RESOLUTION NO.
83-385
1
RESOLUTION OF THE CITY OF SAN BERNARDINO AWARDING A CONTRACT TO SCC
2 GENERAL CONTRACTORS FOR CONSTRUCTION OF SIDEWALK AT FOUR LOCATIONS.
3 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN
BERNARDINO AS FOLLOWS:
4
SECTION 1. It has been determined that SCC General Contractors is
5
6
the lowest responsible bidder for construction of a public project, to-wit:
Construction of Sidewalk at four locations, in accordance with Plan No. 6405,
for the total amount of $12,369.20; that a contract should be awarded accord-
7
8
9
ingly, but such award will be effective only upon the contract being fully
signed; that all other bids therefor are hereby rejected; and that authoriza-
tion be given to execute said contract, a copy of which is attached hereto
marked Exhibit "A" and incorporated herein by reference as fully as though set
10
11
12
forth at length.
SECTION 2. The contract shall not take effect until fully signed
and executed by both parties. The City shall not be obligated hereunder unless
and until the contract is fUlly executed and no oral agreement relating thereto
shall be implied or authorized.
I HEREBY CERTIFY that the foregoing resolution was duly adopted by
13
14
17.
18
19
the Mayor and Common Council of the City of San Bernardino at a regular
meeti ng thereof, hel d on the 21st day of
November
, 1983, by
the following vote, to-wit:
AYES: Council Members castaneda, Reilly, Hernandez,
~arks, Quiel, Frazier, Strickler
NAYS:
ABSENT:
None
None
~""-.~~
/' .lty Cler
..-
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
, .
1
2
The foregoing resolution is hereby approved this .,.2/.ACt- day of
November
, 1983.
3
4
5
6
7
Approved as to form:
.~., ~t'-9
elty~y'W
8
9
- 2 -
...
t::; try t::::LsJtef:..
g;..J f~
t
CITY OF SAN BERNARDINO
STATE OF CALIFORNIA
CONTRACT DOCUMENTS
PLAN AND SPECIAL PROVISIONS NO. 6405
FOR
CONSTRUCTION OF SIDEWALKS AND CURB & GUTTER
ON
WATERMAN AVENUE AND MILL STREET
AND ON
PALM AVENUE AND GENEVIEVE STREET
DIVISION OF ENGINEERING
DEPARTMENT OF PUBLIC WORKS
CITY OF SAN BERNARDINO
SEPTEMBER, 1983
BIDS WILL BE RECEIVED UP TO THE HOUR OF
2:00 P.M. ON November , -2- 19~
.
.
P)(ff/4!!7/T /lA11
October 20, 1983
File No. 13.662
..
.
ADDENDUM NO. ONE
For
CONSTRUCTION OF SIDEWALK AND CURB & GUTTER
On
WATERMAN AVENUE AND MILL STREET
And On
PALM AVENUE AND GENEVIEVE STREET
,PLAN NO. 6405
The Contract Documents for this project are hereby amended as follows:
1. On page SP-7, of the Special Provisions, add the following
sub-section:
8-1.07 ASPHALT CONCRETE -- Asphalt concrete shall comply
with the requirements of Section 203-6, "Asphalt Concrete,"
and Section 302-5, "Asphalt Concrete Pavement," of the
Standard Specifications and these Special Provisions.
'Asphalt concrete shall be Type 1, Class B, Grade of Asphalt
AR-4000.
Pavement shall be saw-cut to a smooth and straight line as
required for placement of forms, as directed by the Engineer.
Asphalt concrete pavement shall be placed between the
existing pavement and the new concrete gutter. The asphalt
pavement shall be a minimum of 3-inches thick and be feathered
over existing pavement a minimum of 12-inches.
Full compensation for furnishing and placing asphalt concrete
pavement, including saw-cutting,shall be considered as included
in the prices paid'for the various contract items of work
involved and no additional compensation will be allowed
therefor.
All bidders shall indicate receipt of Addendum No. One in their bid.
~~~
irector of Public Works/City Engineer
By:
Date: October 20, 1983
.
Il
."
Engineer's Estimate $11,755
-'
NOTICE INVITING BIDS
NOTICE IS HEREBY GIVEN that the City of San Bernardino will receive bids or
proposals for:
CONSTRUCTION OF SIDEWALKS AND CURB & GUTTER ON WATERMAN AVENUE AND
MILL STREET AND ON PALM AVENUE AND GENEVIEVE STREET, IN ACCORDANCE
WITH SPECIAL PROVISIONS NO. 6405, ON FILE IN THE OFFICE OF THE
CITY ENGINEER, ROOM 405, CITY HALL.
Deliver all bids to the City Engineer's Office, Room 405, City Hall, 300
North "D" Street, San Bernardino, CA., with the specification title and
number clearly marked on the outside of the envelope.
Said bids or proposals will be received up to the hour of 2:00 P.M.
November 9 ' 1983, at which time all of said bids or propo-
sals will be publicly opened, examined and declared in the City Engineer's
Conference Room, 405.
No bid will be received unless it is made on a proposal form furnished by
the City. All bids or proposals shall be signed, sealed and accompanied by
cash, cashier's check, certified check or bid bond made payable to the City
of San Bernardino, in the amount of ten percent (10%) of the bid. Such
cash, check or bond shall be given as a guaranteCl that the bidder will enter
into the contract if awarced to him. In the event the bidder refuses to
execute said contract, the use by the public of the improvements will be
delayed, ar.c the puolic wi:] suffer great damage. From the nature of the
case, it would be extremely difficult and impractical to fix said amount of
damage. Therefore, the City and the bi dder agree tha t the above sum of 10%
shall be Daie to the City upon the condition above set forth as liquidated
damages and not as a forfeiture. All bonds furnished pursuant to this
netice must be undenvritten by a surety company having a rating in Best's
most r-ecent Insurance Guide of "A" or better.
Pursuant to law, the Mayor and Common Council of the City of San Bernardino,
by Resolution No. 12846 and any and all amendments thereto which are hereby
refer'red to and made a Dart thereof by reference as fully as though set
forth at length hereir., have ascertained and determined the general prevail-
ing rate of per diem wages, dnd o~ per diem wages for legal holidays and
ovel'time work for each crilft or type of workman needed in the execution of
contracts under jUl'isdiction of said Mayor and Common Council.
Sa -j d preva i 1 i ng )'a tes of wages sha 11 conform to "General Preva il i ng Wage
Determination made by the Oirector' of Industrial Relations," filed in the
Office of the City Clerk, which are made a part of said Resolution No. 12846
and alllendlllents thereto.
.
It shall be mandatory upon the contractor to whom the contract is awarded
and upon any sub-contractor under him to pay not less than said specified
rates to all labon'I's, wOI"kmen, and mechanics employed by them in the execu-
tien of the contract, and to IJrl'vcnt discrimination in the employment of
pel'sons becallse of r'ace, creed, culor, or nationdl origin, as set forth in
t.he provisions of Resolution No. "/414 of the Mayo" and Common Council of the
City of San Bernardino.
..
."
".
No bid will be accepted from a contractor who is not licensed in accordance
with the provisions of Chapter 9, Division III of the Business and Profess-
ional Code.
The City of San Bernardino reserves the right to reject any and all bids.
No bidder may withdraw his bid within 30 calendar days from the date
of the bid opening.
Plans and specifications may be obtained from the City Engineer's Office,
Room 405, City Hall, 300 North "0" Street, San Bernardino, California
92418, upon a non-refundable payment of $ 5.00 for each set
CITY OF SAN BERNARDINO
~u,v.n t~
SHAUNA CLARK, City Clerk
lto,)
~~~\
~
.NOTICE TQ.....A.J2YERTISE
, SPECIFICATION NO" 6405
t~HALL mE,~R IN FlRSl issiiii'NOT'"l'ATfri"THAN
~TE.Q.(;:t.Qber.".2L&Oct b .
SC.COIW PUG' ',', T (, ,,". Qer:26...J 983
L.I....h 1:"J.'J I" I\"t. L'i\YS LATER
SIGNATURE
-- '-.._.OAT<'
'"--_.
.
.
/
r
."
c.
PROPOSAL FORM
TO THE MAYOR AND COMMON COUNCIL OF
THE CITY OF SAN BERNARDINO
The undersigned declares that he has carefully examined the
location of the proposed work, that he has examined the plan and
read the accompanying instructions to bidders and hereby proposes
to furnish any and all required labor, materials, transportation
and servi ce for the CONSTRUCTION OF SIDEWALKS AND CURB & GUTTER ON
WATERMAN AVENUE AND MIlt STREET AND ON PAlM AVENUE AND GENEVIEVE
in str1ct con orm1ty W1t ans an pec1a rOV1S1ons o. 6405
City of San Bernardino Department of Public Works, and also 1n
accordance with Standard Specifications for Public Works Construction,
19~ Edition, and he proposes and agrees if this proposal is accepted,
that he will contract with the City of San Bernardino, in the form of
the copy of the contract annexed hereto, to provide all necessary
machinery, tools, apparatus and other means of construction, and to do
all the work and furnish all the materials specified in the contract,
in the manner and time therein prescribed, and that he will take in
full payment therefor the following unit prices or lump sum prices,
to-wit:
.
.
..
..
ITEM
1.
2.
NOTE:
~
...
QUANTITY
1
UNIT
L.S.
if.-"'*;'
BID SCHEDULE
PLAN NO. 6405
WATERMAN AVENUE
I
UNIT
PRICE
L.S.
Eight Hundred Twenty-five dollars and seventy cents
15.75
Cu.Yd.
DESCRIPTION OF ITEMS WITH
UNIT PRICE WRITTEN IN WORDS
Unclassified Excavation at
the lump sum price of
Portland Cement Concrete Side-
walk and curb & gutter at ___
wDe hundred Eig~t9~D ggllaFs
per cu. yd.
TOTAL WATERMAN AVENUE
2684.20
The unit orice must be written in words and also
shown in figures. The total price must be extended
for each item of work and the total of all items
inserted in the space provided.
-~:(,,'~:F'''':
TOTAL
825.70
l8S11.SU
I
.
ITEM
1.
,
BID SCHEDULE
PLAN NO. 6405
MILL STREET
QUANTITY
1
DESCRIPTION OF ITEMS WITH
UNIT PRICE WRITTEN IN WORDS
UNIT
PRICE
loS.
TOTAL
UNIT
loS.
Unclassified Excavation at the
lump sum price of
1104.vu
2.
.
.vDe thousand one hundred four dollars
23
Cu.Yds. Portland Cement Concrete Side-
walk at
2714.00
NOTE:
.
one hundred eighteen dol lacs
per cu. yd.
TOTAL MILL STREET
The unit price must be written in words and also
shown in figures. The total price must be extended
for each item of work and the total of all items
inserted in the space provided.
3818.vv
I
.~,
';,i.:" --:'j!;".,;,"(.::'ii:1_'f't~""""-':"':"':-:'. ;-.--~ ::';-:~_\!~::. '..
,~,:,;{,~}t~_, ~
,_-,-',"l_,--,_,~,-.--,":'_ -. ,1 ,-,'_,;;';d~".~'
.
.
.
BID SCHEDULE
PLAN NO. 6405
PALM AVENUE
ITEM
1.
DESCRIPTION OF ITEMS WITH
UNIT PRICE WRITTEN IN WORDS
QUANTITY
1
UNIT
L.S.
Unclassified Excavation at the
lump sum price of
. Bight hundred thirty~S1x d<llUars
2.
14.50
Cu.Yds. Portland Cement Concrete side-
walk and curb & gutter at
. -
UDe hundred eighteen dollaxper cu. yd.
"TOTAL PALM AVENUE
NOTE: The unit price must be written in words and also shown
in figures. The total price must be extended for each
item of work and the total of all items inserted in the
sPilce provided.
.
UNIT
PRICE
L.S.
;*,~,"'i";~"'W^'!"~'" . ~_'.'~{
r"
836.vv
171l.uO
2S47.uv
TOTAL
~
A
ITEM
1.
2.
... .
- BID SCHEDULE
PLAN NO. 6405
GENEVIEVE STREET
QUANTITY
1
DESCRIPTION OF ITEMS WITH
UNIT PRICE WRITTEN IN WORDS
TOTAL
UNIT
LoS.
Unclassified Excavation at the
lump sum price of
UNIT
PRICE
LoS.
96u.00
Rine hundred sixty dollars
20
Cu.Yds. Portland Cement Concrete Side-
walk at
2361.1.00
one hundred eighteen dollaper cu. yd.
TOTAL GENEVIEVE STREET 3320.uu
GRANO TOTAL WATERMAN
AVENUE, MILL STREET,
PALM AVENUE, & GENEVIEVE
STREET ................ 12369.20
NOTE: 1. The unit price must be written in words and also shown
in figures. The total price must be extended for each
item of work and the total of all items inserted in the
space provided.
2. A contract will only be awarded for the grand totals of
all four sites.
.'
i""..' .>
"............,....,-,." ''-"
,_ ~: ~ ; ,-i-'-'-~-',:' -~,t~' _~: '.:; ( ~~::' -/j-'}:
,.
In case of a discrepancy between words and figures, the words shall
prevail.
It is the understanding of the undersigned that the work hereinabove
described shall be commenced within 10 days from the date of the
"Notice to Proceed," and shall be completed within 15 working days from
the date of said notice.
The undersigned further agrees that in case of default in executing
the contract, or furnishing necessary bonds, all within the specified
time, the proceeds of the Bidder's Guaranty accompanying this proposal
shall be paid to the City of San Bernardino as liquidated damages.
Licensed in accordance with an act providing for the registration of
contractors, License No. 286044 , Classification C-B
FIRM NAME: B.C.C. General Contractor and n~ Quai1tv Cuncrete Cunstruction
A Joint Venture
BUSINESS ADDRESS: 22816 La/liiX~ G~errace. Ca. 92324
SIGNATURE OF BIDDER: It!.Jt _~
If an individual, so state. If a firm or co-partnership, state the
firm name and give the names of all individuals, co-partners compsoing
the firm. If a corporation, state legal name of the corporation, also
the names of the president, secretary, treasurer and manager thereof.
..ndividua1
B.C.C. General Contractor
22816 La Paix
Grand Terrace, Ca. 92324
Telephone No. (714)
,
824-3542
Dated
Nov. 9, 1983
, 198
.
I
'-
L
DESIGNATION OF SUB-CONTRACTORS
In compliance with the provisions of- Section 4100-4108 of the Government Code of the
State of California, and any amendnlents thereof. each bidder shall set forth helow
the name and location of each sub-contractor who will perform work or labor or render
. service to the contractor.
TRADE
Concrete
SUB-CONTRACTOR
ni QUality Concrete
S.C.C. General Contractor
j
-j
,
~
,
-.
CITY
BloomiMton
LICENSE NO. CLASSIFICATION
286044 G-8
355548
B-1
.'
.
.
.
"
\.
"';.'''~'''P
'~. :t,~. .
,..
'Clii.
CERTIFICATION
t am aware of, will comply with, Section 3700 of the
Labor Code, requirinq every employer to insured against
liability for Workers' Compensation or to undertake se1f-
insoJrdnce before commencing any of the work.
Con t ra ili!:.
NAME OF FIRM: S.r. c. ~Qrtr~<:lto"
Po\': . 'J/TA" ~b/
___~._~4~
Tl Tl. E: _.___~"--.
OATf :__l1-~,:,Jll-__._
.l
"\
-,1 Before me, a Notary Public, personally came.-..-...Bla~_.Be1dei:L::.:._:::::.:~....., "~_ .."__ _.........".:;
. . Allown to me, and known to be the Attorney-in-Fact of United States Fidelity and Guaranty Company, a
~aryland Corporation, which executed the attached bond as surety, who deposed and said that his signa-
. "Ire and the corporate seal of said United States Fidelity and Guaranty Company were affixed by order
,d authority of said Company's Board of Directors, and that the execution of the attached bond is the
1jee act and deed of United States Fidelity and Guaranty Company.
,\ ATTORNEY-IN-FACT AFFIDAV~"-------~"'"""~---I
~!1.. OFFiCIAL SEAL
r (".: \/'-~'\ L'f':U\ S, KR^,FT
'S'fATE OR COMMONWEALTH OF___...Cali:fQrnia..__....__... 1 ",: W","RV PU"LlC--Ct, "GP~JIA
San Bernardino 8.,. {j f"U,I\\y ~,n'D rllr"O 1'1
COUNTY OR CITY OF -.-m...._..__........m.____.___._._.. s;" rcc"i ~D"JO (JUNTY
l:c"'rnIS~!OCj E Jlres Lily 4 lSi::7
1
Given under my hand and seal thls.._____ 9+.11
.
~:rji1;~
._,198.3-_.
/ .
[-I Cemmission explres,_~~ll 4 t 1987
"-878 (t-I'/)
Notary Public.
.."..
'"
.
r~.i'\~.;fir~~1~!![r~"~:lf'r;~\'il;:;'i'~\\:11/[,'~'~li'.'l':&\;"'IF/iil')>;;1~~1:V~:;:~;P'@~\i!:I!'.f~(,t\"111./fli,*\\'!I/'fflA"'1~q,~~,"'% '':!.~"''?'::' '"if:;!!:~'~IJ
. ")'. ~\'i)\lIll""""b r "~~'
i UNITED ST A TIS FIDEU't!~:;~:GUARANTY COMPANY ~~!
gc fA Sl~ Cocnpany)
F
~
~
liD IOND
!'"
-,
~
BONO NUMBER .........~.Q:::.Q.1.g.Q.~J..Q5.9..9.:::.1?3.:::.1?..............
~
KNOW ALL MEN BY THESE PRESENTS:
?,
:~
~:
~:4.
~~
[~
~:.
f"
;~
THAT .......Dal:e....Sb~:t.......DBA.:........S...C....c....Gener..a~...Contr..ac:tor..............................................................
.................................................................................................................... of .....Jl;r.!il.ng....'r~.r..r.gg.f:.....C.gl;!,.f..Q.r.n;!,,€l,.....................
_......................................................................................................................................................... as Principal . and UNITED STATES FIDELITY AND
;!:.,;
:"i:!
GUARANTY COMPANY, a Maryland corporation. as Surety, are held and firmly bound unto.......!he.....C.i:!;y....Q.!....S.an...J3.e.r.n.~r..o.ino ,~.
~ :.:~~}j I
:~:~i
:~II'
,..~
j~
I~~
II!
i~.~
S
~'.I
!.;~;'Ii
~' ~
~~.:
tt'~ I
!':;i~~ !
j~.1.11
:;~~
~
!,,~
(i!.::
~
1
w,
:1'~.;li
:,::;:
"':~
I*":
I,)
I':"
'" . I
*"
~-~-- - ---- -......w..,..... ... I'" - -- -.--.--~.-;- ~---;::--- ...., -.~;c:--' ::...:.~;~m
:,\.,~1lJj:h~l~l;1\~~J.dJ.Ii~)lf~i\\;..J:tljii\\.\.;J:./iJi.;l~\;~:JiHi\\\\~~;)jj~iJ~:;:jffi.~~1~:~,~~flj~JtW/Mw""';u.:;h:>,'l?Mjl.:~.~J{;~_:~_~~;/ii!~\fJ.,jlj~\,:~'tiinf~~~':ijlji!\'"7:
:~
-..............................................................................................................................................................................................................................................
:~<
. . 10% OF THE AMOUNT BID
as Obligee, In the full and JUst sum 01..............................................................................................................................................................................
?:
.................................................................................................................................................................._............................................................ Dollars,
~
lawful money of the United Slales. for the payment of which sum. well and truly to be made. we bind ourselves. our heirs. ex.culors,
~.'
:~
administrators. successors and assigns. jointly and severally. firmly by these presents.
[~
WHEREAS. Ihe said Principal is herewith submitting its proposal Construction of sidewalks,
curbs, gutters on Waterman, Mill, Palm & Genevieve
'"",.
;:tE
~:."
.-
~
:~
THE CONOITION OF THIS OBLIGATION is such Ihal if Ihe aforesaid Principal shall b. awarded Ih. conlracllh. said Principal will, within Ihe
:"'=t
time required, enter into a formal contract and give a good and sufficient bond to secure the performance of the terms and conditions of
!
the contract then this obligation 10 be void; olh.rwis. Ih. Principal and Sur.ty will pay unto Ih. Oblig.. Ih. diff.r.nc. in money b.tw..n
the amounl .f Ihe bid of the said Principal and the amounl for which the Obligee I.gally contracls wilh anolh.r party 10 p.rform Ihe work
.
if the latter amount be' in excess of the former, but in no event shall liability hereunder exceed the penal sum hereof.
Signed, sealed and d.liv.red........1J.:=:9..:::~3...........................
lDatel
_-Ill~____-
........................................................................................................ISEAU
........................................................................................................1500
-4~:'" ....,
Attorney.in-fact
ITY AND GUARANTY COMPANY
.
.
."
eo.t.nct.ll
.-,:-.
CERTIFIED COPY
GENERAL POWER OF ATTOR..'l\ffiY
No....:<J3.9.tH........... ...............
K,."III aU ,l'e" by ,iteM PrettenU:
Thlt UNITED STATES FIDELITY AND GUARANTY COMPANY. . corporation orglnized .nd ..isling under lhe I.ws of the
State of Man'land. and having ils principal office at the Gty of Baltimore, in the Statr of ~(aryb.nd. does hereby constilule and appoint
Blair Belden
of the Ci.y of Colton
iu true lAd lawful ..tom.y in ""d for the State of
. State of
Cali !ornia
Cali !ornia
for the following PUI'p08el!:. to wit:
To sign its name as surety to, and to execute, seal and acknowledge any and. all bonda. aDd to respectively do and ~rfonu any and
aU lets :md .hings set forth in the resolution of the Board of DirectOR of the said UNITED STATES F1DELITY .\ND Gl:AR.-I.NTY
COMPANY, a Ct:rlified copy of which is bereto aDDend and made a part of this Power of Attorney; and the said U:SITED STATES
F1DELITY AND GUARANTY COlllPANY, thmugh u.s, it. Board of Directon. hereby ratilies and eOltfir... all .nd wha......r the Mid
Blair Belden
may lawfully do in the premises by virtue of th... presents.
'n WfIn... Wh.reo/. the said UNITED STATES F1DEIlTY AND GUARANTY COlllPANY has caused this itUlrutnent to be
oealed with ita corporate seal. duly .....t.d by tbe slpatures of its Vi...President and Assistant S.cretuy, this l6l1! day of
February . A. D. 19 68
UNITED STATES F1DELITY AND GUARANTY COMPANY.
(Signed)
B1'..... ..Karl. H... Dllerr.e............ .............
Yice.Pnsident.
(SEAL)
(Signed)
....... ~~. Jk ~1:':~"'~.~............................
AuialtllU Secretary.
STATE OF lIIAR1fL.\1'lD,
BALTUIOP.E CITY,
} ss,
On this
l6!a
day of
Karl H. Doerre
February , A. D. I!pB , before m. penonally came
. Vice.Presid.nt of tbe UNITED STATES F1DEIlTY AND GUARANTY
COMPANY ""d H. G. Sachse , ......is..nt Secretary of oaid Company, witb botb of
who!" I am. pemor.n.lly acquainted. who bein& by me :!e,'erally duly sworn., :!aid that they l'f'sided in the City of P,.sltim.OI'c. Mlaylaud;
thot th.y, the .aid Kar 1 11. Doerre and H. G. Sachse we... re.p.cti..ly
,he Vi...P....id.nt and the A.,istant S.cret....,. of tb. said UNITED STATES FIDELITY AND GUAP.ANTY COMPANY, the co..
poratioD described in and which executed the fDregoing Power of .'\ttomey: tbat they eilch knew the seal Q{ said corporation: that the
lea] affixed to !aid Power of Attorney was such corporate seal. that it was fiG n:ted by order of the Board of DirectOr! of said corpora-
tiOD. and that they signed their Dames thereto by like order as Vice-President and .-\.ssist311t Secretary, 1"6peetively, I)f tbe Company.
My commission expires the fint day in July, A. D. 19. .. 9.~. ..
(SEAL)
(Signed)
Herbert J. Aull
.......................................................
Notary Public.
STATE OF ~IARYUND
. BALTIMORE CITY,
I. James F. Carney , Clerk of the Superior Court of Baltimore City, which Court is a
Court of Record. and has a seaL do h.reby certify that Her be r t J. ;\ u 11 . E.quire. b.fore
whom tbe annexed adidavit.! were made, and who hall thereto ~uhlcribed his name. was at the time of 80 doing a Notary Public of the
State of ~(arvhmd, in and for the City of Baltimore, duly commis~ioned and sworn and 3uthlJri7.ed by l3W to administer oath. and take
.cknowlcd"ru~nts, or proof of deeds to be recorded therein. I further certify that I am acquainted with the handwriting uf the aaid
Notary. and verily believe the aiKD3ture to be hill genuine signature.
In T~.'i"lfJnr Wla~reol. 1 hereto !!el my hand and af6.x th~ seal of the Superior Court of Baltimore City. the same being :l COUlt
. .f Record, tbls 16\!l day.f February , A. D. 1968
. (SEAL) (Signed) .........,{~IMI\.F....~...r:nl'y.............................
ct.rk of 1M Saperior C0f4rl 0/ Ballimore City.
}
Set.
Fa 3 (9-1171
.......
~,:~
.
.
SPECIAL PROVISIONS
SECTION I
SPECIFICATIONS AND PLANS
1-1.01 GENERAL -- The work embodied herein shall be done in accordance
\1ith the Standard Specifications for Public Works Cortstruction, 1982 Edition,
and City of San 8ernardi no Standard Drawings, insofar as the same may apply
and in accordance with the following special provisions.
1-1.02 DEFINITIONS -- Whenever in the Standard Specifications the following
terms are used, they shall be understood to mean and refer to the following:
Agency - The City of San Bernardino.
Board - The Mayor and Common Council for the City of San Bernardino.
Engineer - The Director of Public Works/City Engineer for the City of
San Bernardino.
Labora tory
The laboratory to be designated by the City of San Bernardino
to test materials and work involved in the contract.
Notice Advertising for Bids
Notice Inviting Bids.
Standard Specifications
Standard Specifications for Public Works Construction.
Other terms appearing in the Standard Specifications, and these Special
Provisions, shall have the intent and meaning specified in Section 1-2, "Definitions,"
in the Standard Specifications.
In case of conflict between the Standard Specifications and these Special
Provisions, the Special Provisions shall take precedence over and be used in
lieu of such conflicting portions.
,
SP-l
~
. .
.
SECTION 2
2-1 PROPOSAL REQUIREt1ENTS AND CONDITIONS
2-1.01 GENERAL -- Bids must be submitted on the proposal form contained
herein. All bids or proposals shall be signed, sealed and accompanied by cash,
cashier's check, certified check or bid bond made payable to the City of San
Bernardino, in the amount of ten percent (10%) of the bid. Such cash, check
or bond shall be given as a guarantee that the bidder will enter into the
contract, if awarded to him. In the event the bidder, to vlhom the contract is
awarded, refuses to execute said contract, the use by the public of the
improvements will be delayed and the public will suffer great damage. From the
nature of the case, it would be extremely difficult and impractical to fix
said amount of damage. Therefore, the City and the bidder agree that the
proposal guarantee of 10% of the bid shall be paid to the City upon the con-
ditions set forth above as liquidated damages and not as a forfeiture. Bid
bonds shall be underwritten by a surety company having a rating in Best's most
recent Insurance Guide of "A" or better.
SECTI ON 3
3-1 AWARD AND EXECUTION OF CONTRACT
3-1.01GENERAL -- Award of the contract will normally be made by the Mayor
and Common Council at the subsequent Council Meeting after opening of the bids.
The bidder, to whom the contract is awarded, shall file with the Engineer all
required bonds and insurance policies, and execute the contract, within 10
calendar days after receiving notification of the award. Failure to file the
stipulated documents and execute the contract within the prescribed time shall
constitute good and sufficient grounds for recession of the award and payment
of 10% of the bid to the City as liquidated damages.
3-1.02 CONTRACT BONDS -- The Payment and Faithful Performance Bonds shall
be filed with the Engineer before the contract is executed by the City in
accordance with Section 2-4, "CONTRACT BONDS," of the Standard Specifications.
SECTION 4
4-1, CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK,
TIME OF COMPLETION AND LIQUIDATED DAMAGES
4-1.01 -- Attention is directed to the provisions in Section 6-1,
"Construction Schedule and Commencement of Work," in Section 6-7.1, "Time
of Completion," and in Section 6-9, "Liquidated Damages," of the Standard
Specifications and these special provisions.
The Contractor shall diligently prosecute the work to completion before
the expiration of
15 WORKING DAYS
from the date of the "NOTICE TO PROCEED."
.
The Contractor shall pay to the City of San Bernardino the sum of $50.00
per day, for each calendar days delay in finishing the work in excess of the
number of working days prescribed above.
.
SP-2
SECTION !-l
5-1 LEGAL REQUIREMENTS
5-1.01 LIABILITY INSURANCE The Contractor's attention is directed
to Section 7-3, "Liability Insurance," of the Standard Srecifications, providing
that the Contractor shall furnish the City with a policy or certificate of
liability insurance as prescribed therein, prior to execution of the contract.
5-1.02 WORKMEN'S COMPENSATION INSURANCE The Contractor's attention
is:irected to Section 7-4, "Workmen's Compensation Insurance," of the Standard
Specifications, providing that the Contractor shall file a signed certification
Certificate of Workmen's Compensation Insurance before execution of the contract.
5-1.03 PAYMENT OF PREVAILING WAGE RATE The Contractor and all sub-
contractors shall pay each craft or workmen employed on this project not less
than the prevailing wage rates specified in Resolution No. 12846 of the Mayor
and Common Council of the Ci ty of San Bernardino. The Engineer shall have the
right to interview any craft or workman on the project site in order to verify
payment of prevailing wage fates in accordance with Resolution tlo. 12846.
5-1.04 PAYROLL RECORDS -- The Contractor's attention is directed to the
following provisions of Labor Code Section 1776 (Stats. 1978, Ch. 1249). The
Contractor shall be responsible for the compliance with these provisions by
his subcontractors.
(a). The contractor and all subcontractors shall keep an accurate payroll
record, showing the name address, social security number, work classification,
straight time and overtime hours worked each day and week, and the actual per
deirn wages paid to each journeyman, apprentice, worker, or other employee employed
by nirn or her in connection with the public ~lOrk.
(b). The payroll records enumerated under subdivision (a) shall be certified
and shall he available for inspection at all reasonable hours at the principal
office of the contractor on the following basis:
(1). A certified copy of an employee's payroll record shall be made
available for inspection or furnished to such employee or his or her authorized
representative on request.
(c). Each contractor shall file ri certif"ied copy of the records enumerated
in subdivision (a) witn the Engineer on a ~Jeekly basis. It will be the Contractor's
responsibility to submit the records enumerated in subdivision (a) for all of
his subcontractors, in addition to his own emrloyees. Failure to submit the records
enumerated in subdivision (a) on J timely basis shall constitute good and sufficient
reason for withholdinq the partial payments for work accompl ished.
.
SP-3
.
.
SECTION r,
6- 1 GENE RAL
6-1.01 INCREASEO OR DECREASED QUANTITIES I f the total pay quantity
of any item of work, subject to the provisions in Section 3-2.2.1, "Increased
or Decreased Quantities," of the Standard Specifications varies by mere than
25 percent, compensation payable to the Contractor will be determined in
accordance with said Section 3-2.2.1 and these special provisions.
\vhen the compensation payable for the number of units of an item of werk
performed in excess of 125 percent of the Engineer's Estimate is less than
$1,500 at the applicable contract unit price, the Engineer reserves the right
to make no adjustment in said price if he so elects, except that an adjustment
will be made if requested in writing by the Contractor. Such Contractor's
request shall be accompanied by adequate, deta 11 ed da ta to support cos ts 0;"
the item.
Should the total pay quantity of any item of work required under the
contract be less than 75 percent of the Engineer's Estimate therefore, the Enqineer
reserves the right to make no adjustment in said price if he so elects, exceot
that an adjustment will be made if requested in writing by the Contractor. Such
contractor's request shall be accompanied by adequate, deta'iled data to support
costs of the item.
6-1.02 SOUND CONTROL REQUIREMENTS -- The Contractor shall comply with
Chapter 8.54 of the City of San Bernardino Municipal Code regulating and pro-
hibiting loud, unnecessary and excessive noises.
Each internal combustion engine, used for any purpose on the jOb or related
to the job, shall be equipped with a muffler of a type recommended by the man~-
facturer. No internal combustion engine shall be operated on the project without
said muffler.
No equipment, machinery, or apparatus that permits loud and excessive noise
shall be operated during the hours of 10:00 p.m. and 7:00 a.m., unless approval
has first been secured from the Mayor and Common Council of the City of San
Bernardino.
Said noise level requirement shall apply to all equipment on the jOb or
related to the job, including but not limited to trucks, transit mixers or
transit equipment that mayor may not he owned by the Contractor. The use of
loud sound signals shall be avoided in favor of light warnings except those
requi red by safety 1 aws for the protection of per sonne 1.
.6-1.03 PERMITS & LICENSE -- The Contractor wll, not be required to
obtaln a "Street Cut Permit" from the City of San Bernardino.
The Contractor shall obtain a City Business License, prior to execution
of the contract.
.
.
~
SP-4
J
.
6-1.04 EXTRA WORK -- Any extra work done shall conform to the prOV1Slons
in Section 3-3, "Extra -Work," of the Standard Specifications. However, equipment
rental rates shall conform to State of California Business and Transportation
Agency, IJepartment of Transportation, Division of Construction, "LABOR SURCHARGE
AND Ef)UIP~1E~IT RENT,~L RATES," latf'st edition, unless the extra work is done for a
negotiated price.
6-1.05 HOURS OF LABOR -- In the event that the Engineer is required by
the Contractor's operations to work more than eight (8) hours in any given day,
or more than forty (40) hours in any given week, or on any Saturday, Sunday or
Holiday, in the setting of Lines and Grades or performing inspections, the Con-
tractor sha 11 pay an amoun t to the City equa 1 to one and a ha If (1 '>) times the
Engineer's normal wages and fringe benefits. Such amount shall be deducted from
the next following progress payments.
6-1.06 PAyr1ENTS -- Attention is directed to Section 9-3, "Payments,"
and 9-3.2, "Partial and Final Payment," of the Standard Specifications and these
special provisions.
No partial payment will be ~aGe for any materials on hand which are furnished
but not incorporated in the work.
6-1.07 PROJECT APPEARANCE
appearance to the work.
The Contractor shall maintain a neat
In any area visible to the public, the following shall apply:
Hhen practicable, broken concrete and debris developed during clearing and
grubbing shall be disposed of concurrently with its removal. If stockpiling
is necessary, the material shall be removed or disposed of weekly.
Full compensation for conforming to the requirements of Section 6 shall
be considered as included in the prices paid for the various contract items of
work involved and no additional compensation will be allowed therefor.
SECTION 7
7-1 DESCRIPTION OF WORK
7-1.01 GENERAL -- The work to be done consists in general of grading and
excavating for the construction of concrete sidewalks and curb & gutters and shall
consist of furnishing all necessary labor, materials, tools and equipment to com-
plete in every detail the work shown on the plans, and such other items or details,
not mentioned above, that are required by the plans, Standard Specifications, or
these Special Provisions, shall be performed, placed, constructed or installed.
.
.
.
SP-5
.
SECTION n
8-1 ITCIINICAL SPl:cIFICAlIONS
----. ~--- .
fl. 1. 02 MAlNTf\INING TRAFFIC
"Pub1 ic CnnveTnieilcc arid-Silfc-ty:"
'special provisions.
Attention is directed:to Section 7-10
of the Standard Specifications, and these
l.Jarnin~ signs, li<1hts, and devices for USe in perfonllancc of work upon
higl'lvays shall conform to the "~1anual of Tt'affic Controls ," 1977 Edition,
pUblished by the State of Califot'nia, and the "Hork Area Tt-affic Control
Handbonk," 1976 Edition, adopted hy the City of San Bernardino, .Califol'nia.
A minimum of one (1) lane shall he maintained for each directi6n of
traffic at all Urnes, unless approved otherwise by the Engineer.
Full compensation for furnishing and installing all signs, lights,
flarcs, barricades and other t"affic cont,'ol devices necessary to expedite
passage of public traffic throuoh the vlod: area shall he consid,'red as
includpd 'in the prices paid fOt' the avrious contract items of vlOrk involved
and no ;,dd'i Uonal compensation will be allovlCd th'erefor.
. . .
The full width of the traveled Vlay shall b'e open for use by public
tt'affic Oil Saturdays, Sundays ilnd desi'lnilted legal holidays, after ',:00
p,m. on fridays i<nd the dilY precedin~ designated legal holidays, and when
construction operations at'e not actively 'in progress on ~Iol'king days.
Personal vr,hicles of the Contractor's employees shall not be> parked
on tnl, tl'aveled viay at any t'ime.
The Contractol' shall notify 1,oca1 authorities of his intent to begin
work ~t least 5 days before vmrk is begun. The Co~tractor shall cooperate
with local authorities relative to h~ndling traffic through the area and
slwll Iililkc, his 01'111 ilrr'an~lE:rnents reliit.i\iE,to keeping the worlring area clear
of parked vehicles.
Thc~ pnJvisions in thi~, "ection may be rnodifi"rj or altered if, in the
opillic}n of the Eng'ineer', public tr'arfic I.rill Ge bc,tt'2'- sel"ved and work
expedii.c,d. Said modifications 0" dlten,tions shall not be adopted until
approved in writin~ 11Y the [nrjiflcer.
fj-l, 03 COO!'U{ATJOi~ ANti COLLAHRf,1 ,laRK
Sec t i on 7, 7, T, Coc;rJe'ra-t:]Uii--ilri,TcoT'[ a te r:;;iiJC:Jrk ,"
and th0se speci~l provisions.
Attention is directed to
of the Standard Specific~tions,
Certain cOlnpiJnie,;.. governmental J'lencies, or their Contractors may bc \lorUng
~lithin the construction area. Certilin utility faciliLies of vdrious lociltions
\~Hh i n project 1 i m i ts may hr, rernoved, n,l oca ted, abandoned, or ins ta 11 cd by
compini2s' or agencies' cuntractors.
,
It is anticipated that thesp existing utilities will not interfere with
the contractors construction operations. However, the contractor shall exercis~
due carc' to insure that th('<,(' utility facilities are not dalilaged during his
opel'.. t ions.
.
.
.
SP-G
I
The utility locations shown on the plans are correct to the best of our
knowledge. When in doubt the contractor shall contact the utility concerned
before proceeding further.
Full compensation for conforming to the requirements of this section, not
otherwise provided for, shall be considered as included in the prices paid for
the various contract items of work involved and no additional compensation will
be allowed therefor.
8-1.04 DUST CONTROL -- Dust control shall conform to the provisions in
Section 7-8.1, "Cleanup and Dust Control," of the Standard Specifications.
8-1.05 CLEARING AND GRUBBING -- All clearing and grubbing work shall comply
with the requirements of Section 300-1 of the Standard Specifications and these
Special Provisions. .
Full compensation for clearing and grubbing and for doing all the work in-
volved in clearing and grubbing shall be considered as included in the prices
paid for the various contract items of work involved and no additional compensa-
tion will be allowed therefor.
8-1.06 UNCLASSIFIED EXCAVATION -- Unclassified excavation shall conform to
the requirements of Section 300-2 of the Standard Specifications and these Special
Provisions.
The top 6 inches of the subgrade shall be compacted to a minimum relative
density of not less than 90%.
Unless otherwise specified all excess excavation or removed material shall
become the property of the Contractor and shall be disposed of by him away from
the site of the work. Any costs involved in such disposal shall be absorbed in
the contract lump sum payment and no additional compensation will be allowed therefor.
Full compensation for unclassified excavation, including all subgrade prepara-
tion, and achieving the specified compaction shall be considered as included in the
contract lump sum price for "Unclassified Excavation," and no additional compensa-
tion will be allowed therefor.
8-1.06 SIDEWALKS AND CURB AND GUTTER -- All portland cement concrete materials
and work shall comply with the requirements of Section 201-1, "Portland Cement
Concrete," and Section 303-5, "COncrete Curb, Walk, Gutters, and Driveways," of
the Standard Specifications, City Standard Drawings and these Special Provisions.
Portland cement concrete shall be Class 520-C-2500, with a maximum slump of
4 inches.
The price paid per cubic yard for Sidewalks and Curb and Gutter shall include
full compensation for doing all the work involved in preparing subgrade, form work,
placing material, and finishing as designated on the plans or as directed by the
Engineer.
,
.
SP-7
~. 6"
2B
FUI, R<d, "
..
"
,
<J t, 'I"
. ~ 0.05/ elL yo
PER Lt.</. Fr:
t>- o
.
GENERAL NOl [31
.. .
.?C>.lJ...
.
CURING cOt.ll'OUIIO S"ALL Dl!
SPRAyeD UNIFUII ML Y OH ALL l pose:o
sunrACfS .'mOR TO r:VAPOI~A ION
Of SURfAce WATER.
/8"
,. .
"t:"
txPANSION JOINTS AT END Of
RETURNS a ~TRUCTUR[S wr KENO
PLANE JOIN1S EVERY 10 FT.
OR AS INS1RUCTED.
I
\l:)
0
I..
.,
.,
l-.
"
.
,. .
SLorE 1:/8
. -~..
R..-
4
. .
, c, I,
'-ll .
.
. I.. h
o
TYPE "B" P.C.C. CURB a GUTTER
2i#l"
/8"
R-~. ,
SLOPE 1:18 ~
-4 R-~"
-4
. ~
.. .
'{
. .\:>
. ..
TYPE lIell P.C.C. CURB 8 GUTTER
(LOCAL STREETS WHEN APPROVED BY THE ENGINEER)
/Or
~;4-ii ~:.'
3'
R'4
R~-jj"
l,z'
24"
... . ,,,:,...
. .
! .
~
.
L .
.. '
.
.
0.0(,7 Cl/. YD.
PER /.IN. Fr.
TYPICAL SECTION
ROLLED CURB
IONL Y FOR SPECIAL APPLICATIONS AS
APPROVED DY THE CITY ENGINEER)
NOll:
CONI:RrTf, MtJ:iT llr A1 lEA<;T
~.5 SAC"; MIX (~.;.:n- r. ?'30'1)
A!\IO HOl.D ?~.oO ".5.1. IN
20 DAYS.
Ii): -~"
4
~
O.O~7 c(/ YO.
PEN /..11t/. FT
'i'II
~
. ,,"
R';I
/Z~T- 1
. A 0.03/ CU YD.
· c.l "'RM n
. ,
'\
90'
o
.
TYPE IIAII
P. C.C. CURB
.
CITY OF SAN BERARDINO-PUBLIC WORKS DEPT.
TYPICAL SECTION-
P.C.C. CUI~B 8 GUTTER
APPHOVED'
-1:11ay 2. 7 19m
~.tf- c ;;,/ ) 0
~~ L:,L~"'~_J'..<=' (;-GIP.Jt:.~
CITY ENGINEEJ~ 20
.
STJl.NI)ARD
No.
.
....r"Z"v:- "till'
/
VARIes
(4'
-I
t'!
;'zOF'E- 4- /I"r:
"
.... .
~ I
LTf'?/t:44 -tdC.4TIO,l./
(/Tl/.ITf' TRE.NCII
-
!J {HIM.
WEAKENEO flA,vE JOINT
CASE ';Lj"
,PREFERReL) $IOEJ../ALJ:' LOCATION
VARIES
5,LN't: :I H r:T.
4- '(/#OtJSTRl/t'rEP
WIDTH
","NIIII.
." : ... . .~
-
itJO$E GRAVEL ar A.C.
/'J>lJIIIDllCO 1# THIS AREA
" "
58 MI#. ref.
$OENAtK
CASE "8"
NAY CE USED: I.) WHEN F/?O,1/7:4GE IS LEM THAN la>' ANO SAMe
.(JECTION EXI.5T$ ON BOTH SlOES OF LOT.
1':) FOR HEA,vOE/?ING SIOEWALKS.
-~
GENERAL NOTES:
B"Sr.
$Ipe,wAJ.K
I'ROl'O.s6P
.#/DC'NA/-IG
l)C'ONCRETE CLASS -.5.i!'O-t'-.i!'.500
r.)WEAKENEO n..4NE .JOINT,S TONATCH
CtlRB .JtJINT AS OIR'6'CTEPBf'
THE. ENaINEEIi?
5.)CtlRIMS conrovNo .sfIALL BE
STRAYEO tZVlr-ok.'II1L.Y ONAL./.
EKF().5EP tlURF.4Cc.!/ F.elo.e' TO THE
EVARJMT70N OF SdRF;4CE AlATER.
'LIRe I'i4CE
TYPICAL SIDEWALK.
TRANSITION
.
CITY OF SAN BERNARDINO PUBLIC WORKS DEPT. APPROVED STD. NO.
_~7 ,1983
SIDEVifALt< LOCATIO~~ ~i~tf~. 202
.. r .'
.
Slope of"" l2.."....,ps
Widlh ot I2bmps bt Top - ,
Wi d lh of R.bmp. or Gutter Line ,
Trbnsition Slope bt Curb Fbee (X''5\ope)
Lip .!>t Gutter-
LltVe:~ F"r2. lZA~PI"'~~UtZa,~ -:t\)O -~I~~~~:'.~\f~~-:--l
Dcsire..ble. Min. Acccptcb1e. :
12: I g.. ( (I) !
GO" 4!:>"
4BH 3C;1I
co: 1 4'1
o ~8"(M~x)(1.)
.
GUIC~
r2-2\mp5 shal1 re.c::e;ve b hebv'J broom finish, fr-byerse. tc> the hxis or {he.
r~mp in order to ~nd\cd.~e. eo. ch.~.n~ of \-e.xturc For 61 ind person:;;.. ~nJ to
rnbke them ~'5 not") - slip bS. possible..
I2Arnps should hbve no ebr-upf- chl:!!t"'lC)es in etevotian or c-,09le. of slope..
The nunlbe..- of rZ)mps bt e~c:.h corner-- ,deoHy should be. two ('2..), one 6djl-.::.e.rrf-
~ ","en beg;nninq of curb rerurn.
(I) 12..mr. ..lopE'S m6~ ~"ceed 8>: I to 1> "",,,imum ore;:.; I when clrcumsh"'nces
I'rec ude lhe ir>St'bllotio() of romps ot I: 8 or less.
('I.) If 0 lip .."t the bottom of b romp is obs",lutelL) ",",cessa.rt,) if should be. tb<:.
smbilest lip possible ond vnder ,",0 c;rcums,h,.-,ces s,hould it excee.d 0/...
or C!l.n inch.
~A"'O! C.A\:>ps:.c r::2.AMl='
COf\strL\Cr obt ~ll il"\teisecHon"OJ
lItili,e I";n 1'1." ..lopes 6nd broom Fin',s,h.
Ali'Jn ramps w',th c~ter or X. Wbll<,s
x' Wd/l5
(><. W~\I<,L
Ii- Gutter____
T'Jpe"A"
3 ADDE:D TYPE: 'A"
l . NCI"/set! .5ro"c/,cu..J No
I RU10VF..D NOn: AlLO:,JING CON~T.
or ONLY ~c RAI'JP.
NO. REV\:)\ON APPRDVED [lI\TE:
CITV OF SA~ 6F.lZtJAJl.DINO . PUBLIC WDRK5 ,.,r..~
f..sz:r.:/.A~.."j J:..., ."
". "/~I
J"C'>-
T~pe. "{3"
.
t2A~1P1~G OF
CUIZo ~ 5JDE\VAL14
Art'ROVED
2..-..s- 1975
,
2-_ ;J.~.!.~.~
CITY EklGltJEc;R.
STANDARD
No.
.
ZO~J
.
.
AGREEMENT
CITY OF SAN BERNARDINO
This agreement, made and concluded this day of
,19~~ between the City of San Bernardino,
party of the first part, and SOD estJE~AL. co,JTR......CTOR. , Contractor,
party of the second part.
Article I - Witnesseth, that for and in consideration of the payments and
agreements hereinafter mentioned, to be made and performed by the said party
of first part, and under the conditions expressed in the two bonds, bearing
even date with these presents, and hereunto annexed, said party of the second
part agrees with the said party of the first part, at his own proper cost and
expense in the Special Provisions to be furnished by said party of the first
part, necessary to complete in good Workmanlike and substantial manner the
CONSTRUCTION OF SIDEWALKS AND CURB & GUTTER ON WATERMAN AVENUE AND MIl I
STREET AND ON PALM AVENUE AND GENEVIEVE STREET
,
in strict conformity with Plans and Special PrOV1Slons No. 6405 and also in
accordance with Standard Specifications for Public Works/Construction, 19~
Edition, City of San Bernardino, Department of Public Works/Engineering Divlsion,
on file in the Office of the City Engineer, which said Plans Special Provisions
and Standard Specifications are hereby especially referred to and by such re-
ference made a part hereof.
Article II - And the said contractor agrees to receive and accept the
following prices as full compensation for furnishing all materials and doing
all the work contemplated and embraced in this agreement; also for all loss
or damage arising out of the nature of the work aforesaid, or from acts of
the elements, or from any unforeseen difficulties or obstructions which may
arise or be encountered in the prosecution of the work until its acceptance
by the City of San Bernardino and for all risks of every description connected
with the work; also for all expenses incurred by or in consequence of the
suspension or discontinuance of work, and for well and faithfully completing
the work and the whole thereof, in the manner and according to the Plans and
Special Provisions, and requirements of the Engineer under them, to wit:
Article III - The said party of the first part hereby promises and agrees
with the said contractor to employ, and does hereby employ the said contractor
to provide the materials and to do the work according to the terms and conditions
herein contained and referred to, for the prices aforesaid, and hereby contracts
to pay the same at the time, in the manner, and upon the conditions above set
forth; and the said parties for themselves, their heirs, executors, administrators,
successors, and assigns, do hereby agree to the full performance of the covenants
herein contained
.
.
"
.
.
ITEM
1.
BID SCHEDULE
PLAN NO. 6405
WATERMAN AVENUE
QUANTITY
1
DESCRIPTION OF ITEMS WITH
UNIT PRICE WRITTEN IN WORDS
UNIT
PRICE
l.S.
TOTAL
821.70
2.
UNIT
l.S.
Unclassified Excavation at
the lump sum price of
18S11.5J
NOTE:
.
.
.
Eight Hundred Twenty-five dollars and seventy cents
15.75
Cu.Yd.
Portland Cement Concrete Side-
walk and curb'& gutter at
~ne hundred Eig~tQQA aallars
per cu. yd.
TOTAL WATERMAN AVENUE
2684.20
The unit orice must be written in words and also
shown in figures. The total price must be extended
for each item of work and the total of all items
inserted in the space provided.
"
"
.
ITEM
1.
BID SCHEDULE
PLAN NO. 6405
MILL STREET
QUANTITY
1
DESCRIPTION OF ITEMS WITH
UNIT PRICE WRITTEN IN WOROS
UNIT
PRICE
loS.
-- , ,-,'~~'}?fJ,-~;; c, '-"f;:'iX.,
TOTAL
1104."u
2.
.
UNIT
loS.
Unclassified Excavation at the
lump sum price of
2714.00
NOTE:
"
.
.
....De thousand one hundred four dollars
23
Cu.Yds. Portland Cement Concrete Side-
walk at
vne hundred eighteen dollaes
per cu. yd.
TOTAL MILL STREET
3818.uv
The unit price must be written in words and also
shown in figures. The total price must be extended
for each item of work and the total of all items
inserted in the space provided.
,
..
'"
TOTAL PALM AVENUE
NOTE: The unit price must be written in words and also shown
in figures. The total price must be extended for each
item of work and the total of all items inserted in the
space provided.
~
.
-
2547.liv
-~
..
.-
~
ITEM
1.
QUANTITY
1
- BID SCHEDULE
PLAN NO. 6405
GENEVIEVE STREET
UNIT
L.S.
DESCRIPTION OF ITEMS WITH
UNIT PRICE WRITTEN IN WORDS
TOTAL
Unclassified Excavation at the
lump sum price of
UNIT
PRICE
L.S.
96u.OO
Nine hundred sixty dollars
2.
20
Cu.Yds. Portland Cement Concrete Side-
walk at
2360.00
one hundred eighteen dollaper cu. yd.
TOTAL GENEVIEVE STREET 3320.UU
GRAND TOTAL WATERMAN
AVENUE, MILL STREET,
PALM AVENUE, & GENEVIEVE
STREET ................ 12369.20
NOTE: 1. The unit price must be written in words and also shown
in figures. The total price must be extended for each
item of work and the total of all items inserted in the
space provided.
2. A contract will only be awarded for the grand totals of
a 11 four sites.
.
.
.
..
,
.
Article IV - it is further expressly agreed by and between the parties
hereto that should there be any conflict between the terms of this instrument
and the bid or proposal of said contractor, then this instrument shall control
and nothing herein shall be considered as an acceptance of the said terms of
said proposal conflicting herewith.
IN WITNESS WHEREOF, the parties to these present have hereunto set their
hands the year and date first above written.
ATTEST:
CITY OF SAN BERNARDINO
SHA~~itY Clerk
Approved as to form:
CONTRACTOR
----
Name of Firm:
.
City Attorney
BY:
TITLE: t"J--t~
MAILING ADDRESS: ~~/~~~~
~:t~Hj}:;h-1 ,',t_II ~.
/
~ '!; -z.$L'
/
PHONE NO. (1/1) ~~-'k~~~
.
'"
..