Loading...
HomeMy WebLinkAbout13-Development Services . .~ CITY OF SAN BERNARDINO -REQUEST FOR COUNCIL ACTION From: James Funk Subject: Resolution approving a Cooperative Agreement between the City of San Bernardino and the City of Lorna Linda for traffic signal improvements on Tippecanoe A venue/Anderson Street between Hospitality Lane and University Court. Dept: Development Services Date: November I, 2002 O""""""~L 'ill ...., i I .t~ MCC Meeting Date: December 2, 2002 Synopsis of Previous Council Action: July 2002 - Adopted FY 2002/2003 Capital Improvement Budget which included Item 20 of the Traffic Controls section entitled "Tippecanoe Ave/I-I0 Frwy Interconnect" in the amount of $31,700. Recommended Motion: Adopt Resolution. ~~ James Funk Contact person: Michael Grubbs, Field Engineer Phone: 5179 Supporting data attached: Staff Report, Reso., Letter, Aw-eement, Map. Ward: 3 FUNDING REQUIREMENTS: Amount: $31,700.00 Source: Account No. 250-370-5504-7337 Tippecanoe Ave Signal Interconnect 1-10 Frwy Finanee~~~:Y 4L Council Notes: ~~.,&.lZOO2.-3'" 0 No. /3 Ia../J./O;J-I ,~ CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Staff Report Subject: Resolution approving a Cooperative Agreement between the City of San Bernardino and the City of Lorna Linda for traffic signal improvements on Tippecanoe A venue/Anderson Street between Hospitality Lane and University Court Background: The City of Lorna Linda staff has proposed a joint project to upgrade and coordinate the traffic signals between Hospitality Lane and University Court This signal improvement project includes interconnecting the traffic signals along Tippecanoe A venue (Anderson Street in Lorna Linda) from Hospitality Lane to University Court and installation of protected/permissive left turn phasing at 1-10 eastbound ramp, 1-10 westbound ramps and Redlands Boulevard, The City of Lorna Linda will be paying a much higher percentage of the total project cost based on the proportionate share of the cost of improvements as calculated by Albert Grover & Associates and as indicated in Exhibit "A" attached to the Agreement Tippecanoe A venue is designated a major arterial on the Circulation Element in the General Plan for both San Bernardino and Lorna Linda and is on the regional Congestion Management Plan (CMP) for the SANBAG Region. Tippecanoe Avenue is one of a few north/south arterials traversing several cities and provides freeway access for major retail development in the southeast portion of San Bernardino. In addition, staff feels that cooperating with neighboring cities on such projects when the opportunity arises will encourage those neighboring Cities to cooperate with San Bernardino on other similar projects in the future, Construction of this project is expected to start in early 2003 and be completed by the middle of 2003. A traffic assessment prepared by Albert Grover and Associates indicates that this interim measure will significantly improve traffic circulation in the vicinity of the Tippecanoe Avenue/I-I0 Freeway as summarized in the attached letter dated April 8, 2002. Financial Impact: The estimated total project cost is $160,305 of which San Bernardino's share will be $31,700 and Lorna Linda's share will be $128,605. Lorna Linda will be the lead agency for design and construction o(the project. Upon completion of the project, San Bernardino will pay to Lorna Linda its share of the actual cost of the project not to exceed $31,700. Sufficient funds for this project ($31,000) are available in the FY 2002/2003 budget in Account No. 250-370-5504-7337. Recommendation: Adopt Resolution. . <, ANp.SON .. ....1ftP.BCANOE AVENUE 'I'IlAFftC .GNAL ....O...BN. ~17Y LANE #;// - -- COULSTON ST . -t. lU Q ~ LAUREL WOOD ~ ~ W Q.. :s i:: '<( CITY OF IAN.EaHAaDINO DR --- ;-"----.. ':.1 0; .......' ,/ ..,.., 0' .' REDLANDS BLVD .............. -~ '... "-- ---'. SAN CITY OF LOMAUNDA f..,: Cf.l " -.."~ l/',,- -"""'0 ,~ ~O ...: Q) --~-_/.. UNION --1--_ . "l"-_ . -r-_" "'--....t --~ -~-I- ACADEMY ~ Q 0) ffi c:::l ST Cl:: "'l: ~ Q Q.. STEWART v: N LEUVEN -1- __' r-__.:.. . --' '---L - --+-_1 y UNI'IE~~_- .----R.,. COIJ YlClNITTJIAP ,L. 11- 4-02; 1 :12PM; ; 9 9097"992891 I # 2/ 3 , FRctI ; AGA ) I FAX NO. ;7149922883 ..?ct. 29 281212 10: 36AM P2 ALBERT GROVER & WSOCIATES April 8, 2002 , Mr. T. JarbThaipejr, p.a, Public Works Director/City Engineer City of Loma Linda 25541 Barton Road I Loma Linda, CA 92354 . \ I I Ite: Andenon StreetlTippecanoe Avenue Slgn~ Synch nlzatiol1- Benefits to City of San Bernardino Dear Mr. Thaipejr: PUlSuant to your re~uest Albert Grover & Associates has identified a SlIlDmary of benefits to the motorists/residents of City of San Bernardino with t\1e implementation \ of the proposed signal interconnect and coordjnation project on Anderson \ StreellTippecanoe Avenue in the Cities ofLoma Lin~ and San B~~O. \ \! The project involves mOllifying selected existi~g traffic: signals Ptotec:, ted only left-turn pbll$ing to protectc:dlpermissive eft-turn phasing, lIing signal interconnect along And~ Street. upgradin selected traffic si nal binets and controllers to Model 17Q type /lftd develofing, implementing I an fine-tuning coordinated traffic signal timing plb for all project intersections. , Certain specific project components on AndFn StrecvTippecanoc Avenue that would directly benefit traffic from San Bemardjno inJlude; . IJ Installation of protected/permissive I,ft turn phasing at I-I Eastbound Ramps, 1-10 Westbound Ramps Bnd Re lands Boulevard. The timated cost of these improvements is approxiPmtely 17,200. IJ Traffic signal coordination/re-timing 0 Laurelwood Avenue, I-to Eastbound I 5 traffic signals (HoJitality Lane, ps, 1-10 West\x1und\ Ramps and TRANSPORrAnON CONSU :nNO ENGI R5 211 E. 'mperio! Hwy" S.ilo 3]8. 11_ CA '28lS (71.1I,",W,,", fAX!7l4I __ : ......CDlllpuHIYf. 1--------- . '" 11- 4-02; 1: 12PM; ;9 9097992891 # 3/ 3 . FROM : FO=l FAX NO. : 7149922883 . Oct. 29 201112 1121:37AM P3 Mr. T. Jarb Thaipejr, P.E. April 8. 2002 Page 2 I Rcdlaods Boulevard). The estimated cost of. these improvements is approximately $12,500. o Installation of WWV time source receiver at the field master located at Tippecanoe Avenuc:lCooley Avenue. The installation cost of WWV time . source receiver Is approximately$~,OOO. As has been historically proven, i~lationJimplemenlation of coordinated traffic signal systems and protected/permissive left-turn phasing (yen: feasible), results in reduced delays, less queuing and fewer stops In the project cur' idor. \ Please call me if you have any questions r~ing 1his letter. Respectfully submitted, ) ALBERT GROVER &. ASSOCIATES i Chalap K. Sadam, P.E. Senior Transportation Engineer aJ LOIIIlllin'" Ie Iltnofllt II> San Bemonlino.doc I ) e e r 'L f.~ ',,-. RESOLlITION NO. 1 2 RESOLUTION OF THE CITY OF SAN BERNARDINO AUTHORIZING THE EXEClITION OF A COOPERATIVE AGREEMENT BETWEEN THE CITY OF SAN 3 BERNARDINO AND THE CITY OF LOMA LINDA FOR TRAFFIC SIGNAL 4 IMPROVEMENT AT ANDERSON STREET AND TIPPECANOE AVENUE. 5 6 7 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. The Mayor of the City of San Bernardino is hereby authorized and 8 directed to execute on behalf of said City, a Cooperative Agreement (attached as Attachment 9 10 11 12 13 14 15 / / / "I" and incorporated herein) with the City of Lorna Linda for traffic signal improvement at Anderson Street and Tippecanoe A venue. SECTION 2. The authorization to execute the above referenced agreement is rescinded if the parties to the agreement fail to execute it within sixty (60) days of the passage of this resolution. 16 //I 17 18 19 20 21 22 23 24 25 26 e 27 28 - I - e e e RESOLLiIOl'i OF THE CITY OF SAl'i BERNARDINO AliHORIZI:\G THE 1 EXECUTIOl'i OF A COOPERATIVE AGREEMEl'iT BETWEE:'i THE CITY Of SAN 2 BERNARDINO AND THE CITY OF LOMA LINDA FOR TRAffIC SIGNAL IMPROVEMEl'iT AT A!\'DERSOl'i STREET AND TIPPECANOE AVENrE. 3 I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and 4 5 Common Council of the City of San Bernardino at a 6 7 8 meeting thereof. held on the day of . 2002. by the following vote. to wit: ABSTAIN ABSENT Council Members: AYES NAYS ESTRADA 9 10 LONGVILLE 11 MC GINNIS 12 DERRY 13 SUAREZ 14 ANDERSON 15 16 MC CAMMACK 17 18 19 City Clerk day of .2002. The foregoing resolution is hereby approved this 20 21 22 23 Approved as to 24 form and legal content: 25 Judith Valles. Mayor City of San Bernardino JAMES F. PENMAN. 26 City Attorney :: By: L 1. f~ (J - 2 - A TTACH\lE:\T 'r e COOPERATIVE AGREEMENT FOR TRAFFIC SIGN<\L IMPROVEMENT AT ANDERSON STREET AND TIPPECANOE A VENUE Between THE CITY OF LOMA LINDA AND THE CITY OF SAN BERNARDINO AGREEMENT This Agreement is made and entered into this day of . by and between the CITY OF LOMA LINDA. herein referred to as "LOMA LINDA" and the CITY OF SAN BERNARDINO. herein referred to as "SAN BERNARDINO". RECITALS 1) LOMA LINDA and SAN BERNARDINO desire to partIcIpate in a construction project for Traffic Signal Interconnect at Anderson Street/Tippecanoe A venue from Hospitality Lane to University Court and installation of protected/permissive left turn phasing at 1-10 eastbound ramps. 1-10 westbound ramps and Redlands Blvd (hereinafter "PROJECT"). e 2) LOMA LINDA and SAN BERNARDINO desire to specify the terms of participation in the costs to engineer and construct the planned improvements. SECTION I LOMA LINDA agrees: 1) To provide all necessary design, including plans, specifications, utility identification and location, and all necessary construction engineering services for PROJECT; To prepare contract documents and provide said contract documents to SAN BERNARDINO for review and approval. Such contract documents shall include appropriate provisions requiring contractor to provide insurance and indemnification provisions satisfactory to LOMA LINDA and SAN BERNARDINO: 2) To submit to the City Engineer of SAN BERNARDINO, for plan check and approval, all plans, specifications and construction estimates for the portions of PROJECT within the City Limits of SAN BERNARDINO: e 3) To advertise and solicit bids for PROJECT in accordance with state and local laws: I A TT ACHMEI'\T "1" Cnuperative Agreement for the Traffic Signal Improvement at Anderson Street and Tippecanoe Avenue Page.2 of6 e 4) To provide :0 the City Engineer of SAN BERNARDINO a set of bid plans and specifications and to invite said City Engineer to any mandatory pre- bid "Job Walk" with contractors. the bid opening. and the pre-construction conference: 5) To provide copies of all bids to SAN BERNARDINO and. if bids indicate that a cost overrun of no more than fifteen percent (15 %) of the estimate will occur. to award the contract to the lowest responsible bidder. after consultation with the City Engineer of SAN BERNARDINO. LOMA LINDA shall retain the power to reject all bids in accordance with this agreement ; 6) If, upon opening of the bids, it is found that a cost overrun exceeding fifteen percent (15%) of the estimate will occur, LOMA LINDA and SAN BERNARDINO shall endeavor to agree upon an alternative course of action. If, after 30 days, an alternative course of action is not agreed upon, this Agreement shall be deemed to be terminated by mutual consent; 7) e To provide SAN BERNARDINO proof of Liability Insurance for LOMA LINDA's Contractor covering injury or damage to persons or property arising out of work for which legal liability may be found to rest upon LOMA LINDA's Contractor in a minimum amount of $1.000.000.00 and naming SAN BERNARDINO as additional insured on the policy: 8) To obtain a "no fee" Public Works Construction Permit from the City Engineer of SAN BERNARDINO prior to start of any construction within the City Limits of SAN BERNARDINO; 9) Prior to, or concurrent with. the start of construction, to install information signs at entry points mutually agreeable to both LOMA LINDA and SAN BERNARDINO identifying the project as "A cooperative project between the City of LOMA LINDA and the City of SAN BERNARDINO", or similar wording agreeable to both agencies; 10) To permit inspection of the portion of the work within the City Limits of SAN BERNARDINO by the City Engineer of SAN BERNARDINO, or his duly appointed representative, during all phases of the work: e II) To obtain approval of the City Engineer of SAN BERNARDINO prior to approval of any Change Order that will increase the cost of PROJECT to SAN BERNARDINO; 12) To pay a percentage of the design, construction engineering and construction costs, as shown on Exhibit "A", PROJECT COST A TTACHME!\'T ..,.. Cooperative Agreement for the Traffic Signal Improvemenl at Anderson Street and Tippecanoe Avenue Page 3 of 6 e 13) 14) IS) e ESTIMATE. to be amended following final cost accounting. based on the proportional share of the PROJECT cost in each jurisdiction: Concurrent with award of construction contract for PROJECT. to bill SAN BERNARDINO for 85% of SAN BERNARDINO's proportional share of the cost of PROJECT based on the estimated total design. construction and construction engineering costs as shown in Exhibit" A". PROJECT COST ESTIMATE: To furnish promptly to SAN BERNARDINO upon completion of PROJECT and all work incidental thereto, a report containing a detailed statement of the total engineering and construction costs to be borne by SAN BERNARDINO, including resolution of any construction related claims which may have been filed by LOMA LINDA's contractor; Concurrent with filing of a "Notice of Completion" for project. to submit a final bill to SAN BERNARDINO for the balance of SAN BERNARDINO's share of the cost of PROJECT based on the detailed statement of total engineering and construction costs; 16) To furnish promptly upon completion of PROJECT, "As Built" plans for PROJECT; 17) To retain or cause to be retained for audit for SAN BERNARDINO or other government auditors for a period of three (3) years from the date of final payment all records and accounts relating to construction of the PROJECT: 18) To indemnify, defend. and hold hmmless SAN BERNARDINO and their agents. officers and employees from and against any and all liability, expense and claims for damages of any nature whatsoever. including, but not limited to. bodily injury. death, personal injury, or property damages arising from or connected with LOMA LINDA's operations, or its performance under this Agreement. SECTION II SAN BERNARDINO agrees: e I) To pay LOMA LINDA that percentage of the construction engineering and construction costs, as SAN BERNARDINO's proportional share, as shown on Exhibit "A", PROJECT COST ESTIMATE, to be amended following final cost accounting, based on the proportional share of the cost of PROJECT in each jurisdiction, to a maximum amount not to exceed $31,700; A TT ACH!\IEI\'T "I" Cooperative Agreement for the Trame Signal Improvement ill Anderson Street and Tippecanoe A venue Page 4 of6 e e 2) To promptly render payment for all billings submitted by LO~1A LI"DA in accordance with this agreement: 3) Prior to award of the construction contract for PROJECT, and in sufficient time to allow LOMA LINDA to reject all construction bids therefore, SAN BERNARDINO may terminate this Agreement in writing, provided that SAN BERNARDINO reimburses LOMA LINDA for proportionate costs incurred by LOMA LINDA under this agreement prior to termination; 4) If termination of this Agreement is by mutual agreement, SAN BERNARDINO will bear its proportionate share of all costs incurred prior to termination based on the Engineers Estimate of the cost of the portion of PROJECT in the City Limits of SAN BERNARDINO; 5) To indemnify, defend, and hold harmless LOMA LINDA and their agents, officers and employees from and against any and all liability, expense and claims for damages of any nature whatsoever, including, but not limited to, bodily injury, death, personal injury, or property damages arising from or connected with SAN BERNARDINO's operations, or its pelformance under this Agreement. SECTION III It is mutually agreed: IIIIIII III II! I 1/11111 IIIIIII e 1) This Agreement will be construed and enforced under the laws of the State. of California; 2) This Agreement may be executed in counter parts, each of which will be deemed to be an original for all purposes but all of which will constitute one in the same agreement. e e e '. Cooperative Agreement for the Traffic Signal Improvement at Anderson Street and Tippecanoe Avenue Page:' of 6 ATTACHMENT "j" I:\' WITNESS WHEREOF. said parties have caused this instrument [0 be officially executed and attested by their duly constituted officers. CITY OF LOMA LINDA APPROVED: Floyd Petersen. Mayor ATTEST: Pamela Byrnes-O'Camb, City Clerk APPROVED AS TO FORM: Richard Holdaway, City Attorney CITY OF SAN BERNARDINO APPROVED: Judith Valles. Mayor ATTEST: Rachel Clark, City Clerk APPROVED AS TO FORM AND LEGAL CONTENT: . e e e ATfACHME!\'T'r EXHIBIT "A" PROJECT COST ESTIMATE TRAFFIC SIGNAL IMPROVEMENT AT ANDERSON STREET/TIPPECANOE A VENUE SAN LOMA LINDA DESCRIPTION TOTAL AMOUNT BERNARDINO SHARE SHARE* Proportional Share of Cost in 100% 19.77% 80.23% City Limits Design Cost $52,800 $0% $52,800 I Construction $98,505 $29,000 $69,505 Contract Construction Engineering & $9,000 $2,700 $6,300 Inspection Total Project Cost $160,305 $31,700 $128,605 *Maximum participation by SAN BERNARDINO shall not exceed $31.700. f:IPlIlJlic Works Admin \A GREEMENTS-CITY CLERK\}! Agr Traffic Signal Alldersoll-TljJ/)(!CQIU)(!.drH" OFFICE OF THE CITY CLERK RACHEL G. CLARK, C.M.C. - CITY CLERK 300 North "D" Street. San Bernardino' CA 92418-0001 909.384.5002' Fax: 909.384.5158 www.ci.san-bernardino.ca.us ,. December 6, 2002 Pamela Byrnes-O'Camb, City Clerk City of Lorna Linda 25541 Barton Road Lorna Linda, CA 92354 Dear Mrs. Byrnes-O'Camb, At the Mayor and Common Council meeting of December 2, 2002, the City of San Bernardino adopted Resolution 2002-370 - Resolution authorizing the execution of a cooperative agreement between the City of San Bernardino and the City of Loma Linda for traffic signal improvement at Anderson Street and Tippecanoe Avenue. Enclosed is one (1) original agreement. Please obtain signatures in the appropriate locations and return the original agreement to the City Clerk's Office, Attn: Michelle Taylor, P.O. Box 1318, San Bernardino, CA 92402, as soon as possible. Once returned, you will be provided with a certified copy of the resolution and agreement. Please be advised that the resolution and agreement wiIJ he null and void if not executed within 60 days, or by January 31, 2003. If you have any questions, please do not hesitate to contact me at (909)384-5002. Sincerer'. ftl. (/; {~~ Michelle Taylor Senior Secretary Enclosure CITY OF SAN BERNARDINO ADOPTED SHARED VALUES: Integrity' Accountability' Respect for Human Dignity' Honesty '. City Of Lorna Linda 25541 Barton Road, Lorna Linda, California 92354-3160 '_I~~ ~) 799-2890 Sister City - Manipal, Karnataka, India '03 JAM -2 P 1 :53 December 27, 2002 Michelle Taylor Office of the City Clerk City of San Bernardino P. O. Box 1318 San Bernardino, CA 92402 Dear Ms. Taylor: Cooperative Agreement - Traffic Signal Improvement at Anderson Street and Tippecanoe Avenue Enclosed, per your instructions, is a fully signed Cooperative Agreement between the Cities of Lorna Linda and San Bernardino relating to the traffic signal improvement at Anderson Street and Tippecanoe Avenue. Subject: I understand a certified copy of the City of San Bernardino Resolution 2002-370 and Agreement will be returned to me for the City's records. Ifanything further is needed, please contact me (909) 799-2819. Sincerely, ~~-i)~ Pamela Bymes-O'Camb City Clerk Enclosure Recycled paper ", CITY OF SAN BERNARDINO Interoffice Memorandum CITY CLERK'S OFFICE Records and Information Management (RIM) Program DATE: January 2, 2003 TO: Mike Grubbs, Field Engineer FROM: Michelle Taylor, Senior Secretary RE: Resolution 2002-370 - Agreement with City of Loma Linda CC: Veronica Martinez, Senior Secretary Attached is a fully executed copy of the cooperative agreement with the City of Lorna Linda for traffic signal improvements at Anderson Street and Tippecanoe A venue, The original agreement is on file in the City Clerk's Office, If you have any questions, please call me at ext. 3206, . OFFICE OF THE CITY CLERK RACHEL G. CLARK, C.M.C. - CITY CLERK 300 North '"D" Street. San Bernardino. CA92418-0001 909.384.5002. Fax: 909.384.5158 www.ci.san-bernardino.ca.lis ,. January 2,2003 Pamela Byrnes-O'Camb, City Clerk City of Lorna Linda 25541 Barton Road Lorna Linda, CA 92354 Dear Mrs. Byrnes-O'Camb, Enclosed is one certified copy of City of San Bernardino Resolution 2002-370 and the cooperative agreement between the City of San Bernardino and the City of Lorna Linda for traffic signal improvement at Anderson Street and Tippecanoe Avenue. If you have any questions, please do not hesitate to call me at (909)384-5002. Sincerely, , , 'i)/ t (~l( <.. .J') (~'- Michelle Taylor ' Senior Secretary Enclosure CITY OF SAN BERNARDINO ADOPTED SHARED VALUES: Integrity. Accountability. Respect for Human Dignity. Honesty ""< .' ** FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT ** RESOLUTION AGENDA ITEM TRACKING FORM Meeting Date (Date Adopted): 12-Z-<:>2... Item # IS Vote: Ayes 1,3- ') Nays Qr Change to motion to amend original documents: - Resolution # 7062:- 3 '10 Abstain.c;;r Absent 1-.. Reso. # On Attachments: -L Contract term: - Note on Resolution of Attachment stored separately: ~ Direct City Clerk to (circle 1): PUBLISH, POST, RECORD W/COUNTY NulllVoid After: leo DPYYS J ,- 31-0,"~ By: .- Date Sent to Mayor: 1"- 3-02- Date of Mayor's Signature: 12- '-j-02- Date of Clerk/CDC Signature: (2 - S - 02- Reso. Log Updated: V Seal Impressed: v Date MemolLetter Sent for Signature: ! ;) -eo 'Ocr 60 Day Reminder Letter Sent on 30th day: 90 Day Reminder Letter Sent on 45th day: See Attached:/ Date Returned: t -:.? - 63 See Attached: See Attached: Request for Council Action & Staff Report Attached: Yes / Updated Prior Resolutions (Other Than Below): Yes Updated CITY Personnel Folders (6413, 6429, 6433, 10584, 10585, 12634): Yes Updated CDC Personnel Folders (5557): Yes Updated Traffic Folders (3985, 8234,655,92-389): Yes No By No ~ By No -L By No -4 By No~ B Copies Distributed to: City Attorney ./ Parks & Rec. Code Compliance Police Public Services Dev. Services / EDA Finance / MIS Water Others: Notes: BEFORE FILING. REVIEW FORM TO ENSURE ANY NOTATIONS MADE HERE ARE TRANSFERRED TO THE YEARLY RESOLUTION CHRONOLOGICAL LOG FOR FUTURE REFERENCE (Contract Term, etc.) Ready to File: JlJf.- Date: \<}-03 Rev ised 0 I /12/0 I