Loading...
HomeMy WebLinkAbout14-Development Services ORIGINAL CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION From: Valerie C. Ross, Director Subject: Resolution awarding a contract to Repipe — California, Inc. for Sewer Line Rehabilitation Dept: Development Services by Cured-In-Place (CIPP) Method, two locations in Sierra Way and one location in Date: September 10, 2007 Northpark Boulevard (SW-E, SW07-04, SW07-05),per Project Plan No. 12148. File Nos. 3.7701, 3.7704, 3.7705 MCC Date: October 15, 2007 Synopsis of Previous Council Action: August 2006 The Mayor and Common Council approved FY 2006-07 CIP Budget. Recommended Motion: Adopt Resolution. Valerie C. Ross Robert Eisenbeisz, Acting City Engineer Contact Person: Robert Sepulveda, Engineering Associate Phone: Ext. 5026 Supporting data attached: Staff Report, Resolution, Cost Distribution Chart& Map Ward: 4, 5, 7 FUNDING REQUIREMENTS: Amount: $ 275,500 Source: (Acct. Nos.) 132-431-5505-7701;132-431-5504-7704; & 132-431-5504-7705 Acct. Description: Sewer Maintenance Fund Finance: Council Notes: c200 7- i a Agenda Item No. 1611516-7 CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT Subject: Resolution awards a contract to RePipe — California, Inc. for Sewer Line Rehabilitation by Cured-In- Place (CIPP) Method. The project locations are Sierra Way from 30th Street to 34th Street (SW-E), Sierra Way from Parkdale Street to 40th Street(SW07-04) and Northpark Boulevard from "H" Street to Mayfield Avenue (SW07-05),per Project Plan No. 12148. Background: This project consists of the following: 1. Cleaning of sewer main. 2. Installation of new CIPP material. 3. Videotaping and cutting of laterals. The plans and specifications for this project were completed and the project was opened to public bidding on July 10, 2007. The project was advertised locally in the San Bernardino County Sun Newspaper, F. W. Dodge, Construction Bid Board, High Desert Plan Room, San Diego Daily Transcript, Sub-Hub Online Plan Room, Reed Construction Data, Bid America Online, Construction Bid Source, Bid Ocean, the City's web sites, and with the San Bernardino Area Chamber of Commerce. Bids have been received and are listed below: Name of Bidder City Amount of Basic Bid RePipe-California,Inc. Ontario,Ca $ 211,861.00 Insituform Technologies, Inc. Chesterfield, MD $ 247,114.50 Wesco Infrastructure Technologies Torrance, Ca $ 264,319.00 Engineer's Estimate 1 1 $ 409,590.00 Based on review of the sealed competitive bids received, staff has determined RePipe—California, Inc. of Ontario, the apparent low bidder, has met the minimum requirements of the specifications and bid guidelines; and, therefore, recommends that the Mayor and Common Council award the referenced contract to RePipe—California, Inc. The estimated project costs are as follows: Construction Cost(Basic Bid) $ 211,861.00 Contract Management and Inspection(Approx. 15%)+/- $ 31,779.00 -Contingencies(Approx. 15%) $ 31,860.00 Estimated Total Project Cost $ 275,500.00 If approved, this project is expected to begin construction in October of 2007 and be completed by December of 2007. 2 10/11/2007 9:24 AM CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT - Continued Financial Impact: Sufficient funds are available in Acct. No. 132-431-5505-7701 "Miscellaneous Sewer Repairs," Acct. No. 132-431-5504-7705 "Northpark Boulevard Sewer Repairs," and Acct. No. 132-431-5504-7704 "Sierra Way Sewer Repairs." If replacement of sewer main is required, it will be necessary to repave the street after the work is done. Recommendation: Adopt Resolution. Attachments: "1" Cost Distribution Chart 112"Vicinity Map 3 10/11/2007 9:24 AM i 1 = O V _ r ch O M Z = a W O N (o U) N O 10 L Y o O Q E o a > > o �— o o > > o N >N O N � _N L � O O U7 M M v Z N o O O o O O O V r-, 1, O O r O O 7 N M m H 69 w N y co A 60 O ] (D O W f> » A O 3 C p C 49 N E aU) ¢ o w a ¢ D O 00 Y m O O ° o m o ° 0 0 ¢ ° v_ 0 a ° m r- 69 6 X v LO O —° w Q z N m a' ZO ¢ O Q z n -J Y U U N N O Q Q W E O O V O U � � m E - v r0 o ¢ 0 aM v ro W X N Z r N In In a, a. O U 19 EA 60 N EL LU U d to W in 0 m o 'i o n F=- 00 ~ � = F c ,0 O O ° o Lu f co N O V co C p O O Q1 Q Ir U d .- } N O 1- d = E v F m o ZUp c (D i9 w 0 W R c Q U O J U a D °o °o °0 00 C M M of to N } N C O W _ m _ C IA EA M C En fl to U 0 Y U z o O O o z o 0 0 0 O c o N o F M O N to O v � oc F E v r r fl A fl N m � w3l ¢ m 2 W w W C T o Z O N m J W 0 n U) o Z V N d Lll O O O a E o o v 0 z c y o 0 0 Lj E r n In v v z o O Lo o c 0 M M M O U V N N N Q M co M ��RNARDI'�'p City of San Bernardino, California Department of Public Works, Division of Engineering CIP No. SW-E •^z SW07-04 0 SW07 05 D SEWER LINE REHA B-ILITAI ON BY CURED-IN-PLACE PIPE (CIPP) SIEI?I" TEA Y AND IN NORTHPARK BOULEVARD I i 617E �� y ��._•�_ B .+1��'9FS y9'� 5T �N r J'�a a� N 1vM �# IFpi r- V, <,, . 4 SBTN Si `- ,NSx ;EM Nsr uI'f 3r �' �3 ePo <770 A IMEN IN 3 lro.rom 300 �Y BLVD OOVf l I�, _l f 8 a 3 �y •unov Oy oa ` \ B y < a f 51 ^f�W 0 w S s OR NJI tn1 ,� v cry., y 0 NILL II �I � 30o aq+N f alvc a FARE N I .- Zi NAN�xA I < F y G 3 81 '} F Nerx sr < g r 40TH 3 $T nn E IDIFI r., Tx C N 1 zs E® , � 1000 $T 90p� 100 L G u S' ON S� 5 7N • rt E I RALSTON AV ' �.ivPyIR[ W ^ 'I I W E �6TN t,r -.+: f i _-- _ Ir , �y A� �t.s44' �cE Ny�39TN 5 y ��R � AAWO& E PµYN M{F = _ @!?h � N F A4X L.,. Y.•:1EMJtl.4 —. i AllT _ � -£-__'. Y ww-147-� 'y'.$' ,� y EE_ �SF "J IRO F'' !y Qe wN EEf W r Ir g ywy IIYANOA y Yl '� $T TH s. l:i ST E i 361N ..ST J w ST i • I E E rte' ST qI f °p1 PROJECT I l G s�3 y�i R i T R { lei L 0 C TIONS _ No VJ — HHj{�rr y C: �- �p 3 E! MAA9Ull aLV,] 'Ey TE WA9VilL BLNj--_`#I—. v �..n x �aoE f w NM o_i e 8 E r. a y 40— a — .I m 3011✓ soo � 3 L c�IFrw000._"�E I I ST R 30TH " °"ST"k RWY I 14"Y E Q - VICINITY MAP -- N.T.S. CIP No. SW-E SW07-04 C (DPY RESOLUTION NO. 1 2 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN 3 BERNARDINO AWARDING A CONTRACT TO REPIPE — CALIFORNIA, INC. FOR SEWER LINE REHABILITATION BY CURED-IN-PLACE (CIPP) METHOD, TWO 4 LOCATIONS IN SIERRA WAY AND ONE LOCATION IN NORTHPARK 5 BOULEVARD (SW-E, SW07-04, SW07-05), PER PROJECT PLAN NO. 12148. 6 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE 7 CITY OF SAN BERNARDINO AS FOLLOWS: 8 SECTION 1. RePipe - California, Inc. 5525 E. Gibraltar Street, Ontario, CA 91764, is 9 the lowest responsible bidder for sewer line rehabilitation by cured-in-place (CIPP) method, two 10 locations in Sierra Way and one location in Northpark Boulevard (SW-E, SW07-04, SW07-05), per 11 12 Project Plan No. 12148. A contract is awarded accordingly to said bidder in a total amount of 13 $211,861.00, with a contingency amount of$31,860.00, but such award shall be effective only 14 upon being fully executed by both parties. All other bids, therefore, are hereby rejected. The 15 City Manager is hereby authorized and directed to execute said contract on behalf of the City; a 16 copy of the contract is on file in the office of the City Clerk and incorporated herein by 17 reference as fully as though set forth at length. 18 SECTION 2. This contract and any amendment or modifications thereto shall not take 19 20 effect or become operative until fully signed and executed by the parties and no party shall be 21 obligated hereunder until the time of such full execution. No oral agreements, amendments, 22 modifications or waivers are intended or authorized and shall not be implied from any act or 23 course of conduct of any party. 24 SECTION 3. This resolution is rescinded if the parties to the contract fail to execute it 25 within sixty(60) days of passage of the resolution. 26 27 28 .�,� 1 2 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AWARDING A CONTRACT TO REPIPE — CALIFORNIA, INC. FOR 3 SEWER LINE REHABILITATION BY CURED-IN-PLACE (CIPP) METHOD, TWO LOCATIONS IN SIERRA WAY AND ONE LOCATION IN NORTHPARK 4 BOULEVARD (SW-E, SW07-04, SW07-05), PER PROJECT PLAN NO. 12148. 5 I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor 6 and Common Council of the City of San Bernardino at a meeting thereof, held on the 7 8 day of , 2007, by the following vote, to wit: 9 Council Members: AYES NAYS ABSTAIN ABSENT 10 ESTRADA 11 BAXTER 12 BRINKER 13 DERRY 14 KELLEY 15 JOHNSON 16 MC CAMMACK 17 18 19 City Clerk 20 The foregoing resolution is hereby approved this day of , 2007. 21 22 Patrick J. Morris, Mayor 23 City of San Bernardino 24 Approved as to form: 25 JAMES F. PENMAN, 26 City Attorney 27 28 By: 2