CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION
From:
Valerie C. Ross, Director
Resolution awarding a contract to Grand
Pacific Contractors, Inc. for Construction of
ADA Access Ramps and Sidewalk at Various
Locations, Phase VII - 2005/06 (SS-B), per
Project Plan No. 1150 I.
Subject:
Dept:
Development Services
Date: .
June 6, 2007
File Nos. 1.7202-05-2
MCC Date: July 2, 2007
Synopsis of Previous Council Action:
August 2006
The Mayor and Common Council approved FY 2006-07 CIP Budget.
Recommended Motion:
Adopt Resolution.
vmW u. RoJY
Valerie C. Ross
Contact Person:
Mark Lancaster, Deputy Director/City Engineer
Phone:
3305
Supporting data attached:
Staff Report, Resolution & Ramp
Location List
ALL
Ward:
FUNDING REQUIREMENTS:
Amount: $ 335,000
Source: (Acct. Nos.)
129-367-5504-7202
Acct.
Description:
Construct Accessibility Improvements at
Various Locations
Finance:
Council Notes:
7/'-/01
Agenda Item No. /5
e
e
e
CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION
STAFF REPORT
Subject:
Resolution awarding a contract to Grand Pacific Contractors, Inc. for Construction of ADA Access
Ramps and Sidewalk at Various Locations, Phase VII - 2005/06 (SS-B), per Project Plan No. 11501.
Background:
On August 7, 2006, the Mayor and Common Council allocated funds, as part of the FY 2006/07
Capital Improvement Program (CIP) for "Construct Accessibility Improvements at Various Locations"
(SS-B).
This project consists of the following:
1. Removal of existing curbs, gutters, spandrels, roadway improvements.
2. Construction of ADA ramps, sidewalk and spandrels.
3. Replacement of existing roadway improvements.
The plans and specifications for this project were completed and the project was opened to public
bidding on May 15, 2007. The project was advertised locally in the San Bernardino County Sun
Newspaper, F. W. Dodge, Construction Bid Board, High Desert Plan Room, San Diego Daily
Transcript, Sub-Hub Online Plan Room, Reed Construction Data, Bid America Online, Construction
Bid Source, Bid Ocean, the City's web sites, and with the San Bernardino Area Chamber of
Commerce.
Bids have been received and are listed below:
Name of Bidder City Amount of Basic Bid
Grand Pacific Contractors, Inc. Mira Loma $ 256.327.00
I.D.C., Inc. Rancho Cucamonga $ 320,938.00
Portsmouth Construction, Inc. Chino $ 334,531.85
EPS, Inc. San Bernardino $ 340,000.00
S. Parker Engineerinl!, Inc. Costa Mesa $ 351,110.00
Above All Names Concrete Rialto $ 383,421.00
Del Rio Enternrise Temecula $ 472,159.32
Fischer Plumbinl! San Bernardino $ 636,460.00
Enl!ineer's Estimate $ 353 940.00
Based on review of the sealed competitive bids received, staff has determined Grand Pacific
Contractors, Inc. of Mira Lorna, the apparent low bidder, has met the minimum requirements of the
specifications and bid guidelines; and, therefore, recommends that the Mayor and Common Council
award the referenced contract to Grand Pacific Contractors, Inc.
The estimated project costs are as follows:
$ 256,327.00
$ 38,450.00
$ 40,223.00
$ 335,000.00
2
06113120077:36 AM
e
e
e
CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION
STAFF REPORT - Continued
If approved, this project is expected to begin construction in August of 2007 and be completed by
November of2007.
Financial Impact:
Funding in Account No. 129-367-5504-7202 "Construct Accessibility Improvements at .Various
Locations" (SS-B) from FY 2006-07 shall be carried over to FY 2007-08 in order to provide sufficient
funding for this project.
Recommendation:
Adopt Resolution.
Attachments:
"I" Ramp Location List
]
06/20/20079:51 AM
LOCATIONS OF ACCESS RAMPS
e PER PLAN NO. 11501
RAMPS
SHT2: 1 NWC MOUNTAIN AVENUE & EUREKA STREET
SHT4: 2 SWC-SEC MARSHALL BOULEVARD & DUMBARTON AVENUE
1 SWC MARSHALL BOULEVARD & ARDEN A VENUE
4 IN FRONT OF BELVEDERE ELEMENTARY SCHOOL
ALONG SOUTH SIDE OF MARSHALL BOULEVARD
2 SWC-SEC MARSHALL BOULEVARD & BELVEDERE AVENUE
2 SWC-SEC MARSHALL BOULEVARD & V ALARIA DRIVE
2 NWC-NEC DEL NORTE DRIVE & BLYTHE STREET
2 NEC-SEC DEL NORTE DRIVE & BELVEDERE A VENUE
SHT5: 2 NWC-NEC MIRADA ROAD & HA V ASU COURT
e 2 NWC-NEC MIRADA ROAD & PINON COURT
2 NWC-NEC MIRADA ROAD & OLETA LANE
2 NWC-NEC OLETA LANE & CITRUS STREET
3 IN FRONT OF SERRANO MIDDLE SCHOOL ALONG
EAST SIDE OF BANGOR A VENUE @ CITRUS STREET
2 IN FRONT OF SERRANO MIDDLE SCHOOL ALONG THE SOUTH
SIDE OF PIEDMONT A VENUE, EAST OF BANGOR A VENUE
SHT6: 2 SEC-NEC PALM A VENUE & PUMALO STREET
2 PARKING LOT ENTRANCE OF OEHL ELEMENTARY SCHOOL
ALONG EAST SIDE OF PALM A VENUE
2 PARKING LOT EXIT OF OEHL ELEMENTARY SCHOOL
ALONG EAST SIDE OF PALM AVENUE
2 SEC-NEC PALM AVENUE & PIEDMONT DRIVE
e
SHEET I OF 2
LOCATIONS OF ACCESS RAMPS
e PER PLAN NO. 11501
RAMPS
SHT7: 1 NWC MAYFIELD A VENUE & SEQUOIA STREET
2 PARKING LOT ENTRANCE OF CHURCH ALONG
EAST SIDE OF MAYFIELD A VENUE @ SEQUOIA STREET
1 NEC ELECTRIC A VENUE & 48TH STREET
NWC ELECTRIC A VENUE & 49TH STREET
SHT8: 1 PARKING LOT ENTRANCE ALONG SOUTH SIDE
OF HARRIMAN PLACE, NORTH OF GAGE CANAL
1 SWC SIERRA WAY & 5TH STREET
1 NWC "E" STREET & 17TH STREET
SHT 10: 2 NWC-NEC RIALTO A VENUE & "L" STREET
e 1 T-INTERSECTION OF RIALTO AVENUE & "L" STREET
1 SWC RIAL TO A VENUE & "L" STREET
4 ALLEY NORTH OF RIALTO AVENUE & "L" STREET
4 "L" STREET & KING STREET
SHT 11: 4 ALLEY NORTH OF KING STREET & "L" STREET
4 RIALTO AVENUE & GIAVANOLA AVENUE
2 SWC-SEC RIALTO AVENUE & EUREKA STREET
67 TOTAL NUMBER OF RAMPS
e
NEC - Northeast Comer
NWC - Northwest Comer
SEC - Southeast Comer
SWC - Southwest Comer
SHEET 2 OF 2
e
e
e
RESOLUTION NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN
BERNARDINO AWARDING A CONTRACT TO GRAND PACIFIC CONTRACTORS,
INC. FOR CONSTRUCTION OF ADA ACCESS RAMPS AND SIDEWALKS AT
VARIOUS LOCATIONS (PHASE VII) - 2005/06 (SS-B), PER PROJECT PLAN NO.
11501.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE
CITY OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. Grand Pacific Contractors, Inc., 11405 Geyser Drive, Mira Lorna, CA
91752, is the lowest responsible bidder for construction of ADA access ramps and sidewalks at
various locations (Phase VII) - 2005/06 (55-B), per Project Plan No. 11501. A contract is awarded
accordingly to said bidder in a total amount of $256,327.00, with a contingency amount of
$40,223.00, but such award shall be effective only upon being fully executed by both parties.
All other bids, therefore, are hereby rejected. The City Manager is hereby authorized and
directed to execute said contract on behalf of the City; a copy of the contract is on file in the
office of the City Clerk and incorporated herein by reference as fully as though set forth at
length.
SECTION 2. This contract and any amendment or modifications thereto shall not take
effect or become operative until fully signed and executed by the parties and no party shall be
obligated hereunder until the time of such full execution. No oral agreements, amendments,
modifications or waivers are intended or authorized and shall not be implied from any act or
course of conduct of any party.
SECTION 3. This resolution is rescinded if the parties to the contract fail to execute it
within sixty (60) days of passage of the resolution.
lIlt
e
e
e
1
2
3
4
5
6
7
8
9
10
11
RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN
BERNARDINO AWARDING A CONTRACT TO GRAND PACIFIC CONTRACTORS,
INC. FOR CONSTRUCTION OF ADA ACCESS RAMPS AND SIDEWALKS AT
V ARIOUS LOCATIONS (PHASE VII) - 2005/06. (SS-B), PER PROJECT PLAN NO.
11 50 1.
I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor
and Common Council of the City of San Bernardino at a
meeting thereof, held on the
day of
,2007, by the following vote, to wit:
AYES
NAYS
ABSTAIN
ABSENT
Council Members:
ESTRADA
BAXTER
12 BRINKER
13 DERRY
14
15
KELLEY
JOHNSON
16
17
18
19
20 The foregoing resolution is hereby approved this
21
22
23
24
25
MC CAMMACK
City Clerk
day of ,2007.
.
Patrick J. Morris, Mayor
City of San Bernardino
Approved as to form:
26 JAMES F. PENMAN,
City Attorney