HomeMy WebLinkAbout15-Development Services
e
e
e
'~. ,.-,"~ ,:.. " il(\
CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION
From:
Valerie C. Ross, Director
Resolution authorizing execution of
Amendment No. 3 to Professional Services
Agreement with LAN Engineering
Corporation to provide Engineering Services
for the Design of Old Waterman Canyon
Bridge Replacement (SS07-14).
Subject:
Dept:
Development Services
Date:
July II, 2007
MCC Date: August 6, 2007
Synopsis oCPrevious Council Action:
12120/04
Adopted Reso. No, 2004-391 awarding a contract to Gwineo Construction and Engineering, Inc.,
for Old Watenoan Canyon Road Bridge Repair (SS05-1I) in the amount of$141,991.76.
Adopted Reso. No. 2006-145 approving Agreement for Professional Services in the amount of
$224,621.00 with LAN Engineering Corporation to provide Engineering Services for the Design of
Old Watenoan Canyon Bridge Replacement (SS07-14).
Adopted 5-Year CIP for FY 2006111 which included funding for design and construction of Old
Watenoan Canyon bridge replacement (SS07-14)
Adopted Reso. No. 2006-376 approving Amendment No. 1 to Agreement for Services in the
amount of $25,916.94 for additional environmental services for the Design of Old Waterman
Canyon Bridge Replacement (SS07-14).
Adopted Reso. No. 2006-376 approving Amendment No. 2 to Agreement for Services in the
amount of $8,000.00 for Initial Site Assessment (ISA) for the Design of Old Waterman Canyon
Bridge Replacement (SS07-14).
05/15/06
08/07/06
1lI06/06
05/07107
Recommended Motion:
Adopt Resolution.
WtMv.&-
. Valerie C. Ross
Contact Person:
Mark Lancaster, Deputy Director/City
Engineer
5019
Phone:'
Supportiog data attached:
Staff Report, Reso., Amendment to
Agreement Ward:
4
FUNDING REQUIREMENTS:
Amount: $3,650.00
Source: (Ace!. No) 242-362-5504-7671
Acct. Description: SS07-14 Old Waterman Canyon
Bridge Replacement
Finance:
Council Notes:
81"J~
15
Agenda Item No.
~~ o"".'!,i,::tIl'l!I!!'Y:t'W''l''.O' "., "", """ ,
e
e
e
''''''-''~{r,)
CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION
STAFF REPORT
Subject:
Resolution authorizing execution of Amendment No.3 to Professional Services Agreement with
LAN Engineering Corporation to provide Engineering Services for the Design of Old Waterman
Canyon Bridge Replacement (SS07-14).
Background:
On August 7, 2006, the Mayor and Common Council adopted the FY 2006/11 5-Year Capital
Improvement Program (CIP), which included a project to replace Old Waterman Canyon Bridge
(SS07-14).
This bridge is located on Old Waterman Canyon Road, approximately one mile northerly of
Waterman Avenue (State Route 18). The bridge was severely damaged in a flood that occurred
on December 25, 2003. Funding for repair of the bridge was approved by the Federal
Emergency Management Agency (FEMA); however, before repairs could be started, a flood
occurred on January 10, 2005, and further damaged the structure.
A federal disaster declaration (FEMA-1577-DR) was made for the San Bernardino area
subsequent to the January 10, 2005 storm. FEMA reviewed the condition of the bridge and
determined that repair of the bridge was not feasible and allocated funding for its replacement.
Funding in the amount of $505,000 was allocated for the project, 75% of which is to be
reimbursed by FEMA and the remaining 25% by the State Office of Emergency Services
(OES).
On May 15, 2006, an Agreement for Professional Services in the amount of $224,621 was
approved with LAN Engineering Corporation to provide Engineering Services for the Design of
Old Waterman Canyon Bridge Replacement (SS07-14).
On November 6, 2006, Amendment No. 1 to the Agreement for Professional Services in the
amount of $25,916.94 .was approved, authorizing Jones & Stokes, an environmental
subcontractor to LAN Engineering, to proceed with focused surveys for six sensitive species
that may inhabit the site. Five of the special-status species are plants and one is an animal
(Merriam's Kangaroo Rat).
Although none of the sensitive species was found at the site, during preparation of the
biological, cuitural and water quality technical reports by Jones and Stokes, environmental
subconsultant to LAN Engineering, the need was identified for a hazardous waste Initial Site
Assessment (ISA). This assessment was not included in the initial scope of work with LAN
Engineering in the original Agreement or Amendment No. I.
On May 7, 2007, Amendment No 2 was approved, authorizing LAN Engineering to proceed
with preparation of the ISA.
2
~7'~... '.'lJI'~."'i",\'";~:"~'<:r,"\'!f:,~:'"<~;i':""-
:"'}!J~~,-
CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION
STAFF REPORT - Continued
e The work was performed and a report provided by Kleinfelder, geotechnical subconsultant to
LAN Engineering. The report found no history or readily apparent visual evidence of
hazardous material at the site; however, it concluded that a separate asbestos survey would be
required to meet Air Quality Management District requirements prior to demolition of the
bridge struoture.
This task was not included in the scope of services of the original Agreement, Amendment No.
1 or Amendment No.2; therefore, LAN Engineering is requesting an additional amendment to
its contract and additional compensation in the amount of $3,650.00. Kleinfelder will perform
the work.
Since this asbestos survey is necessary prior to demolition of the existing bridge and for CEQA
compliance, staff recommends approval of the attached Amendment No. 3 authorizing LAN
Engineering to proceed with the work.
Financial Impact:
The breakdown of funding for the LAN Engineering Corporation Agreement and Amendments
will be as follows: .
tit
Description Amount FEMA Funds (75%) OES funds (25%)
Oril!.inal Al!.reement $224,621.00 $168,465.75 $56,155.25
Amendment No. 1 $ 25,916.94 $ 19,437.71 $ 6,479.23
Amendment No.2 $ 8,000.00 $ 6,000.00 $ 2,000.00
PropOsed Amend. No.3 $ 3,650.00 $ 2,737.50 $ 1,012.50
Totals $262,187.94 $196.640.21 $65.646.73
FEMA and OES allocated a total amount of $505,000 for replacement of the bridge. The cost
of construction is currently estimated to be approximately $2,400,000.' OES staff has been
made aware of the significant difference between the current allocation and the estimated total
cost of the project. A letter requesting authorization for supplemental funding was sent to OES
on May 7, 2007. Staffis following up on the status of that request.
The entire cost of this Agreement and Amendments will be charged to Account No. 242-362-
5504-7671. FEMA and OES will reimburse the City upon completion of the work.
Recommendation:
Adopt Resolution.
tit
3
I
~
.
.
.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO.
RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING
AMENDMENT NO. 3 TO AGREEMENT FOR PROFESSIONAL SERVICES WITH
LAN ENGINEERING CORPORATION TO PROVIDE ENGINEERING SERVICES
FOR THE DESIGN OF OLD WATERMAN CANYON BRIDGE REPLACEMENT (SS07-
14).
WHEREAS, on May 15,2006 the Mayor and Common Council adopted Resolution No.
2006-145 approving Agreement for Professional Services with LAN Engineering Corporation to
provide Engineering Services for the Design of Old Waterman Canyon Bridge Replacement
(SS07-14), and
WHEREAS, on November 6, 2006 the Mayor and Common Council adopted Resolution
No. 2006-376 approving Amendment No.1 to Agreement for Professional Services for
additional environmental services for the Design of Old Waterman Canyon Bridge Replacement
(SS07-14), and
WHEREAS, on May 7, 2007, the Mayor and Common Council adopted Resolution No.
2006-376 approving Amendment No.2 to Agreement for Professional Services authorizing an
Initial Site Assessment (ISA) for Old Waterman Canyon Bridge Replacement (SS07-14), and
WHEREAS, pn June 29,2007, a letter was received from Consultant requesting an
Amendment No.3 to said Agreement for Professional Services for an asbestos survey of the
existing bridge, and
WHEREAS, City concurs that the asbestos survey will be required to notify the Air
Quality Management District ofthe demolition of the existing bridge structure and was not
included in said Agreement for Professional Services, Amendment No. 1 or Amendment No 2.
THEREFORE, BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL
OF THE CITY OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. That the City Manager is authorized to execute Amendment No.3 to the
Agreement for Professional Services with LAN Engineering Corporation to provide Engineering
- 1 -
-no. /5
Og 10/107
,
I
.
.
15
16 III
17 III
18
19
20
21
22
23
24
25
26
27
. 28
1
2 RESOLUTION ... APPROVING AMENDMENT NO. 3 TO AGREEMENT FOR
PROFESSIONAL SERVICES WITH LAN ENGINEERING CORPORATION TO
3 PROVIDE ENGINEERING SERVICES FOR THE DESIGN OF OLD WATERMAN
4 CANYON BRIDGE REPLACEMENT (SS07-14).
5 Services for the Design of Old Waterman Canyon Bridge Replacement (SS07 - I 4) (attached and
6 incorporated herein as Exhibit "A").
or authorized and shall not be implied from any act or course of conduct of any party.
SECTION 3. This resolution is rescinded if the parties to the contract fail to execute it
within sixty (60) days of passage of the resolution.
14
III
-2-
,
t
.
.
.
1
2 RESOLUTION ... APPROVING AMENDMENT NO.3 TO AGREEMENT FOR
PROFESSIONAL SERVICES WITH LAN ENGINEERING CORPORATION TO
3 PROVIDE ENGINEERING SERVICES FOR THE DESIGN OF OLD WATERMAN
4 CANYON BRIDGE REPLACEMENT (SS07-14).
5
I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and
6
Common Council of the City of San Bernardino at a
7
meeting thereof, held
on the
8
day of
,2007, by the following vote, to wit:
9 Council Members:
10
11
12
13
AYES
NAYS
ABSTAIN ABSENT
ESTRADA
BAXTER
BRINKER
DERRY
14
15
KELLEY
16 JOHNSON
17 MC CAMMACK
18
19
20
City Clerk
The foregoing resolution is hereby approved this
day of
,2007.
21
22
PatrickJ. Morris, Mayor
City of San Bernardino
23
24 Approved as to form:
25
26
27
28
JAMES F. PENMAN,
City Attorney
By:
7-.
- 3 -
.
.
.
Exhibit" A"
AMENDMENT NO.3 TO AGREEMENT FOR PROFESSIONAL SERVICES
THIS AMENDMENT NO 3 TO AGREEMENT FOR PROFESSIONAL
SERVICES is entered into this _ day of ,2007, between LAN Engineering
Corporation ("Consultant") and the City of San Bernardino ("City)."
WITNESSETH:
A. WHEREAS, on May 15, 2006 the Mayor and Common Council adopted
Resolution No. 2006-145 approving Agreement for Professional Services with LAN
Engineering Corporation to provide Engineering Services for the Design of Old
Waterman Canyon Bridge Replacement (SS07-14), and
B. WHEREAS, on November 6, 2006 the Mayor and Common Council adopted
Resolution No. 2006-376 approving Amendment No. 1 to Agreement for Professional
Services for additional environmental services for the Design of Old Waterman Canyon
Bridge Replacement (SS07-14), and
C.
WHEREAS, on May 7, 2007, the Mayor and Common Council adopted
Resolution No. 2007-135 approving Amendment No.2 to Agreement for Professional
Services authorizing an Initial Site Assessment (ISA) for Old Waterman Canyon Bridge
Replacement (SS07-14), and
D. WHEREAS, on June 29,2007, a letter was received from Consultant requesting
an Amendment No.3 to said Agreement for Professional Services for an asbestos survey
of the existing bridge, and
E. WHEREAS, City concurs that the asbestos survey will be required to notify the
Air Quality Management District of the demolition of the existing bridge structure and
was not included in the scope of services for said Agreement for Professional Services,
Amendment No I or Amendment No.2.
NOW THEREFORE, the parties hereto agree as follows:
1)0. /5
Og/cvJo,
.
.
.
Exhibit "A"
Amendment No.3 to Agreement for Professional Services - LAN Engineering Corporation
Page 2 00
1. Section I of said Agreement for Professional Services is amended to add that the Consultant
shall also complete an Asbestos Survey of the existing bridge in accordance with letter
proposal from Consultant entitled "Proposal for Additional Environmental Services,
Waterman Canyon Road Bridge Replacement Project", dated June 29, 2007 (attached and
incorporated herein as Attachment "I ").
2. Section 5(A) of said Agreement for Professional Services is amended to add the following
paragraphs:
The City shall also reimburse the Consultant for actual costs (including labor costs,
employee benefits, overhead, profit, other direct and indirect costs) incurred by the
Consultant in the performance of work involved in preparation of an Asbestos Survey of
the existing bridge as identified in Attachment I, in an amount not to exceed $3,650.00.
The following is a summary of the costs authorized to date for this project:
Description Amount
Orieinal Al!reement $224,621.00
Amendment No. I $25,916.94
Amendment No.2 $8,000.00
Amendment No.3 $3,650.00
Totals $262.187.94
3. All other terms and conditions of said Agreement for Professional Services, Amendment No.
I and Amendment No.2 as approved by Resolution Nos. 2006-145, 2006-376, and 2007-135
shall remain unchanged.
III
III
.
.
.
Amendment No.3 to Agreement for Professional Services - LAN Engineering Corporation
Page 3 of3
Exhibit "A"
AMENDMENT NO.3 TO AGREEMENT FOR PROFESSIONAL SERVICES
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date shown
below.
Date:
Date:
ATTEST:
Rachel Clark, City Clerk
Approved as to form:
James F. Pemnan
City Attorney
LAN ENGINEERING CORPORATION
by:
Signature
Print NameITitle
CITY OF SAN BERNARDINO
by:
Fred Wilson
City Manager
LIM & NASCIMENTO ENGINEERING CORPORATION
ATTACHMENT~
.
June 29, 2007
Mr. Michael Grubbs
City of San Bemardino
300 North "0" Street
San Bemardino, CA 92418
Subject:
Proposal for Additional Environmental Services
Waterman Canyon Road Bridge Replacement Project
Dear Mike:
Per our discussion during our PDT meeting of June 28th 2007, LAN's subconsultant, Kleinfelder
provided an Asbestos Survey scope of work at the City request to complete the environmental
documents. The asbestos survey would also be required to notify the Air Quality Management
District of the demolition of the bridge structure. This task was not included in the initial scope of
work for the Environmental Services. We have asked LAN's geotechnical sUbconsultant,
. Kleinfeider, for a proposal to perform this service.
An amendment to the contract is required to perform the Asbestos Survey and be included in the
study reports. The additional fee to perform the Asbestos survey and prepare the reports is
$3,650. Please process the amendment request to authorize the additional environmental
services for the Asbestos Survey. The Scope of Additional Services is attached (original copy
provided during the meeting).
Should you have any questions or require any additional information, please feel free to contact
me at (909) 890-0477, extension 301.
Very Truly Yours,
L1m & Nascimento Engineering Corp.
t:2--Q l, <..,
[fJ~@~OWl~[Q)
1~ 1) ~
Edward Ng, P.E.
Project Manager
CITY OF SAN BERNAHDINO
DEVELOPMENT SERVICES
DEPARTMENT
.
1887 Business Center Drive, Suite 6
San Bemardino. CA 92408
(909) 890.Q477
Fax (909) 890-0467
ATTACHMENT "1"
.
RlKLEINFELDER
An employee oW/led company
June 26, 2007
Proposal No. 05603GNTEME7P013
Mr. Mahmoud Khodr
Urn & Nascimento Engineering Corporation
1887 Business Center Drive, Suite 6
San Bernardino, CA 92408
via electronic mail
mahmoud .khodr@lanengineeriing.com
Subject:
Proposed Scope and Fee for an Asbestos Survey
Replacement Bridge Over Old Waterman Canyon Creek
San Bernardino, San Bernardino County, California
Dear Mr.Khodr:
.
Kleinfelder is pleased to present this proposed scope and fee to perform a limited
asbestos survey for the above-referenced project, located in San Bernardino, San
Bernardino County, California (Site) for Urn & Nascimento Engineering Corporation
(Client). This proposed scope and fee has been prepared in response to your request
for these services and is based on our present understanding of your requirements.
Kleinfelder is committed to providing quality service to our clients, commensurate with
their wants, needs and desired level of risk. If a portion of our proposed scope does not
meet your needs, or if those needs have changed, Kleinfelder is prepared to consider
appropriate modifications, subject to the standards of care to which we adhere as
professionals. Modifications such as changes in scope, methodology, scheduling,
contract terms, and conditions may result in changes to the risks assumed by the client,
as well as adjustments to our fees.
SCOPE OF SERVICES
Task 1 -Asbestos Building Materials Survey
The asbestos survey includes a site visit, collecting bulk samples of suspected
asbestos-containing materials (ACMs), sample analysis, and providing a letter report of
findings. A California Occupational Safety and Health Administration (Cal-OSHA)
. Certified Asbestos Consultant will conduct a review of the structure to evaluate the likely
05603PROPITEME7P013
Copyright 2007 Kleinfelder, Inc.
Page 1 of6
June 26, 2007
KLEINFELDER 43174 Business Park Drive, Suite 103, Temecula, CA 92590 19511506-1488 (951) 506-1491 lax
.
.
.
ATTACHMENT "1"
presence and approximate quantity of suspect ACMs. The collection of samples
requires the removal of small amounts of building materials at sample locations.
Destructive inspection and sampling methods will be used on the structure.
Samples of suspect ACMs will be collected in general accordance with United States
Environmental Protection Agency (US EPA) regulations and local regulations.
Kleinfelder estimates that up to 12 building material samples will be collected during
sampling activities. The actual number of samples collected will depend on the field
judgment of the consultant conducting the survey. Samples will be analyzed by
Polarized Light Microscopy (PLM) at a laboratory certified under the US EPA-National
Voluntary Laboratory Accreditation Program (NVLAP) administered by the National
Institute of Standards and Technology (NIST). If actual field conditions dictate the
collection of additional samples, the samples will be collected, but will not be submitted
to the laboratory until we receive authorization for the additional costs of sampling and
analysis from the Client. The samples will be submitted to the analytical laboratory on a
72-hour turn-around basis.
South Coast Air Quality Management District (SCAQMD) provides local enforcement of
the asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP)
regulations. According to the NESHAP regulations, building materials containing 1 % (or
greater) asbestos by PLM analysis must be designated an ACM, with adherence to
applicable regulations, unless the asbestos content of less than 1 % is confirmed by
point counting methods. If a building material contains greater than 1 % asbestos, then
it is regulated under the local air district asbestos regulations. Kleinfelder will provide a
recommendation for further analysis by point counting methods, following a review of
the PLM analysis results. If point count analysis is recommended, the Client will be
contacted for notification and authorization prior to proceeding.
Task 2 - Final Letter Report of Findings
Kleinfelder will provide a final letter report of findings, which will document the following:
· A description of the field activities, observations, and protocols;
· Tabulated results of the building materials sampled with copies of the analytical
laboratory results;
· Approximate quantity estimates, written descriptions of locations, and conditions
of the ACMs;
. Conclusions and recommendations.
05603PROP/TEME7P013
Copyright 2007 Kleinfeider. Inc.
Page 2 of6
June 26. 2007
KLEINFElDER 43174 Business Park Drive. Suite 103. Temecula. CA 92590 19S1} 506-1488 (951) 506-1491 fax
r--...
.
.
.
ATTACHMENT "I"
The final letter report will be submitted to the Client within 5 working days after receiving
analytical results from the laboratory for the building material samples.
FEE AND SCHEDULE
The following budget has been developed based on Kleinfelder's current knowledge and
assumptions of site conditions, and previous experience with similar projects. Work
performed under this proposed scope and fee will be executed on a lump sum basis. A
breakdown of the fee is listed below:
Descri tion
Asbestos Surve
Professional Services
Outside Services (Analytical Laboratory)
12 asbestos bulk sam Ie PLM anal sis
Expenses (Mileage, mailing, personal protective
sam lin e ui ment
Cost
$ 3,400
$ 150
equipment, and $ 100
PROJECT TOTAL $ 3,650
Project setup is anticipated to take approximately one week. Field work can be
completed within one business day. Results of laboratory analyses of asbestos
samples are typically received within two weeks of collection. A report will be submitted
one week from receipt of analytical results. Therefore, we anticipate the report can be
submitted within approximately four weeks from authorization. However, we will attempt
to complete the work sooner, if possible.
The fees presented in this proposal are based on prompt payment of services
presented in our standard invoicing format. Our fee does not include time for meetings.
Attendance at meetings is beyond our scope of services and will be billed in accordance
with our Standard Fee Schedule. Additional charges will be applied on a time-and-
expense basis for specialized invoicing if backup documentation is needed. Late fees
will be charges if payment is not received in accordance with our Master Agreement.
An invoice for our services will be submitted upon completion of our services, or on a
monthly basis, whichever occurs first. This offer is valid for a period of 90 days from the
date of our proposal. We will review our scope and fees if an agreement to provide our
scope of services has not been reached within 90 days.
05603PROPITEME7P013
Copyright 2007 Kleinleider. Inc.
Page 3 016
June 26. 2007
KLEINFELDER 43174 Business Park Drive, Suite 103. Temecula, CA 92590 19511506-1488 (951) 506-1491 fax
ATTACHMENT "1"
. If our proposed scope of services and fee are acceptable to you, please authorize a
Change Order to our existing agreement in the amount of $3,650.
TECHNICAL ASSUMPTIONS AND UNDERSTANDINGS
The proposed scope of services and budget are based on the following:
· The client is requested to provide any as-built plans or other related building
plans that they may have in their possession for review by the consultant prior to
conducting the fieldwork.
· The asbestos survey can be completed in one day (during normal business
hours), depending on site access. If additional time is required to complete the
surveys due to conditions beyond the control of Kleinfelder, then increased fees
will be incurred by the client.
· Two copies of the report of findings will be delivered to the client. Additional
copies can be provided for a fee of $50 per copy. Client meetings and revisions
to the report are not included in the budget estimate, but can be provided on a
time and materials basis at the client's request.
. · An AHERA accredited asbestos consultant certified by the State of California will
conduct the asbestos survey. The report provided will be signed by a California
Certified Asbestos Consultant.
· Laboratory costs include analysis of 12 building materials for asbestos analysis.
The bulk samples submitted will be analyzed to determine asbestos content, by
PLM methodology. Laboratory analytical costs are based on a 3-day turn-around
basis for asbestos samples. The laboratory conducting the analysis is certified
by the State of California, and certified under the US EPA-NVLAP administered
by NIST.
· Sampling and analysis, other than that set forth in this proposed scope and fee
submittal, are not included in the scope of services. Additional sampling and
analysis, if required, can be provided for additional fees.
· Regulatory agencies having jurisdiction in the local area may require further
analysis of building material samples containing less than one percent by point
counting. Point counting will be performed following verbal authorization from the
client at a cost of $72 per sample. The cost of point counting will be in addition to
the cost estimate provided.
.
05603PROPITEME7P013
Copyright 2007 Kleinfelder, Inc.
Page 4 of 6
June 26, 2007
KLEINFELDER 43174 Business Park Drive, Suite 103, TemeclIla. CA 92590 (951) 506-14B8 (951) 506-1491 fax
.
.
ATIACHMENT "I"
. The asbestos-containing materials survey will be conducted at a level appropriate
for a pre-demolition survey, as much as practical. Unless otherwise directed by
the client, this project scope of services will include destructive sampling.
· Our scope of services does not include asbestos abatement specifications,
oversight, clearance inspections, clearance air sampling following abatement
activities, or other services not specifically mentioned in this proposed scope and
fee. Kleinfelder can provide additional services under a separate proposed
scope and fee, if requested.
. The scope of services does not include notification of building occupants, other
than what is presented in the final report of findings for each facility. Nor does
the Scope include training employees and owners in the work place hazards
associated with asbestos and lead-based paint containing materials. However,
Kleinfelder can provide these services on a time-and-materials basis, as needed.
LIMITATIONS
The proposed scope of work requested by the Client is limited to evaluating
environmental concerns associated with the potential presence of hazardous
substances in conjunction with the aforementioned property. This limited environmental
evaluation does not include soil sampling and analysis or other services not described.
Other environmental or geotechnical investigative services can be provided for
additional fees.
Kleinfelder will assume no responsibility or liability for any claim, loss of property value,
damage, or injury which results from pre-existing hazardous substances being
encountered or present on the project site, or from the discovery of such hazardous
substances.
Kleinfelder offers a range of investigative and engineering services to suit the varying
needs of our clients. Acceptance of this Proposed Scope and Fee will indicate that the
Client has reviewed the scope of service and determined that it does not need or want
more services than are being proposed at this time. Any exceptions should be noted
and may result in a change in fees.
Kleinfelder will perform its services in a manner consistent with the standards of care
and skill ordinarily exercised by members of the profession practicing under similar
conditions in the geographic vicinity and at the time the services will be performed. No
warranty or guarantee, express or implied, is part of the services offered by this
. proposed scope and fee.
05603PROPITEME7P013
Copyright 2007 Kleinfelder, Inc.
Page 5 of 6
June 26, 2007
KlEINFELDER 43174 Business Park Drive. Suite 103, Temecula, CA 92590 (951) 506-1488 (951) 506-1491 lax
ATTACHMENT "1"
. The scope of services described here is not intended to be all-inclusive, to identify all
potential concerns, or to eliminate the possibility of environmental problems. Within
current technology no level of assessment can show conclusively that a property or its
structures are completely free of hazardous substances. Therefore, Kleinfelder cannot
offer a certification that the property is clear of environmental liability.
We appreciate the opportunity to submit this proposal and look forward to working with
you on this project. If you have any questions or comments, or if the scope of services
we have developed differs from that which you intended, please contact the
undersigned at (951) 506-1488.
Respectfully submitted,
KLEINFELDER, INC.
flm "rnm on.)
~~-F~~
Gretchen Kunze-Fahrney
Certified Asbestos Consultant No. 03-3270
Lead Inspector/Assessor No. 9143
Lizanne Simmons, PG
Senior Geologist
.
.
05603PROPITEME7P013
Copyright 2007 Kleinlelder, Inc.
Page 6 016
June 26. 2007
I<LEINFELDER 43174 Business Park Drive, Suite 103, TemeclIla, CA 92590 19511506-1488 (951) 506-1491 fax