CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
Dept: Development Services
Subject: Authorization to execute Change
Order No, One to the contract with
Architect Milford Wayne Donaldson,
FAIA, Inc" for preparing a fInal plan,
specifIcations, and estimates for renovation
and retrofIt of the San Bernardino Santa Fe
DepoL
MCC Date: 4/16/01
From: James Funk, Director
Date: March 26, 2001
File: 6,7178
Synopsis of Previous Council Action:
11/20/00 Award contract to Architect Milford Wayne Donaldson, FAIA, Inc, for preparing a fInal
plan, specifications, and estimates for renovation and retrofit of the San Bernardino Santa Fe Depot
10/20/00 Agreement for Professional Environmental Inspection Services approved with Earth Tech for
providing inspection of hazardous waste removal at the San Bernardino Santa Fe Depot
3/06/00 Approval of the Rehabilitation and Adaptive Reuse Plan for the San Bernardino Santa Fe
Depot
6/07/99 Agreement for Professional Services awarded to Architect Milford Wayne Donaldson, FAIA,
Inc" to prepare preliminary plans, specifications, and estimates for the rehabilitation, seismic retrofit,
and adaptive reuse of the Santa Fe Depot
2/15/99 Authorized an amendment to the Cooperative Agreement with SANBAG and the Economic
Development Agency to include City as owner for restoration of the Santa Fe Depot and the Commuter
Rail Station,
Recommended Motion:
Approve Contract Change Order No. One to the contract with Architect Milford Wayne Donaldson,
FAIA, Inc. for preparing a final plan, specifications, and estimates for renovation and retrofit of the
San Bernardino Santa Fe Depot ~~ r ~
James Funk
Contact person: T Jarh Thaipeir Senior Civil En~ineer
Phone:
5127
I
Supporting data attached: Staff Rc:port
Ward:
FUNDING REQUIREMENTS:
Amount:
$8 500 00
Source: (Acct. No,) 123-558-5504-7178
Acct. Description: Restoration of San Bernardino Santa
Fe Deoot
Finance:
Council Notes:
JlI,/'//))
Agenda Item No, -9
City of San Bernardino - Request for Council Action
Staff Report
Subject:
Authorization to execute Change Order No. One to the contract with Architect Milford Wayne
Donaldson, FAIA, Inc., for preparing a final plan, specifications, and estimates for renovation
and retrofit of the San Bernardino Santa Fe Depot.
Backeround:
Materials testing necessary to develop a comprehensive structural strengthening design for the
Santa Fe Depot was not included in the architect's original proposal. Although Milford Wayne
Donaldson originally intended that the City contract for the material testing independently,
staff is recommending that the architect retain the original geotechnical firm, Kleinfelder, to
perform this task. Kleinfelder is familiar with the project through their involvement in the
adaptive reuse study and their subcontracting with the architect simplifies the consultant
approval process with CALTRANS since it is a normal activity in the design process. The
materials testing scope of work will include coring wall and floor slab, shear testing masonry
units, and sampling steel members at selected locations.
Financial ImDact:
Sufficient funds are available for this change order from the project contingency fund of
$106,484.00 originally authorized from Account No. 123-558-5504-7178 (Restoration of San
Bernardino Santa Fe Depot) as part of the contract award. The majority of the cost of this
project (88.53 percent) will be reimbursed through Federal/State Aid funding with the local
match covered by the disbursement previously received from SANBAG.
Summary of Contract Costs
Orie:inal Contract Amount
Increase due to Contract Change Order No.1 - Material Testing
Revised Contract Amount
$1,064,840.00
8,500.00
$1,073,340.00
Recommendation:
That the Mayor and Common Council authorize execution of Change Order No. One in the
amount of $8,500.00 with Architect Milford Wayne Donaldson, FAIA, Inc. for preparing a
final plan, specifications, and estimates for renovation and retrofit of the San Bernardino Santa
Fe Depot.