Loading...
HomeMy WebLinkAbout1987-400 , 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 .~ '. J RESOLUTION NO. 87-400 RESOLUTION OPTHE CITY OF SAN BERNARDINO AUTHORIZING THE EXECUTION OF AN AGREEMENT WITH QUKLITY CARPETS (CONTRACTOR) TO PROVIDE CERTAIN CARPET AND CARPET INSTALLATION FOR THE 4.'l'H FLOOR- EAST, OF CITY HALL. .; BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. The Mayor of the City of San Bernardino is hereby authorized and directed to execute on behalf of said City an Agreement with Quality Carpets (Contractor) to provide certain carpet and carpet installation for the 4th floor-east, of City Hall, a copy of which is attached hereto, marked Exhibit "A", and incorporated herein by reference as fully as though set forth at length. I HEREBY CERTIFY that the foregoing ordinance was duly adopted by the Mayor and Common Council of the City of San Bernardino at a regular meeting thereof, held on the 2nd November day of , 1987, by the following vote, to wit: AYES: Council Members Estrada, Reilly, Flores, Maudsley, Minor, Pope-Ludlam, Miller NAYS: None ABSENT: None ~.- ~~~ "'City Clerk 10/30/87 1 , c" .liD,) " . /-- ! 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 A G R E E MEN T THIS AGREEMENT #O.cJ&/~/:?~ made and entered into this 'l~ day of , 1987, by and between the City of San Bernardino, a charter city ("City"), and Quality Carpets ("Contractor") . WITNESSETH: WHEREAS, City has need for certain carpet and carpet installation for the 4th Floor-East, of City Hall; and WHEREAS, Contractor was selected as a result of a bidding process in accordance with law. NOW, THEREFORE, the parties hereto agree as follows: 1. Contractor will comply with all provisions of the "Standard Carpet Installation Specifications" attached hereto and designated as Exhibit "0". 2. Contractor will also comply with the four-page document and diagrams entitled "San Bernardino City Hall Fourth Floor-East Floor Finishes" dated October 14, 1987, and on file in the City's Public Buildings/Security and Parking Division of the Public Works Department. 3. City agrees to pay Contractor the amount of $15,403 upon satisfactory completion of the project and inspection and approval as provided in the "Standard Carpet Installation Specifications". 4. The parties agree and understand that Contractor shall for all purposes be considered as an independent contractor, and shall not be considered as an agent of the City. 1 EXHIBIT "A" 1 5. Should Contractor breach this Agreement, City shall be 2 entitled to all damages resulting thereby and reasonable 3 attorney's fees. 4 5 6 7 8 IN WITNESS WHEREOF, the parties have executed this Agreement on the day and date first above shown. By ATTEST: ~~~-4( 9 C'ity Clerk 10 11 12 13 CONTRACTOR - QUALITY CARPETS By 4~~ ~/ ~~- Title .54~- 'l:P//'C1/Y~-ft'--- / 14 Approved as to form and legal content: :: tf,;~~.rw~au'- CjIl AttornW~ 17 18 19 20 21 22 23 24 25 26 27 28 2 BID SPEC: F-87-44 PAGE 2 OF...L. S'f l\ N Ill\ HIl C l\ It P E'l' I N S'J:llliJ..ll:U.!llLl1 1.1'; 1:11'J...Cl\l' 1 0 N S EXHIBIT "n" ART - 1 GENERAL 1.01 All requirements condition apply to section the same incorporated. Work Included of the work as general of the if herein 1.02 a. Remove old carpet b. Prepare surfaces to receive carpeting. c. Apply glue down carpeting on floor and base surfaces where indicated. d. Install edge strips where carpeting terminates at other floor finishes. e. Install padding when applicable. ) ART - 2 EXECUTION 2.01 Preparation of Surfaces a. Clean floors of dust, dirt, solvents, oil, greasc, paint and other substances dctrimental to proper performances of adhesives and carpet. 1\llow to thoroughly dry. b. Fihish trowelling of concrete floor slabs. c. Ensure concrete floors arc free from scaling and irregularities and exhibit neutrality relative to acidity and alkalinity. d. Use an approved cerncntitious filler to patch cracks, small holes and for levelling. e. preinstallation inspection by Public Buildings amI contractor prior to installation -- h,blic Buildings ContI-actor BID SPEC: F-87-44 PAGE.--L- OF 3 3.01 - INSTnLLnTION a. Check matching of carpet before cutting and ensure there is no variation between dye lots. Cut carpet, where required, in a manner to allow proper seam and pattern match and are unfrayed. Where possible and practical, locate seams in areas of least amount of traffic. Provide one - piece widths wherever possible. Join seams in recommended manner so as not to detract from the appearance of the carpet or decrease its life expectancy. Spread adhesive in quantity recommended by manufacturer to ensure proper adhesion over full area of installation. Lay carpet on floors with the run of pile in same direction as traffic. Do not change run of pile in any one room or from one room to next where continuous through a wall opening. Cut and fit carpet neatly around projections through floor and to walls where other vertical surfaces leaving no gaps. Carpet installation is to be laid tight and flat to sub-floor, fastened at edges and present a uniform pleasing appearance. Install full length edging stripes where carpet terminates at other floor coverings. Where splicing cannot be avoided, butt ends tight and flush. If carpet terminates at door openings, center edging strip under door. Install padding (where applic-. able so that carpet tact board is within 1/2 inch of all walls or facings nIl carpet pad seams must be cut to fit snug and taped in place. Final inspection by Public Buildings, purchasing ngent and -(Public Buildings) Contractor. b. c. d. e. f. g. h. i. j. k. 1. - ___.._(______n__) Contractor - ( jiiirCii~sj jig Agent)