HomeMy WebLinkAbout1982-312BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN
4 BERNARDINO AS FOLLOWS:
5 SECTION 1. Change Order No. Three in the contract between the City
6
of San Bernardino and
RESOLUTION NO.
82-312
1
A RESOLUTION
OF THE CITY OF
SAN BERNARDINO APPROVING CHANGE ORDER
a copy
NO. 3 TO THE CONTRACT
BETWEEN THE CITY
OF SAN BERNARDINO AND STEVE BUBALO
2
CONSTRUCTION COMPANY,
FOR CONSTRUCTION
OF INTERCEPTING SEWERS, MILL STREET AND
ARROWHEAD AVENUE.
3
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN
4 BERNARDINO AS FOLLOWS:
5 SECTION 1. Change Order No. Three in the contract between the City
6
of San Bernardino and
Steve Bubalo Construction Company
for construction of
7
intercepting sewers,
Mill Street and Arrowhead Avenue,
Plan No. 3878,
a copy
8
of which is attached
hereto and incorporated herein by
reference, is
hereby
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
approved.
I HEREBY CERTIFY that the foregoing Resolution was duly adopted by
the Mayor and Common Council of the City of San Bernardino at a regular
meeting thereof, held on the 19th day of July 1982, by
the following vote, to wit:
AYES: COUNCIL MEMBERS Castaneda, Reilly, Hernandez, Quiel,
Hobbs, Strickler
NAYS
ABSENT
None
Council Member Botts
City Clerk
Tho foregoing res
Ly
Approved as to form:
City AtZorney
1
2
3
4
5
6
7
8
9
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
CHANGE ORDER NO. 3
IN THE CONTRACT BETWEEN THE CITY OF SAN BERNARDINO, CALIFORNIA AND STEVE
BUBALO CONSTRUCTION COMPANY FOR CONSTRUCTION OF INTERCEPTING SEWERS, MILL
STREET AND ARROWHEAD AVENUE, PLAN NO. 3878, 1969
I
1. DESCRIPTION: Delete: Item No. 4 - 18" Vitrified Clay
Pipe (VCP, Installed Complete 12 L.F.) $( 516.00)
Delete: Item No. 9 - Brick Manhole,
Installed Complete 1 each (1,600.00)
Increase: Item No. 8 - Special Manhole,
Installed Complete $ 2,116.00
2. PURPOSE: Under the terms of the contract, the Contractor was required
to install complete a brick manhole and 12 L.F. of 18" VC pipe to
connect to the special manhole. When the actual construction took place,
the modification had to be made to the plans. There was not sufficient
room to build the brick manhole since site condition varied and the
special manhole was reconfigured by adding a projection onto it to, in
effect, serve as the junction manhole that the brick manhole was intended
for. This change was agreed to in the field by the City Inspector,
i
Currie Engineers' Inspector and the Contractor. The value of the modifi-
cation to the special manhole was considered equivalent to the
construction cost of the brick manhole and 12' of 18" VC pipe. i
3. CONTRACT COSTS:
The contract cost is changed by .............................$ 0
The total contract cost is..................................$850,240.53
RECOMMENDED:
:••:U@
CURRIE ENGI ERING COMPANY CITY OF SAN BERNARDINO
By: vei' By: d��i—oft" -- -
Partner City Engineer
CITY OF SAN
By:
Date:__
AUTHORIZED:
CITY OF SAN BERNARDA
Da
Approved as to Form:
ATTEST:
BY:
rator ! City Clerk
RESOLUTION NO.,
STEVE BCcBA�UBALO CONSTRUCTION COMPANY
By:A�-- , a/� %
Mayor TL e
City Attorney