CITY OF SAN BERNARDINO -REQUEST FOR COUNCIL ACTION
From: James Funk
Subject: Resolution approving a
Cooperative Agreement between the City of
San Bernardino and the City of Lorna Linda
for traffic signal improvements on
Tippecanoe A venue/Anderson Street
between Hospitality Lane and University
Court.
Dept: Development Services
Date: November I, 2002
O""""""~L
'ill ...., i I .t~
MCC Meeting Date: December 2, 2002
Synopsis of Previous Council Action:
July 2002 - Adopted FY 2002/2003 Capital Improvement Budget which included Item 20 of
the Traffic Controls section entitled "Tippecanoe Ave/I-I0 Frwy Interconnect" in the amount
of $31,700.
Recommended Motion:
Adopt Resolution.
~~
James Funk
Contact person:
Michael Grubbs, Field Engineer
Phone: 5179
Supporting data attached: Staff Report, Reso., Letter, Aw-eement, Map.
Ward: 3
FUNDING REQUIREMENTS: Amount:
$31,700.00
Source: Account No. 250-370-5504-7337
Tippecanoe Ave Signal Interconnect 1-10 Frwy
Finanee~~~:Y 4L
Council Notes:
~~.,&.lZOO2.-3'" 0
No. /3
Ia../J./O;J-I
,~
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
Staff Report
Subject:
Resolution approving a Cooperative Agreement between the City of San Bernardino and the
City of Lorna Linda for traffic signal improvements on Tippecanoe A venue/Anderson Street
between Hospitality Lane and University Court
Background:
The City of Lorna Linda staff has proposed a joint project to upgrade and coordinate the traffic
signals between Hospitality Lane and University Court This signal improvement project
includes interconnecting the traffic signals along Tippecanoe A venue (Anderson Street in Lorna
Linda) from Hospitality Lane to University Court and installation of protected/permissive left
turn phasing at 1-10 eastbound ramp, 1-10 westbound ramps and Redlands Boulevard, The
City of Lorna Linda will be paying a much higher percentage of the total project cost based on
the proportionate share of the cost of improvements as calculated by Albert Grover &
Associates and as indicated in Exhibit "A" attached to the Agreement
Tippecanoe A venue is designated a major arterial on the Circulation Element in the General
Plan for both San Bernardino and Lorna Linda and is on the regional Congestion Management
Plan (CMP) for the SANBAG Region. Tippecanoe Avenue is one of a few north/south
arterials traversing several cities and provides freeway access for major retail development in
the southeast portion of San Bernardino.
In addition, staff feels that cooperating with neighboring cities on such projects when the
opportunity arises will encourage those neighboring Cities to cooperate with San Bernardino on
other similar projects in the future,
Construction of this project is expected to start in early 2003 and be completed by the middle
of 2003. A traffic assessment prepared by Albert Grover and Associates indicates that this
interim measure will significantly improve traffic circulation in the vicinity of the Tippecanoe
Avenue/I-I0 Freeway as summarized in the attached letter dated April 8, 2002.
Financial Impact:
The estimated total project cost is $160,305 of which San Bernardino's share will be $31,700
and Lorna Linda's share will be $128,605. Lorna Linda will be the lead agency for design and
construction o(the project. Upon completion of the project, San Bernardino will pay to Lorna
Linda its share of the actual cost of the project not to exceed $31,700.
Sufficient funds for this project ($31,000) are available in the FY 2002/2003 budget in Account
No. 250-370-5504-7337.
Recommendation:
Adopt Resolution.
. <,
ANp.SON .. ....1ftP.BCANOE AVENUE
'I'IlAFftC .GNAL ....O...BN.
~17Y LANE
#;// - --
COULSTON ST
.
-t.
lU
Q
~
LAUREL WOOD ~
~ W
Q.. :s
i::
'<(
CITY
OF
IAN.EaHAaDINO
DR
---
;-"----..
':.1 0;
.......'
,/
..,..,
0'
.'
REDLANDS
BLVD
..............
-~
'...
"-- ---'. SAN
CITY
OF
LOMAUNDA
f..,:
Cf.l
"
-.."~ l/',,-
-"""'0
,~ ~O
...:
Q)
--~-_/.. UNION
--1--_ .
"l"-_ .
-r-_"
"'--....t
--~
-~-I-
ACADEMY
~
Q
0)
ffi
c:::l
ST
Cl::
"'l:
~
Q
Q..
STEWART
v: N LEUVEN
-1- __'
r-__.:..
. --'
'---L
- --+-_1
y
UNI'IE~~_-
.----R.,.
COIJ
YlClNITTJIAP
,L. 11- 4-02; 1 :12PM;
; 9 9097"992891
I
# 2/ 3
, FRctI ; AGA
)
I
FAX NO. ;7149922883
..?ct. 29 281212 10: 36AM P2
ALBERT
GROVER &
WSOCIATES
April 8, 2002
,
Mr. T. JarbThaipejr, p.a,
Public Works Director/City Engineer
City of Loma Linda
25541 Barton Road I
Loma Linda, CA 92354 . \
I I
Ite: Andenon StreetlTippecanoe Avenue Slgn~ Synch nlzatiol1- Benefits to
City of San Bernardino
Dear Mr. Thaipejr:
PUlSuant to your re~uest Albert Grover & Associates has identified a SlIlDmary of
benefits to the motorists/residents of City of San Bernardino with t\1e implementation
\ of the proposed signal interconnect and coordjnation project on Anderson
\ StreellTippecanoe Avenue in the Cities ofLoma Lin~ and San B~~O.
\ \!
The project involves mOllifying selected existi~g traffic: signals Ptotec:, ted only
left-turn pbll$ing to protectc:dlpermissive eft-turn phasing, lIing signal
interconnect along And~ Street. upgradin selected traffic si nal binets and
controllers to Model 17Q type /lftd develofing, implementing I an fine-tuning
coordinated traffic signal timing plb for all project intersections.
,
Certain specific project components on AndFn StrecvTippecanoc Avenue that
would directly benefit traffic from San Bemardjno inJlude; .
IJ Installation of protected/permissive I,ft turn phasing at I-I Eastbound
Ramps, 1-10 Westbound Ramps Bnd Re lands Boulevard. The timated cost
of these improvements is approxiPmtely 17,200.
IJ Traffic signal coordination/re-timing 0
Laurelwood Avenue, I-to Eastbound
I
5 traffic signals (HoJitality Lane,
ps, 1-10 West\x1und\ Ramps and
TRANSPORrAnON CONSU :nNO ENGI R5
211 E. 'mperio! Hwy" S.ilo 3]8. 11_ CA '28lS
(71.1I,",W,,", fAX!7l4I __ : ......CDlllpuHIYf.
1---------
. '" 11- 4-02; 1: 12PM;
;9 9097992891
# 3/ 3
. FROM : FO=l
FAX NO. : 7149922883
. Oct. 29 201112 1121:37AM P3
Mr. T. Jarb Thaipejr, P.E.
April 8. 2002
Page 2
I
Rcdlaods Boulevard). The estimated cost of. these improvements is
approximately $12,500.
o Installation of WWV time source receiver at the field master located at
Tippecanoe Avenuc:lCooley Avenue. The installation cost of WWV time .
source receiver Is approximately$~,OOO.
As has been historically proven, i~lationJimplemenlation of coordinated traffic
signal systems and protected/permissive left-turn phasing (yen: feasible), results in
reduced delays, less queuing and fewer stops In the project cur' idor.
\
Please call me if you have any questions r~ing 1his letter.
Respectfully submitted, )
ALBERT GROVER &. ASSOCIATES
i
Chalap K. Sadam, P.E.
Senior Transportation Engineer
aJ LOIIIlllin'" Ie Iltnofllt II> San Bemonlino.doc
I
)
e
e
r
'L
f.~ ',,-.
RESOLlITION NO.
1
2 RESOLUTION OF THE CITY OF SAN BERNARDINO AUTHORIZING THE
EXEClITION OF A COOPERATIVE AGREEMENT BETWEEN THE CITY OF SAN
3 BERNARDINO AND THE CITY OF LOMA LINDA FOR TRAFFIC SIGNAL
4 IMPROVEMENT AT ANDERSON STREET AND TIPPECANOE AVENUE.
5
6
7
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE
CITY OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. The Mayor of the City of San Bernardino is hereby authorized and
8 directed to execute on behalf of said City, a Cooperative Agreement (attached as Attachment
9
10
11
12
13
14
15 / / /
"I" and incorporated herein) with the City of Lorna Linda for traffic signal improvement at
Anderson Street and Tippecanoe A venue.
SECTION 2.
The authorization to execute the above referenced agreement is
rescinded if the parties to the agreement fail to execute it within sixty (60) days of the passage
of this resolution.
16 //I
17
18
19
20
21
22
23
24
25
26
e 27
28
- I -
e
e
e
RESOLLiIOl'i OF THE CITY OF SAl'i BERNARDINO AliHORIZI:\G THE
1 EXECUTIOl'i OF A COOPERATIVE AGREEMEl'iT BETWEE:'i THE CITY Of SAN
2 BERNARDINO AND THE CITY OF LOMA LINDA FOR TRAffIC SIGNAL
IMPROVEMEl'iT AT A!\'DERSOl'i STREET AND TIPPECANOE AVENrE.
3
I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and
4
5 Common Council of the City of San Bernardino at a
6
7
8
meeting thereof. held on the
day of
. 2002. by the following vote. to wit:
ABSTAIN
ABSENT
Council Members:
AYES
NAYS
ESTRADA
9
10 LONGVILLE
11 MC GINNIS
12 DERRY
13 SUAREZ
14
ANDERSON
15
16 MC CAMMACK
17
18
19
City Clerk
day of
.2002.
The foregoing resolution is hereby approved this
20
21
22
23
Approved as to
24 form and legal content:
25
Judith Valles. Mayor
City of San Bernardino
JAMES F. PENMAN.
26
City Attorney
:: By: L 1. f~
(J
- 2 -
A TTACH\lE:\T 'r
e
COOPERATIVE AGREEMENT
FOR
TRAFFIC SIGN<\L IMPROVEMENT AT ANDERSON STREET AND
TIPPECANOE A VENUE
Between
THE CITY OF LOMA LINDA AND THE CITY OF SAN BERNARDINO
AGREEMENT
This Agreement is made and entered into this day of . by
and between the CITY OF LOMA LINDA. herein referred to as "LOMA LINDA" and
the CITY OF SAN BERNARDINO. herein referred to as "SAN BERNARDINO".
RECITALS
1)
LOMA LINDA and SAN BERNARDINO desire to partIcIpate in a
construction project for Traffic Signal Interconnect at Anderson
Street/Tippecanoe A venue from Hospitality Lane to University Court and
installation of protected/permissive left turn phasing at 1-10 eastbound
ramps. 1-10 westbound ramps and Redlands Blvd (hereinafter
"PROJECT").
e
2) LOMA LINDA and SAN BERNARDINO desire to specify the terms of
participation in the costs to engineer and construct the planned
improvements.
SECTION I
LOMA LINDA agrees:
1) To provide all necessary design, including plans, specifications, utility
identification and location, and all necessary construction engineering
services for PROJECT; To prepare contract documents and provide said
contract documents to SAN BERNARDINO for review and approval.
Such contract documents shall include appropriate provisions requiring
contractor to provide insurance and indemnification provisions satisfactory
to LOMA LINDA and SAN BERNARDINO:
2)
To submit to the City Engineer of SAN BERNARDINO, for plan check
and approval, all plans, specifications and construction estimates for the
portions of PROJECT within the City Limits of SAN BERNARDINO:
e
3)
To advertise and solicit bids for PROJECT in accordance with state and
local laws:
I
A TT ACHMEI'\T "1"
Cnuperative Agreement for the Traffic Signal Improvement
at Anderson Street and Tippecanoe Avenue
Page.2 of6
e
4)
To provide :0 the City Engineer of SAN BERNARDINO a set of bid plans
and specifications and to invite said City Engineer to any mandatory pre-
bid "Job Walk" with contractors. the bid opening. and the pre-construction
conference:
5) To provide copies of all bids to SAN BERNARDINO and. if bids indicate
that a cost overrun of no more than fifteen percent (15 %) of the estimate
will occur. to award the contract to the lowest responsible bidder. after
consultation with the City Engineer of SAN BERNARDINO. LOMA
LINDA shall retain the power to reject all bids in accordance with this
agreement ;
6) If, upon opening of the bids, it is found that a cost overrun exceeding
fifteen percent (15%) of the estimate will occur, LOMA LINDA and SAN
BERNARDINO shall endeavor to agree upon an alternative course of
action. If, after 30 days, an alternative course of action is not agreed
upon, this Agreement shall be deemed to be terminated by mutual consent;
7)
e
To provide SAN BERNARDINO proof of Liability Insurance for LOMA
LINDA's Contractor covering injury or damage to persons or property
arising out of work for which legal liability may be found to rest upon
LOMA LINDA's Contractor in a minimum amount of $1.000.000.00 and
naming SAN BERNARDINO as additional insured on the policy:
8) To obtain a "no fee" Public Works Construction Permit from the City
Engineer of SAN BERNARDINO prior to start of any construction within
the City Limits of SAN BERNARDINO;
9) Prior to, or concurrent with. the start of construction, to install
information signs at entry points mutually agreeable to both LOMA
LINDA and SAN BERNARDINO identifying the project as "A
cooperative project between the City of LOMA LINDA and the City of
SAN BERNARDINO", or similar wording agreeable to both agencies;
10) To permit inspection of the portion of the work within the City Limits of
SAN BERNARDINO by the City Engineer of SAN BERNARDINO, or
his duly appointed representative, during all phases of the work:
e
II)
To obtain approval of the City Engineer of SAN BERNARDINO prior to
approval of any Change Order that will increase the cost of PROJECT to
SAN BERNARDINO;
12)
To pay a percentage of the design, construction engineering and
construction costs, as shown on Exhibit "A", PROJECT COST
A TTACHME!\'T ..,..
Cooperative Agreement for the Traffic Signal Improvemenl
at Anderson Street and Tippecanoe Avenue
Page 3 of 6
e
13)
14)
IS)
e
ESTIMATE. to be amended following final cost accounting. based on the
proportional share of the PROJECT cost in each jurisdiction:
Concurrent with award of construction contract for PROJECT. to bill SAN
BERNARDINO for 85% of SAN BERNARDINO's proportional share of
the cost of PROJECT based on the estimated total design. construction and
construction engineering costs as shown in Exhibit" A". PROJECT COST
ESTIMATE:
To furnish promptly to SAN BERNARDINO upon completion of
PROJECT and all work incidental thereto, a report containing a detailed
statement of the total engineering and construction costs to be borne by
SAN BERNARDINO, including resolution of any construction related
claims which may have been filed by LOMA LINDA's contractor;
Concurrent with filing of a "Notice of Completion" for project. to submit
a final bill to SAN BERNARDINO for the balance of SAN
BERNARDINO's share of the cost of PROJECT based on the detailed
statement of total engineering and construction costs;
16)
To furnish promptly upon completion of PROJECT, "As Built" plans for
PROJECT;
17) To retain or cause to be retained for audit for SAN BERNARDINO or other
government auditors for a period of three (3) years from the date of final
payment all records and accounts relating to construction of the PROJECT:
18) To indemnify, defend. and hold hmmless SAN BERNARDINO and their
agents. officers and employees from and against any and all liability,
expense and claims for damages of any nature whatsoever. including, but
not limited to. bodily injury. death, personal injury, or property damages
arising from or connected with LOMA LINDA's operations, or its
performance under this Agreement.
SECTION II
SAN BERNARDINO agrees:
e
I)
To pay LOMA LINDA that percentage of the construction engineering and
construction costs, as SAN BERNARDINO's proportional share, as shown
on Exhibit "A", PROJECT COST ESTIMATE, to be amended following
final cost accounting, based on the proportional share of the cost of
PROJECT in each jurisdiction, to a maximum amount not to exceed
$31,700;
A TT ACH!\IEI\'T "I"
Cooperative Agreement for the Trame Signal Improvement
ill Anderson Street and Tippecanoe A venue
Page 4 of6
e
e
2)
To promptly render payment for all billings submitted by LO~1A LI"DA in
accordance with this agreement:
3) Prior to award of the construction contract for PROJECT, and in sufficient
time to allow LOMA LINDA to reject all construction bids therefore,
SAN BERNARDINO may terminate this Agreement in writing, provided
that SAN BERNARDINO reimburses LOMA LINDA for proportionate
costs incurred by LOMA LINDA under this agreement prior to
termination;
4) If termination of this Agreement is by mutual agreement, SAN
BERNARDINO will bear its proportionate share of all costs incurred prior
to termination based on the Engineers Estimate of the cost of the portion of
PROJECT in the City Limits of SAN BERNARDINO;
5)
To indemnify, defend, and hold harmless LOMA LINDA and their agents,
officers and employees from and against any and all liability, expense and
claims for damages of any nature whatsoever, including, but not limited to,
bodily injury, death, personal injury, or property damages arising from or
connected with SAN BERNARDINO's operations, or its pelformance under
this Agreement.
SECTION III
It is mutually agreed:
IIIIIII
III II! I
1/11111
IIIIIII
e
1) This Agreement will be construed and enforced under the laws of the State.
of California;
2) This Agreement may be executed in counter parts, each of which will be
deemed to be an original for all purposes but all of which will constitute
one in the same agreement.
e
e
e
'.
Cooperative Agreement for the Traffic Signal Improvement
at Anderson Street and Tippecanoe Avenue
Page:' of 6
ATTACHMENT "j"
I:\' WITNESS WHEREOF. said parties have caused this instrument [0 be officially
executed and attested by their duly constituted officers.
CITY OF LOMA LINDA
APPROVED:
Floyd Petersen. Mayor
ATTEST:
Pamela Byrnes-O'Camb, City Clerk
APPROVED AS TO FORM:
Richard Holdaway, City Attorney
CITY OF SAN BERNARDINO
APPROVED:
Judith Valles. Mayor
ATTEST:
Rachel Clark, City Clerk
APPROVED AS TO FORM AND LEGAL CONTENT:
.
e
e
e
ATfACHME!\'T'r
EXHIBIT "A"
PROJECT COST ESTIMATE
TRAFFIC SIGNAL IMPROVEMENT
AT
ANDERSON STREET/TIPPECANOE A VENUE
SAN LOMA LINDA
DESCRIPTION TOTAL AMOUNT BERNARDINO SHARE
SHARE*
Proportional
Share of Cost in 100% 19.77% 80.23%
City Limits
Design Cost $52,800 $0% $52,800
I
Construction $98,505 $29,000 $69,505
Contract
Construction
Engineering & $9,000 $2,700 $6,300
Inspection
Total Project Cost $160,305 $31,700 $128,605
*Maximum participation by SAN BERNARDINO shall not exceed $31.700.
f:IPlIlJlic Works Admin \A GREEMENTS-CITY CLERK\}! Agr Traffic Signal Alldersoll-TljJ/)(!CQIU)(!.drH"
OFFICE OF THE CITY CLERK
RACHEL G. CLARK, C.M.C. - CITY CLERK
300 North "D" Street. San Bernardino' CA 92418-0001
909.384.5002' Fax: 909.384.5158
www.ci.san-bernardino.ca.us
,.
December 6, 2002
Pamela Byrnes-O'Camb, City Clerk
City of Lorna Linda
25541 Barton Road
Lorna Linda, CA 92354
Dear Mrs. Byrnes-O'Camb,
At the Mayor and Common Council meeting of December 2, 2002, the City of San Bernardino
adopted Resolution 2002-370 - Resolution authorizing the execution of a cooperative agreement
between the City of San Bernardino and the City of Loma Linda for traffic signal improvement at
Anderson Street and Tippecanoe Avenue.
Enclosed is one (1) original agreement. Please obtain signatures in the appropriate locations and
return the original agreement to the City Clerk's Office, Attn: Michelle Taylor, P.O. Box 1318,
San Bernardino, CA 92402, as soon as possible. Once returned, you will be provided with a
certified copy of the resolution and agreement.
Please be advised that the resolution and agreement wiIJ he null and void if not executed
within 60 days, or by January 31, 2003.
If you have any questions, please do not hesitate to contact me at (909)384-5002.
Sincerer'.
ftl. (/; {~~
Michelle Taylor
Senior Secretary
Enclosure
CITY OF SAN BERNARDINO
ADOPTED SHARED VALUES: Integrity' Accountability' Respect for Human Dignity' Honesty
'.
City Of Lorna Linda
25541 Barton Road, Lorna Linda, California 92354-3160 '_I~~ ~) 799-2890
Sister City - Manipal, Karnataka, India
'03 JAM -2 P 1 :53
December 27, 2002
Michelle Taylor
Office of the City Clerk
City of San Bernardino
P. O. Box 1318
San Bernardino, CA 92402
Dear Ms. Taylor:
Cooperative Agreement - Traffic Signal Improvement at
Anderson Street and Tippecanoe Avenue
Enclosed, per your instructions, is a fully signed Cooperative Agreement between the Cities of
Lorna Linda and San Bernardino relating to the traffic signal improvement at Anderson Street and
Tippecanoe Avenue.
Subject:
I understand a certified copy of the City of San Bernardino Resolution 2002-370 and Agreement
will be returned to me for the City's records.
Ifanything further is needed, please contact me (909) 799-2819.
Sincerely,
~~-i)~
Pamela Bymes-O'Camb
City Clerk
Enclosure
Recycled paper
",
CITY OF SAN BERNARDINO
Interoffice Memorandum
CITY CLERK'S OFFICE
Records and Information Management (RIM) Program
DATE:
January 2, 2003
TO:
Mike Grubbs, Field Engineer
FROM:
Michelle Taylor, Senior Secretary
RE:
Resolution 2002-370 - Agreement with City of Loma Linda
CC:
Veronica Martinez, Senior Secretary
Attached is a fully executed copy of the cooperative agreement with the City of Lorna Linda for
traffic signal improvements at Anderson Street and Tippecanoe A venue, The original agreement
is on file in the City Clerk's Office,
If you have any questions, please call me at ext. 3206,
.
OFFICE OF THE CITY CLERK
RACHEL G. CLARK, C.M.C. - CITY CLERK
300 North '"D" Street. San Bernardino. CA92418-0001
909.384.5002. Fax: 909.384.5158
www.ci.san-bernardino.ca.lis
,.
January 2,2003
Pamela Byrnes-O'Camb, City Clerk
City of Lorna Linda
25541 Barton Road
Lorna Linda, CA 92354
Dear Mrs. Byrnes-O'Camb,
Enclosed is one certified copy of City of San Bernardino Resolution 2002-370 and the
cooperative agreement between the City of San Bernardino and the City of Lorna Linda for
traffic signal improvement at Anderson Street and Tippecanoe Avenue.
If you have any questions, please do not hesitate to call me at (909)384-5002.
Sincerely,
, ,
'i)/ t (~l( <.. .J') (~'-
Michelle Taylor '
Senior Secretary
Enclosure
CITY OF SAN BERNARDINO
ADOPTED SHARED VALUES: Integrity. Accountability. Respect for Human Dignity. Honesty
""<
.'
** FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT **
RESOLUTION AGENDA ITEM TRACKING FORM
Meeting Date (Date Adopted): 12-Z-<:>2... Item # IS
Vote: Ayes 1,3- ') Nays Qr
Change to motion to amend original documents: -
Resolution # 7062:- 3 '10
Abstain.c;;r Absent 1-..
Reso. # On Attachments: -L Contract term: -
Note on Resolution of Attachment stored separately: ~
Direct City Clerk to (circle 1): PUBLISH, POST, RECORD W/COUNTY
NulllVoid After: leo DPYYS J ,- 31-0,"~
By: .-
Date Sent to Mayor: 1"- 3-02-
Date of Mayor's Signature: 12- '-j-02-
Date of Clerk/CDC Signature: (2 - S - 02-
Reso. Log Updated: V
Seal Impressed: v
Date MemolLetter Sent for Signature: ! ;) -eo 'Ocr
60 Day Reminder Letter Sent on 30th day:
90 Day Reminder Letter Sent on 45th day:
See Attached:/ Date Returned: t -:.? - 63
See Attached:
See Attached:
Request for Council Action & Staff Report Attached: Yes /
Updated Prior Resolutions (Other Than Below): Yes
Updated CITY Personnel Folders (6413, 6429, 6433, 10584, 10585, 12634): Yes
Updated CDC Personnel Folders (5557): Yes
Updated Traffic Folders (3985, 8234,655,92-389): Yes
No By
No ~ By
No -L By
No -4 By
No~ B
Copies Distributed to:
City Attorney ./
Parks & Rec.
Code Compliance
Police Public Services
Dev. Services /
EDA
Finance /
MIS
Water
Others:
Notes:
BEFORE FILING. REVIEW FORM TO ENSURE ANY NOTATIONS MADE HERE ARE TRANSFERRED TO THE
YEARLY RESOLUTION CHRONOLOGICAL LOG FOR FUTURE REFERENCE (Contract Term, etc.)
Ready to File: JlJf.-
Date: \<}-03
Rev ised 0 I /12/0 I