HomeMy WebLinkAbout1982-312BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN 4 BERNARDINO AS FOLLOWS: 5 SECTION 1. Change Order No. Three in the contract between the City 6 of San Bernardino and RESOLUTION NO. 82-312 1 A RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING CHANGE ORDER a copy NO. 3 TO THE CONTRACT BETWEEN THE CITY OF SAN BERNARDINO AND STEVE BUBALO 2 CONSTRUCTION COMPANY, FOR CONSTRUCTION OF INTERCEPTING SEWERS, MILL STREET AND ARROWHEAD AVENUE. 3 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN 4 BERNARDINO AS FOLLOWS: 5 SECTION 1. Change Order No. Three in the contract between the City 6 of San Bernardino and Steve Bubalo Construction Company for construction of 7 intercepting sewers, Mill Street and Arrowhead Avenue, Plan No. 3878, a copy 8 of which is attached hereto and incorporated herein by reference, is hereby 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 approved. I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and Common Council of the City of San Bernardino at a regular meeting thereof, held on the 19th day of July 1982, by the following vote, to wit: AYES: COUNCIL MEMBERS Castaneda, Reilly, Hernandez, Quiel, Hobbs, Strickler NAYS ABSENT None Council Member Botts City Clerk Tho foregoing res Ly Approved as to form: City AtZorney 1 2 3 4 5 6 7 8 9 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 CHANGE ORDER NO. 3 IN THE CONTRACT BETWEEN THE CITY OF SAN BERNARDINO, CALIFORNIA AND STEVE BUBALO CONSTRUCTION COMPANY FOR CONSTRUCTION OF INTERCEPTING SEWERS, MILL STREET AND ARROWHEAD AVENUE, PLAN NO. 3878, 1969 I 1. DESCRIPTION: Delete: Item No. 4 - 18" Vitrified Clay Pipe (VCP, Installed Complete 12 L.F.) $( 516.00) Delete: Item No. 9 - Brick Manhole, Installed Complete 1 each (1,600.00) Increase: Item No. 8 - Special Manhole, Installed Complete $ 2,116.00 2. PURPOSE: Under the terms of the contract, the Contractor was required to install complete a brick manhole and 12 L.F. of 18" VC pipe to connect to the special manhole. When the actual construction took place, the modification had to be made to the plans. There was not sufficient room to build the brick manhole since site condition varied and the special manhole was reconfigured by adding a projection onto it to, in effect, serve as the junction manhole that the brick manhole was intended for. This change was agreed to in the field by the City Inspector, i Currie Engineers' Inspector and the Contractor. The value of the modifi- cation to the special manhole was considered equivalent to the construction cost of the brick manhole and 12' of 18" VC pipe. i 3. CONTRACT COSTS: The contract cost is changed by .............................$ 0 The total contract cost is..................................$850,240.53 RECOMMENDED: :••:U@ CURRIE ENGI ERING COMPANY CITY OF SAN BERNARDINO By: vei' By: d��i—oft" -- - Partner City Engineer CITY OF SAN By: Date:__ AUTHORIZED: CITY OF SAN BERNARDA Da Approved as to Form: ATTEST: BY: rator ! City Clerk RESOLUTION NO., STEVE BCcBA�UBALO CONSTRUCTION COMPANY By:A�-- , a/� % Mayor TL e City Attorney