HomeMy WebLinkAbout15-Development Services e e e CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION From: Valerie C. Ross, Director Resolution awarding a contract to Grand Pacific Contractors, Inc. for Construction of ADA Access Ramps and Sidewalk at Various Locations, Phase VII - 2005/06 (SS-B), per Project Plan No. 1150 I. Subject: Dept: Development Services Date: . June 6, 2007 File Nos. 1.7202-05-2 MCC Date: July 2, 2007 Synopsis of Previous Council Action: August 2006 The Mayor and Common Council approved FY 2006-07 CIP Budget. Recommended Motion: Adopt Resolution. vmW u. RoJY Valerie C. Ross Contact Person: Mark Lancaster, Deputy Director/City Engineer Phone: 3305 Supporting data attached: Staff Report, Resolution & Ramp Location List ALL Ward: FUNDING REQUIREMENTS: Amount: $ 335,000 Source: (Acct. Nos.) 129-367-5504-7202 Acct. Description: Construct Accessibility Improvements at Various Locations Finance: Council Notes: 7/'-/01 Agenda Item No. /5 e e e CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION STAFF REPORT Subject: Resolution awarding a contract to Grand Pacific Contractors, Inc. for Construction of ADA Access Ramps and Sidewalk at Various Locations, Phase VII - 2005/06 (SS-B), per Project Plan No. 11501. Background: On August 7, 2006, the Mayor and Common Council allocated funds, as part of the FY 2006/07 Capital Improvement Program (CIP) for "Construct Accessibility Improvements at Various Locations" (SS-B). This project consists of the following: 1. Removal of existing curbs, gutters, spandrels, roadway improvements. 2. Construction of ADA ramps, sidewalk and spandrels. 3. Replacement of existing roadway improvements. The plans and specifications for this project were completed and the project was opened to public bidding on May 15, 2007. The project was advertised locally in the San Bernardino County Sun Newspaper, F. W. Dodge, Construction Bid Board, High Desert Plan Room, San Diego Daily Transcript, Sub-Hub Online Plan Room, Reed Construction Data, Bid America Online, Construction Bid Source, Bid Ocean, the City's web sites, and with the San Bernardino Area Chamber of Commerce. Bids have been received and are listed below: Name of Bidder City Amount of Basic Bid Grand Pacific Contractors, Inc. Mira Loma $ 256.327.00 I.D.C., Inc. Rancho Cucamonga $ 320,938.00 Portsmouth Construction, Inc. Chino $ 334,531.85 EPS, Inc. San Bernardino $ 340,000.00 S. Parker Engineerinl!, Inc. Costa Mesa $ 351,110.00 Above All Names Concrete Rialto $ 383,421.00 Del Rio Enternrise Temecula $ 472,159.32 Fischer Plumbinl! San Bernardino $ 636,460.00 Enl!ineer's Estimate $ 353 940.00 Based on review of the sealed competitive bids received, staff has determined Grand Pacific Contractors, Inc. of Mira Lorna, the apparent low bidder, has met the minimum requirements of the specifications and bid guidelines; and, therefore, recommends that the Mayor and Common Council award the referenced contract to Grand Pacific Contractors, Inc. The estimated project costs are as follows: $ 256,327.00 $ 38,450.00 $ 40,223.00 $ 335,000.00 2 06113120077:36 AM e e e CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT - Continued If approved, this project is expected to begin construction in August of 2007 and be completed by November of2007. Financial Impact: Funding in Account No. 129-367-5504-7202 "Construct Accessibility Improvements at .Various Locations" (SS-B) from FY 2006-07 shall be carried over to FY 2007-08 in order to provide sufficient funding for this project. Recommendation: Adopt Resolution. Attachments: "I" Ramp Location List ] 06/20/20079:51 AM LOCATIONS OF ACCESS RAMPS e PER PLAN NO. 11501 RAMPS SHT2: 1 NWC MOUNTAIN AVENUE & EUREKA STREET SHT4: 2 SWC-SEC MARSHALL BOULEVARD & DUMBARTON AVENUE 1 SWC MARSHALL BOULEVARD & ARDEN A VENUE 4 IN FRONT OF BELVEDERE ELEMENTARY SCHOOL ALONG SOUTH SIDE OF MARSHALL BOULEVARD 2 SWC-SEC MARSHALL BOULEVARD & BELVEDERE AVENUE 2 SWC-SEC MARSHALL BOULEVARD & V ALARIA DRIVE 2 NWC-NEC DEL NORTE DRIVE & BLYTHE STREET 2 NEC-SEC DEL NORTE DRIVE & BELVEDERE A VENUE SHT5: 2 NWC-NEC MIRADA ROAD & HA V ASU COURT e 2 NWC-NEC MIRADA ROAD & PINON COURT 2 NWC-NEC MIRADA ROAD & OLETA LANE 2 NWC-NEC OLETA LANE & CITRUS STREET 3 IN FRONT OF SERRANO MIDDLE SCHOOL ALONG EAST SIDE OF BANGOR A VENUE @ CITRUS STREET 2 IN FRONT OF SERRANO MIDDLE SCHOOL ALONG THE SOUTH SIDE OF PIEDMONT A VENUE, EAST OF BANGOR A VENUE SHT6: 2 SEC-NEC PALM A VENUE & PUMALO STREET 2 PARKING LOT ENTRANCE OF OEHL ELEMENTARY SCHOOL ALONG EAST SIDE OF PALM A VENUE 2 PARKING LOT EXIT OF OEHL ELEMENTARY SCHOOL ALONG EAST SIDE OF PALM AVENUE 2 SEC-NEC PALM AVENUE & PIEDMONT DRIVE e SHEET I OF 2 LOCATIONS OF ACCESS RAMPS e PER PLAN NO. 11501 RAMPS SHT7: 1 NWC MAYFIELD A VENUE & SEQUOIA STREET 2 PARKING LOT ENTRANCE OF CHURCH ALONG EAST SIDE OF MAYFIELD A VENUE @ SEQUOIA STREET 1 NEC ELECTRIC A VENUE & 48TH STREET NWC ELECTRIC A VENUE & 49TH STREET SHT8: 1 PARKING LOT ENTRANCE ALONG SOUTH SIDE OF HARRIMAN PLACE, NORTH OF GAGE CANAL 1 SWC SIERRA WAY & 5TH STREET 1 NWC "E" STREET & 17TH STREET SHT 10: 2 NWC-NEC RIALTO A VENUE & "L" STREET e 1 T-INTERSECTION OF RIALTO AVENUE & "L" STREET 1 SWC RIAL TO A VENUE & "L" STREET 4 ALLEY NORTH OF RIALTO AVENUE & "L" STREET 4 "L" STREET & KING STREET SHT 11: 4 ALLEY NORTH OF KING STREET & "L" STREET 4 RIALTO AVENUE & GIAVANOLA AVENUE 2 SWC-SEC RIALTO AVENUE & EUREKA STREET 67 TOTAL NUMBER OF RAMPS e NEC - Northeast Comer NWC - Northwest Comer SEC - Southeast Comer SWC - Southwest Comer SHEET 2 OF 2 e e e RESOLUTION NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AWARDING A CONTRACT TO GRAND PACIFIC CONTRACTORS, INC. FOR CONSTRUCTION OF ADA ACCESS RAMPS AND SIDEWALKS AT VARIOUS LOCATIONS (PHASE VII) - 2005/06 (SS-B), PER PROJECT PLAN NO. 11501. BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. Grand Pacific Contractors, Inc., 11405 Geyser Drive, Mira Lorna, CA 91752, is the lowest responsible bidder for construction of ADA access ramps and sidewalks at various locations (Phase VII) - 2005/06 (55-B), per Project Plan No. 11501. A contract is awarded accordingly to said bidder in a total amount of $256,327.00, with a contingency amount of $40,223.00, but such award shall be effective only upon being fully executed by both parties. All other bids, therefore, are hereby rejected. The City Manager is hereby authorized and directed to execute said contract on behalf of the City; a copy of the contract is on file in the office of the City Clerk and incorporated herein by reference as fully as though set forth at length. SECTION 2. This contract and any amendment or modifications thereto shall not take effect or become operative until fully signed and executed by the parties and no party shall be obligated hereunder until the time of such full execution. No oral agreements, amendments, modifications or waivers are intended or authorized and shall not be implied from any act or course of conduct of any party. SECTION 3. This resolution is rescinded if the parties to the contract fail to execute it within sixty (60) days of passage of the resolution. lIlt e e e 1 2 3 4 5 6 7 8 9 10 11 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AWARDING A CONTRACT TO GRAND PACIFIC CONTRACTORS, INC. FOR CONSTRUCTION OF ADA ACCESS RAMPS AND SIDEWALKS AT V ARIOUS LOCATIONS (PHASE VII) - 2005/06. (SS-B), PER PROJECT PLAN NO. 11 50 1. I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and Common Council of the City of San Bernardino at a meeting thereof, held on the day of ,2007, by the following vote, to wit: AYES NAYS ABSTAIN ABSENT Council Members: ESTRADA BAXTER 12 BRINKER 13 DERRY 14 15 KELLEY JOHNSON 16 17 18 19 20 The foregoing resolution is hereby approved this 21 22 23 24 25 MC CAMMACK City Clerk day of ,2007. . Patrick J. Morris, Mayor City of San Bernardino Approved as to form: 26 JAMES F. PENMAN, City Attorney 27 28 By: "-'k / U 7 Pv/,"~ 2