STAruS IlEPORT - MT. VlRlIION
CORRIDOR IlEQUEST FOR
QUALIFICATIOIIS
Date: JAllUAJlY 4, 1991
Synopsis of Previous Cammission/Council/Comaittee Action:
At the November 19, 1990 Community Development Commission meeting, the Commission took
certain actions in connection with the acquisition of consultant services for the Mt.
Vernon Corridor Redevelopment Project Area.
Recommended Motion:
(Community Development Comaission)
That the Community Development Commission receive and file the Status Report relating
to the Mt. Vernon Corridor Request for Qualifications.
~Ltt J. IIBIIDIRSO , Executive Director
Development Departm t
Contact Person: Ken Henderson/Susan Morales
Phone: 5065/5081
Project Area: Mt. Vernon
Ward(s): 1 & 3
Supporting Data Attached: Staff ReDort
FUNDING REQUIREMENTS:
Amount: $ n/a
Source:
n/a
Budget Authority: n/a
Commission/Council lIotes:
KJH:dlm:5254R
Agenda Item 110.
7
.
.
.
.
.
DEVELOPIIEIIT DEPAJrnomlor.r
STAFF REPORT
Status ReDort - Mt. Vernon Corridor
Reauest for Oualifications
Ba,.1rlJrOlDld
On August 10, 1990 the Development Department issued a Request for Qualifications
for a "professional redevelopment services" with respect to the redevelopment of
the Mt. Vernon Avenue Corridor between 4th and 9th Streets. As stated in the RFQ
document, the consultant services were for the purpose of augmenting the
Department's professional capabilities in developing a specific plan; conducting
an environmental review; conducting analysis and assisting in negotiations with
developers in the acquisition and disposition of real property; relocation
services; conducting site demolition analysis; conducting market feasibility
studies. Though not specifically stated in the RFQ it was understood that
project financing and engineering studies would be addressed in the actual
proposal process.
At its November 8, 1990 meeting, the Redevelopment Committee considered and
recommended approval of staff's plan for providing consultant services. The plan
was conceived on the basis that negotiations will be conducted with the qualified
respondent to the RFQ and that those qualified respondents will make oral
presentations to a selection committee in lieu of the Department having to issue
a follow-up request for proposal. The plan allows for staff to:
(a) Hire an economic research firm to conduct a market feasibility study of
the area
(b) Establish a consultant team for providing all the necessary project
services
(c) Review all reports, studies, data base, study methodologies and
instruments or tools for consistency with meeting project objectives.
The Community Development Commission took action at its November 19, 1990 meeting
that served to implement the aforementioned work plan. The Commission took
action to (i) grant conceptual approval of the preparation of a specific plan for
the project; (ii) authorized staff to initiate an economic feasibility study.
This will be conducted by consultant service providers currently under contract
with the Department; and, (iii) authorized staff to negotiate and recommend
contracts for the provision of developer consultation services, specific plan
development services and environmental review services.
proiect Outline
The Mt. Vernon Avenue Corridor between 4th and 9th Streets, referred to as the
Mt. Vernon Avenue Theme Area, represents an area of the City that has suffered
structural dilapidation, infrastructure deterioration and a general decline in
its economic base. The Corridor is a key component of the Mt. Vernon
Redevelopment Area in that it acts as the centralized business district for the
area. Solving the economic problems and blight of the entire Redevelopment Area
will most likely depend on the emergence of the Corridor between 4th and 9th
Street as an economic force.
KJH:VM:dlm:5254R
COMMISSION MEETING
Meeting Date: 1-7-91
.
.
.
.
.
DEVELOPMENT DEPARTMENT STAFF REPORT
January 4, 1991
Page -2-
The "Theme Area" concept was devised to capitalize on the rich ethnic and
cultural heritage of the area. The concept essentially requires that all
structures and infrastructure reflects a central theme which design and ambience
would form the marketing program and thus shape the economy of the area. It is
expected that the project will serve a wide population base, consistent with the
theme concept.
It is anticipated that the project will be designed to reflect the hispanic
motif, utilizing the store front concept of retail and service outlets and
incorporating local parks and buildings whose design and purpose fits the
overall theme.
ADD roach
In general, the project must be assessed as viable both on a short term and long
term basis. Theme projects can and do lose their "lustre" and marketing edge
sometime during the projects "mid-life" period. This may occur after the first
ten years of the project's life. In some critical situations, this could occur
as early as the fifth year of project's life. Programs, therefore, must be
developed and implemented both initially and at the project's critical "mid
life" phase to avert any major downturn. The fact that the project represents
the first significant capital outlay within the redevelopment project area could
cause significant financial distress for the project area, financing sources,
guarantors (if used), and the City as a whole.
Specific systems were built into the development of the project to provide the
type of prudence that is necessary to avert financial distress. The project has
been designed to:
1. Determine needs of the area's population in terms of goods/services
income and overall quality of life. This would be considered through a
market study that would quantify their needs and, assess relevant avenues
of supply. This would in turn provide the basis for marketing to
customers and foods/service providers. The project's financing and
financial feasibility is directly linked to the market feasibility study.
2. Create a project theme through design standards along with the
formulation of project objectives, development and land use and
streetscape concepts and public infrastructure.
3. Create specific crosswalks between the market study and other relevant
phases of the project, e.g. market study to project specific financial
feasibility; market study to design guidelines; market study to business
mix; and market study to a marketing program.
4. Provide for demolition and relocation activities.
5. Provide for project specific assessment and financing.
6.
Ensure that there is adequate infrastructure and that the project does
not cause stresses to the environment including the public infrastructure.
KJH:VM:d1m:5254R
COMMISSION MEETING
Meeting Date: 1-7-91
.
.
.
.
.
DEVELOPMENT DEPARTMENT STAFF REPORT
January 4, 1991
Page -3-
Profect Status
To date several activities have occurred that are consistent with the time plan
for the project. These activities include the following:
1. All proposals have been evaluated for consistency to project objectives.
The proposals were grouped into two categories:
(a) Proposals, relating to the economic feasibility study. The
Department currently has contractual agreements with three firms
which services were considered appropriate to this study. These are
Natelson Company, Keyser Martson Associates and Kotin, Regan &
Mouchly, Inc.
(b) Qualification statements of proposing entities were also reviewed.
Several firms responded to the request for qualifications. Out of
those, four finalist firms were selected for further consideration.
An extensive review was conducted on these four proposals. The four
finalist firms were Urban Futures, Inc.; The Arroyo Group; Turrini &
Drink; and, The Planning Center.
2.
The work plan for developer consultation and the specific plan were
reviewed for consistency with project objectives, and to provide
sufficient detail for the purpose of negotiations. This was to ensure tha
a clear understanding was derived on what is needed to be accomplished and
to be able to communicate same to the consulting service providers.
3. A determination was made that by conducting negotiations with the finalist
firms and allowing a period for presentation would obviate the necessity
for a request for proposal (RFP). It was instead decided that through the
negotiation and interview process, a better more pro fluent process will be
realized.
4. Basic standards for negotiating the proposals were outlined. These
standards drew reference to scope of services; company history and
experience in projects of a similar nature; approach and methodology;
implementation program or action plan; implementation schedules; criteria
for success and evaluation measures.
5. Project components were categorized after review of overall project
objectives and statements of qualifications. These components consisted
of consulting services in the areas of:
(i)
(H)
(Hi)
(iv)
(v)
(vi)
Specific Plan Development
Developer Consultations
Environmental Review
Financing ,
Relocation'
Engineering.
Note that the component dealing with economic feasibility studies were dealt with
separately since the Department maintains ongoing relationships with firms for
such purpose.
KJH:VM: dIm: 5254R
COMMISSION MEETING
Meeting Date: 1-7-91
.
.
DEVELOPMENT DEPARTMENT STAFF REPORT
January 4, 1991
e
6.
Page -4-
During the period beginning December 17, 1990 and ending December 21,
1990, each of the firms were counseled on the projects parameters,
proposal requirements and the actual interview process. Negotiations were
held with Turrini & Brink; Urban Future, Inc.; The Arroyo Group; The
Planning Center and Natelson Co., Inc. The issue of severability was
discussed with each firm, so as to inform them of the City's intent of
building an independent team. This meant that the prime consultant and
providers of subcomponent services may be structured differently in their
relationship than what was originally proposed. Detailed information was
provided on the interview so as to better facilitate the proposal process
and to promote fair and equitable treatment in the procurement of services.
Negotiations with Natelson Co.,
contract document is underway.
should begin during the week of
this agreement included:
7.
a.
b.
c.
d.
e.
f.
e g.
h.
1.
j.
k.
1.
Inc. was finalized. Development of the
Start-up of this phase of the project
January 7, 1991. Items negotiated for
Conducting of field survey to determine existing uses, competition,
and surrounding land uses.
Survey instruments and methodologies.
Conducting of intercept interviews.
Conducting of business survey to determine current market base.
Conducting of surveys.
Examination of reasons for business failure and trends thereof.
Establishment of trade area.
Conducting of socieconomic and demographic analysis of the trade
areas.
Determination of market support.
Validation of data base to be used in the study.
Development of method for projecting future growth in market base.
Creation of methods for determining financial feasibility,
particularly on a project specific basis.
8. It is anticipated that interviews with each of the proposers will be
conducted by mid month (January, 1991). Information is being developed to
provide the interview panel an understanding of each "proposal".
Also the interview format and areas of concern are being identified. The
interview panel would also be provided with questions relating to specific area
of the project for interview purposes. A package of information is currently
being developed to forward to each qualified firm in order to better prepare them
for their respective interivew.
Staff recommends adoption of form motion.
KJH:VM:dlm:5254R