Loading...
HomeMy WebLinkAbout09-Public Works C~...Y ,OF SAN BERN.bINO I - REQUEST T COUNCIL ACTION ... ............... ..~.... - ~ - -- ~- Data: 12-13-90 Approval of Change Order No. ONE Subject: - Construction of Storm Drain in Redlands Blvd., Hunts Lane to Waterman Avenue, per Plan No. 8072-- CORNISH CONSTRUCTION COMPANY, TNC" From: ROGER G. HARDGRAVE Dept: Public Works/Engineering Synopsis of Previous Council action: June, 1989 __ Allocation of $357,600 in 1989/90 Storm Drain Con- struction Fund Budget - Acct. No. 248-368-57835. 05-07-90 Negative Declaration adopted and finding of consis- tency with General Plan made. 08-20-90 Authorization granted to advertise for bids - Plan and Specification No. 8072. 08-20-90 Authorization to transfer $94,400 from Account No. 248-368-57813, "Pershing Ave - 40th to 48th" to Acct. No. 248-368-57835 "Redlands Blvd. - Hunts Lane to Waterman," granted. 11-05-90 __ Resolution No. 90-442 adopted, awarding a contract for the low bid price of $330,000. Racommanded motion: That Change Order No. One to the contract with Cornish Construc- tion, for the construction of a storm drain in Redlands Boulevard, from Hunts Lane to Waterman Avenue, in accordance with Plan No. 8072, be approved, to direct the Contractor to install 455 feet of 8-inch sewer main, for an increase in the contract price not to exceed $19,500.00: from $330,000.00 to $349,500.00. cc: Shauna Edwins Andy Green Bernie Kersey Supporting data attached: Roaer G. Hardarave Staff Report, CCO n Phone: 5025 Contact person: Ward: 3 FUNDING REQUIREMENTS: Amount: $19.500 i_"" r Source: (Acct. No.) 248-368-57835 Hnn+'R T.a.np TO Wi=!It:erman Avenue Finance: d. Acct. Descri tion Storm Drain Council Notes: Agenda Item No q 75-0262 , c;ITY; OF SAN BERNeRDINO - REQUEST .R COUNCIL ACTION STAFF REPORT Page 1 of 2 The plans for the installation of a storm drain in Redlands Boulevard, from Hunts Lane to Waterman Avenue, show a conflict with an existing sewer lateral. This lateral serves a business on the south side of Redlands Boulevard, and is located about 400 feet east of Hunts Lane. The Contractor is required by the plans and specifica- tions to re-install the lateral to cross over the new storm drain, or under in an inverted siphon, depending upon the actual relative elevations determined during construction. During con- struction, a second lateral was found, that was not shown on the plans. This omission was due to the fact that this lateral is not included in our records. These laterals serve the Motel 6 and Country Hoe Down Restaurant. Both of these businesses are experiencing sewer problems, consisting of odors due to low velocity of flow in their laterals. This condition is a result of the sewer interceptor flowing at or near pressurized conditions. Additional sewer capacity is, therefore, needed to accommodate the sewage flow in the 21-inch sewer interceptor in Redlands Boulevard. After excavating the liiterals and ascertaining their exact elevation, in relation to the storm drain, it was dis- covered that the laterals would have to be re-installed for a considerable distance on the properties served. permission to work on these parcels would be required from the property owners, which might be difficult to obtain (due to the resulting disturbance to their business operations). The best method. of maintaining sewer service to these two businesses would be to install a relief sewer from the 12- inch main in Hunts Lane, as shown on the attached map. This relief sewer could be extended to the east in order to serve the properties south of Redlands Boulevard, and thereby relieve the 21-inch intercepting sewer. Change Order No. One will authorize the Contractor to install 455 lineal feet of 8-inch sewer main in Redlands Boule- vard, on a time and material basis. The work is to be done in accordance with Section 3-3 of the Standard Specifications, at a cost not to exceed $19,500, which includes a credit of $500.00 for eliminating Bid Item 21 for reconstructing one sewer lateral. The alternative to installing this relief sewer is to have the Contractor install an inverted siphon for the sewer lateral shown on the plans, and issue a change order to authorize this same work for the lateral not shown on the plans. The estimated cost for a siphon is $500.00. 12-13-90 75-0264 , CITY, OF SAN BER,.DINO - REQUEST reR COUNCIL ACTION STAFF REPORT Page 2 of 2 The total estimated project cost, based upon the actual low bid price, included an amount of $55,000, for contingencies, which could be used to finance the cost for this change order. We feel the appropriate way to maintain sewer service to these two properties is by installation of a relief sewer. Therefore, we recommend that Contract Change Order No. One be approved. 12-13-90 75-0264 .:>....'-'.I-~~. ..................~. _.- ..-----"-- .) from Hunts Lane.o Waterman project: .' Avenue Date: I lL-l~-~U . File No. 4.42-14 Plan No. 8072 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO. CALIFORNIA CONTRACT CHANGE ORDER NO. ~ (Change necessitated because of field conditions) TO: Cornish Construction Co. 9435 Bellegrave Glen Avon, CA 92509 Gentlemen: You are hereby authorized and directed to perform the following extra work: 1. Construct, complete and in-place, 455 :!: L.F. 8" sewer in Redlands Boulevard, a manhole tie-in at the existing 12" sewer main in Hunts Lane, and 2 lateral tie-ins, as directed by the Engineer. This work shall be performed in accordance with the Project Specifications, and shall be paid by force account in accordance with Section 3-3 of the Standard Specifications. The total cost shall not exceed $20,000.00. 2. Delete Bid Item 21, Reconstruct Sewer Lateral.. [$500.00] L.S. Total extra work cost added to contract ..............~lItima1;ea~...$ 19.500.00 Previous Contract price.............................................$ 330.000.00 Amended Cost Pri ce .................................................. $ 349.500.00 Additional time to complete contract due to change order ............5 Workina Days CONTRACTOR: CITY OF SAN BERNARDINO: By: Title: By: ROGER G. HARDGRAVE Director of Public Works/City Engr. Accepted Date: Approved Date: