HomeMy WebLinkAbout07-Development Services 01""'<' ".. "L 't1. 'v. . . " ~ CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Dept: Development Services Subject: Authorization to execute Change Order No, One to the contract with Architect Milford Wayne Donaldson, FAIA, Inc" for preparing a fInal plan, specifIcations, and estimates for renovation and retrofIt of the San Bernardino Santa Fe DepoL MCC Date: 4/16/01 From: James Funk, Director Date: March 26, 2001 File: 6,7178 Synopsis of Previous Council Action: 11/20/00 Award contract to Architect Milford Wayne Donaldson, FAIA, Inc, for preparing a fInal plan, specifications, and estimates for renovation and retrofit of the San Bernardino Santa Fe Depot 10/20/00 Agreement for Professional Environmental Inspection Services approved with Earth Tech for providing inspection of hazardous waste removal at the San Bernardino Santa Fe Depot 3/06/00 Approval of the Rehabilitation and Adaptive Reuse Plan for the San Bernardino Santa Fe Depot 6/07/99 Agreement for Professional Services awarded to Architect Milford Wayne Donaldson, FAIA, Inc" to prepare preliminary plans, specifications, and estimates for the rehabilitation, seismic retrofit, and adaptive reuse of the Santa Fe Depot 2/15/99 Authorized an amendment to the Cooperative Agreement with SANBAG and the Economic Development Agency to include City as owner for restoration of the Santa Fe Depot and the Commuter Rail Station, Recommended Motion: Approve Contract Change Order No. One to the contract with Architect Milford Wayne Donaldson, FAIA, Inc. for preparing a final plan, specifications, and estimates for renovation and retrofit of the San Bernardino Santa Fe Depot ~~ r ~ James Funk Contact person: T Jarh Thaipeir Senior Civil En~ineer Phone: 5127 I Supporting data attached: Staff Rc:port Ward: FUNDING REQUIREMENTS: Amount: $8 500 00 Source: (Acct. No,) 123-558-5504-7178 Acct. Description: Restoration of San Bernardino Santa Fe Deoot Finance: Council Notes: JlI,/'//)) Agenda Item No, -9 City of San Bernardino - Request for Council Action Staff Report Subject: Authorization to execute Change Order No. One to the contract with Architect Milford Wayne Donaldson, FAIA, Inc., for preparing a final plan, specifications, and estimates for renovation and retrofit of the San Bernardino Santa Fe Depot. Backeround: Materials testing necessary to develop a comprehensive structural strengthening design for the Santa Fe Depot was not included in the architect's original proposal. Although Milford Wayne Donaldson originally intended that the City contract for the material testing independently, staff is recommending that the architect retain the original geotechnical firm, Kleinfelder, to perform this task. Kleinfelder is familiar with the project through their involvement in the adaptive reuse study and their subcontracting with the architect simplifies the consultant approval process with CALTRANS since it is a normal activity in the design process. The materials testing scope of work will include coring wall and floor slab, shear testing masonry units, and sampling steel members at selected locations. Financial ImDact: Sufficient funds are available for this change order from the project contingency fund of $106,484.00 originally authorized from Account No. 123-558-5504-7178 (Restoration of San Bernardino Santa Fe Depot) as part of the contract award. The majority of the cost of this project (88.53 percent) will be reimbursed through Federal/State Aid funding with the local match covered by the disbursement previously received from SANBAG. Summary of Contract Costs Orie:inal Contract Amount Increase due to Contract Change Order No.1 - Material Testing Revised Contract Amount $1,064,840.00 8,500.00 $1,073,340.00 Recommendation: That the Mayor and Common Council authorize execution of Change Order No. One in the amount of $8,500.00 with Architect Milford Wayne Donaldson, FAIA, Inc. for preparing a final plan, specifications, and estimates for renovation and retrofit of the San Bernardino Santa Fe Depot.