CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
From: James Funk, Director
Subject: Resolution awarding contract to
Dalaj International Corp. for bridge seismic
retrofit at four locations, and replacement
ofrail barrier at Rialto Avenue, per Plan
No. 10309 and authorization for the
Director of Finance to amend the FY
2002/03 budget.
MCC Date July 15, 2002
Dept: Development Services
Date: June 20, 2002
File: 1.7094
Or: fl"' " , 'L
tl i \.-d I ni
Synopsis of Previous Council Action:
11/20/00 Authorization to execute Agreement with Lim and Nascimento Engineering, Inc.
(LAN) for Civil Engineering and Construction Management Services for seismic
retrofit of 4 bridges.
Recommended Motion:
1) Adopt Resolution.
2) Authorize the Director of Finance to establish Account No. 242-362-5504-1748 in the
amount of $223,200 and Account No. 129-367-5504-1748 in the amount off28,900 from
Measure I funding in the FY 2002/03 budget and also increase the corresponding revenue
Account No. 242-000-4658 (Federal reimbursement) by $223,200 to reflect the Federal
reimbursement to be received for Rialto Ave at Burlington Northern Santa Fe Rail Road
Crossing (replace rail barrier). r 'r ,Ll~~./
James Funk
Contact person: Mehran Sepehri, Senior Civil Engineer
Phone:
'i177
Supporting data attached: Staff Report, Map, & Reso.
Ward:
1. 3. & 6
FUNDING REQUIREMENTS: Amount: $1,202,118.00
Source:
Acct. Description: Proiect Account No. to be assil!ned.
Finance: ~~/~~~~
Council Notes:
'R{".~;!!-?CO,), -;)dl
Agenda Item No. is'
7//Sf()?Y
'lCr
,
,.tI. 1'.
.'
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
Staff Report
Subject:
Resolution awarding contract to Dalaj International Corp. for bridge seismic retrofit at four
locations, and replacement of rail barrier at Rialto Avenue, per Plan No. 10309 and
authorization for the Director of Finance to amend the FY 2002/03 budget.
Background:
This project consists of strengthening four bridges over railroad tracks in order that they will
be able to withstand stronger earthquakes by installing reinforcement bars and additional
concrete work. These bridges, all over existing railroad tracks, are located on south Waterman
Avenue south of Caroline Street, north Mt. Vernon Avenue north of Highland Avenue, west
Rialto Avenue near Lytle Creek and west Rialto Avenue west of Macy Street. Seismic studies
prepared for these bridges determined that currently they might not withstand more than small
to moderate earthquakes, depending on depth and distance from earthquake center.
Seismically retrofitting these bridges will better enable them to withstand a larger earthquake.
Also as part of this project, the contractor will replace a damaged rail barrier at Rialto Avenue
bridge over BNSF railroad track.
The City received authorization for Federal and State funding for Seismic Retrofitting of these 4
bridges from Highway Bridge Replacement Rehabilitation (HBRR) grants in the total amount of
$834,000 (Federal $667,200) and (State $166,800). Additionally, $223,200 in HBRR grants has
been authorized for replacing the rail barrier at the Rialto A venue bridge over BNSF railroad
track. The Seismic Retrofitting projects are 100 percent reimbursable by Caltrans. The rail
barrier replacement at the Rialto A venue Bridge requires a $28,900 local match. Due to the fact
that the seismic retrofit of the bridges and the replacement of the rail barrier at the Rialto
Avenue Bridge are two different projects, CALTRANS requires that costs be kept separated for
the two projects.
Plan and specifications for this project are complete and it is ready to be awarded. The
estimated project costs are as follows:
Construction Cost for 4 Bridl!es $694,671.30
Construction Cost for Rialto Ave @ BNSF Guard Rail $239,670.00
Total Construction Cost $934,341.30
Contingencies for 4 Bridges $ 35,000.00
Continl!encies for Rialto Ave @ BNSF Guard Rail $ 5,000.00
Total Contingencies $ 40,000.00
Desil!n, Inspection, and Contract Administration for 4 Bridl!es $220,328.70
Design, Inspection, and Contract Administration for Rialto $ 7,448.00
Ave @ BNSF Guard Rail
Total Desil!n, Inspection, and Contract Administration $ 227,776.70
Total project cost $1,202,118.00
2
.
i ~ ~ ','
I' ,I
;.
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
Staff Report continued
This project was advertised locally in the San Bernardino County Sun Newspaper, Construction
Trend Newspaper, the City's web site, and with the San Bernardino Area Chamber of
Commerce. The following companies responded:
Name of Bidder City Amount of Bid
Dala.i International Corn, Los Anl!:eles $ 934,341.30
O'Donnell Construction, Inc. San Dimas $ 1,090,403.00
Bonadiman-McCain, Inc. San Bernardino $ 1,132,519.78
Beador Const. Co. Inc. Corona Del Mar $ 1,159,700.00
R. 1. Bullard Const., Inc. Bonsall $ 1,211,774.35
J. Mc Loughlin Eng. Co., Inc Rancho Cucamonga $ 1,254,609.00
Peterson Chase Gen. Enl!. Const., Inc. Irvine $ 1,446,197.45
Lehigh Construction Como. Los Angeles $ 902,007.00
Engineering Estimate $ 1,050,351.00
After the bid opening, Lehigh Construction Company was the apparent low bidder in the amount
of $250,475.00. However, after staffs review of the submitted bid documents, the total basic
bid Project amounts were not correct (it was $902,007.00), the Bid Bond was not signed, and
the bidder's acknowledgement of Addendum No. 3 was not signed. Therefore, Lehigh
Construction Company was not a responsive bidder. Based on review of the sealed competitive
bids received, staff has determined that Dalaj International Corp, the apparent responsive low
bidder, has met the minimum requirements of the specifications and bid guidelines, and
therefore recommends that the Mayor and Common Council award the referenced contract
accordingly.
Financial Impact:
Funding for Seismic Retrofitting of these 4 bridges in the amount of $950,000 has been
included in the FY 2002/03 budget. Staff recommends that the Director of Finance be
authorized to establish Account No. 242-362-5504-1748 with $223,200 and Account No. 129-
367-5504-1748 with $28,900 from Measure I funding in the FY 2002/03 budget, and increase the
corresponding Revenue Account No. 242-000-4658 (Federal reimbursement) by $223,200 to
reflect the Federal reimbursement to be received for Rialto Avenue at Burlington Northern
Santa Fe Rail Road Crossing (replace rail barrier). The Seismic Retrofitting of 4 bridges
project is 100% reimbursable through Federal and State grants, however the City is required to
provide $28,920 in matching funds for the Rialto Avenue at Burlington Northern Santa Fe Rail
Road Crossing project.
Recommendation:
I) Adopt Resolution.
2) Authorize the Director of Finance to establish Account No. 242-362-5504-1748 in the
amount of $223,200 and Account No. 129-367-5504-1748 in the amount of $28,900 from
Measure I funding in the FY 2002/03 budget and also increase the corresponding revenue
Account No. 242-000-4658 (Federal reimbursement) by $223,200 to reflect the Federal
reimbursement to be received for Rialto Ave at Burlington Northern Santa Fe Railroad
Crossing (replace rail barrier).
3
, .
. ,
If'fl
City of San Bernardino, California
Vicinity Map
For
BRIDGE SEISMIC RETROFIT
At
Four Locations
Mt Vernon Ave #54C-076, Ria/to Ave #54C-377
Ria/to Ave # 54C-378, Watennan Ave # 54C-067
'-
I
-:t
,
, I
i~
,
=~,-_:~
,
I
,--
-L-__, .
.-:!
,
,
~ 1:
~ 1
~ r
<<
r ~-'
1---------.
r-__....J
,
I
NA~DrNo AV !
1
i -~ ~ ~
1-"-
"
~
I
~
'-;""i-~
-., ,~~~:"
,'u-_:~.:"
'-,.
"-~--.0~: "
I" ~ I
----0.\ J----......,
I' , .1
, \
, _..t -.
I
L
I,
I
- -, ,
r--'
,
r--; "I
" ,_-i i! r--: I
_"'-_,eJ.' - -, " ' _Ul
- --
'1
.,_ .f',_,
ZgNS __:u: /~f
!'f;~
!.~
,-1
t' 1
'I.. __~
"
I
'--I
~~i{:
;"
.. t L i
--.lJ
~----- ~
N
_ ~"l I. ili
Ii i;~~- I \ ~~-
~ ., @2000 TI~oma2. Bras. M~ps l~'i;
""-'ijf,} """'1'''''.'''''''' .":.f"""""";,,, '. "..",. '1"';\' ;c< ",
.~_.~;"Jt%m:-;y",'-~tli:>i;),."i",-:-.,... .,~;."<j.~'~,~_,<fl".:.':r~
, 1
VICINI1Y
MAP
N.T.S.
e
e
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
r0> ,V In! '\1-('
\.'::Y '00 lJ l
l
RESOLUTION NO.
RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN
BERNARDINO AWARDING COl'iTRACT TO DALAJ INTERNATIONAL CORP. FOR
BRIDGE SEISMIC RETROFIT AT FOUR LOCATIONS AND REPLACEMENT OF
RAIL BARRIER AT RIALTO AVENUE, PER PLAN NO. 10309.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE
CITY OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. Dalaj International Corp. is the lowest responsive and responsible bidder
for bridge seismic retrofit at four locations and replacement of rail barrier at Rialto A venue,
per Plan No. 10309. A contract is awarded accordingly to said bidder in a total amount of
$934,341.30 of which $694,671.30 is for seismic retrofit of four bridges, and $239,670.00 for
Rialto A venue replacement of rail barrier at BNSF, with a total contingency amount of
$40,000, but such award shall be effective only upon being fully executed by both parties. All
other bids, therefore, are hereby rejected. The Mayor is hereby authorized and directed to
execute said contract on behalf of the City; a copy of the contract is on file in the office of the
City Clerk and incorporated herein by reference as fully as though set forth at length.
SECTION 2. This contract and any amendment or modifications thereto shall not take
effect or become operative until fully signed and executed by the parties and no party shall be
obligated hereunder until the time of such full execution. No oral agreements, amendments,
modifications or waivers are intended or authorized and shall not be implied from any act or
course of conduct of any party.
SECTION 3. This resolution is rescinded if the parties to the contract fail to execute it
within sixty (60) days of passage of the resolution.
III
e 28 III
e
e
e
.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN
BERNARDINO AWARDING CONTRACT TO DALAJ INTERNATIONAL CORP, FOR
BRIDGE SEISMIC RETROFIT AT FOUR LOCATIONS AND REPLACEMENT OF
RAIL BARRIER ATRIAL TO A VENUE, PER PLAN NO. 10309,
I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and
Common Council of the City of San Bernardino at a
meeting thereof, held on the day
of
,2002, by the following vote, to wit:
NAYS
ABSTAIN
ABSENT
Council Members:
AYES
ESTRADA
LIEN
MC GINNIS
DERRY
SUAREZ
ANDERSON
MC CAMMACK
City Clerk
The foregoing resolution is hereby approved this
day of
,2002.
Judith Valles, Mayor
City of San Bernardino
Approved as to
form and legal content:
JAMES F. PENMAN,
City Attorney
By: ~/71,,,, t \ t ~.
(}
-, !
1'1 r-
r
CITY OF SAN BERNARDINO
Interoffice Memorandum
CITY CLERK'S OFFICE
Records and Information Management (RIM) Program
DATE:
July 18, 2002
TO:
Mehran Sepehri, Senior Civil Engineer
FROM:
Michelle Taylor, Senior Secretary
RE:
Transmitting Documents for Signature - Resolution 2002-229
At the Mayor and Common Council meeting of July 15, 2002, the City of San Bernardino
adopted Resolution 2002-229 - Resolution awarding a contract to Dalaj International Corp. for
bridge seismic retrofit at four locations and replacement of rail barrier at Rialto Avenue, per
Plan No. 10309.
I am providing you with one certified copy of Resolution 2002-229 and four (4) original bound
contracts. Please obtain signatures where indicated and return one fully executed original
contract to the City Clerk's office as soon as possible.
Please be advised that the resolution and contract will be null and void if not executed
within 60 days, or by September 13, 2002.
If you have any questions, please do not hesitate to contact me at ex!. 3206. Thank you.
I hereby acknowledge receipt of the above mentioned documents.
Sig=! $~/ J
Date: 7- ~"L
Please sign and return.
-1 rlT
, . .
CITY OF SAN BERNARDINO
Interoffice Memorandum
CITY CLERK'S OFFICE
Records and Information Management (RIM) Program
DATE:
September 3, 2002
TO:
Mehran Sepehri, Senior Civil Engineer
FROM:
Michelle Taylor, Senior Secretary
RE:
Resolution 2002-229 - Agreement with Dalaj International Corp.
Our office has not received the executed contract with Dalaj International Corp. for bridge
seismic retrofit at four locations and replacement of rail barrier at Rialto Avenue, per Plan No.
10309, which was approved at the Mayor and Common Council meeting held on July 15, 2002.
Please forward the executed contract to the City Clerk's Office, to my attention.
Note: The resolution and agreement will be null and void if not executed by September 13,
2002.
If you have any questions, please do not hesitate to call me at ext. 3206.
,'.. '*'.
,
** FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT **
RESOLUTION AGENDA ITEM TRACKING FORM
Meeting Date (Date Adopted): IJ -1.$ - O.:l
Item #
IS
Resolution # ;) Cf:,::J. - :; d cr
Vote:
Ayes
1-'\
Nays -e-
Abstain
~
Absent ..e,
Change to motion to amend original documents: -
Reso. # On Attachments: L Contract term: -
Note on Resolution of Attachment stored separately: y'"
Direct City Clerk to (circle 1): PUBLISH, POST, RECORD W/COUNTY
NullNoid After: !c,O Orrys /'4 - (3 -D.;l
By: -
Date Sent to Mayor: fJ - I b- 0 :;-
Date of Mayor's Signature: fJ -( ,-0:;l
Date of ClerklCDC Signature: '1- \ 1-0 d
Reso. Log Updated: II'"
Seal Impressed: /'.
Date Memo/Letter Sent for Signature:
(jo.-rfay Reminder Letter Sent ou.,3Oflr1fay:
90 Day Reminder Letter Sent on 45th day:
r'J-IY-o~
Q-30d
See Attached: /' Date Returned: <?-- :;4:) :;l-
See Attached: y'
See Attached:
Request for Council Action & Staff Report Attached: Yes L
Updated Prior Resolutions (Other Than Below): Yes
Updated CITY Personnel Folders (6413, 6429, 6433,10584,10585,12634): Yes
Updated CDC Personnel Folders (5557): Yes
Updated Traffic Folders (3985, 8234, 655, 92-389): Yes
No By
No -.L By
No ~ By
No /' By
NoT
Copies Distributed to:
City Attorney ./
Parks & Rec.
Code Compliance Dev. Services L
Police Public Services Water
EDA
Finance
,/
MIS
Others: m~ (2- \
Notes:
Ea.,n 0 ((y)~1
BEFORE FILING. REVIEW FORM TO ENSURE ANY NOTATIONS MADE HERE ARE TRANSFERRED TO THE
YEARLY RESOLUTION CHRONOLOGICAL LOG FOR FUTURE REFERENCE (Contract Term. etc.)
Ready to File: {)'Y!
Date: ct -5 -0'/
Revised 01112101