerial mapping/ photogrammetry.Arrowhead Mapping Corporation is lead by Steve Dillon who has been providing aerial mapping services in the area for over 25 years.HFI has worked with Arrowhead Mapping Corporation on many municipal and public works projects including County of San Bernardino's Glen Helen Canyon Road, Lake Arrowhead's on-call contract, and City of Brea's Carbon Canyon Road.Arrowhead Mapping Corporation is a registered SBE/WBE firm and can help the City of San Bernardino meet any related citywide goals. Saf-R-Dig Utility Surveys,Inc.-Underground Utility Location/Potholing The SAF-r-DIG Utility Surveys, Inc.(SAF-r-DIG)organization is a sophisticated, state- licensed,federally-certified, minority-owned,certified small business(OSMB#0011159). with a WBE(100%woman owned business)status. SAF-r-DIG is a utility-based subsurface information-service provider for public,private and industrial utility-related projects.They will be providing utility locating and potholing services.They specialize in obtaining accurate subsurface utility information for creating utility base maps. Their method is non-destructive, minimally invasive, air/hydro/vacuum process which exposes the utility for visual verification, identification, inspection, measurements and recordation of the data for subsequent creation of the infrastructure and utility base maps. HFI and SAF-r-DIG has teamed together on various street improvement projects including City of Corona's Chase Drive Phase III Street Improvement Project and Carbon Canyon Road Road Reconstruction/Widening Project. r Section 7 Items,Actions,or Information HFI Expects From City Comments/ It would be beneficial to the project if the City would provide assistance in working with Suggestions/ Caltrans in the acquisition of right-of-way, meeting any conditions and standards that Expectations they might impose on the project, and helping to obtain a speedy review of the project documents that Caltrans might undertake. HFI understands that it will be necessary for the San Bernardino County Flood Control (SBCFD)to review the hydrology and hydraulic calculations for the Flows in Cable Creek adjacent to the roadway. Timely review from SBCFD for these calculations and an acceptable design for the slope protection of the roadway may be an item that HFI needs assistnace from the City for, as well as project team members to meet anticipated Project Schedule deadlines. Comments or Suggestions _ Due to potential mitigation, HFI suggests that the project be phased into two independent street segments/phases.The first segment should be from Little League Drive to the northwest corner of Tract 34737.The second segment should run from the northwest corner to Cable Canyon Road. Please see Section 1 "Scope of Services"under project understanding and Exhibits for detailed information. ° Attachment "2" NPF, Hall & Foreman, Inc. -g reer.ng-Sur�e,;rg-Parr rg•Landscape Arch;'ecfjre March 26, 2007 Mr. Michael Grubbs, P.E. Engineering Manager/Field Engineer Development Services Department 300 North "D" Street San Bernardino, CA 92418-0001 Subject: Realignment of Existing I-215 Freeway Frontage Road and Extension Northwesterly 0.73 Miles From its Existing Terminus to Dement Street, Including Environmental Approval and Acquisition of Right of Way, Which May Include Decertification of Existing Operating State R/W (SS07-29) Dear Mr. Grubbs: Hall & Foreman, Inc. (HFI) hereby proposes to provide professional services for the City of San Bernardino's Realignment of Existing I-215 Freeway Frontage Road and Extension Northwesterly 0.73 Miles From its Existing Terminus to Dement Street, Including Environmental Approval and Acquisition of Right of Way, Which May Include Decertification of Existing Operating State R/W (SS07-29), as outlined in our Proposal dated March 26, 2007, for the lump sum, not to exceed fee of $281,805.00. Details of the fees and breakdowns are enclosed on the following Cost Proposal Excel Spreadsheet. The fee includes the cost of all administration, courier services, mileage/ reimbursements, overhead, project site visits, attendance at meetings, and all reproduction costs. Respectfully, Hall & Foreman, Inc. Jon E. Bourgeois, P.E. President— Inland Empire Office/Principal Enrlcsures 1) C�f t��J v� N O O (G'J p.^, !.]t D j N L O O O:C "O O O O r^ of j V al OC . 'S ' . 0 (� J^ N (. N C n (W[7 Z N I N J IJ 1 O � I O N -L N (C O N O (O:O' `�1 co h G N ,f,'Q` CJ z t7 n� Q O _ O O O SZ T U -,J N 1v O � F- O !o En a a O O N (,j Y.O: i G:G: C 00 N O R Q Q O C --- o Q:Q .}� W LL. N.. N O N m M F- Z C vO m w W �' m:O iC O i O i -K:Q Q.O N 00 O ID O U• Qi Nf Q:(Di C i9 U a w u' ' O W O l`- W i Q T u- a 1 i+ I o O ; Z a N J J !A J J Q O O O H l'- __. O F- rio V 7 in In in W: V: Z N Q LLJ _ z w w I a J °.CJ:a z O.� T li Ja v - na � a.O p a lZ w I ? ° o a.a ! 3 O I a Q > r p = z < J y (Y w wa > I I w (_ Cu a >< a I� jj< mz � w � I wa J o:v � � wFw ; ,: w jl Z r� H C LL 5 I CJ li p > I w C j± _z W li J -Z Z 2' .( r- F- I H 1 w LL C U J Q �.' �w Q a L i r a o r v ;I p z a Q a F- a !7 `3 O t a p v f¢ ` a C7 c Ir v, a �.Q �% C Z ? 3 J Z w I O �� tin u- Iz J K C , ;'z :, _ ;, w a Q. ~ Q a I Z tl W Q a ` i Q Q it 1 W m .L m m m CO m m m CO CO Z ~ ~ (I IjO z z C}J Iw Z Z m II IIZ C C C O O O C O O C I.[, L 2 Z Z Z Z Z Z Z Z Z w a = v, w LO I II d Us) W d a V U, W•U I / f N V (n (/J (n N I.- (� U, Q ,t Lut a Q a Q a Q w ri7 in `' Z Z EXHIBIT "B" X. San Bernar 'Igo CITY OF SAN BERNARDINO Development Services Department Public Works Division REQUEST FOR PROPOSAL TO PROVIDE CIVIL ENGINEERING DESIGN SERVICES FOR REALIGNMENT OF AN EXISTING 1-215 FREEWAY FRONTAGE ROAD AND EXTENSION NORTHWESTERLY 0.73 MILES FROM ITS EXISTING TERMINUS TO DEMENT STREET, INCLUDING ENVIRONMENTAL APPROVAL AND ACQUISITION OF RIGHT-OF-WAY, WHICH MAY INCLUDE DECERTIFICATION OF EXISTING OPERATING STATE R/W. (SS07-29). ISSUED ON: FEBRUARY 26, 2007 DUE ON: MONDAY, MARCH 26, 2007, AT 4:00 PM Paoc I of 9 EXHIBIT "B" I. INTRODUCTION The City of San Bernardino is soliciting the services of a consulting engineering firm for realignment of an existing 1-215 Freeway Frontage Road northwesterly of Little League Drive and extension 0.73 mile northwesterly from its existing terminus to Dement Street (SS07-29). The project includes environmental approval and acquisition of right-of-way, which may include decertification of existing operating State RAN. II. BACKGROUND The 1-215 frontage road, which is the subject of this RFP, currently exists from Little League Drive to a point approximately 1.28 miles northwesterly thereof where it terminates. The existing road consists of two paved traffic lanes constructed by the State of California in conjunction with the 1-215 corridor and relinquished by the State to the City of San Bernardino in the 1950's. The alignment is substandard near the intersection with Little League Drive. Signalization of the intersection of the road and Little League Drive. Coordination with potential development on the east side of Little League Drive will be necessary. io Hall & Foreman, Inc. completed preliminary alignment concepts for the project. Copies of the preliminary alignment concepts, identified as Exhibits 1", "2" & "Y, are attached. Most of the property needed for the project is controlled by the City of San Bernardino Economic Development Agency (EDA) and Caltrans; however, a small amount of needed right-of-way near Little League Drive is owned by a private party. III. SCOPE OF SERVICES 1. Consultant shall prepare and complete all required construction documents, including plans, specifications, and cost estimates for the following items: a) Construction of the "proposed collector road" to eliminate the substandard reverse curve near Little League Drive, including intersection modifications at Little League Drive. b) Modifications to the existing frontage road as indicated in the attached alignment study. Page 2 of 9 1 10 c) The extension of the frontage road from its existing ter 9 g minus to Dement Street. d) Drainage modifications necessary to drain the road and protect it from flooding. Hydrology and hydraulic calculations must be provided to support the drainage design. e) Signalization of the intersection of the road and Little League Drive. Coordination with potential development on the east side of Little League Drive will be necessary. f) Identification of right-of-way needs for the extension of the street and the "proposed collector road", including preparation of legal descriptions, plats and securing of title reports for the parcels to be acquired for the project. g) Acquisition of right-of-way and permits from public agencies. Note: City staff shall conduct all communications with private property owners. h) If condemnation becomes necessary, the consultant shall provide all necessary title documents, engineering documents, communication, etc. necessary to support the eminent domain process. It is anticipated that the acquisition of right-of-way from EDA and Caltrans will occur through friendly negotiations. i) Consultant shall complete all necessary CEQA documentation including all studies and submittals to the City for CEQA clearance. It shall be the consultant's responsibility to obtain CEQA clearance for the project. City staff will facilitate the process, but the consultant shall perform all work necessary for CEQA clearance and represent the project, if needed, at meetings. j) Consultant shall be responsible for obtaining all approvals from outside agencies for the work, including but, not limited, to permits from Caltrans, San Bernardino County Flood Control District, streambed alteration agreement from the California Department of Fish and Game (CDF&G), Section 404 permit from the U.S. Army Corps of Engineers, clearance from the U.S. Fish and Wildlife Service and a 401C waiver from the California Water Quality Control Board, Santa Ana Region. k) Consultant shall pothole existing underground utilities where a high probability for conflict with proposed improvements exists. Page 3 of 9 EX141 BIT "B" Y Compensation for potholing shall be on a per pothole basis and cost of potholing shall be stated separately from the consultant's design fee. 1) Consultant shall investigate alternatives for the realignment of Dement Street for an improved intersection with Santa Fe Street or Devore Road. The design of the selected alternative may be added as an amendment to the basic contract. 2. Consultant shall prepare the improvement plans, specifications, and cost estimates for the project in conformance with City of San Bernardino standards, Caltrans standards, and the requirements of the Manual on Uniform Traffic Control Devices (MUTCD) and California Supplement, latest edition. Plans, specifications, and estimate shall conformance to the following design requirements: a) The plans shall be prepared at a scale of 1 inch = 40 feet on standard 24" by 36" sheets, using the City of San Bernardino standard title block. A scale of 1 inch = 20 feet may be used subject to approval of the City Engineer. b) The plans shall clearly show existing conditions, including but not limited to, the location and type of signing and striping, pavement markings, storm drain facilities and street condition. c) Consultant shall be responsible for survey; research and other data or work needed to establish existing conditions. Information readily available from City files will be made available to the consultant at no charge. d) Improvement plans shall clearly indicate the following • The type and location of existing and proposed signing and striping, including but not limited to lane striping, stop bars, cross walks, pavement markings, and any other traffic control devices. • Signing and striping, pavement markings, raised pavement markers, stop bars, crosswalks and related traffic control devices shall be designed and detailed on a separate sheet drawn to a scale of 1" _ 40'. Page 4 of 9 1 EXHIBIT "B" • The type and location of existing and proposed storm drain and street improvements, including but not limited to curbs, gutters, curb ramps, and cross gutters, street lights, culverts and open channels. e) All improvements shall be designed in compliance and accordance with the Americans with Disabilities Act (ADA). f) The street improvement plans shall include, but not be limited to, curbs, gutters, berms, and curb ramps. Limits of pavement, sawcuts, removals and construction should also be shown. g) The plans, specifications and cost estimates shall be signed and sealed by a civil engineer licensed to practice civil engineering in the State of California. Legal descriptions and plats shall be signed and sealed by a civil engineer or land surveyor, licensed to practice surveying in the State of California. 3. Consultant should meet and confer with City staff periodically during the preliminary design phase to resolve design issues and ensure continuity with City standards and preferences. 4. Consultant shall conduct utility research and identify the location and depth of all existing utilities within the limits of the proposed improvements. Consultant shall be responsible for identifying and resolving utility conflicts both overhead and underground. Copies of all written communication (including maps) between the consultant and utility companies shall be provided to the City. 5. Consultant shall conduct the necessary research to determine the existing public right-of-way and identify the required right-of-way needed to construct the proposed improvements. A preliminary study conducted by City Staff indicates that additional right of way will be required. Consultant shall prepare the appropriate legal descriptions and plats describing the property to be acquired. Consultant's obligation for right-of-way identification, documentation and acquisition shall be as stated in Item III-1 above. 6. Consultant shall identify any additional improvements that are required to construct the proposed street improvements. Additional improvements may include but not be limited to curb and gutter, drainage improvements, storm drains, street widening, curbs, curb ramps, and channelization. If additional improvements are required, consultant shall include the design of those improvements in the scope of the proposal and incorporate them into the plans, specifications and cost estimates. Page 5 of 9 J EXHIBIT "B" 7. Consultant shall submit an updated project schedule within 1 week of receiving a notice to proceed, indicating the design tasks and project timing from start to submittal of final PS&E. The Consultant shall estimate two (2) City plan reviews for each plan set. Each review should be estimated to take three (3) weeks for schedule purposes. Consultant shall provide an updated schedule showing progress and timing every two weeks. Upon completion of the consultant's work, the City shall have in hand, both an electronic, and a hard copy of an approved and signed set of completed plans, technical specifications, quantities, estimates and special provisions ready for bidding including all supporting data, calculations, utility locations, utility notices, survey data, permits and other details necessary to complete this project in a format acceptable to the City. Consultant should expect to meet with the City on a bi-weekly basis for updates on project progress, concerns, problems and accomplishments. The City desires to have the completed design in hand within six (6) months after the notice to proceed is issued. Acquisition of R/W, if required, may take longer, but shall be diligently pursued by the consultant. IV PROPOSAL REQUIREMENTS A. Four (4) copies of the proposal shall be submitted to the following: City of San Bernardino Department of Development Services Division of Public Works ATTN: Mr. Michael W. Grubbs, P.E. Project Manager 300 North "D" Street, 3rd Floor San Bernardino, CA 92418 Proposals shall be received in hand by this Division up to the hour of 4:00 P.M. on Monday, March 26, 2007. B. Responsive proposals will include, but not be limited to, the following: 1. Responsive proposals will present a Scope of Services that includes at a minimum the above described services and any other tasks necessary to achieve completion of design (PS&E) needed for the successful construction of the proposed improvements. 2. Identify the professional, technical and support staff that will be performing the work associated with the proposed scope of Page 6 of 9 i fl-X'HIBIT «B„ services. Short resumes may be included, but extensive resumes should be limited to key personnel only. 3. Include a timeline indicating project milestones for the delivery of final plans, specifications, and cost estimates ready for public bid, including but not limited to a flow chart showing project tasks and timing. Include allowances for review periods. 4. Include a list of similar projects recently completed by the Consultant, identifying the location, date, agency and contact person name, and address and phone number. 5. Previous obligations with other projects (related to time and availability of staff). 6. Name of sub-consultants to be used for specific aspects of the project, including a summary of previous working arrangements on similar types of work. 7. Statement of local preference eligibility, including identification of any office located in the City of San Bernardino and the number of employees stationed at the office, the number of employees doing business inside the City limits, and a copy of your firm's City of San Bernardino Business License. 8. Items, actions or information the Consultant expects to be provided by the City. 9. Any comments or suggestion that the Consultant believes necessary to improve the finished project or to comply with the requirements of this RFP. 10. Separate sealed envelope. Fixed fee or not-to-exceed fee for the work required by this RFP, together with an hourly rate sheet applicable to this project for classifications above, including all materials and expenses, shall be submitted in a separate sealed envelope. Please note that the City will not pay or compensate separately for travel time, courier services, mileage or reimbursement for travel to the City of San Bernardino to attend meetings or conduct the activities necessary to complete tasks required to be performed as part of consultant services. Page 7 of 9 4 E` 141BIT "B The fee proposal shall include the total fee and a separate fee breakdown for the traffic signal improvements and another one for the street and drainage improvements. This is necessary for cost tracking within the City's Capital Improvement Program. V. SELECTION PROCESS The selection process will be based on a point system and will consist of three phases as follows: 1. First phase selection shall consist of an evaluation by staff (including the Development Services Director, City Engineer, a Senior Engineer and Project Manager) of proposals based on the above items identified in Section IV B (except No. 10). An additional five (5) points will be given to City of San Bernardino based consultants. In order to be deemed as "City of San Bernardino Based Consultant, the company shall have an office with a minimum of one (1) owner or employee doing business inside the City limits and shall possess a City Business License. The three (3) consultants with the highest points will continue to the interviews. A maximum of 100 points can be achieved in this phase of the selection process. The three consultants with the highest numerical scores will be invited to continue with the second phase of the selection process. 2. Second phase of the selection process will consist of staff evaluation of a presentation by the three consultants with the highest numerical score from the first phase selection. The interview will be detailed questions on this specific project, including, but not limited to, personnel, schedule, project staging, and knowledge of the project. Five (5) points of local preference will also be awarded in this phase of the selection process for Consultants that meet the requirements identified in paragraph 1 above. A maximum of 100 points can be achieved in this phase of the selection process. 3. The third and final phase of the selection process will consist of staff submitting a final package to the Mayor and Council for consideration approval. Final scores of the top three consultants will be submitted to the Mayor and Common Council with a recommendation to award an Agreement for Professional Services to the consultant with the highest numerical score. However, the Mayor and Common Council have the prerogative to award an Agreement for Professional Services to any of the top three consultants or reject all proposals. Page 8 of 9 r, 4. If the Mayor and Common Council award an Agreement for Professional Services, the selected consultant will be requested to execute an Agreement for Professional Services (draft copy attached). Failure of the consultant to execute the Agreement within 60 days of approval by the Mayor and Common Council will void the approval. VI GENERAL This "Request for Proposal" does not commit the City to award a contract, pay any costs incurred in the preparation of a proposal in response to this request, procure or contract for any services. All proposals submitted in response to this request will become the property of the City and may be used by the City in any way deemed appropriate. The City reserves the right to accept or to reject, in part or in its entirety, the response to the request for proposal if such action is deemed to be in the best interest of the City. Any contract entered into as a result of this proposal shall be considered to include the items of work detailed in this proposal unless specifically deleted in the proposal at the request of the City. VII PAYMENT The Consultant that is recommended by Staff and approved by Common Council shall attend the pre-design meeting to establish)they tart date. Once the Notice to Proceed has been given, the Consultant can submit for payments. The City will release funds at percentages with receipt of Plans, Notices, or Specifications. No payment shall be given above the percentage of completed work accepted by the City. The City shall hold 15% of the total cost for 360 calendar days after acceptance of plans and specifications by the City, or 45 calendar days after the City issues a Notice of Completion for the project, whichever occurs first. Addenda to this RFP, if any, will be faxed to prospective consultants no less than five (5) business days prior to the due date. Consultants shall be required to acknowledge receipt of all addenda as part of the proposal. Any request for additional information or clarification should be submitted to Mr. Michael W. Grubbs, P.E. Project Manager at (909) 384-5179. ATTACHMENTS: Location Map Exhibits 1, 2, and 3 - Alignment Study by HFI Liability/Insurance Requirements Draft Copy of Agreement for Professional Services Page 9 of 9