HomeMy WebLinkAbout30-Development Services
e
..e
e
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
From: Valerie C. Ross, Director
Dept: Development Services
Date: May 1, 2007
Subject: Specific Plan Amendment No. 06-
03, Tentative Parcel Map No. 17887,
Variance No. 07-08, Development Permit 2
NO.06-06 - Hillwood Southgate Project.
MCC Date: May 21, 2007
Synopsis of Previous Council Action: None
Recommended Motion:
That the hearing be closed and that the Mayor and Common Council adopt the resolution to
amend the Specific Plan and approve Tentative Parcel Map No. 17887, Variance No. 07-08,
and Development Permit 2 No. 06-06 based upon the Findings of Fact and subject to the
Conditions of Approval and Standard Requirements.
~?1<Hr
Contact person:
Valerie C. Ross
RrianFnntF! A!:!:ndatF! PlannF!r
Supporting data attached:
Staff Reoort
FUNDING REQUIREMENTS:
Amount:
Source: (Acct. No.)
(Acct. Description)
Council Notes:
phnnA" 3R4-5057
Ward:
1
N/A
Finance:
Agenda Item No. ... ~O
S / '-I }/)7
e
e
e
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
STAFF REPORT
SUBJECT:
Specific Plan Amendment No. 06-03, Variance No. 07-08,
Tentative Parcel Map No. 17887 (Subdivision No. 06-13), &
Development Permit 2 No. 06-06
OWNERlAPPPLICANT:
OWNERlLESSEE:
Hillwood Investment Properties
Ned Sciortino, Vice President of Development
105 N. Leland Norton Way, Suite 3
San Bernardino, CA 92408
(909) 382-0033
BACKGROUND
Inland Valley Development Agency
Mike Burrows, Assistant Director
294 S. Leland Norton Way, Suite 1
San Bernardino, CA 92408
(909) 382-4100
The Inland Valley Development Agency (IVDA) submitted an application to amend the
San Bernardino International Trade Center Specific Plan. Hillwood Investment
Properties, LLC, submitted applications to construct warehouse/distribution facilities and
consolidate parcels and resubdivide for the project. The proposed distribution centers
will be located on approximately 159 acres located east of Tippecanoe Avenue, south of
San Bernardino International Airport, and north of the Santa Ana River (Exhibit 1).
Generally, the applications include the following:
San Bernardino International Trade Center SDecific Plan Amendment (SPA) No. 06-03
. Changes the name of the "San Bernardino International Trade Center SpeCific Plan"
to "San Bernardino Alliance California Specific Plan";
. Expands the Specific Plan area to include 32.6 acres of land adjacent to the current
Specific Plan boundaries;
. Updates the maximum allowable capacity of the Specific Plan, by transferring
approved unbuilt square-footage among planning areas;
. Changes the district names of the various planning areas within the Specific Plan to
Northgate, Centergate, Westgate, Southgate, 3rd Street, and D.F.A.S.; and
. Provides for a future boundary adjustment to the 3rd Street District.
Tentative Parcel MaD No. 17887
Consolidates parcels to accommodate the project with ten new parcels, as follows:
. Parcel 1 - Building 1 (- 2.4 acres)
. Parcel 2 - Building 2 (- 5.2 acres)
. Parcel 3 - Building 3 (- 8.4 acres)
. Parcel 4 - Building 4 (- 33.8 acres)
. Parcel 5 - Building 5 (- 34.7 acres)
e
e
e
SPA 06-03, TPM 17887, VAR 07-Q8, DP2 06-06
Hearing Date: May 21, 2007
Page 2
. Parcel 6 - Building 6 (- 26.3 acres)
. Parcel 7 - Open Space (- 7.5 acres)
. Parcel 8 - Buildings A through T (- 13.5 acres)
. Parcel 9 - Detention Basin (- 5.0 acres)
. Parcel 10 - Detention Basin (- 2.8 acres)
Variance No. 07-08
A request for approval of the subdivision with one standard route of access and two
non-standard routes of emergency access.
DeveloDment Permit 2 No. 06-06
The Southgate development project represents a major effort by Hillwood Investment
Properties in conjunction with the Inland Valley Development Agency (IVDA) to
redevelop lands around San Bernardino International Airport and stimulate economic
development with 6 large warehouse/distribution facilities and 18 smaller light industrial
buildings for a total of 2,979,416 square-feet of floor space, and related on-site and off-
site improvements.
Please refer to the Planning Commission staff report (Exhibit 2) for a complete
discussion. At the April 17, 2007, Planning Commission hearing, the Commission voted
to continue the item to May 8, 2007, pending submittal of written documentation of the
Fire Marshal's recommendation. On May 8, 2007, the Planning Commission voted to
move the project to the Mayor & Common Council with a recommendation for approval.
FINANCIAL IMPACT
None. The applicant paid the filing fees for all applications.
RECOMMENDATION
That the hearing be closed and that the Mayor & Common Council adopt the resolution
to amend the Specific Plan and approve Tentative Parcel Map No. 17887, Variance No.
07-08, and Development Permit 2 No. 06-06, based upon Findings of Fact and subject
to the Conditions of Approval and Standard Requirements contained in the Planning
Commission Staff Report dated April 17, 2007.
EXHIBITS:
1
2
3
4
Location Map
Planning Commission Staff Report dated April 17, 2007
Memorandum from Fire Marshal
Resolution
Exhibit 1
SPA 06-03, TPM J 7887, VAR 07-08, DP206-00
Hearing Date: May 2 J, 200-
It)
\
J '~i'
I '
IlL
" f""'.'
.:''''
. -;;:
\"'~
...-.......
\ .~
\ .
,
. .,
:.1..
-\
. ,,', \ qIt.
. :. '..\:
(\II/) ~
... ''>
~u w
~
..0 'C 0
,- ... '"
.s::::1/) c..
X'- u
UJO "
:>
Q} 0
:I:
I/) W
r.: ::J '"
" ... <(
< .~w~ "0 ;:
Z :.I I:! ~ ~ 0:: W
t ,.. -c tJ 0( ti c: ~
'" <(
-c CI.o:: '" "
<< O~:.l:C ...J
... ~!; ~ ~ :I:
... ~
I v. !3 0 :oJ 0 = ;". c: :>
Q)S c; . Z U lJl f- :: '" 0
C!)
a..
i <r"""NC")~Ll)(O U
to::
Ilrnl~1 'u
Q}
< 0-
r.:
" en
<
'"
c:
...
~
'"
()
Q}
U
c:
'"
<(
0
c:
"0
...
'"
c:
...
Q)
III
c:
'"
en
e
.......-.""
!
I
-.-----."
, .'
e
,
!
!
I
I
-1,
.
\
,.
,.
'-,~
.'
'.
\
.
'.
I .
"'
\ ~
c 11l E
~
~ o. .
~ i ... j
...
u 0
I ~ z
! d'
~
0 ' ,
iC-'"
c ~-
" , ."""" ~ ~
I ;~1~
'"
e Ii ,~h
-- C!)
~ ,- "
..1... fl ~
.ll ,- . ~
l ~
~--
e
e
e
.~
Exhibit 2
()
SUMMARY
CITY OF SAN BERNARDINO PLANNING DIVISION
CASE:
Specific Plan Amendment No. 06-03, Tentative Parcel Map No. 17887,
Variance No. 07-08, Development Permit Type 2 No.06-06
3
April 17, 2007
1
AGENDA ITEM:
HEARING DATE:
WARD:
OWNER/APPLICANT:
OWNER/LESSEE:
Hillwood Investment Properties
Ned Sciortino, Development Director
105 N. Leland Norton Way, Suite 3
San Bernardino, CA 92408
(909) 382-0033
Inland Valley Development Agency
Donald L. Rogers, Executive Director
294 S. Leland Norton Way, Suite 1
San Bernardino, CA 92408
(909) 382-4100
REQUEST & LOCATION:
A proposal to amend the San Bernardino International Trade Center Specific Plan, to change the
name to "San Bernardino Alliance California Specific Plan", to modify and rename the planning
areas within the Specific Plan, add 32.6 acres ofland to the Specific Plan area for a new total of
657.2 acres, and increase the total allowable building square footage. Also a request to subdivide
approximately 159 acres into 10 parcels with a variance to permit one standard and one non-
standard means of access, and a request to construct approximately 2,784,425 square-feet for
warehouse/distribution facilities and light industrial uses. The existing Specific Plan area is
approximately 625 acres surrounding San Bernardino International Airport (SBIA) to the north,
south and west. The development project site is located south of SBIA, north of the Santa Ana
River, and east of Tippecanoe Avenue in the lTC, International Trade Center Specific Plan area
and the IL, Industrial Light land use district.
CONSTRAINTS & OVERLAYS:
Biological Resources, Flood Hazard, Liquefaction Susceptibility, Ground Subsidence
ENVIRONMENTAL FINDINGS:
o Addendum to Previous Environmental Impact Report
o Mitigation Measures and Mitigation Monitoring/Reporting Program
o Negative Declaration
o No Significant Effects
ST AFF RECOMMENDATION:
o Approval with Conditions
o Denial
o Continuance to:
()
SPA 06-0ryM /7887. VAR 07-08. DP206-06
\.JiI Hearing Date: April!7. 2007
Page 2
e REOUEST & LOCATION
The development site is the former Palm Meadows Golf Course located south of the San
Bernardino International Airport. The project site is located on the north and south sides of
Central Avenue (formerly Palm Meadows Drive) which extends east of Tippecanoe Avenue, and
north and northwest of the Santa Ana River channel (Attachment A). The applicant requests
approval of a Specific Plan Amendment to modify and update the International Trade Center
Specific Plan (see Table 1), a Tentative Parcel Map to subdivide approximately 159 acres into 10
parcels, and, a Development Permit to construct 6 large warehouse/distribution facilities and 18
smaller light industrial buildings for a total of 2,784,425 square-feet (see Table 2).
e
The proposed Specific Plan Amendment is summarized by the following modifications:
I) Change the name of the "San Bernardino International Trade Center Specific Plan" to "San
Bernardino Alliance California Specific Plan";
2) Expand the ITCSP area to include 32.6 acres ofland adjacent to the current boundaries;
3) Change the district names of the various ~Ianning areas within the Specific Plan to
Northgate, Centergate, Westgate, Southgate, 3' Street, and D.F.A.S.;
4) Provide for a future boundary adjustment to the 3'd Street District;
5) Change in Floor-Area Ratio for industrial uses in the Southgate district from 0.25 to 0.5;
6) Change the name of Palm Meadows Drive to Central Avenue; and
7) Update the maximum allowable capacity of the Specific Plan by transferring approved
unbuilt square-footage among planning areas, resulting in an additional 1,972,375 square-feet
for use by current and future projects.
e
TABLE 1. Summarv of Pro Dosed Changes to the ITC SDecific Plan.
DISTRICT NAME CURRENT PLAN PROPOSED PLAN NET CHANGE
Southgate 128.5 acres 151.5 acres + 23 acres
2,172,446 sq. ft. 3,299,757 sq. ft. + 1,127,311 sq. ft.
D.FAS. Not a Part 9.6 acres + 9.6 acres
209,088 sq. ft. + 209,088 sq. ft.
Northgate 138.8 acres 138.8 acres + 635,976 sq. ft.
2,225,916 sq. ft. 2,861,892 sq. ft.
Centergate 154.9 acres 154.9 acres No Change
3,373,286 sq. ft. 3,373,286 sq. ft.
I Westgate 152.8 acres 152.8 acres No Change
I 3,327,984 sq. ft. 3,327,984 sq. ft.
. 3 ,d Street 49.6 acres 49.6 acres No Change
1,080,288 sq. ft. 1,080,288 sq. ft.
TOTAL 624.6 acres 657.2 acres + 32.6 acres
12,179,920 sq. ft. 14.152,295 sq. ft. + 1,972.375 sq. ft.
e
e
e
E1t
SPA 06-03f!}'JliM 17887, VAR 07-08, DP206-06
\iilI Hearing Dare: April 17, 2007
Page 3
The Development Permit proposes a total of 24 industrial buildings for a total of approximately
2,800,000-sq.ft. (see Table 2). The 6 large warehouse/distribution facilities will be constructed
on the north side ofa 0.9-mile extension of Central Avenue. The 18 smaller buildings (a total of
194,803-sq.ft.) for light industrial uses will be constructed as a multi-tenant complex on the 13Yz-
acre site located at the southeast comer of Tippecanoe and Central Avenues. Two large
detention basins will be constructed on approximately 8 acres on the south side of Central
Avenue to accommodate runoff from this project. The precise sizes of the large
warehouse/distribution facilities may vary depending on the needs of the prospective tenants.
TABLE 2 S
fP
dP
b T
fL dU
dS
ummary 0 ro ose arce s an tructures, lY l ype 0 an se.
TYPE OF PARCEL PARCEL SIZE TOTAL ACRES STRUCTURE SIZE
LAND USE NUMBER (ACRES) BY LAND USE (SQ. FT.)
1 2.4 38,723
I 2 5.0 98,799
Warehouse &
Distribution 3 6.5 119,939
Facilities 125.9
4 21.3 366,261
5 57.3 1,251,360
6 33.4 714,540
Open Space 7 7.5 7.5 N/A
Light Industrial 8 13.5 13.5 194,803
9 5.0 N/A
Detention 7.8
Basins 10 2.8 N/A
N/A
Not a Part NAP. 3.8 -
TOTAL SIZE - 158.5 154.7 2,784,425
SETTING & SITE CHARACTERISTICS
The site is generally flat, with a slope of approximately 1-2% to the south. To the north is the
San Bernardino International Airport in the A, Airport land use district. To the west is
Tippecanoe Avenue, and industrial properties beyond Tippecanoe including the former Defense
Finance & Accounti'ng Service (DFAS) facility proposed for addition to the Specific Plan area.
From the northeast comer to the southwest comer of the property, comprising the southeasterly
boundary, is the Santa Ana River channel in the PFC, Public Flood Control land use district.
e
e
e
~~.
'.-
\-,
SPA 06-03l"fJ!iM / 7887. VAR 07-08. DP206-06
I;;;iI Hearing Date: April /7. 2007
Page 4
The previous land use for a majority of the site was the Palm Meadows Golf Course on the
former Norton Air Force Base. A 3.8-acre portion in the middle of the site (labeled Not a Part)
contains a component of the Air Force use of the property, a former water treatment plant that is
near final remediation. The Air Force Real Property Agency is in the process of completing its
remediation work and the property is currently in escrow. Also, located on Yz-acre approximately
in the center of the site, there is a water pumping facility owned and operated by the Riverside
Municipal Water District and will remain in place.
BACKGROUND
The Mayor & Common Council adopted the San Bernardino International Trade Center (ITC)
Specific Plan in 1996. The ITC Specific Plan includes the non-airport portions of the former
Norton Air Force Base that were conveyed to the Inland Valley Development Agency (IVDA)
for economic development purposes. In conjunction with adoption of the Specific Plan, the
Mayor & Common Council certified a Final Environmental Impact Report (EIR) and certified a
Traffic Impact Analysis pursuant to the Congestion Management Program.
Initially, the Specific Plan was intended to accommodate a World Trade Center project. When
that concept proved infeasible, the IVDA requested amendments to allow for more traditional
development that could be accommodated in the area. In 1999, the Mayor & Common Council
amended the ITC Specific Plan to expand the permitted uses, and determined that the changes
were within the scope of the previously certified EIR.
In 2003, the IVDA entered into an agreement designating Hillwood Investment Properties as the
Master Developer to redevelop areas on and around the former base. Since that time, Hillwood
has successfully developed several properties within the ITC Specific Plan as well as other
properties in the vicinity, achieving a number of economic development goals of the IVDA and
the City. The IVDA and Hillwood now request a Specific Plan Amendment to further implement
redevelopment and economic development goals in conjunction with recent and current
development plans.
CALIFORNIA ENVIRONMENTAL OUALITY ACT (CEOAl
The Mayor & Common Council previously certified a Final Environmental Impact Report (EIR)
in conjunction with adoption of the ITC Specific Plan on March 4, 1996. The EIR (SCH
#90020109) considered all potential effects, evaluated project alternatives, and included
mitigation measures for land use, hydrology, water resources, biological resources,
transportation/traffic, air quality, geology and soils, hazardous waste/materials, and public
services. The EIR contained a full range of mitigation measures, which are included in the
updated Mitigation MonitoringIReporting Program (MMRP) attached herewith as Attachment E.
An Initial Study has been prepared to analyze the current applications, in compliance with
CEQA, and concludes that a subsequent EIR is not required pursuant to CEQA Guidelines
Section 15162 and Public Resources Code Section 21166. The Initial Study, including new and
updated mitigation measures, is proposed for adoption as an Addendum to the previously
certified EIR for the ITC Specific Plan.
.
.
.
()
SPA 06-0!l!'!1iM J 7887, VAR 07-08, DP206-06
I...jJ Hearing Date: April J 7, 2007
Page 5
FINDINGS & ANALYSIS
SPECIFIC PLAN AMENDMENT
], Is the proposed amendment consistent with the General Plan and the San Bernardino
International Trade Center Specific Plan?
The proposed amendment is consistent with the General Plan and the ITC Specific Plan,
The purpose of the proposed ameI).dment is to maximize economic development
opportunities, consistent with the General Plan land use policies for the Tippecanoe
Strategic Area. The proposal for incorporating 32.6 acres of land that is located adjacent
and contiguous to the ITC Specific Plan, transferring square-footage between planning
areas for maximum build-out potential, and other related text changes will facilitate the
following Goals of the Specific Plan and their applicable policies.
Goal I : Replace lost jobs with new job generating uses and quality projects.
Goal 2: Integrate the Norton Air Force Base site back into the physical structure of the
community.
Goal 3: Create a development plan which will have the effect of generating financial
reinvestment on-site and within the community.
Adoption of the amendment to the ITC Specific Plan will enable the proposed Hillwood
Southgate project (and subsequent projects) to proceed as intended, thereby fulfilling the
purpose of the Specific Plan and implementing the General Plan. The current and future
projects in the Specific Plan area will not only retain local jobs, but also provide
opportunities for new jobs as the current and future projects are completed.
2,
Would the proposed amendment be detrimental to the public interest. health, safety,
convenience, or welfare of the City?
The proposed amendment will not be detrimental to the public interest, health, safety,
convenience, or welfare of the City in that it maintains land use designations that will
enable reuse of the former military base, avoid deterioration of the site, and promote
higher land values. The amendment includes provisions for connecting to City water,
sewer, and storm drain systems, fire services by the City's Fire Department, and private
security services under the supervision of the City's Police Department. The project
Initial Study and Addendum have analyzed the potential impacts related to the proposed
amendment and the project, and determined that there will be no new impacts that have
not been previously analyzed and planned for mitigation or avoidance.
3.
Will the proposed amendment maintain the appropriate balance of land uses within the
City?
The amendment proposes to add 32.6 acres of land, transfer square-footage between
planning areas, and rename the planning areas within the existing ITC Specific Plan. The
amendment does not negatively impact the balance of land uses within the City or within
the Specific Plan. The proposed warehouse/distribution facilities and other uses are
e
e
e
~
SPA 06-00M 17887, VAR 07-08, DP206-06
J Hearing Date: April!?, 2007
Page 6
consistent with the Specific Plan. The D.F.A.S. facility is existing and will not affect the
balance of land uses. The 23-acre addition to the Southgate District within the Specific
Plan is proposed for a multi-tenant light industrial complex that is consistent with its
previous IL, Industrial Light land use designation.
4.
In the case of an amendment to the General Plan Land Use Map, are the subject parcels
physically suitable (including but not limited to, access, provision of utilities,
compatibility with adjoining land uses, and absence of physical constraints) for the
requested land use designation and the anticipated land use development?
The 32.6 acres of land that is proposed to be incorporated into the Specific Plan area is
physically suitable for the anticipated land use designations and development, as
indicated in the proposed revisions for Specific Plan Amendment No. 06-02. The 9.6
acres that comprise the former D.F.A.S. facility have been developed to the maximum
practical extent, and that facility is not expected to expand. The 23 acres proposed for
addition to the Southgate planning area is physically suitable for development, as
indicated on the plans submitted for Development Permit 2 No. 06-06 and Tentative
Parcel Map No. 17887. The Specific Plan area and the Southgate project include
integrating and installing connections to the City's existing street, water, sewer, and
storm drain systems.
TENTATIVE PARCEL MAP
1.
Is the proposed map consistent with the General Plan and Development Code?
The proposed subdivision is consistent with the applicable development standards of the
Specific Plan as well as the General Plan. The parcels created will meet the lot siie, lot
coverage, and development standards as described in Table 3. General Plan Policy 2.7.5
requires that development be contingent upon the ability of public infrastructure to
provide sufficient capacity to accommodate its demands, and the proposed project will
provide connections to City water and sewer services, roads, storm drains, and public
utilities, in addition to payment of applicable Development Impact Fees.
The project will include an extension of Central Avenue approximately 1 mile in length
between Tippecanoe Avenue and Mountain View Avenue. The new segment of Central
Avenue will connect to Mouhtain View Avenue after SANBAG and IVDA construct a 4-
lane bridge over the Santa Ana River, which will connect the project to Interstate 10 via
the Mountain View Avenue interchange. The new bridge will ultimately provide traffic
relief along Tippecanoe Avenue, as well as the Interstate 10 interchange at Tippecanoe
Avenue. Other project-related improvements will include a new storm drain along
Tippecanoe Avenue, re-routing and improving drainage from the airport around the
project site, new sidewalks and pavement along Tippecanoe Avenue, as well as fair share
contributions for various off-site traffic system improvements. The project Initial Study
. and supporting technical studies discuss these topics in greater detail, and are
incorporated by reference in the MMRP (Attachment E) and the proposed Addendum
(Attachment F).
r--
.
.
e
'()
SPA 06-0~M J 7887, VAR 07-08, DP206-06
\J Hearing Dale: April J 7, 2007
Page 7
S 'fi I &G
IPI C
TABLE 3, SoeCllC Pan enera an onslstenCy
CATEGORY PROPOSAL SPECIFIC PLAN GENERAL PLAN
Permitted Parcel Map Subdivision Consistent Consistent
Use
Lot Area 2,4 - 34.7 acres No minimum N/A
Lot Frontage More than 100 ft. each 100 ft. (min.) N/A
Floor-Area 0.22 to 0.50 0.50 (maximum) Consistent
Ratio
2.
Is the design of the proposed subdivision consistent with the General Plan?
The subdivision design is consistent with a number of General Plan policies and
objectives. Goal 2.2 promotes development that integrates with and minimizes impacts
on surrounding land uses, and the project site is surrounded by industrial and aviation
uses. Land Use Policy 2.5.6 require~ that new development be designed to complement
and not devalue the physical characteristics of the surrounding environment, including
consideration of the site's natural topography. The project will preserve open space
located adjacent to the Santa Ana River in compliance with this policy. The proposed
project has been designed and conditioned to ensure orderly development that will be
compatible with the existing and planned character of the area.
3.
Is the site physically suitable for the type of proposed development?
The proposed subdivision conforms to the subdivision design standards for minimum lot
size and lot coverage as specified by the Development Code. The proposed uses are
industrial and will be consistent with the ITC Specific Plan as well as the underlying
Industrial land use districts.
The location is unique in that eXlstmg topography and pre-exlstmg developrpent
surrounding the site restricts the number of viable access points. To the north is an
existing airport, and to the east and south is the Santa Ana River channel. The only viable
point of access available to the site is from the intersection of Central and Tippecanoe
Avenues. A standard secondary point of access will not become available until SANBAG
constructs the 4-lane bridge over the Santa Ana River to connect to Mountain View
Avenue. A Variance is requested for one standard means of access during the interim
time period. A secondary route for emergency access will be provided along the northerly
property line, taking access from Tippecanoe Avenue with an easement from the San
Bernardino International Airport Authority, Connecting to the existing infrastructure
surrounding the site will provide the necessary water, sewer, electricity, storm drain, and
utility services.
e
e
e
~.
\II
SPA 06-03('!'!!iM 17887, VAR 07-08, DP2 06-06
I.JI Hearing Date: April!7, 2007
Page 8
4.
Is the site physically suitable for the proposed density of development?
The site is physically suitable for the subdivision, and each of the proposed parcels will
meet the provisions of the Development Code, The maximum allowable Floor-Area Ratio
is 0.5 in the ITC Specific Plan, and the maximum proposed Floor-Area Ratio of any
parcel will be 0.5 (see Table 2). The trip generation rate for high-cube warehouses is
expected to result in less overall traffic than if the site is developed with higher-intensity
Light Industrial or Heavy Industrial uses. The site design is suitable for the proposed uses
in that the project is consistent with all development standards such as setbacks, lot
coverage, parking, loading, landscaping, etc. The proposed density of development can
be accommodated on the proposed parcels.
5.
Is the design of the subdivision likely to cause substantial environmental damage, or
substalttially and unavoidably injure fish or wildlife or their habitat?
The proposed subdivision will not cause substantial environmental damage or injure fish
or wildlife or their habitat. The proposed project is consistent with the ITC Specific Plan,
for which an EIR was previously certified in 1996. All potentially significant effects have
been previously identified and analyzed in the ITC Specific Plan EIR. This project will
be subject to the mitigation measures detailed in the EIR and MMRP (Attachment E),
incorporated by reference in the Conditions of Approval and Standard Requirements, The
DIERC and the Planning Commission have independently reviewed and analyzed the
proposal, and have exercised independent judgement in consideration of the proposed
project. Considera!ion of the current application does not require preparation of a
subsequent EIR, pursuant to CEQA Guidelines Section 15 I 62 or Public Resources Code
Section 21166, because the current application does not involve:
a) Substantial changes to the project analyzed in the EIR which would involve any new
significant effects on the environment or substantially increase the severity of
previously identified impacts;
b) Substantial changes with respect to the circumstances under which the project is
being undertaken which would involve new significant effects on the environment not
analyzed in the EIR; or
c) New information of substantial importance which would involve new significant
effects on the environment not previously analyzed in the EIR which would
substantially increase the severity of previously idimtified impacts.
6.
Is the design of the subdivision likely to cause serious public health problems?
The design of the subdivision is not likely to cause serious public health problems. The
Specific Plan EIR examined the presence and extent of environmental impacts including
public health and safety problems. Through the project's design, Conditions of Approval,
and mitigation measures, the potential impacts to public health and safety can be
mitigated to less than significant levels. The project includes a request for a Variance
from the requirement to provide two standard means of access to a new subdivision, The
Fire Marshal recommended approval of the interim emergency access planned for the
project site.
e
e
e
.
SPA 06-0?('j!l/lfiM J 7887, VAR 07-08, DP2 06-06
VI Hearing Date: April J 7, 2007
Page 9
7.
Will the design of the subdivision or the type of improvements conflict with any
easements, acquired by the public at large, for access through or use of. property within
the proposed subdivision?
The design of the subdivision and the proposed improvem~nts will not conflict with any
public easements, The existing drainage pattern from the airport and runway will not be
obstructed, and future drainage from the airport will be facilitated by the construction of
on-site and off-site improvements associated with this project. The extension of the
portion of Central Avenue east of Tippecanoe Avenue will be dedicated and improved as
a public road to facilitate traffic flow, The City Engineer will review and approve all
documentation relating to easements, dedications, and improvements prior to recordation
of the Final Map.
VARIANCE
1.
Are there special circumstances applicable to the property, including size, shape,
topography, location or surroundings. such that the strict application of this
Development Code deprives such property of privileges enjoyed by other property in the
vicinity and under identical land use district classification?
I
The applicant is requesting approval of a Variance to permit one standard route of access.
The circumstances applicable to the property, specifically topography and surrounding
development, prevent a second route of access into the project site at this time. To the
south and east, a second means of access is infeasible due to the Santa Ana River
channel. To the north, the existing airport and runway prevent a standard route of access
to the subdivision. A pending SANBAG project to construct a bridge and 4-lane road
over the Santa Ana River to connect to Mountain View Avenue will provide the second
standard route of access, and will ensure compliance with the Specific Plan as well as the
General Plan Circulation Element.
2.
Is the granting of the Variance necessary for the preservation and enjoyment of a
substantial property right possessed by other property in the same vicinity and land use
district and denied to the property for which the Variance is sought?
The existing properties in the vicinity have industrial, aviation, and office related uses
that were previously developed when the airport was an active Air Force base, as well as
warehouse/distribution facilities that have been recently constructed. The proposed
development will be consistent with the development standards imposed upon
surrounding developments, and will be consistent with the type of redevelopment
envisioned by the Specific Plan. Strict application of the requirement for a second
standard route of access (pending construction of the bridge) would prevent economically
viable development of the site, due to the significant cost and time required to build the
bridge.
e
e
e
(t
SPA 06-0!I!"!JBM /7887. VAR 07-08. DP206-06
'<i:ifI Hearing Dale: April /7. 2007
Page /0
3.
Will granting the Variance be materially detrimental to the public health, safety. or
welfare or injurious to the property or improvements in such vicinity and land use district
in which the property is located?
Granting the proposed Variance will not be materially detrimental to the public health,
safety, or welfare according to the determination and concurrence of the Fire Chief, the
City Engineer, and the Development Services Director. Granting the Variance will be
consistent with the criteria provided for an exemption from the access standards pursuant
to Development Code 9l9.30.200(6)(A). The project will include an emergency access
road from the airport, which will allow emergency ingress and egress in the event that
Central Avenue is not accessible from Tippecanoe Avenue. Granting the Variance will
not result in any injurious effects to properties or improvements in the vicinity, since the
proposed Central Avenue extension will serve only this project and will not affect any
other development.
4.
Will granting the Variance constitute a special privilege inconsistent with the limitations
upon other properties in the vicinity and land use district in which such property is
located?
Granting the proposed Variance will not constitute a special privilege inconsistent with
the limitations upon other properties in the vicinity and land use districts. Approval ofthe
subdivision with an interim secondary emergency access driveway will allow the project
to develop in an orderly manner" similar to other properties in the vicinity. The
development will be consistent with overall plans for redevelopment of the area as
envisioned in the ITe Specific Plan.
5.
Will granting the Variance allow a use or activity which is not otherwise expressly
authorized by the regulations governing the subject parcel?
Granting the proposed variance will not permit a use or activity that is not authorized by
the ITC Specific Plan. The proposed uses include warehouse/distribution facilities and
light industrial businesses (e.g. assembly, manufacturing, wholesale, distribution, etc.) all
of which are permitted in the ITC Specific Plan subject to Development Permit approval.
6.
Will granting the Variance be consistent with the General Plan?
Granting the Variance will be consistent with the goals and policies in the General Plan.
Land Use Policy 2.5.6 requires that new development be designed to complement and not
devalue the physical characteristics of the surrounding environment, and the proposed
project will enhance the surrounding development and improvements while appropriately
mitigating and avoiding potential environmental effects. Granting the Variance for one
route of access as an interim condition (until the Mountain View Avenue bridge is
constructed to provide a second means of access) will allow base redevelopment
consistent with the redevelopment goals of the IVDA and the City. Approval will
facilitate General Plan Circulation Policy 6.3.4 that requires appropriate right-of-way
dedications of all new developments to facilitate construction of roadways shown on the
Circulation Plan.
~----
e
e
e
o
SPA 06-00M 17887, VAR 07-08, DP206-06
-- Hearing Date: April J 7. 2007
Page J J
DEVELOPMENT PERMIT
}.
Is the proposed development permitted within the subject zoning district and does it
comply with all of the applicable provisions of the Development Code. including
prescribed development/site standards and any/all applicable design guidelines?
The proposed development and intended land uses are permitted subject to approval of a
Development Permit. The future businesses, such as warehouse/distribution facilities,
will be compatible with the ITC Specific Plan and will be consistent with Table V-2
(Suggested and Permitted Uses) in the Specific Plan. The project complies with the
development standards contained in the ITC Specific Plan as listed in Table 4. Within the
Southgate district of the Specific Plan, the maximum allowable building footprint is
3,299,757-sq.ft. and the proposed project will construct approximately 2,784,425-sq,ft.
Some of this square-footage is proposed to be transferred from other districts of the
Specific Plan. However, the development standards such as building size, lot coverage,
floor-area ratio, etc., will not exceed the allowable limits as indicated in Table 4.
TABLE 4. SDeclfic Plan & General Plan Consistency
CATEGORY PROPOSAL SPECIFIC PLAN GENERAL PLAN
Permitted Use Warehouse/Distribution, Permitted Consistent
Li"ht Industrial, etc.
Bldg. Size
- N. of Central 2,589,622 Sq. Ft. 2,797,292 Sq. Ft. max.
- S. of Central 194,803 Sq. Ft. 502,465 Sq. Ft. max. N/A
Total 2;784,425 Sq. Ft. 3,299,757 Sq. Ft. max.
Setbacks
-Front 19 ft. (min.) 19 ft. min. N/A
- Side o ft. (min.) o ft. min.
- Street Side 19 ft. (min.) 19 ft. min.
- Rear 5 ft. imin.) o ft. min.
Height 42 ft. (max.) 60 ft. max. N/A
Bldg.
Separation 20 ft. (min.) 20 ft. mID. N/A
Lot Coverage 21 % to 50% 75 % max. Consistent
,
I
, 0.22 to 0.50
i Floor-Area 0.5 max. Consistent
I Ratio
Parking 1 space per 1,250 sq. ft. 1 space per 1,250 sq.ft. N/A
e
e
e
~
SPA 06-03t'"(1iM J 7887. VAR 07-08. DP206-06
"'" Hearillg Date: April 17. 2007
Page J 2
,
Is the proposed use consistent with the General Plan?
The proposed development and intended uses will be consistent with the allowable uses
as listed in the Specific Plan (Tables V-2 and V-3) as well as the allowable uses listed in
the General Plan (Table LU-2) for the Industrial Light and the Industrial Heavy land use
districts. Specific Plan Policy G.3.4 requires screening of loading areas and storage areas
from public right-of-way by means of walls, fences, and landscaping. Community Design
Policy 5.7.7 requires minimizing the visual impact of parking lots by locating them
behind buildings or through perimeter landscaping, berming, and fencing. The proposed
project has been designed to implement these General Plan and Specific Plan policies.
3. Is the proposed development harmonious and compatible with existing and future
developments within the land use district and general area, as well as the land uses
presently on the subject property?
The proposed uses will be compatible with existing and future development in the
surrounding area. The existing properties in the vicinity have industrial, aviation, and
office related uses that were previously developed when the airport was an active Air
Force base, as well as several warehouse/distribution facilities that have been recently
constructed. The proposed development will be consistent with the development
standards imposed upon surrounding developments, and will be consistent with the type
of redevelopment envisioned by the Specific Plan.
4.
Is approval of the Development Permit for the proposed development in compliance with
the requirements of the California Environmental Quality Act and Section 19.20.030(6)
of the Development Code?
The project is consistent with the development analyzed in the ITC Specific Plan EIR,
prepared and certified in compliance with the requirements of CEQA and Development
Code 919.20.030(6). This project will be subject to tlie mitigation measures contained in
the certified EIR for the Specific Plan, as well as additional and updated mitigation
contained in the MMRP (Attachment E) and the proposed Addendum (Attachment F).
The D/ERC and the Planning Commission have independently reviewed and analyzed the
Addendum to the certified EIR, and have exercised independent judgement in
consideration of the proposed project. Consideration of the current application does not
require preparation of a subsequent EIR, pursuant to CEQA Guidelines Section 15162 or
Public Resources Code Section 21166, because the current application does not involve:
a) Substantial changes to the project analyzed in the EIR which would involve any new
significant effects on the environment or substantially increase the severity of
previously identified impacts;
b) Substantial changes with respect to the circumstances under which the project is
being undertaken which would involve new significant effects on the environment not
analyzed in the EIR; or
c) New information of substantial importance which would involve new significant
effects on the environment not previously analyzed in the EIR which would
.substantially increase the severity of previously identified impacts.
e
e
e
',--
~
SPA 06-0~M 17887, VAR 07-08, DP206-06
I!ioII1 Hearing Date: April 17, 2007
Page 13
5.
Are there potentially significant negative impacts upon environmental quality and
natural resources that could not be properZv mitigated and monitored?
The proposed project will cause no significant adverse impacts on environmental quality
that were not disclosed and analyzed in the ITC Specific Plan EIR that was completed
pursuant to the CEQA Guidelines and previously certified. The current proposed project
has been analyzed for its environmental effects and the findings have been documented in
the project Initial Study. This project will be subject to the mitigation measures detailed
in the updated MMRP (Attachment E) and the proposed Addendum (Attachment F)
incorporated by reference in the Conditions of Approval and Standard Requirements.
6.
Is the subject site physically suitable for the type and density/intensity of use being
proposed?
The site has an appropriate size and location for the proposed warehouse/distribution
facilities. The project requires a large amount of available land with ready accessibility to
freeways, which the site provides. Each of the proposed buildings will meet the
applicable provisions of the Specific Plan, including the development standards such as
setbacks, lot coverage, floor-area ratio, height, parking, loading, etc. The trip generation
rate for high-cube warehouses is expected to result in less overall traffic than if the site is
developed with higher-intensity Light Industrial or Heavy Industrial uses. The proposed
density/intensity of development can be accommodated on the project site.
7.
Are there adequate provisions for public access, water, sanitation, and public utilities
and services to ensure that the proposed use would not be detrimental to public health
and safety?
All agencies and City departments responsible for providing access, water, sanitation,
utilities, and other public services have had the opportunity to review the proposal. None
have indicated an inability to serve the proposed development. Constructing on-site
improvements will provide the ability to connect to the existing utility lines in the vicinity
for water, sewer, electricity, and utility' services. The project will not be detrimental to
public health and safety, subject to provision of the interim emergency secondary access
improvements specified by the Fire Marshal.
8.
Are the location, size, design, and operating characteristics of the proposed development
detrimental to the public interest, health, safety, convenience, or welfare of the City?
The project will not be detrimental to the public interest, health, safety, or welfare of the
City. The applicant has requested approval of a Variance for access, pursuant to
Development Code 9l9.30.200(6)(A), and appropriate Findings are provided in the Staff
Report. The future tenants must comply with the operating standards contained in the
Municipal Code and the Development Code. Therefore, the public health, safety,
convenience, and welfare will not be adversely affected, except for the potential effects
that have been addressed in the previously certified EIR for the Specific Plan.
~
SPA 06-0~M 17887. VAR 07-08. DP206-06
1..41 Hearing Date: April/7, 2007
Page /4
e
CONCLUSION
The proposed project is consistent with the San Bernardino International Trade Center Specific
Plan and the General Plan, The application meets all requirements to satisfy the Findings of Fact
for approval of the Specific Plan Amendment, Tentative Parcel Map, Variance, and
Development Permit.
RECOMMENDATION
Staff recommends that the Planning Commission make the following recommendations to the
Mayor & Common Council:
1.) Adopt the Addendum to the certified Environmental Impact Report (Attachment F); and,
2.) Approve Specific Plan Amendment No. 06-03, Tentative Parcel Map No. 17887 (Subdivision
No. 06-13), Variance No. 07-08, and Development Permit Type 2 No. 06-06 based on the
Findings of Fact contained in the Staff Report and subject to the Conditions of Approval
(Attachment C) and Standard Requirements (Attachment D).
Respectfully Submitted,
e 7~JAJ
for:
Valerie C. Ross
Development Services Director
~~
Brian Foote
Associate Planner
Attachment A
Attachment B
Attachment C
Attachment D
Attachment E
Attachment F
Location Map
Site Plans
Conditions of Approval
Standard Requirements
Mitigation MonitoringlReporting Program
Addendum to the EIR
e
'I
e
...,......"
!
I
.
,
,----.".
It)
\
e
,
!
~
ATTACHMENT A
ra SPA 06-03, TPM J 7887. VAR 07.08. DP2 06.0(
IJI Hearing Date. April J 7. 200'
.;',
1\.;11
1.
. r'"
t' .;,
\ "i
\,\
\"
:\\'"
\ . ~
'.\
. \
\. i.
~.~
\. ~~
, \,
~A~"
\:;,: . -.'.
\'; ,\ ,":
'. \ :.
. "
\ I - ~
I
I
i
I
(l()i
I
r.:
~ '" t;
Z ,,1-....
:01 ... <( ... ~
t ~~g~~
~~ ~nu~
Q . Z t.l tn ... =
. __NM..,LIHC
N III >-
-u ::l
.~ ~
.o.C 9
.-..... .....
L: III c..
X'- \,:J
wO g
Q) 0
III ~
~ ~
'0 ~
C ~
m <(
...J ~
>-
C :l
m g
a.
u
<;::
'u
Q)
c.
en
.!ll
C
....
~
ro
()
Q)
u
C
.!ll
<(
o
C
"E
m
C
....
Q)
CO
C
m
en'
I \
I,
\ w
~
. ~ E
i ~
5 ~ g ~
.. 0- j
I () 0
~ Z
Iii ,
~ . ~
~
" .
g - ,
tl ~=H~
e ~ " c
. "Iii
HL,OIl - S
"' 1'/11 L
a_ lii
"' ,.~ ~ '"
~ ,._ "8
L. .2~
S ,- .
,,::< ie
~ II'I~I
~ limlill [J
I \
~, ""\
.... (-.,6'
\\ \
I .... \
I i\ \ .
.,: '<~.<~ .........-:::)'"
, .
. ',::"
r ,',,-'. '"
_ / n~',
~-\:,: ." '"
,,'t.." ......-
.... ), al 0,
"';'-" III ~.\ \
,... :,'...., '-, \\.......::
.','. """~ ./(/
i ; ; "" v' ,/"\
,',: / ,..\
:; /:::"/'"':/ r-...::..~ \
':"~ '"
/' \~' L~ 'Ii' 'V
,...,.,. ........;\ "
/' .....'---'
'- ':,
\ L.:;'
\ \
\
\
, \
: ," \\
.~ '
I'\.....,--"
\,j)
e
e
e
.,
ATTACHMENT 88)
,
,
"-
'".
~"
. ,
'\ \',
,
,
,
,
,
,
,
,
,
, oj.
"~15-
" "+.
, .
, ......
'\~
,
,
,
,
,
,
,
,
,
,
\
,
,
,
,
,
\
,
,
\
\
\
\
\
\
\
\
I
I
1
1
1
1
1
1
1
,
I
,
1
1
1
1
1
1
1
I..
" ~
'"
1 ..
,~
1
I~
'~
I..
I
,
,
,
I
1
I
\
\
g
.
i
,
,
,
,
,
,
,
\
,
,
,
,
,
,
,
\
,
,
,
,
,
,
,
,
,
,
,
,
,
\
,
,
,
,
,
\
\
,
\
\
\
\
\
\
\
\
\
\
\
\
1
I
\
1
I
1
I
1
1
I
1
I
I
,
,
,
L-
\
,
,
,
,
,
,
,
,
,
,
\
\
\y~
YM
"~
~
't:?
,
\
\
,
\
,
,
\
.
.
Ii
Ii
"
\
\
\
~I
,
\.
'lA" 30".11:);"1.1.1.
-,
\
,
rill ,
:01 ..J . -
:<' <
Z u
'-"-. 0 .5
..,!< <0{
~, ...
WZ :>:
....a:, ,
~ ~Wi<:l . ~ ~ I
... J:~'f i,1
~' SOl -I!
,.
,,....-. i .: ,.
I~
i'i'~~~.i '-, n
--,
. {
, I
: II II. I I !il
I"hl lIi:i'
II" II' (il'l
II:!':I 1:.,,1 rill
.111,
! ~~i: ! 5~!
i.
" "
~~~g N Ii!~~
~ .~
. .::I....~
, ~ <:
3 -
~!:i~~ ~ ~U
. f~i1~ ""
f N ~.
~~~~ ~ ~;-
!l_~
. ~~.~
I,
3
~~li~ S ~3i~
. ~.~Q
,
3
~
o
g
o
5
"
"
13
I
I.
,
3
~!~~
~1I)i'~
N
i ~~~ ~
i~~~
~ :51'"
.
,
o
z
~ ~..,~ ~~
~~
0<
~~
'~ ~
~g
..
~ ~ 'I
t~
s ~ 'I
~ :
i
~. I
~ 1.1.
iEE
<<
~
I
.
i
· l
I. .
! .; 8' e
.~l-' .!
lCliili!~
~. ~ 'h~!Hi
oti~iJ!;:"Ca;1-
! :i 8: :
e
~! 1 I'
1'1' I.
'"I i I \ ~
i, i; : I I !
"; i ~'I ~ i
n :l!lil\: ,!
r~ q i'H:, d
'I d Il'll" i! I
'.\h"!I'I'::
~ !: ~ t:1 , ~ I I :
~-)~ -.'-.
::';3 .::~;e8r:::0',"-,<':-'. .:.,
~ ~:~
:1
I!
.
i
"
:
II
Ii/!
III!
1111
.
':
r
"
~
~I
.. ~m
0, a II!
"'1'1
:z. l'
0..1" ii!
~ It
I,"
.i!
~,)
rt ~ ;~I ~
"'1"11
0.._, ~~a
',-
::1
~di
i: a I,.
~ 8i:1
'""' ~ 'u
00'
~
. 1"1
a: !~ ~
~ II';!
~ !, -~
~I i' II
Q ::~!l
e
--,
'~
'i
<
,
I,
~PA 06-03. TPM /7887. VAR 07-08. DP2 06-06
ATTACHMENT B,~ Hearing Date: April /7,2007
, // ; ,.'o\'; ,I,' "" '; ';~'!" Iml
~, ;,;.:fy -~ ~ ~ 111'1
,t I ' " / I ~ !~.
.j 1/ ..
" f
r
J :~...____
, , ~.
.' ;,.:.,
. /- ...:;'--
""-i"-t'-
L ~" .-4'
", . : ~'.~. 1."'" '
~JJ~--;--''O''''-
~ .i: _ t,.:..,
, '
1,':-
II.:
~. - ','
I :' ~
d L"----L;.t'"
= ..
" ..
, :
.
I
.,
I
....
i
- -'...
I
I'
I
'.
I
.
.,.."r
1,.\:,
t 't'
f, ,:f
t-
r....,..
.-
.,
-, ~
,
. ,
.1
..
'i;r.-
I".
I
,
\
,\
,'"
, I
-- - -:'-..:.'-:
.,.~ '
,
'" "
',' "",-~... . I ' .J/.' 1!.,....II..."lfR1."I..III.'mll., "111::'11'"
" , I !,~ "' .n.,; I' ","I- .I~.I It. I' , .',
,'; ~ ~.: ' '.. l!: ~'i " In'jl'lrl.iir",,",III: I "I'Ft!:'1
! " '.-::',.':';~-'-<.. - '.' ,'... \ "I;!f~I~I:il!!!!li!II:!ili,..!j!'!li"II"I' l'li ;'.!II'ii~l~i
' ' . ," -- .. ''', .... ' .' ..~"..II'I'" '''''1,1 I '. '11,%
ltT . ,". 1-',,,; . - . :-.~'::-:.__ I . ',':d '1'llil,I, '1~'r'III"'I'IIII.,q"1 II it. ih:1lr..1
. " "". . - -- 'i~ ..1. .~ I "I"! '" , '11 I' ....,
'.! I '",' , '0_.....-- ~~;:!I.,51:"! lli.li!i'fi!ii~.! Ii !.! 1,1!lljii,
,i . 1\ .. . '!'--, . cl~ll~ :iilli:lir;:ilil,.i:9~~ Ii ;:!1 !n;l;;!ij
" . I.' '. --'-- :....:.. _~,. I . It: I!;miil.ii'i!li m!'il~ ,i i iln Ili,i!i!i.
i
.
,
,
!
t\
III
~I
~ ~ '!I
O a ~,-
"I'!
~ ~ i'
q;ii
Hlii
~ ll~ ~
a :11 ~
'!.
'" ~ ;€.
... ,'\
Q.<( I::'
"-
I:,
~ ~ ;!i
f,::a!I'
<f < ,II
" 0 ,,,
I"'" ~ ur
~.
j..:
,
~Il!i' !
. _.".1
II,. t::.h"_:i~,
I; jl:I!! I
o i:~'l; I
,,!
I
--- 'I'll
~- .
.;
,
ATTACHMENT B "7'!'IrSPA 06-03, TPM /7887. VAR 07.08. DP2 U6-U
r~\ . IKI.JI':W ;j! 1 Heari~,g Date Apl'll!7. 200
?~ , \ Ii ' l:~:d \ !, _ ~ ~!' '.
,r,_\"'\,\\,, ~:i :~~'I!~ Ii!' i !Ill' ,.>";;
(" - !.~ i!:I, 1 <11'1 r -I' 'I ~.:
, . ~~ L! p:~ !!Ir" 3:1 U I J.llj I' ":
i .' . ". \t. Ih' I 1 ~ l~l~ 11~~r. ~ jlll I ~ ~.II'j;! :1
, ' ,.~~' .' }.,__ ~,~ ',iI L~,II~" t, !!
i '~J;if'''~\ ~. ,~\ ~~ 'I I I I I' "II
~. '7;':':-~/'-" ,. I"~ \, " \~ J I I \ II ~~ "1 '
" ' ,.~~ ;-',. "'\ ,'. _~ II ~II' r'.!, l ,,_
; :.,c~~ " \.~~ ) '. fi . '\~\~I' I ~ ! i I',il I~ 'll! ,. --.
,. ,!, .;:':;-" .\:~" ~~. '\iiI!.l" · ;1 i W~ ~ ilir::i
\ ,'J ':" '\I\\\7"I~ '~l ~1~I!l!i!=!iJ! inr,,;:;
J ~ . 1\---,', ,,), 'If . ., .~'f'- .-
',. !'.,~ \. \ hl~!ll.ll
l 'i' ~' ,~> t.-. \ ' J' i :i"""'.,\~~,r:" \ ii'!! ."~-'
" . ~\: -. \. ~\j;'1 ii' . \ ....::.::1'.."'
; \ 't. \, \ .' .1'1' 7 ~' ll' \ 1:1;' '~','---!i.
~ \ .~_ J. ~ '. bl++'~ a," I ~",' .."
~I '\ .'!' ~\\\\'< ~---. l:~ >ILJ'I:' \ i'lilt;.i ~:~;l
~ ,~ \ \ stl -J uii - \ - .,,:1 .", ::, :
.': :.%," \';:<- li~" ~ \ iH,li;: ,I, "4;Hl
,. .. :;'1 " ,i:r'T
" .,' ,,'\, '.,' '.\(\' '. !! ':I'llllli i, I.' Il'!l
,,;,\, ,\".\i.'.,. IIII 'i:'iil".r:::-t:
,. _ II ,;1....: I:. I . 'IN
.. S ' I I r' ,.,.
-~ )\' 'r' '\ \,' ! ~IIIII I' iI~: i 'l, (:~,
ril,' \.\ \~',\",.'! '.', , I' '. ! ~.. ~ "i;~:' L+"h
',::, \ \~i ,\, L _,\ -; I ::'I:;I;~III!: ;;, :,';;;
.\. .....'..:-.\\ ""'\111.
\ .\.....~ .~l.i.. . \, : T X' ~:.~,
. \\. \',\ . \" 1:'. 'I.' 1:/
.' . ~, \'\', ... l \~
. \\\~'~:~ . /~
J \ , ~ ~, m
,~ F! -I '\ \ \' 'I'
,~-':'~J ,.\ ,\\\." 'I/~
,1 _ I ....; '-.;'- \' . ~'
_ -.~ ~.:-.:=--===- _ _ --, I '," -~~. ~. \. II' Iii
'.', -'-,"~~ ":-~'_!<c;-":""~ .~. .'__~>~ . ~ ,'lI
! . . ;_-:~_n~:-:..,-.-, . "_.'. ." .,--.C..."....~I. I' 1 lilil
I .', - - - :--~i;.~..,.~2~-. ~- ,,"/'1 I . '. ' .,'.", - ~.i.:\L.._ . i :.: r
!. ,1...1.; ~:'~:':.'li.r:....'=' --:--: /'l' .' ,'. ~:f. :: . -.....:.,~: ~ ~~' "
",' I - ~ -- ~ .---- ..... . ,-- 1. t .~ ~ ..... "
. ,[,'I -_.- ,. ",':" _.": :~7'.'.::'::' . . . .'j - -. ',r r E':-, .iL ~.'
;~'i\"~=!~::, ."'':-' ".::~ :" .: . . f ~ ~:J fP.":
I .;f::':: ---=:=-!',....'. .. ~, f/ J .I'~
I >i .=:::___.~:c-:-,~ c,',.. '.._- "I ~', 1'1/
']~: _.' .:' ". ,~" '. ' ~ ',' ,. .1' ~ Ilj "ll
: ",~ ....-... --, ,,, ;1',' ---, " f..' · \." \ "t.
",:, '_ ,..~.~..:....__~. fI I, ~ V I~'!ilr.
, .. .-..-- ----; .... J_", . - r.', ' i "" . '.. 'llid'l
,ir"'~: ...___._! ~.~~_. : 11'" ,.,." ~:4f(!i',
.' ~ I 1 l33HEi; J ;li:
I
i
i' .:
,r "
i :
--
l '
I ! i
., , .
"T'! ;a
. I'-
'j" 'J,' ':"
"
I. '._
"', l
....
,
" ,\
I
e
e
, ~ '
1\,:
,:
I
I
III I,: f
~ 1.1. I~II i
=, I-I; I:: I .
c. ..) - 1
~:J . 1..:"1111
,,,._t_...,
! Ij
'.
!I hi I:
'l'lll'h'l i
R 1,lhhP
ATTACHMENT
I:
1 ,
,I ,
~ II' '," I
I ~ l ~
= . i 'I i .
,. 1-'1':
i,i! l:!idli H "
: 1-1111 iil l ,':I ! I I,
:.1 .II! II i I
10<200<:<20000iD0 ~C
"
,
',I
.~
...J . .::.-:
<
Z j!,
0' ' "
~: ; ""~ <
l1.
wZ 1 :I:
...CC'
Si, <W';1 I' , r
<-'~ ' .
~I ~l:'II~' ';: ' .
I 01 I ' .
~IIE OO'j ~ii: I ,
.
1 Cl)lo::' - W I
1
'i
=
, !i
i,
i
i,
i'
"
"
i
II
!
i
i
i
:.:1:
\
\
\
\
\
\
\
i
\
\ n
\ ~
\
\
\
,
I'
"
,I
I ,
I' !
"
", ... -. ~... - ~ - .~......
1 .......--.........
~~~,~.'cl:a....:.~ i
01
'.6
.=:=.=.===e~=~=.=~ &
. ,
~"""~~":":' ":
. II... I .
!~a%~q=...~aC~a." i
,_..,
.. u 0.....""... ~.... "..... I
I
I
~
I
I
i
~
~" i
"\'~~~
',,' ~\;'='
(gl ,} \\~\ ,
.1,\,,',',("\
..~~; '\ 1.1"
'. '_l\\l.':!~,:~~,
~',!. '\-:'
" ".. '\'
~ ;/~.:\ . "',W .\
,,-t' K;.'_i\;.-~.:t\
. ...u_:._....._...a
--- .-..-- --..-,..-
3 0 N \;f 8 3 d d 1
e! ----------I r
1
I i
I
i
I
I
ej
e
,~
ATTACHMENT B
, ,
II
, ,
II
I
, I
I
"
,
j'
,
, ,
()
----
.------
/
,
\
//
_/
/
\..--~'
\
\
\
,
\-
.-----
~~\
,
,
,
,
\
\
,
,
,
,
,
\
\
,
\
\
\
\
\
,
,
\
\
\
\
\
\
,
,
\
\
\
\
\
\
\
\
\
\
\
I,
I
, ,
I,
i;
e:
I
!
I
L__
1
~~~ ~
..J . .-:,.
<,
Z, u
0 .5
I' ""~
~' ; .{
l1.
Z' :<:
l!:!a:
I!! ~W<5 "
B ~f :f
~i g~ .
~'~g~l.. --
,!
E~_
~!~S iI
... elli.::
: N
3
~::f~
c
i
II
~
<
III {:;~$f 1II ~..,~ ~
f iN:ol~ ~
g
. ~~
t ,0
Ii r l ~~
. i~.~hIL ~~
!: If!" f'" fP J ;~
._K~ _._I.~"
II . A. L ~ I
- . i
I' . 'Ii
1,1. '.II!'1
.. ;;0' '1. ~: i ,f
.., I.'
'~ ..:.,Idlii
J ...0.__1.1. II
..
"
II
.,
. "
I ;:,::I!:j
!'
~!
R:
I
jlltl! i
''It.l.ii
I' ,I",
HI_ifi..
a!1
~. ,
~ ~ II
~, Ii!,' ,
J. ~ I .
i" . 'I' i I
P ~ I
I:j ndp I ; I
Ii ':1111' ., .
, i ~ I r l ~. ~. If, I f
f1if!'1i"i!1 '
I' i ,,1'1' I . . ; \ .
I. {Ie 1:1 ; i!' I : :
I :8:,:'J{::0e~0300e ' 0_
III
~ L
i i:
.j
I II
e: !I
i
-I
e:
I
ATTACHMENT
II!
U.
i ~I:
~:J
'.
, '~J
\ ' .
;', " \ '_
\\. " . -.
\~ \: :.
Ii
i
i <'
I
I
,.
,
_I.:
==j-
'tt
"
,
Ci!1
ZI
01
. l-
II' ""<I
'llI!i; w~1
1 il !;cW'l!
i Ii ~~II
' ~ol
,~~~.1
I
I
I
i ,i i
! :\' ;; G ~ I I
.' ~ ~i ! i Ii' .
i :; ;I>! II dill
II:,; 1,:11" II
I~~U~HH~~~ ~~
.:
s'
! .;
, . I"
I ,'.i;; ~
" - I
,..... I
r
a !
> ld 'i
~, HIi'i!;!!1
H llrllihf',
I ~~i;;
i. :;;;. ~
li~ ~ lI!
;;
"
o
z
~
~ ~:;j ~
f;
.
.
II
~.I: ill:I}!:
Oil !.;, h~ 'II f
~:lII!I!::i'll...
! ~3l l
<I~
.~.I
='!
141
fl
%.
;
i:'
.1
I
:il
Ii
::~'(\
..".....--.,.\'i
,~.." 0"-':1
l"'~' ,",\. \'1i
"::;;f~f~: .' " ' ,', 8
I
II
, i
, ;
j:
,; ;';:':+~\~-':~'~---'-':~>':<' {:i
- ';"k' ','~".~F<:! " ':1 '
, ~.\i;~'(~-I:t\~1 'J
'Y;1'i~\m\ LL"
\'':\~",\ ~,~' 1\" I
\.~\-.~ ~l',,'I', ~.J I
.' ",~"~,.,,,,\:!,,,,,,,,,,, I
. . \\,\l:d\ I"''?~'.h'\r \"
<:.. \",,;.,l,~:~\\:',~:~:'.':'~ \,;.,. .,:,: I
'." '\\\"'-\"J"I' ". !
................... \;'~!,1;f;:r ~~ :
'I' "".,,\..,1,\ I
'" MIi "1
.' .".'. ". ,\ ;\"\\~ 't:, ',\"
,..-.-' , ' ;, ~;.~.~' . .,'~" I
"'I'N'H\S"I'
. ......' ".'~'.""~
. /". 'l~\\f-'!"\~
....,........:,~;{S':ll 'I
.,.-\'\
t'\' \~ \ '.' .,
, ""'.'~.-
"'i.; '.t:.\J:J
,.' II',';
,- "',
i '
I
I
I
I
I
,
~
'I
{.~
.'iiJf
ATTACHMENT ~
I' I
' Ii
: I " 1.1.
I, I' !' ' Ii' ~I':
~ ,I d \! I C.
Ii: n n i i ~]
f l;ll q
d i . ~l ~ ! (! i! '
I,' I 'J> 1\ I ,I
I Ii'!{ol!'; 'i' ': I
1 ;jlll/II'\" I, I i I
I' ! I.. , II II .
808000000CiX;0 ,::i:
~]
~ :
I ' -
"- .---:.'- \ \ .:.,...-.........\ \
1,:'-- \ ' .->..---- \ , ,.........
--.-,' .-
e ' ~/, , \..-/'/ ,
I .-/' \ ~_...J..........- \ '. '--~,'
: \ _.-,/\ \ ...k..../\ \
: ........-- \ " ,-' ,
L'" - ..-l!:'/ " '- '
i ~ ".----;-", \ '.
I' --"\ '
,
\
e:
I
i
-'I
<
Z
01
~.; od~1
: wZ
II-a:'
~ <w OS '
",' "I-
~' ::r;!!; f -
~: ~g ...,:
oECI)~j ":'::,
..:.. ;
,
- ~ I
~
-<
11.
:t:
p:
U.
"
".,
'I'
I
,Ii I
"
I
I
I
I
e
! 1 .;i
~ ..' Ii,
: : . - : ~ ~ ;
. !: jl' ~ :! ~ 81
'I !..~lil ~ .,~
I. ' <
I: I I II:? "..
~" ;. . I ~~'l
)-, '\ ~ j. ~ ':- ~
'l!! 'i"i,~ . .~! I l~'"
I,!:;'i! Lil: I- I jl'.{ ~,~
~I!:,!!! ,a;,. . :.! ! I!I=i~
a.. .. ..r;ll ~ ~i;
" .J,............
. \.............\........."'
\..lr-''''''''' \ ----\...--
\--.................... \ \ -"'",
'_/' , /\') /
, .....-1' ", .\...--'~
.1
e
I
e'
1
r;)
ATTACHMENT () .
,I\"'l-~\,I~:I ~:
, " J 0'
I \ \ \1 I i==i
\ '. 1;15:! :~I
Eil-ffi
~: i!z:<11 - :'
~' 50
b:~~'Ji
t ~ I
n:
,
I'
'0 '
q
t.. I
Iii
...:.-
~
f.
:z:
~i
;1
::-:1':
.--1
~
G_ ~ Bl:ii..!
. ~,~...~ ." ......,... t
, ~ ;: ~
3 ,
! H~
I 11 :;::,::.:
i · ~ ~~ I
il i i!.ih id~
Ii i;Hh~fB!~~
i . i8~:' l!:;!:
I, :,II;!
;. Q...~; j
I '
,
! II i-
ll,lll ,
~, II!l!l!:!"
. Ii II
i: ,1.1,
;", iii 101;
~: I' ',i ,C.
iii 'I q i i I ULJ
II j jell! -
Ii :in!!i Ii i,
liIl!,'l, 'd II I
1!llili!illilil I
00e000000i!l0'" 00
,\
~, ~
\\
.".
----~.J
I~ ~-~~--(~ -
, I '-':.. ~.
~i ~ ~i
I " ~
J::: ~
e
, I
I
i II
I
I
I
I I
I
ei
,-
_ AT!ACH~~NTYI~_
--- r .g
,~ C\u!
llZJ' y
---./ ..I.
~Ii ~I;
~,3 ~:j
t;; ...
~I ~i
I I
I
I
"
~
~,;
<..~
~j
:~
~;
,
I
,
,
I
.
hW-
II'"
r-
r-
I'1\ITr
I I~
I
I
l
I
!
I
I
I
cD
~
H
I! ~
I ,"""""
Ji."
~] ~i
en I ~
ill; ""<
~ I: UJZi
< '! .....0::
~. c:3~~.'
~..; ~; J-':
!~I 00.. ~'::::" ,
w..,~ tIJ:ll:... ~I_
. ~ I
~
f
:l:
"
,
I
I
e
e
e
~~
i' ~
, ~i=
, ill ~
I
I ( I
I
\
I
, ,
I I
ej
I
I
~
r \
i
~ I; II,
I ~ ,
, I,' ~
:'1 I Y 'i
"
f: '! !
" .i !!l
i1
;
\
J~ ~ '~
'---I' ,g
,;
"
'()
.
~I
I
,
A IT ACHMENT ~
e
~"O
"
i.-=
<i~
~I~
-,'^"
rN
) <\
\
( ~
~~'\-..:)
,
j
.
~
.
!
~
c .2~
C ~ ~~~~
~:~~ ~; ,~i:i
""'u:;r ..! '-!....o
c~~~ - <'<
c~~w ,."
~
~il
lii"r
'. .
':'8~
~;~
~
.0..
",. ". .~ ....
....I'
<
Zi
e ' :,1 : ~
. ecs: ~ - -<
I: _ CL.
'WZ :1:
I i ~a:
-i <Woe,
; Cl!Z U I
~ ~ol ,:- ,,',
fjrz:OO.:;:":',
0~(/'J~ ci! L..:....:....::----J
,
"
,
I
~
::!,:;
."
~~
:~
d
.~
~i~
~I
~I
i ~
I !2
~ ....
~
",'. ......1
"''''',.''. ,','
'''',' ,", ,',', .~. ...... -'.,' -. '.
"" c."-", -,,"'.
~
j
~
Iii
~
,.
~
8' ,
"
:i
'I
!!l
;
~
g
.0-,1
]f.. .....tul.r5
e
!!iil
~:~
I I
i I
"
,
,
0_
-.
."
.z
'.,-
o~1(
u
a-:---
:;N,l'II:lJcO<jd
i (,,/~
.... r\ '" I
t'! 'j "\_
P ,
. ( ~-
-c. ,
-- --J\ ';j'
'-1
..--::::
!
I
i
;
g
,
e
e
e
()
C)
ATTACHMENT C
CONDITIONS OF APPROVAL
1. This permit/approval authorizes a Tentative Parcel Map to subdivide approximately 159
acres into 10 parcels, a Variance for one standard means of access and one non-standard
emergency access route, and a Development Permit to construct 24 industrial buildings
for a total of approximately 2,800,000 square-feet in accordance with amendment SPA
No. 06-03 to the ITC Specific Plan. Future uses of the properties shall comply with the
list of permitted uses contained in the applicable Specific Plan (Table V -2). The project
site is located south of San Bernardino International Airport, north of the Santa Ana
River, and east of Tippecanoe Avenue.
2. Within two years of development approval, commencement of construction shall have
occurred or the permit/approval shall become null and void. In addition, if after
commencement of construction, work is discontinued for a period of one year, then the
permit/approval shall become null and void. However, approval of the Development
Permit does not authorize commencement of construction. All necessary permits must be
obtained prior to commencement of specified construction activities included in the
Conditions of Approval and Standard Requirements.
Project: Development Permit 2 ~o. 06-06 & Variance No. 07-08
Expiration Date: APRIL 17,2009
2.
Within two years of the original approval date, the filing of the final map with the
Council shall have occurred or the approval shall become null and void. Expiration of a
tentative map shall terminate all proceedings and no final map shall be filed without first
processing a new tentative map. The City Engineer must accept the final map or tentative
map documents as adequate for approval by Council prior to forwarding them to the City
Clerk. The date the final map shall be deemed filed with the Council is the date on which
the City Clerk receives the map.
Project: Tentative Parcel Map No. 17887
Expiration Date: APRIL 17, 2009
3. For the Development Permit, the review authority may grant a one-time extension, for
good cause, not to exceed 12 months. The applicant must file an application; the
processing fees, and all required submittal items, 30 days prior to the expiration date. The
review authority shall ensure that the project complies with all Development Code
provisions in effect at the time of the requested extension.
4.
For the Tentative Parcel Map, the review authority may, upon application and for good
cause, grant up to three extensions of time not to exceed 12 months each pursuant to
Development Code Section 19.66.170 and the State Map Act. The applicant must file an
application, processing fees, and all required submittal items, 30 days prior to the
expiration date(s). The review authority shall ensure that the project complies with all
Development Code provisions in effect at the time of the requested extension.
e
e
e
7.
~
~
SPA 06-0~M J 7887. DPl 06-06. VAR 07-08
IJII Hearing Date: April /7. 2007
Page 2
5.
In the event this approval is legally challenged, the City will promptly notify the
applicant of any claim, action or proceeding and will cooperate fully in the defense of this
matter. Once notified, the applicant agrees to defend, indemnify and hold hannless the
City of San Bernardino (City), the Economic Development Agency of the City of San
Bernardino (ED A), any departments, agencies, divisions, boards or commission of either
the City or EDA as well as predecessors, successors, assigns, agents, directors, elected
officials, officers, employees, representatives and attorneys of either the City or EDA
from any such claim, action or proceeding against any of the foregoing persons or
entities. Any counsel in such action shall be chosen by the applicant to defend such
claim, action or proceeding and shall be subject to the reasonable approval of the Mayor
& Common Council of San Bernardino. The applicant further agrees to reimburse the
City for any costs and attorneys' fees which the City may be required by a court to pay as
a result of such action, but such participation shall not relieve applicant of his or her
obligation under this condition.
The costs, salaries, and expenses of the City Attorney and employees of his office shall
be considered as "attorneys fees" for the purpose of this condition.
As part of the consideration for issuing this permit, this condition shall remain in effect if
this Development Permit and/or Tentative Parcel Map is rescinded or revoked, whether
or not at the request of applicant.
6.
Construction shall be in substantial conformance with the plan(s) approved by the
Director, Development Review Committee, Planning Commission or Mayor and
Common Council. Minor modification to the plan(s) shall be subject to approval by the
Director through a minor modification permit process. Any modification which exceeds
10% of the following allowable measurable design/site considerations shall require the
re-filing of the original application and a subsequent hearing by the appropriate hearing
review authority if applicable:
a. On-site circulation and parking, loading and landscaping;
b. Placement and/or height of walls, fences and structures;
c. Reconfiguration of architectural features, including colors, and/or modification of
finished materials that do not alter or compromise the previously approved theme;
and,
d. A reduction in density or intensity of a development project.
No vacant, relocated, altered, repaired or hereafter erected structure shall be. occupied or
no change of use of land or structure(s) shall be inaugurated, or no new business
commenced as authorized by this permit until Certificates of Occupancy have been issued
by the Department. Temporary Certificates of Occupancy may be issued by the
Department subject to the conditions imposed on the use, provided that a deposit is filed
with the Department of Public Works prior to the issuance of the Certificate(s), if
necessary. The deposit or security shall guarantee the faithful performance and
completion of all terms, conditions and performance standards imposed on the intended
use by this permit or approval.
e
e
e
o
SPA 06-0Y'",JRM J 7887. DP2 06-06. VAR 07-08
Y Hearing Date: April 17. 2007
Page 3
8.
This permit or approval is subject to all the applicable provisions of the Development
Code in effect at the time of approval. This includes Chapter 19.20 - Property
Development Standards, and includes: dust and dirt control during construction and
grading activities; emission control of fumes, vapors, gases and other forms of air
pollution; glare control; exterior lighting design and control; noise control; odor control;
screening; signs, off-street parking and off-street loading; and, vibration controL
Screening and sign regulations compliance is important considerations to the developer
because they will delay the issuance of Certificates of Occupancy until they are complied
with. Any exterior structural equipment, or utility transformers, boxes, ducts or meter
cabinets shall be architecturally screened by wall or structural element, blending with the
building design and include landscaping when on the ground.
9. The property owner(s) and tenants shall comply with the requirements of other agencies
(e.g. San Bernardino International Airport Authority; Federal Aviation Administration;
U.S. ofFish & Wildlife Service; California State Board of Equalization; California Dept.
of Transportation; California Dept. of Fish & Game; San Bernardino County Flood
Control District; Inland Valley Development Agency; etc.), as applicable.
10. The project is subject to all applicable Mitigation Measures contained in certified
Environmental Impact Report for the San Bernardino International Trade Center Specific
Plan and the Addendum document.
11.
The structures for Parcels I - 6 may be developed simultaneously or singly (i.e. phases)
at the discretion of the developer. A Development Permit application shall be submitted
for each parcel in order to verify compliance with the Alliance California Specific Plan,
DP2 No. 06-06, and the applicable provisions of the Development Code (e.g. site plan
design, architecture, parking/loading, landscaping/screening, engineering design, precise
grading and drainage, etc.). The square-footage of each building may vary as needed;
however, the total size of the project shall not exceed 3,299,757 square-feet. The
structures proposed for Parcel 8 shall be developed as one phase.
12. Avigation easement(s) shall be granted to the San Bernardino International Airport
Authority and recorded prior to issuance of any building permits. Written disclosure of
the avigation easement(s) and related impacts (e.g. noise, vibration, odors, etc.) to
initiallsubsequent buyers/tenants shall be required.
13.. Logos on screen walls and/or building elevations shall be applied sparingly as an accent
feature only.
14. Any equipment, whether on the roof, side of structure, or ground shall be screened and
landscaped according to the requirements of the Development Code.
15.
Barbed wire, razor wire, and/or electrified fence shall not be permitted anywhere on-site
or in conjunction with any fence, wall, roof, or by itself, unless required by any law or
regulation of the City, State of California, Federal Government, or any agency thereof.
.
.
.
C)
SPA 06-0~M J 7887. DP206-06. VAR 07-08
\4 Hearing Date: April J 7. 2007
Page 4
16.
Retaining walls, if any, shall be constructed of slump stone or split-face block. Both sides
of the wall (above ground) shall have the decorative finish.
17. The overall landscape plan approved for this project shall comply with the provisions of
Development Code 919.28 (Landscaping Standards). Any open fencing (such as wrought
iron or tube steel) around dock areas and trailer parking areas shall include climbing
vines for screening on the exterior sides visible from public rights-of-way, and shall
include black wire mesh for climbing vines. Groundcover within the front setbacks and
street-side setbacks shall include turf grass.
18. The applicant shall post a bond in an amount equivalent to the cost of landscaping
including landscape installation and one year of maintenance service. The purpose of the
bond is to ensure that all landscaping survives the planting process and last for a period of
at least one-year. The bond will be released no sooner than one-year after issuance of the
final Certificate of Occupancy and only after such time as City staff has verified the
survival of the landscaping. All landscaping and screening requirements for each parcel
shall be completed prior to issuance of any Certificate of Occupancy for each building.
19.
The following standards for lighting and address markings are applicable:
a) The address number of the building shall be located and displayed so that it shall be
easily visible from the street. The numerals in these numbers shall be no less than six
(6) inches in height and be of a color contrasting to the background. In addition, any
business that affords vehicular access to the rear through any driveway, alleyway, or.
parking lot shall also display the same numbers on the rear of the building.
b) Roof top address numbers shall be provided. They shall be a minimum of three (3)
feet high and two (2) feet in width and of contrasting color to the background.
Numbers shall. be placed parallel to the street address as assigned. Each building
within a commercial complex shall have its own address/assigned number affixed to
the roof.
20. Submittal requirements for permit applications (building, site improvements, etc.) to the
Building/Plan Check Division and the Public Works/Engineering Division shall include
all Conditions of Approval and Standard Requirements issued with this approval.
21. All Conditions of Approval and Standard Requirements shall be completed for each
building/parcel prior to final inspections. All site improvements shall be completed as
necessary to serve each new building/parcel, prior to issuing a Certificate of Occupancy.
22.
This permit or approval is subject to the attached conditions or requirements of the
following City Departments or Divisions:
a. Development Services Department - Public Works / Engineering Division
b. Development Services Department - Building / Plan Check Division
c. Fire Department
d. Municipal Water Department
e. Public Services Department
End of Allachment C
e
~
(~
ATTACHMENT D
CITY OF SAN BERNARDINO
Development Services Department - Public Works Division
Standard Requirements
Description: Subdivide 159 Ac. into 10 Parcels and construct 26 buildinas
Applicant: Hillwood Lit II, LP
Location: Central Ave. east of Tippecanoe Ave.
Case Number: PM 17887, DP2 06-06, VAR 07-08
1. Drainaae and Flood Control
d) In addition to the drainage study mentioned in the previous
condition, the developer's engineer shall submit a separate
drainage study specific to each parcel as a part of that parcel's
development plan submittal.
The detention basins shall be designed in accordance with
"Detention Basin Design Criteria for San Bernardino County."
The development is partially located within Zone X (shaded) on the
Federal Insurance Rate Maps and may be subject to sheet overflow
to a depth of less than 1 foot in a 100-year storm. Therefore, all
e
e)
f)
e
a)
All necessary drainage and flood control measures shall be subject
to requirements of the City Engineer, which may be based in part
on the recommendations of the San Bernardino County Flood
District. The developer's Engineer shall furnish all necessary data
relating to drainage and flood control.
A permit will be required from the Department of Transportation and
Flood Control, if any work is required within the Flood Control
District's right-of-way.
c) A local drainage study will be required for the project. Any drainage
improvements, structures or storm. drains needed to mitigate
downstream impacts or protect the development shall be designed
and constructed at the developer's expense, and right-of-way
dedicated as necessary. Release of drainage shall be at locations
and under conditions acceptable to the City Engineer and any other
agency having jurisdiction.
b)
.
e
e
.~
()
Project: Southgate
Case No. PM 17887 & DP2 06-06
Page 2 of 14
building pads shall be raised above the surrounding area as
approved by the City Engineer.
All drainage from the development shall be directed to an approved
public drainage facility. If not feasible, proper drainage facilities
and easements shall be provided to the satisfaction of the City
Engineer.
If site drainage is to be outletted into the pUblic street, the drainage
shall be conveyed through a parkway culvert constructed in
accordance with City Standard No. 400. Conveyance of site
drainage over the Driveway approaches will not be permitted.
A Water Quality Management Plan (WQMP) is required for this
project. The applicant is directed to the City's web page at
www.cLsan-bernardino.ca.us - Departments - Development
Services - Public Works for templates to use in the preparation of
this plan.
A Storm Water Pollution Prevention Plan (SWPPP) will be required.
The applicant is directed to the City's web page at www.cLsan-
bernardino.ca.us - Departments - Development Services - Public
Works for templates to use in the preparation of this plan.
k) The City Engineer prior to issuance of a grading permit shall
approve the WQMP and the SWPPP.
g)
h)
i)
j)
I) A "Notice of Intent (NOI)" shall be filed with the State. Water
Resources Control Board for construction disturbing 1 acre or more
of land (including the project area, construction yards, storage
areas, etc.).
m) The City Engineer, prior to grading plan approval, shall approve an
Erosion Control Plan. The plan shall be designed to control erosion
due to water and wind, including blowing dust, during all phases of
construction, including graded areas which are not proposed to be
immediately built upon.
2. Gradina and Landscapina
a)
The site/plot/grading and drainage plan shall be signed by a
Registered Civil Engineer and a grading permit will be required.
The grading plan shall be prepared in strict accordance with the
City's "Grading Policies and Procedures" and the City's "Standard
Drawings", unless otherwise approved by the City Engineer.
~..,. i J'. ;', \ \.',; \.r ;.', .: ,', .I':;J,
1'- .i';:'.'.. .,;...., ...._", \ :..
'. ,
e
e
i)
e
()
o
Project: Southgate
Case No. PM 17887 & DP2 06-06
Page 3 of 14
If more than 5 trees are to be removed from the site, a tree removal
permit conforming to the requirements of Section 19.28.090 of the
Development Code shall be obtained from the Department of
Development Services-Planning Division prior to issuance of any
grading or site development permits.
c) A grading bond will be required and the grading shall be supervised
in accordance with Section 3317.2 of the California Building Code.
b)
d) If more than 1,000 cubic yards of earth is to be hauled on City
Streets then a special hauling permit shall be obtained from the City
Engineer. Additional conditions, such as truck route approval,
traffic controls, bonding, covering of loads, street cleaning, etc. may
be required by the City Engineer.
e) A liquefaction evaluation is required for the site. This evaluation
must be submitted and approved prior to issuance of a grading
permit. Any grading requirements recommended by the approved
liquefaction evaluation shall be incorporated in the grading plan.
An on-site Improvement Plan is required for this project. Where
feasible, this plan may be incorporated with the grading plan and
shall conform to all requirements of Section 15.04-167 of the
Municipal Code (See "Grading Policies and Procedures").
f)
g) Wheel stops are not permitted by the Development Code, except at
designated accessible parking spaces. Therefore, continuous 6"
high curb shall be used around planter areas and areas where
head in parking is adjacent to walkways. The parking spaces may
be 16.5' deep and may overhang the landscaping or walkway by
2.5'. Overhang into the setback area or into an ADA path of travel
(minimum 4' wide) is not permitted.
h) Continuous concrete curbing at least 6 inches high and 6 inches
wide shall be provided at least 3 feet from any wall, fence, property
line, walkway, or structure where parking and/or drive aisles are
located adjacent thereto. Curbing may be left out at structure
access points. The space between the curb and wall, fence,
property line, walkway or structure shall be landscaped, except as
allowed by the Development Review Committee.
Refuse enclosure{s) shall be constructed in accordance with City
Standard Drawing No. 508 modified as approved by the City
Engineer to provide ADA accessibility. The minimum size of the
refuse enclosure shall be 8 feet x 15 feet, unless the Public
Services Department, Refuse Division, approves a smaller size, in
writing.
,.;,.,\r 1)'-, ,'" .\\.\'1'," I'i SI,II:I{',';"lL";' :111 -lA" - ;11, 11'1;_,_",(,,; "'h", ;".'. (, . ,_.' .,'.
e
e
.
~
Project: Southgate
Case No. PM 17887 & DP2 06-06
Page 4 of 14
j)
Where a refuse enclosure is proposed to be constructed adjacent
to spaces for parking passenger vehicles, a 3' wide by 6 . high
concrete planter shall be provided to separate the enclosure from
the adjacent parking. The placement of the enclosure and design
of the planter shall preclude the enclosure doors from opening into
drive aisles or impacting against adjacent parked cars.
k) The number and placement of refuse enclosures shall be as
approved by the Public Services Department, Refuse Division.
I) Retaining walls, block walls and all on-site fencing shall be
designed and detailed on the on-site improvement Plan. This work
shall be part of the on-site improvement permit issued by the City
Engineer.
m) All walls shall be constructed of decorative block or other materials
with architectural features acceptable to the City Planner.
n) Interior fencing material within 5 feet of the structure shall be either
non-combustible or 1-hour fire rated. Vinyl fencing is not allowed
within 5 feet of the structure.
The on-site improvement plan shall include details of on-site
lighting, including light location, type of poles and fixtures,
foundation design, conduit location and size, and the number and
size of conductors. Photometry calculations shall be provided
which show that the proposed on-site lighting design will provide 1
foot-candle of illumination uniformly distributed over the surface of
the parking lot during hours of operation and 0.25 foot-candles
security lighting during all other hours.
p) The design of on-site improvements shall also comply with all
requirements of The California Building Code, Title 24, relating to
accessible parking and accessibility, including retrofitting of existing
building access points for accessibility, if applicable.
0)
q) An accessible path of travel shall be provided from the public way
to the building entrance. All pathways shall be concrete Paved and
shall provide a minimum clear width of 4 feet. Where parking
overhangs the pathway, the minimum paved width shall be 6.5 feet.
r) Where an accessible path of travel crosses drive aisles, it shall be
delineated by textured/colored concrete pavement.
e
s)
The project Landscape Plan shall be reviewed and approved by the
City Engineer prior to issuance of a grading permit. Submit 5
copies to the Engineering Division for Checking.
;, !'i .\ '. \",1, ;)1 ')",:" I t';',-, .. ~I,"'- _. ~ - ':-': : I::",,,:,,,i ... :.: -.~~:,: j''." ,', I', ; "
....; .
e
. v)
e
z)
e
()
Q
Project: Southgate
Case No. PM 17887 & DP2 06-06
Page 5 of 14
The public right-of-way, between the property line and top of curb
. (also known as "parkway") along adjoining streets shall be
landscaped by the developer and maintained in perpetuity by the
property owner. Details of the parkway landscaping shall be
included in the project's on-site landscape plan, unless the parkway
area is included in a landscape maintenance district, in which case,
a separate landscape plan shall be provided.
u) A Landscape Maintenance District (LMD) shall be implemented to
maintain landscaping within the following areas. The LMD shall be
implemented prior to recording the parcel map. (Note. LMD
formation requires a minimum of 4 months after approval of LMD
landscaping plans.):
t)
i) Central Avenue
ii) Tippecanoe Avenue
iii) Detention basins in Parcels 9 and 10
The cost of installation of landscaping and irrigation system in the
landscape maintenance district shall be bonded as part of the
faithful performance, labor & materials, and warranty bond required
for approval by the City Council and recording of the parcel map.
w) Separate sets of Landscape Plans shall be provided for the
Landscape Maintenance District.
x) The landscaping and irrigation system shall be installed in the
landscape maintenance district and accepted by the City Engineer
prior to application for occupancy of any building in the subdivision.
y) Prior to sale of each parcel, the Developer shall provide the City's
Real Property Section of the Public Works Division with a signed
copy of the "Notice of Assessment District" disclosure for each
property purchaser.
An easement and covenant shall be executed on behalf of the City
to allow the City to enter and maintain any required landscaping in
case of owner neglect. Upon request, the Real Property Section
will prepare documents for execution by the property owner and
shall ensure that, if the property owner or subsequent owner(s) fail
to properly maintain the landscaping, the City will be able to file
appropriate liens against the property in order to accomplish the
required landscape maintenance. A document processing fee in
the amount of ~200.00 shall be paid to the Real Property Section to
cover processing costs. The property owner, prior to plan approval,
shall execute this easement and covenant unless otherwise
,__,1,.: U" 1'1 \ \., \:'" I j'(\i;l: : iI,qu,':, ;':1,1, - L).~,: - I:,. : Ill:",..;! "'", i ",I,' ,'.\ I,'! \ I . ,~, ,;'
"... l
e
e
e
<3
~
Project: Southgate
Case No. PM 17887 & DP2 06-06
Page 6 of 14
3.
allowed by the City Engineer. Applicable to Commercial, industrial
and multi-family development only.
Utilities
a) Design and construct all public utilities to serve the site in
accordance with City Code, City Standards and requirements of the
serving utility, including gas, electric, telephone, water, sewer and
cable TV (Cable TV optional for commercial, industrial, or
institutional uses).
b) Each parcel shall be provided with separate water and sewer
facilities so the City or the agency providing such services in the
area can serve it.
c) Backflow preventers shall be installed for any building with the
finished floor elevation below the rim elevation of the nearest
upstream manhole.
d) Sewer main extensions required to serve the site shall be
constructed at the Developer's expense.
This project is located in the sewer service area maintained by the
City of San Bernardino therefore, any necessary sewer main
extension shall be designed and constructed in accordance with the
City's "Sewer Policy and Procedures" and City Standard Drawings.
f) Utility' services shall be placed underground and easements
provided as required.
e)
g) A street cut permit, from the City Engineer, will be required for utility
cuts into existing streets.
h) All existing overhead utilities adjacent to or traversing the site on
either side of the street shall be undergrounded in accordance with
Section 19.20.030 (non-subdivisions) or Section 19.30.110
(subdivisions) of the Development Code.
i) Existing Utilities which interfere with new construction shall be
relocated at the Developer's expense as directed by the City
Engineer, except overhead lines, if required by provisions of the
Development Code to be undergrounded. See Development Code
Section 19.20.030 (non-subdivisions) or Section 19.30.110
(subdivisions).
,..,',,~IJ' ~"\":\.',t>1 S;;l::-!,'q'''>h:fJII~IP.!-rll.ji:lr'.\""d'...\,.,l,q:.:-,i'\\ (f)\ _~.:; ':<l,
',:,1
e
e
e
(.)
()
Project: Southgate
Case No. PM 17887 & DP2 06-06
Page 7 of 14
Sewers within private streets or private parking lots will not be
maintained by the City but shall be designed and constructed to
City Standards and inspected under a City On-Site Construction
Permit. A private sewer plan designed by the Developer's Engineer
and approved by the City Engineer will be required. This plan can
be incorporated in the on-site development plan, where practical.
4. Mappina
j)
a) A Parcel Map based upon field survey will be required.
b) All street names shall be subject to approval of the City Engineer
prior to Map recordation.
c) Additional survey and map information including, but not limited to,
building setbacks, flooding and zones, seismic lines and setbacks,
geologic mapping and archeological sites shall be filed with the City
Engineer in accordance with Ordinance No. MC-592.
5. Improvement Completion
Plans for all required public Street, sewer, drainage improvement,
traffic signals, and landscape maintenance district landscape and
irrigation for the entire project shall be completed, subject to the
approval of the City Engineer, prior to Map recordation.
b) If the construction/installation of required improvements, including
landscaping and irrigation within the landscape maintenance
district, are not completed prior to Map recordation, an
improvement security accompanied by an agreement executed by
the developer and the City will be required.
a)
c) Street light energy fee to pay cost of street light energy for a period
of 4 years shall be paid. Exact amount shall be determined and
shall become payable prior to Map recordation.
6. Street Improvement and Dedications
a)
All public streets and public easements within and adjacent to the
development shall be improved to include combination curb and
gutter, paving, access ramps, street lights, sidewalks, and
appurtenances, including, but not limited to traffic signals, traffic
signal modifications, relocation of public or private facilities which
interfere with new construction, striping, and landscaping and
irrigation in the landscape maintenance district shall be
accomplished in accordance with the City of San Bernardino
"Design Policies and Procedures" and City "Standard Drawings,"
unless otherwise approved by the City Engineer. Street lighting
,~ ,1.'~ ! J' 1-" . \ \, "', \" . :,\ " ,;:-, l/ll" ':: ,~i .'! i ~ ')~.: - ,>, : ! ::I~\ ,',.d "'.n. ~ ,,~..;k I' \\ ('1).\ <::.. . I ,',~ .;'...-
". ,i,'
e
e
.~
~
Project: Southgate
Case No. PM 17887 & DP2 06-06
Page 8 of 14
b)
shall be designed and constructed in accordance with the City's
"Street Lighting Policies and Procedures." Street lighting shall be
shown on street improvement plans except where otherwise
approved by the City Engineer.
For the streets listed below, dedication of adequate street right-of-
way (RW.) to provide the distance from street centerline to
property line and placement of the curb line (C.L.) in relation to the
street centerline shall be as follows:
Street Name Right of Wav(ft.} Curb Line(ft}
Central Ave. 44' 32'
Tippecanoe Ave. Per plans prepared by Associated
Engineers under contract with IVDA
c)
Central Avenue shall be constructed full width from Tippecanoe
Avenue easterly to where it will intersect with the northerly
extension of Mountain' View Avenue. Improvements shall include
curb and gutter, sidewalk, street lights, traffic signals and other
appurtenances as required. During plan check, the City Engineer
shall determine if existing pavement can be salvaged.
d) A temporary turn around shall be constructed at the easterly
terminus of Central Avenue. The minimum turn around dimensions
shall conform to the dimensions of the cul-de-sac in Standard 101,
or as otherwise required by the City Engineer and Fire Marshal.
e) Construct 8" Curb and Gutter per City Standard No. 200 adjacent to
the site along Tippecanoe Avenue. Widen pavement adjacent to
the site to match new curb and gutter. Construct approach and
departure transitions for traffic safety and drainage as approved by
the City Engineer.
f) Construct sidewalk adjacent to the site in accordance with City
Standard No. 202, Case "A" (6' wide adjacent to curb). Sidewalk
shall be constructed on both sides of Central Avenue.
g)
e
Construct accessible curb ramps in accordance with City Standard
No. 205, moditied as approved by the City Engineer to comply with
current ADA accessibility requirements, at all curb returns within
and adjacent to the project site. Dedicate sufficient right-of-way at
the corner to accommodate the ramp.
.::.<,,'.11..... I': :\'\,'\1'\,( l 1'1 \ld'l-f{,p,":, '::',11- ';'';,1- ')" I;I!!\\<""ld "',"': ,::.:\. !,\\ t -L),\'~' .":f\~-
"~ . i'-
<:)
~
Project: Southgate
Case No. PM 17887 & DP2 06-06
Page 9 of 14
e
Construct Driveway Approaches per City Standard No. 204, Type
II, including an accessible by-pass around the top of the drive
approach. Remove existing driveway approaches that are not part
of the approved plan and replace with full height curb & gutter and
sidewalk. Radius type drive approaches may be constructed, if
desired. Complete design shall be shown on the on-site
development plan. A strip of textured/colored concrete 20' wide
shall be constructed in the throat of the driveway.
i) All Curb return radii shall be 25 feet minimum.
h)
j) Curb return radius at the intersection of Central Avenue with
Tippecanoe Avenue and at Mountain View Avenue shall be 35 feet
unless otherwise approved by the City Engineer.
k) The pavement on Tippecanoe Avenue adjoining the site shall be
rehabilitated to centerline using a strategy approved by the City
Engineer.
I) Install Street Lights adjacent to the site in accordance with City
Standard Nos. SL-1 and SL-2.
e
m) Two independent means of access 24 feet wide, paved and
dedicated, shall be provided to each parcel in the project.
Additional width may be required for drainage control and traffic
safety, except as approved by a Variance.
7. Phasina
a) A mass grading plan may be approved for the entire site.
b) An on-site development plan is required for each parcel.
c) Central Avenue extension and second point of access shall be
constructed prior to occupancy of any building on any parcel in the
subdivision.
e
f)
d) LMD landscaping shall be installed prior to occupancy of any
building on any parcel in the subdivision.
e) Drainage facilities, such as storm drains, channels,
detention/retention basins, earth berms and block walls, shall be
constructed, as necessary, to protect the development from off-site
flows and to properly control drainage downstream.
A properly designed water system shall be constructed, which is
capable of providing required fire flow, which might require looping
or extending beyond the phase boundaries.
,:,'., - I), Pi'" ',\,!, 1.'( \1,1(' ikf'".t, ~'lIi- ("~: - ")1. ! I,; .."",i! ,(, I"~!::,' 1".\ (-r j\ ".; :"(
"., ;,
~~~~---
~
C)
Project: Southgate
Case No. PM 17887 & DP2 06-06
Page 10 of 14
e
Easements for any of the above and the installation of necessary
utilities shall be completed.
h) Phase boundaries shall correspond to the lot lines shown on the
approved tentative map.
g)
8. Reauired Enaineerina Plans
a) A complete. submittal for plan checking shall consist of street
improvement, sewer, storm drain, traffic signal, striping, lighting.
grading, on-site landscaping and irrigation, landscaping and
irrigation in the landscape maintenance district, and other plans as
required. Piecemeal submittal of various types of plans for the
same project will not be allowed. except as follows:
i)
The parcel map and mass grading plan with all required
supporting documents (including master drainage study)
may be submitted as one package. Mass grading shall
include design and construction of drainage
detentionlretention basins to serve the development as a
whole. or upstream drainage reaching the site.
e
ii) Complete on-site development plans with all required
support documents shall be submitted for each parcel as
development is anticipated.
b) All improvement plans submitted for plan check shall be prepared
on the City's standard 24" x 36" sheets. A signature block
satisfactory to the City Engineer or his designee shall be provided.
c) After completion of plan checking, final mylar drawings, stamped
and signed by the Registered Civil Engineer in charge, shall be
submitted to the City Engineer for approval.
d) Electronic files of all improvement plans/drawings shall be
submitted to the City Engineer. The files shall be compati.ble with
AutoCAD 2000, and include a .DXF file of the project. Files shall
be on a CD and shall be submitted at the same time the final mylar
drawings are submitted for approval.
e)
Copies of the City's design policies and procedures and standard
drawings are available at the Public Works Counter for the cost of
reproduction. They are also available at no charge at the Public
Works Web Site at
e
httO:/ /www.ci.san-bernardino.ca.us/site/ow/default.htm
, ., ,:. ':' I," i': ,\', '. '" ,,'I '",' ~i'_;h' '1 ";, ' C ':': j 1:1.'\'" 'd -.",,: ::-.:;.1,' ; ,'',, i', J" . '.. :< ,t
"..l
e
e
e
<l)
()
Project: Southgate
Case No. PM 17887 & DP2 06-06
Page 11 of14
9.
Reauired Enaineerina Permits
a) Grading permit.
b) On-site improvements construction permit (except buildings - see
Development Services-Building Division), including landscaping.
c) Off-site improvement construction permit.
10. Applicable Enaineerina Fees
a) All plan check, permit, inspection, and impact fees are outlined on
the Public Works Fee Schedule. A deposit in the amount of 100%
of the estimated checking fee for each set of plans will be required
at time of application for plan check. The amount of the fee is
subject to adjustment if the construction cost estimate varies more
than 10% from the estimate submitted with the application for plan
checking.
b) The current fee schedule is available at the Public Works Counter
and at htto://www.cLsan-bemardino.ca.us/site/oW/default.htm
Expeditious plan review is available. A non-refundable fee in the
amount of 125% of the' estimated plan check fee for each set of
plans will be required at time of application for expedited plan
check. The amount of the fee is subject to adjustment if the
construction cost estimate varies more than 10% from the estimate
submitted with the application for plan checking.
11. Off-Site Traffic Impact Mitiaation
c)
a) Prior to any occupancy, a new traffic signal shall be installed at
Tippecanoe Avenue/Rialto Avenue.
b) Prior to any occupancy, the following improvements shall be
implemented at Tippecanoe Avenue/Central Avenue:
i) Widen the westbound approach (east leg) of Central Avenue
and/or modify striping to provide one (1) exclusive left-turn
lane, two (2) through lanes and one (1) exclusive right-turn
lane for the westbound traffic at Tippecanoe Avenue.
ii)
Widen the eastbound approach (west leg) of Central Avenue
and/or modify striping to provide one (1) exclusive left-turn
lane, two (2) through lanes, and one (1) exclusive right-turn
lane for eastbound traffic at Tippecanoe Avenue.
~u ,:. 'l" : h :'1 . \ '\ '.: \.' I ,)1 \1.\::- i/,:l, ,:', :':1 '1;- ,;~, I - """ ; I: ~ I "_, ",,' '""," 1 , .
".
(;j
()
Project: Southgate
Case No. PM 17887 & DP2 06-06
Page 12 of 14
e
iii)
Widen the southbound approach (north leg) of Tippecanoe
Avenue and/or modify striping to provide one (1) exclusive
right-turn lane, three (3) through lanes, and. two (2) exclusive
left-turn lanes for southbound traffic at Central Avenue.
iv) Widen the northbound approach (south leg) of Tippcanoe
Avenue and/or modify striping to provide two (2) exclusive
left-turn lanes, three (3) through lanes, and one (1) exclusive
right-turn lane for northbound traffic at Central Avenue.
c) This project is subject to fair share contributions toward
improvements needed to mitigate project related traffic impacts.
The fair share contributions shall be submitted to the City prior to
any building permit issuance. The fair share contributions will be
applied to the cost of the following improvements:
i) TiDDecanoe Avenue/Oranae Show Road-San Bernardino
Avenue:
1)
Widen Tippecanoe Avenue south of the intersection
to add one additional northbound exclusive left-turn
lane (resulting in 2 left-turn lanes) and to add one
northbound exclusive right-turn lane. Estimated Cost
= $100,000.
e
'2) Widen Tippecanoe Avenue north of the intersection to
add one southbound exclusive right-turn lane.
Estimated Cost = $50,000.
3) Widen San Bernardino Avenue east of the
intersection to add one westbound exclusive right-turn
lane. Estimated Cost = $50,000.
4) Modify the existing traffic signal to accommodate the
widening of Tippecanoe Avenue and San Bernardino
Avenue. Estimated Cost = $75,000.
Total Estimated Cost = $275,000;
Project Fair Share (28%) = $77,000
ii) TiDDecanoe Avenue/HosDitalitv Lane:
e
1)
Widen Tippecanoe Avenue north of the intersection to
add one southbound exclusive right-turn lane.
Estimated Cost = $50,000,
c''':, " i..... I'. . \ \, \,,:", I I ,)1 '): ,;I" ;( ':P'" 1_ ,:'I.j i - f ).1. I - 1')1, II il! II L.' 1,1 ..., ;(, l, ~:.';':, : ) i \ ( 1 ) \ I '_:. ' ' :(,~'
,... ,',
(t
o
Project: Southgate
Case No. PM 17887 & DP2 06-06
Page 13 of 14
e
2)
Modify the existing traffic signal to accommodate the
widening of Tippecanoe Avenue and to add right-turn
overlap phasing for southbound traffic. Estimated
Cost = $75,000.
Total Estimated Cost = $125,000;
Project Fair Share (23%) = $28,750
iii) Waterman Avenue/Oranae Show Road:
1) Widen Waterman Avenue south of the intersection to
add one northbound exclusive left-turn lane, providing
dual northbound left-turn lanes. Estimated Cost =
$50,000.
2) Widen Waterman Avenue north of the intersection to
add one southbound exclusive right-turn lane.
Estimated Cost = $50,000.
3)
Widen Orange Show Road west of the intersection to
add one eastbound exclusive right-turn lane.
Estimated Cost = $50,000.
e
4)
Widen Orange Show Road east of the intersection to
add one westbound exclusive right-turn lane.
Estimated Cost = $50,000.
5) Modify the existing traffic signal to accommodate the
widening of Waterman Avenue and Orange Show
Road. Estimated Cost = $75,000.
Total Estimated Cost = $275,000
Project Fair Share (14%) = $38,500
iv) The above costs are based upon guidelines presented in the
latest San Bernardino County Congestion Management
Program (CMP) and they do not include costs for right-of-
way acquisition, utility relocation, landscaping, mobilization,
or contingencies.
v) The fair 'share contribution for each parcel, based upon
proposed building size, shall be paid prior to any permit
issuance for each parcel.
e
vi)
The total required fair share contribution is $144,250,
which is divided between individual parcels as follows:
c.,,',', :1" ii .\',\1\;1, i'l SI,~i';I\<l1".',~<t.""I;.l.;-';',il:i:.."i",i",: .'..'.'1'.\ 'l'\'. .'"
'()
(j
Project: Southgate
Case No, PM 17887 & DP2 06-06
Page 140f14
e 1 ) Parcel 1 = $1,875
2) Parcel 2 = $4,785
3) Parcel 3 = $7,989
4) Parcel 4 = $24,789
5) Parcel 5 = $60,598
6) Parcel 6 = $34,602
7) Parcel 8 = $9,612
e
e
.;;.... ')1 .\ '-.'.:'" I I'I.~I.:(I' :<,p,,:, ::',jl'- ';i i -:1, i !;1:',,<',",,1 ;""",;;";. " ]'\\. (I) \ "-='.: :;n,:
".. "
.
Property address:
c3.
~
\1i6
City of San Bernardino
STANDARD REQUIREMENTS
Development Services/Plan Check Division
~
SO\tt( ~.,.~
~P'.'6lJP"DP: ~ t. 01.- ofo DATE: i ('7/4
NOTE; NO PLANS WILL BE ACCEPTED FOR PLAN
CHECK WITHOUT CONDITIONS OF APPROVAL
IMPRINTED ON PLAN SHEETS.
Submit 6 sets of plans, minimum size IS" x 24", drawn to scale. If plan check is for
expeditious review, submit 6 sets. The plans shall include (if applicable):
site plan (include address & .assessors parcel number)
foundation plan
floor plan (label use of aU areas)
elevations
electrical. mechanical, & plumbing plans
.~
detail sheets (structural) .
cross section details
show compliance with Title 24/Accessibility (disabled access) .
a plan check deposit fee will be required upon submittal of plans.
Call Development Services (plan check) 909-384-5071 for amount.
a.
. b.
c.
d.
e.
f.
g.
h.
I.
1. The title sheet of the plans must specify the occupancy classification, tlpe of construction, If
the building has sprinkler,s., & the current applicable codes.
2. The person who prepares them must sign the plans. Also, provide the address & phone
number of that person. Some types of occupancies require that the plans are prepared,
stamped. and signed by an architect, engineer, or other person licensed by the State of
California.
3. For structures that must Include an engineers design, pro,.ide 2 sets of stamped/wet signed
calculations prepared by a licensed architect/engineer.
4.
Provide 2 sets of Title 24/Energy compliance forms and calculations. Some compliance
forms are required to be printed on the plans.
.
5. Submit grading, site, and/or landscape plans to Public Works/Engineering for plan check
approval and permits. For more information, phone 909-384-5111.
300 N 'D' Street San Bernardino CA 92418
909-384-5071 Office
909-384-5080 Fax
e
e
e
~
()
6.
Fire sprinkler plans, fires suppression system plans, etc., shall be submitted to the Fire
Department for plan check approval and permits. For information, phone 909.384-5388.
7. Signs require a separate submittal to the Planning Division for plan check approval and
permits. For Information, phone 909-384-5057.
8. Restaurants, food preparation facilities, and some health related occupancies will require
clearances and approved plans from San Bernardino Count)' Health Department. For
Information, phone 909-387-3043.
9. Occupancies that Include restaurants, car washes, automotive repair/auto body, dentist
offices, food preparation facilities or processing plants, etc. may require approvals and
permits from San Bernardino Water Reclamation. For Information, phone 909-384-5141.
10. An air quality permit may be required. Contact South Coast Air Quality Management
Division for information, phone 909-396-2000.
II. State of California Business" Professions Code/Contractors License Law requires that
permits can be Issued to licensed contractors or owner-builders (that are doing the work).
Contractors must provide their State license number, a city business registration, and
workers compensation polley carrier" polley number. Owner-builders must provide
proof of ownership.
NOTE: PLAN CHECK TIME ON THESE TYPES OF PROJECTS IS APPROXIMATELY 4-6
WEEKS FOR I ST CORRECTIONS. EXPEDITIOUS- REVIEW IS APPROXIMA TEL Y 10 WORKING
DA YS. THE DEVELOPMENT REVIEW PROCESS IS NOT THE BUILDING PLAN CHECK AND
DOES NOT IMPLY THAT THE DESIGN AS SUBMITTED WILL BE APPROVED WITHOUT
CORRECTIONS.
Comments:
300 N . D' Street San Bernardino CA 92418
909-384.5071 Office
909-384-5080 Fax
I
,
~ "
~ ~
CITY OF SAN BERNARDINO FIRE DEPARTMENT
STANDARD REQUIREMENTS Case:-rP/VI 1,9,og'1
Date: (". 2.? . (0
-r pt1 I'1Q,Q1' .Di2/L 0(').011.- Reviewed By: ~
INERAL REQUIREMENTS: '
. Provide one addttlonaJ set of construction plars 10 Building and Safety for Fir. Department use at time of plan check.
Contact the City of San Bemardino Fire Dopartment at (909) 384-5585 for specific detailed requirements. '
The developer shall provide for adequate tire now. Minimum fire flow requirements shall be baled on square footage, construction features. and exposure
inlonnation supplied by the developer and must be available 2!!2r to placing combustible materials on site.
jJATER PURVEYOR FOR FIRE PROTECTION:
The tire protection water service lor the area of this project is provided by:
""rst San Bernardino Municipal Water Department-Engineering (909) 384-5391
o East Valley Water District-Engineering (909) B88.8986
o Other Water puNeyor.
Phone:
PUBLIC FIRE PROTECTION FACILITIES: '
~ Pub,.c fire hydrants are required along streets at intervals not to exceed 300 feel for commercial and multi-res6dential areas and at intervu not to exceed
500 feet for residentiallr.u.
111 Fire hydrant minimum flow rata of 1.500 gpm at I 20 psi mintmum raidull pf'8Slure are required lor commercial and muhi-resldenti8lareas. Minimum 'ire
hydrant now nltes of 1.000 lP" at a 20 psi minimum resktual pressure are required lor residential aresa.
)d Fire hydrant type and specific location shall be jointly determined by the City 01 San Bernardino Are Department in conjunction with the water purveyor. Fire
'I'- hydrant materials and installation shall conform to the standards and speclflCatlOnl of the water purveyor.
1st Public lire hydrants. lire $8rvices. and public water facilities necessary to meet Fire Department raquiremenla are the developer'llinanciaJ responsibility and
l' shall be installed by the water purveyor or by the developer at the waler purveyor's discretion. Contad the water purveyor indicated above for addltlonal
information.
ACCESS:
':ii Provide two separate. dedlcaled reutes 01 ingress/egress to the property entrance. The routes shall be paved, aU weather.
~- Provide an access road to each building lor fire apparatus. Access roadway shall have an all-weather driving surface of nolless than 20 feet of unob-
5tNCIad widII1,
~ Extend roadway to 'Nithin 150 feet ct all portions 01 the exterior wall 01 aU sin~1e story buildings.
~ Extend roadway to lNithin SO feet ot the 6'.<tenor '1411 of aU multiple-story buildings.
Provide "NO PARKING" signs wnenever parking of vehidas would-poasible reduce the ctaarance of access roadways to less than the required width. Signs
are to reed "FIRE LANE-NO PARKlNG-M,C. Soc. 15.15",
o Dead-end streets shall not exceed 500 feet In length and shall have a minimum 40 foot radius turnaround. r
o The names of any new streets (public or private) shall be submitted to the Fire Department for appro~al. '~ r:O~
SITE: .11 f/- $
~I access roads and streets are to be constructed and usable prior to combustible construction. (fJ-'
Private fire hydrants shall be instaUee: to protect each building located more than 150 feet frem the ccrO line. No fire hydrants shou be within 40 1 of
xtenor wall. The hydrants shall be Wet Barrel type, 'Nlth one 2Yl inch and 4 inch cutlet, and approved by the Fire Department. A adjacent to fire
hydrants shall be designated as a "NO PARKlNG~ zone by painting a" 8 inch 'Mde. red stripe tor 15 feet in each direction in front of the in such
manner that it wtU not be blocked by parked '/ehic!es. Lettering to be in whfte 6~ by 'At-. .
BUILDINGS:
~ Address numerals shall be ir:staUed ,;" l~t! bWldi:"1g at the lront or vther approved location in such a manner as to be visible 'rom the frontage slreet. Com-
!'\. mercial and multi family addmss numerals st'la!l be; inelles tall'1g1e family address nU'~ali'?ls snail be 4 inches lall. The color of the numerats shall con-
:=~t~:~~:~~~:::t~~~~I~~';:.lhth.numbe:~llheU"iU'."~^' 1')( 4-' )/()Ma~.&!.S ON Some 'Ro~.5
~ Fire extingUiShers must be installed pncr to tt..a ty:tdil19 taing cccupied. The 1I1jnimurn (...ling fo, dny fire 8'<1inguisher is 2A 10BIC. Minimum diltribution of
T<... fire extinguishers must be ::)'Jch that f1<) :~',tell(Jr p.ut at the bUIlding is over 75 foe! travel Ciot3nca from a fire CJdingu:"iher
o Apartment houses with 16 or more ul1lt'5, hOlels lIT ,)10:;15) Vllith 20 or more units, or apartments vr r,otels (mot09ls) thrae stories or more in height shall be
equippedwilh automatic fire !lprink~erj de<;rt;;n..;d to NFPA standards.
~ All buildings, over 5.000, square f~t. 3~.:l1l tlo e!i1.JIP,red 'Nit!'1 an alJIOm, atic lir~ s"gp,.~nker $'J<;It:J!iCk:'5igned to NFPA <,tandards. This includes existing buikjings
vacantover365days.5pp../NK.U!I- 'DF.:N:5rrV I:SI/At.<.- t:1e ,~ 3.;J;)O UHl.<:;~ ~/T/C.A
t Submlt plans for the fire prC'tectiol1 s}'5!')(T' to l~ ;:Ire Department pnor te be:)irmmg ronstr 10" of the sy.!>ler:1_ PerTTlIl required. ~ 71!:O
Tenant impro'/ements in 311 sp:";1~:ero;ld ht.J,h~i"gs are tc be apolo".;d by !/"Ie Fire DapartfTlart pfier to start of ccnsl/;Jclt(ln. Pennit required.
Provide fire atann lraqU, Ired throlj'~I:'l, IJt;. PLjr'., must ~ apprOvE.:d by Ino Fire Df.!partme, nt pnor fo.J slart cf lns.taJ1ahon. perrn,ll rCQu~red.
Fire Department connectIon 10 S.prlfild.,;: s',st::lC'slandplpe system. :;hall be lequrred al Fire Department i.lpproved location.
Fire Code Permit lequlred. apply a,r jrx: ci'tst _:,n1 st,ael, (9C9', 384.5188.
Fire Sprinkler monilonng requtrari ?!an..; ,~U.:,\ 00 approveoJ by !"Ie ~;re O-:ipJrtment prior In the start of oonstn;ctJon. ~erm.t reqUired.
o Occupant Load,
Note: 1lle applicant must request.:n ".nfi"l', "-~f ...:har:.1'lS tlJ Fire Department requirements.
ADDI~AL INFORMATlOJ;' p~W I ~ Ie KlJ~1L8;Jt. f,Nf~ ~~Jii. r{'L~.K~J~H.td6vL~tJ.1{2~_. _,
r~*.~l.'()E-A UJmf.WO rr'l~~~ll:~ .t2U1.!JL.M5on.J:I.A;5 fQ;s::a8~._uo_
~~llil!.$~_.GlO~e:.: ,/2.PrC-K. T::1e.l<;"t4... ~_ b=:.-0J-f-;;t2.,fJ/l,fPCl1E12 WI"'-1./
'1!ICI;f'f.1I/J<:t~"- 6J/'J;~./{CT~n~_7JtE:.._~ m 0)2 rr'i _ S-rQr2..lt~~Ei!'.!.,,-__
4~ _4c.C=:'J, -. DIJor;:$ ~(t.. 6E:., f'INL!:lcll..AI ~tLLQQ '61.tCAL, ,Ea,;u:..al;:--;:T
__i1pg_Af<,J5ftS'- 5. ) I!lt:. S"-(OMJA1Yf.~5:1".!!.f>4:l2r'/,a -tOljoJr Qf;J.OPVf!.(:TI:J
>eg""""" /~$( '6S I/~F;.O IV /!JEt r<..F;.~c-v~O \Iv rrH ."rHf- FIRE;; OF-pro Wt+7G:."~ (':'TcJ
,
CITY OF SAN BERNARDINO FIRE DEPARTMENT
STANDARD REQUIREMENTS
~L.m fv'iEADawS/77PPd-~
~p~ 00 - OL !Pm !,!~.~7~= -:l)12 -rr 0 (o_~~__
JNERAL REQUIREMENTS:
Provide one additionat set of conslru .Ilcn pl<ll'~ 10 BUlijing a"d Safely trlr Fire Department use 81 tjm~ <;,f plan check.
Contact the City ot San Bernardino F:re l'''parrr .:nt ':It : 909; .184-558."; lor spticilic detaiJed requirements.
The dev~loper Sh,al! provide for adeq'iJle l:rJ flew. Mir,imum fire. flow reqLdrer:"llmts 'Sh~1 be base,d on s'1~ar'3lcatage. construction features. and exposure
informallon supplied by the d'3veloj;t::r and mUGt t:e av.:.,l:able unor Ie plac1rg combusttble matonals on c;lte
Case: ,PH I 7~ 87
Date: qh(v .
Reviewed By: C4::"JU
~TER PURVEYOR FOR FIRE PROTECTION:
The fire protection water service for the area cllhJ5 proje!';t is prJ"I.j",d by:
)C) San Bernardino Municipal Water Dep3rtment-E/lglneerlroq (909) 384.5391
U East Valley Water Districl-Eng:np.sring \:J(9) 888-8986
o Other Water purveyor.
Phone;
~LIC FIRE PROTECTION FACILITIES: . .
. Publk: fire hydrants are required along streets at intcrllals ~ot to "Ixr.eed 30C feet for commErcial and mulli.rt:sidenlial areas and at intervals nallo exceed
500 feet lor residential areas. .
Fire hydrant minimum flow rates 011.500 gpm at a 20 pSI minimum residual pressure are required ler commerc!al and mutti-residentiala...... Minimum fire
1L hydrant flow rates ot 1,000 gpm at a 20 psi minimum residual pressuro are required for residential araa~.
rs- Fire hydrant type and specific ,location shall be jc:nlly delennined by the City 01, San 8e'ilaroino Fire Departmenl in conjunction with the waler purveyor. Fire
hydrant materials and instaltallon shall .:onfonn to the 31andards ,3nd specificatIOns of the water ;:~lVeyor.
lsa Public fire hydrants. fire se.....1Cds. '-1(,1) publiC ...a~!:"r fdt:.lilies necos:::ary to meet Fire Depe:art1T.ent r'lQuir~ments are the developer's financial responsibility and
shatl be'mstalied by the ,^dter PUI'\.'O;>', .'jr or by the rj,:}'/Hlcpqr at the water pUl'\reyor's dis.:ref'O'" Cotltact the water purveyor indtcated above lor additional
information.
ACCESS:
...R! Provide tv.Io separate, dedicale! 1""11<15 d ingre'islegress to the property antrance. The routes spatl be paved, all weather.
,.- D Provide an access road to &a./;t: to'Jllding IG; I;re ,icrJalafus. Access roadway sl'1all tlave an all.v~ather driving surface of not less than 20 feet of un0b-
structed width.
l5i(' Extend roadway to within 150 feel Crt all j:crtIQf'l$ 'Jl the '1xtcllior wall of cdl single stor; buildings.
.t[j Extend roadway to wlthlO ~o '..ll'l [II ~:"~ ':,<!~.:Pcr ,...,::11 0' iJU muillpje"s~r;ry Oljlld'r,~s.
t"'5r Provide "NO PARKING" <;,'gn5 V/;f"r',r".Cf r3rkir.g ': \. er"de.:i W~'.'Jid posslDle rer.lu<.;~~ i~a cl,~arance of dccess roadways to less than the required iMdth. Signs
V_are to read "FIRE LANE-NO PARK,fIG--M.C. Sec. 15.1fi"
o Dead-end streets shall n,A "~G"l,'d <r,' , ',,:,! in '''!rJ:h <.li:d S!l.l.:1 n__we A. nJlf'limum 40 1"'01 ruuil.s turnaround
o The names of an't new ;tre..::ts r.lJt,I':: ';r P' I'. ""t.:) 3h-:>11 D0 ::'utrll1t;ud to ~r,e Fire DepartlTlcr,t for approval.
SITE:
~AJI access reacts and sfroets m; to "';" ':.J"stn.wl",d and ';sClbln 'Jrior 10 1..0lT'bustible COlstructi"n
Privalelire hydrants shall be :",<;IJII<::'1lr' p:.::t'iK~ .~ach b...:ilcing located rrGrIt lhan l~;a feet from -t.~ curb lill~. No fire hydrants should be within 40 feet of any
exterior wall. The hydrants Sildll Ll:' Nol ililrrel type, 'Mfh Jr'le 2:2 mch and 4 inch Outi'3t. and arr-rov13d ty the Fire Department. Areas adjacent to lire
hydrants shall be de6igraled 'is d NO PARKING' :ore ty pall'mg an 8 '''r.:h wice. ~;Jr; ,I;lp€ fvr 15 feet in each direction in front of the hydrant m such.
manner that it will not be blo.:k.ed by ::;,lfio 'E-d.,( !t;d'1'i Lettcrn:l] 10 b.! In ,.vt1ile 6" ~y ';.~
BUILDINGS:
'V1 Address numerals sh3l) ':e r'!O'd:le-1 en .I"".,~ l:1 '1'11n9 ,'1 ~re fr'Jnl ')" Qlr:t'l :!pprj\l,~!1 ;x~;I'-.:'l in :;ucn a mar,ner as 10 be visible from lhe frontage street. COm.
r mercial and multI family ad' ,,:!,j ,".:rr _ --:,1" .~h1'1 ".:,( ",:r.,!c. (;11'. SII-JI;? '..-ilClly dJdre-:s "wr".ra!" iit,.,:.,i1 t~ ~ ;nchas lall. The color ol1he numerals shall con-
trast wtth the color 01 th~ t;ac,<:~r 'Jr.J, ,7-
o Identity each gas and eleclf'c r~,t.;,W 'oN. t' q., l.. ~b6r ) "'1>1 '." ::f II ;;':l'.'e";
"1v1 Fire extinguishers ml;st be ;n':.~:.I:lt,.j v,:r' ~ h:J I,: - ~ :Y'''J G,':'J":II',C 1 C,,3 mf(hll"J"l ''li''g;cr c.ny lir.,; a:dtngliisher is 2A 10BlC. Minimum distribution 01
r fire extinguishers must be ,s',j,;h It"dl ,I'~ "':.j '.); r.,-,I' ,;~ !".-! i).;:'r"1in~ ''0 ..)~fj' 75 :t't:~ :ravp.! tjis~~tn'-l;; 'c0m a fire mainguisher
o Apartment houses ''''1tn 16 Qr l,,~,rE:--,f' I~. ~ ;'("~ __ "':; .c-';::C ojr ')I:' I! .~!'Ils. 01 "".L'artf11"':l'S r~1 1101el$ (metals) tr:rea slories or more in height shall be
equipped with automatic fire .,;:,rwk'.",,! . Jr".' - ..-"-:",v --.~-r';:j.
~ :c::::~~:~';e~:y~C -:':j:....:!(e '::-f;!t. :~, to! ._ ., ". '~",.. :'r, d' 1l.'~ ,;,i':; ~"e :;.:',r,!<.e- ~:' L' l'~.:..'JIlf;a I'~ IJ.-=-?A ::.~.vldards. This inclIJde!t existing buildings
~ Submit plar.s tnr the 1,(,; pd -'t ~.:1 .
~ Tenant Impro"err.enls :11 J'I,[.," ..",
[1 Provide fire alann {'....qt.I.":fJ :r, ::"",ji'
:is Fire Dep.u1ment c.;r.,'l.';! ,- r' I,.
~ Fire Code Permit requ,re:!. ,\r~:',l~ r.
Fire Sprinkler monill)ril~g r~l'-'r :;r: .1~
Occupant Load.
,.,
'.. ~: 0(''-'': .-,,~~,.;:,...':i ,:(".i"...i,.~<.tl..n ;1 r't? ~1 S:Am. ferrl'l' ,'o'1'Jir<::'d.
f.~'-' ,~v: ~'\ :"c '-., , lp.c.J 'tm~~nt ~dc' :c -:.1;..1:; of _;r"'str! '(.:Ii,:n FerrTll! required.
f:.l i 'l L- !:-.~"-'e -:"-,rilrtnl<}n! ':i;~Jr I" '-o!art .)1 ".;;,u",)f:c') Ptmmt rOG,.lred.
'",- cr, ;;:'y 1 ",.11(',: at FI;.--, CEr;..H~llo:nl lr.~'r::,elj ;':(;.1tlon.
l';r
.1:,..;',.,.,
.: h," ". ' ".':
;,.'l,....t..:.
. .. ,. i.~ ::..!
..\~-:::.3e!j
.", Fir'.. C')f:',~.tl. ("'1 ~rC'IO ;he :,t~rt " ...:n'i:rut:tlcn_ Permit reql,;Jred.
Note; The applicant Tr.'.st r:::'_~u"s: r, I.t ..,~ ~,t ':' ~. (-".' I :~:"IG"I r'Jql':rerr.er:ts.
AOOITIONAlINFOPMATiON. ~ C;::"V I .)\.JG Cow.nuF-I'..1IS -o~ I? (0 h z/ 6lJ. Avfl~'i. ..~ ___ ______
_.:2F-,-_yl.-tJPrl'Ll1 ~I KIC: Ac:.C~5S 12-oAOrs.{SSU~5 51/:tt1.-t. I3l! $OULJf:'J:L_
__WL7lf _Iilr- I~Pe MPr(l:;#'Ac , __________
FP8 171 'o:J.03~
~~ BERNARDINO MUNICIPAL WATER REPARTME~
STANDARD REQUIREMENTS
DRCIERC C..e: TENTATIVE PARCEL MAP NO. 17887 (SUBDIVISION No. 06-13) & DEVELOPMENT PERMIT 2 NO. 06-06
APN NUMBER
EPN NUMBER
REVIEW OF PLANS:
OWNER
DEVELOPER:
TYPE OF PROJECT:
0280-121-26,27,29, 30, 31, 32, 34; 0280-251-49, 51, 52; 0280-101-26; 0292-011-39; 0136-341-03. 48; 0136-371-02
2004-076 DATE COMPILED; 6120/2006
COMPilED BY: Brunson. Ted
Hillwood lij II. lP
Thienes Engineering
A request to subdivide approximately 163 acres of land into 11 parcels and construct 26 buildings (total of 2.981.106
sq.ft.). The sije is generally located on the former Palm Meadows GoWCourse -Intemational Trade Center (DiStrict 5.
o
The former Palm Meadows GoW Course. east of Tippecanoe Avenue, south of San Bemardino Intemational Airport,
and on the north and south sides of Palm Meadows Drive.
WATER DEPARTMENT ENGINEERING:
NUMBER OF UNITS;
lOCATION:
CONTACT; Litchfield. Matthew
PHONE NUMBER (909) 384-5386
FAX NUMBER (909) 384-5532
NOle: Alf Wa"" Services aAl Subject to the Rules RegUlations of the Wa"" Department
:-.: Size of Main Adjacent the Project
:::: Approximate Water Pressure Elevation of Water Storage: Hydrant Flow@ 20psi:
-= Type, Size, Location and Distance to Nearest Fire Hydrant
:-: Water Supply Study Required ;:::: Pressure Regulator Required on Customer Side of the Meter
=- Offsite Water Facilities Required Water Main Reimbursement Due
:::: Area Not Served by San Bemardino Municipal Water Department
:::: Network Hydraulic Analysis Required per Uniform Design Standards
Comments: . - MAIN EXTENSION REQUIRED THROUGH DEVELOPMENT
. - DEVELOPER INSTAllED AGREEMENT REQUIRED
WATER QUALITY CONTROL
a;ONTACT: Arrieta. Con PHONE NUMBER: (909) 384-5325
~ RP.P. Bacl<ftow Device Required at Service Connection for Domestic Service
.'1 Double Check Bacl<ftow Device Required at Service Connection for Fire and Irrigation
~ Bacl<ftow Device to be Inspected before Water Service can be Activated
. No aacl<ftow Device is required at this time
FAX NUMBER: (909) 384-5928
SEWER CAPACITY INFORMAnON
CONTACT: Thomsen. Neil PHONE NUMBER: (909) 384-5093 FAX NUMBER: (909) 384-5592
Note: Proof of Payment Must be Submitted 10 the Building Safely Department !'riOT 10 Issuance of the Building Parmlt
::~ Sewer Capacijy Fee Applicable at this time
Sewer Capacity Fee must be paid to the Water Department for II Gallons Per Day: Equivalent Dwelling Units: II
~ Subject to Recalculation of Fee prior to the Issuance of Building Permij
-_~ Breakdown Of Estimated Gallons Per Day
COPY TO: Customer; Planning; Engineering
e
Thursday, June 22, 2006
EPM
Page 1 ofl
e
'(~ ~
.L~ \~~
City of San Bernardino Public Services Department
Standard Development Requirements
300 North 0 Street - 4th Floor
San Bernardino, CA 92418
COMMERCIAL & INDUSTRIAL DEVELOPMENT
Collection Services
,
1. The collection or transportation of refuse, recyclable discards, or green waste from any commercial and
industrial locations within the City shall be provided by the City of San Bernardino Public Services Department'
unless otherwise franchised or permitted. [MC ~ B,24.140J
2. New accounts require a completed Service Application, with a full deposit and a copy of manuals for all I
compactor units, returned to the City of San Bernardino Refuse & Recycling Division prior to issuance of the final I
Certificate of Occupancy.
3. Shared refuse and recycling services for multi-tenant commercial sites shall be billed to a single owner or I
property manager; leases shall include terms to accommodate sub-metered services. ,
4. All refuse containing garbage, such as food, vegetable, or animal wastes, shall be removed at least twice weekly,
and all other solid wastes shall be removed at least once weekly. [SB County Health, Sanitation and Animal
Regulations ~ 33.0B3]
All commercial establishments generating 6 cubic yards or more of solid waste per week shall establish City ,
recycling services for maximum diversion within 30 days of opening business, or establish an alternative I
diversion program to be identified in the IWM Survey for the project. I
Automated Cart Service to Nonresidential Facilities
6. Nonresidential establishments such as small offices, shops, meeting halls, or churches, whiCh generate 2 cubic
yards or less of non-bulky waste per week and are located on the same side of a residential block receiving
automated cart service shall meet residential rather than commercial requirements.
Service Vehicle Access
7. proj~cts shall meet City Engineering requirements for commercial vehicle drive access along the main ingress to !
and egress from enclosures. These requirements shall not limit requirements for Fire vehicle access. i
B. Property without through access shall incorporate at least one of the following designs:
. A cul-de-sac with a 40-foot turning radius for a 32-foot vehicle length
I
i . A hammerhead turn with a 40-foot turning radius for a 32-foot vehicle length
Gated Access
i 9. Gated properties that are locked and unmanned on service days anytime between the hours of 5 AM and S PM '
, Monday through Saturday shall provide access code or key to Public Services.
Shared Collection Areas - Reciprocal Access
.0. Front-load bin enclosures and roll-off compactor units may be shared across existing or proposed property
lines If enclosures or equipment provide adequate capacity for anticipated refuse and recyclable materials
, generation, AND if Reciprocal Access for shared collection areas is recorded with the property.
Roll-off Compactor Units
MD PS 6.272003
("'~ G.
11. Sealed compactor units dedicated separately to refuse and recyclables may be required to be Installed at
facilities with an anticipated waste generation of 60 uncompacted cubic yards per week.
) 2. Roll-off compactor units must be installed according to manufacturer's and City Engineering specifications ''''th
the compactor hopper and roll-off box on a concrete slab with a minimum 3-foot continuously paved perimeter
for safe access.
e,
J 3. Roll-off boxes at locations receiving City service must meet City rail and hook specifications per City.
Engineering Standard 5 J O. Boxes shall be designed with disposal end oppOSite hook-up; boxes with same-side
design may be subject to a roll-back charge.
14. Compactor equipment shall be screened from view of public right-of-way by materials compatible with building.
architecture and landscaping as specified by City of San Bernardino Development Code. [MC ~ 1 9.20.030 (21))
15. Location, orientation, and dimensions of enclosures, enclosure gates, pedestrian entry, compactor pads, and
compactor screening, shall be shown on site plans and labeled that construction shall meet City Engineering
. Standards.
e
e
MD PI6.27.2003
(j~
City of San Bernardino Public Services Department
Standard Development Requirements
tit Page 2 of 2
(Tr.l
Existing Bin Enclosures
16. Existing bin enclosures must have minimum inside dimensions of 7'9" x 9' OR 15' x 4'5" to fit two 3CY bins.
Existing enclosures must have block walls, inside bumper guards or curbing, and solid steel gates, OR
enclosurels) must be reconstructed to meet Engineering Standard 508. Enclosure may be relocated for best drive
access and alignment, plans subject to Public Services approval. (Please note, if site will generate 2CY or less of
solid waste per week, see Residential Collection options.)
Front-ioad Bin Enclosures & Access
17. Minimum double-wide enclosures of 8 feet by 15 feet shall be required for all development to allow for
dedicated recycling bins, except where potential waste generation or space is restricted. [Specifications adopted I'
in accordance with Model Ordinance as required by CA PRC ~42911]
18. Front-load compactor units must be contained in an enclosure large enough to hold the unit and one additional;
bin facing lengthwise.
19. Front-load bin and compactor enclosures must be constructed according to City Engineering Standard 508. Rear
or side pedestrian entry shall be provided on enclosures for all multi-unit residential development. Pedestrian
entry on free-standing enclosures shall have a 4-foot width, no gate or door, and an 'L' shaped block screen the'
same height of the enclosure.
O. Pedestrian access from building exit to bin enclosure shall be a minimum 4 feet wide and continuously paved,
without crossing curbs, steps, or driveways.
21. Enclosure pads shall be level to restrict bins. from drifting and designed for proper drainage of surface water.
22. Enclosures must be at least 5' from combustible walls, eave lines, or openings. [98 CA Fire Code ~ 1103.2.2]
23. Only refuse bins and the contents therein for disposal may be stored in refuse enclosures. All other equipment,
fixtures, and materials such as electrical panels, circulation or exhaust ducts or vents, grease bins, or surplus
supplies are strictly prohibited.
24. Enclosures shall be buffered with landscaping when viewable from public right-of-way, and vegetation shall not I
restrict gates or exceed height of enclosure. Include vegetation on landscape plans.
25. Enclosures shall be located with gates aligned for straight access for service vehicles.
. I
26. Enclosures shall not obstruct drive aisles, driveways, loading zones, parking, handicap access, or visibility of !
cross-traffic from drive aisles, alleys, or streets. Location shall not cause service vehicle ~o block access drives i
during'while bins are being serviced.
27. Enclosure gates shall not open into drive aisles, parking spaces, or walkways. Enclosures placed adjacent to
parking shall be separated by a minimum 2-foot wide curbed area out to the farthest pOint of both gates, and
designed to safely restrict gates from opening into parking spaces or landscaped areas..
tit
28. Location, orientation, and dimensions of enclosures, enclosure gates, and pedestrian entry,
sIte plans and labeled that construction shall meet City Engineering Standards.
shall be shown on
MD. PI 6.27.2003
e
e
e
.'il!l SPA 06-0PWM /7887. VAR 07-08. DP2 06-06
.1 A IT ACHMENT EJ Hearing Date: April /7. 2007
MITIGATION MONITORING AND REPORTING PLAN
The following Mitigation Monitoring and Reporting Plan (MMRP) will help assure that the
mitigation measures contained in the Environmental Impact Report (EIR) are properly implemented
according to state law. The MMRP identifies measures incorporated into the project that reduce its
potential environmental impacts, the entities responsible for implementation and monitoring of
mitigation measures, and the appropriate timing for implementation of mitigation measures. As
described in Section 15097 of the California Environmental Quality Act (CEQA) Guidelines, this
MMRP employs both reporting on and monitoring of project mitigation measures.
The objectives of the MMRP are to:
. Assign responsibility for, and ensure proper implementation of, mitigation measures;
. Assign responsibility for, and provide for monitoring and reporting of compliance with
mitigation measures; and
. Provide the mechanism to identify areas of non-cornpliance and the need for enforcement
action before irreversible environmental damage occurs.
As the Lead Agency, the City of San Bernardino is responsible for ensuring full compliance with the
mitigation measures adopted for the proposed project. The City will monitor and report on all
mitigation activities. If, during the course of project implementation, any of the mitigation measures
identified cannot be successfully implemented, the City shall immediately inform any affected
responsible agencies. The City, in conjunction with any affected responsible agencies, will then
determine if modification to the project is required, and/or whether alternative mitigation is
appropriate. The following MMRP presents the implementation plans for the proposed mitigation
measures for the San Bernardino Alliance California Specific Plan, including ihe Southgate
Warehouse Project (SWP).
Michael Brandman Associates
H.IClienI1263600OSI.MMRF
1
e
e
e
e:
~I
'"
~
'"
C
t:
o
2-
0:
'tl
C
..
'"
C,
'C
g
'2
~
C'
,~
1;
:
i
t
~
'~
e
~
~
..
,
o
.c:
e
~
~
..
'"
;;
,
o
'"
I
,~
e
g
';i
<.>
~
u 0
~.S
'- '2
~ ~I
o e.
.5 ~I
'2 cl
.. ..
e",
~~
11I0
Ci!;-
..'-
"'<.>
c
o
'"
..
tI
o c
U 'C
!!:.
~
o
c
o
'"
..
"
""
'C
~
..
:i>
-.;,.,
ct:
0..
0. a.
..
..
a::
'gc
,<:0
a;!
~c
.....
c E
.. ..
CIIQ.
.5E
E:;:
j::o
l!!
::J
..
..
..
~
c
o
i
CII
'"
:i
~
ii
'"
:s
~
..
Z
..
-
..
Q
~
'- 0
~:?;
S
C.l .~
~:c
O~o
c
e
0. ~ ~
oB.s
~ 'E ~
o~a
"'0 .~
~;; :c
gf'~'~ ~ 5 ~
.- c ~,.,!g == -
1il 8-= 0.'>: c
~ co "'0 ~.9
.9 ~.;j.~ -8 ~ .
~ '6 .,. e'- t:: ~
o - ~..c ;;.. 'C 0
'C '3 CO ::s fa lU ~
c... .c CI) rIl c.. > ;:>
VI
U
j::
W
J:
~
VI
!c'i!
~
.E
oil lU Oil
~..s_]~
- 0 co 0
~...>OOOlU
co "'0 e.5:g.c :5
-a ~ jS::9 c = ...
-0 '''' oj '3 ..:lll g
= "'0 = - rIl.::
~~; '~2::Q
g.~~~;:J~.fJ
0) ..0.2 !.] [3 :s
~aiJE~ea::
"'0 ~ .....- - In U
~ eo t:: :E .-
";j ~ ~.5 0 F-O::C
.... - e- :::I
vr co :('-fo.- . c...
.~c..._;.::<~c
....~~c; o'fie
& ~ -t:: ''5 :0 'E lU
o.o.c ilJ; fJ)..c:
0...0- u-
:.a .5 .~ 8. ; ~ ~
'3:E<-gE:oe8
..0 ~ (; co ~ .;:
>. _ t:: ell t.::: .~ u
C . 0'" ';:j ~
co B ,..::..c lU .... III
'- lU co.!:P Co ~ '=
o .. e u CI) lU co
o So OJ..c OJ..c ~
g co is ~.s'~..c
co E -.- o..c ...
:::1_ 0"'0 _ :r: 0
~~=:;E~';
.~ i: ~..o .... C ~
.s ..eaot.Eoe!;
-~E-= ....
.s co lU 0 0 ~ E
....o.a:l.~ u'3~
~.~ ~] ~ [.~
~
;::-
c
c
!:!.
VI
W
u
a::
::l
o
VI
w
a::
...
~
::l
~
::l
U
"
Cl
c(
e i:
'3 :J
g" c(
<>: ::l
" a
o a::
~ :<
~
-
&
<(
,.,
.&>
""
"
""
1Jl
~
8-
::J
en
~
;n
Gl
_ Gl
fit ::.
N
&
<(
oll
&
<(
,.,
.&>
""
"
""
"
~
"
0.
:l
en
~
B
';;;
c
o
,
N
m
;n
Gl
Gl ...
::. J;
N
&
<(
,.,
.&>
""
"
""
"
~
~
"
0.
:l
en
~
(':1
;n
Gl
Gl
::.
N
&
<(
,.,
.&>
""
"
""
"
~
~
"
0.
:l
en
~
"t
Gl
;n
Gl
Gl
::.
~
'"
&
<(
,.,
.&>
""
"
""
"
~
~
"
0.
:l
~
It)
m
;n
Gl
Gl
::.
N
&
<(
,.,
.&>
""
"
""
"
~
~
"
0.
:l
~
~
Gl
;n
Gl
Gl
::.
'"
&
<(
,.,
.&>
""
"
...
"
~
~
"
0.
:l
~
':'
Gl
--l
iN
;n
Gl
Gl
::.
..-
~"
- .
ClI_~
',,~
00:
..-
"0-
'to:
c~
..~
e-
~~
I!~
11I:6
'i~
.. c
.c:::!
J!Y
::l!i:
tit
tit
tit
t
~
.~
~
~
..
"
o
.c:
e
~
.!!
..
'"
5
"
o
'"
I
..
"E
i
~
~
u 0
~ .5',
;sO!
'C( 'Ii
o e
~ ~
.~ III
O!
.. ~
~ ..
~'"
~~
III 0
~;e.
.. .~
",U
e
l!
1
'"
~
t:
o
l
"
~
..
'"
~
.~
2
'e
~
~
o
1;
~
i
lS
:::
..
is.
E
o
o
-
o
e
o
:::
lJ
0;::
'C
~
..
:a
..'"
e1:
011
"'lL
..
c!
'8e
.co2
oS
::Ee
.....
e E
II..
01 is.
.5E
E;;:
.- 0
...,
ii
:::
:s
j
-
e
'C
lL
-
..
E
II
Z
S
II
Q
l!!
"
..
II
..
::E
e
o
:::
II
01
:::
i
;:::-
6-
<
,.,
.&J
"0
"
"0
"
..
~
"
'"
"
CIl
-
~
00
6-
<
,.,
.&J
"0
"
"0
"
..
I ~
"
go
CIl
-
'I'
'"
on
'"
'" "
:::. '"
~
on
'" 0
'" -
~ m
..
...
~
o
:;;: ..
o
.:! 0
:L5 e
.,cQ
"
;.
" 0
..s ti. CIl)
oo:~ ~ ".=
.5 a",= 6i,:S..
" t:... 11._ .. 0
UliUS..c::v.lQ.,,::
.~ c. ~ v.l ~ 00 ~
o OIlS i5".S!3
: ~ .~ t) .-:= -g ,~
0..... - IU o;n ..--
'C :s .g.= IU U S
0...&J 0.. Q -S.S "
~
6-
<
<<l
o
-
6-
<
,.,
.&J
"0
"
"0
"
~
&
"
CIl
-
~
.:;;
c
o
OIl
c
'i3
'S;
8
'"
,.,
.<:>
"
"
c
~
<.!l
..
"
.5
"
s
..
J:>
.~
"
E!
,;
B ..
~
~ fP
;]
OIl...
.S ~
~ "
.. ~
"'E!'
" .-
;;2
OIl"
'" "
c 0-
o~
U ..
it) it)
'" - '"
'" - '"
::. m ::.
0;,
= c
~ "i
.. 0
~=
5l~
c "
8.-s
.. "
-"0
&j "
.~-
e g
",.-
" l!!
oS,.!!!
-'"
p.
~g
OIl]
.5 '"
:g-
]1
.. OIl
t.. .5
o:g
--; "3
;..<:>
e~
"'.c
{;--
" ~
.s~
B l!!
.. 0
.g E
o..~
on
N '"
- '"
J, ::.
c
E
g.~g
~"E ~
Q~O
:!
S'.~
~ &
.; OIJ
- .5
""0
0-
'c '3
0...<:>
..
o
]
..
..
...
"
o
';j
.~
"0
"
~
o
:;
..
'-
o
...
..
"
...
-S
.c
OIl
"
o
.s
c
,9
tl
.g ~
~ S
-g l!!
.2 ~
]1
... "
~ ~
'"
"
oil
e
'N
..
0;,
"
o
"0
c
'ii {j
'- 0
O.c
c -
9 e
~ a
- ,-
..::: c;
::1:-=
.,g=
f- ~
.
...
c
...
'u
S
...
]
..
c'
.9
1;
"'3
.5
~
~
..
"
oil
c
'"
.~
'i3
c
o
"
..
.;
oil
.5
1;
"
.<:>
C "
" u
"tj ~ ..
S.~
... 0
,.,"
e!J~
".-
E.8
'-.;
o ...
o "
.2 ~
1; F
~:..
; t
... 1;
.0 "
f-.o
.
.
.;
~
...
1;
"
.0
..
..
'0
..
"0
o
..
o
OIl
':;;
"
"0
~
..
'0
..
"
;.
.:;;
..
..
'"
'-
o
o
.,g
e
o .
e-~
8 'i:
.5 ~
~Q.
f-{;-
.
~
"
.c
"
..
"
1;
"
"
<.l
"
"0
"
~
B
~ vi
'u tE
g.~
.. "
-.<:>
o ..
~ ..
.~ "0
.. ..
~ "
- ;.
..e';:;;
OIl..
" ..
o 0..
~..g
0";>
.~ ::
1; '"
0"0
.c 0
- ..
'ii c
o .9
~e.
~ 3
"0 ..
C 0
j 8
.
c
E
Q., ~ 0
,g (J t)
~ .~ ~
Q~O
OIl:!
~~
.~ 8.
s ~
a~
'C f!
0..00
o
o gj,
0"; .9
~ 5 ~
8. E .;
.. ,,"0
o o.~
.~ E ::s
e";;-u
Q., .8 .5
" .. "0
.c .. 0
- " ..
2~ ~
'2 0 "
c.2 ~
& 1;"
0Il'~ E
=.~ c
'i3::E ,9
:: :>, <;
] .-=:.gp
I-< t;.-=:
o " E
0Il0'.c
.5.:: ~
-g<iU
So;:;
~:>,o
<<I'~ "C
....u=
o 1J .-
....c "
,,- 0
00..
~-o.
.. 0- ..
.~ 1:
B~!-
~ C
.S,,; <<I
Q:-5lC:
-
~
;:::-
o
o
!:!.
M
..-
~'C
1; .~
'1:;"5
o ~
..~
"a.
<(0:
~:;;
..:;;
e-
ii
~~
~-
.."
.co!
"u
if
tit
e
e
e
l!
I
Do
"
l:
o
2-
0:
...
"
~
Do
.~
S
'e
~
"
,2
...
~
~
t;
~
'~
.t
~
~
~
o
.r:
e
~
.!!
~
r
~
o
'"
I
~
"E
J1
..
o
~
u 0
;.5
'--e
~ ~
o E
" ~
'- 03
-e "
~ ~
E",
~,
030
;t
",0
e
o
'"
..
is.
E
o
u
'0
e
o
'"
..
u
'"
;:
..
>
'~
"iii
'"
:s
:s
s
e
;:
!!:.
..
E
II
Z
GI
'iii
Q
GI
:;;
OJ...
et:
0..
liD.
GI
II:
"8e
.co2
~-
GIS
::lie
~~
....
..is.
.5E
E::
1=0
!
"
:3
..
::Ii
e
o
'"
..
..
'"
:ii
Qj S ~
~ ~ ~ cf.~ Ul .M
~ ilJ 0":= 4) "0 =:;....
VJ ..s '';: .5 6 "0 0 ~ p"
go >- e : .9- ~ .! "0 ]
- CIS 0 = s..~ lI) ~ S
~~ g.~... "'-
._ OJ l+-o U">< 0'0:-=
OClSc..oOSOOl)8.~
tIl ell 0 .;: ~.5 en_
'SS"'i:L,,'it;:E
~]] i 5 g ~.~~
tnoo";crllUi-o
~ -" ..c_ __ 0 '" '':: '" al
c';l (,) u sg II.) - .
=..gc1: Co ~ 005 g1S
0..2 e <I) --'+-<:::105
'5 0" ~~ 5 '2 0 ;
". B-tIlsJ3=o"'!:
.~:: oS >- ::s c.. 0 .-::s e
':;;:; ~ '; ,,3 ~]I '"
t: ;;>0 _ "'0 ~ a' cO = '0 ,5_
.cc~~,+-<ilJ=uE
G e ~~ ~.g-5]8]
<0 ,;- >. t: ~ g ; ~ ~ 8-
c O'"~] o]c..-~ e
.9 OJ "0 f-o..s 10-0 _ ;::.:..:-: Q.,
3510-0 ..:~gC'lS~~
c'=~>.eo=:!2<-
II,l u ell CIS ~ .- 0 VJ '-
8 2 sg "0 c.~ (,) ~ ti 0
o_t:.cc..e_ouc
c.. ~ < ~"3 Q) ~ CIS ~ .g
6 0 ilJ C" C "0 \.0 "0 u
.- U d coo ilJ <.., = ;:J
0i)4. CIS CIS 4. l.c 0 CIS J::
cO 10-0 10-0 o"Of-o E C tIl
".g e c == ~~ .::l..:g g
ilJ ILl 0 ~.- >. ~ E Q. u
E '5. [ 6. ~ ; ~..~ e ~
e -5 '3 '3 "0 "0 S ~ E 'C
.g~g"ff;;~ttJ8.g
"
E
c.. ~ 0
.su~
"> :: -
... f:::
o~i:S
0Il2l
" '8
'3 E
.~ g.
g gr
~ ,-
0'"
'C e
0.. OIl
M
o ~
2! ":; ,J;; '.. ...
= 0 ~'3c;..!:!"O ] 000"';;
.-'- :t ca:::.u u u CUe c..-. Oil
;. Jii... a;a:g" u ,- ,:;; 0 ,$
... .- .- 0 U 0 o..c: ;<.~ t: = ""'"
;Oi;~..c:>-:t~:-=~o::s
.~ = .... CY u Oil Oil~"O ~ 0 '; ~
c.. ~ .:: -< !5'.8.5.> ~ m ~ = u
c.. t:: ~ U .... u fr.- c.. .. <<I o.!
<<I o~tIJ,B'B 0'0 m== e Q..
o Oil .... tU m ~ tU "t:I 0'1::' u u
..c "".o..c: :t Il,) m = = = ::s: -~...
- -... .... 0 .- ~" "
.. tU = ';:' c..-. .. ....:...-:t tU ...
~"'="tU~Om..c:- ___
=~__.=~~uouQ.. -;
G.l ~ c.. = 0 U =' Oil c..- '..c:
5 "'- ... ,- '" l:l" 0 >. '"
.- 0'" -,..r;;;i" - m ... <<I ... tU
It.l ";j tl.~ <<I U ~ s: ~ 00 - "'0 m
> ::s s: ~.~ > 5 0 tU = S ~ ~_~
e CY 8 0 c..""; ..c: ~ ..c::.a U ~ U =
~.= _ U ~ ~ ~ 0 e..~ t; ~ -< 0
.5 -< ~ ~ 0 0I.l Q.. S t:::iS.a \0 CQ e
"'0 t; "'0 _ "'C s: m'_ V'l S c..-. "'0 ~
It.l <<I u:-=.a .t: iLl co N m ~ 0 = 0
\I) 0 to:: ~ U 0 ~ VI "0 U'r........ 5 " ~
o U .- s: > t: \I) iLl "'C .. s: e.
c.. U c.- 0 0 G.l C ::s tU ~
e oS 8. ~ (; U ~ ~ ~ tU ~ E Q.'-
c.. S ~ =OS ~ S ~ 0 0' ~ 'x - "E
~ lZl U 0 \1)'0 <<I ~ ~ tU S g \I)
-...G.l..!:"'="\I)\I)::=:o....."ccO
_ .~ C ~ "0"0 ~ 0 c.
0.seoU"OcUcUc..>.8cU8e
C"O Q.. U < G.l e e \I) tU.~ S _ c..
.:3 = tQ ~ CQ .g "0 \1)"0 ~ C CIl ~ 0
'0 tU..c ::s G.l .d ~ ~.5 =' to:: c "'C oS
;::l ~.-= "0 "0 ~ tIS U ::=: .= c .,g U c..-.
-= .- ::=: u.a ..." Q.. (,) \I) ;::l 0 flS to:: 0
\I) U _..c 0 0 C tU ::s 7 ... _ .-
""'O!-C"'='"OOV'lIt.lU~S
o ..c .- \I) " U 0 _ > c.. ... ._
0-"'="__....0>=_009-_
~tIS-U tUft! 0 "'0
.9 ~ CI > ~ .~ VI Q..~" ..c~"O ~ '0 2
, . ._ -- 0 ... - "0 C ._ ... _
- > ...... .... ....- 0 e <<I =' "0 \I)
.:3 0 U c.. "t:I -e G.l 0 t; 0 <<1.0' =
Q:; Co ~ g.. ; t; ~..::.5 ~ So 0'.0 Co 8
N
~
t:'
Q
Q
~
"
E
o..~8
.s 0 ~
~.~ ~
~~i5
~c~
.-= U (;
:: €,~
U<<I]VJ
<<I 0..'- "0
co.... ....
= ,sa 0 8. 8
<<I U Oil: ~
~ ,5~~ t;
'C '" c I:: 15.
8 8 c: ~ .5
" "
8.; ~i
'3 -; "0 C
C""O c .:3
iLl 0 .2 ~
ct) --
0- vi CI:l c
.: Q.. ~ ~ e
!:l 5 '00'<) "
tl8cg.Q.
~ : ~ m e
0'; 0 ='~
oc..OJJ~O
VJ" ~'$ ~ Ci;
C Il.l t:"O 0.0
l! u._ _ ,-
c c - c.-
!: i! 2! E a
O,B tIS 0.>'
e. = OI.l'S'-=
i: .; .5 0-"
.- C C G.l g.. C
"0: a "'0 .....:3
~ CI:l t ~ .; '0
O..C: c.. m Il.l 2
g..-=o"'O..c:...
.... :t: .... .... - en
Q.. "'0 e- 8 .5 c
OIl.l"O~08
-s.s ::= u :'= eo
-Suo;:gc
~.5.5 ;; o.~
o!ll"'"cQ."O
.- l:: ~ 0
o>.<<Ic~-
2 0:: g '; u 6-
ti 1lJ._ 1:::.J:J <(
" "'-
o e 13 E c; .E
(,)c.o~..c:"O
0il1lJ - C VJ 'lJ
C .J:J ~ .9- ~ :oS
.~ = ~ ::s 0:;
o 'i 0 S" -5l 0
..,
~
t:'
Q
Q
~
"
E
c. ~ !s
.s U (j
~.~ ~
~~i5
. - ~
~ c"::"
.~ 0 ";j
,:: s,~
-I:",
u " 0
tU c..-
" " ~
=.90 g
<<I - CD:
0=._
0Il,5 ,- ;.
.5 en 2 ~
5 = tIS ~
o8Q:t;
"
.&J
.~
'" ~
~~
o "
t; "
ga
"on
8 "
=.2
,,-
vi' ~
" ~
lL
~tS
e ==
~E
:;;9>
~ g..
o ...
"'''
e .S!
"'t;
1:!,5
- '"
'- "
o 0
" U
.S! 0
o~
5g
'"
" 0
8 c
OIl'"
" ~
!3 '::
o'i
"t
a
<(
t:'
Q
Q
N
-
...
..-
.!!~
,,-
'..'8
00:
~-
~Q.
<(0:
,,::e
,,::e
U
"0
l!'"
O3:;l
'i~
~c
.co!
:i~
e
e
e
~
'~
~
..
~
o
'"
e
~
.!!
~
S
~
o
III
I
,~ I
E
-2 .
~ I
" 0
~.S
'- '!!
~ca
o e
C ..
'-Ill
'!!c
~~
elll
..~
03 0
~.~
lilt.>
e
e
~
II.
'"
C
'e
!
"
C
..
'"
C
'C
g
'i!
~
C
.S!
...
:
ii
ii
..
s
c
0
..
.. i
D.
E -
0 c
U 'C
'l5 !!:.
c ~
0
.. CO
CO Z
U
0::
'C
..
>
s
CO
c
..
:is
i~
0..
~Q.
..
a:
'8c
.c.!!
'is .!i
~~ ';;;
.. .. ~
OlD.
.5E tl
E:: [
1=0 .5
l!!
"
1&
..
:IE
c
o
..
CO
0>
..
j
E
~
c.. '" -
.9 8 g
~'E e
o~Ci
~ ~
IIJ = = II.}
.s .8!!.g~,
21' -Ec..l_c
~a~Bq~~
a5rn~oS:;fI)u
.~ c.. ~ 1; ~ 8 lS 'S
S! ~ go ~ .~ .8 ~ go
.... .- u 0 i:l - J:I ...
.s:] > E! ~ ; c.~
== 6b~~E:-= 80S
.~
E
E
c..
'S
'"
"
c
.9
~
'"
c
o
u
."
C
..
I~
1'0
E! ..
OIlC
" .~
.~ 0
cg=
0<8
III
~
.s
""'
o
..
c
o
>,
C
..
~
'S
'"
~
1l
"0
8
.s
.~
."
[
c..
'g.
"
E
~
"g.
"
C
.9
~
;g
o
u
"8 d
C':S.E
~]
.- :l
." u
.. -
- .-
0Il~
B -
.- '"
'" ..
C OIl
o :;;
""' :l
o '"
1;l~
;:J "
.
;;:
o
o
~
;>,
- '"
o::!:,
~ '"
OIl" -
oS .g ~ g
._ :; .....c
~"'Cl C ...
.,,-~~
8.~ c.. 0
.9-_ '3 fr
:l 1;l 3' ~
g".~"'O .8
c"'08"1:t'
e~.a~
.9- ~ ~ ~
:s O"t'O~
8"~.s 0
S :€.~ g
'11 ~ ;g E
,,'" 0'-
J::..2 '::: ~
;g J! S a
o c.. '"
(J'i 0 OJ:)
]: C':S C.S
~ ~.S ";
e.o>'--
.S '3 ~ B
e ~ ~.2
o.Qdj 0 c;
U (II (J ...
,"= .~ "CI 8-
;g." C 0
0"'0 C':S ~
""' 1l ~ 0
o ._ ._ In
CIJ :g"i !3
~ ~ bii.8
.
""';>,
-'"' 0 '"
...",'"
~ g g,
"''''0
" - .,
8: 0 is
'S ';j..c
",,, -
~:: ~
e e 8.
a a "
Q.,c..:
........ 0
50 g...c
" "....
c." '"
ou":.
.= g ~
2"E~
~ _ 0
;g .. a
8:E e
"8 ~ ';!
"':;; '"
0Il>>1::
c-
~ g <<I
'" '" OIl
... tJ .5
oo'U'M
""'~
~ " 0
'(i;;.a ...
'5 "'Cl c
~.~ .~
cu~ t)
::l ~ go
.
'"
g]
" u
:l :l
"'."
'" "
oS = ~
,- 0
~:€ a
." ~ :l
,.!,i a
" ;g.-
t2 0 >(
EE E
" " '"
.~!5-~
:s =;.:
go.S S
ct)s
~gg
~ :a '::: .
.t:: 0 e >.
II) (J 8..f3
S -g 0 ...
(,J cu ~ 8-
"'0 0.0 0 V)
= C In ...
co'''' .... :s
00"'0 g 0
cE!",'"
.... tlO ...
"g CIa 5 ~
1-0 C _ ....
OJl'C IIJ 0
.~ .e ~ ~
~uco
O:l!oi'"
~~t:o
o OJ .9-8
u ~:I ~
:S;.a g-~
.
(~
E
E
c.. '" -
.s8S
0'- u
> i:: ~
IlJ 0'-
0",0
c c u
.s v oa'sa y
..s - c '
v.J -t::U_c:
~'a:; 0 (0 .5:": v
'S t: -5i ~ fr ~ :l e
.~ 0 ... -; .0 0 ~ ~
- Q. IlJ J:J 00 u g 'S
OOOj:l.,VlCIlJOO"
- S 0 c 'a '" '" ~
S~o9=::.t:::
,_ ~ > c ~ ~ c.;g
~ 6iJ~ -8 c:.;; 8-=
""' ;>,
o '"
~t
o c..
'" ~
- :l
o 0
0;'"
" -
<:: ~
co
[~
'S ..8
"'N
".....
s't'!.
''; 0\
u""'
E~
~ '"
So
u -
." a
; e
OIl'-
s ~
-g I::
- '"
OIl 0
" -
'" c
~ .sa
g e
." "
~g.
.
..... '"
0-
0:":
::..t3
'" "
.~ ~ v
b ;;'f
U '" U
"OIl "
"iic'O
~;.a'"O
.- :::l I1J
~ U ~
o .5 :l
Ii ~ 8.
=0_
e .s ~
v c.~
> .S '"0
E tio ...
c..:l""
aJ::."
,- ;g "
." 0 "
" u C
'" "
8..~ '"
E g ~
e-~ ~
'" -.g
~~-
0'"0 '0
.~ ~.9
- > III
u 0 _
E 0.. ~
%! 0 r; .
-.&J ... v.J
8 _ c.....
OIl",aB
c.coe
._ v.J (,) 0
03 a] fi
:l '" OIl
'9
a
c(
;;:
o
o
~
.
E
E
c.. '" -
o B .s
"E'~ ~
~JlQ
.s E
" .8 ~
'" - 1::
~'a= B '!!
.- c.a ::
:l"",BO
l:l c.. ~ " ..
.- [J:: '"
B~o iq
!5:S U ~ i:l
'C'S ~ II,)..!
Q...c'"O'"OQ..
;g
.51
:;;
:g~
o ._
.- u
l:l "
e a-
~.s
~.;;
~ .~
" "
'" u
" C
" '"
",'"
- Ci
" u
:;; u
u '"
~ .5
.5 C
- "a
'" 00
"'''0
'" u_
~.~ -
'" ~ "
-a] "3
- c..0::
.2~.o
ao...~
:.;;~o
--<
!...m u
'"0 ~Cf.l
C '" C
CQ '"0 .-
>>"."
CQ to:: 0
~;;; ,g
'"0"3(,)
gEt:
0::"."
...
a
c(
;;:
o
o
~
on
..-
.!!~
.!'-=
gal
..es
'''a.
'to:
C::!
..::!
e-
~~
Ol:;l
Qi~
~c
.c:~
.S!y
:I:t
tit
tit
tit
1:;
,~
eo
Q.
~
..
~
o
.c:
e
~
~
1;
r
~
o
cn
I
~
'E
~
1;
C.l
~
u 0
o 0
~,~
'- 'e
~ca
o E
o ~
'-Ill
'eO
~ ~
Ecn
~~
11I0
0);:.
~,-
cnC.l
E
ll!
1
'"
o
'e
o
2-
0:
..,
o
~
'"
o
'0
g
';:
~
o
,2
1;
~
i
c
o
;:
..
Q.
e
o
CJ
-
o
c
o
~
J;::
'c
..
>
..
:a
Iii...
c1:
o co
"'11.
10
~
"8 C J: U
.c.2 .:2 8
i!! ~
~ C l:
~ ~ a
co.. 0
aa. u
.s e J:!
e:: -
1=0
, ,
ii
;:
:5
j
C
'I:
!:.
~
co
Z
~
c
E
H
.. "
- -
s's
u '"
~ ~
1; 5 .ra
';;u';;
l!!
::l
10
co
..
~
C
o
:;
..
;:
:i
E
E
c. ~ 15
..2u""u
~.~ ~
o~i:5
v de U
.;; ,," ,g E
0lI.'i_';;~!:!-1:!
5E ] .e e. ~ 1 E
a 0 en.!! 0 C U'l IlJ
~ 0. 8. ~ Ol) 8 .9 's
s~o~caJoO"
~ ~ '0 o'~ oS ~ f:
.8~" > e ~ ~ =.~
~.Q~..gS:-58.s
>.< -
.-= . ~
,=""...l
~~>
'O=::I::
>,,~
~:: ~
0-"
-.2~
>>.. "
eM a
o~ = ~
Vl_,,2
= 4) ~
,,- "
e " e
"c.: "
~ 0 '0
e.:E ~ ,
E: 0'''<: J:
.... <( .!:P.i
"Ou..c:~
~ CI.l t.~
8..5';; ];
E "0'0 ~
Q., ~ :10-0
ll.I t+:.5 c
..c II.) r.n co
t:""O:S..c
o [Q] $
C Ill;': _
.S Ol) c. 0
U .5 g. c
E g ~ E
;g u _ Q.
0"0 c; .-
uc.c&
0.0 co "" 0
.5 ~ ~ >.
_ = c co
6'3.'~~
'I'
a
c(
t:'
Cl
Cl
!:!.
E
E
f5"~.9
~.~ ~
o~o
ell ~
.~:; :s E
ooc-5 ';:0'5
.5 8. t 'i oS g.
a..... c..~ OJ 0 ~
en ..... 0 CO U "'""
.- u - ./::Ie;; Ol)
g ; ~ ~ ~ !3 ,=
,g g...g ~ ~ ~ ~
1-o~~UOU..!
Q.,o':"Ou8Q.,
" - ..
~.2 8
oS :; 'E 4)
0. Cl) QJ.o 0.0
l3 ... tn_ C
o CIS.... -....
-= .s .~ .~ M
'i c./::l 0 C
.... ~ u 0
: Vl o'E u
o 8 CIl 0 :
.:: .... 0 CI) II)
.a E: E ".::
~~eS.a
~.!:!jj-a~
tJt:-_S
= OJ) CIS'-
~-;;.5 g ~
.... a=- CO
y]o~~
J: "..<:'- 0 ,
= ~ CIl ;g -;; ~
8 0 ao ~]
rJ:gSvi.2-
00 cutE
._..c: OJ) 0 to.-.
c~c'=o~
QJ ~ CO 0 ...
Ill..::..:' :l C OJ OJ
C ] - '':: t.C E
.g g .5.g ~ ~
~ OJ OJ _ OJ C
E:::E'~ ~.~ ~
~ "0 U 1:'''0 ~
cCOJ~':":OO
.- ~ .~ u V c
~IIlEOJ.E::2
.- " "" " !l
~ .J:I OJ >. C i::
Ovi'..o.s';1-o
.g"O ~ E"~,...~_
._ 0 V ~,._
> Q.'- - >
o _ E: "" 0 e
~ ~ ~ ; ~~
"I
~
t:'
Cl
Cl
!:!.
~i,:
E
E
"".. -
o CJ S
'0 V V
> 'E e
o~a
.'i=
al!
0lI t: ..
.S OJ t)
= Q. Q. OJ
~>.o-;
.- 0 -.t:I
.s ; ~ i9
5 g..g oe
.c 8J! CJ
~o_"O
..
:.g
.;;
.~
"
;;!
.!!
}
o
u
1:!
E
1:
" "
.;: is
.eO
" 0lI
_ J:
~.@
e==
1-05=00 ~ >.
0._._ 5 ~
~ g 13'e fJ .~ 8 13
N "O.!:= 0 Q c e =.!j
>. e = So:a _"e OJ ~ "'0 1-0
o C"o OJw~O
e.aeo~IIl~~~.s
c .sa U1.5 l-o ~ e. 1-0 0 ~
iU U1 ~ OJ OJ C = Q...::
"0 .~ - "0 "0 - OJ C ~ e
= t: t:; .3 "0 ~ 1-0 .2 .2P ~
~ iU _ U ~ ._ CJ '0 ;; !::'^
OJ c ~.5 0 C; Q, ::s t: 0'
v~- OD::SIll"Of,I)w
8..; !J^ ~ .5 0' t OJ.:: Q,
f,l)c......oQ,l-o~w-C
~.J:I" 13'& g.< ~ ~ Eo- .2
.;;; Ul C 0 tj 0 ~ .~ "E U
s =.g 6 ": -S ~.:g ~.g
..<:l!<>,,':'i)c=cc:ne
o III 0 CJ'- 0 OJ
alll13.g'=15F;o~~
~ two >.:.:: >. ~ .- .sa
"o>.a....c~a::sEIIl
~.s 0 a !..eo III ~ 0> .:g
v. Q.'- 0 E 0 0 t:
8.. s .~ 'c;j '-2.!:: ~ 0 o.
e CJ E.;a 8 !. s..g ~ .5
""eCJ OJ cl! ~eE-.:'1::J)
o c~-'t .G=
..s '':: ~ C 0 -5 C 0 =
o=fJNCro::;.c!ll!c:t:8.
~ ~ ] ~ .;;; ~ ~ ~ c...; :~
~""_No~ ,,-oot:
_ 0 ~ ~] Q.Q; S 0,) ~
!l E'- "..<: E 0-'- ;S ""
-5 ._ (; =:: ~ 8 -< 0 >. E
l;"i'-5o_o_-.J:Ilno
~;S::E~-SS]]s::E
o Q. ~ 0' t.;;; c ~ ::s ;;.. .- CI
.~ e tb.( a:.a bb"O e .~ <:
::s Q e u ~.<.= e ;; 8: E U
c:n C Q.,OO 0 ~ Q.. t+:< ~ OJ en
Cl
~
~
t:'
Cl
Cl
!:!.
E
E
"" " -
o 8 .9
~'E ~
o~a
f2
0lIt:..
.5 8. ~
~ ""'- Q. ~
III .-. 0 ~
.- g'O =
.9 ~ > ;a
- Q." ...
Ci ::s "0 ~
'C ~ ~ 0
Q..0';l"'O
,; "
-0 ~
o "
""""
J: "
" -
>..<:
]:.a
: ~
"0 vi'
o .eo
""l:
;~
u <>
,,:a
" "
~>
-0lI
~E
" "
~ ~
.. 0
" u
~ ~
""u
.. "
0lI""
J: "
.- -
~ e
8.~
~ ~
a E ~
e c 0
~.9 .~
" Oi."
o..~ 5
~'s~
> III ._
E:.a~
o..f->
~
~
~
t:'
Cl
Cl
!:!.
..
..-
!!:'8
fI.5
'ili
0",
..-
"0.
<t'"
c::E
~:E
H
c:o
ll!'"
10'"
"ii~
~ c
.c:!
uu
if
e
e
e
e
l!!
1
..
."
;:
o
ll-
a:
."
"
..
..
"
."
g
'S
~
"
.e
1;;
~
i
~
.~
~
"
..
~
o
.c:
!!
~
.!!
..
01
-s
~
o
'"
I
..
'E
~
~
"
u 0
;.5
'- 'l!
~ta
o e
" "
'-Ill
'l!"
.. ..
e",
,,~
III 0
litl
"'01
ii
;:
:s
c
0
;;::;
.. ~
'i5.
E S
0 c
(J 'C
- !!:.
0
c ~
0
i ..
z
u
l;:
'C
..
>
..
-
..
Q
..
:;;
0;>.
ct:
0..
~Q.
~
'8c '" C
:S~ :s ~
"s -5
~c i .s "
-g~ 0..
"
" 0
..... u 0
..'i5. c - ell
.!S "
.EE 3 .S
E:: ]- '" E!
" "
j::O 0 EO:
u
!
"
Xl
..
~
c
o
;:
..
..
;:
i
c
a
0.."'.
..s 8 0
~"E g
Q..l cu .=
0",0
'" ...
.s :s"
..!f_ -5 ~
.~ 's] cu 'i .s B-
In 0 r.f.I - iU 0 Q
.~ Q., ti g g - co
,g .~ 8' a ~ ~s
.g ~] ~ ~ ~ g
c....s~~8ea:
.~ cu]
" i! ".
t) u ~
"0 E'"
~ (Jl-SO
~~~ IU
'C .5 tl .s
o "
-5"="0
"oS VJ C
" ."
"0"'0..
.~ ;] .9
~ ~ ~ :
=il,e.E
"';ti~'O
.2 .~ ~ B Il.i
e'O <<I ~
.s 0."= ~ 0
..... iU VJ';:;;..c
u.s~-8~
s .0 "
c.5 ~ u ~
OIU~.sU
u:;gc:-5
.~ e E ~ ~
<n =,:r: U'l
c='--CG
iU .0 :g ~ ~
= =,.Q ell cu
8..~gp~~
e >...... Ol) >.
c..;:: -g ~ 3
- <<1- V,I Q..
~ .~ ~ ~ E
.~-.- ... iU
e ~ -c ~u;
Q.. o.~ .- 8
~u~~s
r-~=~o
'"
~
~
t:'
o
o
!:!.
-
"
E
g.~~
~ 'E ~
Il.) o.!::l
0",0
.s ~ E
.; €
00-- :Eu
s~] ~-5fr
aOUlB8_oo
I;/) Q., 1-0 ~ ....
..... Ol) 8..tt ; IU Ol)
,g.s 0 a;.= 3'"
."01log.gj~
g '3 ~ 5 c ~..e
c..,o '0 '0 8 cc..
.s
E
o
-=
"
.51
Oi
u
..9
"
~
0..
"
'"
"
.S
0/)
"
:E
"
0..
.
8 ell
:!a~
> "
"0..9
""0
" "
" "
~ell
o "
]-~
" 0..
" -
3 ~
0/)<::
"2~
8E
'"
~
~
t:'
o
o
!:!.
-...
F~
c
a
0. ~ 0
..9 0 '0
~'> "
u h ...
o",Ci
'"
(Il - :s
a] .c
Ol) C en .~ u
.S 8. II ~ -5
ii:>,o.Buo
.~ o.s .s g .....
,g a ~ a!S ~
.g 8"-8 ~]- ~
...g.s-88a
.>:
~'3.s
= '" .
IU .5 c.S
-5
.5 c; ~
-..c 0. uoi
~ ~ 0 4)
(J C - u
.siU~;
Q.. = .... .....
~ ~~i
:-9 .... 0 C\1
.;a Q.. 0. 2;
> t) Q.,.....
c: 0 0 u
.- '0' u -
"0 .... oS .5
.!! 0. u.I In
CI) iU .... ::I
8.~ ~ .g
'" ."
6i,'. 8. >
._ Ol) 0 .=
r/) s:: ~ U
1U;a 0-=
1l-".
_ 0 J:: IU
i:! z ~ ~
.-:: 0 8-
C;2":;s
~~g~
5bCGs.~
'in oS] ~
~ r/) 0 0
u fi.8 g
u;_>-
'0' Ol.l B'E
s...S E 'E
u..::.d 0 0
".e;~~
!- c.. 0 0
'ot
~
a
c(
t:'
o
o
!:!.
E
a
c.. ~ 0
..sou
~ 'E ~
o~o
~
~
"
0..
"
o
0/)
"
.~
"
0:
" '"
oS :s
r/)~ .;:
~'a:; .- 0
.- c.c ~ -5
::I U r/) .!! 0
gj c.. ~ ~ ~ g
.- 0......
O ClO c.. V,I (0 !U
_ s:: 0 s::;.: :;
~~ooEo..Egj
.51:: > "
ct.s~.g8e
.s
-g
o
'"'
"
.0
'"
0/)
."
:2
.S
.0
-;;;
.s
"
.9
Oi
:;
'"
.s
" .
"0 '"
..:!"E
u "
""0
.- "
]~
'"
.,.
.....
c"
~:;:
01-
8'....
. 0
0..",
U E
'S E
s..~
o '3
.c <:r
I- ~
It)
~
a
c(
t:'
o
o
!:!.
c
a
1::
"
0..
"
o
gf
.~
'"
0:
..
..-
,,'0
c; _~
'il'\i
~~
"0.
'0:0:
,,:;
...,
~8
~~
1ll::J
'ii~
.. 0
..c::!
~y
:I"
e
e
e
II
.~
~
..
!rl
o
.c:
~
~
.!!
'"
'"
s
"
o
lI)
I
"
'e
.e
zj
..
u 0
~.5
.~ t!
~fI
o E
~ ..
.~ 01
t!~
" "I
Ell)
~ '01
~'~I
lI)(J
E
e
I
'"
~
t:
o
il'
II:
"
~
"
'"
~
.~
2
'E
~
~
o
;
~
:i
e
o
'"
G>
Q.~
E S
o e
U 'C
- !!:.
o
g ~
~ ~
0::
'C
~
G>
:;:;
iii...
e'l:
o co
Q,lL
..
G>
II:
'8e
.co2
mE
::Ee
'g~
.. G>
...'Q.
.5E
E::
i=O
I
I
~
ii
'"
:s
~
c
E
E
.,. ~ ~
.2 8 0
o .- t)
> ~ ~
" " -
0",0
o v.I E
oS ::S 05
"
0.0 - - oS t::
.5 's ] 'i.s fr
~ II) en .!:l llJ 00,
.!2 c.. ti ~ g..... 0.0
o ~ go ~ .e e c
': :e u Q e. iil .~
,9:-: > c E ~ ~
6:.E~~8eE:
!
"
..
..
G>
::E
e
o
~
...
'"
i
"
"0
.;;;
" e
..: .-
C:]
0_
e-;;;
OIl 1;;
'5.5
"0 "
".0
.s:;
0":
.5 :
~.:E
.:5.2,0
0Il-
;':;>.
>'0Il
~ ~
B 5 .
~ ~"O
o 0 e
e-...J E
8o~
.5::c >.
_"OIl
"';.S:! ii
..: - e
III ~ 4)
'2: 1-0 0
" .,. u
e ~ "
0""0
.,.;. "
e ~ ~
.,."-
..: :.0
U ~ c
" .-
'0' bb:s:!
lo.o c .-
c..;a ]
0:-:: 0
~.E-S
'" ;::-
- '"
~ ~
E
E
c.. ~ IS
..2(,,)....
u'- (.)
;. i: "
IlJ u.!:l
0",0
u o;n i::
oS :s IU
" E
..__ .s 1:
n:2 ,,~.s fr
~8.::C;8.9Cl
.- 0.0 u ~ ; u 0.0
.9.5 g. e;:: s.!:j
5:SuS2Q.~~
'C'- > I: c u C':I
Q.,.E~-88EE:
.9
e
.!:!'
~
"
"0
"
.,.
"
u
~
"0
e
.!l
"
.s
o
.5
"0
.!l
f!
o .
e-;g
o 0
g .~
-e
~ "
]e
~ 5
!l.e-
e "
.!!g"
.,.
- "
e .,.
'" "
~ u
" ~
]]
,E;..!:
OIl"
5 g
..."0
o !!
... ;::-
- '"
9 Q
.. !:!.
E
E
.,. ~ ~
oug
U'~ ()
> i:: e
OJ Il) .-
0",0
~ E
.s ;S E
~.!l~' = :E" ~
- .2 ;..se-
.::s Ill.!! u _
~ iU 1-0 t'lS CJ s.....
.- c.. 0 tl ; IU Of)
.9 OIl g. ;g;:: S.5
15~"iiog.~~
._ C':I > E I:: IU C':I
== ~~ ~ 8 e E:
'-
.0 0
;; ~" .~
" -
0' C ~
.!:l co._ 0.0 en
<( e-~2~
c Cl 0" ::l en
'" ~ "
u ~.!:1 ...... oS
a.'a ~ ri 0
4.l ; c; OJ ....
1-0 _ :> .O'Q.,
c.c...._:E
:; .0..8 ~o<(
":0 e'=
(1.1 '; -= u ....
cu-.....cg
C':I.s~<2::o
~Su."c~
.,. -" l! ....
.,.." -;;; " = 0
t'lS.--5u.!!00
] e e 5 80.5
_.o"'''=e
c::f ~ Q.}; ;
.g ] .:a ._ ~ is:
UC':l~~fJ)~
~ - G,) c'-
.;;c.....:.:: cuU
5~~ti~~
u.....,o~a.-
~ ~ 8: G,) go]
t: = cu G,) G,) cu
cu.!: "'O~.;: ~
;; c.. c ~ cO
Obl)cu~oti
oS.~ ~ roll .~ 0.,.
... 0 0 u
g g '> !3 ::s a
....- QJ roll J::.-
.9 S ~ ~ ~ 0
cI:::EJa 5 80
.. ;::-
- '"
.0 0
c( !:!.
('\
I"'
i
,
"
E
a.~'"
oS U 0
~ 'E ~
O~Q
S roll C
... - :s E
.51 ~ .s t::
a. to: _ ._ 0 cu
.. 0 ~..c a.
o..c~~o _0
~~-:-; 8S0
.u .S c & t; ; ~ ~
-= > cu 0 C :.: ::1'-
~ e -au 0 0. roll a
cua.o>aa~tU
== go.~ .g -8 8 E E:
e
.51
-
..
QJ .Sf!
;.-
.~~
" ..
~ -
IlJ 4J ""':'
;S .::: -=
~wQ
roll E;
:5 ~ go
'€ --.~
8.;,;
...
l5 .~ cS
"' "
:a t
-'"
-
Ul
W
U
II:
;;)
o
Ul
w
II:
..J
<
U
(3
o
..J
o
iii
-;;;
"0
'0 ~
~ -= ~
S 4J '"
Oltl
--g:z:~
e -
.~ 0 -g
tl.~ '"
--g;g,.
~OM
]~r?
=oM
~EN
roIl~ I
_"M
u _ ~
.~ ~ ~
0._ =
a.~1Il
IlJ -0 ~
t::o::;;
00-
~l
,,-
'ui
00:
00-
"'a.
<to:
~:::;
"':::;
U
~g
eM
01'"
-!>
..-
,,0
.c:j
uu
~'t
in
C7l
_C7l
'-
"'-
e
e
e
~
e-
...
~
"
"
o
~
~
!!
~
E
"
o
'"
I
.~
e
.2
~
; ,sl
::
- ~
q; ~
o e
" ~
'- III
l!"
~ ~
e",
~o
~~
",0
e
I!
1
01
"
'e
o
...
~
."
"
~
01
"
."
.!!
.~
~
"
.S
1;;
g
:i
e:
o
:=
..
is.
E
o
CJ
~
o
e:
o
~
u
'"
;:
~
..
:a
"; >-
e:1:
8."
..11-
&
1le:
",,0
l!
:lEe:
-g~
" ..
III is.
.5E
E::
j:o
~
ii
;;
:s
;;
..
-
e:
'I:
!!:.
~
"
Z
s
"
C
c
~
'" .. ~
oS B 0
0'- t)
> t: "
do) U'!:;
Q",Q
iU II) ~
OO~- ~ ~
e:,,_ a] '~.s e-
I') t:: fJ) ~ IlJ ,...
v.I~_CUO.s1ooool
.- ll.) J::l ; iU tit)
S ~ go a:.:: 3=
... ._ - 0 c. (,I) c:
.9 ]" ~ 6 e 5 ;
c:tb~~8ea:
I!
"
I
..
:lE
e:
o
~
III
;;
:i
... 1:: ~
t> ~U)~ -5 8.~
.~ 0 ~ e. (,I) 'S ] e .sf
Q,..5 .:a..c =,'~] g ,c ~ cu ~
IU ~"O Q. C. ~ t.:: IU;S c .5 ~
.... c C':I ...... 4.1 c.._ 1-0'_ C':I "0 '=
2'- ... ~..c rIl C iU :r: - Q.l t:
~ U 4).~ f-o U 1U :r: II) c.......;.:
l.o;;jo05e .05"Ov.l~iU~O
:; oS ] c. i1 c.. ';' ~ e.:: t: &J
'"" ..: ~ c;.E 0 -;; i:: ~'"5 ::s '0
~.!!iU::s;>~:t::sgclS=
'A c C :'E 'F, eO.S fJl ., ~ "0 -"
~ 11) .~ ;> .... '- > 0 ::::
c U .- cu 0 U - rlI "0 1lJ.J::J
lU "0"" ... CU J::I Co).L:I ~
eUu5COQ.::lc'iJ-C
II) ] t) '_ ~ ~ c g' U 00] 0
~~::~c.~~]gsCI'J?
II) _ "00 lU..Q 0 en-
~ c; .a u "ii a. IlJ ~ <J ~ .~ <.E
'3l5f1l]iju~~:;Q"~=
c.=~!:!"O..s..c:~..cg.fJ)~
lU ~.- ... "0 s: -,.Q In Ion II)
a~1~;58...-o>.~~
=_OCU t;::>.O-8~..clU
o c ._ - 6 c !3 en u C ...... ~
.~ ";:;..Q ~.;:: 8 c ~ 0 '; 'c 3
5 ~ ~ ~ ~ g.~ ~ ~ oS.= :
C; 0..:': 2! ell .~ 0 In CJi ~ ::s ~
=' 0 i! cu C (I) 8. lU >..- ~
"0 ~ O'"~ 8 ~ en oS ~ ~... .
'S: ~ cu P.. >. e: ~ '0 :3 Sh.,g ,~
] co.c-(.o:= 4) CDIn~t-U en
_ e.~ -"'0 In ~ C 4) 0 4) U
c.- co at In E = '= .c :l fJi.:;'u
o _ c ~ 0 U . = t- .... .~ u
4)"';0>~:=~'= 'Sog~
E c'-....- 0"0 u"'O 8."'0
'':: .- 3 a ~ ~ u .:; ~"'3 In 0 ~
o In - - ..0 .0 4) In - :: .-
.s ~ ~ ,a ~ 51 "'3 9 Q. 8. e '5 ~
-..c 0 .... cO .... .... Il,) C 0,-..0-
-( c.. 0 ~.:; ~ ~.a 8 a; a:E
N
,
M
11
'"
0" -
.. e
g 0
s e
- '"
] gp
~ cf g ~
~ '" ..
o :g 0 -s
= -; ~ ff.~
~i..~o_~t::
_ 0 OJ) IV...... IV
~ ~.~ 't1 a::E
"'OSo&.r:.f.l~
~g3~t~
j 's...o u t; co
.:. In e OIl 4) e
O.1n 0..9 :t 0
11 ~o;....,€~
~co~~zoa
en~;>.....J en
. . . . . .
~
~
o c ob
go .g co.:: 09J'
0> .s - .;:-
o~''=''O ;5~ 'o~
o = "'0 .~ ~ .,g -;:::: ~ c.. c cu
..0 .. ~ u co - Dr:3 r:i c .9 'u
o ~'S III ti 0 ~ 4) 0'- ..... g,
C 'm C""'8 "'0 ..... :: .... .- "0 .s In
=uu=co~ ~uuccu
, ._ '"0 .... u ...0 u !: cu c.. co <n
:t_,.g.....ra5.::==a.9'E...,g
>.u OOou:= ulll-
o ,~= ~ co ......0 0;> s: 0
..c 0 .- g. 00 0 "0 4) cO U'l
.... .... a: en.5 ~ :; \;;; tl '"0 ~ ;
,-Q.,tf.I>'__.c~InCU 0
.- 0 c::: U U Ill'" 0..0 vi 0
S Z.9 j> 4) ..0 = .S .... "'0 4)..0
..: := u ~ e' B 0 -; "'0 "3'(j cu
c'"OcOoc..c'-;"3.!lofi:E
~ C ~.c 0 Os OIl go..! -5i Oil.s
e sa 'f: ~::: 4):.g c.. ~ In co '3
c..c0;>0 cU-C: CI)"OO(l).
.... Q., 0.... u EQ. !?:!3 = ; ~ ~
o 0 = .....~ "0'" 0 - -
s: _ 0 :=..0",_ 0 .... - "S! - -
o 4).... "0 In'lI.) "0 <n .... .....c 0
; t.,g ~ ~:: fi'~ ~ ~ -= c:
<n "0 t- - U - ~ s .- u 'ar: ::2
n 4) U.... cO U U "
'~.c ,2 cO.c 0 Ow) c: 0" 0
u_"OQJ=U':Io....Q.,~ ~
8. >. u "0._ E U ... CI.l ''::
U':I ..0.= en.c cO ~ '"0. ~ U'l
_ := ._ .~.... u ~ ,0 := .S:!
o.....C"lIlatooUU-- 0
~ S: QJ U 0 ..c U'l ';:;j ~ ~ 0
- 0 .... '... "0 .... - - c..
.:couHcQ.,..rOC:Q.,o
c. _ ., o"OulIl
<; E:: ~ g ~.~ 5 .::: c..c ti
..c ._ - QJ....- g.- ~ c-:'~ ar:
::: >.'i ~ ~ = u 'E'::: 0 0;>0 0
C -= c..c .- cO Ol) _ .:= U 4) =
uS: _U"E..cOCit:CU4)
;> cO.S _ 8. Co 4) U "0 ~ ;;.s .
4) ~ ~ 0 In C ~ .... U 4) "0 Q.,-
.,g.~ CD U _._ := 0 ti E .... III cO
.... ~:E 2 ;] ~ :0 ~.~ ~ r; a
.s 'in E c i5.. ~ ~ ; Vi c tu ~ ;
10>
,,-
.!lal
," .5
"'Ii
0",
"-
"e.
~'"
,,::!
~;;
~~
~~
~-
~ c
.c:j
,stY
:Ex
e
e
e
il
,"
e-
o.;
"
~
~
o
'"
e
~
.!l
..
r
~
o
'"
I
..
'E
J1
;;
<.l
"
u 0
~.S
'~ 'E!
~l'I
o e
~ "
'-Ill
'E! ~
.. ..
e",
"--
III 0
~~
..'-
"'<.l
e
~
I
..
~
'€
o
l
b
~
..
..
~
'~
s
'j;
~
~
,2
;;
~
ii
I:
,~
'i
'Q.
E
o
(J
'0
I:
o
W
""
'C
~
'~
ii
'"
:s
j
I:
'C
!!:.
~
II
Z
..
-
..
Q
..
:a
.~~
0..
:ilL
..
II:
c
E
Q., ~ 0
.suo
~.~ ~
O~O
"81:
.c:.!!
--
"S
:::EI:
-g~
II..
co'Q.
.5E
E=
i=o
.. c
" :.2_
..s E
bll S _ ..c: t::
C '8 C; .-:= 0 co
'3 t::..c: " ~ -S il'
~o:cu~oO
.- c. 4J l: = ....
: .SO s ~ i ~!l .~..
.9 --g ~ I:: c ... c
~~~..g8eE:
!
::I
=
..
:::E
I:
o
i
co
'"
i
"
QJJ 2 CI)
....c:1lJ ._ co ~
r.Il _ en o;n ~ oW
C .-!::: co :E
~E.sooS:!~_
C;"Oo~~t:
"> IlJ <..:; O..s tIS CI')
..2~g5~O..s
0.... .- .... O"'C """"
-; cu II.) ceo
OJ g. oo..c: 0 co =
~"O:E'ii'i3,.s; S:!
~ c.:E CI) u'- t:
o co co '0 LL. ~
.:: "3 ..... ~ Q.. '0 co
~Q..Scu -c..'
tlIJ 0 .- "'0 "0 C u 0
.~] :a ~ : ~ ~ t3
.- ~ CI) ~ 0 e :c u
l! '= 0 ," .. ,_
c 9t'= c,t'\I fr~~
0-.... c,..., 0....
(,) = u"O 001-1 Q.."-
.... co > ~ 'in cu_ _ 0
,..t::; 0 co II.}' 0
~CI)cc"OEcS
co = 2:.~ u t.E CIl-'::
>..!! ti ~ -= :.:'- u
C 0..._ "0 f-< tIS 6 ~
~ c ~ to- . U ': .~
o .9';:: 0 ~ u co ~
..... :::s !: .-..c: 00 U'l
C cu '-' t: a .... .-
E'.;o-=~ &.-S'~~
o.'s'~ " !f'~ " 'c;
.s co CI) -5 0."'0 ''5; -..
~ .....:..~ u .5 ~ ~ "3
o CI.l u ~ 0 CI) to,..; ....
"0 cr.: e s "0 B ~ '3
o l.Lo QJ)- 'Vi <J) _ 0"
o:S..( co j tIS ~ . ~
00:: v Qjo'-'o
--~-Vl..cO..c
....'O::sso=LL._
.9 2 ~:.c..c co Q c;
Q:~~.!g-;;S-5
on
'"
"''''
'-
"'-
c
E
c..~o
.su-
u'- u
~ ~.~
o ell 0
.. -'
~ :s ~
bllS= :;'3,,'5
5 '2 ..1! ~ -s 0.
:::l C CIl B u U
en Go) 1-0 CO uS Q
,~ 0. 8. l: I: " bll
g OJJ 0 ~ .! 3'S
'8_ ~ "0 EO Q. :Q a
lo.~~u~~..!
.0.. 00"0 "0 (,,) C.o..
..c: ,-
8 ~ >-~ ~.~ ~ .~ ~ ~ ~.~] lo. .s U) .s
~~~~=~'O~]~B.o..g~oo~_o~~i
cU)o..s''''508..~U)~(,,)dlo...cQ.,iUU 600
'!~~.~~~~U)~CiU.S~Q.,U~~..s"O~c]
~>-o~s~_uU)~g-Qi~U~~~.2<~'
'~~i!!~~~~~;I~~~~~;]j~~
~~~~l~,~~ti~l!il~~~~~gg
; IS.. c ~ ~..g 8..2 8:'= U "tfJ 'l:t C c' 5 c ~ ..... 0 ~
-~o~U) ~~(,,)..'~UC~UiU U)Oo.~u..
OJ ~ '= CJ .- ~"~ c = 5bf,l., ;:>..s e 0 ~ c - ::::
~"O~lo...s..c~'-"O_~Q~ u~~uc~u~
= .S,{) >- ,,-, ~ B ; S oou eIl"'o lU ~ t:: ;;.. ,2 ~ -= ~
00 !'lS _ J;J >- iLl ~ .- ._ I: ;:::J 1-<_'" iLl iLl _ 0..10.; "
=~._~=_'_U)U)~ ~-~~=-:.2" ~"
'au~u~'~~-u~EcCJ~<Et'lS oo~~"O
.~ Q., "O.d "0 ~ ~ ~ ..c; '2 Cd ~ Q., = ~ 15 ~:'$ - "0 B
~~~'~Q.,BlUC~=~~'~~ooo~o=~~~
glUSo8(,,)>lU8'!8..~u~~,co-_o~'-
(,,)ij:.Eac-ii:E~ ~ otfJe.e-a~:Qs::a:E~
:Q"O~u8U)~~~.&~u~o!.5'-o:.E~!'lS,e
lUlU ~ t'lSCJiUC-~-~U<~oU)~=~~
~..c::.2U)- ,_U)~S"O~~"O >--_..ct'lSlU~
t'lS_ ~O!'lS~C~iU~t-lU"O=~SC..c~"O
>-~-~.2-U!'lS8~"OlU~..cIU!'lS(,,)'-!'lS~~'3
c..c ~ t'lS ~..c .- ~ c ;> - ~ eo lU ~ .- - ~ 00
!'lSU)~~>]5~lf~'~"O~S~'&~~~~lU
~ j ~ ~-g ~ o.go ~.5 ~ JS ; OJ ~ !'lS So].go e ~ j
cc.o_t'lS ClU~ ~..c~ ~U!'lSlU~~~
.- ~ ~ C !'lS..c ~ C IU 0 ~ u tfJ IU .!:: -..c c. I..:; r-
"ec~~o,!'c-o<..s '-~!'lSlo.~~~t'lS_.
o ._ ~ ~ _ ~ c _ I.- ~ Lt. !'lS r::r::. ~ _ M
Q.,'': "0 !'lS t'lS t'lS c.'-:: iii 0 e- ,-...5 u IU ~ ..:. ~ ~ a..
o !'lS.~..c ~.&.- 0 ::.. IU 0 ell ..c: ~ ~ "0:: ~ 0'0
- 00 lo. 0 _ ~ U) ~ .- t: ' C iLl ~ C ~ C ~-
~.= ~ Cc;l.-:C ~_ (,,) coU;::l ~Lt...c u!'lS ~Lt. Q "!!J
Q) ';::::l '~.! iLl 0 c ... <:! &. c. >- U c; 0 : '0 c =',..., lO. ~ ~
"Oc~~5bc~~lU~~~..c..cUOCt'lSOu~~=',~_
iLl co .::: c. OJ "3 >- !'lS C - - ~ 0._ ~ b.(l-'
..s~~'-e~~"Oe-"O<S~uce.o~~"O~c~
IU~~_ ~ Su ,og~.2co.&Q)c'~'-c
S u IU C t'lS go 1:: U u) In g- tfJ <J:.- >.' - ~ ... ,_:: co 0 ~ .:::
_3'0 ='_o~CO~_ '_~~colU"O ~~'c~
.2 0 c.!! ff lU c. 1Il.c II.) QJ ~ =' "0 .~.s .- 'iji eo ~ - ..9
_ r.n ~ ~ 1.-0 ~ go 5 g] ~ ~ ~ g ] ,= ~ ~ c UO ~ ~ -
.0.. e ~ ~ .... ~ (,,) ~ :::1 "0 _._ (,,) !'lS = 0 co ~ "<...... ~
-
It)
'"
'f'"
"':;.
~
c
.. ,
c..]
c..c:
o.~
'~ :c
,~~
s ~
."..c:
~ S
8.3
o ,_
IS..~
"..c:
..c:""
~ '0
o "
~~
.. -
0."
bllc
" ..
~E
.... "
~ ~
" ..
E.s
~ ~
..-=
~.~
OJ:;;
uS
< ~
.
I~
~-
.!lai
" _S
'Il'g
00:
~-
~a.
"to:
~:;
..;;;
~8
~o
~'"
IIlg
li~
. c
.c:!
uu
if
e
tit
tit
~
.~
.t
..
"
:>
o
.c:
~
~
.!!
r
:>
o
..
I
-
'E
i
;;
o
..
"0
i.s
'- '!!
~ "
o e
c: ..
'-11I
'!! c:
- -
e..
..~
11I0
~t
..0
ra
,';:
1i
;:0 .
S
=
0
;:0
D
a. i
E -
0 =
U 'C
- e:-
O
= ~
0
~ D
Z
iC
'C
D
>
S
II
C
D
:0
.'"
=1:
&."
IlL
II:
"8=
.c.!!
-)
:1=
"D
= E
" D
ala.
.5E
E=
1=0
e
l!
1
'"
c:
~
al-
II:
"
c:
-
'"
c:
~
';:
~
c:
.2
1;
'"
'"
':i
!
"
..
II
D
:I
=
o
i
aI
;:0
:i
~~
<.>1,-
." 0
~ =
8,..g ..0
o .. ..
~ = >.
Q.,~ 0
~~g.
.. .. c
Ci '- OJ
Ja .~ .8
.c
"ficus
"." >.
"",,,,,
'- .. ..
0__
'" g ..
o ._ J::
'-.0 {/)
aCllc
'C -= .s
~=cu
.... ""
." e .:;
.. .. ."
.. u c
"O..!..c
.;;: is' ~
o ~ ..
l5. '- "0
_ 0 c
C;c:.E
.c .. ..
~e.c
"'.c ..
.! .:a (;
e-~ .~
t:rJ~
.
.c
g
-;;',f] r.I.I
C'''' tIO"';
.sa:a.5 8
~ >< "0 'S::
~ ~.a ..
- == g ~
OJ 0'- =
-5-!:i-,;"
... e OJ e
.:.! OJ "3 ~
B"] C" ~ -d
"0 ;::J ~ ~.s:!
;:... lU.:..: = rd
G:).o..._~
.~ = ~ e ~
lj l! .c .- .-
... II) 1:: 0.0 II,)
c;l.._ea's.o
~ ~ ~~j
"O,.Qt'Cl.=-
u.~ ... >. j!
"'g:E~c-
_ ell III (U
gtiC"OB
._ OJ ea C OJ
OJc;-a~v.i'
.o.~r.l.lOO'"'
..c ."", c 'Ijj
-; " ...- ~
..c.cu...;;o-
Ul u.5 5.n
.~ t gfc OJ
.c.c..oil
.- ~ >. (J u
~~.!!]E
OJ Ci ;;. (U ell
.~ lU:.s 00 Co
-a ; _ .5 e
ea"Oc;~"O
O;.;;tb~
.
~
,g
~.~ .s
.. '0 c
1; oo:.a
~~~
'" c ~
~ g c
.s 0 ~
u ..
." "" ~
~ C 0-
]'~.~
OJ .~ .~
~ .. c
.. '- "
.c 0 e
- ~ e
l!t!o
~ .. u
Z.c
3-.:: 2
:E fg u
l! 0 ~
cUJ!
cu~~
'c'';:: ::s
lU! e,';i
'C OJ "'0 r.I.I
OJ.c c_ .....
.c-t'lS-
-~"Oloooo
.~ ~ ; 0
_ U'l_ In
f/) cn"'O tU
.. 8. 0 ~
co"
~ ~ :I; "0
a.>.c~
... OJ.! ~
C III tU C.
.! .s .90 e
~ (,) ....-
.
... ~
:g,-tS ~
uo~ "E ~ti
ilt!; "'gll.
r.I.I ~ "'O.~] ea ~
u.ac-.wQ.c
_ 2.... S In.. (/) OJ 9l!
e '0'.:: u: ~ 8 .;: ~
~ l5.~ .""5 C C c CJ
lU C t1 ~ ~ o...!!
OIl 0 OJ ~:.=. E r.I.I Q.,
u'.; Il)_ ctS,~ ~
:.3 e.o-S Q.. 0 l-o 'S: 13
~:; S ~ '.; 8. '': cu
~ C c.=i e.o e.o"'O ~ Q.
.. '" c'6 [;j of
1l -5 56- . c1::.sa
CU OIJ'';: '';: oil c '0
~ 5 CU c.2 ~ Il) .
Il). u u._ _ U Q....c
'E~S]~S "'en~
c1 ,- U _ Q.. c ,5 c .b
",;E' .. Uc ~ I.l !l!"-
o co a-.- r.rf = C S]
~ti~=uB"'O~co
'Vi : == ~ 5- 0 ~ ~ ~
c C en .- "0 = en IlJ
ool.lcc"O cus::o
Q....;:co-5c-o~
~ u.~._ QJ CU Q.. '= ......
l-oco:::lS-=~cuo
QJ U C" 0 Oil 0 ._ Oil_
..c t:: 0 0il.5 ';:;j l-o 'E co
....y l-o QJ _ ,- ~._ ~
~oC~;C:~OCl~
~.g ~ -a 8. _.5 QJ
:! c ...- ." ";j'" ~
o l-o ~ ~ ~ ..c :::1"0
C;',;: 8.cC; u ~O c
.c CU IlJ u 't: u c c CU
en == l-o 'i ~ c cu '-...-r
C I.l ""c !l! :! "S. '<0 0
..!C~Q..CiU u-=
Q.. Il)'- 0 -.c 0 C
o -a'; ~ c.5 ~.~ 8
..c e c "'.!! !l!
~._ <<I <<I Q.. C .
~
.! en
~ ~.~
B ~ 11)
'cu u C
" 0
u U':l ...::
u ...
c.:a 0Cl
~ ~.~
tSlio
~:;-s
'" .. ~
"'8 i:; ~
cu :.a c;
~ u >
"'''''''
"g ~ c
-l! ..
~ c fg
Oil..! ,2
c Q..t)
't: 0 =
g-S~
'c b t)
~'€~~
- " ."
.,g ~ 7;'>
- :;l>.c e
'€~;;'"
~'e~ .9
l1~~"'3
Cl)u"''''O
="O~e
<<10-_
.c--c
~." l!'-
c 0 en .~
.. ~ "
Q.:::I 't: S
o.M.B:.o
t: g '5 .2
.
"il
.~ >
o'O..!::!
.c .. ..
-' .9 '2' ~
tlf "'0 Q.. 0
~ QJ 0"0
e....c.o
",u_
Q.. 8.!! S
tlf X cu ...
>. 0 e..o S
g.~:E :.0
o.c E CU
~,~ _ :t
.J::';c
.sa ~ ~ .!l!
U U fIl;
o ~ C Q..
E 0 .S C2
::::l.o,~ _
en CU"O i:!
~]gtU
_ C U ~
-'- QJ
nq~
~ ~ 0 0
<<I iU Q.. ~
"S. ~ U ~
~ ~ 's]
'Vi a l-o.c
.. '" E
"0 0 0 cu
0-=-50
,~............ 1::
en 0 0 U':l
aCt:-5oj
.-.s CU 0 U
- - Q....o C
~.sIll_C'I:l
:.a fi cu a ~
E E"'3 ~ 'c
_ 0,:: g ell
~ Q.::::l Q. 'Vi
.- E go e '-
l.l.. _ l-o._ 0
-
-
,,-
.."
-"
" .S
Oil'll
00:
"-
"e.
"to:
c::lE
_:lE
e-
d
l!ill
~~
..-
_ c
.c:i
o!!\!
~:r
e
e
e
e
~
1
'"
.5
l:
o
l
'tI
'"
..
'"
'"
'",
s
'e
~
'"
.2
~
:
~
t;
..
.~
~
..
"
"
o
~
~
!i
~
S
"
o
III
I
..
'E
~
~
..
<> 0
;.5:
.~~
~C'I
g ~
.~ OJ
~'"
.. ..
elll
..~
OJ 0
"'b
...~
lilt>
=
o
'"
..
is.
E
o
o
-
o
8
'"
'"
"
<;:
'C
~
ii
'"
:s
j
=
'C
e:.
~
'"
z
s
'"
Q
..
:c
.>.
=1::
8.'"
..a.
&
c
E
c. .. .
.9BS
~.~ ~
QJ 0 .:::
O<ZlO
'&=
5~
"s
::E=
"..
= E
'" ..
...is.
=~
E=
1=0
.. -c'
:s
oS €
'~.s a.
" 00"
" -
e " ..
~ !3.5
~l(j !i
o ... '"
"Ea:
.s
..d-
c';: <;j
'a E.;; ~
~ ilJ .... tIS
.- Q. II,) .t:I
o r:.o Q., ~
:.5.3 S
.2"i ~ e
.... .... IU QJ
c.. o.o"'lj"'Q
e
"
:
::E
=
o
~
...
'"
i
1l '_~ e ] ,_Sf 00
'" "E ca A> . . ~qj~ ~
._ ,,~ - e _ _ _
] :: J::a ~ ~ s ~ ~ '5
<:r] lr:! E 'g ~ g ...5 E E
~~8tlSe-CVlS~QJB
rg ~ c; .9 ;; ~ 5 "in ~ 's 5
:E 'a e ] g B ~] ~ if e
~ .0 "'0 (tt'::: 0 .c - 's . E
....... r:.o ca .... - <<I C 0
c; ca g .- 'S;: co '- "t:) ... 0 r.J
U ~.-.'S - 0 = -.- 0
'00 ClO - = : jg Vl II) i c; -
_0 ~u_ ~ I-o....t:: - '_~ = 0;: .~ 0
O -~ o~ Vl._ ca -.-
_ to.. ca - - Go) ';::l ....
:c.~ ~ -d' 0 o:c c; :; = c..
o c; :::J ~ le :; '(;'l..c Ul..c .-:..
>'u lr:!.- 0 - e '" <:.... .
:E QJ 0 ~ ,=.~ &. l5 ~ at .B
Vl ~o ca u J::l Vl'~ _ - QJ
5 en - ~ ~ ~ e 0= ";;j"~ vr
<Il U ~;; n"'O_~--'=_."_
,-uS -cca.c:;UC
0....- CI) VlO'_ 0 0 0 ~
:l C U..c "'0'- Qh C U -
~s:iEo~-c~c~-~
Q) 0 :::J = cu t.......- 0 0 .:
. . e 0 .- _ ..... ~ ~ c OJ"
<<1_ lIl...ca 'oeoc
.5 ~ .2 ~ B 'B B = 8 "'0 ~
_ a -0 -; 0 Vl ~J2 OJ Vl -
5 :g 2 u o.g Vl 0 "'O.~ ...
a ~ ~ .~ ~ ~ 5..s ~:~ ~
g...g 0'0 0 ~ g.~ ~ U >.
_ 0 u ._..c... :::J'" ('U v
~ ca,L) Ul :::s "'0 - Q., = c:
"Oil,) 0 ~ a ~ g 8. g ~ .2 ~
- .- "- 0 - _ -
o .~ '"0 .~ 0 -0 "ij '"' 0 g"
-ooll,)v_ >0_
.... 0.5 ~'E 00 ~."= ....
.g "0 S g. 0 u -g g .9 ~
Q., 15 ~ .5 ~ ;g ::I e a g
Ii)
'"
"''''
.~
"'~
t;Oh
15.5
","0
G e
.. ..
"0
.... = "3 1-0
o (IS 0 c.E
u-..c:l.t-o
cu Q.,VI_'"O
E ~~ c.!l
0'- cu.9 ~
v'"Oe~t;
~ f! VI - >
..c: 00 VI = ~
.si8g~
.- t.:: cu U '"0
~ "00-
'"0 ~ = '"0 ::I
"ij';:cu j
(;:;..c:v..<v..
Il,).-.:=~CI>-
..c:: ~ 0 ~ II,)
- ~ .... u.;: c
=0"3= ..0
.- = ca .- ~.:
~-E:I:13ma
(lS 0 . t.:: VI iU
cut..:: ~ e
.9 ~ 6 6 ~ B
u = 00'"0 0
::S'- (IS - ~ "0
J:: 6 Q,) ~ ca <
~ u.~ ~.~ CI
o 8.l5..'" S"l
~ VI e gf~ U
..c::.5 0.'- iU Q,)
- "0 0. "0 ..c: ..c:
oocae--
c; ~ iU oo~.;:
~ = -B .5 ';j 'i
'(i;.~ >...c: :;
u~.o:~O~
:!2 "0 "E ~ 6
~ ~ >] .- -
~ oS 0 - .-.:= ,~
.;; "0 a';;;.~ ;g
B=c.uuo
""'" (IS ca.c (IS v
.. "
.5 "-,,,
'"Oo::s
~~ ::I
o
... i:;>-=
~ ca VI
$ . '"
::I 8. 5
o E':
.~ IlJ ~
--:
~-=VI
,sii.g
~ :: ",.
~ 01)_ .
!; ~.~ ~
<;j c'", !i
~Ul ~~
'" J:l $ "
=Crn"O
1l ~ ~~
c: 0 0 (IS
~ 0 = QJ
~ "0 ~ =
a<(..I.., rn
l.t-oO''''':''~
o "l 8.':
gfu e ~
.- = "-
5'-] 0
"E-g6~
8:="0 'i;j
- " -
QJ = "'0 :1
.~ ~ c 0
i::'- '" "0
u rn VI ~
go ~ 1;j e
en :; &..9
N
~
" '"
c 'E: ;.a
-~.~ ~
S~~B~
>'.t:::: .....-
~ lr:!.J:! g
Sl :3 0 e
~ >-s~
..c:crn_
;.<~>.
.oi-!;~
'0'- C QJ
rn.:: ~ U
-'C c
ll~ca~
g c'~~
_ 0 ._
00':.2 :;
= v _ ....
.- g e 0
~lr:!8~
rn o'~ IlJ
uo"'O-
-==caS
- CIS~'"O
o ~ ~ ~
~ rn'~ Ol)
.- .)5 "0 '"
> t: v c:
e .- E 0
-s-",
:g ~ .- >.
~; ~ e
ca.g:; ~ C
g ~ ~ ~ .9
"'0 =LI'- :1 ti
c .;;;.~ 0 G
Uo v U f/l <Il
"'OCIS~~
..;
"0"0
:g22
.!I ~ ~
-....
00'- .-
= ~ ~
~"'O"'O
..:-gs
g CIS ~
~=-6
. " ~
B 2 00
" 0 <:
g ~''::
15 !t,6
" <: '"
v.s! ~
.su~
:Eg~
~ ;g c'
15 8 t!
'(i; >. &.
~~ e
VI ... .-
-" "
~-=-S
o 0 ell
.:; -g.5
g CIS ~
"0 - .
iU fi 1il
;]~
... .
U EO
" t;
"'O'c 0) en
c <Ll Q. C':J
o Q. III ~
U Sl.e (IS
.f
'"
~
,,-
!ill
~ .S:
~i
~~
"a.
"to:
",::;
..::;
e-
~i
OJ:;!
_Sl
..-
.. 0
.c:~
.IlY
lIE,;
e
e
e
t
~
I
~
..
"
o
~
~
~
"
E
"
o
'"
I
"
e
~
~
~
., 0
~.s
'-1!
~ "
o e
co ~
'-Ill
1!co
" "
e",
~~
III 0
co<:-
",-
"'<.>
e
~
1
'"
co
'E
o
~
II:
..,
co
"
'"
co
'co
2
'"
~
co
,2
~
~
i
e
o
.,
It
E
o
u
-
o
8
i
u
<=
'C
~
ii
.,
:5
i
e
'C
e:.
~
..
Z
~
C
.
:is
.....
et:
&."
lOlL
.
a:
'&8
"" .-
'ii
::Ie
~~
...
llla.
.5E
E::
j:O
l!
::l
10
..
.
::I
e
o
i
III
.,
:i
e
.2"0..=
-~g..s
g ~ "'.'!i
In -in ~ "'0
S..g:€ ~
u 1lJ.~ C
e'.so~
" .. -
""e ,9 '0 '0 8
u'- 0 (,)
,S "5.3 "
E!;;O~.c
'0 c ~ c:a
'= e " 0 ::l
t: co [:; ',c ]
1-0 C ~ Ul
~.- S.t:l Ul
'" 3,S ~ ,2
e"'O ;>. o'~
=' "'0 J:1 (,).~
]~5~~
e 3 E Ul =
Q., 0 e rJ .9
Ul (,) l,i;i U U
Ul =: "'0 0 ~
:s Q) OJ = J::l
it o.~ 1-0 fIl
.- l.,;;; .c ~ c
"'0:': .- 0
o:2-;c..u
:t.I .- 1-0 IlJ .c
C;~Q.~(J
:g~]llJa
gc:s!aj~
..c U :::I ....
Ul E 0 ('lI
5 ~ ~ S
.~ ClS _'_
r:: ... IlJ -
~~ n
IlJ E 5l tii
..c ... ... c
I-~ lie
C\
,;"
" -
,_ 0
>..-=:
" "
> 0
3 5
.. "
....c
..-
~
6 ;a ...:
'n !5 s e 0
g Q.~ :'2
1;I'l::>:eoo5
" ' ~ >
o~8.e"
~.5! Ul 8:-5
5'~ 0 cO.c
.~ e i ~ 'i
"0 Q. IlJ 0
~1lJ..c:26
.~ j ~ ~ '3
..cClS:s!O-
... :::l 0 :::l
s..s] [:; g
.?;-;9 :: ~ (,)
-.; '!i s; ,S
.~ 0 ~ ~ ~
"'Ou.:<<lo
.:2 = c P "'0
... cO 0 -
8.~ u ~ ~
Cl8~8:s!
IlJ 0'" U :s
Ul (.,) ceO 0
2:::....o"O..c
c.. 0._ C Vl
.-= '0 = c
] ~ E -t:j.g
::s! c (/) ~ e
::::l "'0 6 ... 0
~ ; u"3 t;
Ul '- co 0
1-0 ~ O..c =
o (IS c >..-
.-= C 0 c..c
c ~ '':: CG roo
~ 1-0 IU U
~ ~l~:_~
f-o _ U 1-0
,S
>,
i:'=
.. 0
~~2i
" 0 '21
~ "'0 E:
" " "
>,'" Q.
1;:s! ~
'0"'"
c j B
(IS Ul ._
c..
go
ilJ~"O 0.0
S ~ ., '~'2 e
~ bb N ~ o.S!
01 >......-u
Ul ilJ "0 j,.,,-'a U.c
~a.;.soE:s!
._ u ~ e e jg =
] .s t.9 .::.0= o.,g
o _ ~ (.J (n
.... tU "'CI.G ....._
.f'.",,~ou
0iJ:E~..c:<:.<;~
1::::1 -oo~o
..;::oo>.~o>
(n..c-5..c-E 0
~ ~=]]"'CI.~~~
00 ..........-;"'C 0
..c 'S U ~ (n 0 ~ .9 d S
-~.c_o..ctno.]..
~ '2 e '0 tn 0 c.... > <
..... t:: c.. 0 Vi d I..
3dOtn~:'="'CIu~~
"'CI .S! t) "E "'CI .! :E .0 ..c "'CI
"'C .... "'CI..... 0 u 5" 0 _
"g(.J prJ....o>.....<+-o(;
- ell OJ) 0 c.. c c.. 0
(.J .5 d OJ) tn <: .. _ <:
.a ta "'CI'- C "'CI >. tU f-o
doe~~~;g~~
o to) OJ) C c._ Il,) Il,) 5 ..,.
(.Ju~....~c;....OJ) ..o!:;
~..soo...;sC\1tU~c;
tU .. u'-=o 0 O"""O.!:! ...
-Vl OJ)~ Q) Il,) tU . Il,)
Vl >, ~ C "'C ..c ~._ Vl "'CI
.~ "3 ..c'C ;; - C ~~ ~
'S: '7 0. g _ >..~ e c OJ
._ >...c.'='. <: 1.." tn 0. OJ ..c:
u...~~f-o~OJo.OJ)-
C\1 ~ Il,) 05 c:c Ul ""0 C\1 C\1..c
cc.... ~Q)Q)oc;.~
.S! -fi t.9 lo-: e ~ oS.s ti ~
tjt.t.uo_cco"'CilJ
.5 B ~ g.(]'~:; c: ~
~~~u~E',c~o~
o .- ~ :::I tU U 'S: 0 u c..5
u ~c g'e"'O',c 0.-;
= :::. 8 ~ f-.~ ~ ~ en 8
)-
E
~
0. ~ 0
..9:ut":
~'E 2!
o~o
"
.:;
..
:s
OJ) tn" _ .s
S8 ] '!i .s
:::I C tn iU OJ
~ U .... ~ (.J g
.- c.. u l:l C
S .i .g ~ i ~
0""0 :> c c cu
J: a~.g 8 e
"
.so
. "
<+-0 ~ ,~s
OVl<+-o.s~
g_o~~~~
:E c .-
" (j ",0_ 9. ~
..c~"'O-Ee
c; 0 ;; ~ O'~
.~ iU Vl :.= ~ ~
~.s E ~ cu cu in
-0 S l!,..- ~ ~ g
:.E :::I U l!..~
iUEg~~u<+-o
.~ .~ Il,) 0 ~ a 0
'Vi "E. ;> "'0 cu "'0 ~
C o.',c ~ 8 "3 _Q.
u cu u._ C\1 0 >.
tn t) ~-E; ~~ OJ)
g Il,) 0 cu _ .:.5
_'~ ... >. ... w.
C e Q.i:: 8. ~ ~
u Q. _ cu o.~ __0
~ u ~ ~ ""
~..c - (.J "; ~ tS
cu;'~ca""Oll,)
~ .o.~ ~ ~ ; oS
u'"Oc:.oo.:a~
;; B iU ~ - C III
cdcr.cu_~=
.- ~ OJ).c U cu.:::
C ~ 5 ~ ~ '-' ~
E c..~ u ~ 0 :I
Q)'3 ~ cu -" ~
Q...c ..... c ._
o-~Ec~"'O
"il c; "'CI !Y >'_ Vl
;> ..c c C ._ "E.~
u (n cu c.. - 0. '-'
"'CI Q) 00 0 ~ cu..E
S g .5 Q C u g
.2 ~ ~ ~ g.~ ~
Q: tiE:~..s c..oS
u;
'"
'i''''
..,~
I
Q.
"
Q
""
e
'~
..
0:
'ii
"
""
..
-
,g
>,
s
-'.
-
c; ~
.s~
~ 2
5j<
.~ g
E~
'OJ:!
1;1-
o e
Q.'-
'" '"
" ...
g "0
.. >,
.~ 8
"
" ,;,
-g~
.. ...
'" ""
ti]
""
;; c
~ E
o Q,
.. 0
",,-
e ~
's .g
.. "
~.:;
.
..
-
..
~
E
~
Q.
o
U
>
"
'0
.:;
!i
'0
.!l
..
'u
o
..
..
..
..
~
~
"
'"
-g
..
..
,_'E ~
1::
:0 tU
';;;"'0
" "
o ..
6r~
c:!!i
.
'"
~
..-
~"
ii .~
'g'li
..'"
..a:-
oq",
co:!
~;l
!~
~~
Ill'"
'ii~
,,"
.c:!
..,U
~f
e
e
e
~
'~
~
..
~
~
o
.c:
e
~
.l!
~
01
;;
~
o
."
I
~
'E
~
..
u
..
" 0
~ .S
'- 'l!
~ I'll
o e
c ..
'- '"
'l! c
~~
e."
.....
'" 0
:;~
."u
e
~
1
01
C
'e
o
~
Q:
"0
c
~
01
C
'c
g
'c
~
c
,51
1;j
~
55
c
o
;:;
..
~
o
U
-
o
c
o
~
lC
'c
~
..
:is
"in >.
C1::
0..
~D.
&!
"'c
00
i!
2c
.....
c E
.. ..
Ol'Q,
.EE
E=
j::0
ii
:;::
:E
j
-
c
1:
!!::.
~
co
Z
!
c
e
"
..
co
..
2
c
o
II
Ol
:;::
i
"
~
~ ~
'" <..>
~ ~ t3
- 0 0
"'c.'"
.0 0 ~
"'00.. iU
~ u:E
e:-E ~
0. 23 c
c." "
'" 0 '"
:] g
" " .'!l
~ ~ ~
c." e.
c~c
u _.-
E '"-
u'~ 2
!:!' ~.51
.. - -
;~:.a
t:"",
u;<
~ c '"
"'O.g.~
~ ~ .g
c s 3
.g-g]-3
~ E - f.l
t:~C...
~ 5 E tU
o \.J., 0.. CI'l
E 1.0-0..9 ~
_ Q.1 U ;I
~:a~e
i:.I..U"'Oo
.
~
",
E
",
.0
'"
"
>
'" e
'", c.
~ c.
'" '"
.5 -M
~g
.!! "
::: ~
c."
'" 0
~~
00_
:.:: 0
00
.~ .s
'i3 00"
's '6
0-=
- <..>
;.5
o.~
gf~
,- '"
:c "
.~ ~
- c.
"" CI'l ...:
'- " "
o 0 g
Ego'@,
eB.ij
c. E _'"
..5i "
~ ~ U
V'~ 0
O"g-S
.
oj
'"
:~
E
"
-g
~
'-
o
"
'"
"
"
~
."
,5
1ij
" ,~
.~ 'a
~ 's
'- 0
0-
" " ~
,51.!;! !!!
C; g c
'u U.E
~.o
0.."0]
fi'"3 ~
c] III
ijl
tE CI.l ""
" <..>
.s s ':
c en ~
~ ~ c
'0:: E.g
:S:c <-
co'- r..2
.oc;.:
'" "'"
",:"'0:0:
..'- ~
..8 s c
"'''' "
c ; ~
E !6;;
" t:.o
C;~~
';j ~.~
'" "'c
:E 8 5
I- " <..>
.
E
e
g.~s
] 'f ~
u 0'=
0",0
'" E
.s :5 0
. -5 €
00 !J = ._ lU co
,5 'S ll! ~ -5 fr
;I E CI'l 0 U
.; 8. t ~ g g 0
g 01) go 19] ~ .r!
~o~"ilOg.Vl~
"I: CU > e I: CU '"
~ t'o-8 ~ 8 ~ is:
'" "
'" '"
~ .... ;I
~ .s __9
~ 0 CI'l
= "0 ';(
~ " "
o '" "
,,- -
.- e 2
~ e:g
:g ~o
= ; Ci
-8~o
o '" <..>
~ .5.g
o.~ ~
'" t: .
"iiu.!:!
~::E~
:: o.;!:
5 .5 U
~"E e
(.)E~1Ii
"0 u .... CIS
ccc.8 ~
o """ '"
;>. Cl:S? IU
]Cl'JllifJ
u 1.0 lU..c
~ tE 'u -
"'0(;8.;
o.~ III g
"g..QC:tIl
cu .a lU IU
0._ ] ~
~ .~ ... ,~
... lU C
.:: 5 > U
,.e '0 ''''-g
-e ~.~ ~
Q., 0 ~ 0
'"
'"
...'"
'.....
M_
~
E
E
c. '" ~
o " 0
o:i.~ '0
> e: "
U 1U.!:l
0",0
~ II) is
'S~= :s ~
"il 'Q,ll! -5" t:
> II) ....,;: (IS
88.13 ~Bfr
l5:~c."*""o
(lS1I).2.t:1g00Ll
.s]~~(lS,=c
... (IS lU oi (IS'a
O-"'EE:'~"
.c ~ l! 0 0 .= ~
Q., (IS _ "00 = ~
.
o 0 -;
-:S i: lI)~lU
... "0 0 (IS.o
.so~ oc..~"O
..0~1I)1Il_-=
"'-,,"O-~;':;:''''-
8 C "0 l--l 0 0
cB1;~== 0"=
~;.:: -:S c.. (IS rn !. ::
lUl5:lI)~:;~c
a l'lS ~'in ~"i5.. == cu
ot);.::cu=oo&-a
.oo..g>"OCOo
= .0'.... .5 =='s.. 8 .?;
.a ... ~ .. ~ (lS.- ~
lI)~~~"01il1~
O....t::! 00'- 0"'0..... C
o .. ._ c; g == 0._ tti
==_lI)CQ.cu"" ~=
O(lSU'o-OUo
~-="O 6 ""~ u.~.;::
>lI)~==Q.....:';::t'#~
lUO;r..==o~c~
~".S:! ~.t:: (lS ~ 0 C: 00
a i::] ~ $a ~ c 8.5
c..~ (IS"g] 8';,- ~
~00--"O8==0.2
c.. == "O.S,,,, 0.. CI:S u-
t'#._ ~ 0 > - II) ~
0"0 CU 0 e c; o.~
~:-= o.~ 0.>(; .~
C~~l'lS~ed-g-
,.g "0 c.. ~.o ~ 0 :';:: .5
~c~g::gcu8~"O
t'# (Q CU if: :::l "0 cue..c "
,-OLl"=u]= 8r9
0.5 en - III (lS 0 0. ti
c;====BII)~>'>,~
> == 00.... II) U C -= "0
o ,.g .~ gf.5 'S: ~ .S:? II)
"'~(Q-"ii~o.c(lS
0.. '- 0 "0'" II)
C. 0 "0 0 ._ 0 oolll 11)-0
(IS ... I:: 0 :::l..c .... 0
o 0 tU lU 00 - .5 -.. =
--~:ooo:::::2o
~ ~ C lU III .5 :::l :::l a
'c,= ~ ~ ~ 3 ~.,g g
~OCU(Qt-"OOIllU
'"
'"
00'"
......
M_
\'j
"E
~
]
:c;
'~
.:::
~
"
~ "
~ "; :;
.28;
-0.0
o ~ ~
""''''
"''' "
"0.';::-
~ ~ g
II) .c ....
" 0 '"
e a.~
o " !i
of ~ ~
';:r:! ~
.g 6 g
> A '"
,,'" ,
.::: -0 ~
"''' !l
!: go 0
" <..> <..>
.- ~ '-
","-
:::;" !?
'" <..> -
..: == lU
" O..c
,,- -
'0 8 ~
0. d .-
"0'"
:; 0"::
~ S.5
-='3.J
'" <..> <..>
E "'.~
'" '" 0
'Q,'6 S.
<..>'" "
> '"C .c
.- Cl:l ...
c;-'-
c " 0
c':= ~
01::1::
Z !. a
...
~
~-
.."
_w
fa _~
'u'g
00:
~Q:"
<to:
c::'
~::;
!~
!s
",:;J
li~
~c
.co!
,!HI
~:t
e
e
e
e
1!
~
II.
'"
=
'E
o
~
0:
"
=
..
to
=
'=
s
';:
o
::E
=
.2
1;
~
i
1:;
~
'~
~
~
'"
~
o
.c:
E
~
!!
..
'"
;;
~
o
'"
I
,~
S
~
'ii
o
~
u 0
f;.s
,~ '2
~"
oS
=~
'~ 01
'2=
.. ..
~~II
010
~~
",0
e
o
'"
.
a.
e
o
u
'0
e
o
'"
..
u
<;:
'l:
~
'ge
5~
.S
:Ie
-g~
.. .
0115.
.Ee
e:;:
1=0
j
e
'l:
e:..
.
e
..
z
16
c
.
:is
'0;...
e~
0..
Cl.~
..
.
II:
l!
::J
=
.
:I
e
o
~
01
'"
i
~
ii
'"
:s
00
c
'~
..2
:E
"
.s
S
""
~
]
~
E
"
';::
~
e
8
IS: ~
" ci.
~ ~ 5r
-S E E
~ fi- a ~
_ ::'2;..::., \,,) ~ .., ,.-:.,
c..;\' ~.::!~-o~
c.. ~ g;: l::l... ~ 0 s:::;::
~;..::.,w ~ .., ~ ~ ~ ~
~ :.: _ I::: .... Q.. l:::I ..
- " e"- ~ -- ~ .~ - 1:3
':l=:::: :-: ~ ""':' ci.~:::::
- -;..:a~EQ.c..~
5 .g E ~ ci. __ e .~ a- III 5
':';:::cG.}~c..c..oo\,,)""~e
~ "= .c 5 V,I :I = ~ ~ "-
~c5cU~~>-5~1:3..3
t: co - ~ 0) :s CI':J':::::": IS:__
Q,.l~ ~rIl'.:::t:~~_~ c..
~-.E ~r~.s~ > u-,S
.co 1=: (.) bh v .- :!4 ~
..... - ~ ._ C d VI..!:!
~ ~ ] ~ e] E ~ .~ 'i ~
0) E - ~ 0 e :I E 'C c e
~ C':I ~ C':I e u 0 r~ Q,.l ~ c..
f-ac.?o..~~"'vo..~'"
'0
c
. . . . . . . . . . .
~
.~
~
...
,~
~
~
"
oS .. _
~~-8
> .- =
o.~ ::I
i lS,.Ul"O"
:;.. '0 c.. & ~ :
c u C':I ~::I'-
.- ''=''l- III It) ~
.!! e '5h-8..o .s
.0 c.. 0 .- "0 -
..! .5 "0 .~ "3 ~
- ._.0 0 v
g].otiu.g
CUl"O..c_
o=~'o~.9.
to> Go)._ __
U..c-UVl....
.o>.~~O)~
o !l cr"" 'u 'C
- t: C':S u ~.5
1= III __ III V,I-
~.!:! ...." 8.. u g
g ~ ~ e.::
.;.: c.. c c.. ~ e
u 1Il'- > co
'"".c1::~=_
C':I u C'I:I _._ =
~ = Q.."O 0,.0
'u tf) u :;.:: 0
ucnlll --0
~~g~~.a
~ ti (,) ::s = ~
.!:! III c- "C 0'-
S~o~z~
os:l.ooo ,0
3"Og.~B
>u._ ; .. "0 E
.J:J c..-
'r;; co 0.0"0 .~
CCI .c .5 I: C ::
~"'CQ.cou~
.- ~ ~ rJ"8'u
~ !l ~u - 1i
~ ej ~1J;
~
~
"
';;;
_'~~ 5
~l::: e..
~~;":"O;j
"= ~ 1S ; ~
~ l::S.i! '.i:
'" "5 ~ -- ~
a l:::..s c. e
E ~ :: ~ 8
~ 2 I: "'J ~
~ =;: (;) E-
~ c "',- "
re _ S2"tl ~ ]
~ r.:: ..;;"~. u -
OOtu:S~~ ~
9QhE~~ e
oco2'=c a.
c] 0 1.0,,8 ~
~ E!~~ ~
:z:: ~ "" 0.. U ,g
tIl
. . . . .
.,;
"
u
~
Q.
~
C
g,
o
"
~ .~
"" ;;
:i U'
o ..
.c 1; ~
.dEc
~ -g ~
Vl "'C ~
" C Q.
"Egg
~t:-
~ ~ ~
>. Vl .~
"C c u
o " 8-
~ i ::
g ".j e
"BEen
o..~~
~ en._
o 0 ~
.~ ".j i:
b ~ 'c
t;; ~ g
.~ ~'-
"" ~ 0
"~ ~ g
.r:::.._ ~
~ ~ ~--.
".j IU C In
~ ~ cu 5
;o5o~
co u ~-
"'C:::~~
:J 0,- :J
C OIl ~ ;;
t: coO C
I:J 0 U 0
CQ"'C~-
"'C IU'- c:
";: ::: 0.'-
-e "$: e -g
.....t:a.~
:I:ua.a.
...., a. "" In
~
~
;;
c
.9
1:
u
u
~
f
~
~
~
~
,=
I~
I
I
"'-
!!~
.ft ,_
;:;~
0",
"'-
"'0.
00;'"
=::!
..::!
e-
l~
01'"
li~
~,~
i~
e
e
e
,~
e-
ll.
..
"
~
o
.c:
~
~
~
i
~
o
'"
I
~
'E
~
~
..
u 0
fi .5
'- '!!
~ ca
o e
c ..
'-Ill
'!! c
~ ~
e",
..~
11I0
~~
",0
e
l!!
1
'"
c
t:
o
~
0:
"
c
~
'"
C
'I:
l!
;:
~
c
,S!
1;;
'"
'"
:i!
e:
o
'"
..
a.
E
o
u
'0
g
i
u
<;:
1:
..
>
'ge:
",.2
liE
:lEe:
~~
....
Ola.
.5E
E=
j:O
,.;;
ii
'"
:s
j
e:
1:
!!:.
..
E
..
z
~
c
..
:;;
'W; ~
e:1:
0..
~A.
~
;:
...
E
Q. ~ S
.2ut,j
~.~ ~
o~o
...
o III 'i:l
~~G.l s:S E
8 In..c _ '.;..s t::
e: - .... - u -- iU CIS
'8 ~ ~ s ~..s go
~ Go) .~ -: ~ 8 g Q
.- c.~ il.l ;> I=: co
.s 00 3: go o.~ ~ C
2; ~ rJ) ~ ~ ~ ~ .~
i:e~iUEo~.!!
Q.. o.o~"O Q.u CQ..
!
:J
::
..
:IE
e:
o
'"
..
Ol
'"
i
~...
>,0
";r- il.lc
.ceO [:0
III 0 5 1lJ"'8 :::l';:
... .... "O.c eG III U
~~~~lXctf
.2 en E -:. ~ o.~
u......IUConc:c"O'CU
r; CI:l CO ~ en ~ III
"O(.I.ls::=-=:o~1lJ
u""ccs<:::.o-s
..c 0 Cf.l 00 c:: ,9 0
-: "",'" ~ '"
oS::; ...0:';
.~O-cao_1U
1Il~.stii'i..E
0...- l!l"::-.C N ~
~~~ge-a~
...0..~~g;5~
oS '2'- ti CIS. e ....
... "';>O=IU
~ 0' ._ .... en I: J:J
III ~ fi~"t:i ~-",
.'$ 0 - c U CIS
1::';: 8..< -e "'0 ~
.... U ""'l 0 IlJ
iLl il.l '"' s.o;;; .... ....
Q.cn ~ =.~ ::s :::l
00 CIS "0 ~ U)
=<tf.ltn"Or,I)fi~
~~~"";IlJEu
E _ ~ 0 J:J U'l IIJ
0.0 ClS (J) _"0_.... ....
l-.....~Cl::B]..c:O
O~.c~,!gfll~OO
IlJ ~.<: c:c 0.... . C
;5 CIS ~ ~.!a.~ gfJ'S
~ 1-0 = .... .sa J:J ~ C
",,]OellJl!ClS~
U'l -.;:: 0 ~ ... Q..
.- .- ell 0 III en OCI >-
.sQ.l.=....-~o_
c ::s CIS u;;> .....-
.12 'C; ~ 0lJ.~~ 6 u
.....:E 0 ; E -< 'C il.l
Q.. 0 c..; ~ Q.CI) 0..;5
-
-~
.0
a:o
lll~
;:
~
Cl. ~ -
o 8 .s
].~ ~
o~o
... ..;
o ~
~cS s:S ~li
u en ",;I..c
u:3......... _ClS_
e.~ 0 ....... cu -; u .; cu ,...
'" 0"'.;;",<:: "-5 ll'
~ cu ~ 0 .. roIl'5 cu 0 0
.:a Cl.. ..... roll '"' > ("Ie -
~ 0 cu cu cu OJ)
g OIJ ~ roIl"'€ go ~ ~ 9 .S
_ .5 ...J:l ... _.~ g. ~ 5
o -0 V~.c Cl.. ~ > C CIS ~
'C ~ ~ ..;! e cu e 0 g-...
Q.. OIJ _ ... Cl..-o Cl.. ("I 'I;
]~ ]
~ 0 roll
~ ;:g ~ ~
CIS ~..:.G ~
= c=! = CIS ~
Li:'I;ClSgS
cu >..c 'I; (,)
~.c g.:a ~
~].=~O
o i.~~ ~
5~~ y~
vi It) CIS roll ~
:2:.c 5 CIS Q..
::E ';5 ~.iO'
.-:;j... ~u
8ro1l'5ir/J~
~.~ If:: g ~
Q.."'E~bo
::;.. Cl..s Cl.. C
;;> e.- Cl.. 0
r/J Q.~ CIS '':
cu -..c >. ~
.;:r/Jr/J!9+:i
C -< r/J t:.~
o ~ [.L.,.:a ~
~':;'~~.s
..c cu cu .
.2 .:! :c .g s
r/Jt:s~"C
r/J ~'3 _ ~
[.L., roll.. t:
<....-...
".35 E ~
'-Croll=,-
~ g ~.5 ~
II} (,) ... c.-
.s < 5.'5.8
Nt:'
.0
a:o
lll~
G\
;:
~
Cl. ~ -
o ~ g
].~ ~
cu cu'::
OCllO
.~i~ i.s I
:::I t:: roll ~ cu 00
.~ ~ ~ ~ ~ ~ OIJ
S .. is' l!!.::I El e
6 ~ ~ ~ i ~ .~
'1:: ~ cu cu 0 cu ~
Q.. OIJ-o "C (,) e Q..
o
= j;.t., c ~.
",0:)<1
..cu-E OIJ
roIl-ou.c roll t:
C C C; .:! :E '8
CIS CIS ....c t-o =
.;! vr~:.t CIS
c.. e-~ ] ~ E:
g.8cuClS~.~
cu ...;; IU cu u
.s"ES:C~l!
u~"C~c..-
- -. cu .- ., '-
.{;'; IoIool -; c.. ~ 0
Q..--o.-c
:s: g ~ CIS N.S
r/Jg~~e~
cu U > roIl":::I 1;;
-5 >, e -8 .E -=
C.-=c..oE!CIS
0"'; Q. (,).= In
.Ei ::: CIS cu = cu
.e 0' 5 e ",-5
c '"' roll CIS (; 0
....!!.-~"e.;
Q. CIS "C 0 IU
Oll~ e.=;:
c _ 8. CIS CIS IU
;.a ~ c';;.~ e
t!,.9i! ti:e~
l+oo ~-g BlUe
o ~ 0 t! (; .-
o 0 _ tf.l.c IU
g...f"'! .. "C p"..c
CIS-.:l~CO=
:::I.eClS CIS s.cu
roIl:~'C _ p"..c
.:a ~ go ~ CIS ~ ~
g - ... -.... IU '"' 0
...~8:t]au
.9 c CIS ~ U ~ .~
Q: 8 ~ ;:> .5 e 0
..,t:'
.0
a:o
lll~
;:
~
Cl.. ~ S
.s u t)
~.~ ~
o~o
.s
OIJul_
Sa]
:::I C roll .s
gj 0 ... t':S
.- c.. 0 ::
grfg.~
.13 ~ l e
'"' '"' IlJ IlJ
Q.. bO"C"C
roll c!
:s e
-5 t:
.~ .s &
SO
~ ~
iii .~
'" '"
~o:
...
i:!
::I
}
o
<.>
- ... ...
.:! ~::
] -=p,,";roIlOlJ=
S ~ tf.l..c:E
"; '"' c roll f- 'g
::: 0 &"6 en ~
0"] co'{;'; ~ ':
CIS ~.g "C ..a ;:> ..--.
~ ~] ; g ~ a
cu .- t':S CIS 0 tf.l cu
0.."C 0 (,) ..c:
e~:€<:]];::
Cl..o :r: _ f-o CIS 0
g;'o~S .c.::c
;:> _.c c=! CIS ~ .2
tI):::'=~~i::Dt)
cu g., [~CIS{/)~
.;:~e;~~.~
~]8::E;.aroll~
.~8.~sef.s
E e B '~.5 a s
IlJ o..'~ t: IlJ --0
Q.u_cu..s=u
00.5 ~ <.Il O"E
C _ '':''l S.S ~ u
~.2eUroll(,)e
~-Cl..cu;-~
OOc CU..c-::: 0 g..
......_..c - - roll C
o t= - ~ CIS .= ._
cu QJ C 0 ~ ::: q,)
(,)uoc......~.c
C roll 0....... ...
~ ~ c .= C QJ]
gj~g~g-=roIl
.- _ 1= QJ 1= e ~
~:a~E~"O~~
-'c.oo~;''''O:::tl
:SS:Q..c..CQJ[Q~
'i: 0 .... E CIS ~ QJ.~
... :c .5 .~ ::E .J:l E 0
"tS
a:o
lll~
'"
~
,,-
~il
fI.=
'i:i~
00::
"-
"a.
<1:0::
c:"
~"
e-
"8
c:o
l!!:5l
~~
..-
~ ~
~=
uu
if
.
e
.
~
l
Ii:
"
o
~
~
.l!
~
01
S
"
o
"'
I
,~
E
,g
;;
o
~
u 0
c c
~ '-I
'-l!
~CI
oE
c~
'-Ill
~c
et;
~~
III 0
c)eo
~,-
",0
E
l!
01
e
II.
01
C
1:
o
1
'tl
c
~
01
c
'.,
2
'E
~
c
:8
~
~
i
e
o
i
}J
o e
(,) "C
- !!:.
o
~ ~
;: "
" z
..
'"
"C
~
..
:is
~t
g,"
lOlL
..
iii:
'8e
=0
..j
:Ie
~~
" ..
...'ii.
.5E
E::
j::o
!
:>
lO
"
..
:I
e
o
1;
...
;:
i
ii
E;
.5
~
C
('}.
"
~
c.."'~
.2 ~ S
~.- to)
> t: ~
O~O
Q) CfJ ~
oS :s'"
~~ = :E J
.- I:: J!! ~.:; c..
~or/)BQ)oQ
.~ Q., ... f! ~ ....
OIl It ~ " OJ OIl
g.5 0 it!:= !:l.5
l5:g";jgQ.~a
._'_ > " E: !< "
Q:.E~~8cE:
Ul
....
o
Ul
011
>-
C)
o
....
o
w
C)
'" -= '-
II) ~ 0
;.a CfJ c
.E! <...., C
CfJ U 0 on ~
C; 'S ~ ';;j Q..
U r.n 0 iU oS
';:; 'il.="tl OJ
-= en el2 0;> .
u_]-=-8B
.!l<oS ~ 0 0) ';;j
o = '"' II,)
~ ] .... if-=
u tU 0'"0 s.! C
t;:ouBco
'o:~ e e c.. ~
8.iUO&...2~
en -S ~ j;O ~ '~
Be. 8 iU e
._ 0 ILl c"O c..
In _.__
.. c 'VJ u -; 5
~.2 0 Jj to.. .-
.~ ~ ~ ~ ~ ~
Q.;g ~ :: 'S ~
00 0 iU iU t.;: 0
.5 (,) ... ~ 0 (.)
:!a~aa~~
'3 iU ~ CI) e-S
.cc':::-yO
'- - '" " ."
o C; on'~ c"'8
iU S.5..a.~ tU
g r..=; t; ~ ~ CfJ~
~"'2'>( 0"0 e
1-0 U U C ;;:,
~tU~ootUu
.- g. 0 (.) oil ::I
U ... e.o~ c .=:
-S c. c: ._._ III
o QJ'S U :0 OJ)
~.Q..:ltOJ"
S::::: 0 CfJ.5 ''51
.- J!! ~ OJ OIl._
~Vl~'~e~
Vi'
Gl
_Gl
, -
--
"
~
c. ~ 5
.2 u -
Q)'- (,)
> t: e
Q~O
'" ~,,'
.s :s S
- -= 1:
ooE) = .t;: u C'I:I
.5 ';: J!! ~.:; e-
::I C In Q) 13)
~u...1;ugCl
.- c.. OJ ~ !; " OIl
g ~ 8' ~:.= 5 .~"
... .... OJ 0 g. Vl
.S! "g ;> S c C'I:I
"'I-IUOO~-
~ 0.0'"0 "0 (,,) C c..
"
.S! C
.~ ~
- c..
8:..2
-" OJ
]..c>
.~ gf-8
e 0 e
:$.s 6
S -0 S
u C',e
.Q " u
="'"
" >.,J:,
-;;5;a
" " 0
.2 j ~
'" " OJ
e e.o-5
OJ " 0
"'0 .;;"'C
~ ~ !;
_'"'OIl
!3 .Q .5
..,,,"tl
u '; e
-; i:: 00
.~ -8 :
"'85'=
.- "
-;gj"tl
..c ~ ~
'" " >
:g .5 .~
CIS >..:.:
c.."i:t;rIi
Oil..! Q. 0
C =' -''::
.;o.~ ~ .:;
e '5 ~.~
OQ.O~
Vi'
Gl
NGl
'-
--
"
~
c.. '" ~
.2 8 0
~ .~ y
o~i5
o (I) i:l
..s :.s 0
OIl J5 _ .:; e
5 ';: -; ii jj "
::::I c.J: 0 _fr
;8.::;;8.90
It ~ !; OJ OIl
g OIl 0 it!:= !:l .5
~ ,5 - Sl So., "
o"'Ooct:~c
'i: ~ r; 0 0 ~..!
j:l.., 00"'0 "'0 0 ~ j:l..,
Ul
....
c(
ii:
I>l
~
:IE
Ul
~
o
~
:z:
c
z
c(
Ul
C
iii:
~
:z:
OJ
o Oil ~ =
.:;.~ ~ ~
.:3 c.:: c..
~..!<.s
.- Q., 0
:r: 0 ~ >
'-ofi -~
~oc;"'C1
OJ -.:; ~
Q. 0 .. 0
Oilggc..
c: 0'- e
~ ~ 'E c..
CIS > ~ 0
tbot:..c:
... c: 0 :
o ~ CO CIS
aE !;.:; ~
E::r:tn"'g::::l
8.~, ~ ~.. c..
00':; >.. C ~
" 0 ... !II -
;oa.Ul::c..
=-=_ ..... c..::::I
]t;g..s;
>..-5~~~
; is ,= ~ 0
'-BO....9
~:.:~toSon
~Q.oot:
> c..- - !S
o CIS t:';;; l.O-i
~~ ~ 0 ~
0._ .: 0
~ .. 0il"O "0
~ ~:a 0,) .5
_;..=:~..c:
.9 t3 '3 ~ '0
"'oCQ~c
.2 '0'''0 (I) =
~ a.;.a'f;
Vi'
Gl
_Gl
'-
"'-
"
~
c..~S
.20-
0'- 0
> t: ~
~J5i:S
o on i:l
.; :.s 0
'" e
OIl.;;= :EOJ"
.~ 5.a 0 :r: -S fr
on 11) on_11) 00
onQ.l.oeg_
.- 00 11) - ~ 11) eo
g " 8" it!:= !:l.5
~:ao;oSo"'2
,2:: > E c ~ CIS
ct]~~8EE:
~
::i
c(
~
a
a:
I>l
~
~
c
z
c(
>-
C)
o
....
o
iii:
C
>-
:z:
.!l
"
~ OJ
jg.s
~~
~:l
"
] ~
'" OJ
c'3
Cl:I c::r C
~ ~.9
c.._ c;
go:a t=
11) c; ~
-5-;;0
....s 0
's -s ti
[.~ ~
OIl"'OIl
I::'~ C
:a 9. 'E
:: l:: Cl:I
" 0 OIl
.Q u OJ
" " ~
'- 0 OJ
0',:: "'8
1l ;:Ju
"l:: OIl
~ ~ .5
'" 0 "tl
.~ 0 ::
]~~
- " "
0_ l:
:";~
0_._
.- Cl:I C
~-s~
Vi'
Gl
_Gl
, -
N_
po.
-
,,-
.l!il
.. .=
gi
..!;.
"0.
'Co:
,,::;
~::;
e-
ii
III'"
'ii~
,,"
.c:~
U()
if
tit
tit
tit
e
l!
'"
~
'"
C
~
l
",
C
"
'"
C
'C
2
'"
~
c
.S!
1;
~
i
~
.~
~
..
~
o
.c:
e
~
.!l
"
01
-S
=
o
II)
I
"
'e
.2
~
..
"0
;.S
.- '!!
~ 11
oE
c ..
'-Ill
'!! c
" "
Ell)
..~
III 0
c;e.
".-
11)'"
e
o
:::
..
}j
o e
CJ 'C
- !!:.
o
is ~
::: "
" Z
u
'"
'C
..
>
'8e
5~
"s
::lie
"..
e E
" ..
..is.
.5E
E;:
j::o
ii
;:0
:s
..
-
"
C
..
2i
.,..
e,\:
g,"
..II.
..
lI::
"
E
Q.. ~ c;
.2u~
~'E e
O~O
'" "
.s :s ~
"",;_ .g t:
5 E! ]i.s ~
::Ie tf.I B u
~G;_cuo.sCl
- "q'l:l C ""
.9 "" 8" i!!,g ~.5
. .5 - Q "" '" C
.S: ~ ~ E e CI:I a
"".... 1-0 QJ Q.) 0 UE ...
_oo""O"Ou _
!
"
:;
..
::Ii
C
o
i
..
:::
:i
C
~ '; =
CI:I is Q.)
l:lg " "
Lg:;s.s
t:i - :! ,,""
lU >":S.~ ;;
""00;: I: ..... 0
- c:.= 0
]2~Zal
U)~ ~<e
-.. - ......
; ;; ~ ~ 5
.~ "0 u C U
0.. B'~ e >.
Q., cu Q u;<:::..o
<<I ,ao c.!:: -; =
~ ,=.S: 5o:s ~
-=;;uo......
..:~=iX~o
e = ~E! ~ ~
It.- - t:i? t:i
oo~g~Bs
c 00.- lU S
~ ;; ~ ~tf.l ~
(U..c Z (U iLl !'t
... u ..c..c-
OIJ.~ _~ ~ _ <<I
<<I ""0 _._.c V"l
tz ti C 0 -i Ol)
A. A' 1-0 .5
y-;..=B"'O..o
C ~ - .. " 2
~E-=~t2",
tIl .... .- E U :.=
.~ 9 ~ ......0 ~
.s ~ 8 .9 ~ .9
.~ c U::..c t)
S~~8~2
csog.B-o:;;
.-;j c ~z "
c:.s8cn_8
on
'"
N'"
'-
N_
"
E
"" '" .
o tl B
] 'E ~
o~o
'" -c'
:a_
E
ui oS 1:
~'E! = ._" OJ
3t:~.2~-=e-
~8._eggCl
- "" It - .. " ""
.9 5 0 i!!;.:: !3."
... :s "i) 0 c.. (/J ~
.S! - > 8 8 5 cu
Q:]~..g8e~
.s
"
:,s
.~ :.~
c.- ~
51 ~ l:':
U _ 0
"-",,
:::: <S c:
'" " ..
S oS B
u >. 'r.;;
~.-;: 5
g U OJ)
>,.,g .S
,,-""
.. 0 .
....:: ~
~ 's ~
's.g ti
... VI ~
II.) _'_
""- ""
OI)~C
C';J lU
:EiS~
'S ~!oS
..0'- -
"8:~
... .. C'
o ..
- " E
~ oS 0
e ctl:
c.~ c
g.Q.. .S
~~3
-.- C ii
o ~ u Ol)
- c. 8 cu
o CI.l ::s .5
._ u u C\t
=:..s~.a
on
'"
"'Cl>
'-
N_
""
"
'il
"
..5i
!:l
..
'"
"
.51
'il
>
"
u
""
.5
:s
3
.,
.
o
S .~
t;"E.,
tE~
"" 0
" 0
",<::
o .
"""
:= ~
""0
'0
~-
.- "
""-"
:!'"
"""
",,:2
~:l
<: g
-;;-
~
a"ll
o "
r.t: 's
~ 5
o "
<:: '"
" ~
",,0
:!<::
.~ c;
""
u Go! -;;-
~-=-~
"'011)....
~;;:;;
E E !:l
o " "
u .!:l t)
" " "
'" C'l:l
; ~ II)
"'" "
!jo~
t;~ ::t
'" . .
"'.tJ 0
~; ~
C\t _....
5 '" ..
'C\t t) .a
.a "" E
~.~ 0
'in II) ~
C t; C
o u ._
Go) .':"t..c
..c E.-=:
... "" ~
;j;'
.5 in 5
>. ~ ~
.&J ~ B
""""
B = ~
~.~ ~
..- 0
~tS 0
o U ~
~ -s ~
"... "
~ 0 .5
.. "
.8 6
8;
"
i g
E i!!
* ~
~~
" "
"".,
:! "
.; ~
.a '"
.~~
'"
!:!:
o 'E
Go) '0'
.c .
...""
"
~
'"
"
..
.5
""
"
'"
o
"'''''
; 8
" ""
- "
-a-s
~~
o "
" '"
a: e
C ..
~ ~
E !3
" "
- "
~o
"'=
'0 'i
l:l _
6~
" -
"" ~
o 0
.g<::
E E
B .9
" '"
~.5 Ci
~ "
o '"
"" ~
" .
.c "
t-o .5
-
"3
'"
"
.
g
i
u
"
0'
Q..;,)
" ~
.c 0
...<::
N
-
"
"
'is'
.
""
"
-=
o
",-
., "
-';
~.a
!:!:-
o~
" -
. "
...s
.2'"
.- "
:1.::
u 'u
" "
'e~
"""
".c
-=;;
~:s
II) .~
~ '"
o "
C.,,::: ui
~ : U
c U'-
,S..c:E
en 'O'u
.5 E ~
" 0 "
~ r.t:.~
~:Jt:::
" "'.. 0
.5
>-~E
c ~ C\t
<:""'"
~
....,
"
E
l:l. ~ -
..9 0 0
~ .~ ~
O~Q
"
-=
,;
""'-e =
" ..
.- .c
a Go) r.n
'" "".
.; 00 8-
-.50
l5 :9 03
.c'S ij
....,""
Cl
Z
Z
z
:3
..
all
w
.,
::;)
c
z
:3
"
'il
l:l...
i!! 0
n.s
Go) .... 0
'"C --.
_:;"0
~oa
1I):5! Go)
t) '3 e
""., "
.2 C\t -.""5
~ .5
".c "
"O'-'::.&J
" ~
-S .:a "';
. .c
'" - '"
'E!" "
E E 3
8.! E
~ ~ e
:g.g:a
'S ; t-o
.,-
>- l:l....
C u ~
CGl.::t.o=.
~'o ~
u 8. CG
" '" "
cog"
~.!:l c
~ E_51
.- "
.9"11
.-=
.S - \C!
~.s=
-
";~
::;)0
...~
...
~
..-
~"O
;; .~
''''Ii
0",
"-
"0.
'0:'"
c::;
..::;
U
l!~
Ill'"
_!::f
~-
,,0
.c::!
.SlY
::II,;
e
e
e
'G
..
'~
~
..
..
~
o
.c:
e
~
2
..
r
~
o
lI)
I
..
'E
~ I
~ 0
;.5
'-l!
~I'O
o E
C ..
'- 01
l!c
.. ..
Ell)
..~
010
:;.~
lI)CJ
e
1
..
,S
1:
o
1
..,
c
..
..
c
'C
S
'S
~
c
,51
1;
..
'"
i
=
o
i
li'
o =
(.l 'i:
~ ~
o
g ~
'" ..
.. z
u
q:
;:
~
ii
'"
:s
!
c
.
:s
"i >-
=t:
0..
Q.lL
..
!
'8=
5~
.J!
::E=
-g~
.. .
..a.
.5E
E:::
j::O
~ E
~ €
"i] 3-
" -"
i;t(,gO
J: = 4) Oll
l!! J:! 3 ,=
~ ~~d
-8Sea:
!
"
=
.
::E
=
o
til
..
'"
:i
..;
o
U
~
Q
lOll
=
'"
~
c::
c
U
"
.:;
'-
o
"
,9
U
~
,:!l
1i
~
(\
Ul
W
(.l
a:
;,
o
Ul
w
a:
....
~
w
z
!i
,
E
~
0. ~ -
.s8S
It.).- 0
> i: "
4) It.) .!:I
0",0
III E
:s ~
Ollti'= -= 1:::
,5 '8" ~.s a.
oE~~u Go)
~"_",,so
,:!l 0. 111:> ~ " lOll
S lOll 0 l!!:.: 3,5
s~uog.~a
._ ~ > e C 4) CIS
Q: ~.g.g. 8 e Q:
1!
~
'"
"
-
':;
""
"
c.:
"
"
o
Z
-
":2
o ~
Ef"
, 0
0.'=
<> "
9.5
..... l!!
~ 8
, 0
sz
,; ,
0>:
9.~
';; 2..;
" " ,.,
"'" "
lc:-52
" 0-
~ ..,8
o s_
';Q.~
2g.g
.~~~
l: '" _
~ c 0
- " ~
o . ~
.0 S '"
::; tti 3
-;;g~
c .. c
o~o
'': III e
~ ~~
I:> '" 0.
~... -
Co~
8~g
w
Ul
(5
Z
in
01
~Ol
. ~
GO _
E
~
0. (l S
.su-
U'- 0
> ~ ~
o~o
IlJ III E
-= :s 8
.r .:; 1::
~'~e::; .;;: 4,) co
,_ "" > .:; 0.
o Vol B 0 ~
~~lo.oeu"S""
.- - 0... 0lI
S lOll g. l!! J:! ~5
_ ,5 - 2 Q. ~ "
0"'0 G.l l:. c ClS =
'C CIS i) u 0 u ~
o.i;h",,,, " So.
"8
"
'"
~
':;
""
"
JJ
-;;
""
~
~
" '
- ~
,- -
.0 "
~e
::l
"8 S
" lOll
"'CI .5
" "
~ .9
"" "
]~
-,.,
ci:
~ 11
",f:
,- 0.
"""
""-
" ,-
" ~
.5!"'O
- "
" "
5B
l!!5
8 E
in
01
NOl
.~
co_
-C)
E
~
~ (l S
'O.~ '0
> ~ ~
Q~O
IIJ VI E
.;: :s u
. "",-- €
0I):l = u cu
,5 '8 Jl ~ .:; e-
o E III II) 0
~u...C;uBO
.- c.. u t: c OJ:)
g 00 go ~ ~ S.5
_ ,5 ;; 0 ~ ~ "
0'" S ""
'c ClS > 0 CIS
c..5iJ.g.gSSE:::
-;;
,:!
U
l'l
0.
~
"
-
~
~
"
'"
"
1i
"
..Q
JJ
:2
~
~
"
~
"
lOll
"
'60
g en
~ "
" ~
'U "
:.a 4)
~ .~
'" '~
; OJ
~
lOll"
.5 .~
:: 0
"'''
'tl. E
So
"'<J:
in
01
..,01
.~
co_
E
~
Q.(lg
~.~ u
> t: ~
o~o
"
.:;
o.olJf-
5 '8:2
a E en
.~ 8. 0
o lOll 0.
:.5..2
.S!] ~
- - "
0. lOll'"
-;;
JJI
s 8
.!!! '-
" 0
o u
f~ ~
5~
~~
8 0
" i!l
" 'c
"" "
~-
"0 .~
~ is
" "
u~
.0 ~
- -
,,'-
"" 0
~ ~
~ "
ti~
'E <>
~~
0.5
.;a..e
o .=
" ~
i:'",
a ~
0. 0 ~
E 't:.=
~ 8. 3
in
'"
"t'"
co::'
1:'1
..-
.."
-"
CI.s:
'il~
00:
..-
"a.
~o:
c::!
..;:
~8
~~
01'"
'ill:!
~j
.!!y
:Ei:
e
i
e
e
~
.~
~
..
~
~
o
.c
Ie
~
.!!
~
'"
;;
~
o
'"
I
~
'E
:i
~
..
" 0
;.E
.~ -e
~ "
o E
~ ..
.~ 01
-e~
~ ~
E",
.....
010
~b
~ .~
"'(.)
e
~
1
'"
~
'e
o
it
Q:
."
~
~
'"
~
.~
S
'i:
~
~
.S
;;
'"
""
i
e:
I~
I~
o
U
-
o
e:
o
';
u
'"
'C
"
>
"
:;;
.'"
e:t:
0..
lio.
"
ex:
'8e:
...0
-'"
"J!
::Ee:
..."
e: E
.. "
.."6.
.5E
E=
1=0
ii
'"
:s
i
-
e:
"C
!!:.
"
E
..
z
s
..
c
~ ;:
~ ~
.~ ~ fr
~ IV 00
l: ~ -
fJl ~ cu ;:!l
,,:= 3,=
n'~ ~
~8ac:
!
::I
..
..
"
::E
e:
o
'"
..
..
'"
j
I
;:
E
'" ~ ~
..9 ~ S
v'- ()
> t: ~
I1.l 0'-
ClCllCl
~ .;
" :s "
-=~ -C ~
":l- .. 1:
sa ] 'ii.s a.
::s t: fI) ~ u u
~u_co("lBCl
-Q.,o.t:lCuoo
.9 ~ go g ~~ e!3
t5 ~ "i) S .. a
"c r: ~ ~ tU
Q.,OIJ-o-8Bt::E:
.,;
"
~
:;
"
,t:>
;;
""
~
;:
E
'"
.:;
~
"
<l
>
~
"
~
'g
~
j
;n
'"
on",
'-
., -
;:
1 fJl 1-0
08..9
~ 'E ~
iU Q) .!:l
ClCllCl
~ .;
.s :s E
OIl ld' _ oS fi
"'a;; 'ii" ~
'3 E..c B -S go
v.I IU en v 0 Cl
.!!l Q. ... ~ ~ .....
8. .." OIl
.9 Oll 0 ltl:= 3'S
~~~~~lQa
'0 e QJ U 0 us,g
Q.. 0.0"0 "0 0 ,0..
;;
.~
t;
:!
'"
~
!:
~
1l
~
.:
.s
"
OIl
.9
3
"
"
o
.9
'0
"
a
..
c..
"
,t:>
;;
""
~
~
.~
:~
ti
..
>.
~
o
z
;n
'"
"'"
.,:::.
C)
z
iii
:l
o
:z:
olJ
z
o
.~
:l
0.
o
0.
'0
"
~
:;
~
"
~
"
"
o
Z
'--
;:
E
Q. ~ 0
.su't":
~'E ~
8Jlo
~ -,,'
J;
~j - E
OIl c ~ oS 1::
C u.. .~ ~ [
'3 c.. u u .. u
U':l>-,.c._ooQ
.!!l (,) 0 r: ~ -
cu.....colIJCl.l
.9 .. > ltl:= ~.5
o g.-8 ~ ~ ~ ~
'C tl,.g U 0 us;P,l
c..o_"'Cu _
en
w
U
:;
ex:
w
en
U
:J
tlI
:l
0.
.s "'0 0 0
s~~u~1!
~.g5'S~]~
~~S:;lS.~"O~
<0 0 >. co 'S ~ :::s
.... co ... fJl
cc..c..SQ.cc
.9 cu ~ '0 co U u
t::.~ 0 rJ'l S
0- ::II.,: co ClJ
Q. 8..~ '0 u -= ]
e .... c 8..5 c.~
co tE .- fJl _ ClJ -
~23].8"'B~~
.!:l :g ~ - a a! g
r2! u > ~ ..0
fIl-e~:::~JS
....5Q.,fJlcc>.
il S ".!oi::> !.! !!I
'=0 u..o.~ >.. C l::
""' > >,:0:: ..... IV
_ 0 ~ tJ ._ u_
-....cr2!UOb<:vi
~e. ....utUClu
';;I .c ~ o..c u > .~
>. - .- - t.: i::
cO '3'~ ~ >."- ~
Q., ,_ ] t':S.J:I ~ >. ~
-;~~~]~~~
..cU'-W~>_~t.:
II) - ~ ~ e ~ ~"'C
-a ~ ~ Q.l 0. ''='"l...... C
Q.l 0 ,~ ~ 0. e c cO
c',= >.- cO 0. E "
0'- ... ... Q.l u
Q., "'C ~ g..J:I -d' :.=
o-g,,~o"o"'o
... 0 0.._ > _ 0..
~ ~.- c. c 0 Q.l ...
u>EcOco=IS,.>J:!
~ 0 lI.) Il.l - c.. u
'~u > ..c c.. t':S Cl II)
e 0 ~ ~ U II) >.'~
c.......... u - U ...
u>.-viCC=:-:
,.c.-= ~ lI.) ~ cO ~ 0
r-o u t.: ~ t;: c.,'> ~
;n
-'"
''''
"'-
--
;:
E
"'~
o 1l
~~
" "
ClCll
.;
5~
:l "
III '"
.; OIl
- "
...:.a
0-
.t: '5
o..~
"
.12
" :;;
~ '0
:l Oll
g"~
-g ~
~.2
'"
""'V>
g"E
~ ~
.'0
~ "
~~
.. >.
~:'=
~'::
.~ 8-
,,-
" el
:.2
- ~
e 2
o ><
Eo"
o Oll
u.E
.5 :s!
= "5
.- ,t:>
~'O
~ 5
..!! 0
"';
6],0ll
.- "
~ ';;
'O.g,
(j:'=
" -
.O'~
~ .-
0.. "
;n
"''''
.'"
"'-
--
:;:
"
oS
~-
.."
1; _~
'u'li
0",
~-
~a.
<(",
o:~
~:;l
~8
0:0
~lll
01<0
-~
..-
H
.!tY
lE:t
e
e
e
~
.~
~
~
~
o
.c:
e
~
s
~
01
S
~
o
Ol
I
.~
S
.g
..
(J
~
u 0
; .5
'- 'l:!
~ ~
o S
~ ~
'-11I
'l:! ~
~~
SOl
~~
11I0
~<::-
~.-
Ol(J
e
l!
I
01
~
t:
o
l
."
~
~
01
~
..,
s
'S
~
~
o
'"
~
'"
i
c
o
'"
.
a
E
o
u
'0
c
o
II
u
'"
'C
~
ii
'"
:s
I
c
'C
e:.
~
..
z
.
-
..
Q
.
ii
;;,.,
ct:
0..
"'II.
i
-
o
1>
~
Q
'llc
.c.!!
--
."
:'c
....
c E
.. .
ala
.5E
E:;:
j::0
Ul -a
:;s ~
oS e
- .- II.) co
'" ~ oS ""
"'5l8oo~
...eu_......
O"';uOil
8' ~ ~ 3.5
~~~~~
II.) 0 0 IUs'"
"O"Ou _
I!
:J
ill
.
:.
c
o
~
al
'"
i
>,
~ iIl~
" II
"'u
.$j e t)
~ Q..~
~~E
..... u ""
u)-5~
~c=
.~ ~ 0
.<: ""1:
iLl IIJ t':I""':"
> ~ Q. III
~= r/l"2
c 0 C'O E
u 1: ;>-. 0
2? cu',";:; Q.
!! ""U Oll
i::Q ~.5
u -::-0
'"' "0 >.:-:
$:~.o.E
~o"Oto...
~ 'S: ~ 0
ClS e:!: 8 8
c.uo.C
::s.c Q. ClS
U co a
.~ 'i]'~
"OVlV)B
; ~ a 5
u a c 'c
U co c c..
"O~ Q.Q-
; ;>-.'~ ~
~.~ ~ ~
'a i:; 0 a.
~ ~ '8' ~
~.sc.u
c '- u 'S:
.s: 0 -S ~
~
"
E
""~-
o B g
].~ ~
Q~O
~ "
:;s E
..:i _ oS '"
S'U '~;fl ~
::I IV Ul U U _
~Q.,",c;ugJ-l
.- Oil 0 J: I: lU Oil
.95 go ~ ~ ~ .c~
o:9'Oc='"
'C "3 (; 4,) 0 05-
~..c""O"Ou ~
~
o u
~ ::: .8-=c
~ c; .~ 5 fi "0 e:s II.)
" 0 c <( E 5 - 0 '" oS
~ ':: .S! 0 'E c.. is J,t:: c =
u !:l;a > !...2 ~ ::- u ,-
... - "0 - 0 OJ _ .5 "'0
~~CU~O[;~:.oc~
au>. ';;l _ "'0 't:i co 11,)._
I;/'luc ".!!Q)~Q.;>u
C ,= '" il "'.<:'" rJ.8 g,
.9 ::l ... =:3: - J:: 0 co V,I
] [;.'s.c;E'~.; c ~
~ ~ .e-~ l,;.; L... !Ill tl
u.- - u - 5 ~ ell.)
c ~ c ~.~ ';j w, Q.~
'2 lU - s;:; ... .!:! '- 0 u
~..c:C'O::SUrllOU~
"O--U);:Ec>.c>
II.)'~ u.~ II.) III 0 U
~ ;S ,~ ] ~ .8]-5: ~ ~
uCQcc,o.... 0 cO
"'OOOOI.o.:i~g':::t.:3o;"=
"3 o:g] t:"'O~ c:E] t:
o..sooo;<<Ig::g oS
3: c - '': ~ C >. 0 <<I = Q",
- 0 (1) .- c 0 c ~ 0 ,
~_e::g~"'OC':J::S.ce.o~
_ c._ <<I ~ ~ ~ - s: t;
f~~=1;~~U)~]~
e go-5 1Ii.~ 3: ~.~ ~ ~ ~
go'U <ciS :,...~: u "; ~ -< .9 (1) d
o~o 050 -o~
>"'0 ~ u,s..:.cCl c c 9.l
o ....l:! - C':J.c .- - ::: ~ '"
"'0 -.;;I Q.,1.o.:i _ "'0 "0 :; 5:
; 'i .5 S'~] ;,.g C':J.o.. ~
ii:"'2 E 'E (1),.g c r- fr ti .::
u c .!!: u ~ - .2 -ti Q ~ "ll::
t;::EU)U);.:cfi}~~o1i:
'u 5 >. ... 1::'- 1:0._ U ... 0
oo~~o~!.g.<ciS~t:
~~..s ; 8 ~ ~ ~ ~ ~~
on
...'"
.'"
0_
--
~
"
E
"" ~ -
3S's
U'- u
> 1: u
o u .!:l
0",0
~ U) 5
-.;;I :s 5
'"
bI) - o:S t:
.5 'E ~ '~.s!.
~oU)Bo Q
Ul Q., li3 f! ~ ,S
's ~ 8" ~] s.~
.9 ~ ~ ~ ~ 5 ~
:t.5-8-88ec:
...
c ~
~o~0-82 II::
-.;;I _ - bI).;> ._~ S ~
.s 0 c ; 0 ' .-
~ u - t: =: ,_ ~ ~
~ ~.:! iii C':J -- ""-.....
f!;..= ~.~ = ,s 5] ~ o:S
~ 5 '5- :oS i = ~.2 ~ .5
o ._ u ~ l-j _ .;:;;1 >.
bll- u ~ -< ::s....
-~t;oO ~:g"'2~
.Ba>'U>C':JUlC':Jl::~
o ~'E- ""=u'u g,
c; U.s u ~ Q '~oS g, '"
_ U U)-.;;I... U Ul 1:0
~-5~iid'B-<C:Ul3
IWI:! ~ t'llIQuC':J-
~.;:;;I 5 o'~ ~ > Ul 4) ~
~>,':::U)c -.s~c
0'""gJ ~] !. i~ = 0.2
Ul I-< "; 0 ><.- r- 0 ;; =
c &. > ..: o.~ E::s 's
o 0.... Ul C iii t: 0'"
=~o"'Oe::s.,_~_",~u
's 3 '3 "'g 'S ~ fro 5 S
<<i 0'" 1-<00'" o'~ -;.: ....
Oe.oUt,:j~c""''''''':-o
C I-< .- ~ 0 e;o
~ ] ';: "8 ~ ]e ~ o:Se l: ;
O_:;>CU) 0 00-
~ '5- 5 - >. 0._ 0 .- :::
Ul .~ Ul ~ ::: ~ 0_
80BEUc:g>."OQ",
x g ~ 0 .g, t'lS C':J.-':: g t:;
o Ul - 0 rJ:I >..~ >. ~
.5 ~ ~ 8.. C.1; f;j'~.E d 0
i: 0 t'lS ~ U >. ~ 9- _ ~ .5
I-< _ .c _ ~, "" c -
~ ... u - - .... .... u u ~ c
~ ~ ~ ~ ~ u ~ 8 E d.S!
go ~ ~'2.c u C._ Q., ~ -
oOUlc:..s]:C:3~~
>t;->.o =.c- 0 o!..la
uC':J::::u~:::1-<0~~5o
O~U""u~""o""ti;u
on
"'f'"
o~
--
N
"
~
0. ~ l5
3 u 0
~'E ~
Q~O
u ~
o:S :.s
'" .<:
Ef'~ ~ '~.s
::s u Ul B 0
.fa 0. ~ ~ ~ .s
OJ)&, <<IU
9 ,5 0 19:.:: S
... "0 - 0 g. Ul
.2 ~ ~ E I::: ~
Q::.E-8-88e
5 .,;
B 0.2
<<I Ul - 1-<.
U >'''0 0 0
... .c Ul ~, c.
~Q.lt-oo=~o
"Q..s ~ ~'s ~ ~
~Q.l~ii.c.c::s
<<I - <<I ~ ::s u Ul
Q..E u u U) c.~
Q.l.... Ul Ul U ~ 0
l5..~!3u.cQ.-
1Il:OS 0 o:S = 0 l5
c u ~ .;: .c ._
~]~o:;>-6
Q.<<IouUlgf"'O
c c bI) g ;'c u
'~'~.M <<I c: ::s.!:l
U)..._"'; "O~
~se.c~~o
"'0 u 0 II.)'Vi.~ I-<
;gtt:o:Sl:=~~
"OQ.l~.gOI-<=
_0 - 0 .- Ul ... C':J
u~,=~g~.;i
::s 0" I-< -...._
"O~~~-:e~
8s~gni
~ ~ t; u U) a-s
Ul ~ 0 >. U ._
.:;: ~ ~ .; .-:= 0 ~
;;>0 - ~ U <r. '"0
t1l~~=u",",,-
'v) e c .~o:S l5 ~
~~Q.r;Ul~t,;:
ct3"'O~uu
C':J(/'J~.8o:':-=
~~~ ~.g~
'i: ~"'C.~ ~ Q., <<i
H>.B5 ..2'>
c: _ u u._ 0
.....;> ~ 0': U ~
OJ) C':J '0' t; U)
,~ ... ... >. C ~ ...,.
_O'OQ.UlO_......
~-
sa;
..S
'u '6
o~
~!;.
~Q.
~lX
~::;
~:;;
~~
l!~
Ill'"
l~
..c:!
.!:!y
lIE:.:
on
"''''
.'"
0_
--
e
e
e
e
!!
~
0..
'"
=
'E
o
2-
a:
"0
=
..
'"
=
'"
2
'i!
~
=
,2
1;
'"
'"
:i
t;
..
l
..
..
"
o
'"
~
~
.!!
..
'"
;;
"
o
III
I
,"
E
~
~
..
" 0
~ .5
==t!
<t..
o e
= ..
'- CQ
'E! =
.. ..
elll
..,
~~I
III 0
e:
o
:=
..
is.
E
o
u
-
o
e:
o
:=
..
..
'"
1:
..
>
..
:is
"; >-
e:1:
0..
li~
&1
iii
..
:5
j
e:
'C
!!:.
~
..
Z
.!
..
Q
'8e:
,c:.2
--
"S
2e:
.....
e:E
.. ..
,,,is.
.5 E
E::
i=o
l!!
:0
..
..
..
2
e:
o
..
..
'"
..
j
~
"
....
E
~ ~ S
.9 u y
~ 'E ~
O~Q
"
...
€
oS
Q,
...
CI
""
c
.~
oS
E:
~ ~
.;; 1::
.- 0 Cl:I
~ .;; Q,
Boo~
(Uv_......
~ ; 4) 0.0
6 ~ ~.~
e s Eg3..:g
"'" ...
.s
of
~'a :;
.- t:.c
a 4) Vl
~ Q, ...
.~ ...
o~c..
-.- ..2
.9;G ~
... ::l ...
.....0'"
oS
...
...
oS
...
~
o
"
...
'0
""
...
.;;
.5
"
E
Q,
o
"
,.
...
'"
'"
...
c
c
oS
I~
...
"'0-; - 0
Il.l,.s:: "0 :oS-
t:: en C ~ ... l:3
8 c oS . ~ 0 -;l,'-
.&J ~ ~ !A.s.. ~ 'Iii 5.
~ 0..5 5 0. ~ t ~
en 0 _ 1-0 OJ) >._
"8 ~ t.&J.5 ~ 0 u
CO r- _ IlJ - .- "'0 0
"0 ...: ~ .5 .~ E c..c
Il.lc..._xoCQ-
... 4) ..." 0 "0 >..
cu E J:! ..... 0'- U.&J
Q. e - .5 ..c = ~ "0
~ Cl:I :5 '; ~.~ ~ 0
Q., g-to=o c.. CeO ~
] Q ~ ~:5..s1.5 l5..
-""'~~"iio.!!o.
.!! .0.;1 01) 1-0 QJ t:: CO
] oS ... .e-", ~... "
o:n:::gg.c[""""'o.J:I
a _ cu 0.0 cu cD >..S
~ a E ..9 ri'.5 g ~
o 'u c U'l Q. In 0 C
g .- .- ';( 's. J! ::3.!: ~
S e U u 0. g' Q.'j;!
~~ 4-..c-~uE
B ~ 0 0 - ~ ~"c 0,,)
= g.~ :; ~ '0' 8 E-: 0.
';._ <<I 0 ._ 1-0 ._ >. ClO
:::; "E c 0.0 ~ 0. eo u.5
<<I IlJ c.- 0.0 C cu "'0
'" E > 'r:: U'l C E ::::s:-=
c u 0 CIS ='C s:r ::::s
cu .... ... Go) 0::1 .....&J
.1:: C%:) c.. (j :-5 "0 ~ -g u
cu c"'C Ul't:l lU 0. 1-0 0
g. ~ ; ~ s.i.5 cS 'Cf
ex:: ~ .1:: u Y 5.~ ~ a
cnOC":l::SeooVlU,-
.~ C fr en...5 Q..:g] 0
:0.:::'- 1.0 U'l C. 0.. .... u 0
!"':U>...~cucu~:;u
u~,I,O..,_- ...c
~ ..... ,- :..: 0 C >- ilJ ~
~ oS ~ '0 .:J ~ 1:: 'S: a
<( g ~ ~ 'S: ~ a. ~ ,;a
;!l
8
...
...
Q,
""
c
:9
5
.<:>
on
'i""
0'"
~
~-
;i'
:J
;>.
..0
'"
...
'"
"
~
...
...
go
~
.s.
] ~ ilJ
t::: J:! ~
~ :,O'~.s
"0 0(1 C tj ilJ
ilJ a.i 0 ilJ >
::: _..c:,~o ...
';:: ~ 0. '""' ilJ
]k)~o.~~
::l:-E ~ "0 -'~
~>-~.o
~ 0 ~ 0'-
~ '""' '""' 0.- ilJ
ilJ 0. ilJ 0:..0 Q.,
~>.5'""'~0(I
.t::Eoo.~.5
0.-= ~.,g O:s!
.t: ::l >. - : ,-
~=;ilJ~.E
ilJ ilJ o.,~ 'S: ~
,;;;.5 E ~ 0 0
~ t:: 0 G.l Q.. llJ
ilJ ilJ U ~ ~
go.~gc~
'""' = I:':J '-::l
0. cu 0 .~::a ~
~ g ilJ:':: ::l ,-
G.l .c,.o 0 0
'S: "'E ~ (l;l oS :
ilJ - ~~ 0
,"",,~ c:: 0 S'c
c:: S S; c:: 0 0.
,~.g~,sa~"O
~~~~c::~
"0 0 I:':J .=~ .S 'S
_,.0 ,- ~ C"
~ = E (.) ilJ
'0"; tS B!-E ~
'""' 0;>-;.:: ilJ ~,.c
0. ~ ~ "0 ilJ
~ ~ U] ~ ';
-c.e~oo;>-
"" c ilJ :::.. e ~
= .c 0;>- .- 'oJ
.- "" - ... ~ ...
~'5 15'~ ~ 'e
.....~Cf.l'""'OO'
on
...'"
.'"
o~
~-
on
..'"
.'"
o~
~-
z
o
~
w
a:
u
w
a:
rt
'"
!:
'5
a"
...
~
...
c
o
Z
.
u
ii:
II.
~
t-
oll
Z
o
~
o
~
VI
Z
~
t-
N
N
s
..-.
~
f-
;>.
.<:>
'"
...
'"
...
~
...
...
Q,
::l
~
&
<
;>.
.<:>
'"
...
'"
...
~
...
...
Q,
;:l
'"
-
~
'v;
c
o
..-
.."
-~
~-=
'ti'6
o ~
..e;.
..a.
<to:
,,::E
..;:
~:g
=8
!!'"
CQ::l
-~
..-
.. <
.c:!
..u
:if
on
'"
~'"
.~
...-
on
'"
N'"
.~
...-
e
e
e
E
e
~
a..
'"
~
'f
o
it
a:
"
~
..
'"
~
'~
g
'"
~
~
o
'"
..
'"
'"
i
1;;
~
'~
~
~
~
~
o
.c:
e
~
~
1;
'"
;;
~
o
III
I
..
'e
~
~
~
u 0
;.5
,~ 1:!
~l'I
o e
~ ~
,~ III
1:! ~
.. ..
elll
~-
III 0
;~
III 0
I:
o
i
'D..:a
E .!
o I:
U 1:
- !!:.
o
6 ~
= ..
.. z
u
c;:
1:
GI
>
GI
:g
'ji ~
1:1;:
0"
a. a.
..
GI
ll:
'81:
.<:0
-=
GlJ!
::IiI:
1m
III a.
.5E
E::
j::O
"..
(,~..11
ii
..;
:s
GI
-
..
Q
c:
8
Q. ~ -
o ~ .E
~.~ ~
o~o
oo~ ~ ~ J
.5 8. ti ~..s e-
~:>-.Q.BcuoO
.~ (.)..2 .s ~ ....
S ; ~ ;g ~ S.S
.9 8~ ~ ~ ~ ~
Q:~..s~88E:
!
"
..
..
GI
::Ii
I:
o
i
III
=
j
u
>>S _ v.J.~
"O~..J:j -8=:e
a l: '" ~
~~~1 u~~.
~ '"0 '"0 u ~ (lS._
v.J ILl eN.... .... a.u
8 ~ :.~ ~ .~.~ .s
g.- 8 ~
\+-0 "0 0 IlJ "; S co >.
O~N.;a (.I., c.o=..SP.,J;;
;;; 'is < ~ ,~,= 1l
o "0 1:: -e __0 t: ,= '"
(.) "0 ~..1 U 0 ~ ~
iU .... ~,.Q ~ cu _ .~
-co-o"Oo-
.....cfll"d-U~
Vl t: U fl.) <I.) "0 IU 0
"O~C;o"Oe,,-eQ.
.... t.,;:; ._ .... "0 u 00
; v.J g 0 -< ': = ~ .5
OClSVlS"-CO_'"O
_11l~~iUOoe::~
" ,- ...., ::;: '" 'v ';:: ~.o=
:;:Q]cn"OlEo2J...
~~ClS~;=..s~O
a ; :s.~ \.IJ Ul '0 (,,) 0
o..c.~8v.J~cueg
u::.:.c~B~g~~
-os 0 -< .- - Cl:t v.I v.J
a ... "0.::::-;> en
-5l ClS ~ '"0 C CO '"O.!:'~
Ct'lS;8.Q.,ClS~-
~ ~~a~~.5'O a
oc.&J.-=--]o'~
e8]~g~5:gB
c..IUClStfNjge.,gU
u~e-t":l ...oOU~
~ Q. c.. ~ = 'g e. i i5
e E ~.,g Vi .lJ .5 0 II)
0..'- ._ .... :::s 'E 0 a ~
OClS"O""O ODc.o >'0
..c~ac3oo,.,(fJ,:>
~COUleo.....U__;:>
~;:-
,0
ll:0
f-!:!.
c:
E
g.~g
~.~ ~
o lU .-
Or.nO
III ~
,fa ~ ~
~ t:: .~ ~ [
3 Q.8..s u+Jo"
.; >. 0 co U s=
~ u t; ; OJ bl)
s co ;> s:: ~ a'5
.s a~ ~ e- ~ ~
Q:~..s-813~C:
III
::Ii
w
~
III
>
III
W
U
~
W
III
Q
Z
0(
III
W
j::
::;
j::
;;)
tl
= <1j
os os"
..c " >>-=
"'.;;-..
~"8.~ g
lllos...-e
OJ 0.0 o.o~
_ = t) d
t)'a = t)
.... i3 - e
~.s8~i!i
....~~e-B
o _ 0 ._ U
::0 '; '"C OJ e
cot).c"o-
~ - r.)-
.... t) 'S"'; rJ:I
8..:: ....a.~ ~
0- 0
u~~~~
;> .... - rJ:I U
~ : ~ ~;.:
~~a~.g
-'S: ~ rJ:I c..
tE.s-~]
t:: Q.,t) co
.- >...c vi 0.0
c:;: S t) ,5
~'':: rJ:I"O C
._ :l OJ e d
e "'; ~ ~..!
:0 U _ co c..
o U .... OJ
~:;; ~o-5
co.':: e ~ to...o
= 3t.- U
t) ,-.- c
-~oto
t) co _ t)''::
ace o:fl U
~ ~ ~ >.~
S ~:E.:!!
.< 8 ['g ~
.:-
~g
;;)!:!.
~
-
c
8
Q. ~ -
o " 0
u uti
;> 'E e
o~o
'"
,~] ~
0.0 Eo:fl .- IV
,5 "t ~.;;
:::s Q., Q., OJ u
~>'oC;uS
.- g u Jj ; !IJ
g <<I > ~ .- :;
t; 8~ ~ l ~
.~ u u u 0 u
c..o-:'"CuE
~
"
.;;<.!:l
.~ ~ ~
u Q., co u
"'e~';;
.5;::'2 0
"Eoo';
0- o:fl U
o E ~=
u E! c U
~ ~8i~
E3utic~
= -= @ .- .!:
~'"C<<I~o
B; >.-1,;i
~ Ollu e; ....
a5::~~
~ ~ ~ s .~
~-a~ ~:E
:::s U _ U :::s
o:fl.".:: g E c..
-0 o:fl o:fl"'C
U 0 rn._ C
,-=_g..cco
'';: U '"C r-. OJ)
=:.:: _ . c
U -; ~ ~'2
:=! _ ~,_ e
~~=..!
~~6.cc..
.:!3o:flOJ..!~
c ~..s <<I -
os.. "....
C "'C ~ ; 0
~ ~ ~ .... c
OJ ~ ~ 0 .9
a>'Q.,~t)
:::s -= -.~ ~
~::I~ c:.:a
~UooOJ";
....... _ rn rn
;:-
~g
;;)!:!.
..,
'"
E
8
1::
os
'"
"
o
00
..
'~
os
0:
~-
~"
-Q
" -=
'~ '8
00:
~-
"a.
q;o:
~:;;
..:;;
E-
"8
:is
""
IIlw
~~
~~
.SlY
:iI!:t
e
e
e
<t
l!J
City of San Bernardino
Addendum - Int'I Trade Ctr Specific Plan EIR
SPA No, 06-02, DP2 No, 06-06, TPM No, 17887, V AR No, 07-08
ATTACHMENT F
ADDENDUM TO ENVIRONMENTAL IMPACT REPORT
(CEQA GUIDELINES ~15164)
FOR
SPECIFIC PLAN AMENDMENT NO. 06-02
DEVELOPMENT PERMIT TYPE 2 NO. 06-06
TENTATIVE PARCEL MAP NO. 17887
& VARIANCE NO. 07-08
FOR APPROVAL OF THE MODIFICATION OF
THE INTERNATIONAL TRADE CENTER SPECIFIC PLAN
AND THE DEVELOPMENT OF THE SOUTHGATE DISTRICT
W AREHOUSEIDISTRIBUTION FACILITIES
1
e
e
e
~..~..
\.-i.1i
t1}
City of San Bernardino
Addendum - Int'l Trade Clf Specific Plan EIR
SPA No. 06-02, DP2 No. 06-06, TPM No. 17887, V AR No. 07-08
The City of San Bernardino, as Lead Agency under the California Environmental Quality
Act, Public Resources Code 921000, et seq. ("CEQA"), has prepared this Addendum
pursuant to CEQA Guidelines 915164. This is an Addendum to the Environmental
Impact Report ("EIR") prepared for the San Bernardino International Trade Center
Specific Plan ("Specific Plan") that the City adopted in 1996. Prior to approval of the
Specific Plan, an EIR (SCH#90020109) had been prepared pursuant to the CEQA
Guidelines. The Mayor & Common Council of the City of San Bernardino certified the
Final EIR, Mitigation MonitoringlReporting Program, and Statement of Overriding
Considerations on March 4,1996, with Resolution No. 96-50.
The purpose of this Addendum is to document the review required for an amendment to
the Specific Plan (SPANo. 06-02), and approval of Development Permit (DP2 No. 06-
06), and approval of a Tentative Parcel Map (TPM No. 17887) to allow the construction
of warehouse/distribution facilities and other buildings for industrial uses. This
development application is referred to as the "Revised Project," and is consistent with the
Specific Plan as well as the General Plan. All applicable mitigation measures included in
the 1996 EIR are incorporated into this document by this reference.
The Initial Study, prepared by Michael Brandman Associates, Inc. for the Alliance
California and Southgate warehouse project, documents the City's conclusion that the
San Bernardino International Trade Center Specific Plan EIR adequately analyzed the
potential impacts of the Revised Project. The Initial Study also updates and adds to the
adopted mitigation measures, to produce an up-to-date Mitigation Monitoring/Reporting
Program for the Revised Project.
.~~
1\ AeM\- UJ\l1
Date
Signature
~k~ ~~
Printed Name
i\s~~-<it:.. ~"""',".\"~a.
Title
2
Exhibit 3
e SAN BERNARDINO CITY FIRE DEPARTMENT
INTEROFFICE MEMORANDUM
To:
Brian Foote, Associate Planner
From:
Doug Dupree, Fire Marshal ~
Subject:
Secondary Access Southgate- Tippecanoe/Central
Date:
April 18, 2007
Copies:
file
e
This memo is a follow-up to our discussions April 12, 2007, regarding Hillwood's Southgate
project. The drawing that is attached is the proposed access document that we discussed
previously. The Fire Department has reviewed and approved the primary access and secondary
access (constructed to city Fire Code standards approximately 1400' north of the primary access)
as depicted in this drawing. Several factors were considered as part of the approval process. Most
notably; these buildings will be equipped with state of the art fire suppression systems which
include Early Suppression Fast Response fire sprinklers. These sprinklers are designed to not
only control the fire, but to actually suppress the fire. Additionally, there will be fire alarm
systems in all buildings and fire hydrants spaced at 300' intervals. We have also been informed
that Hillwood's project south of Central Avenue will also have an access point that will be
constructed prior to completion of the first phase of the Southgate project. This point of access .
will be an additional means of secondary access to be used in case the primary access is
unavailable for use. This access point is approximately 800' south of the primary access.
The San Bernardino Development Code provides an exemption which will allow only one (I)
standard route of ingress and egress, without a secondary access point, if approved by the
Planning Commission, Mayor and Common Council, City Traffic Engineer and the Fire Chief.
The Fire Chief finds that the public health, safety and welfare in the event of flood, fire, or other
emergency do not required two standard means of access under the circumstances of this
particular tentative map. Therefore, we recommend approval of this tentative map.
.e
e
e
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
I
\
\
\
\
\
\
\
,
,
,
\
\
\
,
\
,
\
\
,
\
,
Ii
e
\
\
\
\
\
\
\
,
\
,
-- :~-Y- i-O.1f-:)-U....-!- l
~~
Exhibit 3
\
\
:~ g
,..,fi1 ::: ;
~ ~ I!!Z ::: :::
: I i~ i ~" :
~~~~J ==~
<!
. :::....
=1
i!
i
:1:.
I
.
I
,
"
II
I ~'>\
I \ '\\
,
\
,
,
,
\
\
,
\
\
II,'
"~'
, ..
',~
\
\
\
,
,
,
\
\
\
,
'\
\
\
\
\
\
\
,
,
\
,
\
\
,
,
,
,
,
I
\
,
,
\
,
,
,
,
\
,
,
,
,
,
,
,
,
'0:
'w
\~
" ~
"
'"
't-
" ~
..
I
,
,
,
,
,
,
,
I
,
\
,
"
,
,
\
,
,
,
\
\
\
\
,
,
\
\
\
\
\
\
,
\
\
\
\
\
\
\
\
\
\
\
\
\
\
,
,
\
,
\
,
,
,
\
\
\
\
\
\
,
\
,
\
,
I
,
I
I
,
,
I
,
,
I
.' I' ~
I I
'I I,
lIill! lill! hili
:.1,1 1:,1,1 :ul,1
~ "'~,
! ;5lo; ..
.. ..
8q~! Ci ~~~
. ijR~~ .~
I'
" -
- !liP ~ ~u
tt; __Ii! "'
f . ~
N -
~~-~ ~ ~;-
. ~.__~ai N_~
I' ~N.~
" ~
~2i!~ s ~:x~
~ .11I .N .
I' ~ !:. ~
" ~
8!Z~ iI ;!f;l~ h
N ;~.;
I' N z~
" -u
~i
~~~~ ~ q~~ ~~
f ~ "'"
~i
i ~i
i y ~~
l ~ E ~~
i 'll.1 {II..
... ~&I~ I L.~
I ifllH5f.U ~~
I I . i III
I ~~
~ Ii !h !
1111' ULI
Ii I !ll' II
I : .1 I I' II
I ~l'i,' pi I I,
! , I II:'
ooe""*,,,,*,_ BD
1
e 2
3
4
.
.
5
6
7
8
9
10
11
12
13
14
RESOLUTION NO.
RESOLUTION OF THE CITY OF SAN BERNARDINO ADOPTING
SPECIFIC PLAN AMENDMENT NO. 06-03, TO AMEND THE SAN
BERNARDINO INTERNATIONAL TRADE CENTER SPECIFIC PLAN.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE
CITY OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. RECITALS
(a) WHEREAS, on March 4, 1996 the Mayor and Common Council of the
City of San Bernardino ("City") certified a Final Environmental Impact Report, adopted
Facts, Findings, and Statement of Overriding Considerations, and adopted a Mitigation
MonitoringlReporting Plan, adopted General Plan Amendment No. 95-03 and adopted
Specific Plan No. 95-01, the San Bernardino International Trade Center Specific Plan,
for the non-airport portions of former Norton Air Force Base; and
(b) WHEREAS, the Specific Plan recognized the importance of redeveloping
e 15 the former Norton Air Force Base; and
(c) WHEREAS, in 1999, 2004 and 2005 the Mayor & Common Council
have adopted amendments to the Specific Plan to facilitate orderly redevelopment 6fthe
Specific Plan area; and
16
17
18
19
20
21
22
23
24
25
26
e 27
28
(d) WHEREAS, Michael Brandman Associates, on behalf of the Inland
Valley Development Agency and Hillwood Investment Properties, prepared an Initial
Study and Addendum to the certified Final Environmental Impact Report for the
proposed Specific Plan Amendment SPA 06-03 (attached and incorporated herein as
Exhibit A) and other entitlements sought by Hillwood Investment Properties associated
with the Southgate Project ("Project"); and
(e) WHEREAS, on September 7, 2006, the Environmental Review
Committee determined that the Project would not have significant adverse effects on the
environment, beyond those impacts identified in the 1996 FEIR, and therefore a
subsequent Environmental Impact Report is not required pursuant to the California
Environmental Quality Act (CEQA) in Public Resources Code Section 21166; and
I
1Jt~ ~7
e
I
e
e
1 (f) WHEREAS, on September 7, 2006, the Environmental Review
2 Committee recommended adoption of the Addendum to the 1996 FEIR and Mitigation
3 Monitoring/Reporting Plan (the attached Initial Study and Attachments E and F to the
4 staff report to the Planning Commission, Mitigation MonitoringiReporting Plan and
5 Addendum to the EIR, all of which are incorporated herein as Exhibit B); and
6 (g) WHEREAS, on April 17, 2007, the Planning Commission of the City of
7 San Bernardino held a noticed public hearing on the Project in order to receive public
8 testimony and written and oral comments relating to the Addendum and the proposed
9 amendment to the Specific Plan and other entitlements sought in conjunction with the
10 Project; and
11 (h) WHEREAS, the Planning Commission considered the Development
12 Services Department Staff Report on April 17, 2007, which addresses the Addendum to
13 the 1996 FEIR and the proposed Project; and
14 (i) WHEREAS, the Planning Commission, after receiving public testimony,
15 continued consideration of the Project to the Planning Commission meeting of May 8,
16 2007; and
17 (j) WHEREAS, the Planning Commission conducted a continued public
18 hearing on May 8, 2007 and recommended that the Mayor & Common Council adopt
19 the Addendum to the 1996 FEIR, adopt Specific Plan Amendment No. 06-03, approve
20 Development Permit 2 No. 06-06, a,pprove Tentative Parcel Map No. 17887, and
21 approve Variance No. 07-08; and
22 (k) WHEREAS, the Mayor and Common Council conducted a noticed public
23 hearing on May 21, 2007, and fully reviewed and considered the Addendum to the 1996
24 FEIR, the Development Services Department Staff Reports, and the recommendation of
25 the Planning Commission;
26 SECTION II. ADDENDUM TO 1996 FINAL ENVIRONMENTAL IMPACT REPORT
NOW, THEREFORE, BE IT HEREBY RESOLVED, FOUND, AND
27
DETERMINED by the Mayor and Common Council that the proposed amendment to the
28
Specific Plan, together with other entitlements comprising the Project will have no
2
..
.
.
.
e
1 significant adverse effects on the environment beyond those impacts identified in the
2 1996 FEIR, and therefore a subsequent Environmental Impact Report is not required
3 pursuant to the California Environmental Quality Act (CEQA) in Public Resources Code
4 Section 21166, and the proposed Addendum (including the updated Mitigation
..
.
5 Monitoring and Reporting Plan) to the 1996 FEIR is hereby adopted.
6 SECTION III. FINDINGS - SPECIFIC PLAN AMENDMENT
7 BE IT FURTHER RESOLVED by the Mayor and Common Council of the City of San
8 Bernardino that:
9 A. The proposed amendment is consistent with the General Plan and San
10 Bernardino International Trade Center Specific Plan, specifically with the following
11 goals: Goal I of the SBITC Specific Plan, which states "Replace lost jobs with new job
12 generating uses and quality projects."; Goal 2, which states "Integrate the Norton Air
13 Force Base site back into the physical structure of the community."; and Goal 3, which
14 states "Create a development plan which will have the effect of generating financial
15 reinvestment on"site and within the community." Adoption of the amendment to the
16 SBITC SP will allow the proposed Project to proceed. The proposed subdivision and
17 construction of warehouse/distribution facilities and light industrial structures at this
18 location will not only retain local jobs, but will also provide opportunities for new jobs.
19 B. The proposed amendment will not be detrimental to the public interest,
20 health, safety, convenience, or welfare of the City. The Initial Study and the Addendum
21 analyzed potential impacts related to the proposed amendment and related entitlements
_ 22 comprising the Project, and determined that there -were no adverse impacts directly
23 related to the Project that could not be mitigated in accordance with the certified 1996
24 FEIR and Mitigation MonitoringlReporting Plan.
25 C. The proposed amendment will maintain the appropriate balance of land
uses within the City of San Bernardino because the proposed Project is consistent with
26
the goals and policies of the Specific Plan and will enhance opportunities for economic
27
development in accordance with the goals of the Inland VaIley Development Agency
28
and the City of San Bernardino, as expressed in the City's General Plan.
3
1 D. The areas within the Specific Plan affected by the proposed amendment
e 2 are physically suitable for development as proposed in the Specific Plan and by the
3 proposed Project, as recommended for approval by the Development/Environmental
4 Review Committee and the Planning Commission.
e
e
..
.
5 SECTION IV. SPECIFIC PLAN AMENDMENT
6 BE IT FURTHER RESOLVED by the Mayor and Common Council of the City of San
7 Bernardino that:
8 A. Specific Plan Amendment No. 06-03, the amendment to the San
9 Bernardino International Trade Center Specific Plan of the City of San Bernardino, to
10 change the name of the San Bernardino International Trade Center Specific Plan to San
11 Bernardino Alliance California Specific Plan; expand the Specific Plan area to include
12 32.6 acres of land that is adjacent to the current Specific Plan boundaries; update the
13 maximum allowable capacity of the Specific Plan by transferring approved unbuilt
14 square-footage among planning areas; change the district names of the various planning
15 areas within the Spe~ific Plan to Northgate, Centergate, Westgate, Southgate, 3rd Street,
16 and D.F.A.S.; provide for a future boundary adjustment to the 3'd Street District; and
17 various text changes to accommodate the Project, are hereby adopted.
18 B. The amendment designated as Specific Plan Amendment No. 06-03 shall
19 take effect upon adoption of this resolution by the Mayor & Common Council as
20 provided herein.
SECTION V. NOTICE OF DETERMINATION
21
22
23
24
25
26
27
28
In accordance with the provisions of this Resolution, the Planning Division is
hereby directed to file a Notice of Determination with the County of San Bernardino
Clerk of the Board of Supervisors certifying the City's compliance with the California
Environmental Quality Act in preparing the Initial Study and adopting the Addendum to
the 1996 FEIR.
III
III
III
4
1 RESOLUTION OF THE CITY OF SAN BERNARDINO ADOPTING SPECIFIC
A 2 PLAN AMENDMENT NO. 06-03, TO AMEND THE SAN BERNARDINO
,., INTERNATIONAL TRADE CENTER SPECIFIC PLAN.
e
e
3
4 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the
5 Mayor and Common Council of the City of San Bernardino at a
6
meeting thereof, held on the
7
8
9
day of
, 2007, by the following
vote, to wit:
NAYS
ABSTAIN
ABSENT
AYES
Council Members
10 ESTRADA
11 BAXTER
12 BRINKER
13
14
15
16
17
18
19
DERRY
KELLEY
JOHNSON
MC CAMMACK
Rachel G. Clark, City Clerk
20
21
22
23
24
25 Approved as to form:
The foregoing resolution is hereby approved this
2007.
day of
Patrick J. Morris, Mayor
City of San Bernardino
26
27
28
By:
5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
EXHffiIT A
Revised~
OctoberApril 2001~
SAN BERNARDINO
ALLIANCE
*CALIFORNIA
SPECIFIC PLAN
Prepared for:
INLAND VALLEY
DEVELOPMENT AGENCY
Specific Plan Amendment No. ~4
Revised by:
David Evans and Associates, Inc.
~,3(,)
sr~'Jo1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SAN BERNARDINO
ALLIANCE
*CALIFORNIA
SPECIFIC PLAN
Specific Plan Amendment No. ~4
Prepared for:
INLAND VALLEY DEVELOPMENT AGENCY
Adopted: March 4, 1996
Effective Date: April 18, 1996
Revised: September 3, 1999
Revised: November 12, 1999
Revised: October 4, 2004
Revised: October 17, 2005
Revised: April 17. 2007
Revised by:
David Evans and Associates, Inc.
April 20070etober2005
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE OF CONTENTS
Chapter
Page
Acknowledgements .................. ..... .............. ... .... ........ ....... .... ..... ............ ... ...... .......... ... ..... viii
EXECUTIVE SUMMARY ............................................................................................. ES-1
I. INTRODUCTION
A Site Location and Description........................................................................ 1-1
B. Background................................ .................................................................. 1-1
B.1 The Establishment and Closure of Norton AFB.................................. 1-1
B.2 The Inland Valley Development Agency ............................................1-1
C. Institutional Setting ....................................................................................... 1-3
C.1 Property Ownership ........................................................................... 1-3
C.2 Relationship to the San Bernardino Int'l Airport Authority................. 1-5.4
C.3 Adjoining Jurisdictions.......................................................................1-5.4
D. Purpose and Authority................................................................................... 1-5.4
D.1 Purpose .............................................................................................1-5.4
D.2 Authority ...........................................................................................1-16
E. Plan Organization....... ............................................................. ...................... I -lFf
F. Relationship to the General Plan and Development Code ............................... 1-28
G. Special Incentive Zones.................................................................................1-28
G.1 Foreign Trade Zone ........................................................................... 1-9
G.2 LAMBRA.......................................................................................... I-IQ9
II. EXISTING SETTING
A Land Use....................................................................................................... II-I
Al Onsite Land Use ................................................................................ II-I
A2 Offsite Land Use................................................................................ II-I
A3 San Bernardino International Airport ................................................. II-5.3
AA Public Benefit Parcels ........................................................................ II-5.3
B. Existing Access/Circulation ........................................................................... II-5.4
C. Public Services and Facilities ......................................................................... IH>4
C.1 Public Services .................................................................................... II-Q4
C.2 Facilities.............................................................................................. II -Q3
D. Hazardous Waste Remediation...................................................................... II-I07
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE OF CONTENTS
(continued)
Chapter
Page
III. PROJECT ISSUES, GOALS, OBJECTIVES AND POLICIES
A Project Issues ................................................................................................ III-I
Al Jobs.. .... .......................................... .................. ............... ................ .. III-I
A2 Long-Term vs. Short-Term Uses ....................................................... III-I
A3 Regional Access and Circulation ........................................................ III-I
A4 Public Benefit Parcels/Uses................................................................ I1I-2
AS Infrastructure........................................... ............................... ........... III - 2
A6 Development Compatibility and Quality............................................. I1I-2
B. Specific Plan Goals, Objectives and Policies .................................................. I1I-3
IV. SPECIFIC PLAN FRAMEWORK
A Purpose.......................................... ............................................................... IV - I
B. Approach ...................................................................................................... IV-I
B.I Concept .............................................................................................IV-I
C. Public Benefit Parcels.................................................................................... IV-2
D. Land Use.............................................................................. no...................... IV-4
E. Circulation.................................................................................................... IV -le
F. Public Services and Infrastructure.................................................................. IV-B'l
F.I Public Services ................>................................................................. IV-B'l
F.2 Utilities.............................................................................................. IV -2g
F.3 Public Facilities.................................................................................. IV -118
V. SPECIFIC PLAN REGULATIONS
A Basic Provisions ............................................................................................ V-I
Al Consistency with Specific Plan and General Plan................................ V-I
A2 Conflicting Permits and Licenses to be Voided................................... V-I
A3 Similar Uses Permitted....................................................................... V-I
A4 Conflict with Other Regulations......................................................... V-2
AS Language........................................................................................... V-2
A6 Severability ........................................................................................ V-2
A7 Use of City Development Code.......................................................... V-2
A8 Application of Document ................................................................... V-2
B. Purpose of Specific Plan Regulations............................................................. V-3
11
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE OF CONTENTS
(continued)
Chapter Page
C. Temporary and Interim Uses and Occupancies............................................... V-3
C.1 Purpose ........ ..... ....... .......... ...... .... ... ...... ............. .... ............ ....... ....... V-3
C.Z Applicability.... .... .... ....... ...... .... ....... ..... .... .............. ..... ... ............. ...... V-3
C.3 Definitions. ........ .... ...... ........ ......... ...... ... ..... ... ... ... .... ........ ............ ...... V-3
C.4 General Standards for Temporary and Interim Uses/Occupancies....... V-4
D. Uses on Public Benefit Parcels....................................................................... V-4
E. Circulation Element....... ....... .......... ....... ... .... ................ ...... ................. ... ... .... V-4
E.1 Purpose ... ...... .... ..................... .... ... ......... .... ....... ........ ................. .... ... V-4
E.Z Previous Circulation Element ............................................................. V-~
E.3 Additions to the Circulation Element.................................................. V-~
E.4 Driveway Access Standards ............................................................... V-2H
E.5 Traffic Signal Requirements............................................................... V-2H
F. Land Use Districts......................................................................................... V-1Ql
F.l Purpose ............................................................................................. V-1Ql
F.Z Specific Plan Land Use District Map.................................................V-18~
F.3 Permitted Uses ................................................................................. V -18'63
G. Development Standards................................................................................. V-ZQ+
G.1 General Standards.............................................................................. V-ZQ+
G.Z Land Use Specific Standards.............................................................. V-ZQ+
G.3 Property Development Standards....................................................... V-ZQ+
G.4 Sign Regulations...................................................... ...................... ... V-3m}
G.5 Offsite and/or Shared Parking ............................................................ V-314
G.6 Landscaping ...................................................................................... V-32,4
G.7 Trails............................................................. .,~".............................. V -34
VI. IMPLEMENTATION
A. Introduction...................................................................................................... VI-1
B. New Development Review Procedures.............................................................. VI-Z
B.1 Administration....................................................................................... VI - Z
B.Z Applicability Of Policies And Regulations .............................................. VI-3
B.3 Conditions Of Approval......................................................................... VI-3
B.4 Permit Streamline, Environmental And Development Reviews ............... VI-3
C. Public Benefit Parcels........................................................................................ VI-4
D. Infrastructure Development Program................................................................. VI-4
D.1 Land Use/Infrastructure Relationship..................................................... VI-4
D.Z Procedure.............................................................................................. Vl-5
III
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE OF CONTENTS
(continued)
Chapter
Page
E. Infrastructure Financing .................................................................................... VI-7
E.1 Direct Developer Construction .............................................................. VI-7
E.2 Redevelopment Bonds ........................................................................... VI-7
E.3 Economic Development Grants.............................................................. VI-7
EA Development Fees.... .................. .......... .... ..... ....... ... ....... ... ................... VI -B+
F. Maintenance .... ....... ......... ... ... ... ..... .......... .... ....... ....... ....... ... .......... .... ..... ........... VI-8
F.1 Assessment Districts....... ....... .... ........... .... .... ........... .... ..... ....... ............. VI -28
F.2 Property Owners' Association................................................................ VI-9
G. SUBDIVISION MAP ACT REVIEW............................................................. VI-109
G.1 Future Map Act Submittals................................................................... VI-109
APPENDICESX~
A. Records of Decision For Public Benefit Parcels
B. List of Former Base Facilities
C. Adopting Ordinance #MC-962
D. Resolution of Adoption 1999-276
E. Resolution of Adoption 2004-324
F. Resolution of Adoption 2005-359
G. Resolution of Adoption 20Q7 - XXX
IV
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
LIST OF EXHIBITS
Exhibit
Name
Page
I -1 Site Location.. ... .., .............. ...... .... ...... .... ... .... .., .......... ........ ...... ..... .... ......... 1-2
1-2 Adjoining Jurisdictions..... ... .... ... ... ..... .... ... .... .... ....... ... .... .... ........... ...... ...... I -tiS
1-3 Foreign Trade Zone......................... .............. .... .... ....... ...... ............ ... ......... I-II
1-4 LAMBRA Area............. ...... ... ................. ... ................................................ 1-13
II-I Base Buildings............................................................................................ II -2
II-2 General Plan Land Use for Surrounding Jurisdictions.................................. II-41
IV-I Public Benefit Parcels................................................................................. IV-3
IV-2 Land Use District Maps.............................................................................. IV-s
IV-3 Water Sewer Maps..................................................................................... IV-Ul
IV -4 Drainage Plan ............................................................................................. IV -IQ4
V-I Circulation Element - Prior To Amendment ................................................ V-~6
V-2 Circulation Element - Amended Circulation ................................................ V-7
V-3 Roadway Design Standards ........................................................................ V-~W
V -4 Reseaf€h-antl-DeveloFmernNorthgate---L1HHltlse District-l........................ V -Ill
V -~6 Westgate'fHlde-Fafk--ba-R&-Bse District~ .................................................. V - 1;16
V-6 Centergate District ..................................................................................... V-IS
V-18 Southgate IndHstfial-~banfr-Yse-District-5 .................................................. V-I9
V-8 . Third Street District .................................................................................... V-20
V-2.W DFAS District ............................................................................................ V-21
V-lO Land Use District Map ............................................................................... V-22
V -llH Intersection Visibility .................................................................................. V -2~9
V-I2H Driveway Visibility ..................................................................................... V-29
V -13_~___...2<lJl1a. AnjLRiveLTraiL.~,............ ,................................................................ V - 35
v
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
LIST OF TABLES
TableExhibit Name
Page
IV-l
IV-2
IV-;!;!
Land Use Summary .................................................................................... IV-6
New Construction .. ..... ....... ... ....... ...... .... ... ........... ................. ..................... IV -6
City of San Bernardino Services and Providers ...........................................IV-lO
V-I
V-2
V-3
V-4
City of San Bernardino Circulation Element Amendments........................... V-9
Suggested and Permitted Uses.................................................................... V-23
Westgate District Land UsesTrade Park District ......................................... V-2,!:!)
Development Standards.. ... ....... ... ....... no.......... ....... .... ... ... ... ... ... ............. .... V - 218
VIOl
Infrastructure Construction/Maintenance Responsibility.............................. VI -10
VII-I
Infrastructure Construction/Maintenance Responsibility.............................. VII-?
VI
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ACKNOWLEDGEMENTS
INLAND VALLEY DEVELOPMENT AGENCY
IVDA Board Members
Countv of San Bernardino
Supervisor Dennis Hansberger, Co-Chair
Supervisor Josie Gonzales
Alternate (vacant)
City of San Bernardino
Mayor Judith VallesPatrick J. Morris, Co-Chair
Councilmember Gonlon MeGir~'lis
Councilmember Esther Estrada
Councilmember Wendy McCammack (Alternate)
Councilmember Rikke Van Johnson (Alternate)
Citv of Colton
Mayor Kelly Chastain
Councilmember John D. Mitchell
Mayor Pro Tern Helen }.. Ramos
Councilmember Richard DeLaRosa (Alternate)
Citv of Lorna Linda
Vice-Chair/Mayor Karen HansbergerRobert Christman
CounciImember Floyd Petersen
(i\lternate)
CounciImember Robert ChristmanZiprick , Vice Chair(A1ternate)
CITY OF SAN BERNARDINO
Mavor and Council Planning Commission
Mayor Patrick J. MorrisJudith Valles Carol ThrasherMike Sauerbrun, Chair
Councilmember Esther Estrada - First Ward Mike SauerbrunJohn Coute, Vice Chair
Councilmember Dennis ~.i1Kt~rSusilnL~en.boAb>viHe.- Second Ward Kenneth Durr. Su\lliedo
Enciso
CounciImember Gordon McGinnisTobin Brinker - Third Ward Kenneth G. gurr, SLFrank
Ha~J<jJ1.S,U!
Councilmember.Neil Derry - Fourth Ward Sheryl BrownLmIY_ Heasley
VB
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Councilmember Chas Kelley - Fifth Ward Jolm CcJllteSusan Longville
Councilmember Rikke Van Johnson - Sixth Ward Larry TeaseleyJames Mulvihill, Phd.
Councilmember Wendy McCammack - Seventh Ward Jim MorrisA. Jay Munoz
George Rawls
Vlll
,
I
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
EXECUTIVE SUMMARY
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
EXECUTIVE SUMMARY
SAN BERNARDINO
ALLIANCE ...L
)Ilf" CALIFORNIA
!NTERNAT!OIVA.L TRA.DE CENTER
SPECIFIC PLAN
I. INTRODUCTION
Site Location and Description
The subject property, referred to as the San Bernardino Alliance*Californialnternational Trade Center
(SBAHC), is located in the southern portion of the City of San Bernardino, approximately 60 miles
east of Los Angeles. The area contained within the Specific Plan boundary is approximately
692.6660--acres, comprised of three non-contiguous sites. The properties covered by the Specific
Plan are located within the boundaries ofthe former Norton Air Force Base and adjacent areas to the
south. The Specific Plan area, which is generally located south of Third Street, north of the Santa
Ana RiverCentral Avenue extended, east of Lena Road, and west of Alabama Street (see Exlubit 1-1).
The SBAHC was formerly known as the San Bernardino International Trade Center (SBlTC) but has
since been renamed due to a change in development focus for the area. The SBAC is located entirely
within the City of San Bernardino. The SBACI-+G Specific Plan areai7Hljet.-'l boundaries abut both the
City of Redlands to the south and the City of Highland to the north. The portion ofthe Specific Plan
prejef."t-area abutting Redlands consists of the proposed industrial area south of and including the
former golf course. The City of HigWand abuts the Specific Plan Base boundary north of Third Street
between Tippecanoe Avenue and Leland Norton WayDel Rosa Drive and east of Victoria Avenue.
Property Owner
The property included in the Specific Plan boundary is now owned by the Inland Valley Development
Agency (IVDA), private parties, and other local governmental entities. The Specific Plan areasite is
being marketed and developed consistent with the provisions of this Plan. Ultimately, all of the land
within the Specific Plan boundary will have been acquired in fee by the IVDA, except for the prior
Public Benefit lands, with the intent to either retain ownership or sell portions of the Specific Plan
!JLeasite to individual owners.
The Inland Valley Development Agency
The Inland Valley Development Agency (IVDA) is a Joint Powers Authority formed in conformance
with the provisions of Article I, Chapter 5, Division 7, Title I of the California Government Code.
The IVDA was formed through the execution of a Joint Powers Agreement dated January 24 and
amended on February 12, 1990. Four local governmental entities comprise the IVDA: the County of
ES-l
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
San Bernardino and the ~Gities of San Bernardino, Colton and Lorna Linda. The IVDA has the
ability to exercise redevelopment powers pursuant to Health and Safety Code Section 33492.40, et
seq.
The IVDA and Hillwood Development Services ("Hillwood") entered into a Master Disposition and
Development Agreement (DDA) on November 6. 2002. for the development of the project area in
accordance with this Specific Plan. The IVDA agreed to sell portions of the Specific Plan area to
Hillwood and required Hillwood to complete certain infrastructure improvements as set forth in the
Master DDA.
Relationship to the San Bernardino International Airport Authority
The San Bernardino International Airport Authority (SBIAA) is a separately constituted joint powers
agency made up of the ~Gities of San Bernardino, Colton, Lorna Linda, Highland, and the County of
San Bernardino. It is currently leasing the airport property from the Department of Defense and will
become the owner of the air field and related facilities portion of the former Norton Air Force Base
following remediation of toxic wastes. The SBIAA is responsible for the management and
development of the airport facility into an operating international airport.
Background of Norton Air Force Base
Norton Air Force Base, originally named the San Bernardino Air Depot, was established as a supply
depot in 1942 shortly after the United States entered World War II. The original Base covered about
500 acres and had about 1,000 civil service employees. By 1943, the Base comprised about 13,000
civilian and 5,000 military personnel. The name Norton Air Force Base was not conferred upon the
facility until 1950 in honor of Captain Leland F. Norton. Eventually, the Base encompassed
approximately 2,003 acres and, as late as 1988, included a military and civilian population of about
10,000 people.
In 1988, the Secretary of Defense established the Base Realignment and Closure Commission for the
purpose of recommending the realignment or closure of military facilities. In 1989, the Commission
approved the closure of Norton Air Force Base. Base operations were discontinued in September
1993 and the facility was officially closed in March 1994.
Purpose of the Specific Plan
The purpose of this Specific Plan is to provide for the transition of the non-airport portion of the
former Norton Air Force Base site from a single-purpose military use to a multi-use
commerciaVindustrial center. To accomplish this, the Specific Plan must address three criteria.
-1. Meet Economic Development and Redevelopment Needs
The most critical need and obligation of the IVDA is to facilitate and stimulate the economic
revitalization and reuse of the former Norton Air Force Base as quickly as the market will
allow. It is IVDA's intent to develop the former Base site in a manner that will help recoup
ES-2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
and expand upon the number of jobs lost due to the closure of the Base. To meet this need,
the IVDA has focused upon two (2) specific objectives.
. Encourage future business development, generate or create new jobs for the community
and provide revenue. This can be accomplished through the effective reuse of Baseexisting
buildings and facilities to the extent possible, as well as through redevelopment. Simplified
review procedures and interim use development and building standards must be adopted to
ensure that this occurs smoothly.
. Provide for a broad mix of commercial, office and industrial development opportunities
consistent with the overall objectives and policies established for the property. This is
accomplished through a plan that accommodates a broad range ofland uses and a coordinated
road and infrastructure network. The Plan will provide sufficient detail on land use and
development standards to permit streamlined administrative land use decisions on a case-by-
case basis. A detailed Environmental Impact Report has been prepared to accompany the
adoption of the Specific Plan, so that future discretionary permits for projects consistent with
the Plan can proceed with minimal review and processing times.
8-2. Comply with the City of San Bernardino General Plan
The San Bernardino General Plan is the foundation for all development approvals within the
City. Compliance with the goals, objectives and policies of the General Plan is essential if this
Specific Plan is to meet the needs of the community. The General Plan text has been recently
amended to reflect the transition of the previous Norton Air Force Base to civilian use. A
separate General Plan Amendment accompanies the Specific Plan to ensure that the intent of
the General Plan is achieved, including provisions for the proposed land use intensity and
required additions to theCeirculation Eelement.
---3. Be Consistent with State Law
State law has established the authority and basic framework for the preparation and adoption
of specific plans. This Specific Plan has been prepared consistent with those provisions, to
take maximum advantage of the legislative opportunities afforded. The adoption of the
Specific Plan represents a major commitment of the IVDA and the Mayor and Common
Council for the City of San Bernardino to the actions, recommendations and obligations
adopted through the over'lll Sspecific I:plan document.
This Specific Plan can be characterized as the vehicle that will create the planning framework
for the transition and redevelopment of the Base, while effectively linking with City
regulations to provide administrative and legal responsibility. The effective life ofthe Specific
Plan may span several decades. Therefore, the Eptan will be utilized is-to guide development
until the entire project is developed and beyond.
ES-3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Plan Organization
The Specific Plan is organized into the following chapters:
Chapter I - Introduction: This chapter describes the project location, background information,
relationshipproxirnity to other agencies and facilities, the purpose and authority of the Specific Plan,
and the document's organizational structure.
Chapter II - Existing Setting: This chapter describes the existing land uses on and off the Specific
Plan areafJfOject site, planned land uses and operations of adjoining properties)', a description of
public benefit uses, public services and facilities, existing circulation/access, and the status of
theeHffeflt hazardous waste remediation program being implemented by the United States Air Force.
Chapter III - Project Issues, Goals, Objectives and Policies: This chapter includes a discussion of
project issues and a listing of the goals, objectives and policies intended to address these issues. The
goals, objectives and policies focus on job creation, streamlined decision-making, economic
revitalization, economically sound development standards, adequate access and circulation, and
financial mechanisms to promote reinvestment in the project and surrounding area.
Chapter IV - Specific Plan Framework: This chapter creates a framework for the discussion of
land use, circulation, public services, infrastructure and urban design elements in a policy perspective.
These elements represent a further refinement and implementation of the goals, objectives and
policies discussed in the previous chapter.
Chapter V - Specific Plan Regulations: This chapter contains the permitted uses for each land use
district, associated development standards and administrative procedures. The administrative
procedures are focused on creating a predictable and streamlined process for day:to:-day land use
decision: making and for the issuance of building and occupancy permits.
Chapter VI - Implementation: This chapter contains various programs and methods of achieving
the goals, objectives and policies of this Specific Plan, in addition to discussing a financing program,
development fees, and maintenance provisions. Particular focus has been given to long-term
infrastructure financing and development incentives in a locally and regionally competitive setting.
Reference to Enterprise Zone and Foreign Trade Zone
Included in the Specific Plan is a discussion of the Local Agency Military Base Recovery Area
(LAMBRA) program and a Foreign Trade Zone within the Specific Plan area. These programs are
recognized as critical elements to the ultimate successful conversion ofthe Base to private ownership
and development. To that end, they are included in the fllli.<::.l!SsionJ*0:jeet-tles€fi!"cion inCh'Wtlli
and willbecovered in the Environmental Impact Report that wais--being prepared concurrent.}'lith the
Specific Plan adoptionly for \tltima~approval and certification by the City of San Bernardino as Lead
Agency.
ES-4
I
'.
I.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II. EXISTING SETIING
Land Use
The project area wasis originallycurrent\y improved with a lafge-number of exiGting buildings that
provided support to the military mission previously occupying the Base. The buildings consisted of
warehouses, offices, detached residential and dormitory units, and a variety of commercial support
and recreational facilities, including a former golf course. Within the Specific PlanlVM boundary,
the formerexisting Base buildings provided approximately 3.82!) million square feet of floor space.
To the extent feasible, the Specific Plan has attempted to recognize the existing land use patterns and
groupings to facilitate interim use of former Baseexisting buildings and enhance the transition to new
construction and development in a compatible manner.
Existing Street Network
There are a number of existing streets in the Specific Plan areaproject site providing general
circulation and access to the various buildings and uses. The IVDA has also completed improvements
to Del Rosa Drive, Harry Sheppard Boul!,vard, and Tippecanoe Avenue in anticipation of the need for
better circulation and access to the surrounding area in the immediate future.
Public Services and Facilities
A number of ~public services and facilities are availableprovided 10n the Specific Plan
areaprejeet-site since the formerprevious Base was--essentially operated as an island unto itself and
was selfc-sufficient. Over time, these facilities have beenwiH be upgraded and transitioned, as
appropriate, to existing public agencies for operation and maintenance. The City of San Bernardino is
currently providing police and fire protection services to the project area. Integration of the water
system to the City" s system was recently completed and a wastewater system transfer agreement i~
being finalized.
Hazardous Waste Remediation
The United States Air Force is responsible for the cleanup of hazardous wastes caused by its
operations at the former Base. A program to accomplish this has been developed and implemented.
The required cleanup is currently in progress. with the majority ofthe remediation efforts completed.
Continued monitoring of the groundwater and landfill area is ongoing to ensure that the
contamination has been abated. Prior to the transfer of any land to private use, any existing hazards
on that site must be mitigated.
III. ISSUES, GOALS, OBJECTIVES AND POLICIES
A number of issues have been identified that have an impact on the goals and structure ofthe Specific
Plan. These issues cover such areas as jobs, long-term versus short-term uses, regional access, public
ES-5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
benefit parcels and uses, infrastructure, location and compatibility with surrounding uses, and
planning and coordination.
In response to the issues, a set of goals, policies and objectives were prepared. These goals, policies
and objectives address each of these issues and provide the foundation upon which the Specific Plan is
based. -The goals of the Specific Plan are to replace lost jobs with new job generating uses;, integrate
the previous Base into the surrounding communities; and create a plan that will generate reinvestment
back into the area. Procedural streamlining, maximum use opportunities and utilization of a
combination of financing mechanisms to facilitate new development opportunities set this project
apart from other commerciaVindustrial development in the area.
IV. SPECIFIC PLAN FRAMEWORK
Purpose
The purpose of this section of the Specific Plan is to establish the overall policy framework for the
Plan. This section contains policies that will guide and govern future development and redevelopment
of the project area.
Approach
The concept for this Specific Plan reflects a series of considerations:
Utilize various design components of the former Baset*isting site, such as the roadway
alignments, building types and landscaping features, as the physical framework for the
establishment of future land use and circulation patterns;
I . Allow for the utilization offormer Baseexistiflg facilities for interim and/or short-term uses to
provide an avenue for immediate reuse of the site;
Integrate the public benefit parcels established by the Department of Defense (DOD) into a
coherent pattern of uses;
I . Arrange land use patterns to maximize economic opportunities, circulation, efficiency, as well
as compatibility with surrounding uses, and streamline regulatory procedures for CEQA and
project review;
Phase redevelopment consistent with infrastructure availability, and utilize various financial
mechanisms for maximum effectiveness;
Provide appropriate guidance to assure a high quality of development.
ES-6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Land Use Pattern
The land use element of the Specific Plan is intended to build upon the land use patterns previously
established at the Base and llLfacilitate the orderly transition of the Specific Plan areasite to non-
military use, accommodating new construction when appropriate and utilizing existing building types
and related uses as long as possible in a compatible manner.
The overall Specific Plan areaproject site has been dividedidentitied with into sixtllree distinct land use
districts, including the Northgate. Westgate. Centergate. Southgate. Third Street and Defense Finance
and Accounting Services (DFAS) Districtstrade park, research and de'ielopment, and indllstriaL
Each land use district responds to a unique set of needs, opportunities and constraints offered by the
existing setting and conditions.
The land use districts represent broad policy groupings of common land uses combined with several
unique aspects that require a focus at a more detailed scale. Thus, the discussion of each district
includes a block by block set of land use planning guidelines that will serve as the basis for the land
use controls and opportunities.
These land use districts are illustrated in Exhibit IV -2 and summarized in ballil-*1se- Table IV -1. As
shown, the Specific Plan proposes an ultimate buildout of approximatelyHeaTly 14.15~ million
square feet of building floor area. This represents an increase of approximately 10.33&68 million
square feet over the previous building floor area in this section of the Base. The land use districts are
further defmed in Chapter V.
Public Benefit Parcels
A number of parcels have been granted by the United States Air Force directly to various
organizations as Public Benefit parcels. These grants of use on specifically defined parcels must be
continued by the recipients for a minimum of thirty years. unless otherwise approved by the IVDA
the public benefit parcel owner. the City of San Bernardino. and the Uni.ted States Air Force. The
Specific Plan has recognized these uses and structured adjacent land uses that are compatible. The
public benefit uses are clearly identified and spelled out to benefit the lVDA and the City of San
Bernardino as they implement this Plan over the life of the development to ensure that the appropriate
actions are taken to protect and enforce these use requirements. The long-term objective is to
integrate these public benefit parcels and users into the overall fabric of the project for an ultimately
cohesive and mutually beneficial resultJ!nless otherwise determined by the IVDA the public benefit
paLeyl owner. the City of San Bernardino. and the l}nited States Air Forcy that such use is no longer
mutually beneficiaL
Circulation
Given the increased intensity of proposed land use~, there is a need to significantly upgrade the
existing circulation network within the Specific Plan areaprojeet"ite. Key roads have beenare also
being upgraded to improve linkages to the surrounding community. These include Tippecanoe
Avenue, Del Rosa Drive, Mill Street and Harry Sheppard BouleYJlJJllve. These roads,aleHg-with
ES-7
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Harry Sheppard Blvd., are beinghave been upgraded to six-lane, divided arterials within the project
boundary. Other internal roads within the Specific Plan areaproject site are being upgraded to four-
lane collector streets. Rialm Avemw is-being extended east to Del Rosa Drive as a secondary arterial.
Off-site, the primary road improvements, beyond those described above, haves included the widening
of Third Street adjacent to the project area. Ultimately, Third Street will require improved access to
the Route 30 Freeway and Lena Road will need to be extended south to terminate at Orange Show
Road.
V. SPECIFIC PLAN REGUlATIONS
Chapter V will be adopted by ordinance and will serve as the regulatory basis for the issuance of
permits. The sixthfee land use districts are established and structured for clarity and administration.
The purpose of each district is clearly identified and testablished. The list of permitted uses by district
is defined, along with minimum development standards, procedures and standards for temporary and
interim uses in existing buildings and structures, general property development standards, parking and
loading requirements, signs, landscaping standards, and the streamlined administrative process to be
used in reviewing and approving individual projects and permits. Where appropriate, this section
incorporates provisions of the existing City of San Bernardino Development Code for consistency of
review and administration.
VI. DESIGN GUIDELINES
A series of urban design guidelines are included within the Specific Plan. These address building
massing, articulation, orientation, materials, roof equipment screening, signage, landscaping, Third
Street streetscape and pedestrian circulation. These guidelines will serve to establish the project as a
high quality development and enhance its integration into the surrounding neighborhoods.
VII. IMPLEMENTATION
Introduction
IVDA will be the principal agency through which implementation of this Plan will occur, in close
coordination with the regulatory authority, which is the City of San Bernardino. In coordination with
Hillwoo.Q,.J!iUhe-rele-&f master developer, IVDA has the ability to regulate the pace, location and
timing of new development subject, of course, to market conditions.
In this role, IVDA will have the authority and responsibility to ensure that adequate public facilities
are made available in a timely manner to accommodate new development. Infrastructure
improvements will also be required off-site to address certain impacts created by the project, such as
increased traffic, at such time as development begins to exceed the level of activity of the previous
Haase. Specific projects may require additional improvements on a case-by-case basis, as determined
during the City development review process. The IVDA can direct potential users to the area of the
project most compatible with and responsive to the tenant and/or new development needs. Financial
ES-8
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
programs and incentives will also be administered by the IVDA for quick decision-making, consistent
application, and enhancement of the site for potential users.
Infrastructure Financing
A discussion of the process through which the needed infrastructure improvements will be financed is
included in this Specific Plan. This includes the use of redevelopment financing, as well as the careful
utilization of development impact fees. This is one of the critical elements in the successful
accomplishment and effective implementation of the Specific Plan. It will be coordinated with
redevelopment agency financing to create a unique financial incentive package for new users and
development.
Maintenance
Maintenance of common areas, buildings and landscaping will be addressed through the formation of
appropriate assessment districts or property owner associations to ensure that initial public agency
investments are maintained over the life of the project, to the advantage of tenants and owners.
ES-9
,----
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1. INTRODUCTION
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1. INTRODUCTION
A. SITE LOCATION AND DESCRIPTION
The subject property, referred to as the San Bernardino Alliance*Californialntemational Trade Center
(SBAHC), is located in the southern portion of the City of San Bernardino, approximately 60 miles
east of Los Angeles. The area contained within the Specific Plan boundary is approximately
692.6669 acres, divided into three non-contiguous sites. The properties included in the Specific Plan
are located within the boundaries of the former Norton Air Force Base and adjacent areas to the
south. The Specific Plan area, which is generally located south of Third Street, north of the Santa
Ana RiverSan Bernardino ,^,/effile, east of Lena Road, and west of Alabama Street (see Exhibit 1-1).
B. BACKGROUND
B.l The Establishment and Closure of Norton Air Force Base
Norton Air Force Base, originally named the San Bernardino Air Depot, was established as a supply
depot in 1942, shortly after the United States entered World War II. The original Base covered about
500 acres and had about 1,000 civil service employees. By 1943, the Base comprised about 13,000
civilian and 5,000 military personnel. The name Norton Air Force Base was conferred upon the
facility in 1950, in honor of Captain Leland F. Norton. Eventually, the Base encompassed
approximately 2,003 acres and, as late as 1988, included a military and civilian population of about
10,000 people.
In 1988, the Secretary of Defense established the Base Realignment and Closure Commission for the
purpose of recommending the realignment or closure of military facilities. In 1989, the Commission
approved the closure of Norton Air Force Base. Base operations were discontinued in September
1993 and the facility was officially closed in March 1994.
B.2 The Inland Valley Development Agency
This Specific Plan has been prepared by the Inland Valley Development Agency (IVDA). The IVDA
is a Joint Powers Authority formed in conformance with the provisions of Article I, Chapter 5,
Division 7, Title I of the California Government Code. The IVDA was formed through the execution
of a Joint Powers Agreement dated January 24 and amended on February 12, 1990. Four local
governmental entities comprise the IVDA: the County of San Bernardino and the !;Gities of San
Bernardino, Colton and Lorna Linda. The IVDA has the ability to exercise redevelopment powers
pursuant to Health and Safety Code Section 33492.40. This section provides that the IVDA shall
have and exclusively exercise the powers of a redevelopment agency pursuant to the California
Community Redevelopment Law in connection with the redevelopment of a project area approved by
such joint powers authority. Such a project area would include a military facility wlrielJ-jS' subject to
closure and certain areas in proximity to it, as provided by Public Law 100-526.
1-1
I
I
I
I
I
IfiGHLAND AVE.
~
~
~W
~rs
r.;
I
I
I
I
I
I
I
I
I
I EXHIBIT 1-1
I Site Location
I
I
S.R. 66
~
I
~
~
~
~
I BASELINE ROAD
5TH STREET
-..... .,...,-.
MILL ST,
0
'" ~
~ ~
~ ,..; en
OJ 0
!
'"
~
OJ
J.
1-10
L__lESi~N~.. .. j
_ SBAC SPECIFIC
PLAiIi ARB;A
~,
\NORTH,;
"-..../'
NO SCALE
SAN BERNARDINO AIliANC~ALIFORNIA
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Pursuant to Redevelopment Law, the IVDA may exercise broad governmental functions and authority
to accomplish its purposes, including, but not limited to, the right to issue bonds and expend their
proceeds and the right to acquire, sell, develop, administer, or lease property. The IVDA may
demolish buildings, clear land, and cause to be constructed certain improvements including streets,
sidewalks, and public utilities. With certain exceptions, the IVDA may not construct or develop
buildings, with the exception of public facilities including improvements to school facilities, but must
sell or lease cleared property to developers for construction and development in accordance with a
Redevelopment Plan adopted by the Agency in 1990.
The Agency's purpose in adopting the Redevelopment Plan was to provide a mechanism and funding
to (1) acquire the former Norton Air Force Base and facilitate successful reuse of the property, (2)
assure adequate access to and from major transportation systems, and (3) promote economic
development within the surrounding area. Implementation ofthe Redevelopment Plan was intended
to achieve a wide range of goals including pooling of resources to better attack problems of blight
elimination, improvement of infrastructure, provision of needed improvements to community
facilities, promotion of rehabilitation of housing stock where appropriate, and alleviation of
environmental deficiencies, including substandard circulation.
C. INSTITUTIONAL SE"ITING
C.t Property Ownership
The leusearea included within the boundaries of this Specific Plan was previouslyis under the
ownership of the United States Department of Defense (DOD). As of March 7, 1995, the IVDA
entered into a long-term lease with the DOD to develop and manage the transition of the property
from an Air Force )1base to non-military land use. The lease also providegs for partial releases ofthe
property for sale to individual ownership, subject to the completion of the environmental remediation
and clean-up which wais underway, and for which the DOD is responsible. Additional environmental
assessments will be scheduled on a case-by-case basis to accommodate the development of new users
as they come on-line. In no event can the property be transferred to the IVDA or another owner until
existing environmental hazards have been removed or contained in an approved manner. .
The bulk of the remaining portion of the previous Norton Air Force Base was previously authorized
for transfer to the San Bernardino International Airport Authority (SBIAA) by the DOD as a public
benefit transfer and sale ofreal property. This is described in the initial Record of Decision issued by
the DOD and included in Appendix A. The SBIAA land incorporates those portions of the previous
J1base that were designed for and committed to aviation uses. These lands do not include any ofthe
land within IDe SBAC Specific Plan area.
The boundaries of the Specific Plan were established in concert with direction provided by the IVDA.
The ownership boundary of the airport became a fixed boundary between the IVDA and SBIAA
interests. The remaining areas of the previous J1base that were determined to have potential for reuse
in the foreseeable future were included within the Specific Plan boundaries. This resulted in the
exclusion of the off-base housing and other properties located north of Third Street-antl-Hie-ballistic
missi\e-(}.Efice-HHFlpleJH1Hfle-Setl+hwesl..cer~ef-ef-Mill-Stfeetillltl-+iWecilfl0e-Aveooe.
1-3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Within the Specific Plan boundaries, the most intense development area is located to the northwest of
the Aairport. However, the Specific Plan area also includes the former existing golf course on the
south side of the airport and a smaller area along the south side of Third Street, generally east of
Victoria Avenue, which includes the previous Air Combat Camera facility. The immediate proximity
of the Airport and the dual benefit of site improvements to both the IVDA and SBIAA necessitate
continued close interaction between these two agenciesm.
Subsequently. the IVDA and Hillwood Development Services ("Hillwood") entered into a Master
Disposition and Development Agreement on November 6. 2002 (the "Master DDA"). under which
the IVDA agreed to sell approximately 440 acres of land on the former Norton Air Force Base
("NAPB") to Hillwood. The Master DDA property is exclusively within the Specific Plan area.
except for the optional purchase of the property referred to as the County 44 Acres. located on the
north side of Central Avenue approximately 800 feet west of Tippecanoe Avenue. The sale to
Hillwood of the County 44 Acres was completed in November 2005.
Prior to the date of the Master DDA. the IVDA agreed to sell the property now developed with the
KoW's Distribution Center and an optional 20-acre parcel under a separate disposition and sale
agreement. Thereafter. all other Hillwood projects have been undertaken pursuant to the Master
DDA. The Master DDA required Hillwood to undertake and complete certain infrastructure
improvements as set forth in the Master DDA. All such infrastructure requirements will soon be
extinguished after the date of this Amended Specific Plan. HiIlwood has also entered into a Tax
Increment Reimbursement Agreement. under which the IVDA has agreed to repay Hillwood the costs
of certain infrastructure items sokk-.frpm the new tax increment revenues to be generated-ill'
identified J-lillwood developments both on the former NAPE and. in under certain circumstances.
within the other areas of the IVDA Redevelopment Project Area.
The only remaining areas to be developed by HiIlwood gursuant to the Master DDA include: 0) the
South.gate District (former Palm Meadows Golf Course). (ii) the portions of the Northgate District
located east of the Mattei facility and the area located east of Del Rosa Avenue and south of Third
Street. and (iii) approximately 30 acres withi1:! tbe interior areas of the Westgate District between the
Pep Boys facility and the Kohrs Center. KoW's 20-acre optional parcel has_.also. reverted to the
RIQn-"Ities as now encompassed by the Master DDA due to Kohrs not having timely executed the
option as initially granted by the IVDA.
Hil]wood is currently undertaking the construction of the Medline facility. a 404.097-square-foot
develoPJ])ellLQ1Lil.portion of the Defense Finance and Accounting Services (DF AS) property and a
portion of the County 44 Acres. just outside the Specific Plan Area. Other Hillwood properties
located in the vicinity of the eastern extension of Central Avenue east of Tip.]:1ecanoe Avenue (the
form~LP_,!.ImNeadows Drive) have been included within the Specific Plan areAwithin the Southgate
DistJ:i\1,.to~ther with the former IVDA golf course area.
HiIlwood has shifted the focus of the various areas included within the Master DDA from their prior
Air FO.Ice building de~ignations to a marketing...J;1lmJ that is compaLajJj~\oJh~Alliance-Texas project
1-4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
of Hill wood in Fort Worth. Texas. The IVDA has renamed the Specific Plan to include the Alliance-
California name and to change the designation of each identifiable area of the Specific Plan to the
Hillwood-designated marketing areas. The areas presently included within the Specific Plan are
presently known as: Northgate. Centergate. Westgate and Southgate. Such references to the various
areas of the Master Plan are presently used herein for identification purposes.
C.2 Relationship to the San Bernardino International Airport Authority
The San Bernardino International Airport Authority (SBIAA) is a separately constituted joint powers
agency made up of the !;Gities of San Bernardino, Colton, Loma Linda, Highland, and the County of
San Bernardino. It is currently leasing the airport property from the Department of Defense and will
become the owner of the airfield and related facilities on this portion of the former Norton Air Force
Base through a public benefit transfer following remediation oftoxic contamination. The SBIAAlt is
responsible for the management and development of the facility into an operating international airport.
C.3 Adjoining Jurisdictions
The SBAI+C is located entirely within the City of San Bernardino. The SBAI+C project boundaries
abut the City of Redlands to the south and the City of Highland to the north as shown in Exhibit 1-2.
That portion of the Specific Plan i7ffijeet-area abutting Redlands consists of the formerexistiHg golf
course area. The City of Highland abuts the Specific Pla~boundary north of Third Street east of
Victoria Avenue and between Tippecanoe Avenue and Del Rosa Drive.
An important issue in the future implementation of development along Third Street is the
jurisdictional boundary between the cities of Highland and San Bernardino. When Highland was
incorporated, the two jurisdictional boundaries were aligned such that the total right-of-way for some
portions of Third Street is currently located in the City of Highland. When Third Street is to be fully
improved, through this Specific Plan or other projects, the additional right-of-way dedication along
the south side of the street will occur in the City of San Bernardino. Close coordination will be
necessary between both jurisdictions when improvements are contemplated along Third Street as a
result of this Specific Plan.
D. PURPOSE AND AUTHORITY
D.I Purpose
The purpose of this Specific Plan is to provide for the transition of the former Norton Air Force Base
site from a single-purpose military use to a multi-use civilian operation. To accomplish this, the
Specific Plan must contain certain provisions and conform to requirements of three separate and
independent criteria:
1-5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CENTRAL AVE.
.;
!<
~
~
~
LEGEND
EXHIBIT 1-2
Adjoining Jurisdiction
_ SBAC SPECIFIC PLAN AREA
...-.. CITY BOUNDARY
SAN BERNARDINO AWANC~AUFORNIA
r./~
\(~~Y
NO SCALE
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
D.1.1 Meet the Needs of the IVDA
The needs of the IVDA are predicated upon developing the project area in a manner that will
help recoup and expand upon the number of jobs lost due to the closure of the Base. To meet
this need the IVDA has focused upon two specific objectives.
It must meet the short-term needs ofthe Agency to generate revenue, enhance future
business development, and generate or maintain jobs for the community.
It must meet the long-term desires of the Agency by creating a Plan which allows for
a variety of new development consistent with the overall objectives and policies
established for the property.
D.1.2 Be Consistent with the Reauirements of the Citv of San Bernardino General
Plan
The San Bernardino General Plan is the foundation for all development approvals within the
City. Consistency with the goals, objectives and policies of the General Plan is essential if this
Specific Plan is to meet the needs and desires of the community.
D.1.3 Be Consistent with the Provisions of State Law
State law has established the authority and basic framework for the preparation and adoption
of Specific Plans. The issues to be addressed within the Specific Plan are contained under
Section 65450 of the California Government Code. as dis.cussedAHthefity-below.
This Specific Plan can be characterized as the vehicle that will create the planning framework
for the transition and redevelopment of the Base, while effectively linking with City
regulations to provide administrative and legal responsibility. The effective life ofthe Specific
Plan is not intended to be date-specific but rather project-oriented. Therefore, the Plan willis
lB guide development until the entire project..ilrea is developed.
D.2 Authority
The California Government Code, Section 65450, permits cities to prepare and adopt Specific Plans
"for the systematic implementation of the Qgenerall'rlan." The law further provides that a Specific
Plan shall include a text and diagrams which discuss the following issues.
The distribution, location and extent of the uses of land within the area covered by the plan.
The proposed distribution, location and extent and intensity of major components of public
and private transportation, sewage, water, drainage, solid waste disposal, energy, and other
essential facilities proposed to be located within the area covered by the plan and needed to
support the land uses described in the plan.
1-7
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Standards and criteria by which development will proceed, and standards for the conservation,
development, and utilization of natural resources, where applicable.
A program of implementation measures including regulations, programs, public works
projects, and financing measures necessary to carry out the preceding three items.
The Specific Plan shall include a statement of the relationship of the Specific Plan to the
General Plan.
E. PLAN ORGANIZATION
This Specific Plan establishes broad concepts, goals and policies and identifies specific development
standards for development and redevelopment within the Specific Plan boundaries. This structure will
not only identify specific building standards, but provide a basis for understanding how such standards
were arrived at and what objectives are intended to be achieved. This level of discussion is helpful in a
variety of situations, such as:
Evaluating individual projects subject to review and approval by the City of San Bernardino;
Determining the implications of future amendments to the Specific Plan;
Providing a rationale to help citizens and decision-makers understand the Specific Plan.
The chapters of the Specific Plan are organized as follows:
Chapter I - Introduction: This chapter describes the project location, background
information, relationshipj3fmHffiify to other agencies and facilities, the purpose and authority
of the Specific Plan, and the document's organizational structure.
Chapter II - Existing Setting: This chapter describes the land uses on and off the Specific
Plan areapmjecH;ite, planned land uses and operations of adjoining property, a description of
public benefit uses, public services and facilities, existing circulation/access, and the current
hazardous waste remediation program being implemented h)' the Air Force.
Chapter III - Project Issues, Goals, Objectives and Policies: This chapter includes a
discussion of project issues and a listing of the goals, objectives and policies intended to
address these issues.
Chapter IV - Specific Plan Framework: This chapter creates a framework for the
discussion of land use, circulation, public services, infrastructure and urban design elements.
These elements represent further refmement and application of the issues, goals, objectives
and policies discussed in the previous chapter.
1-8
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Chapter V - Specific Plan Regulations: This chapter contains the permitted uses for each
land use district, associated development standards, and administrative procedures.
Chapter VI - Implementation: This chapter contains various programs and methods of
achieving the goals, objectives and policies of the Specific Plan, in addition to discussing a
financing program, development fees, and maintenance provisions.
The entire Specific Plan is intended to be adopted by ordinance. Chapters 11 through IV 4 aHe 7
contain the goals, objectives, policies and issues involved with the development ofthe SBAITC, while
Chapter !)V contains the specific standards that new uses and/or development must meet in order to
be located within the SBAHC. Chapter VI addresses the implementation mechanisms for the Specific
Plan.
F. RELATIONSHIP TO THE GENERAL PLAN AND DEVELOPMENT CODE
This Specific Plan is intended to implement the requirements of the City of San Bernardino General
Plan and be compatible with the City of San Bernardino Development Code in format and
administrative procedures. The existing General Plan contains provisions that provide for the orderly
transition of the former Base to productive civilian use.
The format of the Regulations component of this Specific Plan (Chapter V) is similar to that of the
City's existing Development Code. In addition, the Regulations portion contains references to a
number of the development standards and administrative and public hearing procedures contained
within the Development Code. The purpose of these references is to provide a Specific Plan that is
comprehensive in scope but does not reiterate and duplicate existing City standards or procedures.
Listing standards or procedures which already exist within the Development Code can create future
conflicts if portions of the Code are amended but the Specific Plan is not. Therefore, the use of
referencing is viewed as a method of maintaining longe-term consistency with the City Development
Code and minimizing unintended results.
G. SPECIAL INCENTIVE ZONES
The IVDA has been successful in pursuing inclusion of the project area_in the Local Agency Military
Base Recovery Area Program (LAMBRA), which is designed to enhance its ability to attract and
retain businesses within the San Bernardino Alliance*California Specific Planl+llemalionaJ-'[-HHle
CeHter. A Foreign Trade Zone has also been established within the Specific Plan Area. These
programs are discussed below:y-will also be jncluded-in the project description for the preparation of
the environment-al-impaa report.
G.t Foreign Trade Zone
A Eforeign Itrade Zwne (FTZ) is a site within the United States in or near a U.S. Customs port of
entry, where foreign and domestic merchandise !H"is generally considered to be inpart of international
commerce. Foreign or domestic merchandise may enter this area without a formal Customs entry or
the payment of Custom duties or government excise taxes. Merchandise entering a zone may be
1-9
!---
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
stored, tested, sampled, re-labeled, re-packaged, displayed, repaired, manipulated, mixed, cleaned,
assembled, manufactured, salvaged, destroyed or processed. If the final product is exported from the
United States, no U.S. Customs duty or excise tax is levied. If, however, the final product is
imported into the United States, Customs duty and excise taxes are due only at the time of transfer
from the Eforeign Drade Zi!:one and formal entry in the U.S. The duty paid is the lower of that
applicable to the product itself or its component parts. The benefits of an FTZ provide potential users
with significant opportunities both in access to foreign trade and monetary savings.
FTZStiffi-designations are only part of a larger array of incentives used to encourage reuse of the
former Norton Air Force Base. However, they are important to the implementation of the Specific
Plan because they serve as a magnet to attract future developments by helping to offset Customs cost
advantages available to manufacturing plants abroadareas.
The FTZ program encourages companies to maintain and expand their operations within the FTZ by
removing disincentives associated with manufacturing in the United States. Specifically. the program
corrects the imbalance in paid duties by treating a product made in the FTZ. for purposes of tariff
assessment. as if it were produced abroad. Thus. companies can increase their cash flow. save taxes
and improve their bottom line by locating their operations in an FTZ. The FTZ program impacts
indirect employment as well. because a local business not only creates jobs for the area's labor force.
but also creates opportunities for suppliers and service providers in the community.
Exhibit 1-3 shows the boundaries of the Foreign Trade Zone in the Specific Plan area. as of June
2006.
G.2 LAMBRA
The State of California has established the Local Agency Military Base Recovery Area program
(LAMBRA) for the purpose of stimulating business and industrial growth in areas experiencing
military base downsizing and closure. The LAMBRA program is modeled after the enterprise zone
concept, which offers incentives to businesses that locate within a specified area. The program
provides methods of reducing regulatory controls to encourage private investment and foster
cooperation and innovation between state and local governments and private business and industry.
The reduction of governmental constraints on business development will be used to provide~ positive
economic incentives for investment in these areas.
The LAMBRA designation will enhance the IVDA's ability to attract quality development to the San
Bernardino Interoofi(maFFraseGeflterAlliance*California. The incentives ofthe LAMBRA program
are structured towards individual businesses and include:
Tax credits for sales and use taxes paid on (up to) the first $20 million of qualified high
technology equipment. aircraft maintenance equipment. aircraft components.-aoo machinery
purchases. and, Section 1245 property 011 ta!lgi!:>I~PLQP~rJ)'J)1at is depreciated other than
land/real~state )
I-IO
-------------------
---
en "o:j t:I:j
~
to 0 :x:
~ >-j ~
rg ([) ........
...... to
!Z! (Jq ........
0 :::::1 t--3
~ t--3 ........
n >-j I
i PJ W
~ p..
([)
~ N
0
:::::1
([)
.-LII'lA_RDlI
...J
~ I
I
.
I:
~: DDD
~: D
, '""
i
~
0 I
.
.Ii
I
Ul '"%j
tJj 0
> :ll L'
() t':l t':I
~
Ul (,') ()
'"0 Z
t':l t':I
() o-,l Z
~ :ll
'"%j > t:1
- 0
() t':l
'"0 N
~ 0
Z
t':l
>
:ll tJj
t':l 0
> c::
z
0 z
~ ~([)
-< n ~
~
~
TIPPECANOE AVE
.
.
.
... .
09
PPECANOE AVE
.
:1.
.
.
~ .
"
i!J
0" ~
~
to
'"
'"
..
'0
~
lJ
DO;
~~
Ol
~
rll--
''''I ~ DEL ROSA DR.
Q I' 0 ,- I
<0 0 NORTON ;.; uP:l
I v '~I~"-""""'-_~ ....,. .
I- '-- -
11 _ _
"
;.' i!l
~
I ..
"
~
to>
i!l
;1
jl
PALM AVE
I
'--- ------ --------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I'
Hiring credits for wages paid to qualifying employees during the first five years of
employment - 50% the first year and declining 10% a year (which can amount to $29.000+
per employee).
Up to a IS-year net operating loss carryover . which permits losses to be carried over to
future years (which is longer than the other California businesses) to offset taxes.
Election to treat a portion of certain property as an expense chargeable to the capital account
and eligible for treatment as a deduction against income. This Business Expense Deduction
allows for rapid depreciation of qualified property used exclusively in the LAMBRA such
that businesses can take the accelerated LAMBRA depreciation for the year the qualified
property is placed in service.
Priority technical assistance from the California Trade and Commerce Agency, Cal EP A, and
the Office of Permit Assistance.
Preference points for State contracts. including the following:
1. LAMBRA provides a five percent bidding preference' on state solicitations for goods and
services valued at more than $100.000 if the worksite is located in a LAMBRA area. as
designated by the State Trade and Commerce Agency.
2. LAMBRA allows state contracting officials to award the bid worksite preference when 50
percent of the labor hours required to perform a contract for goods. or 90 percent of the
labor hours required to-p-erform a contract for services is performed at the approved
worksites.
3. Workforce Preference: Companies qualifying for the five percent worksite preference may
request an additional one to four percent workforce preference by certifying to hire a
specified percent of the contract workforce employees from those designated as LAMBRA
q ua!ifi~c;Li!ldiy.iduaJ~
Exhibit 1-4 shows the boundaries of the LAMBRA designation in the Specific Plan area. as of June
2006.
1-12
-------------------
~
~
..........,..,...,..'""",..,...~
'"
~
~t:tj
~><
toES
~~
>>-3
""
I
rz
o
~
i
~
.........
I
~
I
~
~ ,
.
\
.
.
\
0 .
,
.
..
Ul f;
tJ:j
> s::: L'
() tJ:j tIj
Ul ~ (.l
'1:l tIj
t':l tJ:j
() 0 Z
>-< c::
"'J tj
>-< Z
() t:i
'1:l ~
~ -<
>
::0
t':l
>
Z
~(]D
n ~
~
-.,.-",.'."'.'-iW""VJI..,.. "'- ~
.
.
.
,
~
"r"'"
..
~
ODD
D
I
09
,
, ..
: i:J
..............rri........~
' .
PPECANOE AVE ~
''''
:fl
o " r~
:~
o n~
\I~ ~
[1. "
. ,
.J
,
~
"
:.
-~ .....~
~
'"
'"
'"'
"
~
!J
b
to
~ ' 0
~o '~-i<>. pEL ROSA DR.
l': J l-/.... J~
~ I:' ~ "''''01 ~~:,
"' 0 N.o~N ...,.,y". ... ,:=;r _. ':~
i: - ,~. _' - ~.III.
II I,:"
' ..
~.
.,\
~.~
t'
.
~"
1
I
I
I
I
.
.
,
I: il:'~
I" .t'
: I :1
. .
.
.
,
il:I'
I,'
f:~
I.J
I~!
I'"
If
.
,
,
~:
I
:~
.'
Cl :J
.
'.
~ ~l
'U :j
"
Ii ~
,
.
.
.
.
.
.,
"
."
'\. II~
\\ Jt
'. ..... ......., ,,~, ,.m
-"PALM"'AVE
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II. EXISTING SETTING
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II. EXISTING SETTING
A. LAND USE
A.I Onsite Land Use
The existing land use~ on the former Base consisteds of a variety of former military facilities, most of
which stillwhich existed until the IVDA and then Hillwood initiated the demolition of virtually all the
older Air Force buildings within the Specific Plan area and some which still house their former uses.
In general, the former Base includegs a number of residential and commercial related facilities,
including single family residences, barracks, recreational facilities, medical and office facilities,
training and warehousing/storage facilities. .Exhibit II-I shows the previous Base buildings within the
Specific Plan area. As noted in Chapter I. except for the transfers of the recreational and medical
facilities to qualified public benefit transfer recipients. the other warehousing/storage and office
facilities were transferred to the IVDA. As of this date. few onhe original Air Force buildings remain
in use on the Base.
The roadways which provide access to these facilities are laid out in a grid pattern suitable for
vehicular and, in some cases, railroad access; however, rail accessJo the site, although previously
provided a number of years ago. is not currently available. A variety of facilities have been occupied
since the closure of the Base. These include facilities transferred directly to specific users (such as the
Lorna Linda Clinic), uses that continued to operate after Base closure (such as the Credit Union and
the former Palm Meadows Golf Course until its closure by the IVDA on April 1. 2005), and uses
attracted to the Base since closure by the SBIAA and IVDA (such as Santa Barbara
!\crospareaircraft maintenance activities on the Airport and the Northrup/Grummon complex
formerly known as TRW). Recent developments or new construction include Kohrs Department
Store Distribution Center. Matters Distribution Warehouse. Norton Community Credit Union. Pep
Boys, and Matich Corporation.-._Th!e.SJ.<!1er ..!3rothers, Markets Distribution Center and Corporate
Headquarters Office Complex are presently under construction within the Center gate area.
A.2 Offsite Land Use
The land uses surrounding the Specific Plan area (including the aAirport) are located in four separate
jurisdictions: Highland, Redlands, the unincorporated portion of the County of San Bernardino, and
the City of San Bernardino (see Exhibit 11-21). The area north of Third Street includesveJ.ves land in
the cities of San Bernardino and HigWand and consists of a variety of residential and commercial uses.
Streets extending north from Third Street, such as Tippecanoe Avenue and Del Rosa Drive are focal
points for commercial uses. The predominant residential community is the off-site housing for the
former Base located west of Victoria Avenue, between Third and Fifth Streets. An area .s.Quth of
Third Street and east ofVicto.ria Avenue has been transferred to the Bureau ofIndianAffairs for tl1.~
benefit of the San Mgnuel Band of Mission Indians.,-alH1Ough. sSeveral privately owned apartment
buildings and a condominium complex exist offill the vicinity of SHJFifth Street. Approximately fifty
(50%) percent of the land aleHgfronting on Third Street is vacant.
II-I
-------------------
_ n_______. ~_"
~ tJj trj
'" ~ :><
I UJ ::I:
(!) .......
tJj
z tJj .......
<> >-3
~ ~
....... .......
........
0- .......
i ....... I
::; ......
~ ()'O
UJ
~
LEN.\ RD.
O ==
==
==
==
!
~
~
DDDD
DDD
:DDD
ODD
I
TIPPECANOE AVE
..
TIPPECANOE AVE ;:l
c....- ., ;o'~_-""""
I?iI f~UDUDDD~,st"'~D
c G:::l' = c:aODe. 'i,I(il'V f>
=
:;: 00 d c::J ~ .
o DD~
Cs : : : : : :~ ~
" C::J
ODD. '"
c:::J c:::J d . ~ Cl 't\ l)
c::J Oo.C~;,'8:. 0 0
L ' ;- I
I ~
N~RTON 'WAY LJ U
=
co
i!l
o Q ~
~
o
00,
\J3
DEL ROSA. DR.
I
1
\
1
~
I
........-.......... .-
I' -
.1
,I ~
. .
~
"
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
The area northeast of the Specific Plan. located along of adjacent to Third Street between Victoria
Avenue and Palm Avenue, is within the City of Highland and is designated ~PC (Planned
Commercial) east of Victoria Avenue to Central Avenue and is designated as BP (Business Park) east
of Central Avenue to Palm Avenue on the City of Highland General Plan Land Use Map. The area
north ofthe Specific Plan. located along Third Street between Tippecanoe Avenue and the extension
of Leland Norton Way, is also within the City of Highland. This area is designated PC and BP on the
City of Highland General Plan Land Use Map.
The City of Highland is currently updating their General Plan. including their Land Use Map. The
draft Land Use Map for Highland shows that the area west of Marilyn Avenue to Leland Norton Way
is proposed for redesignation from BP to I (Industrial) and the area east of Victoria Avenue to
Central Avenue is proposed for redesignation from PC to BP. Adoption of the new Highland General
Plan is expected by mid-2006.
Northwest of the Specific Plan area are land within the unincorporated area of the County of San
Bernardino. North of Third Street and west of Tippecanoe Avenue is an area designated CN
(Neighborhood Commercial) and 4M-RM (Multiple Residential) in the County of San Bernardino.
The area west of Victoria Avenue and east of the extension of Leland Norton Way is located within
the City of San Bernardino and is designated CG-I (Commercial General), IL (Industrial Light) and
RM (Residential Medium) on the City of San Bernardino General Plan Land Use Map. A small area
at the northeast corner of Del Rosa Drive and Third Street is also designated CG-l.
The Specific Plan area is designated as ILJlndustrial Light) at the southern. northeastern and central
sections. IH (Industrial Heavy) on the western and northwestern sections. CG (Commercial General)
at the northern section. CO (Commercial Office) at the central section along Tippecanoe Avenue. and
PF (Public Facility) at the southwestern section.
The area west of Tippecanoe Avenue and south of Third Street is located within the City of San
Bernardino and consists primarily of single family residential uses. Th~at portion between Third
Street and Rialto Avenue is designated CG-I (General Commercial) along Third Street with IL
(Industrial Light) to the southbehind that, extending south -'lte Rialto Avenue. The area south of
Rialto Avenue and west of Tippecanoe Avenue is designated RU-I (Residential Urban), IL(lndustrial
Light) and PF (Public Facility).
Westerly of the area described in the preceding paragraph. adjacent toFurthef-ltH:he-west,-betlrJhe
west and east sides of Lena Road areOOfltain a number of governmental offices operated by the
County of San Bernardino and other offices of private fIrms. This area is designated PF (Public
Facility), IL (Industrial Light) and COol (Commercial Office) on the City of San Bernardino General
Plan Land Use Map. The area south of Mill Street is within the City of San Bernardino and contains
a variety of residential and commercial uses. This area is designated IL (Industrial Light) and PF
(Public Facility) on the City of San Bernardino General Plan Land Use Map.
11-3
-------------------
~
rn~
nw
;
I
g
-'-'1'
I
.
I
~ I
I
;
~ I
I ~
a
..-.....
II :...-
jG)
.I
LANUR8HIK .1."1 ~
'Z
10
.
1
::0
m
o
~
Z
o
(Jl
.
VICTORIA AVE L._._._
CI1IIIlIIIGBAK ST.
:2
~
b !t
Fl PAUl AVII
I-----J-
b I ..
CHURCH AVE' ,.... ,
. I .
._.~
R
R
~
'"
o
I
GG ~GG~
.
- ---,
.
I
GSB8G0GG0G ~ n
nlnlnn~~~
l;)
t":l ()
~ ..; fz} 'll tzJ
~~~~ ~8~~;
~R ~ ~~z~~
I t":l CIl
B ~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
The City of San Bernardino recently updated the City's General Plan and Land Use Map (November
2005). The revised Land Use Map for the City shows that the adjacent lands north and west of the
Specific Plan area have the same designations as the previous Land Use Map.
South of the Specific Plan area. E~ast of Tippecanoe Avenue and south of the former golf course is
the Santa Ana River. which extends through the cities of San Bernardino and Redlands and acts as a
dividing line between much ofthe project siteSpecific Plan area and the City of Redlands. except for
the parcels owned by the City of Riverside.
The area within the City of San Bemardino south of Palm Meadows Drive, north of the Santa Ana
River is vacant and designated IL (Industrial Light) and PFC (Public Hood Control) on the City-ef
San Bernardino General Plan Land Use Map. The area within the City of Redlands south of the Santa
Ana River includes an Edison power plant, agricultural land, and a City of Redlands landfill site. This
area is designated FCC (Open Space-Flood Control Conservation), G (Industrial-General), US
(Industrial Urban Services) and PA (Open Space-Park) and is included within the East Valley
Corridor Specific Plan.
A.3 San Bernardino International Airport
The San Bernardino Intematianal Trade Ce!lt~Alliance*California Specific Plan area is
adjacent to the San Bernardino International Airport, however, the Airport is not part of the Specific
Plan. except for the former Commissary Building which has been conveyed by the IVDA to SBlAA
and will remain in the Specific Plan Area. As such, the Airport and its facilities represent a significant
land use adjacent to the SBITCSpecific Plan area. In addition to the runway and hangi!er facilities, a
passenger terminal and a variety of commercial, office and warehouse facilities exist on the Airport
property.
A.4 Public Benefit Parcels
The process used by the Department of Defense (000) to dispose of the Base has included the
transfer of property to various other federal, state, and local agencies for either subsequent disposal
or public sale. As part of this disposal process, a number of parcels have been designated as public
benefit parcels by the 000 and specifically granted to different groups for use in ways that have been
identified as a public benefit. These include facilities for medical use, the homeless, public parks and
recreation, education and fire suppression related activities. These users were iIHle-granted title to
their property and allowed tomay use existing buildings or structures or develop new facilities as
necessary. Several of these parcels are located within the boundaries of the Specific Plan. They will
be described in more detail in Section IV,.C.
B. EXISTING ACCESS/CIRCUlATION
The prejeet-siteSpecific Plan area consists of a number of existing streets distributed throughout the
site in a grid pattern. The primary streets providing for vehicular movement throughout the prejea
siteSpecific Plan area include Tippecanoe Avenue, Harry Sheppard Boulevard-Efurmerly-''G''-&treeft,
and Del Rosa Drive north of Harry Sheppard Boulevi!rd, PeFiruetef-Rtlftd,MemerinIDrive.;.and.p-atl1
11-5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ViRas Seiior BOHlevard, (parallel to and approximately 100' north ofMiR StreetJ. The balance of the
streets that formerly existed during the time of the operation of the Base by the Air Force have been
removed or are intended to provide non-public street accessJQ individual building sites and users.
The IVDA has designed and constructed major street improvements to Tippecanoe Avenue, Harry
Sheppard Boulevard and Del Rosa Drive, substantially widening each street to provide a major
thoroughfare which links to adjoining external master plan streets. These roads will-provide the
beginning of a backbone circulation system for the SBITCSpecific Plan area. The balance of the
street system has been removed to provide for the development of the newly constructed and to be
constructed buildings will Hltimately-need to be Hpgraded or replaeetl-to meet standard clesign criteria
fDr width and right of '.vay irnpro'lements as new development occurs.
C. PUBLIC SERVICES AND FACILITIES
C.l Public Services
City police and fire services are available to the prejeeKiteSpecific Plan area. Police services are
provided from the central police station located in clDowntown San Bernardino at Seventh Street and
"D" Street. The City Fire Department responds to calls to the Specific plan areasite, primarily from
Station llocated on Third Street, west of Waterman Avenue. Depending on the location of a call
from the project siteSpecific Plan area, additional fire stations may also respond as necessary. Calls
from the southwest portion of the project site Specific Plan area may have responding units from
Station 10 at Mill Street and Arrowhead Avenue. Calls from the area along Third Street near
Victoria Avenue may have units responding from Station 6 on Del Rosa Drive near Highland Avenue.
The IVDA also oRerates a security force for the Airport; and other IVDA and SBlAA properties that
is under the supervision of a full-time City Police Sergeant assigned to dulYj!1Jhe Base to supervis~
the security forceis comprised of off-duty City and other law enforcement police officers that patrol
the facilities.
C.2 Facilities
C.2.l Water
The former Base currentlycontaineds an independent potable water system served by four
wells. Three of the wells, located in the northwest portion of the projeetBase,.~iIe pump
water direclly into a 500,000-gallon elevated water tank. within the Specific Plan area near the
northwest corner of the intersection of Harry Shepi2'!rd Boulevard andDel Rosa Driy~. The
fourth well pumps water into an above ground tank for chlorinating. The water is then
pumped into a 250,OOO-gallon elevated tank located on the eastern portion of the Ajrport near
the intersection of VicJolia..Avenue and I_hird Street. The...two-ilBeve-ground-timk-s--are
loc'fttetl-ffi..t-he.wes-ter-A-and castcm portions of-lhe-fu-rffief-base,-re5pe{.'tively~ Booster pumps
at the ground level storage provide a pressure boost to the elevated tanks. The above-ground
storage tanks serve the west or east end of the former Base based-oAils dictatedill' their
II-6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
location. The two water systems originally operated independently of one another and were
not inter-connected. The IVDA has jllst receRtly completed the extension of a fleW-twenty
(20") inch water line that links the two systems together. This action resulteds in an upgraded
water system with more adequate pressure to serve plannedsome nominal levels of lower
density new development which pre'/iollsly had beeR a CORcern for thein the eastern end of the
project siteAirport. The actual water pressure provided by the system at a particular location
is dependent upon the site's location, along with the loss of pressure within the system. +he
water system is cmreRtly operated from facilities located OR the former Base site.
The existing water distribution pipeline system that was constructed by the Air Force
consisteds of a mixture of steel, cast iron, and asbestos cement (AC) pipe materials.
Previously prepared reports on the system have noted that the steel lines were not properly
protected from corrosion and they are no longer acceptable for any level of service. The
portion of the system which is comprised of cast iron pipes is generally regarded as
satisfactory for an interim use, with phased replacements required within the next 10 to 20
years. The AC pipe may have a service factor slightly longer than the cast iron pipe, but most
of the AC pipe installed on the property is .celass 100 which, if required to handle the
pressure of either adjacent water utility, would be operating near its recommended pressure
limit.
In September 2004, the IVDA and the City of San Bernardino Municipal Water Department
("SBMWD") entered into a Water Integration Agreement whereby the SBMWD agreed to
integrate the IVDA water system into that of the City's overall system upon the 0) payment
of $1.200,000 in water acquisition charges, which will be applied by the SBMWD to provide
1.200,000_ gallons of water storage capacity in a recently completed off-site reservoir, (ii)
removal of water connections for buildings that are no longer in use, (iii) installation of
backflow devices and water meters to certain designated former Air Force buildings, and (jy)
a commitment of the IVDA to have new development install certain master plan water
improvements required by the SBMWD to serve the Specific Plan area and the Airport. The
IVQA-require.fuW.)':~ical UpJ)19yements to the Base water system were timely completed and
the former Base system has now been fully integrated into the water system of the SBMWD.
At the same time as the rVDA entered into the WaterJ.!1J~!!tion.Agreement with the
SBMWD, the IVDA also entered into a delegation of responsibilities agreement with
Hillwood whereby Hillwood agreed to j2!!)' the $1.200,000 water acquisition charges to the
SBMWD and to undertake the physical work of the cuts and caps and other meter installation
work.
Existing City water facilities adjacent to the 5.pecific I'J!!!La.I~<!pfOjeelsite include a 12-inch
line in Mill Street, extending west of Tippecanoe Avenue; a 16-1920- inch line in Tippecanoe
Avenue extending north through the Specific Plan areaj7F8jeeHite to Rialto Avenue, where it
transitions to the west; and a 12-inch line in Third Street, west of Tippecanoe Avenue. In
addition, new 20-inch waterlines have been installed as part of the street improvements to
Harry Sheppard Boulevard,_ThirdSt[~~t, and Del Rosa Drive. A 16-inch line has been
installed along Timer Creek and 12-inch lines on Lena RoacLLeland Norton Way, and Central
Avenue. In addition, a new well and booster pump have been installed adjacent to Perimeter
11-7
I
I
I
I
I
, I
I
I
I
I
I
I
,
1
I
I
t
1
t
Raad near the u.s. Forest Service facility and a secand well has been installed at the area
farmerly accupied by the Palm Meadaws Galf Caurse. A new 20" water line was alsa
installed alang the sauthern property line af the Stater Bros. Markets project and extending
nartherly in the recanstructed Leland Nortan Way. Appropriate inter-tie cannectians were
alsa installed ta fully integrate the Base water system with that af the SBMWD.
C.2.2 Sewer
Mast af the Specific Plan areaproject site is currently served by a sanitary sewer system,
which includes a variety afline sizes ranging fram 10 ta 15 inches. The formerHowever, the
gelffarmer galf caurse area, which was previausly served by a septic system, Imt is naw
cannected ta the sanitary sewer system. through a 10- ta 12-inch line that was installed an
Central Avenue. east af Tippecanae Avenue. A IS-inch relief sewer has alsa been installed
alang Harry Sheppard Baulevard and west afTippecanae Avenue. aligned with an extensian
afHarry Sheppard Baulevard.
Alang the sauth side af the farmer BaseJ-near the farmer galf caurse area). the Air Farce
previausly ape rated an industrial waste treatment plant. This plant has been remaved and the
IS-inch line cannected ta it, which traversed the end af the runway, has been abandaned.
Alsa, near the sauthern project baundary is a 36-inch eftluent discharge line which is aperated
by the City af San Bernardina. The pipeline currently fallaws a caurse that runs alang
Central Avenue Palm Meadows-9tWe-and then transitians ta the north side afthe farmer galf
caurse area. At this paint, it cantinues in a nartheasterly directian beyand the farmer Base
baundary.
The primary City sewer line serving the Sp~_<;:.ifi<;_Plan area~f8:iec!--site is a 21- inch line lacated
just east af Lena Raad in an alignment with Harry Sheppard Baulevard. All sewerage flaws
fram the praject area are treated by the City af San Bernardina Wastewater Treatment Plant.
The IVDA and the City af San Bernardina have been negatiating the terms af a Sewer System
Transfer Agreement ta canvey the public partians afthe an-Base system ta the City af San
Bernardina. It is expected that the IVDA winlransfer the an-Base sewer system and the aff-
Base sewer line easements ta the City af..san Bernardina by 2006. As af the date af this
Specific Plan Amendment. the farmeLQ!l::.I3ase sewer system is naw awned by the City afSan
Bernardina. Under the agreement. the lYDA has the benefits afthe use af 1.000.000 gallans
per day af sewer capacity in the City's sewerage treatment facility. which was the amaunt
:jgJuir~mthe USAF fram the City af San Bernardina under priar agreemen15..hetwe~n the
USAF and the City.
II-8
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
C.2.3 Utilities
1. Electrical Service
The Specific Plan areaflroject site is currently provided electricity by a 33-kilovolt
(kv) feeder line operated by the Southern California Edison Company. This facility is
linked with an on~site substation where it is transformed down to 12 kv and 2.4 kv at
various substations. The 66~-kv and 33~-kv overhead transmission lines are located in
the Tippecanoe Avenue right-of-way. Southern California Edison has indicated that
new development will exceed the present electrical load capability of the former .6base
system. New service and service panels will generally be required, but Edison has
indicated that adequate capacity is available.
2. Gas Service
The Specific Plan areaformer Base is served by +hethe Southern California Gas
Company. Gas is delivered through a master meter to the on~site low~-pressure
system, which is owned and maintained by the IVDA. The Gas Company has lines
near most of the former Base areas. except along the river side. A 350-pounds-per-
square-inclL(psi) line extends up Tippecanoe Avenue. This line is a significant
component of the area distribution network. The 350~psi line is connected tosefVe6
fmm five major regional supply lines and, therefore, should be capable of providing
service even during periods of major disruption. As part of the construction of Harry
Sheppard Boulevard and Del Rosa Drive north to Third Street, new high pressure gas
lines were installed. These serve as the backbone for a new on~site high~pressure
distribution system that will be installed at user expense to serve new individual users.
New service will also indude separate meters which will be maintained by l'I'he Gas
Company.
3. Cable Service
Cable television service wais provided by Southland Cablevision. SoutWand
Cablevision has an AML Receiver Site south of Third and west of 100th Street (which
is located in the eastern portion of the former Base near Victoria Avenue). -That dish
providegs service to the former Base housing near Victoria Avenue and Third Street
and hags an additional trunk cable (overhead) which feeds the main area of the former
Base. This latter network consists of overhead cable with some segments connecting
to roofs and other miscellaneous structures.
~ StORm Line
The project site has a steam line-wllieh is used for space heating. Generally this
system has been abandetletJ-a.Hd replaced with modern space heating units whieh
11-9
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
IItilize either natllral gaB m electricity. The condition of the existing system is
IImmOVIIl at this time.
1.S. Storm Drains
The project siteSpecific Plan area is currently served by a number of integrated storm
drain systems. most of which ,have been significantly upgraded as a result of the new
street construction undertaken by the IVDA and the new industrial warehouse and
distribution center construction of the private properties sold to Hillwood pursuant to
the Master DDA. The system incllldes a variety of lines ';;hieh range iH size 1112 to 54
inches and is designee to handle a 10 year stmm. The former stmm drain system twas
reflective of the ~ street grid pattern on the interior of the large
development areas which have now been almost entirely replaced within the Specific
Plan area. Storm water flows currently drain west conceHtrating at a point near the
intersectioHthrough the Timber Creek channel, which has been improved by the City
of San Bernardino with funds provided by Hillwood pursuant to the Master DDA for
the pmtion east of Lena Road to Tippecanoe Avenue near the intersection with aOO
the extension of Harry Sheppard Boulevard. The southern section near the former
golf course and the easterly portion of the aAirport are not included in the storm drain
system but will be upgraded as new development occurs within these areas. Runoff
water from theseat area~ areis carried as surface flows and through individual storm
drains directly to the Santa Ana River.
D. HAZARDOUS WASTE REMEDIATION
The United States Air Force is responsible for the cleanup of hazardous contaminated areas resulting
from its activities at the former Norton Air Force Base~itc. The cleanup process whas-akeady.becl1
initiated by the Air Force in 1<J.8.9~and will continue for all properties prior to the time they are sold,
leased or developed. The burden of paying for this remediation will not be the responsibility oflocal
government or local taxpayers.
The cleanup process currently underway can be separated into two distinct program elements. The
firstcuffcffi program element of cleanup activity has been based upon previously completed
environmental studies, which identified the location of specific hazardous waste sites. Specific areas
fO)Jnd to contain cont<!mination that could pose a threat to human health. groundwater resources
and/or the environment have been investigated: evaluated for the need for remedy: and in some cases.
a removal or remediation a~lion has been implemented. Most of the waste sites have been cleaned up
through the removal OLllnderground storage tanks. the industrial waste treatment plant. the heating
llilline. the iet fuel stOl'~e.system<!nd a number oLwells. Groundwater pmDp-and treatment systems
have been installed to cl~anllpl!l~_ groundwat~.L~9nt;Lmina1iQ!lJ11um,-_and a soil vapm extraction
system used to cleanll12 .<:Qntaminated soils.. The former landfill site has also been capped and a
landfill gas cQlif<:tion and treatment system install~i
Clean up of the contaminated soils from theindustri;tJwaste treatment plant and lagoons was
completed in 2004.andc.;k_~n_l!l2-0f soils 1!.L.L~emaining sites was completed in 2005. The
11-10
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
contamination in the groundwater plume has been reduced significantly to below the maximum
contaminant levels. through the on-site treatment systems. A habitat management plan for special
status species is also being implemented. -This first element is eJWected towill terminate in the near
term. upon the successful remetliation of those-siteswith only the exception of monitoring activities at
the former landfill and groundwater contamination sites.
The second program element provides that no property will be sold, leased or developed until each
has been further assessed to determine if hazardous waste materials exist on a site by site basis. If
such an assessment concludes and/or finds the existence of such materials, the site must be remediated
prior to its sale, lease or development.
Removal of friable asbestos. lead-based paint and radium paint wastes in former Base buildings has
been completed. Thus. no exposure to these hazardous materials is present. Sale of the sites and
buildings that contain asbestos and lead-based paint would require the re-assessment of the potential
exposure to these hazardous materials and their abatement prior to reuse of the structures or the
demolition of the structures and disposal of hazardous wastes in accordance with established
regulations.
The timing of this process will be a function of the level of interest in redeveloping the Specific Plan
areaproject site by potential users.
11-11
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
III. PROJECT ISSUES, GOALS,
OBJECTIVES AND POLICIES
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
III. PROJECT ISSUES, GOALS, OBJECTIVES AND POLICIES
A. PROJECT ISSUES
The issues enumerated below are intended to identify the breadth and depth of the opportunities and
constraints reflected by the Specific Plan areasite. The following represent the most significant
project issues to which the goals, objectives and policies are addressed singly or in combination.
A.l Jobs
Norton Air Force Base previously represented over 10,000 jobs for San Bernardino and the
surrounding communities, which have been lost due to base closure.
Conversion of the Base to private use, and replacing and expanding upon the jobs lost due to
the closure of Norton Air Force Base are critical concerns.
The IVDA, as a redevelopment agency, has been empowered to undertake a variety of
activities to create new development opportunities. However, the goal of the IVDA is
directed towards job creation rather than strictly financial reinvestment.
A.2 Long-Tenn vs. Short-Tenn Uses
Most of the buildings on the former Base weare 40 to 50 years of age and dido not meet
current building code requirements.
I . In order to create new jobs quickly, it will..eelli necessary to use existing buildings and
facilities. The extent to which improvements must be undertaken and the length of time the
existing structures can remain viable are dependent in part upon the duration and financial
viability of the use.
I . Over time, it is expected that most of the existing buildings and structures will be replaced
with new development in full compliance with this Specific Plan.
A.3 Regional Access and Circulation
The Specific Plan areaproject site is not adjacent to or visible from Interstate 10 or Route 30.
The adjacent airport, however, is clearly visible from the Route 30 freeway. Marketing and
design efforts will need to overcome the project's lack of adjacency to an existing freeway
system.
I'
Major streets that previously terminated at the project boundary, due to ~base security needs,
have been opened up to allow the SQecific Plan areaj3ffljeclsi!e' JO become accessible to the
III-I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
A.4
'"
A.S
A.6
I "
surrounding community. Future development will necessitate coordinating the existing
internal street system with the adjacent public streets and circulation network.
Public Benefit Parcels/Uses
Portions of the Specific Plan areasite have been allocated directly to specified users by the
Department of Defense as public benefit uses.
These uses may utilize existing structures for a long-term period rather than redevelop the
property.
The law, which defines the authority for deeding portions of closed military installations to
public benefit users, stipulates that uses described by the applicant on the original proposal
must continue for thirty years on that parcel or the property reverts to Federal ownership.
Infrastructure
Improvements have been completed to a portion ofthe major internal project roads, including
the associated utilities and water facilities, but the remaining internal roadway network will be
inadequate for new development.
Existing utilities, water and sewer facilities must be upgraded to meet future demand.
The timing and extent to which additional major improvements are undertaken will be
dependent upon the location of new uses and their demand for services.
Development Compatibility and Quality
The Specific Plan areaproject site is contiguous to the San Bernardino International Airport
with overlapping identification, access and infrastructure requirements.
Development plans must consider the needs created by the transition of the site from a single
owner and operator, such as the Air Force and/or the IVDA, to multiple users ofthe site and
a variety of owners and operators.
Development plans along the perimeter of the Specific Plan areasite must be sensitive to and
compatible with the surrounding community.
Deteriorated conditions exist in the surrounding community, which reflects a low level of
investment and maintenance.
III-2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
B. SPECIFIC PLAN GOALS. OBJECTIVES AND POLICIES
These goals, objectives and policies establish the basis for the development and operation of the
Specific Plan area. The cornerstone of these goals, objectives and policies is a desire to establish and
develop a world-class business center that is sensitive to business needs and flexible enough to grow
and flourish during future economic business cycles. The goals, objectives and policies enumerated
herein are intended to further the interests of the agencies involved and ensure quality development.
As such, they are intended to serve as a framework for the development and use of the SBAFFC. It is
important, therefore, to understand the intent behind the use of the terms Goal, Objective, and Policy.
Goal:
This term reflects a general, overall, and ultimate purpose, aim, or end toward which
the Agency will direct its effort.
Objective:
A specific statement of a desired future condition toward which the Agency will
expend effort in the context of striving to achieve a broader goal. An objective should
be an achievable task.
Policy:
A specific statement of principle or of guiding action that implies clear commitment
but is not mandatory. It is a general direction that the Agency sets to follow in order
to meet its goals and objectives before undertaking an action plan.
The following goals, objectives and policies reflect the purposes, future conditions and directions for
actions to be generated through implementation of the SBACI+G Specific Plan. To the extent
possible, they also reflect a response to each of the issues previously described in this chapter, either
singly or in combination.
Goal!:
Replace lost jobs with new job generating uses and quality projects.
Objective 1.1 (See lssues 1 and 5)
Create job intensive opportunities to replace existing facilities and uses.
Policies
1.11 Design land use districts to accommodate a variety of employment generating
development.
1.12 Structure land use districts to permit the establishment of mutually reinforcing uses.
1.13 Provide for the incremental upgrading of infrastructure facilities necessary to support
new job intensive development as it occurs.
I11-3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Objective 1.2 (See Issues 1 and 2)
Accommodate short-term use of BaseeJfistiHg buildings and infrastructure.
Policies
1.21 Provide for interim uses within BaseexistiRg buildings.
1.22 Provide modified regulations which establish minimum improvement criteria for short-
term uses to ensure adequate health, safety, and welfare.
1.23 Provide for maximum utilization of existing infrastructure.
Goal 2: Integrate the Norton Air Force Base site back into the physical structure ofthe
community.
Objective 2.1 (See Issue 3)
Continue to open the site to regional and local traffic patterns.
Policies
2.11 Design and construct an internal circulation network capable of meeting the demands
of project related traffic.
2.12 Link the internal circulation system with the existing surrounding arterial streets and
freeways.
2.13 Defme the off-site circulation system needed to accommodate traffic generated by
development within thJ~ Specific Plan area this project.
Objective 2.2 (See Issues 4 and 6)
Ensure on-site development on the Specific Plan areaWDA and public benefit parcels that is
compatible with surrounding land uses.
Policy
2.21 Provide land use regulations which are sensitive to and compatible with existing
development.
Objective 2.3 (See Issues 1 and 6)
Create a high quality environment within the site that will stimulate reinvestment in the
surrounding community.
111-4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Policies
2.31 Provide for aesthetically pleasing and economically functional development through
the sensitive application of landscaping, signage, architectural standards and site
facilities.
2.32 Be sensitive to existing design features which are unique to the site and contribute to
its positive image, such as the mature oak trees.
Goal 3: Create a development plan which will have the effect of generating financial
reinvestment on-site and within the community.
Objective 3.1 (See Issues 1 and 6)
Incorporate sufficient development intensity on-site to encourage investment and fund needed
infrastructure.
Policy
3.11 Provide for a broad range of commercial, office, education, recreational, and
industrial uses and intensities within the plan, allowing sufficient flexibility of
interpretation to accommodate new uses not previously defined.
Objective 3.2 (See Issues 1 and 6)
Stimulate reinvestment within the immediately surrounding community. (See issues 1 and 6).
Policy
3.21 Use available redevelopment processes and programs to attract new businesses and
other reinvestment.
3.22 Use a combination of programs, such as tax increment financing, development fees,
grants, operational income, and other mechanisms to offset the cost of new develop-
ment, including the need to upgrade existing infrastructure and off-site circulation
improvements.
II1-5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
IV. SPECIFIC PLAN FRAMEWORK
I
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
IV. SPECIFIC PLAN FRAMEWORK
A. PURPOSE
The purpose of this section of the Specific Plan is to establish the overall concept or framework for
the Plan. This section is policy-oriented and, as such, has a degree of flexibility not contained in the
subsequent Chapter V.
B. APPROACH
B.l Concept
The concept of this Specific Plan reflects a series of considerations:
Use various design components of the former Basecxisting-site, such as the roadway
alignments, building types and landscaping features, as the physical framework for the
establishment of future land use and circulation patterns;
Allow for the utilization ofbase&JHsting facilities for interim and/or short-term uses to
provide an avenue for immediate reuse of the site;
Integrate the public benefit parcels established by the Department of Defense (000)
into a coherent pattern of uses;
Arrange land use patterns to maximize economic opportunities and circulation
efficiency as well as compatibility with surrounding uses and streamline regulatory
procedures for CEQA and project review;
Phase redevelopment consistent with infrastructure availability, and utilize various
financial mechanisms for maximum effectiveness;
Provide appropriate guidance to assure a high quality of development.
The 692.6W,g acres of land within this Specific Plan abut the San Bernardino International Airport
and have the benefit of a number of unique site features and facilities. The underlying basis for the
proposed land use and parcelization pattern contained in this Specific Plan is the historical land use
pattern, operations and street network. The proposed land use pattern has been influenced by uses
associated with the former Base operations. This concept is intended to provide the lVDA with
immediate opportunities for the reuse of many of the existing structures, while providing for new
development projects within the same areas. This concept will further the project objectives of
providing both immediate and long-term employment opportunities.
IV-l
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
The concept of providing a comprehensive plan for the integration ofland use and circulation, along
with a cohesive set of development and design standards, will establish the SBAHC as a significant
presence in the Inland Empire. The attraction of an international airport and enhanced access to the
regional circulation system will help ensure the project's successful long-term completion.
C. PUBLIC BENEFIT PARCELS
Prior to the closure of Norton Air Force Base, the Department of Defense (DaD) had to determine
how the following issues were to be handled.
How the property was to be divided into parcels for disposal.
What method would be used to dispose of the parcels to be conveyed, such as transfer to
another federal agency, public benefit conveyance or donation, negotiated sale to a public
body, or public sale.
What mitigation, if any, should be adopted covering the disposal and reuse of the property.
During this process, several agencies and non-profit organizations submitted applications for various
sites on the Base to the Department of Defense in order to provide certain specified services or
programs deemed to be of public benefit. The DaD, either directly or through other Federal
agencies, has conveyed the following parcels as Public Benefit land within the boundaries of the
Specific Plan. (See Exhibit IV - I).
C.t
C.2
C.3
&C.4
I C.s
A 6A-acre parcel has been conveyed to Lorna Linda University. The DaD found the
property was suited for immediate and long-term use due to its prior use as a medical facility.
The DaD further found that a medical facility, which offers a broad spectrum of low-cost
primary care services, would improve student training and provide needed low-cost clinical
services.
A 7 A-acre parcel has been conveyed to the City of San Bernardino Department of Parks and
Recreation. The property was the site of former recreational facilities, some of which still
exist, including the Galaxy Service Club, gymnasium, swimming pool, six tennis courts and a
running track.
Two parcels, 1.8 acres each, have been conveyed to the Grace Apostolic Church to assist the
homeless. These sites previously accommodated an on-base chapel, youth center and offices.
These facilities will provide services to assist the homeless, however no on-site housing is
proposed.
A 3.7-acre parcel ul'ea.has been conveyed to the San Bernardino Community College District.
The DaD found the proposed use enhances the educational resources of the community and
is compatible with other proposed uses on the former Base.
IV-2
-------------------
~ '"'0 t?J
~ >c::
'" c:r ::r:: LENA RD.
I ........ ........
....... ttl
(") ........ ;1 ~ .
>-:3
ttl , ,
0 ('I) '<
~ :::s
('I) I a::: ~ :11
...... ......
....... ...... l!
i ...... t""'
t""'
'"'0 ,
Q) en !l Cb '
""1 >-3 0';0
(")
('I) (J ::tl "
........ I:<j ~ ,
en
Z :1 :I~l!
>-3 to ^ 1;
::tl ' , ,
> -.. ~.. ....
t""'
~ TIPPECANOE
<:
I:<j
c::J
, I t.:>
.' ::tl
tj
I en
>-3
I ::tl
I:<j
I:<j
>-3
z
0 'tl
-l
~ -.I Ol ell '" '" II) .. ~
Ei' ;? n
t'l
~ t'"
> =
'tl l>- tIl-l <Il <Il ~ ~ 'tl t'" c:
'tl l>-
g ::;: ~= ~ ~ ~ ~ a 0 <Il
~ t'l
l>- ~, <Il n n t: :ll
M' g ~ ~ ~ tIl t'l t'l
= t'l n ~
.. - ~ ?U ?U ~
g it ill bl t'l ~ 0 0 0
>
n t'" t'" ~ <Il ~
l>- 0 -l ~
.. 8 t'l:ll ~ i 0 0 0 p
t: t:
::r = ~ ~ ~ 0 n n :ll
~ .. n ill
~, n n :ll
tIl 0 :ll 0 :I: :I: n <Il
o :l n_ i ~
S'E. II t'l lii lii [:J ~
l>- ~ c: n n ~
= = ~ :I: :I:
~ m ...
'< = 0
0'< Z
<Il ~ tile> n 'tl
~ ~ 0
>0 ~ lii
'" ~ ~~ 'tl
'< .. c;l 0
o 0 -l;:j t'l <Il
:l .. 00 t'l
::r 0 <Il
~6 ...
e ftl <Il
'" ~ ~
'" ~~
~. g ~
.. ~
::rl>- >c:
.. m
::r 0 <Il Z
"l
'" .. <Il ~CID
:-'l>- > ,
< '"
. n ... n n 'i! j!
o ~. '" -.I '" .. ... -.I Ol :ll ~
. m
> ~, ;" ;" :." Co Co ;,. ;,. ~
. 0
:l
t'l ~
PALM AVE
ROSA DR.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
C.6 A 4.9-acre parcel eastl3etwe-.illefl Tippecanoe Avenue ane Memorial Drive was initially
transferred to the U.S. Forest Service (USFS). However, federal legislation has been recently
enacted by Congress to provide for the transfer of this site back to the IVDA, together with
the USFS moving to another location olltsieewithin the Specific Plan boundaries.
C.7 A 15.64-acre parcel along Perinaeter Road is currently in the process of being transferred to
the San Manuel Indian Tribe as Public Benefit land and an additional parcel of approxinaately
30 acres was transferred from the Air Force to the IVDA and then to the San Manuel Indian
Tribe as part of the EDC. Another 2.26-acre parcel north of Harry Sheppard Boulevard and
west of Del Rosa Drive is also pending transfer to the San Manuel Indian Tribe.
The use of these parcels shall be restricted to the types of uses described above and as stipulated in
the Department of Defense (DOD) Record of Decision (ROD). Use of any existing structures shall
be consistent with the General Standards specified in Chapter V, SectionCI9.30.030 ofthis Specific
Plan. Copies of the Records of Decision are provided in Appendix A. A detailed survey of the
boundaries of these parcels has been prepared and is on file with the IVDA and the City of San
Bernardino Planning Department.
D. lAND USE
The land use element of the Specific Plan is intended to build upon the land use patterns previously
established and facilitate the orderly transition of the site to non-military use, accommodating new
construction when appropriate and utilizing existing building types and related uses as long as
possible in a compatible manner.
The overall Specific Plan areal*{)je€t~ite has been identified with sixtMt*_distinct land use districts,
including the Northgate. Westgate. Centergate. Southgate. Third Street and DFAS Districtsrescarch
_cl-eevem~ment,tfaclepurlcandiJK!ustfiaJ. Each land use district responds to a unique set of needs,
opportunities and constraints offered by the existing setting and conditions.
The land use districts represent broad policy groupings of common land uses combined with several
unique aspects that require a focus at a more detailed scale. Thus, the discussion of each district
includes a block by block set of land use planning guidelines that will serve as the basis for the land
use controls and opportunities.
These land use districts are illustrated in Exhibit IV-2 and summarized in ba-n8--blre- Table IV-I. As
shown, the Specific Plan proposes an ultinaate buildout ofnearly+2,-I-8approxinaately 14.15 million
square feet of building floor area. This represents an increase of approxinaately 10.338,68 million
square feet over the previous building floor area in this section of the Base. The land use districts are
further defmed in Chapter V.
IV-4
-
-
-
en L' t':l
~ PJ :x:
co ::J
"" ~
t:l 0- I---<
~ to
51 c:: I---<
0 t-3
~ UJ
(1) I---<
<:
i t:) I
....... [\)
UJ
c-+
'1
~ .......
()
c-+
-
11.111"'"
.~_ 1:1:
,~ III,
.i:. :':1:1
.<;:) I:':
"( :.:1:
~ ' + I : I : I
o
"'J
>
UJ
.,
:r:
~
o
UJ
.,
:.l
t<J
t<J
.,
UJ
o
c:
.,
:r:
Q
>
.,
t<J
1-
()
t<J
Z
.,
t<J
:.l
Q
~
t<J
z
o
:.l
.,
:r:
Q
>
.,
t<J
~
UJ
.,
Q
>
.,
t<J
-
~
t<J
>
o
~
UJ
...,
:.l
~
()
...,
z
~
t<J
-
-
L'
M
Q
t:I:J
Z
t:j
-
~
~
-
-
-
-
-
-
-
-
-
-
-
LENA RD.
~
I
:':':':1:':;:1:;:;:;;;:':::::::1
l',','rl,I,',IIII',I(II"'I'I'I'
1:,:,:1:::1:':1:,:,:,:1:1:1:1:1:
:':':':'1::':':':':':1:':':':':'
': I :': I: 1,::':1:1 :,":,:1:' :J~I: I:
:'1':':1:,1 I I I I ILl I I It:,:,;,:
I' "II I' I' II"'" 1'1 'I ~ f 'II ',',' I' ',',' I
,'(',',','1,',',1,1""11,':',',',':',',',
1""'1','1,','(1,1,',',',',',',','1,',',
" ,I,' II,' ,~ I : " " ' I
,',',1,',',',',', ,,'.',1'1"""",',1,',
""""""""" ,',','11',',','1',',',
,','11,',','.','.,'1',',',11',',','1',',',
,','t',',',','r',',lll)',','I')',','I',',l,
':I:r:I:"JtltjI"'r!lll:'iWi"I",:,
',11111"'11,1"'11""'1""'11,",'
',II',',' ..1 I' I,'
1,11',I,III,',II',.I,'llj'1t,lr'Jl',I,t,';I'
"II',I",II',r,rrl",I,T"II,lj-"'II."l,'
: ' : I : ' :' : ' : I : . : ' ' . I l ~ I I , ,.,:':' ;'.' :
"I'llr~"I"'I' ',1,1) ',ll'll, ',' 11',.I;i11
,'11111',',',',' 1,'.'IJI,'(',III,' rl'll~1
,'III','l','II,',",',111f','t I,' 111,'tl,
,',IJ',I"IIJI,'I,',I,J,',':I:"I'II,',I',
"III'I','lllt,'I,I,lIJf,'II,',IIII)',11
"111"'1'1',1,' , 1111'1'.1,
"II"""I'JI,',''i',I,','~\II'''I''(llj ,
'I1PPECANOB: AVE
z
:([)
n 51
~
DR.
"
~
~
"
~
I~
JI
--
PALM AVE~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE IV-!
SAN BERNARDINO INTER."I/ATIONAL TR.\DE CENTERALLIANCE*CALIFORNIA
SPECIFIC PLAN
LAND USE SUMMARY
Distriet
District Name NumbeFGeneral FAR Acreage Bldg. S.F.
Location
NorthQateReoearch & West of Del Rosal 0.51 109.6 2,225,916
East of Del Rosa 0.5 29.2 635.976
I "Ha<le-P-ar-kWestpate ;; 0.5 152.8 3,327,984
CcntergatelmlllstFial Sa 0.5 154.9 3,373,286
56 ~ ~ 1,262,012
50 005 .Jti} 271,128
56 005 ~ 1,080,288
50 005 ~ 635,9'16
Southgate North of Central 0.5' 128.4 2.797 .292
South of Central 0.52 23.1 502.465
Third Street 0.5 49.6 1.080.288
DFAS 0.5 9.63ihlc~ 209.0886;6~
Subletap.
I !,,,j)lic !i,,-~Parcels --
-
i~9W
I TOTAL 657.2~) 14.152.295~,'rnl
1 The FAR of 0.5 does not apply to the 7.4:acre parcel deeded to the City for recreation purposes.
2 The FAR of individual developments within Southgate may be as much as 0.58. as long as the combined FAR of all
developments does nO..L~~~~ed 0.50.
32 Excludes arterial streets. which cover approximately 35.4 acres.
S_~.I!seral new developments have been built within the Specific Plan area since Jhe closure of till:
Norton Air Force Base. These new developments include MatteI. Kohl's, Pep Boys, Stater Broth~
and other proiects, mQst of which have building floor areas less than the maximum allowable
<:Ievelopment in TabkJV -1 above. Table IV -2 provides the floor area of new construction within the
Spe.:;jflc;:_Plilll area by districl,
TABLE IV-2
NEW CONSTRUCTION
District Name
Development Name
Floor Area (sO
Difference in ExistinQ Floor
Area with Maximum
Allowable Development
44.043 sf
71 230 sf
30.746 sf
Site Area (acre)
~l>J"1b.@~
MatteI
Community College
Mati~h
1.205,040
~0.70olMJA1J
10.200
57.35
4.68
1.88
IV-6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DilTerence in Existim! Floor
District Name Develooment Name Floor Area (sO Site Area (acre) Area with Maximum
Allowable Develooment
I West~ate Kohl's 651.880 60.25 660.365 sf
Pen Bov< 600.240 52.30 538.854 sf
I DFAS Building 1 70.851 9.60 51.625 sf
Buildino 2 86.612
Centemate Stater Brothers 2.087.300 154.90 1.264.486 sf
Credit Union 21.500
Southoate --
Third Street --
II
4.662.403
339.60
2.661.349 sf
TOTAL
E. CIRCULATION
When the Norton Air Force Base was operational, public vehicular access through the facility was
restricted for security purposes. Major thoroughfares leading up to the facility, such as Tippecanoe
Avenue, Del Rosa Drive and Mill Street were precluded from providing a greater role in facilitating
area-wide and regional circulation.
After military security was no longer required, these roadways were opened up, and now form the
foundation for the future circulation network. This system will compliment the proposed land uses
and link the site to the surrounding roadway network. The IVDA has completed construction of
major improvements to the following roads: Tippecanoe Avenue between Mill Street and Third
Street; Harry Sheppard Boulevard between Tippecanoe Avenue and Leland Norton Way; Mill Street
from Lena Road to Tippecanoe Avenue, Third Street from Tippecanoe Avenue to Del Rosa Drive,
and Del Rosa Drive between Third Street and Harry Sheppard Boulevard. These streets will serve as
the primary backbone circulation system for the Specific Plan area, while simultaneously linking the
site to the existing external circulation network. Additionally, recommendations have been included
in the Specific Pj3lan for upgrading the regional circulation network to meet projected needs.
The premise of the proposed circulation system is to recognize both the existing street improvements
and the need to integrate the external circulation system into the Plan. The City of San Bernardino
General Plan Circulation Element contains a listing of the master-planned streets. The City of
Highland General Plan Circulation Element is also involved since Third Street passes through both
jurisdictions. An amendment to the City of San Bernardino General Plan Circulation Element
adopted concurrently with this Specific Plan integrates the SBAFFC into the local and regional street
network.
The Circulation System is defined in Section V.E.
IV-?
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
F. PUBLIC SERVICES AND INFRASTRUCTURE
An element of the S.specific l'l"lan process is to evaluate the existing public services to ensure that
adequate provisions have been made to accommodate the needs of the project. The following section
reviews the required public services and facilities and illustrates how they are addressed.
F.l Public Services
The City of San Bernardino is a full-service municipality providing all required public services to lands
within its boundaries. With the transition from federal to private ownership, it will be necessary for
the City to provide those services to the project area as well. Each of those services and the
anticipated response is described separately below.
F.1.1 Police Services
As-Rotcd in Chapter II, Existing Setting, most of the former base that is covered by this
~specific l'plan is in a maintcrmnce mode. These portions of the Specific Planprejeet area
that have been transferred to the IVDA, as well as the public benefit and private sale parcels,
are subject to the jurisdiction ofthe City Police Department. In addition. the IVDA operates
a security force for the Airport and other IVDA and SBIAA properties. The security force is
under the supervision of a full-time City Police Sergeant. As reuse and redevelopment
continues, all patrols and calls for service or response will be through the main police station
located at Seventh and "D" Street in Daowntown San Bernardino. "Hlese-flefHens-of+he
pre:ieeHiite that teml*'filfily-rema-in-ltlliler-Department-of-gefense-jufistlietion, such as the on
basef}#it;cr housing, will be subject to military police jurisdiction unt-il--s-1t€fl-time..as a transfer
lB--nOfl-military ownership occurs.
F.1.2 Fire Protection
Similar to police services, fire protection services arewill--lle- _provided by the City of San
Bernardino Fire Department for the entire Specific Plan area al}projcct areas-that have been
transferred to the IVDA or conveyed to other ownership. as well as the Airport area of the
former Base. The Airport Authority recently renovated the Fire Station located at 165 South
Leland Norton Way for aircraft rescue and [lIefighting (ARFF) operations. This stationH is
now under lease to the San Bernardino City Fire Department and it will continue to be a City-
manned facility. This station will be the primary fire station to serve the ARFF requirements
of the airport,lVD,^. and immediat-e-s-urrounding properties.
The other fire station serving the structural [lIe requirements of the Specific Pillnpmjeet area
andJ.b.<<.AiII2QXtwill beis the main fire sMien-station- Station #1 located at 200 East Third
Street, just west of Waterman Avenue. Other [lIe stations that may respond to the project
area are identified as follows:
Station #11,450 Vanderbilt Way
Station #10,502 South Arrowhead Avenue
IV.8
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Station #6,1920 Del Rosa Avenue
The responding back-up station will be determined by the location of the call from within the
Specific Planproject area.
F.l.3 Solid Waste
The City will provide trash pick-up service for all parcels and tenants within the project area.
Each will be billed separately by the City for the service. The City rates cover the cost ofthe
pick-up service, as well as disposal at a County-owned landfill site.
Waste from the project area will be disposed of primarily at the San Timoteo UandfilL located
south of Redlands. Other landfills available include the Colton l,landfill and the Mid-Valley
l,landfill. The San Timoteo and Mid-Valley Uandfills are being proposed for expansion to
accommodate additional growth and development in the Valley.
F.2 Utilities
Utilities within the project area were historically provided through on-site systems which were
privately owned by the Department of Defense. The public utilities will be upgraded and converted
over to ownership, operation and maintenance by the IVDA or the appropriate public utility. Each
utility system is described separately below.
F.2.1 Electricitv
The existing electricillity distribution and service system has been transferred to SCE~SCE
provides electricillity service with the existing system. However, Southern California Edison
planners believe the new electrical load required by the proposed uses permitted by the
Sspecific I'plan will far exceed the previous electrical load of the former .Bbase.
For many structures, the existing load consisted primarily of lighting. As the use of the
structures change and new buildings are built, additional load will be imposed by motors, air
conditioning and expanded lighting systems. Based on this, it is anticipated that new service
to the building~ and new service panels will generally be required.
As part of the installation of the new roadway improvements along Tippecanoe Avenue,
Harry Sheppard Boulevard and Del Rosa Drive, the IVDA installed new underground
electrical trunk lines and vaults which will be owned and operated by Southern California
Edison. As new service loads and/or new construction occurs within the project area, service
will need to be extended from this trunk system at the users' expense. For those locations
where service from the trunk system is not feasible, users will be required to work directly
with Southern California Edison to arrange for the required service extension. SCE's Rules
and Rates will apply to all newly installed equipment.
lV-9
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
F.2.2 Natural Gas
The existing natural gas distribution system wasis curreHtly transferred toowned by the IVDA.
For the short term during which reuse of existing buildings with similar uses occureds, the
IVDA .,vill continue to provided natural gas with the existing system. However, there weare
limitations on that system since gas had to IffiISt-be delivered at very low pressure.
As part of the installation of new roads described above, the IVDA installed a new high
pressure gas distribution line tied directly into Hhe Southern California Gas Company's
regional distribution line that is located within Tippecanoe Avenue. This new line will service
all new users and construction as needed. Connections to this backbone natural gas
distribution system will be accomplished by each new user in coordination with l'fhe Gas
Company.
F.2.3 TeleDhone
An entirely new telephone/telecommunications distribution network will be developed on-site.
VerizonGeneral TelephoHe_-has indicated that it will be able to provide service to the Specific
Plan areasite. Each new user will haveJQ..work directly with VerizonG+E-Jor new service
installation.
F.2.4 Cable Television
A specific cable franchise provider for the Specific Plan areapreje€t--site has not been
established. SoutWand Cable previously provided service to the Base buildings within the
project boundaries previous1y. The City of San Bernardino will be required to approve a
!franchise for the future cable service provide~[MJA2] at such time as service is deemed
desirable.
Table IV -:1~ summarizes these service providers.
TABLE IV-,l;!
CITY OF SAN BERNARDINO SERVICES AND PROVIDERS
Type of Service Service Provider
Fire (includes fire suppression and medical response) City Fire Department
Police City Police Department
Administration City of San Bernardino
Mayor
City Administrator
Planning and Building Services
Public Works City of San Bernardino
Refuse pick-up and disposal
lV-IO
I
I
ypeo ervlce ervlce rovl er
I Street maintenance
Parks and Recreation SelVices
I Water/Sewer
Water IVDA*
Sewer collection IVDA*
Sewer treatment City of San Bernardino
I I Telephone CeReral TelephoRe (CTE)Verizon
I Cable Television Dependent upon award of franchise by City of San
Bernardino.
Electricity Southern California Edison Company
I I Natural Gas Southern California The-Gas Company
I Note: * to be converted to the City of San of San Bernardino
F.3 Public Facilities
I Water, wastewater and drainage facilities are in place. These were installed, owned and operated by
I the former Hbase and are now under the jurisdiction of the IVDA. The facilities in place were
I designed to satisfy the needs and conditions of the military installation. Various improvements and
upgrades wereilJ-lJe necessary as the project areais-converted to private uses. As indicated
previously, this reuse process will-occurred in three forms: (1) interim use of existing on-site Base
I buildings with uses similar to those previously occupying the same space, (2) reuse of Baseffisting
buildings with new uses requiring upgrades of existing utilities and infrastructure as determined
necessary. and (3) demolition of Base buildings and construction of new buildings requiring new
I utilities and infrastructure. In almost all instances, where the installation of new utilities and
I infrastructure is required, construction of such infrastructure will be the responsibility of the user of
the new development within the Specific Plan area. prejeet-site in coordination with the IVDA.
I With regard to specific issues regarding water, wastewater and drainage systems, an analysis of future
I system needs was prepared by ASL Consulting Engineers and arepor+entiliedthe-YtHi+y-Maste-1'
,uIaN-was--issuedin-fflncin, 1993. Th~at report provided technical background for the Master Plan
Reuse Study prepared by Johnson, Fain and Pereira Associates for the IVDA. Those studies served
I as the basis for the preparation of this Sspecific !:,plan, which itself is a further refinement of those
concepts. Subsequent amendments to the Specific Plan and new deve\QJ:lments have occurred to
further refme the infrastructure needs of the area. The primary difference between the previous
I Master Plan and this Sspecific !:'plan is the Plan boundari~~_and the allow_able intensity of development
aoo-t-he-potential ftttllre-reBSe-eJ-!fle-.gelf course area.
I In their report, ASL acknowledged that the land use plan upon which the analysis was accomplished
was an evolving process. They indicated that for the purposes oftheir study, a change to the mix of
uses (which were office/commerciaVindustrial) would not be considered significant unless high density
I IV-II
I
T
fS
S . p .ct
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
residential (greater than 15 dwelling units per acre) were to be developed on the site. Thus, while the
Sspecific I'plan and the Mmaster I'plan differ in respect to details, the basic use assumptions remained
constant and the ASL recommendations are directly transferable. Subsequent studies of the utility and
infrastructure systems needed to serve new developments have also identified the necessary upgrades
to existing utilities.
F.3.1 Water SUDDlv
The lVDA initiallywill continue to owned, operateg and maintained the on-site water system
for the project area for the foreseeable future. As noted previously, the system includes
several wells of varying production capability, three storage tanks and a distribution system.
The distribution system was upgraded by the IVDA with the installation of the 20:inch
backbone water mains in Tippecanoe Avenue, Harry Sheppard Boulevard and Del Rosa
Drive. An extension of the 20-inch line on Third Street to interconnect with the east water
tank and distribution system also was completed. The water system of the San Bernardino
Municipal Water Department in the proiect area includellas a 20-inch line on Tippecanoe
Avenue. I2-inch lines on Mill Street. Central Avenue. Leland Norton Way. and Lena Road.
and a 16-inch line along Timber Creek. A new 20" water line was also installed along the
southern property line of the Stater Bros. Markets project and extending northerly in the
reconstructed Leland Norton Way...(See Exhibit IV-3J
The IVDA has recently entered into a water system integration agreement with the City of
San Bernardino Municipal Water Department to proceefi.wiHlfor the integration ofthe IVDA
water system within the former Base area with the City system within an IS-month period.
Water lines are proposed from the'Hpre€flfloo-Avenue nor#leasterly-{ line running along the
southern boundary of the Centergate DistrictSubarea 3.5a) across the end of the Airport
runways toward the Southgate areato Leland-Nftfl-efl-Way and nort-l1erlY-Gn-belaflll-NBrlml
Way--fe Harry--S-I1epparEl-Beulevaffi;- a~; v.ell-as-a-water-~ine.e~JeHffiHg-wtHfl--anfr. ro u ghly
parallel to Tippecanoe Avenue, to provide water service to futurethe industrial development~
to be undertaken within the fOflner golf course area.
With regard to storage capacity, there are no plans to increase water storage on-site,
however, an emergency interconnect with the City of San Bernardino water system at Third
Street and Tippecanoe Avenue has been provided as back-up supply in emergency conditions
when and if necessary, as part of thc.penffingfull integration with the City of San Bernardino
water system. However, a component of the IVDA agreement for the integration of the
water system with that of the City of San Bernardino includes the acquisition of 1.2 million
gallons of additional off-site water reservoir storage capacity.
Extensions of new water lines and/or replacements of existing water lines will be
accomplished on an incremental basis subject to demand. Any further improvements to the
water system beyond that already described will be the responsibility of individual users.
IV-12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I--~-------- -~-
I
I
I
... ......
.
.
i
.
~
"
:D~r D I
I,D' ,
lJ L
---1=
~J .~a.:
~ r-. -
l" i
... """"
I
I -'
.
-.
G~O
:0
DO~
RW:r'O ...:ft, ~
, .
'I
I l:J il'
I ,_ _0
- '
'If
10
'!
YILL~CiJ,'
!~ c:::::;:;J"", ____ _roo
~
w
I //
CDn1l.U.J.1'Ji.
~
g
.......
---.-'--- -
~~,.~'"
LEGEND
SEWER
SEWER PROPOSED
WATER
WATER PROPOSED
.'
EXHIBIT IV ~ 3
Water & Sewer Systems
g
NO SC/\l.F.
SAN BERNARDINO ALLIANC~AUFORNIA
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
F.3.2 Wastewater
The existing wastewater collection system of the Base wasill--be retained for use in the
Specific Planproject area and within the Airport. Repairs, replacements or relocations of the
existmg lines will be accomplished on a case-by-case basis, as new construction occurs within
the Specific Plan area andprojeet. The .^.SL report indicated that t?tO additional sewefage
lines would be provided as needed.reflllired to serve new developments within the Specific
Planproject area_, and the Airport. These include a 15 inch relief sewer west of Tippecanoe
j\venue aligned with an exteBsien efHarry Sheppard Boulevard. /\ seeond faeility involves a
10 to 12-inch line in Central Avenue extending east from Tippecanoe Avenue extending
between Mill Street and Harry Sheppard Boulevard.
The IVDA previously entered into a Master Services Agreement with the City of San
Bernardino for which the existing system in place had beenwill-be inspected, c1eaned-Bffi and
repaired as required to maintain it in an acceptable working condition. The transfer of the
former NAFB sewer system occurred on December 2005 by the delivery from the USAF to
the IVDA of a Bill of Sale for the entire on-base system and a quitclaim deed for all off-base
sewer line easements. The IVDA and the City of San Bernardino have been negotiating the
terms of a Sewer System Transfer Agreement to convey the public portions of the on-base
system to the City of San Bernardino. It is expected that the IVDA will transfer the on-base
sewer...~stem.JjlJ.9-1!Je off-base sewer line easements to the City of San Bernardino in 2006.
Wastewater from the site will continue to be transported to the City of San Bernardino
wastewater treatment facility via a sewer transmission line that was installed under a 1994
agreement between the City of San Bernardino and the US.AF. Such agreement has expired
as of 1994. after which time the IVDA had control over the sewer system under a license
agreement with the USAF. It is anticipated that the City of San Bernardino will be able to
accommodate this-new demand for sewage treatment as part of its on-going expansion
program, which is funded through a city-wide ~t:WeI. treat!lJent-IllimLcapacity-acquis-it.ien fee
program. An existing arrangegfeement between the IVDA and City provides that up to one
million gallons per day (1 mgd) of wastewater can be accepted at the treatment plant from the
former NAFl;!lmse (which includes the Aairport). At such time as development withinen the
Specific Plan areaproject-sile and the Aairport result in flows of 1 mgd, the IVDA and the
SBIAA will havet-e-begin required to paying sewer treatment plant capacity fees on a per
connection basis for additional treatment plant capacity. The Sewer System Transfer
Agreement. as noted above. addresses the J!\li!i!;l\J!]i\y_QfJ!leJ,!lJ.gd.cjjl1acity!:2t:_ing.re~-''-fveQ
for the former NAFB properties.
F.3.3 Drainal.!e
The existing storm drain system within the former ~base is focused in the western portion of
the overall site. with runoff flows going into Timber Creek. AIt-is illustrated jen Exhibit IV-4
wbi€lris taken from the I\SL report. .^.s.is--eleaHrem-the-e~dtibit, the storm drain system also
grvesindudes .the existing hangar and operations area of the Aairport. The eastern two-
IV-14
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
thirds of the former .!;!base and the Southgate District (former golf course area and adjacent
lands) are served by a smaller storm drain system that flows directly into the adjacent Santa
Ana River. The existing system was designed to serve the presemlevel of development on
the former Base and the related amount of impervious surface.
As part of the Specific Plan development. The ASL report evalllated the existing system was
evaluated and determined that additional on-site development would result in a need for
additional storm drain capacity. Required improvements described as follows are based on a
design of a lO-year storm frequency:
1. Approximately 1,550 feet of 48W:-inch reinforced concretelt&. pipe (RCP)
and 2,150 feet of 543-9:-inch RCPR.C. pipe is required along Harry Sheppard
Boulevard and has been constructed.
2. A 4-foot by 4-foot storm drain box'l;-700-feet-&f-a 1a54 inch R.C.I-' pipe-will
be..is required along Tippecanoe Avenue just south of Harry Sheppard
Boulevard and has been constructed.
3. A 36-inch line on Del Rosa Drive and a 24-inch line on Leland Norton Way
have been constructed.
4. A new storm drain line would be needed to connect the existing storm drain
line on Tippecanoe Avenue with the line on Leland Norton Way. running
along the southern boundary of the Center gate District.
5.". Additional piping in various locations is required for connections to catch
basins and detention basins at scattered locations are needed for stormwater
quality protection and runoff volume and velocity reduction.
IV-IS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
i
5
.
--
I
~;"'...... I
~
~/
f . [j
""""'."!IT; "- 0 ~mw
1< -
~
- c::l
1] .
o
iRUJO}-
~ 'L. I
~~t>
STORM DRAIN
I PROPOSED RETENTION POND
PROPOSED STORM DRAIN
I lOO-YEAR FLOOD PUUN
~
EXHIBIT IV-4
Storm Drainage
Q
~o SCALE
SAN BERNARDINO AIlJANC~ALIFORNIA
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
The storm drain analysis also required ASL report recommended that Timber Creek be
upgraded. The creek is a natural outflow that runs westerly from Tippecanoe Avenue along
the north edge of the WestgateLland lJHse Ddistrict~. The City of San Bernardino Public
Works Department has completed improvements to Timber Creek from the origin of the
creek at Harry Sheppard Boulevard to the Warm Creek Flood Control Channel, located
approximately 2,000 feet to the west in order to adequately carry runoff from a 25~-year
storm. Construction of the Timber Creek channel was originally proposed to be integrated
into the previously proposed World Trade Center project. Since the World Trade Center is
no longer proposed for development, the IVDA and SBIAA IHwe-worked with the City of
San Bernardino to install a channel that conforms with the Master Plan of Drainage for
Timber Creek. As development and changes in the drainage basin affecting Timber Creek
occur, the need for changes and modifications will be evaluated cooperatively with the City
and County.
A separate drainage study will be required for the area along the Third Street District, located
between Victoria and Central Avenues, and the existing Southgate District (former golf
course area south of the San Bernardino International Airport), at such time as redevelopment
or new construction is planned for those areas. Th!efrt drainage studiesy, to be prepared by the
project proponent, will have to address the disposition of the runoff generated by the
proposed development~. In the interim, existing drainage swales, pipes and culverts shall be
maintained to protect and provide for existing improvements.
F,3.4 Santa Ana River Floodulain Area
Along the south side of the project area, a portion of the former existing golf course was
previously located within the lOa-year floodplain are a._ However, the area of the former golf
course is no longer within fflefieEHlplailHlfls-enly Subarea 3€,-klcated south of Palm
MeuElews-9rivc, remain&-within--the lOa-year floodplain. The floodplain area has been
defmed based on input from San Bernardino County Flood Control District and assuming that
the Seven Oaks Dam is completed. This area is identified on Exhibit IV -4. No flood control
improvements along the Santa Ana River are proposed or anticipated beyond that which has
already occurred. Detailed project design for specific projects will prohibit construction
within the lOa-year floodplain.
IV-I?
I
! I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
V. SPECIFIC PLAN REGULATIONS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
V. SPECIFIC PLAN REGULATIONS
A. BASIC PROVISIONS
A.I Consistency with Specific Plan and General Plan
All land or structures shall be used and constructed in accordance with the regulations and
requirements ofthis Specific Plan, including obtaining applicable permits prior to use initiation. The
provisions contained within this Specific Plan shall be consistent with the provisions contained in the
City of San Bernardino General Plan.
A.2 ConDicting Permits and Licenses to be Voided
All permits or licenses shall be issued in conformance with the provisions of this Specific Plan. Any
permit or license subsequently issued and in conflict with this Specific Plan shall be null and void.
A.3 Similar Uses Permitted
When a use is not specifically listed in this Specific Plan, it shall be understood that the use may be
permitted if it is determined by the City of San Bernardino Development Services Director that the
use is similar to other uses listed.
It is further recognized that every conceivable use cannot be identified in this Specific Plan, and
anticipating that new uses will evolve over time, this Section establishes the Director's authority to
compare a proposed use and measure it against those listed in this Specific Plan for determining
similarity.
In determining "similarity", the Director shall make all of the following findings:
The proposed use shall meet the intent of, and be consistent with the goals, objectives
and policies of the San Befl)!!LQm<LGeneral Plan;
The proposed use shall meet the stated purpose and general intent of the district in
which the use is proposed to be located;
The proposed use shall not adversely impact the public health, safety and general
welfare of the City's residents; and
The proposed use shall share characteristics common with, and not be of greater
intensity, density or generate more environmental impact, than those uses listed in the
land use district in which it is to be located.
V-I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
AA Conflict with Other Regulations
Where conflicts occur between the provisions of this Specific Plan and the City Building and Fire
codes, or other regulations of the City, the more restrictive shall apply.
It is not intended that the Specific Plan shall interfere with, repeal, abrogate or annul any easement,
covenant, or other agreement in effect at the time of adoption. Where this Specific Plan imposes a
greater restriction upon the use of structures or land, the provisions of this Specific Plan shall apply.
Nothing contained in this Specific Plan shall be deemed to repeal or amend any regulation ofthe City
requiring a permit or license or both. Nor shall anything in this Specific Plan be deemed to repeal or
amend the Uniform Building and Fire Codes as adopted by the City.
A.S Language
In interpreting this Specific Plan, it is understood that the term "shall" is mandatory, "should" is not
mandatory, and "may" is permissive.
A.6 Severability
If any chapter, section, subsection, sentence, clause, or phrase of this Specific Plan is, for any reason,
held to be invalid or unconstitutional, such decision shall not affect the validity of the remaining
portions of this Specific Plan. The Council hereby declares that it would have adopted this Specific
Plan and each chapter, section, subsection, sentence, clause, or phrase thereof irrespective ofthe fact
that anyone or more portions of this Specific Plan might be declared invalid.
A.7 Use of City Development Code
The purpose of this Specific Plan is to contain the criteria necessary for the development of the
SBAHC. Should this Specific Plan not contain all the elements necessary for the implementation of
this Plan, then the provisions of the City of San Bernardino Development Code shall apply, including
the defmitions included in Section 19.02.050 of the Development Code.
A.S Application of Document
The Specific Plan contains specific measurable standards and shall be considered a regulatory
document, as opposed to a policy document. The contents of this C€hapter are binding, except as
may be modified using the applicable formal procedures contained within this Specific Plan. In the
application of this Chapter, additional policy and intent language as contained in other chapters ofthe
Specific Plan shall be considered. In any event, any proposal to amend the Specific Plan must be
consistent with the overall goals and policies.
V-2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
B. PURPOSE OF SPECIFIC PIAN REGUlATIONS
1. Establish land use districts and development standards which are compatible with the
development goals of the San Bernardino Alliance*CaliforniaInternational Trade
Center Specific Plan and the surrounding community.
2. Provide a variety ofland use districts which will help stimulate business development
and job growth within and around the San Bernardino Alliance*California
International Trade Center Specific Plan.
3. Establish standards which will provide compatibility between different types of
development and land use.
4. Ensure adequate light, air and open space.
5. Protect surrounding uses from excessive noise, illumination, unsightliness, odor,
smoke and other objectionable influences.
6. Facilitate the provision of public improvements commensurate with anticipated land
use, development intensities, and service requirements.
7. Minimize traffic congestion and avoid the overloading of utilities.
C. TEMPORARY AND INTERIM USES AND OCCUPANCIES
C.! Purpose
These standards provide for the establishment of uses within an existing structure.
C.2 Applicability
Any use which occupies an existing structure for a limited or short-term period or proposes to alter or
expand an existing structure shall be subject to the standards set forth in this section.
C.3 Definitions
C.3.! Existinl! Structure
A structure located within the San Bernardino Alliance*California International Trade Center
Specific Plan boundaries which was originally constructed as part of Norton Air Force Base
and existed as of the effective date of the Specific Plan adoption in 1996.
C.3.2 TemDorarv Use/OccuDancv (Lel!al Non-Conforminl! Use)
A use which was established prior to the adoption of the lmemational Trade-Geffier Specific
Plan, which is inconsistent with uses permitted within the Land Use District.
V-3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
C.3.3 Interim Use/OccuDancv
A use consistent with uses permitted in the Land Use District, located in an existing structure
where the site does not meet landscaping, parking, and/or other development standards.
C.4 General Standards for Temporary and Interim Uses/Occupancies
Proposed uses shall be identified as either temporary or interim uses/occupancies subject to a
Development Permit and shall conform to all of the following standards set forth in this Section, in
compliance with the following criteria prior to occupancy or expansion.
C.4.1 TemDorarv Uses/OccuDancies
The structure shall be upgraded as necessary to meet current requirements of the Uniform
Building Code.
C.4.2 Interim Uses/OccuDancies
1. The structure shall be upgraded, as necessary, to meet current requirements of the
Uniform Building Code.
2. The use and/or structure shall meet all applicable standards contained in this Chapter
if any of the following actions occur:
( a) The structure undergoes a change of use or occupancy.
(b) The use or structure undergoes a physical or building floor area expansion.
D. USES ON PUBLIC BENEFIT PARCELS
All uses established on the Public Benefit Parcels shall be subject to the requirements ofthe Record of
Decision (ROD) included in the Appendix A to this Specific Plan. For purposes ofthis Specific Plan,
all Public Benefit uses shall be treated in the same manner and subject to the same requirements as
Interim Uses.
E. CIRCULATION ELEMENT
E.1 The purpose of the Specific Plan Circulation System is to recognize eXlstmg street
improvements and future needs within the Specific Plan area, and integrate them into the
surrounding circulation system.
E.2 Previous Circulation Element
Prioreview; to th~is Specific Plan adoption in 1996projcct, the planned street system adjacent to or in
close proximity to the SBNl'C contained the following elements, as shown in Exhibit V-I.
V-4
------=!fi
~....
CENTRAL AVE. ~ ~
g ~ -- ~
<>: '" -p = "'"' SAN BERNARD NO AVE.
Z~
~r~
;::
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BASELINE RD.
S.H. 66
Iii
'"
2ND ST.
RlALTO AVE.
MILL ST.
~
~
c
~
'"
~
o
'"
'"
~
"'
N
..!.
1-10
EXHIBIT V-I
Circulation Element-
Prior To Amendment
SAN BERNARDINO ALLIANC~AlJFORNIA
HIGHLAND AVE.
f#.
~
& &
t>i ;..
,,: ...
-, i:J
n: ~ ~
'"
< " ;::;
rn ~ 0:
0
0: 0
0: ...
~ ~ u
>
'" rn
5TH ST.
3RD ST.
~
<
:i!
~
'"
~
'" 7
...
rn
'"
"
~
o
REDlANDS BLVD.
L_~~GEN~J
_ FREEWAY
- MAJOR ARTERIAL
- SECONDARY ARTERIAL
_ SPECIFIC PLAN AREA
g
NO SCAlE
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Third Street is designated as a Major Arterial, with a 120- foot right -of-way within the City of
San Bernardino and as a Special Major Highway in the City of Highland.
Both involved six:lane roadways with a raised median improvement. This roadway will
require widening and full improvements as new development occurs on adjacent parcels.
Lena Road, from Third Street to Mill Street, is designated as a Major Arterial, with a 110-
foot right-of-way. This roadway will require widening and full improvements as new
development occurs on adjacent parcels.
I . Mill Street, west of Lena Road, is designated as a Major Arterial, with a liD-foot right-of-
way. This portion of Mill Street does not abut the project site.
Tippecanoe Avenue, between Rialto Avenue and Third Street, was designated as a Secondary
Arterial, with an 88-foot right-of-way. This segment of Tippecanoe Avenue hais be~ing
upgraded as defined below.
E.3 Additions to the Circulation Element
Concurrent with the adoption of this Specific Plan and subsequent amendments, the following
changes were made in the General Plan Ceirculation Eelement as shown in Exhibit V-2:
Tippecanoe Avenue is designated as a Major Arterial (120-foot right-of-way) from the Santa
Ana River north to Third Street, with a raised median.
A southward extension of existing Del Rosa Drive is designated as a Major Arterial (120-foot
right-of-way) from Third Street south to Harry Sheppard Boulevard.
Mill Street is designated as a Major Arterial (IOO-foot right-of-way, 6-lane) extending from
Lena Road eastward to Tippecanoe Avenue.
Harry Sheppard Boulevard, between Tippecanoe Avenue and Del Rosa Drive, is shown as a
Secondary Arterial with an 88-foot right-of-way.
Central Avenue east of Tippecanoe Avenue (formerly Palm Meadows Drive) is designated as
a Secondary Arterial with an 88-foot right-of-way. The actual alignment for this roadway
would be established. when development plans for Southgate are finalized.
Lena Road. from Third Street to Orange Show Road. is redesignated as a Secondary Arterial.
with an 88-foot right-of-way.
The purpose of these changes is to link the site to the local and regional circulation systems, facilitate
local traffic movement, and enhance access to the Aairport. The recommended amendments to the
City of San Bernardino Circulation Element are also listed in Table V-I and the roadway design
standards shown in Exhibit V -3.
V-6
I 5TH ST. ~
~
u:: Z
~ ~
...: u::
I'il
en E-<
0 en
u::
..:l
I'il
3RD ST. ~
:0
rti
0""
.
,
I
I
.
~ 0 D ~
0 a
~
u:: 0
~
~
'1111111
. MILL ST.
,.
I
I
I
I 0
I I
I
..-1-.............
CENTRAL AVE. --I
I
I -:-: .
<=il RIVER
U::I ANA I ~
...:1 I <
I ZI I.
~I I ~
I I I'il
I ORANGE I ;;:
I :i
I E-<
I ~
I 9
I EXHIBIT V-2 LEGEND
NO SCAlE
Circulation Element- - MAJOR ARTERIAL
Amended Circulation SECONDARY ARTERIAL
.".11. PROPOSED MAJOR ARTERIAL (120' R.O.W.)
."!lIi.. PROPOSED MAJOR ARTERIAL (100' R.O.W.)
I SAN BERNARDINO ALLlANC~AIJFORNlA ..... PROPOSED SECONDARY ARTERIAL
- SPECIFIC PLAN AREA
I
I
I
I
.~
~
$i
e/L
..,.
..,.
I
I
u.
- -
IaDUIf WUllAH YD. TEL
....
u.
,.a: 0' CURB
rACI: or CUJtIl
..,.
""
RlGHT or W,I.T
llAJOR ARTERIAL (6 L'XE)
(TIPPECANOE WE. DEL ROSA DR)
I
I
~
l
*'
I
I
I
P......
- . ._~
..,. e/L RfY
s' u' .a' ." s' " ,p' 0<
U. -.... va. lAICll l'JI,.I.VKL YEI. laVI& TKAVn. IoIU'Ia -n<AVB1.~.. U.
J'AOt OJ' CURB J'ACIE or CURB
",'
u~ &!GKT or 1U.Y s.'~
~tAJOR ARTERlAL (6 L\:\E)
(~III.L STJU:ET)
I
I
~"".
. - ..-
I
P......
..,.
e/L
I
I
..,.
""
po'
VEl. VKL ......
'"
..'
RIGHT or WAY
I
~Jo:rO~IHR)" ,\RTERI..\t./SI'Jo:CIFIC 1'1.:\;'\ COI.U:rTOH
IIlARHY SHEPPARD lIl.\"U. DEI. IWK\ IlR.
n;~'\ UO \I), n::~l'It\L .WE.)
I
EXHIBIT V-3
Roadway Design Standards and Setbacks
I
I
SAN BERNARDINO AUJANC~AUFORNIA
I~~~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE V-I
CITY OF SAN BERNARDINO CIRCULATION ELEMENT AMENDMENTS
Street Existing Designation Proposed Designation
Tippecanoe Avenue None except as Secondary Designate as Major Arterial (120 foot right-
Arterial between Third Street of-way) from the Santa Ana RiverPalm
and Rialto Avenue. Meade'lls Drive on the south to Third Street
on the north. Tippecanoe will then be shown
as a continuous Major Arterial through the
Dease and connecting with the existing
Major Arterial designation. The portion
currently skown between Third Street and
Rialto Avenue will be upgraded to Major
Arterial by this action.
Del Rosa Drive None Extend Del Rosa Drive as a Major Arterial
(120 foot right-of-way) south from Third
Street to Harry Sheppard Boulevard.
Mill Street None Extend Mill Street as a Major Arterial (100-
foot right-of-way, 6-1ane) from Lena Road to
Tippecanoe Avenue.
Harry Sheppard Boulevard None Designate as a Secondary Arterial/Specific
Plan Collector with illL88-foot right-of-way
between Tippecanoe Avenue and Del Rosa
Drive.
Central Avenue Secondary Arterial west of Designate as a Secondary Arterial with an
Tippecanoe and Maior Arterial 88-foot right-of-way east ofTippecano~
east of Tinnecanoe Avenue Avenue
Lena Roaq Maior Arterial Designate as a Secondary Arterial with an
88-foot right-of-way between Third Street
and Orange Show Road
E.4
Driveway Access Standards
Each development block has special considerations for driveway access limitation points. These are
described in detail in Section V.F under the descriptions of each land use category, land use district
and any related subareas. Refer to that section for more detailed information.
E.5
Traffic Signal Requirements
Traffic signals currently exist at the primary access intersections of Mill Street and Tippecanoe
Avenue, Third Street and Tippecanoe Avenue, Third Street and Del Rosa Drive, and Third Street and
Victoria Avenue. The signals at Mill Street and Tippecanoe Avenue and at Third Street and Del Rosa
V-9
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Drive were upgraded concurrent with the improvements to the intersectingnal roads. New traffic
signals have also been installed at the intersections of Tippecanoe Avenue and Harry Sheppard
Boulevard, Del Rosa Drive and Harry Sheppard Boulevard, Del Rosa Drive and Rialto Avenue. Third
Street and Lena Road. Tippecanoe and Central A venuePalm Meaeows Drive and Lena Road and Mill
Street, agaifl-as part of the scheduled road improvements beillg installed withduring the first phase
infrastructure improvements.
A traffic signal is also planned at Third Street and Leland Norton Way as part of the access
improvements planned by the San Bernardino International Airport. Lastly, a new traffic signal will
be required at the intersection of Third Street and Central Avenue (in the City of Highland) at such
time as new development activity provides sufficient additional traffic to warrant that improvement.
F. LAND USE DISTRICTS
F.l The purpose of each Land Use District is defined as follows:
F.1.1 Northeate District 1 Research and-De'l'elopment (R&Dl
Located between Harry Sheppard Boulevard on the south, Third Street on the north,
Tippecanoe Avenue on the west, and Leland Norton Way~Rosa DAve on the east (see
Exhibit V-4), the NorthgateResCl;rchnoo Development__tDistrict-+) is intended to
accommodate a wide variety of research and development related uses including
manufacturing, light industrial, neighborhood commercial, laboratories, office professional
use, vocational training and educational facilities, institutional, and recreational open space.
The intent is to combine these land uses and implement them under a "campus" concept,
which ties these uses together with broad landscaped and wellJighted pedestrian walkways.
The extent to which raw materials will be manufactured will be limited to that necessary to
adequately test and analyze new products. The scale and intensity of these uses may allow for
the interim use of existing building stock. Research and development facilities may include
the manufacturing, assembly and testing of products which are characterized as clean and
generate non-hazardous byproducts.
Neighborhood commercial uses may include a food court, retail stores, neighborhood
services, and restaurants. Desired office uses would include a broad range of supporting uses
in a well landscaped setting. Potential uses include medical offices and clinics, corporate
offices, governmental and institutional uses, administrative and professional offices, daycare
facilities, [mancial services and supporting commercial.
Site design should consider existing uses within the resemehanddevelopmentNorthgate
Ddistrict-(see-EK~ibit-V-4). These existing uses include the MatteI facility at Jhe northeast
corner of Tippecanoe Avenue and Harry Sheppard Boulevard and the Lorna Linda University
Medical Clinic on Third Street, which serves a medical clinic to the local area population.
V-IO
CB.'mW. ~vr.
,,,,,,,on
-"'"'\'
~
~
i
~
"T~I
Q
NO SCALE
LOCA'l'lON: THE NORTHGATE DISTRICT IS GENERALLY BOUi\DED
BY TIPPECANOE AVENCE ON THE WEST, HAlmy SHEPPARD AVE.
ON THE SOUTH, LELAND NOTRON WAY ON THE EAST, AND
THIRD STREET ON THE KORTH.
I
I EXHIBIT V-4
I
I
I
Northgate District
SAN BERNARDINO AlJJANC~AUFORNIA
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Additionally, the San Bernardino Community College District facility located on the west side
of Del Rosa Drive north of Harry Sheppard Boulevard should encourage the establishment of
business incubator uses that would benefit from the existing educational and research
facilities.
The existing City of San Bernardino Recreation Park facilities located at the northwest corner
of Rialto Avenue and Del Rosa Drive should encourage a commercial health club or similar
facility.
The vocational and educational uses may range from a potential special attendance high
school for technical and research training to Community College District facilities for post-
high school education and training. All of these facilities will be oriented to research and
development activities associated with technical park facilities and activities.
As a matter of policy, the Sspecific I'fllan does not propose the retention of residential
housing units. The existing officers housing along Tippecanoe Avenue have beenwiH Heed to
I3e removed prior to the development in this area.
Parkway landscaping along Tippecanoe Avenue shall be designed to enhance the site~s
attractiveness and lessen the visual impact of adjacent parking areas. Consideratlition should
be given to locating building mass to buffer potential airport noise from the site users.
Access points will be determined as part of the City's development review process and should
consider existing traffic patterns outside the 5specific I'fllan area, coordination with office and
industrial uses to the south and industrialteurist commercial_and airport uses to the east.
F.1.~~ Westeate District:3 Trllde-P---lH'k-~
Generally located between Lena Road on the west, a drainage channel known as Timber
Creek on the north, Tippecanoe Avenue on the east, and Mill Street on the south (see Exlubit
V -~e), this unique district is intended to provide the image of a self-contained "World TfllfIe
Center,"area offering a combination of light industrial and distributionhetel,€enveHtie-fi;
eenferenee-;---frllil-traee facilities, accompanied by warehousing and some light assembly and
manufacturing activities. The district will be --characterized by open space areas and
associated amenities, highlighting the various on-site activity centers. H----wilI---ffieluee
eemerefl€e-ilflEl-eenve-fltiHfl-faeilit-ies-;-flo-tels-itltEl--mHlels; theaters-afla- efllcrtainmenl--faeilit-ies-;
effiees-,--recreatifmalitnd-€emmc rcial rcefeutiHflul lises;--fes-tauHlflts,whelesale-lmsines5es,afle
light-inEl-uslr-iu-l/-warehouse-uses---ifteluEl-ingl ighl assemhly;
V-12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I EXHIBIT V-5
I
I
I
',-
'T'tt>
.QJ
--~'
kB)'
0, ' oll!. b'
~ ~~(] .
IlL\LI'U AVL ..
~ ~~ )
. rPf'c:I .Qt.'" '~~J_ __.
,,0
.
WLliT~dJl
CINrIAL "V~.
g
NO SCALE
LOCATiON: THE WESTGATE DISTRiCT IS GENERALLY BOUNDED
BY LENA ROAD ON THE WEST, TI~BER CREEK ON THE NORTH,
TIPPECANOE AVENUE ON THE EAST, AND MILL STREET ON THE
SO UTH.
W estga te District
SAN BERNARDINO ALUANC~AUFORNIA
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Primary access points include one major entry from Lena Road, two major entries from Mill
Street, and one major entry from Tippecanoe Avenue. Additional driveway access points
along these roads may be permitted as long as they are at least 150 feet from the major entry
drive. A landscape buffer will be created along Mill Street and along Tippecanoe Avenue
which will serve to screen any proposed parking lot areas through a combination of
mounding, berming, shrubs and tree planting. The building/structures are expected to be
distributed throughout the site except that the most intense development will be oriented
toward the intersection of Tippecanoe Avenue and Mill Street.
Existing uses in this district include the Kohl's Distribution Center and Pep Boys facility.
F.1.~S Centel1!ate District 5 Industrial (lND)
Located east of Tippecanoe Avenue. south of Harry Sheppard Boulevard. west of Leland
Norton Way and north of the airport runways. in five distinct subareas (see Exlubit V-Q8-); the
Centergate Industrial District S is intended to accommodate a variety of industrial and office
uses of varying scale and intensity, taking advantage in two of these locations of the previous
land use and building occupancy patterns established during operation of the Base including
the availability of large buildings, aviation related activities, and compatibility with adjacent
uses. It is expected that initial site tenants will utilize existing buildings to the extent feasible.
In all cases, any manufacturing, assembly or similar activities must occur within an enclosed
building.
Industrial Sub6~,generoHy-le€ffieEl-eilSt-BHirJ3e€itflOe-AveflUc and south-ef-Haffy
Shep!*lffi-fH+ve-fsee-E-lfhibit-\l-(';8j,,ScuI3areit-;2* This district is proposed to include industrial
uses, including manufacturing, assembly, warehousing and distribution facilities. Site design
issues include the creation of vehicular access points at generally equal intervals around the
perimeter of the area. The location of these access points will be based \!pon the location of
adjoining access points and driveways between existing industrial buildings. This access
feature relates directly to the massing of future buildings in an alignment similar to the existing
building arrangement. By locating buildings in this manner the existing parking areas and
mature trees can be retained. Vehicular access points should be generally evenly distributed,
rather than grouped. Two access points are proposed along Harry Sheppard Boulevard and
three access points at Tippecanoe Avenue.
The area adjacent to Harry Sheppard Boulevard and Tippecanoe Avenue shall be subject to
increased setbacks and landscape screening to ensure compatibility with adjacent land useS.-It
is expected that the existing on-site structures will be utilized on an interim basis subject to
improvements to satisfy public health and safety standards. The transition over time to new
construction will be dependent on user needs and requirements.
Existing developments include the Norton Community Credit Union and the Stater Brothers
Corporate Office and Dllitribution Center.
V-14
..
.,
"r~
-~
-~I
~"'Y'E
[]'
. .
b'
, .
~, [J
.,.. -.1 1
5
: G ~ D
------
--
------
___SA1!'I!\
g
NO SCALE
LOCATION: THE CENTERGATE DISTRICT IS BOUKDED ON THE
WEST BY TIPPECANOE AVENUE, ON THE NORTH BY HARRY
SHEPPARD BOULEVARD, ON THE EAST AND SOUTH BY THE SAK
BERNARDINO AIPORT AUTHORITY (3BIAA) BOUNDARY.
EXHIBIT V - 6
Centergate District
SAN BERNARDINO AlllANC~AIlFORNIA
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
F.1.4 Southeate District
Industrial SUOaT"f!8 50 (Gee Exhibit V !iB) is lLocated east of Tippecanoe Avenue between
the airport boundary on the north and the Santa Ana River and other parcels north of the river
on the south, this District includes . proposea to provide for future industrial uses. nhe
former golf course in this area has beeH dosed and adjacent parcels (see Exhibit V-7). This
District is expected to develop with future industrial uses, with the Riverside parcels along the
Santa Ana River (which are utilized by groundwater wells) expected to remain as open space.
Site design considerations include coordinating access points along both sides of Central
AvenuePalm Meado',vs Dri';e with Subarea J.5c, as part of the City's development review
process. Provision of passive and active employee recreational areas and access points to the
Santa Ana River shall be considered as part of the overall site plan for the district. At such
time as this area is ffi-be--converted to industrial development, an overall site plan shall be
prepared and approved by the City.
IndttstFial-SubllFffl-5e--f:see- Exhibit V B) is located south of-Palm Meadows Drive and is
proposetl-fer-fuhlre--industrial uses. Site design considerations ineluee-ooo-ffiiooHHg---aec-ess
points-alo-ngPalm Meadows--Drive with Subarea-!}bte-t-he-- north, as part of---the-Gity's
clevelepment---r-eview-pr-eress. Land usefHtOO developmeHt type . .
te-what is develepe-d-ifl-Subarea 5b.
F.1.5 Third Street District
The Third Street District is generally located south of Third Street. between Victoria and
Central A venuesl11tlustrial-SuollFea--5d (see Exhibit V -8) and is proposed to include industrial
related facilities.
The uses inftlr this districtsOOnr-e-a are expectedpr0p0se-d to includebe large industrial
operations, such as manufacturing, assembly and distribution activities, in addition to aircraft
sales and service usesaire-raft sales and service, and "through-the-fence operations." A
"through:the:fence operation" means that an aviation related or dependent industrial use
backs up to and has direct access to airport operations inside the fenced Aairport boundary.
This allows planes to come directly to the facility to offload or take on cargo, avoiding
unnecessary extra handling and tracking. Existing paved parking areas may be maintained as
large contiguous shared parking areas.
Site design issues include the creation of primary access points along Third Street at Victoria
Avenue and Central Avenue. The existing perimeter road that serves airport users within the
Aairport ownership and that enters the area from the west and extends east toward -Victoria
Avenue shall be maintained. Future site development planning may extend this I'perimeter
roadway through the area if deemed desirable for enhanced circulation and access depending
on ownership and site design. An optional circulation pattern could extend tfle--ilfoad
east/west along the southerly boundary along the alignment of"W" Street, potentially linking
V-16
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Victoria Avenue with Central Avenue. However, this would impact potential through-the-
fence operations by placing a poolic street roadway between on-site users and the airport.
This would result in preventing direct access to the airport cargo freight operations that might
otherwise have been available for potential industrial users.
In addition to the 15.64 acre parcel transferred as a Public Benefit Transfer through the
Department of Interior. approximately 30 acres were transferred from the Air Force to the
IVDA and then to the San Manuel Band of Mission Indians (San Manuel Indian Tribe) as a
part of the Economic Development Conveyance CEDe). with the deed being conveyed by the
IVDA to San Manuel Indian Tribe. A portion of the 45.64-acre site comprising the Third
Street District is contemplated for a boundary adjustment and transfer to the San Bernardino
International Airport Authoritv ("SBIAA") in exchange for an equal amount of land located
north of"W' Street. subject to approval of the Federal Aviation Administration (FAA). San
Manuel Indian Tribe. and SBIAA (see Exhibit V-8). In the event of such a boundary
adjustment. all of the exhibits in this Amendment No.5 to the Specific Plan related to the
Third Street District. including without limitation Exhibit V-8. shall automatically. without
any formal amendment hereto. be adjusted concurrent therewith to reflect the adiusted Third
Street District boundary as shown on Exhibit V-8.
The boundary adiustments for that portion of the Specific Plan area as noted above is hereby
approved as a part of Amendment No.5 to the Specific Plan. subject to the FAA granting the
!Iecessary approvals for the proposed boundary adjustment. including a delivery of an
Instrument of Release and Acquisition of property to thus provide for the exchange of an
identical acreage between SBIAA and the San Manuel Indian Tribe. In the event the FAA
does not approve such Instrument of Release for any reason on or before five (5) years from
tl:le effective date of Amendment No.5 to the Specific Plan. the boundaries of the Specific
Plan as illustrated above shall remain in the currenJJ9cations for the Third Street District as
the same existed for the Third Street District prior to the adoption of Amendment No.5 to
the Specific Plan.
lndustFial-StthlH'ell-se-{see-&hibit-V-8)-GeTlcrally looafefr-aHlre-5emheasl-€eI'IleF-Bf-I)ej
Rosa ,^-venue an~HI-'sIreet--i&-pfOposed--to--iflclucle-fficl'lf5ffial uscs including maflUfaetuffilg;
assemMy,wu-rehousing -am:J-aistribut-ien-faeiliIie5-;-ftirefa#-sewiccs and -'through lhe..fefl€e
oj'leratiens",-wmft-earge-haOOling-and-trackingc
Site-de sign- inelude5-jffimary- acces~; 0 ff-3'~ -8-treet-at..belandNoffEHl Drive and--BfH)el-Resil
Aveflue. /\ccess--peints will-be determined as parl-eHhe--c-tt-y-:.s-develej'lffient review-j3fBCeS5
a-nd-sholl-k!-€eflsider- existing -adjoiniHg---ac-ee5spoilltsimddrivewilYs,-fllld-eoordtootewiHI
'H-ade-Ptlfk-{-W)-u5es-to-Ihewest-and-airj3BR-uses-.te--the -seutfra-n8-easto
-F.1.6 DFAS District
In!; Dej.!<ns~__Finance and Accounting Service (DFAS) buildings are located west of
IW12rcanoe Ave_nue and south of Mill Street. The DFAS District is intended to accommodate
V-I?
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
the existing two buildings in this area. which have been renovated and reused by various
agencies and private parties. These buildings are used and will continue to be used for office
and light industrial uses. with access provided on both Tippecanoe Avenue and Mill Street.
Exhibit V-9 shows the location of the DFAS District.
F.2 Specific Plan Land Use District Map
The San Bernardino Alliance*California lRtematiOllal Trade CeRter Specific Plan Land Use District
Map defines the geographic location of each of the land use districts as described in Sections F.1.1
through F.1.S above. The Specific Plan Land Use District Map is hereby incorporated as Exhibit V-
10.
F.3 Permitted Uses
The uses listed in Tables V-2 and V-3 shall be allowed within the designated land use district subject
to the City of San Bernardino Development Permit procedure~ pursuant to Chapter 19.44 of the
Development Code unless otherwise noted.
V-18
0, 'cg
,
Jl:4U'O.lYE. ~
,
. "
IFF .Ql,.
kB)'
. .
._bj, ,
~l' a
'''r~
.~
- ~=...;:
;
: G B D
----
~I'~~I
CKllT'IUIl.. A.~I
g
NO SCALE
LOCATION: THE SOUTHGATE DISTRICT IS AN IRREGULARLY
SHAPED AREA BOUNDED ON THE ~ORTH BY THE SBIAA
BOmmARY, ON THE SOUTH BY THE SANTA A~A RIVER, AND
O~ THE WEST BY TIPPECANOE AVENUE.
I
I EXHIBIT V-7
I Southgate District
I
I
SAN BERNARDINO ALLlANC~AUFORNIA
-
-.tk"
I=___g
II
:~PF~jql?i ~...2J~
11)-0 ,I I~IU,
.__IIm=~I,s
I ~ ~:1
L 'I I -~:
CDn'bL -.li
~
~
NO SCALE
LOCATION: THE THIRD
THIRD STREET ON THE
THE REMAINING SIDES.
STREET DISTRICT IS BOUNDED BY
NORTH, AND BY SBIAA BOUNDARY ON
EXHIBIT V-8
Third Street District
.......
.
: : Existing Third Street District
.....:
. Potential Exclusion from Third
Street District if Boundary
Adjustment Occurs
SAN BERNARDINO ALLIANC~illFORNIA
. Potential Inclusion in Third
Street District if Boundary
Adjustment Occurs
0" D~
. -
,
IlW.fO ol.'IL ~
. c
... It?t'A All.
U.
. .
.b ',:
,. 0'"
I!I ..-'Li
T;;. ," .
'~i .
"'I~
"="
~.n
~
~
g
-------"
--
--
-~-
_--~~1'A. --
g
NO SCALE
LOCATION: THE DF'AS DISTRICT IS GENERALLY BOUNDED ON
THE EAST BY TIPPECANOE AVE. AND M1LL STREET 01\ THE
NORTH.
EXHIBIT V-g
DFAS District
SAN BERNARDINO ALI1ANC~AUFORNIA
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
,- '" L'
tr:l
~ pl sa
'" :::l
"" 0-
'" ........
z to
~ c:: ........
>-3
2 en
C> CD -<
~ t:::l I
I _. ......
en 0
n r+-
i '"1
_.
(")
r+-
en
C>
~
lENA. RD.
Imlll ',', ~
"'1
',',
:':' l'J
,',' >
,,,,
,
','
:':'
r-'
tr:l
0
t<:l
0 o-J en (1 Z ;j 0 Z
"'l ::r: 0 l'J 0 - t::J
> - c:: z ~ en en
;0 o-J
en 0 o-J o-J o-J o-J ;0
::r: l'J ::r: t:l -
en t:l ~ t:l ::; (1
o-J ::; t:l > o-J
;0 > o-J l'J
trI trI o-J trI Z
trI trI > '"
o-J ~ El
trI Z :~
~(]D
~ - -'~ J!
I
\
PALM AVE
I
~
I
1,1,:."I,'.I,';I,I;:.'I';';'r"
1,:.,'.',',',',1,1,,1,1,1,',1,
',,1,',',",','1',',',',','1',
1,',1,1,1,"1,111,1,',1,1,',',1,
:':':':':':::':1:1:1:':':':':':'
1:,:':.:,:':I:.:I;t;.:.:I;':':,:
,',1,',',"" 1111.1111',','1'
1,111"':'11"" ,'\-"" I,',','
',',1,1, 1"1',',',',1,11',',',1,1,',',',1
',',1""1.',',1""11,',1"111'1',111,',1
:.:':':.:' "'1:":"': I :1:':':
':':1:':':::':':"11:':':':':':':':':1:':1
1.',11"'1111"'1,',1,1,',',1,1,1111',',1
1,',1,',',1,1,',',1,',1"111'1111111111,1,1
1,',11'1',',11111,1,'11,11'1'111',','1','1'
111"I"'l!rtrtjj'm'Uii)'"
'1',11','1"1'1":1',11'1:",1,1,1',1
:1:':':':"'1,11'1,;,1:';'11 :':
,1"II"'I"II,lr"'II"""I',II'll,II""
,1,',',1""1111,',11,,',1111"'1'1',1,;,',
,','111'11,',',' . ,', . lilli',
':':':':':':1:': :':1:':':1:':':'::1:1:':'
""'1"""'1'1 II 'l'I',II',',fl 11111','
:1:':1:':':':1:1':::':':':1:':':11;1:'::':
1"'11,11',',1,'11111,',1"1"""1'11,',
,1,',1"1',111' ',If','1
I : I" ~ , ' JIlt : ' I " ~ ,II f I " " ' III ' , ' I I, I , " I ,
I
~
~
TIPPECANOE AVE
ROSA DR.
'"
El
;
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE V-2
SUGGESTED AND PERMITTED USE
District Suggested Uses Permitted Uses
ReseareR aH~ Research and development, light As listed in the OIP (Office Industrial Park)
De. elopmeHt manufacturing/industrial, laboratories, District, Section 19.08.020 of the Development
North~ate-ff) related office uses. Code except that no residential uses shall be
allowed.
Food court, retail stores, neighborhood As listed in the CN District, Section 19.06.020
commercial services, restaurant, automobile of the Development Code except as follows:
service station. (a) no residential uses shall be permitted.
(b) convenience stores will be permitted as an
ancillary use to an automobile service station
subject to a Conditional Use Permit (CUP\.
,
Medical offices and clinic, corporate and As listed in the CO (Commercial Office)
professional offices, day care facility. District, Section 19.06.020 of the Development
Code except as follows:
(a) No residential uses shall be allowed
including Residential Care and Senior
Con~re~ate Care Facilities.
Health club, recreational commercial uses, As listed in the PCR (Public/Commercial
indoor and outdoor, public and private. Recreation) District, Section 19.10.010 (2) (A)
Alternate uses are educational facilities, of the Development Code.
such as a technical school.
I West~'!Jf'Ffade-Fafl< Tra~e Park-wi!lrOOflfuren€e-ftHtl-€eIf'feft!ffiH See Table V-3
E31 facilities, htltel-;-Qt)ffices, commercial uses.
restaurants, wholesale businesses,
warehouse and light industrial uses
including some assembly.
Centemate. Large industrial related operations including As listed in the CO (Commercial Office)
Souti]g!!!.e. ThiuJ manufacturing, assembly, distribution, district, Section 19.06.020 of the Development
Street and aircraft sales and service and airport related Code, and in the OIP (Office Industrial Park)
D F ASloouslFiaJ+'1 uses. Alternate uses are corporate and District, Section 19.08.020 of the Development
professional offices and business parks. Code, except that no residential uses shall be
allowed including Residential Care and Senior
Congregate Care Facilities. Also, as listed in
the IL (Industrial Light) District, Section
19.08.020 of the Development Code, except as
follows:
(a) Aircraft sales and service shall be an
additional use permitted subject to a
Development Permit.
(b) Processing facilities (recycling) shall be
subject to a conditional use nermit (CUP)'
I All Districts-(-l--"') Temporary uses of existing structures or No permitted uses. All uses are subject to a
facilities for their original intended use temporary use permit to be reviewed 'and
under the Air Force jurisdiction. approved by the City of San Bernardino.
V-23
II
I
I
TABLE V-3
TRADE P,'.RKWESTGATE DISTRICT LAND USES
I
The following list represents those primary uses in the Truee ParkWestgate District which are permitted
subject to a Development Permit (D) or Temporary Use Permit (T):
I
Land Use Activity Development Review Process
A. All offices, including Administrative and Professional Offices D
B. Automotive Related Uses
1. Service station D
2. Vehicle leasing/rental D
C. Lodging/Mixed Use Facilities
1. Hotels D
D. Eating/Drinking Establishments
1. Lounge w/on-sale alcoholic beverages D
2. Restaurants, no drive-thrus D
E. Entertainment/Recreation
I. Auditorium, convention halls, theaters D
2. Miscellaneous indoor D
F. Financial services D
G. Left blank
H. Personal service
1. Barberlbeauty/nail shops D
2. Dance/karate studios D
3. Dry cleaners D
4. Health/athletic club D
5. Laundromats D
I. Retail Commercial
1. Bookstores D
2. Drug stores D
3. Flower/gift shops D
4. General merchandise D
5. Indoor retail/Wholesale malls D
6. Office supplies/equipment D
7. Specialty food stores D
J. Service Commercial
1. Catering establishment D
2. Cleaning/janitorial D
3. Copy centers/postal service centers/blueprinting D
4. Laboratories D
5. Miscellaneous repair/services (indoors) D
I
I
I
I
I
I
I
I
I
I
I
I
I
V-24
I
I
I
I
Land Use Activity Development Review Process
6. Recycling facilities (reverse vending) D
7. Travel agencies D
K Industrial Uses
I. Assembling, cleaning, manufacturing, processing, repairing D
or testing of products including automotive related
(except dismantling) and welding and excluding
explosives, conducted entirely within an enclosed
structure except for screened outdoor storage areas.
2. Crematory D
3. Dwelling for security guard or caretaker D
4. Funeral parlors/mortuaries D
5. Recycling facilities (light processing available for onsite D
users only. Must be wholly enclosed within a
building.) D
6. Research and development D
7. Towing service D
8. Transportation/distribution D
9. Warehousing and wholesaling, including self-service mini-
storage.
L Others
I. Antennae/Satellite dish D
2. Cable companies D
3. Clubs/Lodge/Meeting halls D
4. Day care facilities D
5. Educational services D
6. Fences/walls D
7. HeliportslHelipads D
8. libraries D
9. Museums D
10. Outdoor recreation D
II. Parking lots D
12. Parking structures D
13. Police/fire protection D
14. Public utility uses D
15. Radio/television broadcasting D
16. Temporary uses T
17. TradeITech schools D
18. Accessory structures (typically appurtenant) D
I
I
I
I
I
I
I
I
I
I
I
I
Other similar uses which the Director finds to fit within the purpose/intent of the t;{'tfIe--district, in
compliance with Section 19.02.070(3) of the Sail Bernardino Development Code.
I
I
I
V-25
I
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
G. DEVELOPMENT STANDARDS
G.1 General Standards
Development standards shall be consistent with the standards contained in the following Table V -4.
G.2 Land Use Specific Standards
Special use standards for this Specific Plan shall be applicable to the following uses:
a. Convenience stores
b. Day care facilities
c. Mini-storage
d. Recycling facilities for reusable domestic containers
e. Service stations
The standards for these uses shall be consistent with the provisions contained in Section 19.06.030(2)
of the Development Code.
G.3 Properly Development Standards
G.3.1 Property development standards shall be consistent with Section 19.20.020 of the
Development Code except:
1. Exterior building walls,
2. Screening, and
3. Solar energy.
G.3.2 Intersection and Corner Visibilitv
To ensure clear and unobstructed visibility at intersections, landscaping planting and signs
shall be limited to three feet in height within the following defined areas at street and driveway
intersections and as illustrated in Exhibits V-II and V -12:
Type
Primary street
Secondary street
Local street
Driveways
Distance From Intersection
50 feet
35 feet
25 feet
25 feet
V-26
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE V-4
DEVELOPMENT STANDARDS
Districts
Centemate.
R&9North~ate Southeate. Third 'FPW est~ate
Development Street and
Standards DFASIND
Net Lot Area (min.) 1 ac. NA NA
IBuilding Setback I from Street (min.) 25'(P) 25'(P) 25'(P)
19'(S) 25' (Cm 25'(~9)
15' (L) 19'(S) 19' (S)
15'(PR) 15'(L) 15'(L)
IO'(PR) IO'(PR)
Building Setback from Property ]jne (min.) 10' (A) and O'or 20' 0' or 20'
IO'(B) (A) (B) (A) (B)
Building Separation (min.) 20' 20' 20'
Building Setback along Third Street (min.) 253-1' (tj 253-1' (tj NA
IParking Setback (min.) :;;!20' (tj :;;!20'~ 20'(P)
20'(P) 20'(P) 14'(S)
14'(S) 14'(S) IO'(L)
IO'(L) IO'(L)
Building Height (max.) 60' 60'z:- 120'
Floor Area Ratio (max.) OS ~'i-ttt-0.5 0.5
Lot Frontage (min.) 100' 100' NA
(P) Major Arterial
(S)'4 Secondary Arterial/Specific Plan Collector
(L) Local Road
Third Street setback (includes 12' Bicycle path)
(PR) Private Road
(A) Rear setback
(B) Interior side setback
(C) Mill Street setback !lOO' right-of-wav)
(D) Mill Street setback (IQQ' right of way)
All setbacks are measured from the right-of-way on public streets and from the back of curb or sidewalk on private
roads.
Selhack-.can-he-d-t-fie-r--tii-mens-ion-or--gfen-t-eT.Htan-2tJ',-hu-t--J1H!fl.ffig-i-n-he-l-\veetr.
~,
Subject to FAA height requirements for uses located near the runway. For industrial uses located adjacent to Third
Street, maximum height is 100'.
IOU
The ::;secondary ",arterial contains 6' of landscaping within the right-of-way in addition to the landscaped setback (see
Exhibit V -3).
V-27
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
~
"
x ~ DISTANCE FROM INTERSECTION
(I.E. - SECONDARY ST., X=35')
'"
'"
"-
,
,
,
,
",
,
,
,
,
,
"',
"
CUR8
SHADED AREA FOR SITE UNE VISIBIUTY. NO PLANT OR STRUCTURAL ELEMENT ABOVE 36".
EXHIBIT V-11
Intersection Visibility
SAN BERNARDINO AlJJANC~AUFORNIA
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
/0,/0
/
/
,
/
CURB
/
r
'"
"
,
,
"-
"
"
,
,
"',
"-
'"
~
,
SHADED AREA FOR SITE LINE VISIBILITY, NO PLANT OR STRUCTURAL ELEMENT ABOVE 36",
EXHIBIT V -12
Driveway Visibility
SAN BERNARDINO AWANC~AUFORNIA
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
t
I
G.4
G.3.3 Pronertv Maintenance
Property shall be maintained as defined below. This maintenance includes the following:
a. Irrigation, seeding, pruning and necessary replanting of landscaped areas;
b. Removal of trash, discarded materials and equipment;
c. Removal of boats, trailers or other vehicles either unrelated to the on-site
business or in a deteriorated or incomplete condition;
d. Removal of containers or shipping materials after their function is
accomplished; and,
e. Painting or appropriate preservation of building facades and walls.
G.3.4 Screenin!!:
Any equipment, whether on the roof, side of structure, or ground, shall be screened. The
method of screening shall be architecturally compatible in terms of materials, color, shape, and
size. The screening design shall blend with the building design and include landscaping when
on the ground.
Loading areas, storage areas, and trash collection areas shall also be screened from view from
public streets, pedestrian walks, and common parking areas, per City requirements. In
addition, solid walls and landscaping shall be used to screen ground-mounted equipment (such
as transformers, backflow preventers, etc.) that are located beyond building walls.
G.3.5 Off-Street Parkin!!: and Off-Street Loadin!!:
All development shall comply with Section 19.20.030 of the applicable provisions of the City
of San Bernardino Development Code, Chapter 19.24, Off-Street Parking, and Chapter
19.26, Off-Street Loading.
Sign Regulations
G.4.1 Purpose
The purpose of this section is to provide standards for on-site, off-site and project entry
signage. The signage concept involves the use oflow profile project entry and on-site signs
to maximize consistency and effectiveness while minimizing negative aesthetic impacts. The
sign standards described herein will apply throughout the SBAH'C as specified.
V-30
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
GA.2 Auulication
Sign plans shall be included with building plans when they are submitted for new construction,
remodeling or occupancy of existing building if a sign is proposed for the project. The sign
plan shall show sign elevation, dimensions and location(s) on the site plan.
GA.3 General Rel!:ulations
Sign Regulations shall be consistent with the City Development Code, Sign Regulations,
Chapter 19.22, except as provided below.
1. Office Signs
Signs permitted in office developments and in areas of similar land uses shall be
subject to the regulations contained in Section 19.22.160, Table 022.01 (CO-I) of the
San Bernardino Development Code.
2. Commercial Signs
Signs permitted in the commercial developments and in areas of similar land uses shall
be subject to the regulations contained in Section 19.22.160, Table 022.01_ofthe San
Bernardino Development Code.
3. Industrial Signs
Signs permitted in the Research and Development and ljndustrial developmentsland
use district:; shall be subject to the regulations contained in Section 19.22.160, Table
022.01 of the San Bernardino Development Code.
4. Open Space/Recreational Signs
Signs permitted in the Q]2en space and recreation commercial areas shall be subject to
the regulations contained in Section 19.22.160, Table 022.01 of the San Bernardino
Development Code.
5,- . -FrmJe-Fol'k-Distriet
Signs-permiHed-within-the'f-filde-Par*-gistH6l-&lmlJ.be-t&+lte+eguJa tiD ns co ntaine&ffi
Sectie-Il-19,-22" 160, Table 022-JH"
G.5 OfTsite and/or Shared Parking
Projects within the SBAHC shall have the ability for off-site or shared parking. All parking
improvements shall be consistent with the standards provided in Chapter 19.24 onhe San BernardinQ
V-31
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Development Code. Any proposal for off-site or shared parking is subject to approval by the Director
and recordation of a formal agreement between involved parties to ensure compliance with the
provisions of this section.
G.6 Landscaping
G.6.1 Pumose
The following landscaping standards shall apply to all land uses in the SBAl'FC unless more
specific criteria are noted below. All landscaping shall comply with the requirements of
Chapters 19.24 and 19.28 and as described below.
G.6.2 General Relrulations
Landscape standards shall be consistent with the provisions contained in the City of San
Bernardino Development Code, Chapter 19.28 (Landscape Standards) and Chapter 19.24
(Offstreet Parking Standards) except as noted as follows:
1. Roadway Treatments
(a) The setback area between the face of curb and the parking area or the
building, if no parking is proposed in the front setback, shall contain a
minimum six::foot sidewalk within the street right-of-way and shall be
landscaped with mounded or bermed turf and mounded groundcovers.
Screening shrubs shall be planted outside the street right-of-way in a manner
that will partially shield the parking area and/or buildings from public view.
(b) All landscape setback areas on major, secondary and specific plan collector
roadways shall be incorporated into a landscape maintenance district and/or
property owner association for on-going maintenance. Common maintenance
is not mandatory for local internal streets, but is available at the choice of
individual owners through formation of a property owners association.
2. Maintenance
(a) Landscaping within and adjacent to major, secondary arterial and Specific
Plan collector public street parkway areas shall be maintained by a landscal2!'
and lighting maintenance district and/or property owners association,.jn
accordance with established covenants. codes. and restrictions (CC&Rs)
acceptable to the City for maintenance purposes. The City may allow
property..QW!I!ers to perform landscape_ maintenance on roads abutting
individual properties. where such roads are subiect to a landscajJe and lighti!l.i!,
maintenance district. provided the property owners.enteLinto a default
agreement with the City.
V-32
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
(b) Parking lots and on-site landscaping shall be maintained by a tenants'
association or the individual tenants.
(c) Irrigation on parkways shall be maintained by a landscape maintenance district
and/or association and shall be separately metered from on-site areas.
3.
Existing Tree Preservation
Existing mature trees including the California Live Oak, Silk Oak and Washingtonia
Palm trees located within the Specific Plan area shall be preserved in place to the
maximum extent feasible. This will be accomplished through sensitive site design
practices including alternative building, driveway and parking lot layouts where
feasible. Where appropriate, the Development Services Department shall grant a tree
preservation parking credit for mature trees at a ratio of up to three spaces for every
tree preserved that might otherwise have had to be removed.
Any healthy, mature tree that must be removed to accommodate new construction
shall be subject to review and approval of a tree removal permit. Prior to issuance of
a tree removal permit, an overall landscaping plan must be approved by the
Development Services Department which includes provision for tree removal,
relocation and/or replacement as may be appropriate. Any tree that must be removed
shall be evaluated by a local certified arborist prior to removal to determine if it can be
successfully relocated (such as a Washingtonia Palm).
All site plans submitted to the City for development approval shall indicate the
location, size, type and condition of all mature trees currently on-site. Those trees
proposed to be removed shall be clearly marked on the site plan. For purposes of this
section, a mature tree is defined as having a trunk of 6 inches or greater as measured
four feet up from ground level.
No trees shall be removed without a tree removal permit. All tree removal, relocation
and/or replacement shall be accomplished at the project proponent's expense.
4.
Entry Point Landscaping
Entry points or statements shall signify the entry into the project area or one of its
individual land use districts. These entry points shall highlight those corners in the
project area with landscaping, signage, and project identification. The entry points to
be highlighted will be identified by the IVDA, and the IVDA will be responsible for
the design and construction QLmonuments and landscaping at these designated
entries.
V-33
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
G.7 Trails
The Specific Plan area is located north of the Santa Ana River. In coordination with the Santa Ana
River Trail system that is being developed by various cities along the River. the SBAC Specific Plan
will include the development of passive and active employee recreation areas within the Southgate
District. along with various trail access points to the River.
The majority of the land along the Santa Ana River is outside the SBAC Specific Plan area and is
owned by the City of Riverside. These parcels are currently used for groundwater wells and provide
habitat for sensitive species. This area is expected to remain as open space and would provide
opportunities for informal trails and recreational uses (such as bird watching and plane watching)
along this section ofthe River. In addition. the proposed trail along the south side ofthe River (east
of Tippecanoe Avenue) is anticipated to cross the River at the historic trolley bridge at the extension
of Mountain View Road and then run easterly along the north side of the River. Exhibit V-13 shows
the proposed trail system near SBAC.
V-34
-------------------
~ UJM
'" Pl X
I ~ ~
c-+- .......
Pl tJj
!2! .......
'" :> >-3
~
~ <:::
I Pl I
~-
....... c.u
<:
~ (1) n
..., I ~
>-3 ~
..., ~
Pl
.......
~
TIPPECANOE AVE
LENA RD.
~
ODD
D
I
-.
\~
D 1-+ . \;
i
i \
. t-<
tt:I c
~ ~'1l> > i 0
~I~ n c;')
n
.. \
CIJ tt:I
~ CIJ ~
'" ::l..~ ." Z
9 ~~ 0
~ CI
n ~~ .
." \
~
i . ~
.
.
,
"
iCD , "
\ ~
i :~
. j!
.
.
I
>
TIPPECANOE AVE OJ
. . -
"
~
co I
..
00;
~lr.
DEL ROSA DR.
~ I 1""\ ''I"?
'" 0 N,ORTON WAY '-l! "-r"
';.-......~:.' .. 0 _
"
,. ~
~
I !'l
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
VI. IMPLEMENTATION
-----
,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
VI. IMPLEMENTATION
A. INTRODUCTION
The implementation of the Specific Plan rests primarily with the IVDA as master developer and the
redevelopment agency and Hillwood as the master developer. As the owner of the San Bernardino
Alliance*California lnternational-ffatl&-C-effief-Specific Plan, the IVDA is interested in the long-term
development of the area. The IVDA, through its ability to lease or sell land to prospective users, can
control the type of development which ultimately occurs. The IVDA intends to aUract users which
will complement the project area, thereby further enhancing its ability to aUract high-quality
businesses and maintain quality design standards.
Similar to any master developer, the IVDA and Hillwood haves the ability to regulate the pace,
location, and guidelines for future development through their ownership of land. Future uses will
need to secure leases and/or arrange for the purchase ofland through the IVDA. As such, the IVDA
should be viewed as an integral part of the regulatory approval process. This is especially true with
respect to interim uses, which will utilize existing buildings under a lease agreement. The IVDA will
be able to direct the location of new uses based upon individual business needs and the availability of
infrastructure to the area that most nearly meets the needs and requirements ofthe prospective tenant.
In conjunction with these efforts, the IVDA will.be~ responsible for overseeing the improvement and
expansion of the infrastructure system. The pace of infrastructure improvements will be tied directly
to the rate of development.
The initial focus of development wais directed toward the existing core portion ofthe San Bernardino
Alliance*California Specific Plan arealntematffrlnHrade Centel', generally located south of Third
Street, west of Norton Way, and north of Mill Street. This wais the location of the initial€llHeHl
street improvements and the mesHikelylocation of potential interim uses which willoccupiedy the
Bjl~exfstjng structures.
The area located north of the airport runway adjacent to Third Street will generate development
interest due to its frontage on and accessibility to Third Street and the expected increase in airport
activity.
The formelexisting golf course area will-eont-iffile-tBI3e-tHilizcd as a-gelf-eotlffie-bat--is expected to
transition, at some future date, to industrial uses. The date of its transition will be tied to the level of
developmenLactivity as~oeiatedwithj!1 the Sl2secifiG_!'ttn are<!!!j~lr:ict~b2cH:flQ::2the'firstlwOaFeil5-of
et1'ljJhasis_and the availability of industrial land.
VIOl
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
B. NEW DEVELOPMENT REVIEW PROCEDURES
All development within the project area shall be subject to the development review procedures ofthe
City of San Bernardino. The specific level of review required is defined in Chapter 19.31 of the
Development Code. Prior to submittal of any application for land use approval to the City, the
applicant must obtain authorization to file from the IVDA. This will allow the IVDA to monitor new
development activity within the Specific Plan areaand provide the IlCcessary service capacity letters
for water and wastewater systems.
B.1 Administration
The procedures used to process permit applications shall be consistent with the City of San
Bernardino Development Code, Chapter 19.31 Administration, except as specified by this Specific
Plan and as modified below.
B.1.1 Non-Conforminl! Structures
The existing Base structures within the boundaries ofthis Specific Plan wereshalHle-.exempt
from the provisions of Section 19.62.020(7) of the Development Code through March 7,
2005, except for improvements (including infrastructure) required to protect the health, safety
and welfare of people or the safety of structures, prior to occupancy, as determined by the
City of San Bernardino. These buildings have since been demolished. ,uml--inel1tding;
<r.-------This-el{~eflsien shall apply only-tethefoll{}\ving.lmlliliH~
--Building Nos. 48, ii6-,-5-8,--Ht.3,4'B, 525 539,912 948-iNetec--if-all-oflhe
ablWe-lisfe&fac-ilities-afe-Jef\scdprim-tttFebFuary-;y)(B, said gr-il€e-J3ffiod shaH
nttlmtgerbe-eeemed to be - in fullforce-aflfl effeet ).
--- - -- --- Alllife;-builtliRgc;Roofir-e-sHte-ty-improv-emefl fs-.must--be-c-<7mp\e{e<:l-(Hj---flj\
W9,^, leascd -faeilitieso
---AH-e-x-is-t-iflg-afld-future IVDA- temmts--ffltlSt-apJ31y-.for---anEl--BbHiffi.--.beth--.a
BusiflCss-Registrat-ifJHt-ertifi€HtC-ilflEl-Htert-iifeffi-eBfOccupancy-ffemthet-it-y
ttfSilfl-BcflJaroiHoo
-AlI-ilerns--of-w-effi--pcFfofffiC<:l-fCIHtivc--lo--saiEl--impr-evcments-whi€h--fct]Uire-n
pe-rmit-shall-be-perfermcEl17ya-licc nsed-conl-m€lef-aOO-rcfmilteEllhreugh-the
tity-of--S-iHl-B-ermtrEl-ineo
- - - -----Gity-H f San BefHareinos-hall-enSllicthfrt-aH--1VM-Gefl-ilfc-a-tc-(-}f-G€eupafJcy,
Blls-iHcss-R-egis-ffitfi(tA;afldlflf-eHnsl-Ftl6tffifJfu-tility--imrf{}vement-~hmiss-ie-ns
shall-Bcprf)€cssetlno--Iale-rllmn 1+)WHfkingfu1-y~fHJm-lheclateofsubmis-si()n,
VI-2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
B.2 Applicability of Policies and Regulations
For purposes of reviewing individual development project applications, the policies contained within
the Specific Plan shall be considered in addition to the regulations and design guidelines contained in
Chapter V. Specific site design criteria for each district and sub-area that must be addressed as part
of the overall project design review process are identified in Chapter_- V.
B.3 Conditions of Approval
The City of San Bernardino will require conditions of approval for new development permitted within
the project area. These conditions will incorporate the applicable mitigation measures identified in the
Environmental Impact Report (EIR) for the San Bernardino Alliance*California Specific Plan. as
previously called the San Bernardino International Trade Center Specific Plan, plus any other
conditions deemed necessary.
B.4 Permit Streamline, Environmental and Development Reviews
The Specific Plan brings with it many processing benefits:
1. Development regulations are geared to take advantage of resources and opportunities
affiliated specifically with the Specific Plan areaproject site;
2. Plan adoption is accompanied by an environmenffiHmpa€I'-fej'l6rl.{EIRj which will
serve as the basic environmental document for future projects on the site as long as
they are consistent with the Specific Plan tha.l was analyzed in the EIR;
3. Specific Plan adoption has been accompanied by parallel adoption of a Ggenerall'rlan
Aamendment which provides a broad policy umbrella envisioning and sanctioning
future development possibilities for the Specific Plan areaproject site, therefore, no
future amendments are needed for any developments consistent with th~is--Specific
l'rlan that was adopted in 1996;
4. Since the Specific Plan provides tailored zoning for the site, no zone changes are
needed for future development consistent with this Specific Prlan;
5. The regulations in Chapter V include a broad range of uses, and allow for further
interpretation of uses not explicitly permitted as similar to those already permitted;
and
6. The majority of all uses included in Chapter V are permitted through the development
permit review process, which allows for staff approval, subject to appeal.
VI-3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
C. PUBLIC BENEFIT PARCELS
All Public Benefit parcels will be treated the same as Interim Uses within the Specific Plan. The initial
occupancy of the buildings and parcels disposed of through the public benefit process will be
permitted subject to the upgrading of existing structures to meet minimum life safety requirements, as
determined by the City of San Bernardino Department of Planning and Building Services and the Fire
Department.
At such time as any physical expansion or change of occupancy occurs, all requirements of the
Specific Plan and City Codes shall be met. At all times, during the life of any public benefit parcel
use, the property maintenance provisions of the Specific Plan and the operational performance
standards of the underlying land use district shall apply.
With regard to extension of infrastructure services, it is presumed that the public benefit parcels will
be served by existing infrastructure currently in place. At such time as an additional level of service is
required or desired, it will be the responsibility of the owner/tenant ofthe parcel to coordinate with
the IVDA or the appropriate public utility for any service/infrastructure upgrades.
D. INFRASTRUCTURE DEVELOPMENT PROGRAM
D.I Land Use/Infrastructure Relationship
New uses require the need for certain levels of capital improvements. As land continues to intensify
in use, it creates an additional demand upon public services. Normally, new uses cannot continue to
increase in intensity unless a proportional increase occurs in the ability of public services to meet this
demand.
However, one of the unique aspects of this project is that as late as 1987 the site was an active
military air force base generating over 10,000 jobs in the local economy. This operation also involved
significant usage of existing infrastructure systems both on base and off. In planning for the
conversion of the former Base to private development, a significant amount of capacity in existing
infrastructure systems, such as roads, water, sewer, and storm drain systems, is available to
accommodate initial development activity.
As described in Chapter IV, the IVDA has also installed additional infrastructure improvements that
will primarily benefit the core area. These improvements, which consisted offull road improvements
on Tippecanoe Avenue, Sheppard Boulevard and Del Rosa Drive, new 20-inch water lines, and gas,
electrical and storm drain facilities are intended to serve as a backbone infrastructure system. As new
development or construction occurs, additional required public facilities can be extended from this
backbone system. It is the intent that all additional infrastructure installed to satisfy the requirements
of the Sspecific I'l"lan and new development will be accomplished on a site=by=site basis, with
incremental improvements until the overall S12ecific Pla!U1I~<!site is built out.
VI-4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Initially, in support of the interim reuse of Baseexisting buildings, the IVDA intends to magke
maximum use of the €Hffcnt iHvestment ift-existing infrastructure. Particularly in the case of water,
wastewater and storm drain systems, existing facilities weare intended to be used to the extent
feasible. As the owner and operator ofthese existing systems, the IVDA wiIl-hagve full control over
the maintenance and quality of the operations. The subsequent transfer of the water and wastewater
systems to the CityEaefl will allow them to be maintained and operated to meet all public health and
safety standards that govern these types of public services.
The City, in conjunction with the IVDA, will determine the timing, type and nature of any expansion
or replacement of the existing systems. To the degree that it continues to be applicable, the ASL
Consulting Engineers Infrastructure Study will serve as the base report for determining the need and
timing for new improvements. Over time, the IVDA may require that this report be supplemented as
needed with additional studies to address site specific needs and requirements.
Off-site infrastructure improvements will be focused primarily on various road improvements as
defined in the Traffic Impact Analysis and Environmental Impact Report prepared concurrently with
the adoption of the i&Specific Plan. as well as subsequent updates. For purposes of this Plan, off-site
improvements refer to those road improvements that are determined to be necessary outside of and
not contiguous to the boundaries of the project area. Based on recommendations contained in the
Traffic Impact Analysis, specific plan projects shall contribute on a fair share basis to the needed
improvements. Contributions shall be made by one of the following:
1. Implementation of the recommended intersection, traffic lane or freeway improve-
ments listed.
2. Payment of dollar equivalent ofthe improvements to a specific fund for said improve-
ments.
3. Implementation of additional capacity on parallel routes to offset impacts on existing
routes. Such additional capacity shall be approved by the City prior to implementa-
tion credits be allowed.
However, for the first 46,520 vehicle trips per day generated by new development and uses within the
boundaries ofthe previous Norton Air Force Base (which includes the SBIA), said new development
and uses shall be exempt from the requirement for additional traffic mitigation fees.
D.2 Procedure
Development on the site will require the availability of public facilities and services to meet its needs
at an acceptable level of service as defmed by the IVDA and City of San Bernardino policies. The
determination of availability will be as toHowsmade on a case-by-case basis.
VI-5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
D.2.. Water
The IVDA shall verify withte-the City that adequate water supply and pressure exists to
service the project prior to issuance of building permits. The Agency will negotiate any
required system upgrades with the individual project proponent on a case~-by~-case basis.
As discussed in Chapter IV. the IVDA has entered into a water system integration agreement
with the City of San Bernardino Municipal Water Department for the integration of the water
system within the Specific Plan boundaries with the City's water system. With this
integration. verification of water supply adequacy will be handled directly by the City of San
Bernardino Municipal Water Department.
D.2.2 Wastewater
The IVDA shall verify that adequate collection system capacity exists to service the project
prior to issuance of building permits. The Agency will negotiate any required system
upgrades with the individual project proponent on a case~-by~-case basis. The IVDA will also
monitor~ total wastewater flows. At such time as wastewater flows within the Specific Plan
area and the Airport reach 1 million gallons per day, the IVDA and the SBIM will require
that the project proponent purchase additional wastewater treatment plant capacity from the
City.
Th~_IVDA and the City of San Bernardino have entered into a Sewer System Transfer
Agreement to convey the public portions of the on-base system to the City of San Bernardino.
The agreement addresses the availability of the 1 mgd of treatment capacity that was reserved
for the former NAFB properties.
D.2.3 Roads
Onsite: The initial road improvements constructed by the IVDA for Sheppard Boukvard,
and portions of Tippecanoe Avenue and Del Rosa Drive, referred to as the "Early Action
Phase," will serve as the backbone circulation system for the project, along with the existing
road network. As new construction occurs, additional roadway improvements will be
required. These will be determined on a case-by-case basis as part ofthe development review
process. It is anticipated that each new project will be responsible for improving the roads
that are contiguous to the project site to the level of improvement identified in the Specific
Plan.
Offsite: Additional off-site improvements to the circulation network have been identified as a
result of the traffic study prepared for th"is Specific Plan. These projects are identified as
mitigation measures in the Int~nationalTra8e~-effief-Specific Plan Environmental Impact
Report. The timing and amount offair-share contribution to these improvements is subject to
separate negotiation and agreement between the Inland Valley Development Agency, San
Bernardino International Airport Authority and the City of San Bernardino as defined by the
EIR mitigation measures.
VI-6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
D.2.4 Drainaee
The existing drainage system for the area was originally designed to serve the level of
development and related impervious surface for the former Aair Eforce Bease. Additional
storm drain capacity was installed in Harry Sheppard Boulevard and other streets. consistent
with the recommendations of the ASL Consulting Engineers Study for the Specific Plan.
Additional storm drain capacity in the Timber Creek channel haswillalso-been
completedinstaHed through coordination between the IVDA, SBIAA, the City and County
when future development justifies the channel improvements. l'fie- Timber Creek
improvements will behas been upgraded to implementaeeemmodate the City's Master Plan of
Drainage for this channel. At such time as additional on-site storm drain capacity is needed,
additional system improvements will be installed.
E. INFRASTRUCTURE FINANCING
Financing of the expanded infrastructure system will occur using a variety of methods. As noted at
several points in the Specific Plan, it is anticipated that the majority of new infrastructure beyond this
point will be developer funded. However, there are a number of other methods that can be utilized
when necessary. These are summarized below.
E.! Direct Developer Construction
In most instances, required infrastructure will be installed at the developer's expense. As an
alternative, the developer may enter into a reimbursement agreement with the IVDA if the costs
incurred are those that would otherwise have been handled by the IVDA or a future development
within the project area.
E.2 Redevelopment Bonds
The IVDA is formed as a Redevelopment Agency. As such, it receives revenue on the increased
taxes generated by new development that occurs within the Agency's boundaries. Existing
infrastructure improvements were funded in part by the sale of redevelopment bonds against which
future revenues are pledged to payoff the debt. The acquisition cost of the land within a portion of
the project boundary is also being financed by redevelopment revenues.
E.3 Economic Development Grants
The Federal Government makes certain grant monies available to local agencies for infrastructure
improvements when there is a clear relationship to enhancing economic development opportunities.
The fact that this is a :Bease closure project enhances that eligibility. Generally, these grants are
subject to some local match share.
VI-7
t
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
E.4 Development Fees
The City of San Bernardino has a set of Development Fees in place that address a variety of
infrastructure needs within the City. All new construction within the project will be subject to these
fees at the time of building permit issuance. Since State Law requires a nexus between the fee
collected and the improvements constructed, it is presumed that these monies will be utilized for
various infrastructure improvements that will benefit the Specific Plan area.
A special study was prepared for the IVDA by the Natelson Company, Inc. which evaluated the
feasibility of the IVDA adopting its own development fee structure, in addition to the existing City
Development Fees. The purpose of this analysis was to determine the extent to which additional
development fees could be used to pay for identified Specific Plan Capital Infrastructure
improvements. Using costs identified in the ASL Consulting Engineers Study and supplemented with
road construction costs by the project team, the analysis concluded that in most cases, if developers
had to pay additional fees they would choose to develop elsewhere in the City or region. However,
the IVDA project area offers a special incentive in that land prices can be offered at below market
rates, hence allowing for overall cheaper development costs. There is therefore room to levy
additional fees up to a point where additional fee costs do not completely offset the savings due to
below market rate land costs. A Fee Schedule Model was developed which assesses reduced land
costs versus additional development fees and ultimately derives financially feasible combinations from
a develope(s perspective.
The costs that were inputted into the model reflected the total cost of infrastructure for all phases of
the project, as estimated by ASL Consulting Engineers and NBS/Lowry Engineers and Planners.
These costs did not include off-site costs as previously defmed. Based on these costs (estimated at
approximately $23 million), and applied against the intensity of development identified in the Specific
Plan, it was concluded that as long as land costs within the Specific Plan were approximately 20
percent below market rate, it would be feasible to collect adequate development fees to offset the
infrastructure costs referenced above. Because the model is dynamic, as variables within the model
change, such as land use intensity or overall infrastructure costs, the model can be rerun and the
results evaluated. Ultimately, it will be up to the IVDA whether they choose to adopt additional
development fees and how much those fees might be.
F. MAINTENANCE
Certain improvements throughout the project area will require a consistent level of maintenance.
Primary, secondary and local streets will ultimately be dedicated to the public and become the
responsibility of the City of San Bernardino. Parkway landscaping or landscape areas outside of the
public right-of-way are the responsibility ofthe private property owner, however, represent a major
element in how the overall project presents itself to the community and other potential users.
The IVDA will investigate and employ a variety of maintenance processes to meet the demands of the
project and specific users. Based upon this and subject to review and approval by the City, the lVDA
may utilize one or both of the following types of maintenance mechanisms.
VI-8
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
F.l Assessment Districts
This process involves placing a levy upon property to pay for a public improvement which is of direct
benefit to that property. An example of this type of assessment is the Landscape and Lighting Act of
1972. This type of assessment can be imposed to finance a variety of actions, including:
a. Acquisition ofland for parks, recreation and open space;
b. Installation or construction of planting and landscaping, public lighting facilities,
ornamental structures, and park and recreational improvements; and
c. Maintenance and servicing of any of the above.
Assessment District No. 1022 has been established for the maintenance oflandscaping along portions
of Lena Road. Mill Street. Tippecanoe Avenue. Harry Sheppard Boulevard. Central Avenue. Del
Rosa Drive. Third Street. Rialto Avenue. and Leland Norton Way. The assessment district includes
approximately 825 acres of land. including portions of the SBAC Specific Plan.
F.2 Property Owners' Association
A group of property owners can join together to form an association for the purpose of maintaining
private property in accordance with established covenants. codes. and restrictions (CC&Rs). The
function of the association is comparable to that of an assessment district in that revenue is generated
by assessing individual businesses.
I t is the intent of this Specific Plan to allow the use of a variety of mechanisms for the maintenance of
property. The criteria for allowing the establishment of a maintenance mechanism within the San
Bernardino Alliance*California-lffifflliltiBflal'HaileCeffief is three-fold:
a. It must be a generally accepted method currently employed in business parks;
b. It must have the ability to equitably collect funds for the purpose of maintaining
improvements that exist in common with the project; and
c. It must establish a specific entity responsible for maintenance.
Table VI-l identifies the responsibility for construction and maintenance of various facilities by type.
The IVDA shall facilitate the formation of a property owners association or assessment district.
P!!r.~1E!nt.1CL the provisions of San Bernardino City Municipal Code. Chapter 12.90. for the
maintenance of landscaped areas. ligl:!tiJ:!g, infrastructure and roadway improvements. that are not
otherwise deeded to the City of San Bernardino or other public agency.
VI-9
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
G. SUBDIVISION MAP ACT REVIEW
In addition to the other implementation measures previously identified in this !:;ehapter, it will be
necessary in the course of reuse and redevelopment of the Specific Plan areaproject site to carry out
the provisions of the California Subdivision Map Act, as they may uniquely apply in this circumstance.
The Subdivision Map Act is contained in the California Government !:;eode in Sections 66410
through Section 66499.58 and govern~ the subdivisiondiHg of land for purposes of sale, lease or
financing.
G.l Future Map Act Submittals
As reuse and development progresses, there will be an increasing necessity to prepare for and
facilitate Map Act reviews and approvals through the City of San Bernardino Planning and Building
Services Department. This will occur as hazardous waste remediation and/or major developments
proceed and fee title is gained by the IVDA for sale to new users. In order to make this transition
smooth, attention will be needed along the way to such considerations as street right-of-way and
paving standards, parcel size and alignments, and similar future Map Act review considerations.
Existing lot lines will be recognized to facilitate and allow lot mergers and lot line adjustments. as
land is sold or leased to private parties. This can be done cooperatively between the IVDA and the
Planning and Building Services Department during development permit reviews in anticipation of
future formal Map Act proceedings.
TABLE VI---I
INFRASTRUCTURE CONSTRUCTION/MAINTENANCE RESPONSIBILITY
Construction 0 erations/Maintenance
Water Develo er Cit jVflA'
Wastewater Develo er Cit l-V-AAJ:2
Draina e Develo er /IVDA IVDA
Onsite Roads
Local Developer City
Arterials ~, Cit
Develo er--
Offsite Roads Cit ,,4 Cit
Electrical Develo er SCE
Gas Develo er SCG"fGG4'
Entry Monumentation IVDA IVDA
Notes: ' In some areas, the developer may be able or required to connect directly to a City owned line, In those
instances, the City will be responsible for operation and maintenance. With the recent integration of the water
system wit]1in the Bast;"wi!.hJhe City's water system. this responsibility was transferred to the City's Municipal
Water Department.
VI-lO
I
I
2 With the Sewer Svstem Transfer Agreement between the IVDA and the City. the City became responsible for
the wastewater svstem within the Specific Plan area.
I
" In some instances, particularly where a road is nnt bounded by the IVDA on both sides, but is otherwise within
the boundaries of the Specific Plan, such as the extensions of Mill Street and Del Rosa Drive, the IVDA will
assume responsibility for the non-contiguous half of the roadway construction.
I
" The appropriate City agency will assume ultimate responsibility for the final off-site road improvements using,
in part, the funds paid by developers within the Specific Plan who have contributed their fair share toward
those ultimate improvements as determined by the Traffic Impact Analysis.
I
I
54 For an undetermined period of time, the lVDA will continue to own and operate an existing low pressure
natural gas system. All new construction will connect to the Southern California Gas Company's high pressure
line available as part of the backbone infrastructure improvements.
I
I
I
I
I
I
I
I
I
I
I
I
VI-ll
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
....
....
EXHIBIT B
,'t.,
Ie:;
ENVlRONMENTALSERVICES . PlANNING . NATtJRALREsoURCESMANAGEMENT
Date: J\priI9,2007
To: Valerie Ross, City of San Bernardino Development Services Director
From: Joan Valle, Environmental Planner
Subject: San Bernardino Alliance California and Southgate Warehouse Project
Documentation on Preparation of an J\ddendum to the 1995 EIR
This memo is to substantiate the decision to prepare an J\ddendum to the 1995 San Bernardino
International Trade Center Specific Plan Environmental Impact Report for the revised Specific
Plan (renamed San Bernardino Alliance California Specific Plan), including the Southgate
Warehouse Project.
When a lead agency has already prepared an EIR, CEQJ\ mandates that "no subsequent or
supplemental environmental impact report shall be required by the lead agency or any responsible
agency, unless one or more of the following events occurs: (a) substantial changes are proposed
in the project which will require major revisions of the environmental impact report; (b)
substantial changes occur with respect to the circumstances under which the project is being
undertaken which will require major revisions in the environmental impact report; (c) new
information, which was not known and could not have been known at the time the environmental
impact report was certified as complete, becomes available." (Cal. Pub. Res. Code, ~ 21166) State
CEQJ\ Guidelines Section 15162 clarifies that a subseqnent EIR or supplemental EIR is only
required when "substantial changes" occur to a project or the circumstances surrounding a
project, or "new information" about a project implicates "new significant environmental effects"
or a "substantial increase in the severity of previously significant effects." (State CEQJ\
Guidelines, ~ 15162.)
When only minor techuical changes or additions to a previous EIR or negative declaration are
necessary and none of the conditions described in Public Resources Code section 21166 calling
for the preparation of a subsequent of supplemental EIR or negative declaration have occurred,
~.30
5(;)-/[D1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
April 9, 2007
Page 2
CEQA allows the lead agency to prepare and adopt an addendum. (State CEQA Guidelines, ~
15164(b).)
Previous analysis of environmental impacts has been conducted for the proposed project,
including an Initial Study and an EIR which incorporated the Initial Study. The EIR prepared in
1995 for the San Bernardino International Trade Center (SBITC) determined that the proposed
specific plan would create significant impacts related to noise, and short- and long-term air
quality even after implementation of all feasible mitigation.
The 1995 SBITC project proposed 11.05 million square feet ofindustria1 uses on 616.2 acres. In
1999, the project area was increased to 11.4 million square feet. The currently proposed
San Bernardino Alliance California Specific Plan proposes a maximum buildout of 14.15 million
square feet of building space on 657.2 acres (41 acres over the 1999 approved project area),
however because portions of the Specific Plan have already been implemented at Floor Area
Ratios less than what is being proposed, and because much of the development is planned at
Floor Area Ratios less than the maximum proposed, the actual building square feet at buildout is
projected at 11.64 million square feet. This represents a 2 percent increase in square footage over
the approved 1999 project. At that time, an Initial Study was prepared that concluded an
Addendum to the original EIR was the most appropriate CEQA document for the proposed
project changes. In addition, in 2005 a separate EIR was prepared for the Stater Brothers facility
totaling 1.93 million square feet proposed on 163 acres within the Centergate area of the San
Beniardino Alliance California Specific Plan. The Stater Brothers EIR was prepared to document
that that project would not create any new or different significant impacts from those identified in
the original EIR. Since then, Hillwood and the IVDA have developed the proposed specific plan
changes outlined in Section 3 of this Initial Study. The analyses in the preceding sections
determined that the actual buildout of the San Bernardino Alliance California Specific Plan will
be substantially less than the maximum potential since so much of the specific plan area has
already been built out at much lower floor area ratios than anticipated under the original specific
plan. This reduction in square footage and the change in use from traditional industrial to "high
cube" warehouses have reduced traffic generated by the project by 82 percent, according to
updated traffic studies for the overall specific plan and the proposed Southgate Warehouse
Project (see Appendices E and F). These project changes will also result in significantly less air
pollution and noise being generated by project traffic. The analysis in the following sections
demonstrates that the currently proposed project will produce impacts that are significantly
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Apri19,2007
Page 3
reduced from those outlined in the 1995 EIR (see Appendix H), even with the addition of32.6
acres to the specific plan. This analysis merely clarifies the characteristics of the proposed
project and entire project site, including the Hubbs, Koo, DF AS parcels and the Third Street
District land swap, and does not represent significant new information or change the significance
conclusions of the original EIR. The following table compares each environmental issue from the
current Initial Study checklist to the findings of the 1995 EIR.
Current Impacts Compared to the Original 1995 EIR
Aesthetics
A . cultural Resources
0 0 181 0
0 0 181 0
0 0 0 181
0 0 181 0
0 0 181 0
0 0 181 0
0 0 181 0
0 0 181 0
0 0 181 0
0 0 181 0
0 0 0 181
0 0 181 0
0 0 181 0
0 0 181 0
0 0 0 181
0 0 181 0
Mineral Resources
Noise
Po ulation and Housin
Public Services
Recreation
Trans ortationffraffic
Utilities and Service S stems
As summarized above, the proposed San Bernardino Alliance Specific Plan does not represent
significant new information or change the significance conclusions of the original EIR, and it
actually represents lesser impacts for Air Quality, Traffic and Noise. Therefore, this Initial Study
concludes that an Addendum to the original EIR is the most appropriate CEQA document for
these proposed changes to the San Bernardino Alliance California Specific Plan, consistent with
the requirements ofCEQA.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CITY OF SAN BERNARDINO INITIAL STUDY
FOR THE SOUTHGATE WAREHOUSE PROJECT
AND SAN BERNARDINO ALLIANCE CALIFORNIA
SPECIFIC PLAN AMENDMENT
Project Description/Location:
East Side of Tippecanoe Avenue at
Palm Meadows Drive in the City of San Bernardino
Prepared For:
City of San Bernardino
Development Service Department
300 North "0" Street
San Bernardino, CA 92418
909.384.5057
Contact: Valerie Ross
Prepared By:
Michael Brandman Associates
621 E. Carnegie Drive, Suite 100
San Bernardino, California 92408
909.884.2255
Contact: Kent Norton, AICP
Project Manager
....
....
MICHAELBItANDMANASSOClATBS
April 9, 2007
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Sarnardlno
Initial Sludy for Soulhgale
Table of Conlenls
TABLE OF CONTENTS
Section 1: Project Information........................................................................................ 1 -1
Section 2: Executive Summary ...................................................................................... 2-1
Section 3: Introduction ................................................................................................... 3-1
3.1 - CEQA ............................................................................................................ 3-1
3.2 - Project background........................................................................................3-1
3.3 - Project Location.............................................................................................3-3
3.4 - Project description ......................................................................................... 3-3
3.5 - Surrounding Land Uses and Setting .............................................................. 3-8
Section 4: Environmental Factors Potentially Affected................................................ 4-1
4.1 - Environmental Determination......................................................................... 4-1
Section 5: Environmental Checklist Form..................................................................... 5-1
5.1 - Aesthetics ...................................................................................................... 5-1
5.2 - Agriculture Resources ................................................................................... 5-4
5.3 - Air Quality ......................................................................................................5-5
5.4 - Biological Resources ...................................................................................5-21
5.5 - Cultural Resources ...................................................................................... 5-27
5.6 - Geology and Soils........................................................................................ 5-29
5.7 - Hazards and Hazardous Materials............................................................... 5-34
5.8 - Hydrology and Water Quality ....................................................................... 5-38
5.9 - Land Use and Planning ............................................................................... 5-42
5.10 - Mineral Resources..................................................................................... 5-46
5.11 - Noise ......................................................................................................... 5-47
5.12 - Population and Housing............................................................................. 5-53
5.13 - Public Services .......................................................................................... 5-54
5.14 - Recreation ................................................................................................. 5-55
5.15 - Transportation/Traffic................................................................................. 5-57
5.16 - Utilities and Service Systems..................................................................... 5-65
5.17 - Mandatory Findings of Significance ........................................................... 5-68
5.18 - Documentation on Preparation of an Addendum to the Previous EIR ....... 5-70
Section 6: References..................................................................................................... 6-1
6.1 - Reference Documents ...................................................................................6-1
6.2 - Document Preparation Staff........................................................................... 6-2
Michael ElnIndman Assoclllles
H:\Client\2636\26360006\SBAC Addendum 040907.doc
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
/nlt/a/ Study for Southgate
Tabla of Contants
LIST OF EXHIBITS
Exhibit 1: San Bernardino Alliance California Specific Plan Location.............................. 3-12
Exhibit 2: San Bernardino Alliance California Specific Plan Land Use Districts............... 3-13
Exhibit 3: Southgate Warehouse Project Site Plan ......................................................... 3-14
Exhibit 4: Koo Site Plan .................................................................................................. 3-15
Exhibit 5: General Plan Land Use Districts for Surrounding Jurisdictions ....................... 3-16
Exhibit 6: Biological Habitat Conservation Areas ............................................................ 5-26
Exhibit 7: Airport Noise Contours - 2005........................................................................ 5-51
Exhibit 8: Airport Noise Contours - 2023......................................................................... 5-52
LIST OF TABLES
Table 1: Evaluation of the Environmental Impacts of the 1995 Approved Project
Compared to the Currently Proposed Project...................................................... 2-1
Table 2: San Bernardino Alliance California Land Use Comparison .................................. 3-9
Table 3: San Bernardino Alliance California Land Use by District................................... 3-10
Table 4: Southgate Warehouse Project Specifications ................................................... 3-11
Table 5: Ambient Air Quality - San Bernardino, California (2003-2005) ........................... 5-6
Table 6: Anticipated Construction Schedule and Equipment Inventory ........................... 5-10
Table 7: Construction Emissions (Without Mitigation)..................................................... 5-11
Table 8: Construction Emissions (With Mitigation).......................................................... 5-14
Table 9: Comparison of Long-Term Emissions............................................................... 5-15
Table 10: Estimated Carbon Monoxide Concentrations.................................................. 5-16
Table 11: Existing Conditions 2005 - Delay and LOS ..................................................... 5-59
Table 12: Year 2030 Conditions - Without Project and Planned Improvements ............. 5-61
Table 13: Year 2030 Conditions - With Project and Planned Improvements ................... 5-63
Table 14: Current Impacts Compared to the Original 1995 EIR...................................... 5-72
IIflchaa/ Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
11/
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Southgate
Tabla of Contants
APPENDICES
(on Enclosed CD)
Appendix A: Air Quality
Appendix B: Biological Resources Assessment (Southgate)
Appendix C: Biological Resources Assessment (Koo)
Appendix D: Jurisdictional Delineation Report]
Appendix E: Traffic Impact Analyses (Southgate)
Appendix F: Traffic Impact Analyses (SBACSP)
Appendix G: Related Correspondence
Appendix H: Mitigation Measures from Previous 1995 EIR
Mlchaal Brandman Associates
H:\Cllentl2636\26360006\SBAC Addendum 040907.doc
Iv
! I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Southgate
Project Information
SECTION 1:
PROJECT INFORMATION
1. Project Title: Southgate Warehouse Project and San Bernardino
Alliance California Specific Plan Amendment
2. Lead Agency Name: City of San Bernardino
Address:
300 North D Street
San Bernardino, CA 92418
3.
Contact Person:
Ms. Valerie Ross
Phone Number:
(909) 384-5057
4. Project Location (AddresslNearest cross-streets): East of Tippecanoe Avenue at Palm
Meadows Drive in the City of San Bernardino. See Section 2.3 for a complete description of
the project location.
s.
Project Sponsors:
Hillwood Investment Properties
Address:
105 North Leland Norton Way, Suite 3
San Bernardino, CA 92408, and;
Inland Valley Development Agency (IDV A)
294 South Leland Norton Way
San Bernardino, CA 92408
6. General Plan Designation: Specific Plan
Michael Brarrdman Associates
H:\Cllentl2636\26360006\SBAC Addendum 040907.doc
1-1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
InlUal Study for Soulilgate
Projecllnfonnalion
7. Description of Project (Describe the whole action Involved, inclndlng, but not limited to,
later phases ofthe project and any secondary, support, or off-site feature necessary for
its implementation. Attach additional sheets, if necessary): A warehouse project on
approximately 145 acres of land within the southernmost portion of the San Bernardino
International Trade Center Specific Plan (SBITC), and amendments to the SBITC Specific
Plan, including a name change to San Bernardino Alliance California (SBAC) Specific Plan.
See Section 3.4 for a complete description of the project.
8. Surrounding Land Uses and Setting: Commercial, industrial, and residential, and open
space and flood control related to the Santa Ana River. See Section 2.5 for details of the
current land use setting.
9. Other agencies whose approval is required (e.g., permits, finance approval, or
participation agreement:
RWQCB Regional Water Quality Adam Fischer 951.320.6363
Control Board
SBCFCD San Bernardino County Naresh Varma 909.387.8110
Flood Control District
CDFG California Department of Jeff Brandt 909.987.7161
Fish and Game
USACE US Army Corps of Jason Lambert 213.452.3361
Engineers
USFWS US Fish and Wildlife Nancy Ferguson 760.431.9440
Service
Michael Brandmen Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
1-2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Barnardlno
Initial Study for Southgata
Executive Summary
SECTION 2:
EXECUTIVE SUMMARY
The San Bernardino International Trade Center Specific Plan was originally approved in 1995, with
the closure of Norton Air Force Base. The current San Bernardino Alliance California Specific Plan
proposes minimal changes, which will actually lessen the impacts of previously approved project.
The environmental topics listed in Table 1 were identified in the 1995 Environmental Impact Report
(EIR). This table compares the impacts of the 1995 San Bernardino International Trade Center
Specific Plan to the proposed 2006 San Bernardino Alliance California Specific Plan.
Table 1: Evaluation of the Environmental Impacts of the 1995 Approved Project
Compared to the Currently Proposed Project
Envlronmentlll . 1995 2006
Topic. Approved Project . Proposed PrOject
Project San Bernardino International Trade Center The San Bernardino Alliance Califomia
Description Specific Plan was implemented upon Specific Plan includes a maximum
closure ofNAFB. It included 11,056,617 potential buildout of 14,152,295 square
square feet of building space on 616.2 acres feet; however, because much of the SP
ofland, which revolved around the airport. has already been constructed and is
currently in use, the realistic planned
buildout is 11,640,016. The totalland
area of the proposed SP is 657.2 acres,
plus an additional 35.4 acres for
roadways. The land being added to the
SP includes the Koo, Hubbs, and
Defense Finance and Accounting
Services (DF AS) properties.
Geotechuical Less than siguificant with mitigation. The Reduction in potential impacts due to
project is subject to ground motion during improved technology, structural design,
the life of the structure, and on-site soils and higher design standards.
are subject to wind erosion.
Water Resources Less than siguificant with mitigation. The Reduction in potential impacts due to
project shaH result in the increased use of improved technology, filtration design,
potable water; it may result in increased and stronger standards.
pollutants in water drainage from the site;
and it may result in building within the
100-year flood plain.
Biological Less than siguificant with mitigation. Less than siguificant with mitigation.
Resources Development of the Specific Plan will There is very little land within the SP
impact sensitive biological elements on the area which has not been disturbed since
site, and may affect the habitat of sensitive the 1995 ElR. The southern portion of
species, including the Riversidean Alluvial the site currently has the greatest
Fan Scrub, and may result in development potential for impacts to biological
within riparian areas, and may result in resources. With 1995 ElR mitigation,
incidental impacts and/or "take" of these impacts are reduced to less than
sensitive species and/or elements. siguificant
I
I
Mlchaal Brandman Associates
H:\CIlent\2636\26360006\SBAC Addendum 040907.doc
2-1
I
City of San Bernardino
Init/el Study for Southgete
Executive Summary
I
Table 1 (Continued): Evaluation of the Environmental Impacts of the 1995 Approved Project
Compared to the Currently Proposed Project
I
I
Environmental 1995 2008
Topic. Approved Project Proposed Project
Cultural Impacts No potential project impacts. The 1995 No Impact. The current analysis is
ElR determined that there were no cultural consistent with the previous findings.
or paleontological resources within the SP,
and therefore no mitigation was required.
Land Use and Less than significant with mitigation. The Reduced impacts because much of the
Relevant Planning project may result in land use conflicts area is built out and currently used for
between existing residential units and industrial type uses, including south of
proposed industrial and commercial uses, the project site, adjacent to the southern
and the project proposes industrial bank of the Santa Ana River. The site is
development adjacent to the Santa Ana adjacent to the San Bernardino
River. International Airport (SB IA), and
portions of the site are within the Inner
Turning Zone (Zone 3), Sideline Safety
Zone (Zone 5), and the Traffic Pattern
Zone (Zone 6) of the SBIA.
Hazardous Waste Less than significant with mitigation. The Site contains 3 former contamination
and Hazardous project may result in new development in sites: gun range (lead), dioxin cleanup
Materials or around the Installation Restoration site, and Industrial Wastewater
Program sites. New uses may involve Treatment Plant (IWTP). Reduced
hazardous material and the potential for impacts as much of the project area has
improper disposal of hazardous waste. been treated/decontaminated through
intense remediation, and any remaining
areas requiring clean up will be
remediated prior to development.
Transportation and Less than significant with ntitigation. The Substantial reduction due to less intense
Circulation project will result in increased flows use within the SP area (from traditional
resulting from automobiles accessing the industrial to "high cube" warehouses),
site. which will generate less traffic (fewer
truck trips).
Noise Project construction will result in short- Substantial reduction than originally
term noise increases. The project will approved due to less intense use within
contribute to cumulative noise increases the SP area and a decrease in traffic
along existing roadways; this will generated by the proposed uses. The
adversely affect the sensitive uses project's contribution to cumulative
(residential) adjacent to these roadways. noise impacts will be reduced but
cumulative noise impacts are still
significant.
Air Quality Significant impacts. The project, even with Substantial reduction in potential
mitigation, will impact both short- and impacts (even with the expanded land
long-term air quality. area and increase in building square
footage) due to improved technology,
cleaner burning fuels, and less intense
use than what was originally approved.
With mitigation, short- and long-term
impacts have been reduced to less than
significant.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Michael Brandman Associates
H:\Cllentl2ll36\26360006\SBAC Addendum 040907.doc
2-2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Samardlno
Initial Study for Southgate
ExacuUve Summary
Table 1 (Continued): Evaluation of the Environmental Impacts of the 1995 Approved Project
Compared to the Currently Proposed Project
EnVIronmental
Topic.
Public Services
and Utilities
1995
APProved Project
2006
Proposed Project
Less than significant with mitigation. The
project will result in increased demand for
capital improvements for police and fire
prevention services. The demand for water
and sewer services may exceed planned
capacity. Existing water lines and facilities
may be subject to breakage and/or leakage.
'Environmental topics and order from Section 1.3 of the 1995 San Bemardino International Trade Center Specific Plan
EIR.
Note: Only environmental topics listed in the 1995 EIR as having a potential to create impacts are included in this table.
Less than significant with mitigation.
The proposed project is consistent with
the land use previously approved and
will not create more severe impacts.
The proposed project, even with the addition of the Hubbs, Koo and DF AS parcels, and the Third
Street District land swap, will not result in new significant environmental impacts nor substantially
increase the severity of previously identified environmental effects. The following analysis actually
demonstrates that a number of impacts identified in the 1995 EIR will be substantially reduced (e.g.,
air quality, traffic, noise, etc.). There are no substantial changes in circumstances that will change
this determination.
Michael Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
2.3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
InlUal Study for Southgate
Introduction
SECTION 3:
INTRODUCTION
3.1 - CEQA
The California Environmental Quality Act (CEQA) requires the preparation of an Initial Study (IS)
when a proposal must obtain discretionary approval from a governmental agency, and is not exempt
from CEQA. The purpose of the Initial Study is to determine whether or not a proposal, not exempt
from CEQA, qualifies for a Negative Declaration or whether or not an EIR must be prepared.
This environmental analysis is two-tiered with the impacts from the San Bernardino Alliance
California (SBAC) Specific Plan (SP) amendments evaluated at the program level, and the impacts
from Southgate Warehouse Project (SWP) evaluated at the project level. Throughout this CEQA
document, there will be references to both levels (herein "program" refers to the proposed San
Bernardino Alliance California Specific Plan Amendments and "project" refers to the proposed
Southgate Warehouse Project). This document evaluates potentially significant adverse
environmental impacts that could be associated with either the program and/or the project, and
identifies actions (mitigation measures) that would reduce or eliminate these impacts.
This IS will be used by the City of San Beruardino and the Inland Valley Development Agency
(IVDA) to assess the potential environmental impacts associated with both the program and project
including, the construction and operation of the project components. This IS does not set forth policy
for the City of San Bernardino about the proposed project's desirability; rather, it is an informational
document to be used by decision-makers, public agencies, and the public. During the program and
project review process, the City must consider a1I feasible mitigation measures developed in the IS to
substantially lessen anticipated environmental impacts of the project.
3.2 - PROJECT BACKGROUND
The Specific Plan amendments are within the planning area for the IVDA, and within the plan area of
the San Bernardino Alliance California Specific Plan, which conforms to the former boundaries ofthe
Norton Air Force Base (NAFB) and includes adjacent areas to the south.
Effective Jannary 1990, the IVDA, a Joint Powers Authority in accordance with California
Development Code, has been the responsible agency for the redevelopment of the former NAFB,
which was one of several military bases closed by the federal government in the late 1980s. After
closure in 1994, NAFB was redesignated the San Bernardino International Airport, while the airport
Michael Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
3-1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Barnardlno
Initial study for Southgate
InlloductJon
and the surrounding non-aircraft supporting areas became the San Bernardino International Trade
Center. Ibis project proposes to change the name of the Specific Plan area from San Bernardino
International Trade Center to San Bernardino Alliance California. The purpose for the SBAC
Specific Plan is to provide for the transition of the non-airport portion of the former NAFB site from a
single-purpose military use to a multi-use commercial/industrial center (IVDA 2005). In conjunction
with converting the former military base to multipurpose civilian use, a principal goal of the IVDA is
to promote economic growth and to restore employment levels to that prior to base closure.
For CEQA purposes, the base closure and reuse was originally discussed in the 1993 Final
Environmental Impact Statement: Disposal and Reuse of Norton Air Force Base, followed by the
1995 San Bernardino International Trade Center Environmental Impact Report, prepared by LSA
(SCH No. 95082052). The 1995 SP allowed for just over II million building square feet, and
covered an area totaling 616.2 acres. Although the findings determined that there would be
significant impacts to noise and short- and long-term air quality, the project was ultimately approved
with a Statement of Overriding Considerations. A subsequent CEQA document was prepared in 1999
which amended the 1995 EIR. The 1999 amendments primarily dealt with land use designation
changes which stemmed from the failure to develop the World Trade Center district within the SP
area. The 1999 amendments slightly increased the building square footage; however, the total land
area remained the same. In 2004, an IS was conducted for a DHL Air Cargo Facility on 35 acres
within the Specific Plan area. The DHL project ultimately was forfeited and never came to fruition.
In 2005, the specific plan went through the amendment process in order to accommodate the Stater
Brothers warehouse and corporate facilities. The Stater Brothers CEQA document was an EIR which
focused on only two environmental topics-traffic and air qnality. The Stater Brothers project
required a land swap with the airport. As a result of the land exchange, the Specific Plan area
increased to 660 acres (including roadways). The 2006 San Bernardino Alliance California Specific
Plan increases the total land area to 692.6 acres ofland space (including 35.4 acres of roadways), and
increases maximum potential buildout to rougWy 14 million square feet of building space. Table I in
Section 2.4, Project Description, illustrates the land use changes since 1995.
The main changes to the Specific Plan document include the following:
. Change in Specific Plan name from San Bernardino International Trade Center to
San Bernardino Alliance California;
. Change in district names to Northgate, Southgate, Westgate, Centergate, DF AS and Third
Street;
. Added area for Hubbs and Koo parcels in Southgate and portion of DF AS parcel totaling
32.6 acres;
Mlchaal Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
3-2
iU
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Barnardlno
Initial Study for Southgata
Introduction
. Change in FAR for future industrial uses on the former golf course from 0.25 to 0.5;
. Changing the name of Palm Meadows Drive to Central Avenue; and
. Update of information to reflect improvements and activities completed over the years.
3.3 - PROJECT LOCATION
The San Bernardino Alliance California (SBAC) Specific Plan (SP) area is generally located between
the 215 and 210 Interstate (I) highways and north ofI-1O in the City of San Bernardino,
San Bernardino County. The SBAC Specific Plan includes six districts which comprise three
non-contiguous areas, surrounding the San Bernardino International Airport (SBlA), and is
approximately 692.6 acres in total land area (including 34 acres of arterial streets). See Exhibit I for
the SBAC SP location and Exhibit 2 for a map of the SBAC Specific Plan area and delineation of the
individual districts within.
SBlA borders the cities of HigWand to the north and Redlands to the east (at Alabama street) and is
located from 3rd street in San Bernardino southward to the Santa Ana River. Tippecanoe Avenue is
the westernmost boundary of the airport. The SBAC Specific Plan area extends west of Tippecanoe
Avenue to Lena Road and includes an area southwest of the intersection of Mill Street and
Tippecanoe Avenue. This is the central and core share of the SBAC Specific Plan area. Westgate,
Northgate, Centergate and DF AS, four of the six individual project areas, comprise this core area.
The Third Street District of SBAC is located south of Third Street toward the northeast comer of the
airport. The Southgate District, the subject property, is south of the airport, sandwiched between the
runway and the Santa Ana River. Specifically, the Southgate Warehouse Project totals rougWy
145 acres located immediately east of Tippecanoe Avenue at Palm Meadows Drive, and lies
completely within the boundaries of the City of San Bernardino. The subject warehouse property is
located both north and south of Palm Meadows Drive. See Exhibit 2 for a map of the SBAC Specific
Plan area, including the Southgate Warehouse Project.
3.4 - PROJECT DESCRIPTION
The project involves two components, program specific amendments to the San Bernardino
Intematioual Trade Center Specific Plan (renamed San Bernardino Alliance California Specific Plan
or SBACSP), and a project specific proposal for the Southgate Warehouse Project, which is one
district within the SBACSP. The proposed SP includes three areas totaling 32.6 acres which were not
included in the 1995 SP. These areas include:
. The Koo parcel (10.47 acres on the southeast comer of Tippecanoe and Palm Meadows Drive);
Michael Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
3-3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bemardlno
InltJal Study for Southgate
Introduction
. The Hubbs parcel (12.53 acres north of Palm Meadows Drive and west of Mountain View,
south of the golf course; and
. The DFAS parcel (9.6 acres on the southwest corner of Mill Street and Tippecanoe Avenue)
The DF AS parcel is currently in use and will not be redeveloped; the area is being added to the SP in
its current state to be able to take advantage of signage, marketing, etc. for the Specific Plan
properties and consistency of guidelines for future development. Table 2 at the end of this section
illustrates the land use changes of the SP area since it was first approved in 1995. Table 2 also
demonstrates that the actual buildout of the SP area is much less than the potential buildout. The
following summarizes all of the proposed amendments to the Specific Plan:
. Change name of project from San Bernardino International Trade Center Specific Plan
(Amendment #4) to the San Bernardino Alliance California Specific Plan (Amendment #5);
. Designate Central Avenue east of Tippecanoe Avenue (formerly Palm Meadows Drive) as a
secondary arterial with an 88-foot right-of-way;
. Designate Lena Road from Third Street to Orange Show Road as a secondary arterial with an
88-foot right-of-way;
. Redesignate the Northgate Research and Development District simply the Northgate District;
. Redesignate the Westgate Trade Park District simply the Westgate District and remove the
allowance for conference and convention facilities, hotels, motels, theaters, and entertaimnent
facilities, offices, recreation and commercial recreational uses, restaurants, wholesale
businesses, and light industrial/warehouse uses including light assembly;
. Redesignate the Centergate Industrial District simply the Centergate District, eliminate the
industrial sub-area Sa, and identify the Norton Community Credit Union and Stater Brothers
Corporate Office and Distribution Center as existing uses;
. Eliminate Industrial Subareas 5b and 5c in the Southgate District and indicate the planning area
will develop industrial uses;
. Eliminate Industrial Subarea 5d in the Third Street District;
. Add the DF AS District to the Specific Plan to accommodate the continuation of existing office
and light industrial uses within this area;
. Modify the text and tables in Section V of the Specific Plan to reflect the changes in allowed
uses and development standards indicated previously;
Michael Brandman Associates
H:\Client\2636\26360006\SBAC Addendum 040907.doc
3-4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Sernamlno
Inlllal Study for Southgata
Introduction
. Allow for future construction of recreational trails along the north side of the Santa Ana River
(i.e., south of the Southgate property) under separate funding and CEQA evaluation processes;
. Modify the "non-conforming structures" portion of Section VI in the Specific Plan to reflect
the recent demolition of existing dilapidated buildings, and the drainage section to reflect
recent storm drain improvements constructed on or adjacent to the project site;
. Expand the maintenance portion of Section VI to allow for landscape maintenance districts
and/or property owner associations to maintain landscaping, lighting, or other appropriate
infrastructure;
. Eliminate the strict requirement for an Environmental Impact Report (EIR) for future updates
to the plan, subject to review and approval by the City of San Bernardino;
. Identify new traffic signals to be installed at Del Rosa Drive and Rialto Avenue, Third Street
and Lena Road, and Third Street and Central Avenue under the Specific Plan;
. Creation of a Foreign Trade Zone (FTZ) in conjunction with a U.S. Customs port of entry to
encourage businesses to relocate into or expand existing uses within the FTZ;
. Implementation of a Local Agency Military Base Recovery Area (LAMBRA) program within
the Specific Plan area to encourage new or expanded development;
. Integrate the existing water delivery system onsite into the City of San Bernardino's Municipal
Water Department through a Water Integration Agreement (no new improvements required);
. Integrate the site into the City of San Bernardino's master sewer plan with service provided by
City treatment facilities (no new improvements required);
. Integrate the Southgate Warehouse Project into the City's existing master storm drain system
(no additional improvements required other than those already planned for the Southgate site);
. Integrate the proposed boundary adjustment into the Third Street District;
. Operate a private security service on the Specific Plan site under the supervision of the City's
Police Department;
. Allow for fire protection services to be provided to the entire Specific Plan site by the City's
Fire Department; and
. Continued remediation of areas contaminated by former military operations according to an
agreement between the United States Air Force and the IVDA.
Mlchaal Srandman Associates
H:\CUent\2636\26360006\SBAC Addendum 040907.doc
3-5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CiIy of San Bernardino
Initial Study for Southgate
Introduction
It should be noted that these Specific Plan amendments have no physical expression that would result
in any impacts to the environment.
The SP area currently includes several Public Benefit Parcels (PBP) belonging to the following
organizations: Lorna Linda University, San Bernardino Community College District, Public Park or
Recreational purposes, and two parcels each for both the Grace Apostolic Church and the San Manuel
Indian Tribe. The PBPs total 39 acres and contain 173,003 square feet of building space. These
PBPs were allotted particular land areas through a prior agreement with the IVDA, and at this point
their long term use is unpredictable. It is possible that some or all of the parcels will be exchanged
for land outside of the SP area by the horizon year of 2030. The PBP belonging to the United States
Forest Service (USFS) (PBP 7 on Exhibit IV-I of the SP) has already been exchanged for land and
improvements outside of the SP area immediately south ofDF AS. The former USFS PBP is now
privately owned and will be developed and occupied by Stater Brothers. In order to create a worst
case scenario, these PBPs were considered as existing buildings, even though it is likely that all or
some of the PBPs will be moved offsite and replaced with warehouse type uses.
In addition to a 15.64 acre parcel transferred as a PBP through the Department of Interior to the San
Manuel Tribe, approximately 30 acres was transferred from the Air Force to the IVDA and then to the
San Manuel Indian Tribe as a part of the Economic Development Conveyance (EDC) with the deed
being conveyed by the IVDA to San Manuel Indian Tribe. A portion of this 45.64 acre site
comprising the Third Street District is contemplated for a boundary adjustment and transfer to the San
Bernardino International Airport Authority ("SBIAA") in exchange for an eqnal amount ofland
located north of"W" Street and currently designated for airport development, subject to approval of
the Federal Aviation Administration (FAA), San Manuel Indian Tribe and SBIAA (Exhibit V-8 of the
SP).
The proposed SBACSP total area would be 692.6 acres less 35.4 acres for arterial streets. This
represents 657.2 acres of developable land space. The proposed SP has a maximum potential
buildout of 14,152,295 square feet based on applying the maximum allowed Floor to Area Ratio
(FAR) of 0.5 under the SBACSP to the total acres of developable land. However, the actual
projected bOOdout for the SP area will be much less than the potential because recent development
has already been built at much lower F ARs than allowed under the SBACSP (Le., the land is not
being developed to the maximum FAR). The actual bnildout was calculated using the building square
footage of all existing and planned developments, plus the maximum square footage possible on the
remaining unaccounted for acreage. This generated a probable actual buildout of II ,640,016 square
feet. Table 3 illustrates the potential and actual buildout values for the 2006 SBACSP by district. To
assure the project will build out to these predicted levels, the land use section contains a mitigation
measure that restricts future development to a buildout of 11.6 million square feet.
Michael Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
3-6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Inlt/al Study for Southgate
Introduction
The proposed Southgate Warehouse Project (SWP) is consistent with the City of San Bernardino
General Plan and with the Specific Plan. There are 23 acres within the proposed SWP (Koo and
Hubbs parcels) outside of the current SP boundaries. Development of these areas is currently guided
by the City of San Bernardino General Plan and Development Code. The Southgate project includes
the development of an industrial park and commercial warehouses at the intersection of Tippecanoe
Avenue and Palm Meadows Drive (Palm Meadows Drive is proposed to be renamed Central Avenue)
in the City of San Bernardino. The SWP site is comprised of 12 parcels ofland totaling roughly
145.5 acres. The majority of the SWP is north of Palm Meadows Drive and includes seven
warehouse buildings ranging from approximately 52,400 to 826,020 square feet on approximately
132 acres (5,749,920 square feet) ofland. This equates to nearly 47 percent coverage for this main
section of the SWP. This core portion of the SWP is designed for large scale distribution and would
be considered the main component of the SWP. Table 4 demonstrates the land use specifically for the
Southgate Warehouse Project.
The SWP portion south of Palm Meadows Drive and adjacent to Tippecanoe Avenue is referred to as
the Koo Site. The Koo portion is made up of22 individual buildings totaling 204,135 square feet on
13.75 acres ofland. The Koo buildings are designed for light industrial/manufacturing use. The Koo
Site is divided into two construction phases. The first phase includes thirteen structures which total
approximately 133,634 square feet of building area over approximately 392,142 square feet (9 acres)
ofland. The second phase would include the remaining nine buildings which total 70,501 square feet
on approximately 206,576 square feet (4.75 acres) of land. The average building size on the Koo Site
is approximately 9,279 square feet and the average coverage is approximately 35 percent. The less
intense industrial use on the Koo Site would serve as a transition zone between the mixed uses (Le.,
light industrial, residential) to the west and south with the larger scaled warehouses proposed on the
northern side of Palm Meadows Drive. There are several water detention basins located along the
southern edge of the Southgate site which will channel water flow into the Santa Ana River. These
basin areas will also serve as open space/recreation areas. The project also includes the extension of
and full improvements to Palm Meadows Drive/Central Avenue east of Tippecanoe Avenue. See
Exhibit 3 for the SWP Site Plan and Exhibit 4 fortheKoo Site portion of the SWP. Table 4 at the
end of this section shows the proportion of structures to the land area and also includes both the
required and the allotted parking spaces for the Southgate Warehouse Project.
Note that within the vicinity of the SBACSP, federal funding totaling approximately 75 million
dollars has been allotted for local roadway improvements. Furthermore, SANBAG (San Bernardino
Associated Governments) and Measure 1 are contributing financially to roadway improvements
within the project vicinity. These roadway improvements include but are not limited to the following
intersections: Rialto Avenue at Tippecanoe Avenue; Central Avenue at Tippecanoe Avenue; Orange
Show Road at Tippecanoe Avenue; Hospitality Lane at Tippecanoe Avenue; 1-10 Interchange at
Mlchaal Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
3-7
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Inll/al Study for Southgate
IntroductJon
Tippecanoe Avenue; and various improvements on Mountain View Avenue, including the 1-10
Interchange. As a part of the approved improvements, a bridge will be constructed at Mountain View
Avenue to connect to Central Avenue. The Mountain View Avenue bridge will divert traffic from
Tippecanoe Avenue and will accommodate traffic from the SBACSP, including Stater Brothers and
the Southgate Warehouse Project. The improvements on Mountain View Avenue will occur
concurrently with the SBACSP and are scheduled for completion by 2010. The Mountain View
Avenue improvements are independent of and not included in the SBACSP.
3.5 - SURROUNDING LAND USES AND SETTING
The Southgate Warehouse Project site gently slopes north easterly from 1,045 to 1,100 feet elevation
above sea level. The former Palm Meadows Golf Course, a public course closed in 2005, currently
occupies the majority of the Southgate Warehouse Project (SWP) site. The western portion of the
project site contains active water wells and associated equipment used to pump underground water.
Disturbed areas, including access roads, debris piles and earthen berms, are found throughout the site.
There is one jurisdictional drainage feature totaling approximately 0.04 acres of non-wetlands waters
of the United States and State (MBA 2005). The City of Riverside owns the parcels immediately
south of the site. These parcels are located adjacent to the northern bank of the Santa Ana River. The
river is lined on both sides with flood control service roads and manmade earthen berms.
The project vicinity is generally industrial and vacant land with scattered rural residential. North of
the site is the San Bernardino International Airport, which serves primarily as a general aviation
airport. Immediately northwest of the project site is the future location of the Stater Brothers
Distribution Center. Currently, there is heavy construction-related disturhance within the Stater
Brothers site, such as piles of the old cement which have been excavated, temporary barriers, and
various pieces of heavy equipment. West ofthe project site, across Tippecanoe Avenue, a six-lane
major arterial roadway, is a mixture of light commercial, and rural residential uses with attached
businesses, while directly east is relatively undisturbed vacant open space associated with the Santa
Ana River. Further east in the City ofRedlands, are former citrus groves and a solid waste landfill.
A major power plant and an inactive trolley bridge are located southeast of the project site. Light-
medium industrial and distribution uses are south of the project site along the southern bank of the
Santa Ana River. The land along the northern bank of the river is owned by the City of Riverside,
and is currently used for groundwater wells, and is outside of the SBAC area (SP 2006 V -33).
Further northeast of the Southgate project site (within the current SBITC Specific Plan boundaries)
are light to heavy industrial uses with multiple large scale commercial warehouses and distribution
centers. Exhibit 5 shows the Land Use Districts for the surrounding jurisdictions.
Afkhael Bran<1man Associates
H:\Client\2636\26360006\SBAC Addendum 040907.doc
3-8
I
I
I:
o
'fl
1
-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
S
II
.~f
l~
QIl.2
~!
Oii;
~il!
0.5
I
I
"l-
"
o
."
0.=
tII"
ulll
oC'"
Ill"
tII"
e
"'..
0-
00.
....-
..
"
~
c
o
III
.C
!
E
o
o
..
III
::::l
."
C
III
....I
III
E
~
ii
o
..
u
c
~
<
o
c
'E
III
E
..
III
c
III
III
N
..
:i5
III
....
ii
a.:;::
tile
U~15
~a..g
tIIE=
",,,,,
oEIll
0-
....~
::l!
CII~
.!: ill -< -< -<
;g,; ~ ~ Z
<ll
CII.
.5:..
"''''
=...
<ll
~
e
..
E
."
j
l:!
iii
tII
...
...
...
-
ll:
jjj
l:!
iii
tII
"'
g
-
~~
..
Z
u
E
..
is
..
CII
J ~ ~ ~
~ ~ ~
8.
..
l!
~
~ -< -<
Z Z Z
f. \0 ~
:s.f ~ S 0\
i: z ~ ~r
i
! ~ ~ ~
~
~-= 0 \0 0
-a.f $ S; N
= r:r 00"' v)'" 0\
it/) ~ ~ ~
8.
..
l!
~
ON'"
vi .,; .,:
_ N ....
M
o
M.
-
'0
<-
'"
0'000
....MOO
V'lON .Jl A
",":0 ~Z"" ~Z""
'" 00 00
_000
r--.J"(".l"'_"
00
00
M
-
"l "1 '0 -< -<
~5~ z z
N
a-
00.
-
'0
00
'"
'0 <- 00
00 '" 00
N <- N
~O'I"o"
<- a- 00
MNO
~~..-l"
00
00
M
-
~"1\O
....- .
~~~
'0
-
a-
vi"
N
N
N.
<-
'0
00
i
<-
.....
'0
.,;
o
-
"!
-
a-
N
o
-
o
..:
00
-
-
<-
'0
00
i
<-
..,f
'"
.,:
'"
"!
-
a-
N
1 I
s '":1 Q
o ," > ~
U!l O~
"8 ~o .,,0
o a [;l N
~ U ..., ~
;g ,jl " ~'€
bI> a l!3 1;l 0
~ ~ 0 ~e
~ ~
-< -<
z z
~ 0
z
~ ~
....
a-
a-
00 0
'"
-
<- '0
~ .,.)
- N
]
i 1 i
o~ a il
"'.8 8 8-
_~N d =0
~ ..". 0
'E li'~ '+:I '+:1
,gin ~ ~
.E 8t:: ~ ~
'0
00
M
o
o
'0
'"
00
N
'"
-
....
00
a-
..:
N
M
'"
00
N
'"
-
....
00
a-
..:
N
'"
'"
00
N
'"
-
o
<-
00.
-
00
o
'"
"1
-
....
-
~
"
U
-ll~
..a-~
~~~
"f~~
.gp" ~
III
I
'~
.::
]
.~
j~
UJ~
.."
~s
'08
c .50
i ~~
~ ~;ii
:~ '0",
S ~~
i ~]
S "
g.~ !E]
]! ~J
01"; So
..,'" gO
5~ ll.lE;
-8, ~s ,s 15
'llC
~'K 1l~
",.5 ~ 5
0; ~" ,5 u
<<;SIl el~
"8> <>l Ol
~,s ~":
~ ~.[~ oS ~
~ a rl" ~t:!..
ll!l~~ Il'"
,s~]1l B~
'~"5~ '"
'll].s:a:E:g~
bO]""!i"oU
]g]<;i~<;:~
~ "is i rl iil',s Ol
fI) "'C <<Jell
"'ll' .a 'O,s"
~ ... ~ l(j'K " " " 8
~ 0 ZOl<>l&1~'Og'
1-4~_M..,,,,,,ZZtll
'0
M ....
~. C!,
1;; i.
- ....
....
~
'0 ....
0\ Fi
'0
1Il
00 a-
gg "t
0\ ~
o ....
N ..,f
....
'0 ,..
0\ ~
'0
....
;:!:
~ g
.....
....
....
....
-< ...
z ....
'0
<-
....
~ t
C!,
....
....
....
~ ~
'0
..
'"
~
'8
~
"
o
u
,.;
o
~
o
E
,
u
c
J~
.!!<
I~
"l~
1:0
U
I:!>
U
1~
.c::~
J!9
:l!i:
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Soulhgala
Introduction
Table 4: Southgate Warehouse Project Specifications
MAIN SITE
3 3.69 160 606 52,398 32.63% 65 52
4 5.25 228812 79,456 34.73% 87 102
5 8.47 369 104 152 100 41.21% 145 209
6 33.88 1 475683 673 742 45.66% 562 467
7 34.13 1 486 576 826 020 55.57% 684 535
8 27.26 1,187251 506 660 42.68% 428 393
9 19.14 833 749 392 525 47.08% 337 281
Average 18.83 820 254 383 272 42.79% 330 291
Total 131.82 5.741.781 2.682.901 46.73% 2_~08 2039
KOO SITE PHASE 1
A 1.06 46216 13060 28.26% 27 32
B 0.71 31055 10329 33.26% 24 30
C 0.49 21294 7665 36.00% 20 16
0 0.68 29 766 13 420 45.08% 28 22
E 0.55 23 868 11100 46.51% 25 21
F 0.90 39 006 12760 32.71% 27 24
G 0.62 27129 8800 32.44% 22 18
H 0.49 21389 6732 31.47% 19 20
I 0.86 37311 10212 27.37% 23 32
J 0.58 25418 11136 43.81% 25 26
K 0.87 38,093 13.640 35.81% 28 35
L 0.52 22 487 7280 32.37% 20 13
M 0.67 29.116 7.500 25.76% 20 39
A vera"e 0.69 30165 10,280 34.68% 24 25
Total 9.00 392 148 133 634 34.08% 308 328
KOO SITE PHASE 2
N 0.61 26 588 8190 30.84% 21 21
0 0.39 16900 7665 45.36% 20 16
P 0.39 17,098 5160 30.18% 17 20
0 0.68 29,480 8584 29.12% 21 22
R 0.48 21122 8322 39.40% 21 27
S 0.49 21,397 9,118 42.61% 22 15
T 0.59 25 669 6840 26.65% 19 20
U 0.45 19764 6864 34.73% 19 19
V 0.66 28,558 9,758 34.17% 23 22
A vera"e 0.53 22 953 7833 34.78% 20 20
Total 4.74 206 576 70 501 34.13% 183 182
Koo Site Average 0.62 I 27,215 I 9279 34.72% I 22 I 23
Koo Site Total 13.75 I 598 724 I 204 135 34.10% I 491 I 510
.fZfW~i.
Source: Thi~~ Eng'ineering 2006 .... , I","
. Floor Area Ratio
Mlchaal Brandman Associates
H:\Client\2636\26360006\SBAC Addendum 040907.doc
3-11
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
)
w
~.,~
" If
"0
, o~
, "'<<
~':J
.J...
;J
r~
I
1
~~
rr-~
Cl:
w
>-
Ul
w
"
'3
1t
o~
"
w
"
"
"
l2
u
,5
NOT TO SCALE
w
"
z
o
z
Cl:
w
>
I-
"
Z
Highland
'STWST
"
,
r:J
~l
Lorna Linda
I'~-
BARTON RD '-,~
~~
Source: Census 2000 Data, The CaSIL, MBA GIS 2007,
Exhibit 1
San Bernardino Alliance California
Specific Plan Location Map
SOUTHGATE WAREHOUSE PROJECT
~~1
Michael Brandman Associates
26360006 . 04/2007 I Csbac_specificJ)lan_loc.mxd
o
0,5
Miles
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
"U'fJll'1'l'.
t-
!I'
Jl \.
I \:,
~
Nctlen t-
.- ..... u
..... C (.) UJ
,
:.c \-'i:: ~
.- 0.....
.J::. ~ .!Q Q.
, Q)B UJ
1 X-O rn
i W ctl "
~ ~ () Q) 0
\ Q '" J:
" ~ ~ 5 Q) en UJ
1 (.):::1 0:
I " d ~ ~ ~ C1j ~
\ !; .!!! C I!!
I ii! ~ ~ ~ ~ h = ctl <3
! ~ '" ~ 0 O:I:" <(...J J:
S Z t..l en E-o Q 5
\ z 0 C
r..l C ctl 0
0 'Eo... rn
\ r..l
....l ctl (.)
~ ~III~I C;,;::
.... .-
\ Q) (.)
CD Q)
c.
coo
ctl
00
'.'
I,
~ I,,;'
\
,
\
1
~ "
'E E
,g ,;
~
.. ,
I~ u -g
I Q .
!~ 0 '" :;1
c
Jg Jtj,~ ~,
u ;;:
Q .N
C <t:"
'E
. HUlON Cl 0
E mH
Q
lD CO
c ~~..
. a>'"
rn 0
'CllI'1CI'l ~ ~~U
, ~~;g ~
Q
rn
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
\
\
\
~
"
"~...
\
\
\
\
\
I
1
i
.-
,
('I) C t;
_ III w
:.c a. ~
:2 Q) 0-
X ~ m
WCI)5
o it
'"
.~ ~
e w
a. ~
Q) J:
1Il !3
::J 0
o 00
~
(I!
III
~
jg
III
OJ
~
-
::J
o
CI)
.;
.5
~
J:
~
~
o
00
11
E
C
m
C.
]I
Oiiil
]I
m
'"
1j!J~
h
-<">
~;::
IHL~ON H
~~
o
",,0
fl~H
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
u
.
*
()
\ l
..
..
-./
'''if
\Il
\
o
~\
....
"'-
OJ
....
~
..41
:::--;.. .
.q-ct)
....m~
.-- 0
..c c.. '"
.- a.
..c: Ql w
><:t:: en
Woo 5
o m
o ~
:::c: s:
w
~
(!)
:I:
I-
::;)
o
'"
I
I W
:. 5
'" ii
~ ~
l- !
~ $
"01
~ g
~]~
~ Hl>lONJ~
~ I~ a<;>
:I: III g) ~
., _]8
~ IlIDo~
S 1lI~~~
I
I It)CIlt;
!I. dill 00 ~ I ...... c w
.- 0 -,
~:.t= ~
~ ~ z ! d ..c(..)a.
X'- w
I UJ"O Ul
~~~I I II ~ CIl :>
.- 0
L- I
::l w
~I~dn II i~ ...., a::
~
I ClW
c ,..,
~ ~BB~ 0~ .- <t
~ 800B0~~BB0 "0 "
C I
I ::l 5
I o 0
-i -- L- Ul
[- L-
::l
H H C/)
,
I -.-., ~ ~ I L-
i '...i. ....,.,.."., .Q
" J
.f-'-'- CIl
~. ......
(..)
I ~ 6 'C
......
I .!!l
i 0
Ul a>
I 0 CIl
z
:s 5 ::J
0
-.-.-.., ....y ~ w I "0
i a:: C
I rn
oj ...J
z.
:51u... .....xMT1 a C
I' rn
".
I -.-: Ii a...
"-.-.
.-.-.- rn
............. L-
a>
C
I ....""" a>
<9
..-.-.-.
I .... """"""'"
I
;
I ~
.....~.... ; ; . . .... ..
E ! B
I --- w
-'
-<
()
0 Ul
is 0 0
~ ~ I ....
I is ~ i 9 ....
0 "8
~~ zli I I~ ~iluq~l; z
~
" ~
.
;~~ II .. 0>
I ~~ ~IIIIIIL d Ij~ ",'
~; U I "'
~ i ~ I H 0
0
..s Hl~ON ~ ~
~ ~ It 1lI~ ~ 0
I ~00B "'
6 ~ OO~~OOOO~8~a I IlIIl1 ~ 0
~ 1lI~ .a 0
0 0
u "'
, 1lI~ ~ '"
0 "'
Ul '"
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CIIy of San Samamlno
In/tJal Study for Southgate
Environmental Factors Potent/ally Affected
SECTION 4:
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
The environmental factors checked below would be potentially affected by this project, involving at
least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the
following pages:
D Aesthetics D Agriculture Resources 181 Air Quality*
D Biological Resources D Cultural Resources D Geology I Soils
D Hazards & Hazardous D Hydrology / Water Quality D Land Use I Planning
Materials D Noise D Population I Housing
D Mineral Resources D Recreation D Transportation I Traffic
D Public Services D Mandatory Findings of
D Utilities I Service Systems Significance
* The 1995 EIR determined that air quality was significant, and wrote a Statement of Overriding Considerations.
The current air quality analysis demonstrates emissions below what was originally approved.
4.1 - ENVIRONMENTAL DETERMINATION
On the basis of this Initial Study, the City of San Bernardino Environmental Review Committee
fmds:
D I find that the proposed project COULD NOT have a significant effect on the environment, and
a NEGATIVE DECLARATION will be prepared.
D I find that, although the proposed project could have a significant effect on the environment,
there will not be a significant effect in this case because project revisions have been made by or
agreed to by the proponent. A MmGATED NEGATIVE DECLARATION will be prepared.
D I find that the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
D I find that the proposed project MAY have a "potentially significant impact" or "potentially
significant unless mitigated" impact on the environment, but at least one effect: I) has been
adequately analyzed in an earlier document pursuant to applicable legal standards; and 2) has
been addressed by mitigation measures based on the earlier analysis as described on attached
sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze ouly the
effects that remain to be addressed.
Michael SnJndman Associates
H:\CUent\2636\26360006\SBAC Addendum O409Q7.doc
4-1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Inll/al Study for Southgata
Environmental Factors Potent/ally Affected
[gJ I find that although the proposed project could have a significant effect on the environment,
because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or
NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or
mitigated pursuant to that EIR or NEGATIVE DECLARATION, including revisions or
mitigation measures that are imposed upon the proposed project, and therefore an
ADDENDUM to the previous EIR will be prepared to document the project changes from the
previous project.
Signature
Date
Printed Name
For
Michael Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
4-2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernanilno
Initial Study for Soulhgala
Environmental Checklist Form
SECTION 5:
ENVIRONMENTAL CHECKLIST FORM
5.1 - AESTHETICS
Would the project:
a) Have a substantial adverse effect on a 0 0 181 0
scenic vista as identified in the City's
General Plan?
b) Substantially damage scenic resources, 0 0 0 181
including but not limited to, trees, rock
outcroppings, and historic buildings
within a state scenic highway?
c) Substantially degrade the existing visual 0 0 181 0
character of quality of the site and its
surroundings?
d) Create a new source of substantial light 0 181 0 0
or glare which would adversely affect
day or nighttime view in the area?
e) Other: 0 0 0 181
Discussion: Would the project:
a) Have a substantial adverse effect on a scenic vista as identified in the City's General
Plan?
Less than Significant Impact: The General Plan does not designate the project site
as a scenic vista corridor; however, the San Bernardino Mountains represent scenic
vistas that can be seen throughout the entire San Bernardino Valley. The proposed
project could alter the very local views; however, as long as the proposed project is
constructed to meet the City codes (i.e., does not exceed maximum heights), the
project will not have an adverse impact on a scenic vista. It should be noted that the
Initial Study prepared in support of the previous EIR for the SBIA concluded this
impact would be less than significant due to the project's location within an industrial
zone around the airport. This conclusion also applies to the Hubbs, Koo and DF AS
parcels property being added to the Specific Plan.
Michael Brandman Associates
H:\Cnent\2636\26360006ISBAC Addendum 040907.doc
5-1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Southgate
Environmental Chackllst Form
b) Substantially damage scenic resources, including but not limited to, trees, rock
outcrop pings, and historic buildings within a state scenic highway?
No Impact: The proposed project is not near a state scenic highway, or any other
designated scenic highways. The proposed project, then, will not substantially
damage scenic resources within a state scenic highway. The Initial Study prepared in
support of the previous EIR for the SBIA concluded this impact would be less than
significant due to the project's location within an industrial zone around the airport.
c) Substantially degrade the existing visual character of quality of the site and its
surroundings?
Less than Significant Impact: The Initial Study prepared for in support of the
previous EIR for the SBIA concluded this impact would be less than significant due
to the project's location within an industrial zone around the airport. The project will
produce short-term visual impacts during construction. Views of the site will include
heavy construction equipment and machinery preparing the land (i.e., grading) and
eventually the construction of the proposed buildings. Occasional dust may
temporarily diminish views of the area during grading and construction activities,
however mitigation (Fugitive Dust Control Plan) for minimizing the negative affects
to air quality during the construction phase, as discussed in Section 4.3, will also
serve to lessen the likelihood of dust particles interfering with the view of the
mountains.
The development of the proposed project will convert open space (i.e., a former golf
course) to industrial development, changing the current view of the property. The
inactive golf course which comprises the majority of the SWP site is deteriorating
and is surrounded by tattered fencing. The previous EIR examined the loss of the
golf course as open space and determined that its transition to industrial use
represented a less than significant impact. The proposed project is consistent with
this previously identified impact.
The proposed project is adjacent to the Santa Ana River, and would alter the view of
the river from adjacent properties. The project site and the vicinity are currently
disturbed with water well equipment, debris piles, and there are several large mounds
of old cement chunks which have been excavated during the construction related
SBIA redevelopment activities. The roads leading into the project site are blocked
with locked gates and are therefore currently inaccessible to the general public.
Because of the large scale grading and excavating in the vicinity and the lack of on
Michael Brandman Associates
H:\CIIent\2636\26360006\SBAC Addendum 040907.doc
5-2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bemam/oo
Initial Study for Southgate
Environmental Checklist Form
site maintenance, in its current state, the project site is not considered aesthetically
desirable. Though the project would alter the existing visual character, the project
would be consistent with other development within the vicinity. This conclusion also
applies to the Hubbs, Koo and DF AS parcels property being added to the Specific
Plan.
d) Create a new source of substantial light or glare which would adversely affect day or
nighttime view in the area?
Less than Significant with Mitigation Incorporated: The proposed project would
create new sources of light and glare along the south side of the San Bernardino
International Airport. Portions of the project site are within the Inner Turning Zone
(Zone 3), the Sideline Safety Zone (Zone 5), and the Traffic Pattern Zone (Zone 6) of
the airport, and the property is currently dark. Therefore, this change represents a
potentially significant impact relative to Zones 3 and 5. The previous EIR did not
have a specific measure for this portion of the SP area to address airport lighting.
Therefore, the following measure is proposed to reduce and maintain potential
lighting impacts on the airport remain at less than significant levels:
AE-1 Prior to the issuance of any building permits, all development plans (e.g., site
plans, tract maps, etc.) within the Southgate Warehouse Project area will be
submitted to the San Bernardino International Airport for review and
approval relative to building heights and potential lighting impacts. Building
heights shall conform to the Specific Plan and/or Airport Land Use
Handbook requirements, whichever is more restrictive. This measure shall
be implemented to the satisfaction of the City Public Works Director.
The proposed project would result in new light source for the area during nighttime
hours, and the windows of the buildings may create a glare during the day that is
currently not present on the vacant site. Parking area lighting will be provided for the
parking areas. Parking lot lighting is a potential source of glare and sky glow if not
properly designed. The proposed lighting and the anticipated glare from the building
windows would be consistent with the existing lighting and glare of the surrounding
area. With the implementation City Lighting Standards (19.20 of the City
Development Code), the proposed project would have a less than significant impact
related to new sources of light and glare.
Mlchaal Btandman Associates
H:\CHent\2636\26360006\SBAC Addendum 040907.OOc
5-3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Barnardlno
Initial Study for SoutIIgal8
Environmantal Checklist Form
e) Other: This category is for any other issues that involve aesthetic resources. At this
time, no other issues are known in this regard.
No Impact: No other impacts to any aesthetic resources are considered to occur as a
result of this project.
The proposed San Bernardino Alliance California Specific Plan will not alter the
findings of the 1995 San Bernardino International Trade Center Specific Plan EIR
with respect to aesthetics. In addition, the non-physical aspects of the SPA will have
no impacts related to aesthetics.
5.2 - AGRICULTURE RESOURCES
a) Convert Prime Farmland, Unique
Farmland, or Farmland of Statewide
Importance (Farmland), as shown on
the maps prepared pursuant to the
Farmland Mapping and Monitoring
Program of the California Resources
Agency, to a non-agricultural use?
o
o
rgJ
o
b) Other:
o
o
o
rgJ
Discussion: Would the project:
a) Convert Prime Farmland, Unique Farmland, or Farm/and of Statewide Importance
(Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and
Monitoring Program of the California Resources Agency, to a non-agricultural use?
Less than significant: The Initial Study prepared for the previous EIR found no
significant impacts relative to agricultura1 resources. The Farmland Mapping and
Monitoring Program of the California Resources Agency indicates that the project
site is not classified as prime farmland, unique farmland, or farmland of statewide
importance (DOC 2001). According to Appendix G of the State CEQA Guidelines,
"in determining whether impacts to agricultura1 resources are significant
environmental effects, lead agencies may refer to the California Agricultural Land
Evaluation and Site Assessment Model (LESA) (1997) prepared by the California
Department of Conservation as a method of assessing impacts on agriculture and
farmland." The LESA Model takes into account the soil types, the size of the project,
Michael Brandman Assoclal8s
H:\CIlent\2636\26360006\SBAC Addendum 040907.doc
5-4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
InltJal Study for Southgate
Environmental Checklist Fonn
water resource availability, and surrounding land uses to determine if the project
would be significant. According to the US Department of Agriculture Soil
Conservation Service, the soils within the project area are primarily comprised of
Tujunga gravely loamy sand (TvC), which has a Storie Index of 34 and is classified
as Grade 4. Grade 4 soils are not are not desirable for agriculture. Furthermore, the
project is bounded by the Santa Ana River on the south and the airport on the north,
and is surrounded by industrial use. Agricultural use on the project site is not viable.
When analyzing the surrounding land uses, the LESA Model takes into account
whether the surrounding land uses are considered a protected resource, or if it is
currently used for agriculture. Zero percent of the surrounding land uses are
considered protected resources for agriculture, and none of it is currently used for
agriculture. The proposed project would receive a relatively low LESA score,
including the additional Hubbs, Koo and DFAS parcels property. This low score
indicates the site does not contain important agricultural resources, so potential
impacts would be less than significant.
b) Other: This category is for any other issues that involve agricultural resources. At
this time, no other issues are known in this regard.
No Impact: No other impacts to any agricultural resources are considered to occur
as a result of this project.
The proposed San Bernardino Alliance California Specific Plan will not alter the
fmdings of the 1995 San Bernardino International Trade Center Specific Plan EIR
with respect to agricultural resources. In addition, the non-physical aspects of the
SPA will have no impacts related to agricultural resources.
5.3 - AIR QUALITY
Would the project:
a) Conflict with or obstruct implementation
of the applicable air qnality plan? (South
Coast Air Basin)
D
181
D
D
b) Violate any air quality standard or
contribute substantially to an existing or
D
181
D
D
Michael Brandman Associates
H:\Client\2636\26360006\SBAC Addendum 040907.doc
5-5
I-
I City of San Bernardino
Inillal Study for Southgate Environmentel Checklist Fonn
I
I projected air quality violation based on
I the thresholds in the SCAQMD's
"CEQA Air Quality Handbook?"
c) Result in a cumulatively considerable net ~ 0 0 0
I increase of any criteria pollutant for
which the project region is non-
attainment under an applicable federal or
I state ambient air quality standard
(including releasing emissions which
exceed quantitative thresholds for ozone
I precursors)?
Expose sensitive receptors to substantial 0 0 [gJ 0
d)
I pollutant concentrations?
e) Create objectionable odors affecting a 0 0 [gJ 0
I substantial number of people based on
the information contained in Project
Description Form?
I 1) Other: 0 0 0 ~
In order to evaluate the air quality impacts, URBEMIS 2002 (Version 8.7) was used to model
I potential emissions related to construction and operation of the proposed project. The outputs from
this model are in Appendix A. Table 5 provides a summary of existing air quality data from the
project area, which is collected and maintained by the SCAQMD.
I Table 5: Ambient Air Quality - San Bernardino. California (2003-2005)
I
I Ozone (0,)
1 Hour 0.09 ppm . 0.176 (65) 0.157 (55) 0.163 (48) NO
8 Hours 0.08 ppm b 0.148 (48) 0.129 (39) 0.129 (28) NO
I Carbon Monoxide (CO)
1 Hour 20 ppm . 5 (0) 3 (0) ND YES
I 8 Hours 9.0 ppm . 4.6 (0) 2.1 (0) 2.09(0) YES
Nitrogen Dioxide (N02)
Mean 0.053 ppm b 0.12 (0) 0.0273 (0) ND YES
I 1 Hour 0.25 ppm . 0.0307 (0) 0.06(0) 0.098 (0) YES
I
Michael Brandman Associates 5-6
I H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Southgate
Environmental Checlr/ist Fonn
Table 5 (Continued): Ambient Air Quality - San Bernardino, California (2003-2005)
Sulfur Dioxide (S02)
Mean 0.030 ppm b 0.01 (0)
24 Hours 0.04 ppm . 0.004 (0)
Suspended Particulate Matter (pM 1 0)
Mean 20 Itg/m' . 47.2 (..)
24 Hours 50 Itg/m' . 101 (27)
Fine Suspended Particulate Matter (pM2.5)
Mean 12 Itg/m" 21.8 (..) 20.0 (..) ND NO
24 Hours 65 ltg/m3b 98.1 (I) 71.4 (4) 43.04 (ND) NO
Abbrev: ppm: parts per million; l'glm': micrograms per cubic meter; ND: No Data; Mean: Annual Arithmetic Mean;
a California stale standard used; b Federal standard used
. 2005: preliminary data summaries, not all data available; Source CARB 2005.
**: Exceeds annual standard
0.006 (0)
0.01 (0)
ND
ND
YES
YES
47.7 (OO)
106(29)
ND
ND
NO
NO
Notes: Data for all criteria pollutants from SRA34 monitoring station [San Bernardino]
Source: SCAQMD 2005 and CARB 2005
Discussion: Would the project:
a) Conflict with or obstruct implementation of the applicable air quality plan? (South
Coast Air Basin)
Less Than Significant With Mitigation Incorporated. The Air Quality
Management Plan (AQMP) for the SCAQMD sets forth a comprehensive program
that will lead the air basin into compliance with all federal and state ambient air
quality standards. The control measures and emission reduction estimates in the
AQMP are based on emission projections for a future development scenario derived
from land use, population, and employment characteristics defmed in consultation
with local governments. The San Bernardino International Trade Center Specific
Plan EIR evaluated the specific plan's consistency with the AQMP, as well as the
Southern California Association of Governments (SCAG) Growth Management Plan,
SCAG's Regional Mobility Plan, and the Congestion Management Plan. The
purpose of these plans are to enable the South Coast Air Basin (SCAB) to achieve
compliance with the National and State Ambient Air Qnality Standards. Compliance
with these plans by projects, such as the Specific Plan, is generally achieved by
improving or having a neutral effect on the areas job/housing balance and by
reducing the vehicle trips and vehicle miles traveled within the region to the greatest
extent feasible. Achieving the desired jobs/housing balance reduces the need for long
Michael Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-7
I
I
I
I
I
City of San Bernardino
Initial Study for Southgate
Envlronmentel Checklist Form
work commute trips by providing jobs near employee residences. Reducing the
number of vehicle trips and the miles traveled is achieved by not only reducing the
length of trips to and from work, but by implementing alternative methods of worker
transportation.
I
I
I
I
I
I
I
According to data provided in the San Bernardino International Trade Center Specific
Plan EIR (page 4.9-28), the project area is considered housing rich and job poor
which resnlts in residents of the area commuting greater distances to work. The
proposed project will create additional jobs without creating additional housing and
the San Bernardino International Trade Center Specific Plan EIR concluded that the
Specific Plan with implementation of the following measure was in conformity with
the AQMP and the Growth Management Plan.
"Prior to the approval of more than 100,000 square feet of cumulative
development, the project sponsor shall develop a commuter center,
which would include such information as: bus and rail transit
schedules/maps; telephone numbers for the designated transportation
coordinator; Omnitrans bus route and Metrolink schedules; ridesharing
promotional material; bicycle route and facility information; location of,
and directions to, the San Bernardino Metrolink station schedule; and
location of onsite vanpool/carpool spaces. "
I
I
I
I
I
I
I
The San Bernardino International Trade Center Specific Plan EIR also evaluated the
Specific Plan's consistency with SCAG's Congestion Management Plan (CMP) and
determined that adequate mitigation was provided in the Transportation/Circulation
section of the EIR (pages 4.7-19 and 4.7-18 of the EIR) to demonstrate conformity
with the CMP (pages 4.9-29 of the EIR). These measures are also included in this
project and listed in Section I of this air study. The San Bernardino International
Trade Center Specific Plan EIR also states that while mobile emissions represent the
greatest source of pollutants in the project area, all emissions must be reduced if the
goals of the AQMP are to be met and included area source mitigation measures also
include.d in this air study.
Table 9 demonstrates that the proposed 2006 Specific Plan Amendments including
this project reduce vehicle trips, vehicle miles traveled and resnlting air quality
emissions from those that were analyzed in the San Bernardino International Trade
Center Specific Plan EIR. The proposed project also includes all of the mitigation
Michael Btandman Associates
H:\Client\2636\26360006\SBAC Addendum 040907.doc
5-8
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bematrlino
InlUal Study for Southgate
Environmental Checklist Fa""
measures listed in the San Bernardino International Trade Center Specific Plan EIR.
Therefore, the proposed project is consistent with the AQMP.
b) Violate any air quality standard or contribute substantially to an existing or
projected air quality violation based on the thresholds in the SCAQMD's "CEQA Air
Quality Handbook? "
Less Than Significant With Mitigation Incorporated. Air pollutant emissions
associated with this project could occur during construction and during operation of
the project. Emissions that occur during construction are considered a short-term
impact because they will only occur during the brief construction period. Operation
impacts are considered long-term because they occur throughout the life of the
project.
Standards of Significance
The SCAQMD recommends that the following air pollution thresholds be used by
lead agencies in determining whether a proposed project could result in a significant
impact. If the lead agency finds that the proposed project has the potential to exceed
these air pollution thresholds, the project should be considered significant. These
thresholds have been defined by SCAQMD for the South Coast Air Basin based on
scientific data and factual data within the federal and state Clean Air Acts. Since the
project is located within the South Coast Air Basin and current air quality in the
project site is typical of the air basin as a whole, these thresholds are considered valid
and reasonable. Each of these threshold factors is discussed below.
Thresholds for Construction Emissions
The following significance thresholds for construction emissions have been
established by the SCAQMD:
. 75 pounds per day of reactive organic gases (ROG);
. 100 pounds per day of oxides of nitrogen (NOx);
. 550 pounds per day of carbon monoxide (CO);
. 150 pounds per day of fugitive dust (PMIO); and
. 6.75 tons per quarter or 150 pounds per day of oxides of sulfur (SOx).
Thresholds for Operational Emissions
Specific criteria for determining whether the potential air quality impacts of a project
are significant are set forth in the SCAQMD Handbook. The criteria include
emissions thresholds, compliance with State and National air quality standards, and
Michael Brandman Associatas
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-9
,.
.
.
.
.
I
.
.
.
.
.
.
.
I
.
I
.
I
I
City of San Bernardino
Initial Study for Southgate
Envlronmantal Checklist Fonn
conformity with existing State Implementation Plan (SIP) or consistency with the
current Air Quality Management Plan (AQMP). The daily operational emissions
"significance" thresholds are as follows:
Regional Emissions Thresholds
. 55 pounds per day of ROG;
. 55 pounds per day of NOx;
. 550 pounds per day of CO; and
. 150 pounds per day of PM 10 and Sox.
Projects in the South Coast Air Basin with operation-related emissions that exceed
any of the emission thresholds should be considered to be significant.
Local Emission Standards
. California State I-hour CO standard of 20.0 parts per million (ppm); and
. California State 8-hour CO standard of9.0 ppm.
A project is considered to have significant impacts if project emissions result in an
exceedance of one or more of these standards.
Short-Term Construction-Related Impacts
Air quality impacts may occur during site preparation and construction activities
required to implement the proposed improvements (Table 6). The following
assumptions were used to estimate construction-related emissions of the project.
Table 6: Anticipated Construction Schedule and Equipment Inventory
Site Preparation
Grading
BuiIdlngIFlnlshing
Wheeled Loader (CAT 924) (I)
Track Dozer (CATD8T) (I)
Scraper (CAT 623) (4)
Grader (CAT 12G) (I)
Skiploader (JD 310) (I)
Water Truck 2
Excavator (CAT 300 Series) (I)
Wheeled Loader (CAT 394) (I)
Skiploader (JD 310) (2)
Rubber Tired Backhoe (CAT 420D) (2)
Grader (CAT 12G) (I)
Boom/Reach Lifts (2)
Scissor Lifts (2)
Fork Lift (I)
Paving MachineIRoller (I)
250- Ton Crane (Linkbelt LS-278H) (I)
100-Ton Crane (Linkbelt 218 HYLAB 5) (I)
8- Ton Crane Grove YB4409 1
6 Weeks
29 Weeks
Michael Brandman Assoclatas
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-10
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernatdlno
Initial Study for Southgate
Environmental Checklist Fonn
[ Total Construction Period
35 Weeks
Major sources of emissions during construction include exhaust generated from the
use of heavy equipment and on-road vehicles, fugitive dust generated as a result of
soil disturbance during excavation and grading activities, and the emission ofROG
during site paving and painting applications of the structures. Table 7 presents the
projected short-term (construction) emissions as a result of the project without
implementation of the proposed mitigation.
Table 7: Construction Emissions (Without Mitigation)
Grading Phase:
Maximum Daily Emissions (Ibslclay)
Construction Building Phase:
Maximum Daily Emissions (lbslclay)
Construction: Paving! Architectural Coatings Phase
Maximum Daily Emissions (Ibslclay) 203.08 144.84
95.41
2.16
Daily Thresholds
Exceeds Threshold
75
100
202.90
550
0.02
150
5.69
150
Yes
Yes
No
No
No
Source: Air Quality Data (Appendix A), March 2006
As Table 7 indicates, short term emissions of NO x and ROG exceed SCAQMD
thresholds for daily emissions. The previous EIR recommended the following nine
(9) mitigation measures to help reduce short-term air quality impacts from
construction:
9-1 Approval of exhaust and dust mitigation plan;
9-2 Grading limited to 6 acres per day;
9-3 Dirt haul trucks to be covered;
9-4 Approval of a Dust Control Plan;
9-5 Limit construction during smog alerts and high winds;
9-6 Maintain equipment in good operating condition;
9-7 Use oflow emission mobile equipment;
9-8 Use of emulsified asphalt or asphaltic cement; and
9-9 Restrict painting and use or architectura1 coatings.
The following language is provided to guide the Lead Agency in how to implement
the original mitigation measures based on the most current requirements of the
SCAQMD:
Michael Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-11
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Southgate
AQ-1
AQ.2
AQ-3
AQ-4
Environmental Checklist Form
(Adds details to Measure 9-1) Prior to issuance of any grading or
building pennits, tbe project sponsor shall submit to tbe City an Air
Quality Mitigation Measure Implementation Plan. This plan will detail
each mitigation measure and include daily logs documenting
implementation of each mitigation measure. Daily logs for each piece of
construction equipment will include tbe hours per day tbe equipment ran.
A master daily log will document tbe hours of operation all equipment
ran each day. The master daily log will also document timing and tuning
of equipment, tbe type of fuel used on construction equipment, and any
add-on emissions reduction equipment used such as oxidized diesel
catalysts.
(Adds details to Measures 9-2 tbrough 9-5) Prior to construction oftbe
proposed improvements, tbe applicant will provide the City and tbe
SCAQMD with a project specific dust control plan for tbeir review and
approval. The dust control plan will be consistent witb SCAQMD Rule
403 and will include Best Available Control Measures (BACM) that
include application of water or chemical stabilizers to disturbed soils,
covering haul vehicles, restricting vehicle speeds on unpaved roads to IS
mph, sweeping loose dirt from paved access roadways, cessation of
construction activity when instantaneous wind speeds exceed 25 mph
average wind speeds exceed IS mph (15 minute average) and
establishing a pennanent, stabilizing ground cover on finished areas.
The dust control plan will also limit onsite grading operations to a
maximum of 6 acres/day. Implementation of tbe project specific dust
control plan and BACMs will take place during construction of the
proposed improvements.
(Adds details to Measure 9-6) During construction of tbe proposed
improvements, construction equipment will be properly maintained witb
all maintenance repairs completed at an offsite location and include
proper tuning and timing of engines. Equipment maintenance records
and equipment design specification data sheets shall be kept on-site in
tbe air quality mitigation implementation plan outlined in AQ-I during
construction.
(Adds details to Measure 9-6) During construction oftbe proposed
improvements, all contractors will be advised not to idle construction
equipment for more tban 5 minutes.
Michael Brandman Associates
H:\Ctient\2636\26360006\SBAC Addendum 040907.doc
5-12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Southgate
Environmental Checklist Fonn
AQ-5
(Adds details to Measure 9-7) Onsite grading and construction
equipment will require anyone of the following:
. Use of onsite grading and construction equipment equipped with
cooled exhaust gas recirculation.
. Use of onsite grading and construction equipment equipped with
oxidized diesel catalyst and fueled with aqueous diesel fuel during
grading and construction operations with a reduced equipment fleet
or hours of operation totaling a maximum of 16,224 horsepower
hours per day.
. Use of onsite grading and construction equipment equipped with
oxidized diesel catalyst with a reduced equipment fleet or hours of
operation totaling a maximum of 13,594 horsepower hours per day.
. Use of onsite grading and construction equipment fueled with
aqueous diesel fuel during grading and construction operations with
a reduced equipment fleet or hours of operation totaling a maximum
of 12,030 horsepower hours per day.
. Reduce the grading and construction equipment fleet or hours of
operation to a maximum total of 9,272 horsepower hours per day.
AQ-6 (Adds detail to Measure 9-7 in the EIR) During construction of the
proposed improvements, on-site electrical hook ups shall be provided for
electric construction tools including saws, drills and compressors, to
eliminate the need for diesel powered electric generators.
AQ-7 (Adds detail to Measure 9-8 in the EIR) Roadway and parking lot plans
shall indicate the use oflow emissions emulsified asphalt or asphaltic
cement in accordance with the specifications described in SCAQMD
Rule 1108.
AQ-8 (Adds details to Measure 9-9) During construction of the proposed
improvements, only low-volatility paints and coatings as defined in
SCAQMD Rule lIB shall be used. All paints shall be applied using
either high volume low pressure (HVLP) spray equipment or by hand
application.
The mitigation measures AQ-I through AQ-8 are not new mitigation. All applicable
mitigation measures found in the San Bernardino International Trade Center Specific
Plan EIR will be implemented with the proposed project. Rather AQ-I through
AQ-8 insures implementation of the original mitigation through refinement in the
language. As Table 8 shows, short-term emission of all criteria pollutants with
Michael Bnlndman Associates
H:\Cnent.2636126360006\SBAC Addendum 040907.doc
5-13
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Southgate
Envlronmantal Chacklisf Fonn
mitigation are below the applicable SCAQMD suggested thresholds. Note that in
order to express onsite electrical hookups as mitigation, the model was run a second
time, with 17 electrical tools removed, and the results are shown in Table 8. The
reduction in emissions from implementation of the mitigation measures is estimated
to be approximately 66 percent for RaG, 56 percent for NOx, and 72 percent for CO.
These estimates are accounted for in the URBEMIS program and printout in
Appendix A.
Table 8: Construction Emissions (With Mitigation)
Grading Phase (2006):
Maximum Daily Emissions (lbs/day)
Construction (2006) Building Phase:
Maximum Daily Emissions (lbs/day) 67.01 57.11
Constructlon:(Year 2006) Paving/Architectural Coatings Phase
Maximum Daily Emissions (lbs/day) 68.15 64.16 39.88
13.45
0.94
Daily Thresholds 75
Exceeds Threshold No
Source: Air Quality Data (Appendix A), March 2006
100
No
550
No
0.01
150
No
0.68
150
No
Long- Tenn Air Quality Impacts
Long-term air quality impacts are those associated with the emissions produced from
project-generated vehicle trips as well as from stationary sources related to the use of
natural gas for heating, and ventilation, and the use of landscape maintenance
equipment.
Long-term impacts are analyzed on a programmatic level by comparing emissions
estimates in the original 1995 Specific Plan EIR, 1999 Specific Plan Amendments,
and the proposed Specific Plan Amendments which include the proposed
development. The emissions estimate for the 1995 Specific Plan ElR were taken
directly from the ElR analysis. Unfortunately, the 1999 Specific Plan Amendments
did not quantify emissions. Therefore, the comparative analysis estimated emissions
for the 1999 Specific Plan Amendments and the proposed Specific Plan Amendments
that include this project using URBEMIS 2002 (version 8.7.0), a model developed by
CARB.
Michel Elrandman Assoclalas
H:\CUent\2636\26360006\SBAC Addendum 040907.OOc
5.14
1
1
1
1
I
I'
I
I
I
I
I
1
1
1
1
1
I
1
1
City of San Bernallllno
Initial Study for Southgate
Env/ronmentel Checklist Fonn
A comparison of projected emissions associated with the original EIR analysis, the
1999 Specific Plan Amendments and the proposed Specific Plan Amendments are
included in Table 9. Model runs are included in Appendix A. The previous EIR
concluded that project emissions would result in significant long-term and
cumulative impacts related to exceedances of air quality standards. However, the
analysis summarized in Table 9 demonstrates that the currently proposed project
would generate significantly less air pollution (from 42 to 99 percent reduction
depending upon the criteria pollutant) compared to the emissions estimated in the
previous EIR (page 4.9-25, Table 4.9.H, LSA 1995). These emissions still exceed
applicable SCAQMD thresholds and so are considered significant.
Table 9: Comparison of Long-Term Emissions
Total Square Feet of 11,056,617 11,400,741 11,457,307
Building Spaces
Total Average Daily 103,006 99,100 20,385
Trips (ADTs)
Total Vehicle Miles 1,042,025 831,822 123,400
Traveled (VM1)
Total NOx Emissions 3,002.6 lbslday 2,354.96 Ibslday 377.15lbslday Yes
Total CO Emissions 11,449.3 lbslday 4,500.38 lbslday 695.98 lbslday Yes
Total ROG Emissions 896.2 Ibslday 640.31Ibslday 298.36 Ibslday Yes
Total SOX Emissions 229.61bslday 15.45lbslday 2.30 Ibslday No
Total PM-IO Emissions 337.4lbslday 1,322.5llbslday 195.401bslday Yes
, Data Sources for all variables from the 1995 Sao Bernardino Internarional Trade Center Specific Plao EIR.
.. Data Source for Sq. ft. of building space aod ADTs from 1999 Amendment, air quality modeled in URBEMIS v. 8.7.
"'Data Source- MBA, air quality modeled in URBEMIS v.8.7
Carbon monoxide (CO) is a localized problem requiring additional project specific
analysis oflong-term emissions. Projects with sensitive receptors or projects that
could negatively impact levels of service (LOS) of existing roads need to use the
California Department of Transportation Carbon Monoxide Protocol (hereafter
referred to as the CO protocol) to determine the potential to create a CO hotspot. A
CO hotspot is a localized concentration of CO that is above the State or National
I-hour or 8-hour ambient air standards. Localized high levels of CO are associated
with traffic congestion and idling or slow-moving vehicles. The proposed project has
Michael Brandman Associates
H:\Cltent\2636\26360006\SBAC Addendum 040907.doc
5-15
II
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Southgate
Environmental Checklist Fonn
the potential to negatively impact the LOS on adjacent roadways; therefore, the
project requires a CO hotspot analysis.
The results from this CO hotspot analysis are presented in Table 10. Please note that
for each of the intersections, Table 10 shows the receptor with the highest
concentration. Readings on all receptors can be found in Appendix A. As shown in
the table, the estimated CO concentrations are below the state and federal standards.
Therefore, impacts related to CO hotspots are less than significant and within the
scope of the previous analysis found in the San Bernardino International Trade
Center Specific Plan EIR.
Table 10: Estimated Carbon Monoxide Concentrations
1 Hour Central Ave at Tippecanoe 5.0 1.40 6.40 20 35
Avenue
8 Hour Central Ave at Tippecanoe 4.6 0.84 5.44 9 9
Avenue
1 Hour Mot. View Ave at 1-10 ED 5.0 0.3 5.30 20 35
Ramps
8 Hour Mot. View Ave at 1-10 ED 4.6 0.18 4.78 9 9
Ramps
Notes: Background I-hour and 8-hour CO from Table 1 (values from 2003). Traffic generated CO emissions rates were
computed using the EMF AC2oo2 computer model; Estimated CO = background + traffic generated; See Appendix C for
Caline4 output.
Source: KOA 2006b Table 6
I
I
I
I
I
The previous EIR recommended the following three (3) mitigation measures to help
reduce long-term air quality impacts from construction:
9-10 Each warehouse of 100,000 sq. ft. of floor space or more shall develop a
commuter information center on bus, Metrolink, and carpool/vanpool
schedules/maps;
9-11 Configure parking areas to minimize traffic interference;
9-12 Prior to approval of building permit, the project sponsor shall demonstrate
insulation and energy efficiencies within the buildings including drought
tolerant landscaping to reduce water and energy needs.
I
I
Michael Brandman Associates
H:\Client\2636\26360006\SBAC Addendum 040907.doc
5-16
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Southgate
Environmental Check/1st Fonn
The following language is provided to guide the Lead Agency in how to implement
the original mitigation measures based on the most current requirements of the
SCAQMD:
AQ-9
AQ-10
AQ-11
AQ-12
AQ-13
(Adds detail to Measure 9-10 in the EIR) Provide onsite information
services connecting truck drivers with employee car pools, bus and
Metrolink schedules, and shuttle services in the area that service the
project site including maps showing the routes of transit services and
employee carpool destinations. Onsite local phone services will be
provided to truck drivers free of charge to facilitate drivers contacting
family or making arrangements for rides.
(Adds detail to Measure 9-10 in the EIR) Businesses that lease the
proposed warehousing space and employ 250 or more part-time or
full-time employees shall submit an emissions reduction program that
includes an emissions reduction target (ERn as required in SCAQMD
Rule 2202. Emissions reduction options include incorporating clean fuel
vehicles into the company fleet, scrapping of older vehicles within the
company fleet, participation in the Air Quality Investment Program
(AQIP), which requires payment of set fees per employee into a fund
used to implement mobile source emissions reduction programs
approved by the South Coast Air Quality Management District
(SCAQMD) Governing Board. This mitigation reduces emissions by
participating in emissions reduction programs authorized by SCAQMD.
(Adds detail to Measure 9-10 in the EIR) Provide preferential parking
spaces for employee car pools and van pools. This mitigation measure
reduces commuting vehicle trips, which reduces vehicle emissions.
(Adds detail to Measure 9-10 in the EIR) The project proponent will
contact the local transit authority to determine the practicality of a bus
route in the project area and the infrastructure needed including bus
turnouts, bus shelterslbenches, street lighting, and safe ingress/egress
between the desiguated bus stop and the offices/employee areas of the
warehouse.
(Adds detail to Measure 9-11 in the EIR) Configure employee and visitor
parking in a separate location from the truck fleet parking and loading
5-17
Michael &randman Associates
H:\Client\2636\26360006\SBAC Addendum 040907.doc
I.
I
.
I
.
.
I
.
I
I
I
I
I
.
.
I
.
.
I
City of San Bernardino
Initial Study for Southgate
AQ.14
AQ.15
AQ.16
AQ.17
Envlronmantal Checklist Form
docks. This mitigation measure reduces traffic interference between the
truck fleet and passenger vehicles, which reduces vehicle emissions.
(Adds detail to Measure 9-11 in the EIR) The project design shall include
signs posted in visible places in the truck parking areas that state, "No
Idling." The project proponent shall install electrical hookups to allow
truck operators the opportunity to pay for the electricity necessary to
power their various interior appliances.
(Adds detail to Measure 9-12) The project proponent will include
insulation in all buildings beyond the requirements of Title 24 standards.
(Adds detail to Measure 9-12) The project proponent shall incorporate
skylights into the design of the building. Low energy lights shall be
installed inside the building to reduce energy demand.
(Adds detail to Measure 9-12) Drought tolerant plants shall be
incorporated into the landscape design to reduce landscape equipment
emissions.
All applicable mitigation measures found in the San Bernardino International Trade
Center Specific Plan EIR will be implemented with the proposed project. Mitigation
Measures AQ-9 through AQ-17 insures implementation of the original mitigation
through refinement in the language. In addition, the following measure will help
assure that construction-related emissions do not exceed anticipated levels by regular
monitoring of project construction:
AQ.18
Prior to the start of construction, the applicant shall prepare an Air
Quality Monitoring Plan and submit it to the City Planning Department
for review and approval. This plan shall explain how all air quality
measures will be effectively implemented for this project. During
construction, the applicant shall implement the AQMP to the satisfaction
of City inspectors and the City Planning Director.
In addition, Mitigation Measure LU-l in the land use analysis (Section 5.9) will
restrict future development so that buildout does not exceed that indicated in the
project description (Le., 11.6 million square feet). This will help assure that short-
and long-term emissions do not exceed those levels estimated in this document.
Michael Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.000
5-18
I
I
City of San Bernardino
Inlllal Study for Soutllgate
Environmental Checklist Fonn
I
I
I
I
I
I
I
I
c) Result in a cumulatively considerable net increase of any criteria pollutant for which
the project region is non-attainment under an applicable federal or state ambient air
quality standard (including releasing emissions which exceed quantitative thresholds
for ozone precursors)?
Potentially Significant Impact. The evaluation of emissions presented in the
preceding analysis supports a conclusion that the air quality impacts for the proposed
project are potentially significant. The San Bernardino International Trade Center
Specific Plan EIR concluded that the 1995 Specific Plan would have cumulatively
considerable air quality impacts and a Statement of Overriding Consideration was
adopted. The proposed project and 2006 Specific Plan Amendments will reduce air
quality impacts from those analyzed in the original San Bernardino International
Trade Center Specific Plan EIR. Based on these findings, it is recommended that the
City proceed to consider the proposed project on a CEQA determination that the
projected impacts from implementation of this project fall within the scope of the
1995 San Bernardino International Trade Center Specific Plan EIR and the Statement
of Overriding Considerations. This conclusion is supported by the preceding analysis
that indicates emissions from construction and operation of the Southgate Warehouse
Project will exceed SCAQMD thresholds even with implementation of the mitigation
measures, as outlined in this document.
d) Expose sensitive receptors to substantial pollutant concentrations?
I
I
I
I
I
I
I
I
I
Less than Significant Impact. The nearest sensitive receptor is an existing
residential neighborhoods on the west side of Tippecanoe Avenue. The preceding
analysis demonstrates that localized concentrations of CO are within the state and
national Ambient Air Quality Standards. These emissions will dissipate quickly and
dilute with the surrounding air. Considering the quantity of emissions and the
dispersion of the pollutants, the project is not expected to expose sensitive receptors
to substantial pollutant concentrations.
e) Create objectionable odors affecting a substantial number of people based on the
iriformation contained in Project Description Form?
Less than Significant Impact. Odors are one of the most obvious forms of air
pollution to the general public. Odors can present significant problems for both the
source and the surrounding community. Although offensive odors seldom cause
physical harm, they can cause agitation, anger, and concern to the general public.
Most people determine an odor to be offensive (objectionable) ifit is sensed longer
than the duration of a human breath; typically 2 to 5 seconds.
Michael Brandman Associates
H:\Client\2636\26360006\SBAC Addenclum 040907.doc
5-19
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CIty of San Bernardino
Initial Study for Southgate
Environmental Checklist Fonn
Potential short-term odors associated with the project would be generated from the
diesel exhaust and the application of asphalt and paint during the construction period.
Such odors would be limited to within a close proximity to the site. These odors, if
perceptible, are common in the environment, especially industrial areas, would be of
very limited duration and would dissipate rapidly as they mix with the surrounding
air. While the type of industrial uses on the site are not known at this time, the City's
Development Code and state occupational safety regulations are typically applied to
assure that new industrial uses do not generate odors or air-borne chemicals that
could affect public or worker health and safety. The City's code enforcement
personnel and state occupational safety personnel would be responsible for
enforcement of these regulations. As long as these regulations are enforced, any
potential odor impacts of the project would be considered to be less than significant.
This conclusion also applies to the vacant and former Koo and Hubbs property being
added to the Specific Plan.
j) This category is for any other issues that involve air quality. At this time, no other
issues are known in this regard.
No Impact: No other impacts to air quality are considered to occur as a result of this
project.
The proposed San Bernardino Alliance California Specific PIan will not alter the
findings of the 1995 San Bernardino International Trade Center Specific Plan EIR
with respect to air quality. In addition, the non-physical aspects of the SPA will have
no impacts related to air quality.
Michael Brandman Associates
H:\CIlent\2636\26360006\5BAC Addendum 040907.doc
5-20
I City of San Bernardino
Initial Study for Southgate Environmental Chec/rl/sf Fonn
I
I
5.4 - BIOLOGICAL RESOURCES
I Would the project:
I a) Have a substantial adverse effect, either D ~ D D
directly or through habitat
modifications, on any species identified
I as a candidate, sensitive, or special
status species in local or regional plans,
policies, or regulations, or by the
I California Department ofFish and
Game (CDFG) or U.S. Fish and
Wildlife Service (USFWS)?
I b) Have a substantial adverse effect on D ~ D D
any riparian habitat or other sensitive
I natural community identified in local or
regional plans, policies, regulations or
by the CDFG or USFWS?
I c) Have a substantial adverse effect on D ~ D D
federally protected wetlands as defined
by Section 404 of the Clean Water Act
I (including, but not limited to, marsh,
vernal pool, coastal, etc.) through direct
removal, filling, hydrological
I interruption, or other means?
d) Interfere substantially with the D D ~ D
I movement of any native resident or
migratory fish or wildlife species or
with established native resident or
I migratory wildlife corridors, or impede
the use of native wildlife nursery sites?
e) Conflict with the provisions of an D ~ D D
I adopted Habitat Conservation Plan,
Natural Community Conservation Plan,
or other approved local, regional, or
I state habitat conservation plan?
f) Other D D D ~
I
Two biological studies were conducted by MBA which covered the entire SWP area (Appendices B
I and C). The majority of the project site contains ruderal or non-native grassland vegetation. The
Michael Brandman Assoc/ataB 5-21
I H:\CIient\2e36\26360006\SBAC Addendum 040907.doc
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Southgata
Environmental Checklist Form
eastern portion of the project site (east of the clubhouse) contains mature Riversidean alluvial fan
sage scrub (RAFFS) habitat and 43 acres of critical habitat for San Bernardino kangaroo rat
(Dipodomys merriami parvus) (SBKR) habitat. This area, but not the project site, also supports a
large woollystar population. The area west of the clubhouse contains a mix of moderately to highly
disturbed RAFSS, non-native grassland, and ruderal vegetation. Disturbed areas including access
roads and earthen berms are found throughout the site. The vacant Hubbs and Koo properties that are
being added to the proposed project were included in the aforementioned biological studies. The Koo
site does not contain any suitable habitat for listed species as it has been maintained weed-free by
disking. In addition, the DF AS property is already developed and contains no biological resources.
Discussion: Would the project:
aJ Have a substantial adverse effect. either directly or through habitat modifications. on
any species identified as a candidate. sensitive. or special status species in local or
regional plans. policies. or regulations. or by the California Department of Fish and
Game (CDFGJ or US Fish and Wildlife Service (USFWSJ?
Less than Significant Impact with Mitigation Incorporated: The previous EIR
concluded that potential impacts to biological resources would be less than
significant with implementation of the eight (8) very detailed proposed mitigation
measures. Two biological resources assessments, one for the SWP (October 2004)
and one for the Koo property (April 2004), were completed for the proposed project
(Appendices B and C of this document). In addition, the Hubbs property was
surveyed by biologists with Michael Brandman Associates. These assessments
included literature reviews and database searches for special status species, as well as
field surveys. The following databases were searched; The California Natural
Diversity Database 2004 (CNDDB), The California Native Plant Society Electronic
Inventory (CNPSEI), USFWS, and CDFG sensitive wildlife lists. The CNDDB
search was run for the San Bernardino South U.S. Geological Survey (USGS)
7.S-minute topographic quadrangle. Field guides and pertinent literature were also
consulted.
The literature review and CNDDB database search indicated that 23 special status
species have been reported as occurring in the region. Of those species, three
sensitive species have a moderate potential to occur on the project site. All other
special status species have a low potential to occur on the site. The three sensitive
species that have a moderate potential to occur on the project site are SBKR,
Los Angeles pocket mouse (Perognathus longimembris brevinasus), and the
Northwestern Sand Diego pocket mouse (Chaetodipusfallaxfallax). No sensitive
plant species were found to have a moderate to high potential to occur on the project
Michael Brandman Assoc/atas
H:\Client\2636\26360006\SBAC Addendum 040907.doc
5-22
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CIty of San Barnardino
InllJal Study for Soulhgata
Environmental Checklist Form
site. Santa Ana River woolly star (SARWS) (Eriastrum densifolium ssp. sanctorum)
SARWS is endangered and appears on both the State and Federa1lists, and should be
included as a special status species as the project site is immediately adjacent to the
Santa Ana River. Habitat for SARWS is considered moderately low on the SWP site.
However, a Conservation Management Area (CMA) which serves as woollystar
habitat is located south and east of the SWP between the airport runway and the
Santa Ana River. Immediately east and north of the CMA lies the Open Space
Management Area (OSMA). These two conservation areas belong to the San
Bernardino International Airport.
Previous surveys have identified the presence of the listed SBKR on the SWP site. In
addition, the SAR WS is also potentially present. In contrast, data indicates that these
species are not present on the Hubbs, Koo, or DF AS sites. Based on available data,
the project proponent will have to obtain a federal Endangered Species Act Section
lO(a) permit from or Section 7 Consultation with the USFWS that will compensate
for the loss of any suitable onsite habitat that supports these species on the SWP site.
The previous EIR identified eight detailed mitigation measures (3-1 through 3-8) to
reduce impacts to biological resources to less than significant levels. The following
measure is an expansion of the 1995 EIR mitigation measure 3-2 to ensure that those
impacts remain at less than significant levels:
BR-1 Prior to issuance of grading permits for the SWP site, the developer shall
obtain either a federal Endangered Species Act (ESA) Section lO(a)
permit from or ESA Section 7 Consultation with USFWS for potential
impacts to the SBKR or SARWS. The project site is isolated and
disturbed, so appropriate offsite SBKR SARWS habitat shall be secured
at a minimum 2: 1 ratio based on surveys prior to grading. This measure
shall be implemented to the satisfaction of the City Planning Director.
(This is an expansion and refmement ofMM 3-2 from the 1995 EIR..).
b) Have a substantial adverse effict on any riparian habitat or other sensitive natural
community identified in local or regional plans, policies, regulations or by the CDFG
or USFWS?
Less than Significant Impact with Mitigation Incorporated: The proposed
project does not contain any riparian habitat; however the biological assessments
found that the SWP, with the exception of the Koo site which has been disked
regularly for fire prevention, supports RAFSS. RAFSS is considered a sensitive
natural community; however, the previous EIR identified eight detailed mitigation
Michael Brandman Associates
H:\Cllent\263fl\26360006\SBAC Addendum 040907.doc
5-23
,I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
InltJal Study for Southgale
Environmental Checklist FomI
measures (3-1 through 3-8) to reduce impacts to biological resources to less than
significant levels. The following measure is an expansion of the 1995 EIR mitigation
measure 3-3 given to assure that those impacts remain at less than significant levels:
BR-2 Loss ofRAFSS habitat on the SWP, Koo, Hubbs, or DFAS properties
shall be mitigated by means of purchasing suitable RAFSS habitat offsite
or in a mitigation bank at a minimum 1: 1 ratio. This may apply to SBKR
as well. This measure shall be implemented to the satisfaction of the City
Planning Director. (This is an expansion ofMM 3-3 from the 1995
EIR.)
c) Have a substantial adverse effect on federally protected wetlands as defined by
Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool,
coastal, etc.) through direct removal, filling, hydrological interruption, or other
means?
Less than Significant Impact with Mitigation Incorporated: According to the
Jurisdictional Delineation report prepared by MBA, the proposed project will impact
one jurisdictional drainage feature found within the project boundary. The feature
conveys storm and nuisance flows from a culvert located at the southern portion of
the adjacent golf course. Total jurisdictional impacts will include 0.08 acre of non-
wetland waters of the United States and State (Appendix D). The following
mitigation measure is therefore proposed to assure there are no significant impacts to
jurisdictional land:
BR-3 Prior to issuance of grading permits on the SWP site, the applicant shall
consult with the Regional Water Quality Control Board, U.S. Army
Corps of Engineers, and California Department ofFish and Game, as
appropriate, to obtain permits or approvals related to the federal Clean
Water Act and State Fish and Game codes, as applicable, and which may
include appropriate mitigation at a minimum 2: 1 replacement. This
measure shall be implemented to the satisfaction of the City Planning
Director.
d) Interfere substantially with the movement of any native resident or migratory fish or
wildlife species or with established native resident or migratory wildlife corridors, or
impede the use of native wildlife nursery sites?
Less than Significant Impact: Though the proposed project will change the site, the
site does not include a recognized wildlife corridor, and would not impede the
Michael Brandman Assoc/ales
H:\CIient\2636\26360006\SBAC Addendum 040907.doc
5-24
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Inlt/al Study for Southgate
EnvIronmental Checklist Fonn
movement of fish or wildlife. Neither the project site, nor the surrounding area
represents a native wildlife nursery site, and will not impede the use of a wildlife
nursery site. Because the proposed project will not impede the movement of wildlife,
nor will it impede the use of a wildlife nursery site, the project will not create a
significant impact in respect to this threshold.
e) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural
Community Conservation Plan, or other approved local, regional, or state habitat
conservation plan?
Less than Significant with Mitigation Incorporated: The proposed project site is
partially or completely within the Biological Resource Management Area (BRM) as
described in the City General Plan, Figure 41 (SAN 1989). The General Plan lists
policies associated to development within a BRM area. The Koos, Hubbs, and DFAS
sites have been assessed by a qualified biologist and was determined that neither
sensitive species nor sensitive habitats are present. The proposed project is consistent
with the current land use designation and zoning, and it is not within a formally
established habitat conservation plan (HCP) or natural communities conservation
plan (NCCP). However, the SWP site is adjacent to both a Conservation
Management Area (CMA) for woollystar habitat and an Open Space Management
Area (OSMA) established for SBKR (see Exhibit 6). Since the project may conflict
with an adopted conservation plan, the following mitigation measure is proposed to
help assure that development of the SWP site will not have significant impacts on
conservation plans or areas:
BR-4 Prior to issuance of grading permits for the SWP property, a qualified
biologist shall certify that the proposed layout of buildings and
improvements on the project site are compatible with and do not restrict
implementation of the CMA and OSMA plans in the immediate area.
This conclusion shall be based on the results of current surveys for
SBKR and SARWS. This measure shall be implemented to the
satisfaction of the City Planning Director.
1) Other: This category is for any other issues that involve biological resources. At
this time, no other issues are known in this regard.
No Impaet: No other impacts to any biological resources are considered to occur as
a result of this project.
Michael Bramlman Associates
H:\Client\2636\26360006\SBAC Addendum 040907.doc
5-25
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
co rJl 0
..... C1l w
.- Q) a
.c.... 0::
:E<e ~
x c:: UJ
UJ 0 5
:; :c
C1l w
2: ~
~ ~
o ~
o ::>
o
Q) UJ
(.)
....
:l
o
rJl
Q)
a::
C1l
(.)
00,
o
o
i:ii
$
[ilu.
"!
~
o
"'
III
[il
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Southgate
Envlronmantsl Checklist Form
NOTE: The currently proposed project will implement the mitigation measures
already proposed in the previous EIR to help assure that potential impacts to
biological resources, including the SBKR, are kept at less than significant levels
(pages 4.3-25 to 4.3-32, LSA 1995).
The proposed San Bernardino Alliance California Specific Plan will not alter the
fmdings of the 1995 San Bernardino International Trade Center Specific Plan EIR
with respect to biological resources. The non-physical Specific Plan Amendments
will have no impacts on biological resources.
5.5 - CULTURAL RESOURCES
Would the project:
a) Be developed in a sensitive D 0 0 ~
archaeological area as identified in the
City's General Plan?
b) Cause a substantial adverse change in 0 0 0 ~
the significance of an archaeological
resource pursuant to ~15064.5 of
CEQA?
c) Cause a substantial adverse change in 0 0 ~ 0
the significance of a historical resource
as defmed in ~15064.5 ofCEQA?
d) Directly or indirectly destroy a unique D 0 0 ~
paleontological resource or site or
unique geologic feature?
e) Disturb any human remains, including D D 0 ~
those interred outside of formal
cemeteries?
t) Other: D 0 0 ~
According to the 1995 EIR: no prehistoric sites have been recorded on NAFB or within I mile of the
base boundaries; no facilities were considered significant under Historic Register criteria; the Native
American Heritage Commission concluded that there are no sacred sites within the NAFB environs;
Michael Brsndman Assoclatas
H:\Client\2636\26360006\SBAC Addendum 040907.doc
5-27
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
InlfJal Study for Southgate
Environmental Checklist Form
no fossil remains have been identified or recorded in the project area, and none are expected given the
depth of alluvium and recent scouring.
Discussion: Would the Project:
a) Be developed in a sensitive archaeological area as identified in the City's General
Plan?
No Impact: The previous EIR determined that the project would not have significant
impacts on cultural resources. The City's General Plan designates areas that are
considered to be archaeologically sensitive throughout the City. The proposed
project is not within one of these areas; and therefore will not have a significant
impact on a sensitive archaeological area as identified in the City General Plan. This
conclusion also applies to the vacant and former Hubbs, Koo and DF AS parcels
property being added to the Specific Plan. However, the City must comply with the
requirements of SB 18 in terms of consultation with local Native American groups.
b) Cause a substantial adverse change in the significance of an archaeological resource
pursuant to 915064.5 ofCEQA?
No Impact: There are no known archeological resources within the project
boundaries, and the previous EIR determined that the project would not have
significant impacts on cultural resources. This conclusion also applies to the former
Hubbs, Koo and DF AS parcels property being added to the Specific Plan.
c) Cause a substantial adverse change in the significance of a historical resource as
defined in 915064.5 ofCEQA?
Less Than Significant Impact: According to the City's current General Plan, there
are no known historical resources within the program or project boundaries,
including the former Hubbs and Koo property to be added to the Specific Plan. In
1992, the State Office of Historic Preservation (SOHP), Department of Parks and
Recreation, concluded that the 43 World War II structures onsite were not historically
significant due to their "lack of integrity" and the "absence of any demonstrably
unusual significance relative to their role in World War II in U.S. history"
(Appendix G). This conclusion is still valid based on their characteristics and not to
their physical age (i.e. age in 1992 was slightly less than 50 years, now they are over
60 years old). Therefore, the conclusion is still valid for the proposed project. In
addition, the clubhouse and related buildings at the former Palm Meadows Golf
Course, which were built in the 1950s, are not considered historically significant,
similar to the conclusion by the SOHP referenced above.
Mlchaal Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-28
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Beman/lno
Initial Study for Southgata
Environmental Checklist Fonn
d) Directly or indirectly destroy a unique paleontological resource or site or unique
geologic feature?
No Impact: According to the City's General Plan, there are no known
paleontological resources within the project boundaries, including the Hubbs and
Koo parcels.
e) Disturb any human remains, including those interred outside offormal cemeteries?
No Impact: There are no known human remains within the project site.
j) Other: This category is for any other issues that involve cultural resources. At this
time, no other issues are known in this regard.
No Impact: No other impacts to any cultural resources are considered to occur as a
result of this project.
The proposed San Bernardino Alliance California Specific Plan will not alter the
findings of the 1995 San Bernardino International Trade Center Specific Plan EIR
with respect to cultural resources. In addition, the non-physical aspects of the SPA
will have no impacts related to cultural resources.
5.6 - GEOLOGY AND SOILS
Would the project:
a) Involve earth movement (cut and/or fill) D D ~ D
based on information included in the
Project Description Form?
b) Expose people or structures to potential D 0 ~ D
substantial adverse effects, including
the risk ofloss, injury, or death?
c) Be located within an Alquist-Priolo D D ~ D
Earthquake Fault Zone?
d) Result in substantial soil erosion or the D D ~ D
loss of topsoil?
Michael Brandman Assoclatas
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-29
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
'I
I
City of San Bernardino
Initial Study for Southgata
Environmental Checklist Fonn
Be located within an area subject to
landslides, mudslides, subsidence, or
otber similar hazards as identified in tbe
City's General Plan?
f) Be located within an area subject to 0 D ~ D
liquefaction as identified in the City's
General Plan?
g) Modify any unique physical feature D 0 ~ D
based on a site survey/evaluation?
h) Result in erosion, dust, or unstable soil 0 D ~ D
conditions from excavation, grading,
fill, or otber construction activities?
i) Other: D 0 D ~
According to tbe Project Description Form prepared by Thienes Engineering, grading will be
balanced on site and will consist of 380,000 cubic yards of cut and fill; tbe area is not located in the
Hillside Management District; and, tbe maximum height and grade of constructed slopes is 10 feet.
Discussion: Would the project:
a) Involve earlh movement (cut and/or fill) based on information included in the Project
Description Form?
Less than Significant Impact: The project site gently slopes toward tbe Santa Ana
River. The proposed grading plan shows tbat earthwork will include onsite cut and
fill of 380,000 cubic yards, mainly due to tbe size of tbe site and to level tbe
undulating topography oftbe former golf course. Overall elevations onsite will not
be substantially changed, merely leveled to support new buildings. Therefore,
impacts related to earthwork are considered to be less tban significant.
b) Expose people or structures to potential substantial adverse effects, including the risk
of loss, injury, or death?
Less than Significant Impact: According to data from tbe California Geological
Survey (CGS), tbe project site is not located within any special risk zones other tban
tbe potential for liquefaction (see Section 4.6.fbelow). In addition, tbe previous EIR
Michael Brandman Associates
H:\ClienI\2636\26360006\SBAC Addendum 040907.doc
5-30
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Barnamlno
Initial Study for Southgate
Envlronmantal Chackllst Form
did not identify any unusual or unique geotechnical constraints on the project site
(page 4.1-6, LSA 1995).
c) Be located within an Alquist-Priolo Earthquake Fault Zone?
Less than Significant Impact: The proposed project is not within an Alquist-Priolo
Special Study Zone, as shown in the City General Plan. Therefore, the project will
have a less than significant impact relative to adverse seismic effects or as it relates to
being located within an Alquist-Priolo Earthquake Fault Zone. The buildings and
improvements of the project will be required to comply with applicable seismic
design criteria. With implementation of standard City development requirements, the
proposed project will have less than significant impacts relative to seismic constraints
and potential fault-related impacts. In addition, the previous EIR recommended
implementation of mitigation measure 1-1 requiring site specific geotechnical studies
once actual building locations were selected - this measure will be implemented for
this project as well. This measure will also be applied to the vacant and former
Hubbs and Koo parcels which is being added to th~ Specific Plan.
d) Result in substantial soil erosion or the loss of topsoil?
Less than Significant Impact. Grading for the project does have the potential to
expose soils that would be subject to erosion by wind and water. However, the City
Development Code contains strict erosion control procedures, and the RWQCB
requires the implementation of a variety of Best Management Practices (BMPs) on
constroction and operation of the project which will minimize potential erosion from
the site over the short- and long-term. Therefore, this potential impact would remain
at less than significant levels. In addition, the previous EIR recommended
implementation of mitigation measure 1-2 to reduce wind erosion during grading,
and this measure will be implemented for this project as well. This measure will also
be applied to the vacant and former Hubbs and Koo property which is being added to
the Specific Plan.
e) Be located within an area subject to landslides. mudslides. subsidence. or other
similar hazards as identified in the City's General Plan?
Less than Significant Impact: The site contains low slope related to the Santa Ana
River immediately south of the project site. The proposed project area has very low
potential to create landslides or mudslides, including the Hubbs, DF AS, and Koo
properties, which are essentially level. The proposed project is also identified in the
Mlch881 Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-31
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Inroal Study for Southgate
Envlronmentel Check/1st Fonn
City's new General Plan as being within an area of potential subsidence, based on
historic subsidence in the area. With implementation of standard City development
standards, including foundation design and construction, potential impacts from
subsidence will be reduced to less than significant levels, including the Hubbs,
DF AS, and Koo properties being added to the Specific Plan. Therefore, the project
will not create significant impacts in this regard.
f) Be located within an area subject to liquefaction as identified in the City's General
Plan?
Less than Significant Impact: The proposed project site is adjacent to the Santa
Ana River and in an area of potential liquefaction. However, the actual degree of
liquefaction is based on actual soil conditions and groundwater levels. With
implementation of standard City development standards, including foundation design
and construction, potential impacts from liquefaction will be reduced to less than
significant levels, including the Hubbs, DF AS, and Koo properties being added to the
Specific Plan.
g) Modify any unique physical feature based on a site survey/evaluation?
Less than Significant Impact: The proposed project area does not include any
known unique features that would be impacted by development of the project. The
project, then, will not have a significant impact in this regard.
h) Result in erosion, dust, or unstable soil conditions from excavation, grading, fill, or
other construction activities?
Less than Significant Impact: The site does not appear to contain any unusual soil
conditions, including the vacant and former Hubbs and Koo property, and the City's
standard erosion control measures and best management practices will help assure the
project will not create any significant impacts in this regard.
i) Other: This category is for any other issues that involve earth-related constraints.
At this time, no other issues are known in this regard.
No Impact: No other impacts to any geologic or soil conditions are expected to
occur as a result of this project.
The proposed San Bernardino Alliance California Specific Plan will not alter the
fmdings of the 1995 San Bernardino International Trade Center Specific Plan EIR
Michael Brendman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-32
I
Cffy of San Bemardlno
In/Ual Study for Southgate
Environmental Checklist Form
I
with respect to geology and soils. In addition, the non-physical aspects of the SPA
will have no impacts related to geology and soils.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Michael Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-33
I
I City of San Bernardino
Initial Study for Southgate Envlronmantal Checklist Fonn
I
I
I 5.7 - HAZARDS AND HAZARDOUS
MATERIALS
I Would the project:
a) Create a significant hazard to the public 0 0 ~ 0
or the environment through the routine
I transport, use, or disposal of hazardous
materials?
I b) Create a significant hazard to the public 0 0 ~ 0
or the environment through reasonably
foreseeable upset and accident
I conditions involving the release of
hazardous materials into the
environment?
I c) Emit hazardous emissions or handle 0 0 ~ 0
hazardous or acutely hazardous
I materials, substances, or waste within
one-quarter mile of an existing or
proposed school?
I d) Be located on a site which is included 0 ~ 0 0
on a list of hazardous materials sites
compiled pursuant to Government
I Code Section 65962.5 and, as a result,
would it create a significant hazard to
the public or the environment?
I e) For a project located within an airport 0 0 ~ 0
land use plan or, where such a plan has
I not been adopted, within two miles of a
public airport or public use airport,
would the project result in a safety
I hazard for people residing or working
in the project area?
f) Impair implementation of or physically 0 0 0 ~
I interfere with an adopted emergency
response plan or emergency evacuation
plan?
I
I
MIchael Brandman Associatas 5-34
I H:\CIlent\2636\26360006\SBAC Addendum 040907.doc
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Southgate
Environmental Checklist Form
Expose people or structures to a
significant risk of loss, injury or death
involving wildland fires, including
where wildlands are adjacent to
urbanized areas or where residences are
intermixed with wildlands?
h) Other:
D
D
D
~
Discussion: Would the project:
a) Create a significant hazard to the public or the environment through the routine
transport, use, or disposal of hazardous materials?
b) Create a significant hazard to the public or the environment through reasonably
foreseeable upset and accident conditions involving the release of hazardous
materials into the environment?
c) Emit hazardous emissions or handle hazardous or acutely hazardous materials,
substances, or waste within one-quarter mile of an existing or proposed school?
Less than Significant Impact: The specific industrial uses of the site are not known
at present, however, the City's Development Code, fire department regulations, and
the State's occupational safety codes regulate the use, storage, and transport of
hazardous materials within the City. Once the type of use is known, the types of
hazardous materials associated with this use will also be known. Industrial uses are
required to register with the local fire department and have appropriate material
safety data sheets (MSDS) onsite so that workers and emergency responders will be
aware of what chemicals and/or hazardous materials are located at a particular site.
As long as city, county, and state regulations regarding hazardous materials are
implemented, no significant impacts related to hazardous materials are expected.
Construction on any of these sites will require compliance with the City's
Stormwater Pollution Prevention Plan (SWPPP) requirements, including if any
hazardous materials are spilled during construction. This conclusion applies to the
vacant SWP, Hubbs, and Koo properties, and the existing DFAS property, the later
three of which are being added to the Specific Plan.
The proposed project, including the SWP, Hubbs, Koo and DFAS properties, are not
within one-quarter mile of an existing or proposed school. The nearest school is
Mlcheet Brandman Associates
H:\Client\2636\26360006\SBAC Addendum 040907.doc
5.35
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Barnardino
Inilial Study for Southgata
environmental Checklist Fonn
Monterey Elementary School on Monterey Avenue located approximately one mile
from the proposed project site.
d) Be located on a site which is included on a list of hazardous materials sites compiled
pursuant to Government Code Section 65962.5 and, as a result, would it create a
significant hazard to the public or the environment?
Less than Significant with Mitigation Incorporated: Several specific facilities or
uses on the project site are included on the state Cortese list as involving hazardous
materials. However, since the base closed in 1994 the site has been in remediation
and cleanup is nearly completed. Much of the project area has been treated and/or
decontaminated through intense remediation, and any remaining areas requiring clean
up will be remediated prior to development. The USAF is ultimately responsible for
any and all remediation necessary because of military activities. At present, there are
three contaminate sites within or adjacent to the proposed project, that are currently
undergoing or are planned for remediation in the near future: 1) lead contamination at
the former air force base gun range; 2) ongoing cleanup of dioxin at various locations
south of the airport runways; and 3) ponds associated with a former industrial
wastewater treatment plant.
The following mitigation measures are listed in the 1995 EIR and would apply to the
proposed project (see Appendix H):
6-1 Prior to the approval of any building permit or grading permit within the
project area, the applicant shall provide written evidence to the Planning and
Building Services Director, City of San Bernardino, that the Air Force has
released the site for development, ant that the proposed development will not
hinder the efforts to clean up the TCE plume identified beneath and down
gradient of the former NAFB site.
6-2 Prior to the approval of any building or grading permit within the project
area, the applicant shall provide written evidence to the Planning and
Building Services Director, City of San Bernardino, that an individual site
survey meeting City of San Bernardino requirements for hazardous waste has
been conducted.
I
Michael BrancJman Associates
H:\CIient\2636\26360006\SBAC Addendum 040907.doc
5-36
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Inltiat Study for Southgata
Envlronmanlal Chackllst Fonn
e) For a project located within an airport land use plan or, where such a plan has not
been adopted, within two miles of a public airport or public use airport, would the
project result in a safety hazard for people residing or working in the project area?
Less than Significant Impact: The project site is within two miles of the San
Bernardino International Airport (in fact, it is adjacent to the airport property).
According to the 2003 SBIA Airport Influence Map, the project site is within the
Inner Turning Zone (Zone 3), the Sideline Safety Zone (Zone 5), and the Traffic
Pattern Zone (Zone 6) of this airport. The Airport Traffic Pattern Zone includes
height restrictions, and the proposed project will not exceed these height restrictions
and will be consistent with the development code (i.e. less than 60 feet) The proposed
project is also part of the SBIA Specific Plan which promotes specific land uses
around the airport that are expected to compliment and not conflict with the flight-
related restrictions and requirements of airport operations. New industrial uses will
introduce new sources of light and glare adjacent to the airport property (i.e.,
inunediately south of the runway), so the project has the potential to create
significant impacts on airport safety (see Section 5.1, Aesthetics). Implementation of
Mitigation Measure AE-I will help assure that these impacts will remain at less than
significant levels. A more detailed analysis of the project's consistency with these
airport zones and their requirements is included in Section 5.9, Land Use and
Planning. In addition, mitigation measure AE-I in this document restricts building
heights per applicable safety zone limits, based on the airport land use master plan.
f) Impair implementation of or physically interfere with an adopted emergency
response plan or emergency evacuation plan?
No Impact: The project site, including the Hubbs, Koo and DF AS properties, are
proximate to Tippecanoe Avenue, a major arterial through this industrial area.
Development of the proposed project is consistent with the City's General Plan and
so no significant impacts are expected relative to emergency response plans or
evacuation routes.
g) Expose people or structures to a significant risk of loss. injury or death involving
wildland fires, including where wildlands are adjacent to urbanized areas or where
residences are intermixed with wildlands?
Less than Significant Impact: The City of San Bernardino General Plan has
mapped areas considered to be fire hazard areas. This area is predominantly within
the foothill communities. The proposed project site, including the former Hubbs,
Koo and DF AS property, is not within this mapped area, and is not within wildlands
and would not have a significant risk ofloss, injury or death involving wildland fires.
Michael Brandman Associates
H:\Cllent\2636\26360006\5BAC Addendum 040907.doc
5-37
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Barnardino
Inlt/al Study for Southgate
Environmentel Checklist Form
h) Other: This category is for any other issues that involve hazards. At this time, no
other issues are known in this regard.
No Impact: No other impacts to hazards are expected to occur as a result of this
project.
The proposed San Bernardino Alliance California Specific Plan will not alter the
fmdings of the 1995 San Bernardino International Trade Center Specific Plan EIR
with respect to hazardous materials. In addition, the non-physical aspects of the SPA
will have no impacts related to hazards and hazardous materials.
5.8 - HYDROLOGY AND WATER
QUALITY
Would the project:
a) Violate any water quality standards D D ~ D
or waste discharge requirements?
b) Substantially deplete groundwater D D ~ D
supplies or interfere substantially
with groundwater recharge such that
there would be a net deficit in aquifer
volume or a lowering of the local
groundwater table level (e.g., the
production rate of pre-existing
nearby wells would drop to a level
which would not support existing
land uses or planned uses for which
permits have been granted)?
c) Substantially alter the existing D D ~ D
drainage pattern of the site or area,
including through the alteration of
the course of a stream orriver, in a
manner which would result in
substantial erosion or siltation on- or
off-site?
d) Substantially alter the existing D D ~ D
drainage pattern of the site or area,
including through the alteration of
the course of a stream or river, or
substantially increase the rate or
Michael Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-38
I City of San BsmaRilno
Initial Study for Southgate Envlronmantal Checklist Fonn
I
I amount of surface runoff in a manner
I which would result in flooding on- or
off-site?
e) Create or contribute runoff water D D ~ D
I which would exceed the capacity of
existing or planned stormwater
drainage systems or provide
I substantial additional sources of
polluted runoff, such as from areas of
material storage, vehicle or
I equipment maintenance (including
washing or detailing), waste
handling, hazardous materials
handling or storage, delivery areas,
I loading docks, or other outdoor
areas?
t) Otherwise substantially degrade D ~ D D
I water quality?
D D D ~
g) Place housing within a 1 DO-year
I flood hazard area as mapped on a
federal Flood Hazard Boundary or
Flood Insurance Rate Map or other
I flood hazard delineation map?
h) Place within a 1 DO-year flood hazard D D ~ D
I area structures which would impede
or redirect flood flows?
i) Expose people or structures to a D D ~ D
I significant risk ofloss, injury, or
death involving flooding, including
flooding as a result of the failure of a
I levee or dam?
D D ~ D
j) Inundation by seiche, tsunami, or
I mudflow?
k) Other: D D D ~
I Discussion: Would the project:
I a) Violate any water quality standards or waste discharge requirements?
I
Michael Brandman Associates 5-39
I H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
1-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Southgate
Environmental Checklist Form
b) Substantially deplete groundwaler supplies or interfere substantially with
groundwater recharge such that there would be a net deficit in aquifer volume or a
lowering of the local groundwater table level (e.g., the production rate of pre-
existing nearby wells would drop to a level which would not support existing land
uses or planned uses for which permits have been granted)?
c) Substantially alter the existing drainage pattern of the site or area, including through
the alteration of the course of a stream or river, in a manner which would result in
substantial erosion or siltation on- or off-site?
d) Substantially alter the existing drainage pattern of the site or area, including through
the alteration of the course of a stream or river, or substantially increase the rate or
amount of surface runoff in a manner which would result in flooding on- or off-site?
e) Create or contribute runoff water which would exceed the capacity of existing or
planned stormwater drainage systems or provide substantial additional sources of
polluted runoff, such as from areas of material storage, vehicle or equipment
maintenance (including washing or detailing), waste handling, hazardous materials
handling or storage, delivery areas, loading docks, or other outdoor areas?
Less than Significant Impact: Although the site is adjacent to the Santa Ana River,
it is separated by an existing service road and existing drainage structures, and
proposed in an area planned for industrial uses. Runoff from the site currently flows
toward and into the adjacent Santa Ana River. Once the site is developed, runoffwill
be diverted to constructed detention basins within the project's boundaries before it
discharges to the river. The basins will be regularly maintained to remove sediments
and other urban pollutants that build up, so water-related impacts are expected to be
less than significant in this regard. This conclusion also applies to the Hubbs, Koo
and DF AS properties which are being added to the Specific Plan. The three sites
being added to the plan are relatively flat and surrounded by urban development with
improved storm drains.
1) Otherwise substantially degrade water quality?
I
I
Less than Significant Impact with Mitigation Incorporated: Development of the
site will produce urban runoff, but the project will be designed and graded such that
runoff will flow into detention basins before reaching the river. Runoff from the site
will be increased due to the covering over of native soils with impervious surfaces
(e.g., asphalt, buildings). The project will contain natural or constructed filtration
systems to pre-treat urban runoff before it reaches the river. In addition, the City
requires the submittal of a Water Quality Management Plan to identify how urban
runoff and pollutants will be controlled. The City will also require the project to
comply with erosion control measures, and the RWQCB will require the
implementation of Best Management Practices to control short- and long-term
Michael Srandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-40
I.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bemardlno
Initial Study for Southgate
Environmental Checklist Form
surface water quality impacts. Mitigation measures 2-1 through 2-3 listed in the
1995 EIR (see Appendix II) will assure that runoff from the project site will not
adversely affect water quality of the Santa Ana River:
g) Place housing within a 1 OO-year flood hazard area as mapped on a federal Flood
Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation
map?
No Impact: The proposed project site, including the Hubbs, Koo and DF AS
properties, does not include any housing, and therefore will not place housing within
a I OO-year flood hazard area, and not have an impact as it regards to placing housing
within a 100-year flood zone.
h) Place within a lOO-year flood hazard area structures which would impede or redirect
floodflows?
Less than Significant Impact: The proposed project is adjacent to the Santa Ana
River and in an area determined to by the Federal Emergency Management Agency
(FEMA) to be within the 100-year flood zone according to the previous EIR
(Figure 4.2.1, LSA 1995). However, the project will be constructed so that all
improved structures will be at least I foot above the identified I DO-year flood limit,
as required by FEMA flood insurance requirements. Because the project will not
place structures within the 100-year flood hazard zone, it will not impede or redirect
the flood flows and will not have a significant impact in this regard.
i) Expose people or structures to a significant risk of loss, injury, or death involving
flooding, includingflooding as a result of the failure of a levee or dam?
Less than Significant Impact: The proposed project is adjacent to the Santa Ana
River but separated by a berm and service road. It is within a 100-year flood zone as
identified in the previous EIR (Figure 4.2.1, LSA 1995) and on the ESRlIFEMA
Hazard Awareness Site. The project developer shall raise the finished floor
elevations of the buildings onsite to at least one foot above the 100-year flood limit,
according to FEMA flood insurance requirements. This requirement also applies to
the Hubbs, Koo, and DF AS properties being added to the Specific Plan.
The Seven Oaks Dam was recently completed upstream of the project site, and if it
failed would likely result in a catastrophe along the Santa Ana River, all the way into
Orange County, including the project site. The Seven Oaks Dam is, however, a
relatively new dam (completed in 2000) and has a very low chance of failure due to
Michael Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-41
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San BarnarrJlno
Initial Study for Southgate
Environmental Checklist Form
the technology that is used to build modem dams. Because dam failure is extremely
unlikely, the proposed project will have less than significant impacts in this regard.
j) Inundation by seiche, tsunami, or mudflow?
Less than Significant Impact: The proposed project is not near a large body of
water, therefore seiche and tsunami are not possible, and the site is relatively flat,
without any major hills to produce mudflows; therefore, the site has a very low
chance of being impacted by seiche, tsunami, or mudflow, and will not have a
significant impact as it relates to these hazards.
k) Other: This category is for any other issues that involve water or water quality. At
this time, no other issues are known in this regard.
No Impact: No other impacts to water or water quality are expected to occur as a
result of this project.
The proposed San Bernardino Alliance California Specific Plan will not alter the
findings of the 1995 San Bernardino International Trade Center Specific Plan EIR
with respect to hydrology and water quality. In addition, the non-physical aspects of
the SPA will have no impacts related to hydrology and water quality.
5.9 - LAND USE AND PLANNING
Would the project:
a) Physically divide an established
community?
D
D
~
D
b) Conflict with any applicable land use
plan, policy, or regulation of an agency
with jurisdiction over the project
(including, but not limited to the
general plan, specific plan, local
coastal program, or zoning ordinance)
adopted for the purpose of avoiding or
mitigating an environmental effect?
D
D
~
D
Mlcheet Brandman Associates
H:\Client\2636\26360006\SBAC Addendum 040907.doc
5-42
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bemardlno
Inn/al Study for Southg<J
Envlron"""'tal ChtICkJlst Fonn
c) Conflict with any applicable habitat
conservation plan or natural
community conservation plan?
d) Be developed within the Hillside
Management Overlay District?
o
o
o
~
e) Be developed within Foothill Fire
Zones A, B, or C as identified in the
City's General Plan?
o
o
o
~
f) Be developed within the Airport
Influence Area as adopted by the San
Bernardino International Airport
Authority?
o
o
~
o
g) Other:
o
~
o
o
Discussion: Would the project:
a) Physically divide an established community?
Less than Significant Impact: The surrounding land use is primarily airport and
industrial use with areas of vacant land next to the river, and some mixed use rural
residential with commercial development west of Tippecanoe Avenue. The proposed
project would be consistent with the surrounding land uses and would not physically
divide an established community, including the Hubbs, Koo and DF AS site to be
added to the Specific Plan.
b) Conflict with any applicable land use plan, policy, or regulation of an agency with
jurisdiction over the project (including, but not limited to the general plan, specific
plan, local coastal program, or zoning ordinance) adopted for the purpose of
avoiding or mitigating an environmental effect?
Less than Significant Impact: The Southgate Warehouse Project site is consistent
with both the current and the proposed Specific Plans. The proposed project will not
conflict with the land use plan found in the City General Plan, and would not create a
significant impact related to land use. The Hubbs and Koo properties are zoned for
industrial uses so the proposed project is also consistent with land use and zoning
designations for this additional property as well.
MlchHt Bnlndlllllll_'stes
H:\Client\2638\26360006BAC Addendum 040907.doc
5-43
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study fo, Southgata
Environmental Checklist Fann
c) Conflict with any applicable habitat conservation plan or natural community
conservation plan?
Less than Significant Impact with Mitigation Incorporated: The proposed
project is within the Biological Resources Management Area (BRM) as defined in
the General Plan. The project site is currently designated for Industrial land use,
which is not prohibited qy the BRM designation. The proposed project would not
conflict with the BRM designation.
Previous surveys have identified the presence of the listed SBKR on the project site.
Therefore, the project proponent will have to obtain a federal Endangered Species
Act Section 10(a) permit from or Section 7 Consultation with the USFWS. As
implementing required permitting procedures regarding biological resources, the
previous EIR identified eight detailed mitigation measures (3-1 through 3-8) to
reduce impacts to biological resources to less than significant levels. Therefore,
implementation of mitigation measure BR-l in Section 4.4, Biological Resources, of
this document will help assure that potential impacts in this regard remain at less than
significant levels
d) Be developed within the Hillside Management Overlay District?
No Impact: The proposed project, including the new former Hubbs, Koo and DF AS
property, is not within the Hillside Management Overlay District.
e) Be developed within Foothill Fire Zones A, B, or C as identified in the City's General
Plan?
No Impact: The proposed project is not within Foothill Fire Zones A, B, or C as
identified in the City General Plan.
j) Be developed within the Aitport Influence Area as adopted by the San Bernardino
International Airporl Authority?
Less than Significant Impact: The project site is within 2 miles of the San
Bernardino International Airport, and most of it is actually adjacent to the south side
of the airport property. The Koo portion of the SWP is within the Inner Turning
Zone (Zone 3), and a portion of the remaining SWP area is within a Sideline Safety
Zone (Zone 5), according to the 2003 Airport Influence Map provided by the SBIA.
The entire project area is within the Airport Influence Area, and more specifically,
most of the golf course is within the Airport Traffic Pattern (Zone 5) which includes
Michael Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-44
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Barnardino
InltJal Study for Southgate
Environmental Checklist Form
height restrictions. These zones have height restrictions based on the California
Airport Land Use Planning Handbook.
The Koo property has the potential for most restriction because it is located in Zone
3, the Inner Turning Zone. The SPA limits building heights to 60 feet, so the
proposed project will not exceed the airport zone height restrictions. The proposed
project is also part of the SBIA Specific Plan which promotes specific land uses
around the airport that will compliment and not conflict with the flight-related
restrictions and requirements of airport operations (i.e. consistent with airport
influence area guidelines). Therefore the potential land use impacts are less than
significant.
g) Other: This category is for any other issues that involve land use or planning. At
this time, no other issues are known in this regard.
Less Than Significant with Mitigation: A number of potential impacts of the
project are directly related to the amount of square footage constructed by the project
(e.g., traffic, air pollution, noise, etc.). The proposed specific plan amendment would
allow up to 14 million square feet of buildings to be built, assuming all developable
land were build at the maximum floor area ratio. However, the project area already
contains new development that has been built to less than the maximum FAR.
Therefore, the project description indicates that the actual planned buildout of the
project would be 11.6 million square feet. The following measure is therefore
proposed to help assure that land use and other impacts related to ultimate buildout of
the project are limited to that identified in this document:
LU-1 Prior to issuance of any building permits, the developer shall
demonstrate that the entire specific plan development is within a buildout
limit of 11.6 million square feet. This measure shall be implemented to
the satisfaction of the City Planning Director.
No other impacts to land use or planning are expected to occur as a result of this
project. The proposed San Bernardino Alliance California Specific Plan will not alter
the fmdings of the 1995 San Bernardino International Trade Center Specific Plan EIR
with respect to land use. In addition, the non-physical aspects of the SPA will have
no impacts related to land use and planning.
Michael Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
S-45
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
InltJal Study for Southgate
Environmental Checklist Form
5.10 - MINERAL RESOURCES
Would the project:
a) Result in the loss of availability of a D D IZI D
known mineral resource that would be of
value to the region and the residents of
the state?
b) Result in the loss of a locally-important D D ~ D
mineral resource recovery site delineated
on a local general plan, specific plan or
other land use plan?
c) Be located in a Mineral Resource Zone D D ~ D
as adopted by the State Mining and
Geology Board and identified in the
City's General Plan?
Discussion: Would the project:
a) Resull in the loss of availability of a known mineral resource that would be of value
to the region and the residents of the state?
b) Result in the loss of a locally-important mineral resource recovery site delineated on
a local general plan, specific plan or other land use plan?
c) Be located in a Mineral Resource Zone as adopted by the State Mining and Geology
Board and identified in the City's General Plan?
Less than Significant Impact: The proposed project is adjacent to an area
designated by the City's new General Plan as a regionally significant for construction
aggregate (sand and gravel) (i.e., the Santa Ana River). This designation is
extensive, and is found along the Santa Ana River, the Cajon Wash, Lytle Creek,
Wann Creek and City Creek. However, the site is planned for and surrounded by
industrial development. The Santa Ana River channel is located south of the site, but
the primary aggregate resources of the river are contained within the river channel,
while the project site is on the first flood terrace. For these reasons, extraction of
mineral resources from the project site would be problematic compared to the
adjacent riverbed. Therefore, development of the project site, including the Hubbs,
Koo and DF AS properties, does not represent a significant loss of mineral resources
Michael Brandman Associates
H:\Client\2636\26360006\SBAC Addendum 040907.doc
5-46
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Inll/al Study for Southgata
Environmental Checklist Form
or a mineral resource zone. It should also be noted that even development of the site
would not preclude its future use for mineral extraction (i.e., sand and gravel) but
might require demolition of structures on the site.
The proposed San Bernardino Alliance California Specific Plan will not alter the
fmdings of the 1995 San Bernardino International Trade Center Specific Plan EIR
with respect to mineral resources.
5.11 - NOISE
Would the project result in:
a) Exposure of persons to or generation of 0 181 D D
noise levels in excess of standards
established in the City's General Plan
or Development Code, or applicable
standards of other agencies?
b) Exposure of persons to or generation of 0 181 D D
excessive groundbome vibration or
groundbome noise levels?
c) A substantial permanent increase in D IZI D D
ambient noise levels in the project
vicinity above levels existing without
the project?
d) A substantial temporary or periodic D 181 0 D
increase in ambient noise levels in the
project vicinity above levels existing
without the project?
e) For a project located within an airport D D 181 D
land use plan or Airport Influence
Area, would the project expose people
residing or working in the project area
to excessive noise levels?
t) Other: D D D 181
Michael Brandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-47
I
I
I
I
I
I
I
I
I
City of San Bamarr/lno
In/Ual Study for Southgata
Environmental Chackllst Fonn
Discussion: Would the project:
a) Exposure of persons to or generation of noise levels in excess of standards
established in the City's General Plan or Development Code, or applicable
standards of other agencies?
Less than Significant Impact with Mitigation Incorporated: The previous EIR
identified significant long-tenn noise impacts from project operation. The proposed
project is within an area zoned for industrial uses, which would allow for operations
that may be considered to be noisy. In addition, the former Koo property to be added
to the Specific Plan is adjacent to residential uses, and may create new noise impacts,
however the impacts were already evaluated in the 1995 EIR and a detennination was
made that the impacts would be significant. The long-tenn impacts to noise will be
significantly less than what was originally analyzed because the proposed land use is
less intense (from traditional warehouse to "high cube") and will generate less traffic.
The specific operations of the project are not known at this time; however, all future
tenants will be required to comply with City noise standards.
b) Exposure of persons to or generation of excessive groundborne vibration or
groundborne noise levels?
I
I
I
I
I
I
I
I
Less than Significant Impact with Mitigation Incorporated: The proposed
project is within an area zoned for industrial uses, which would allow for operations
that may produce groundbome vibration or groundbome noise. The specific
operations are not known at this time; however, all future tenants will be required to
comply with City noise standards.
c)
A substantial permanent increase in ambient noise levels in the project vicinity above
levels existing without the project?
Less than Significant Impact with Mitigation Incorporated: The proposed
project will result in additional noise. The proposed project, including the additional
Hubbs and Koo parcels will create additional vehicle traffic, and some operation may
produce noise which would increase the ambient noise levels in the project vicinity.
d)
A substantial temporary or periodic increase in ambient noise levels in the project
vicinity above levels existing without the project?
Less than Significant Impact with Mitigation Incorporated: The proposed
project may require construction, which will result in a temporary increase in ambient
noise levels; however, noise levels would subside once construction of the proposed
I
I
Mlchaal Brandman Associatas
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-48
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Barnardlno
Initial Study for Southgate
Envlronmantel Checklist Form
project is completed. Two types of noise impacts could occur during the construction
phase. First, the transport of workers and equipment to the construction site would
incrementally increase noise levels along site access roadways. Even though there
would be a relatively high single-event noise exposure potential with passing trucks,
the increase in noise would be less than significant when averaged over a 24-hour
period and, therefore, would have a less than significant impact on noise receptors
along the truck routes.
The second type of impact is related to noise generated by onsite construction
operations and the vicinity would be subject to elevated noise levels due to the
operation of onsite construction equipment. Construction activities are carried out in
discrete steps, each of which has its own mix of equipment, and consequently its own
noise characteristics. These various sequential phases would change the character of
the noise levels surrounding the construction site as work progresses. Construction-
related noise will result in a temporary change in ambient noise levels. Noise
generated by construction equipment, including trucks, graders, bulldozers, concrete
mixers, and portable generators, can reach significant levels ranging from 70 dBA to
105 dBA. Impacts from construction are considered short-term impacts since noise
will cease upon completion of construction activity. The nearest sensitive receptors
are located southwest of the site and south of the Santa Ana River. Residences are
over a quarter mile away from the project site, and although there are intervening
structures that block the line of site, so existing residences will likely not be disturbed
by noises from the project site. The previous EIR contained the following six
measures (see Appendix II) to mitigate the noise impacts from construction activities
to be less than significant levels:
8-1 Restriction of construction hours per noise ordinance;
8-2 Maintain muffiers on all construction equipment;
8-3 Stage construction activities away from occupied uses;
8-4 Construct temporary noise barriers where appropriate;
8-5 Utilize equipment with low noise levels; and
8-6 Concentrate noisy activities to minimize duration of impacts
With the implementation of the above mitigation measures, temporary noise impacts
during construction will be less than significant for the currently proposed project,
including the new Hubbs and Koo property proposed to be added to the Specific
Plan. The addition of the DF AS property will not affect construction noise because
the property has already been built out.
Michael Brandman Associates
H:\Client\2636\26360006\SBAC Addenclum 040907.doc
5-49
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bomardlno
Initial Study for Southgate
Environmental Checklist Fonn
e) For a project located within an airport land use plan or Airport Influence Area,
would the project expose people residing or working in the project area to excessive
noise levels?
Less than Significant Impact: The project site is within two miles of the San
Bernardino International Airport which was opened after Norton Air Force Base
closed. In fact, most of the site is adjacent to the airport property to the north, except
for the new Koo property located south of Palm Meadows Drive. Proposed uses
onsite will be industrial in nature, which are not significantly affected by anticipated
airport noise. The City's General Plan requires exterior noise levels of70 dB for
industrial uses. The San Bernardino International Airport Master Plan (SBIAMP)
indicates that, at present (2005), noise levels along the northern portion of the site are
estimated to be 60 dB. However, the SBIAMP also indicates noise levels on the
northern portion of the SWP site will increase to 65 dB by 2023 as a result in
increased air traffic at the SBIA (see Exhibits 7 and 8). Standard construction
methods of planned industrial uses and buildings will be sufficient to prevent
significant noise impacts on future users.
j) Other: This category is for any other issues that involve noise. At this time, no other
issues are known in this regard.
No Impact: No other impacts to noise are expected to occur as a result of this
project.
I
I
I
I
I
The proposed San Bernardino Alliance California Specific Plan will not alter the
fmdings of the 1995 San Bernardino International Trade Center Specific Plan EIR
with respect to noise. In fact, due to less intense use and improved technology, the
proposed project will have significantly less impact with this regard. In addition, the
non-physical aspects of the SPA will have no impacts related to noise.
I
Michael Brandman AS$Oclalas
H:\CUent\2636\26360006\SBAC Addendum 040907.doc
5-50
I
I
I
f
I
!j'
I II i
GO'~
,
!
ppi
I L ! I
.II J ! s
E1E1E1G.
I
\-
-';'fW1
IL.- "";.
,1 ~ ~
. -- L.,
;1'
..: ~~. ."':".
'dl"h
.0."
. I 10;, '.".
... .. .... ~
. ~ . ,,'
i ' . .!I
.. ~.. lnu
11
I
L
,
I
'.
~
!!!
en
c
"
E
0-
~ I.)n
I
I
I
f
.
. ,
'f:"'- ~
L. ~'t. '-~
i-1 ....
.. I ~:'.. \
. ~~ ~
:~';"I ,
;..-~ 'i!J ~
'~~ ~ II ~
vi
:;;
\ ~
'0.
"
.Ul
-. .
d
1 .:2
"
"
~
t
~!
. ..~.:1
l-..!.--i
-, r
I " ~
" 1
- ~.;..."Jo
~ I
I
... .
~ ~~
.... '. ~,- . ;
-;< -'.
.Ii .-.4' ...~
. ...
.
I
I
',t.
~
I. -
t..
_ -: lj:;-.J...;.
ir~
I
I
.
I
I
.
..
I
,r
.. riD ....
ii' ,
'" ,...l.
- --
I
I'- l.O I- <(
OUU
~ 0 w -
..cNO~
..c [to
X (/) wO::
W L.. en <(
:J ::> Z
o 00::
'E:c~
o Wz
0::<(
<.) ~en
<1> w
.!Q ~
o (!)
Z:c
tl-
o ::>
a.5l
L..
4:
;;
0"
ou.
o
..j
"
E
"
.c:;
x
~I
o
o
N
ill
o .0
.z
~H5
.~ ~
~<
.
H~~ON ~ :g
.0
~~~~
~~oS :g
~~~m
~~~N
o
o
o
N
o
o
o.
I
- j ..
I .
...-..
I
I
I
I
I .lj,o
1t
""""
I 'I~"
.....,
-u
I
I
I
I
I
-
I - -'-
\.'
I
I
I
I
I
. ~-----..
1
A'QjJ
"
I
! I f
I II I
,
GO'~
,
!
Ii Hi
J lid
E1EJGG-
-~
~
"".f
!
'-
"
,
.,
~
.'!l
Cii
C
~
E
~ km
~-
IV.. ~
t I' ....:.,.
~. ~~.a....;.::'
· t II. ~. I :;
-T* ·
t"'il .
I ! 1'1
.
:
. ...."
=
~
. -
t
Il "IN
I f
... 11I11
I
I
I !.
u
~--
.-
'"
co C') I-- <l:
:!: ON frl 0-
~ -'0
..... N Oz
~ I 0:: is
X 0..0::
Uj(/)w_
... U) Z
:J => 0::
o 0 W
C I CD
o W z
() 0:: <l:
~cn
(]) w
.!:Q ~
o C!l
Z I
-el--
o =>
a.g
....
<(
1ii
o~
0"-
o
..
~
=>
o
. '"
"
g
.;
.c
~
;:,
N
o
N
:ll
o '0
.z
ILJ~1
~.<(
HUlON ~ ~
.0
~_8C:!
ILJLJ a ;;
Illlll Jl ~
~~8
-":sl
~~
o
o
o
N
o
o
q
I ~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Semanflno
Initial Study for Southgate
Envlronmerrlel Checldlst Fonn
5.12- POPULATION AND HOUSING
Would the project:
a) Induce substantial population growth in D D ~ 0
an area, either directly (for example, by
proposing new homes and businesses)
or indirectly (for example, through
extension of roads or other
infrastructure)?
b) Remove existing housing and displace D D D ~
substantial numbers of people,
necessitating the construction of
replacement housing elsewhere?
c) Other. D D 0 ~
Discussion: Would the projeet:
a) Induce substantial population growth in an area, either directly (for example, by
proposing new homes and businesses) or indirectly (for example, through extension
of roads or other infrastructure)?
Less than Signifleant Impact: Development of the proposed project, including the
addition of the Hubbs, DF AS, and Koo properties to the Specific Plan, would result
in new businesses and create additional jobs; however, the Inland Empire, including
the City of San Bernardino, has more housing than jobs, so many San Bernardino
residents commute to other areas for employment. The proposed project would not
induce substantial population growth, but instead would offer employment to the
local residents and allow some of them to live and work in the same area. Therefore,
the project, including the new properties, will not have a significant impact on
population growth.
b) Remove existing housing and displace substantial numbers of people, necessitating
the construction of replacement housing elsewhere?
No Impaet: The proposed project site is currently vacant and/or already in use for
non-residential use. The project would not require the removal of any existing
housing, and thus would have less than significant impact.
Michael Srandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-53
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Barnardino
InltJal Study for Southgata
Envlronmantal Chackllst Fonn
c) Other: This category is for any other issues that involve population or housing. At
this time, no other issues are known in this regard.
No Impact: No other impacts to population or housing are expected to occur as a
result of this project.
The proposed San Bernardino Alliance California Specific Plan will not alter the
fmdings of the 1995 San Bernardino International Trade Center Specific Plan EIR
with respect to population and housing. In addition, the non-physical aspects of the
SPA will have no impacts related to population or housing.
5.13 - PUBLIC SERVICES
a) Would the project result in substantial D 181 D D
adverse physical impacts associated
with the provision of new or
physically altered governmental
facilities, need for new or physically
altered governmental facilities, the
construction of which could cause
significant environmental impacts, in
order to maintain acceptable service
ratios, response times or other
performance objectives for any of the
public services:
Fire protection, including medical aid? D 181 0 0
Police protection? D 181 D D
Schools? D 181 0 0
Parks or other recreational facilities? D 181 D 0
Other governmental services? D 181 D 0
b) Other: D 0 D 181
Discussion:
a) Would the project result in substantial adverse physical impacts associated with the
provision of new or physically altered governmental facilities, need for new or
physically altered governmental facilities, the construction of which could cause
significant environmental impacts, in order to maintain acceptable service ratios,
response times or other peiformance objectives for any of the public services: fire
Mlchaa/Bnlndman Assochltas
H:\CIient\2636\26360006\SBAC Addendum 040907.doc
5-54
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Southgate
Environmental Checklist Fonn
prolection, including medical aid; police protection; schools, parks or other
recreational facilities; or other governmental services?
Less than Significant Impact with Mitigation Incorporated: The proposed
project, including the added Hubbs, Koo and DF AS properties, will incrementally
increase the need for public services such as police, fire, etc. Mitigation measures
10-1 through 10-8 as defmed in the 1995 EIR will ensure that no significant adverse
impacts are expected relative to the provision of public services. See Appendix H for
a complete list of the 1995 mitigation measures.
b) Other: This category is for any other issues that involve public services. At this
time, nO other issues are known in this regard.
No Impact: No other impacts to public services are expected to occur as a result of
this project.
The proposed San Bernardino Alliance California Specific Plan will not alter the
findings of the 1995 San Bernardino International Trade Center Specific Plan EIR
with respect to public services. In addition, the non-physical aspects of the SPA will
have no impacts related to public services.
5.14 - RECREATION
a) Would the project increase the use of 0 0 ~ D
existing neighborhood and regional
parks or other recreational facilities
such that substantial physical
deterioration of the facility would
occur or be accelerated?
b) Does the project include recreational D 0 ~ D
facilities or require the construction
or expansion of recreational facilities
which might have an adverse
physical effect on the environment?
c) Other: 0 D D ~
Michael Btandman Associates
H:\Cllent\2e36\26360006\SBAC Addendum 040907.doc
5-55
I
I
City of San Bernardino
InlUal Study for Sout/Jgata
Environmental Chacldlst Fonn
Discussion: Would the project:
I
a)
Increase the use of existing neighborhood and regional parks or other recreational
facilities such that substantial physical deterioration of the facility would occur or be
accelerated?
I
I
I
I
I
I
I
Less than Significant Impact: The proposed project is for industrial use, and does
not include residences. It should be noted that the project site contains a golf course
that has since been closed for public use. The Southgate site has been planned for
many years to be converted to industrial uses consistent with the SBIA which will
now occur under the proposed project. The City General Plan requires that all non-
residential development provide on-site open space facilities or pay in-lieu fees. The
proposed SWP includes several active and passive recreation areas, along with
various trail access points with will connect to the Santa Ana River Trail System.
See Exhibit V-13 of the Specific Plan for a map of the Santa Ana River Trail access
points. Development of the SWP site will eliminate the former Palm Meadows Golf
Course; however, the previous EIR examined the impacts of the conversion of this
limited recreational use to industrial use and determined it was not a significant
impact. Similarly, the currently proposed project will not have a significant impact
on recreation.
b)
Does the project include recreational facilities or require the construction or
expansion of recreational facilities which might have an adverse physical effect on
the environment?
I
I
Less than Significant Impact: The current SP includes 7.4 acres ofland which was
designated for Public Park or Recreational Purposes through a prior Public Benefit
Parcel (PBP) agreement with the IVDA. A former NAFB recreation center which
includes multiple outdoor facilities has been converted for public use and is located
on this PBP. The agreement states that the only way to move the recreation center is
by replacing it with equal or better land including all improvements, therefore there
will be less than significant impact in this regard since the facility and the land will
be relocated.
I
I
I
I
I
c)
Other: This category is for any other issues that involve recreation. At this time, no
other issues are known in this regard.
No Impact: No other impacts to recreation are expected to occur as a result of this
project.
I
I
Mlchaa/8nJndman Assoclatas
H:\CI..nl\2636\26360006\SBAC Addendum 040907.doc
5-56
I City of San Barnardlno
Initial Study for Southgata Envlronmantal Checklist Form
I The proposed San Bernardino Alliance California Specific Plan will not alter the
I findings of the 1995 San Bernardino International Trade Center Specific Plan EIR
with respect to recreation. In addition, the non-physical aspects of the SPA will have
no impacts related to recreation.
I
I
I 5.15 - TRANSPORTATION/TRAFFIC
Would the project:
I a) Cause an increase in traffic which is D 181 D D
substantial in relation to the existing
I traffic load and capacity of the street
system (i.e., result in a substantial
increase in either the number of vehicle
I '- trips, the volume to capacity ratio on
roads, or congestion at intersections)?
I b) Exceed, either individually or D D ~ D
cumulatively, a level of service standard
established by the county congestion
management agency for designated roads
I or highways?
c) Result in a change in air traffic patterns, D D D 181
I including either an increase in traffic
levels or a change in location that results
in substantial safety risks?
I d) Substantially increase hazards due to a D D ~ D
design feature (e.g., sharp curves or
I dangerous intersections) or incompatible
uses (e.g., farm equipment)?
I e) Result in inadequate emergency access? D D 181 D
t) Result in inadequate parking capacity? D D 181 D
I g) Conflict with adopted policies, plans, or D D 181 D
programs supporting alternative
transportation (e.g., bus turnouts, bicycle
I racks)
h) Other: D D D 181
I
Michael Brandman Assoc/atas ~57
I H:\CIlent\2636\26360006\SBAC Addendum 040907.doc
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Southgate
Envlronmantal Checklist Fonn
Discussion: Would the project:
a) Cause an increase in traffic which is substantial in relation to the existing traffic load
and capacity of the street system (i.e., result in a substantial number of vehicle trips,
the volume to capacity ratio on roads, Or congestion at intersections)?
Less than Significant Impact with Mitigation Incorporated: Katz, Okitzu &
Associates (KOA) prepared an updated traffic study for the Southgate Warehouse
Project (SWP) and for the overall specific plan in January and March of 2006,
respectively (KOA 2006a, 2006b). These studies can be found in Appendices E and
F of this document and included the Hubbs, Koo and DF AS properties to be added to
the Specific Plan. The studies analyzed the increase in traffic that will result from the
proposed project, both on a project level and relative to the entire SBACSP for its
potential to impact local intersections. The two studies were based on the original
buildout of the specific plan at 11.1 million square feet versus the 11.6 million square
feet currently anticipated at buildout. However, current "high cube" warehouse uses
that have been approved and built within the SBIA area since that time actually
generate about 60 percent less traffic than the trips estimated in the original 1991
traffic study. The new KOA traffic study used these more current (reduced) trip
generation rates and determined that none of the study area intersections would
experience significant traffic impacts from the SBACSP or the Southgate portion of
the specific plan project as long as the identified roadway and intersection
improvements were made as needed (KOA 2006a, 2006b).
The new KOA SBACSP traffic study results represent a "worse case" scenario for
traffic impacts on the surrounding area. The traffic studies used the latest trip
generation rates for "high cube" warehouse uses approved by the San Bernardino
Association of Governments (SANBAG). These studies found that the proposed
project would generate much less traffic than estimated under the original EIR. The
SBACSP will generate approximately 18,644 average daily trips (ADT) versus
108,006 ADT predicted in the previous EIR, a reduction of 82 percent. In addition,
peak hour trips are similarly reduced (by 87%) which generate traffic at reduced
levels but at all times of the day versus peak hour trips. The original and new
project-level traffic studies found that the following 17 intersections could be
affected by the project:
. Rialto Avenue at Tippecanoe Avenue (unsignalized);
. 3n1 Street at Tippecanoe Avenue;
. Harry Sheppard Drive at Tippecanoe Avenue;
. Mill Street at Tippecanoe Avenue;
M/chae/8nJndman Associates
H:\CIlenl\2636\26360006\SBAC Addendum 040907.doc
5-58
I
I
I
I
I
I
I
I
I
I
City of San Sernamlno
Initial Study for Southgate
Environmental Check/1st Fonn
. Central Avenue at Tippecanoe Avenue;
. Orange Show Road at Tippecanoe Avenue;
. Hospitality Lane at Tippecanoe Avenue;
. Harriman Place at Tippecanoe Avenue;
. 1-10 westbound ramp at Tippecanoe Avenue;
. 1-10 eastbound ramp at Tippecanoe Avenue;
. Redlands Boulevard at Tippecanoe Avenue;
. San Bernardino Avenue at Mountain View Avenue;
. 1-10 westbound ramp at Mountain View Avenue;
. 1-10 eastbound ramp at Mountain View Avenue;
. 2nd Street at Waterman Avenue;
. Rialto Street at W aterman Avenue; and
. Mill Street at Waterman Avenue.
Under existing conditions, all of the intersections operate at acceptable levels of
service except the intersection of Tippecanoe Avenue at the 1-10 Eastbound Ramp,
which operates at Level of Service E (D or better is acceptable in the City Genera!
Plan) during the PM peak hour, as shown in Table II.
Table 11: Existing Conditions 2005 - Delay and LOS
I
I
I
I
I
I
I
I
I
Harry Sheppard Drive at Leland Norton Way NA NA NA NA
Rialto Avenue at Tippecanoe Avenue' 1.9/20.9 AlC 3.0/40.6 AlE
3'" Street at Tippecanoe Avenue 25.2 C 33.8 C
Harry Sheppard Drive at Tippecanoe Avenue 14.7 B 9.4 A
Mill Street at Tippecanoe Avenue 10.7 B 17.1 B
Central A venue at Tippecanoe Avenue 2.5 A 11.9 B
Orange Show Road at Tippecanoe Avenue 23.2 C 30.5 C
Hospitality Lane at Tippecanoe Avenue 20.6 C 29.4 C
Harriman Place at Tippecanoe Avenue 19.2 B 27.4 C
1-10 westbound ramp at Tippecanoe Avenue 29.9 C 24.6 C
1-10 eastbound ramp at Tippecanoe Avenue 43.9 D 76.3 E
Redlands Boulevard at Tippecanoe Avenue 27.6 C 34.3 C
San Bernardino A venue at Mountain Avenue 18.6 B 17.5 B
1-10 westbound ramp at Mt. View Avenue 31.1 C 28.8 C
1-10 eastbound ramp at Mt. View Avenue 31.8 C 23.3 C
Michael Brandman Associates
H:\Client\2636\26360006\SBAC Addendum 040907.doc
5-59
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Barnardlno
InltJal Study for Soulhgale
Envlronmenlel Checklist Fonn
Table 11 (Continued): Existing Conditions 2005 - Delay and LOS
2nd Street at Waterman Avenue
Rialto Street at Waterman Avenue
9.8
17.7
25.6
A
B
C
13.2
19.5
29.1
B
B
C
Mill Street at Waterman Avenue
Source: Table 10, Katz, Okitsu & Associates (KOA), 2006b
Note: IFor this unsignalized intersection, the first number in intersection average; the second number is for the poorest
movement(s).
Delay based on seconds per vehicle average
LOS - Level of Service
NA - Not Applicable
Table 12 shows the traffic impacts of the project area in the buildout year 2030
without project traffic and without planned intersection and road improvements. As
shown in Table 12, planned growth in the project area alone would cause the
following nine (9) intersections to operate at unacceptable levels of service (LOS E
or F) in the year 2030 during the AM and/or PM peak hour:
. Central Avenue at Tippecanoe Avenue (AM & PM peak: hours);
. Orange Show Road at Tippecanoe Avenue (pM peak: hour);
. 1-10 westbound ramp at Tippecanoe Avenue (AM & PM peak: hours);
. 1-10 eastbound ramp at Tippecanoe Avenue (AM & PM peak: hours);
. Redlands Blvd. at Tippecanoe Avenue (PM peak: hour);
. San Bernardino Avenue at Mt. View Avenue (PM peak hour);
. 1-10 westbound ramp at Mt. View Avenue (AM & PM peak: hours);
. 1-10 eastbound ramp at Mt. View Avenue (AM & PM peak: hours);
. Rialto Street at Waterman Avenue (PM peak: hour); and
. Palm Avenue at 3n1 Street (AM & PM peak: hours).
IIIlchael Btandman Assoclales
H:\C1ient\2636126360006\SBAC Addendum 040907.doc
5-60
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
Initial Study for Southgate
Environmental Checklist Form
Table 12: Year 2030 Conditions - Without Project and Planned Improvements
Harry Sheppard Drive at Leland Norton Wayl 8.1/8.1 AlA 8.2/8.2 AlA
Rialto A venue at Tippecanoe Avenue' 1.9/20.9 AlC 13.7/>120.0 B/F
3'" Street at Del Rosa Drive 23.1 C 27.9 C
Rialto A venue at Del Rosa Drive 10.2 B 6.9 A
Harry Sheppard Drive at Del Rosa Drive 20.1 C 18.8 B
3'" Street at Leland Norton Way 11.6 B 15.9 B
3'" Street at Tippecanoe Avenue 37.7 D 46.0 D
Harry Sheppard Drive at Tippecanoe Avenue 14.5 B 49.6 D
Mill Street at Tippecanoe Avenue 19.4 B 19.4 B
Central A venue at Tippecanoe Avenue >120.0 F >120.0 F
Orange Show Road at Tippecanoe Avenue 32.4 C >120.0 F
Hospitality Lane at Tippecanoe Avenue 16.5 B 45.5 D
Harriman Place at Tippecanoe Avenue 20.5 C 31.3 C
1-10 westbound ramp at Tippecanoe Avenue 66.0 E 118.1 F
1-10 eastbound ramp at Tippecanoe Avenue > 120.0 F >120.0 F
Redlands Boulevard at Tippecanoe Avenue 36.1 D 65.4 E
San Bernardino A venue at Mountain Avenue 39.0 D 79.9 E
1-10 westbound ramp atM!. View Avenue >120.0 F >120.0 F
1-10 eastboundrarnp atM!. View Avenue >120.0 F 108.8 F
2nd Street at Waterman Avenue 12.1 B 14.0 B
Rialto Street at Waterman Avenue 22.9 C 85.2 F
Mill Street at Waterman Avenue 29.5 C 34.6 C
Palm Avenue at 5" Street 28.5 C 39.0 D
Palm Avenue at 3'" Street >120.0 F 76.0 E
Source: Table 11, Katz, Okitsu & Associates (KOA), 2006b
Note: IPor these unsignalized intersections, the first number in intersection average; the second number is for
the poorest movement(s).
Delay based on seconds per vehicle average LOS - Level of Service
I
I
The proposed project is anticipated to be completed by the end of 2007. Based on
discussions with the City staff, KOA found that it would be appropriate to assume a
6 percent increase in ambient traffic growth during such period. Additionally, KOA
added other known cumulative projects in the area, and added the projected traffic to
the ambient traffic conditions. The results determined that none of the local
intersections would operate at unacceptable LOS by 2030 with the proposed project
traffic and with planned intersection and roadway improvements, as shown in
Michael Brandman Associates
H:\CllenIl2636\26360006\SBAC Addendum 040907.doc
5-61
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Beman/loo
Initial Study for Southgate
Envlronmantal Checklist Form
Table 13. The project would also contribute cumulative traffic at Tippecanoe
Avenue at 1-10 Eastbound Ramp as outlined in the San Bernardino County
Congestion Management Plan (CMP) threshold of 80 trips which is met for this
project. The project traffic study determined that the project would not have
significant traffic impacts as long as the following measures were implemented (i.e.,
traffic study assumed completion of the planned improvements):
TR-1 The project proponent shall contribute towards the cost of necessary
study area improvements on a fair share basis, as further detailed in the
two traffic studies prepared by Katz, Okitsu and Associates (KOA 2006a
and 2006b) and the Katz, Okitsu and Associates Memo to Robert
Eisenbeisz dated August 11,2006 (Appendices E and F of this
document). Fair share contributions shall be paid with sufficient time to
allow for improvements to be implemented in advance of the time
needed to mitigate impacts. Payment schedule of fair share costs will be
determined by the City Public Works Director prior to issuance of
building permits. (This is an expansion ofMM 7-1 from the 1995 EIR).
Note that funding from various sources (Federal, SANBAG, and
Measure I) has been secured and allotted for roadway improvements
in and around the SBACSP area, including specific improvements
identified in the two traffic studies prepared by Katz, Okitsu and
Associates. Therefore, the developer(s) may be exempt from certain
fair share of specific improvements if those improvements have
already been financed through the aforementioned sources. It shall
be the responsibility of the developer to either pay their fair share or
provide verification that the affected roadway improvements have
been financed through outside sources and that the improvements
are scheduled for implementation, prior to issuance of building
permits. This measure shaD be implemented to the satisfaction of
the City Public Works Director.
With implementation of the proposed mitigation measure, project impacts to traffic
and transportation will be reduced to less than significant levels.
Michael SnJndman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5-62
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Samalll/no
Inlllal Study for Southgate
Env/ronmantal Chack//st Form
Table 13: Year 2030 Conditions - With Project and Planned Improvements
Harry Sheppard Drive at Leland Norton Way' 8.118.1 AlA 8.2/8.2 AlA
3'" Street at Del Rosa Drive 24.8 C 28.8 C
Rialto A venue at Del Rosa Drive 8.5 A 5.0 A
Harry Sheppard Drive at Del Rosa Drive 20.9 C 21.6 C
3'" Street at Leland Norton Way 11.2 B 15.6 B
3'" Street at Tippecanoe Avenue 27.9 C 32.3 C
Rialto A venue at Tippecanoe Avenue 11.8 B 10.4 B
Harry Sheppard Drive at Tippecanoe Avenue 23.0 C 43.8 D
Mill Street at Tippecanoe Avenue 27.8 C 30.0 C
Central Avenue at Tippecanoe Avenue 26.5 C 54.8 D
Orange Show Road at Tippecanoe Avenue 24.0 C 38.4 D
Hospitality Lane at Tippecanoe Avenue 13.6 B 34.1 C
Harriman Place at Tippecanoe Avenue 25.9 C 51.4 D
1-10 westbound ramp at Tippecanoe Avenue 0.1 A 0.1 A
1-10 eastbound ramp at Tippecanoe Avenue 38.0 D 32.5 C
Redlands Boulevard at Tippecanoe Avenue 24.1 C 54.1 D
1-10 eastbound ramp at RedIands Boulevard 1.4 A 2.4 A
Palm Meadows Dr. at Mt. View Avenue 33.1 C 27.8 D
San Bernardino A venue at Mountain Avenue 30.8 C 52.3 D
1-10 westbound ramp at Mt. View Avenue 23.7 C 26.4 C
1-10 eastbound ramp atMt. View Avenue 35.6 D 26.4 C
200 Street at Waterman Avenue 12.2 B 14.2 B
Rialto Street at Waterman Avenue 23.6 C 50.0 D
Mill Street at Waterman Avenue 31.3 C 38.8 D
Palm A venue at 5th Street 28.7 C 40.7 D
Palm Avenue at 3'" Street 48.5 D 37.6 D
Source: Table 23, Katz, Okitsu & Associates (KOA), 2006b
Note: 'Por these unsignalized intersections, the first number in intersection average; the second number is for
the poorest movement(s).
Delay based on seconds per vehicle average LOS - Level of Service
b) Exceed either individually or cumulatively a level of service standard established by
the county congestion management agency for designed roads or highways?
Less than Significant Impact. The intersection of Tippecanoe Avenue at the 1-10
Eastbound Ramp is forecasted to operate at an unacceptable LOS; however, the
San Bernardino County Congestion Management Plan requires intersection impact
Mlchaal Brandman Assoc/atas
H:\Client\2636\26360006\SBAC Addendum 040907.doc
5-63
I
I
I
I
I
I
I
City of San Beman/loo
Initial Study for Southgate
environmental Checklist Form
analysis only at locations where peak hour increases of 80 trips or more are forecast.
The project trip distribution identified in the KOA traffic study indicates that this will
not occur at any of the impacted intersections, including Tippecanoe Avenue at the
1-10 Eastbound Ramp. Therefore, the project is not expected to significantly impact
this location, including development of the Hubbs, Koo and DF AS parcels to be
added to the Specific Plan.
c) Result in a change in air traffic patterns, including either an increase in traffic levels
or a change in location that results in substantial safety risks?
Less than Significant Impact. The proposed project will not change air traffic
patterns, or cause a change in traffic levels or location. See Section 5.7, Hazards and
Hazardous Materials, for more information on the aircraft patterns, and Section 5.9,
Land Use and Planning, for height restrictions relative to the airport.
I
I
I
I
I
I
I
I
I
I
I
I
d) Substantially increase hazards due to a design feature (e.g., sharp curves or
dangerous intersections) or incompatible uses (e.g.Jarm equipment)?
Less than Significant Impact. The proposed project does not appear to have any
intersections that are deficient relative to sight lines required by the Caltrans
Highway Design Manual. Therefore, no significant impacts are expected in this
regard.
e) Result in inadequate emergency access?
Less than Significant Impact. The driveways and onsite circulation would
accommodate emergency ingress and egress by fire trucks, police units, and
ambulance/paramedic vehicles. The SWP site would not have access from the north,
east, or south due to surrounding land uses (Le., airport, river, etc.). However,
emergency vehicles will have direct access to the site via Palm Meadows from
Tippecanoe Avenue (see Exhibit 3) and from Mountain View Avenue once the
bridge and street improvements are complete. The additional Koo, Hubbs, and
DF AS properties have immediate access to major streets, including Tippecanoe
Avenue. In addition, the City will require a Traffic Mitigation Plan to assure there
will be no short-term access problems during construction. Therefore, the project
would have no significant short- or long-term adverse impacts relative to emergency
access.
f} Result in inadequate parking capacity?
Michael Brandman Associates
H:\Client\2636\26360006\SBAC Addendum 040907.doc
5-114
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CIty of San Barnard/no
Inlllal Study for Southgata
Environmental Checklist Form
Less than Significant Impact. The proposed SWP requires 2,799 parking spaces,
based on the proposed building square footage. The SWP includes 2,549 parking
spaces and is not fully consistent with the City's Development Code (8% fewer than
required). However, this difference is not substantial considering that the proposed
use (high cube) does not require as much parking as traditional industrial use.
g) Conflict with adopted policies, plans, or programs supporting alternative
transportation (e.g., bus turnouts, bicycle racks)?
Less than Significant Impact. The proposed project will not be in conflict with any
adopted policies, plan or programs supporting alternative transportation. Omnitrans
bus Route 8 runs north-south along Tippecanoe Avenue and there is currently a bus
stop at the comer of Tippecanoe Avenue and Mill, so there is no need for the project
to supply a bus stop. If additional bus stops are needed along Tippecanoe or within
the project, Omnitrans will be responsible for constructing them as needed.
h) Other: This category is for any other issues that involve transportation. At this time,
no other issues are known in this regard.
No Impact. No other impacts to transportation are expected to occur as a result of
this project.
The proposed San Bernardino Alliance California Specific Plan will not alter the
findings of the 1995 San Bernardino International Trade Center Specific Plan EIR
with respect to transportation and traffic. In addition, the non-physical aspects of the
SPA will have no impacts related to transportation and traffic.
5.16. UTILITIES AND SERVICE
SYSTEMS
Would the project:
a) Exceed wastewater treatment
requirements of the Santa Ana Regional
Water Quality Control Board?
o
181
D
o
Mlchaet Brandman Associates
H:\Client\2636\26360006\SBAC Addendum 040907.doc
U5
I City of San Bernardino
Initial Study for Southgate Environmental Check/1st Fonn
I
I
b) Require or result in the construction of D IZI D D
I new water or wastewater treatment
facilities or expansion of existing
facilities, the construction of which
I would cause significant environmental
effects?
I c) Require or result in the construction of D IZI D D
new storm water drainage facilities or
expansion of existing facilities, the
I construction of which could cause
significant environmental effects?
I d) Have sufficient water supplies available D ~ D D
to serve the project from existing
entitlements and resources, or are new or
I expanded entitlements needed?
e) Result in determination by the D r8J D D
wastewater treatment provider which
I serves or may serve the project that it has
adequate capacity to serve the project's
projected demand in addition to the
I provider's existing commitments?
D IZI D D
f) Be served by a landfill with sufficient
I permitted capacity to accommodate the
project's solid waste disposal needs?
I g) Comply with federal, state, and local D ~ D D
statutes and regulations related to solid
waste?
I h) Other. D D D r8J
I Discussion: Would the project:
I a) Exceed was/eWaler trealment requirements of the Santa Ana Regional Water Quality
Conlrol Board?
b) Require or result in Ihe construction of new water or wastewater treatment facilities
I or expansion of existingfacilities, the construction of which would cause significant
environmental effects?
I
Michael Brandman Associates 5-116
I H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
I
I
I
I
I
I
I
I
I
I
City of San Beman/lno
Inlllal Study for Southgate
Environmental Checklist Fonn
c) Require or result in the construction of new storm water drainage facilities or
expansion of existingfacilities, the construction of which could cause significant
environmental effects?
d) Have sufficient water supplies available to serve the project from existing
entitlements and resources, or are new or expanded entitlements needed?
Less than Significant Impact with Mitigation Incorporated: The proposed
project, including the Koo, DF AS, and Hubbs properties to be added to the Specific
Plan, is consistent with the General Plan land use and zoning designations for the
site, and the project is in an area already largely developed for industrial uses. The
only exception would be the Hubbs property which is in an area of mixed use
(industrial and residential), however, the area already contains adequate utility
systems. Potential impacts of the project relative to water quality are addressed in
Section 4.8, Hydrology and Water Quality, and measures were proposed in that
section to help reduce potential water quality impacts of the project to less than
significant levels.
Development of the project is not expected to generate a need for significant new
water supply or wastewater treatment facilities. However, the following mitigation
measure is proposed to help assure that potential impacts related to utilities and utility
systems will be less than significant:
I
I
U-1 As future tenants are identified, the developer and/or future tenants shall
coordinate with local utility providers relative to site planning and the
payment of impact fees to help assure the project does not negatively
affect utility services or agencies. This measure shall be implemented to
the satisfaction of the Planning and Public Works Directors.
I
I
I
I
I
With implementation ofthe proposed mitigation measure, potential impacts to utility
systems will be less than significant.
e)
Result in determination by the wastewater treatment provider which serves or may
serve the project that it has adequate capacity to serve the project's projected
demand in addition to the provider's existing commitments?
j)
Be served by a landfill with sufficient permitted capacity to accommodate the
project's solid waste disposal needs?
g)
Comply with federal, state, and local statutes and regulations related to solid waste?
I
I
Michael Brandman Associates
H:\Client\2636\26360006\SBAC Addendum 040907.doc
5-67
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Samamlno
Initial Study for Southgate
Environmental Chackllst Fonn
Less than Significant Impact with Mitigation Incorporated: The proposed
project is consistent with the General Plan land use and zoning designations for the
site, and the project is in an area already developed for industrial uses. Future uses
will generate solid wastes, both during construction and during long-term operation.
County landfills have sufficient capacity to accommodate short-term construction
wastes as well as wastes generated long-term by operation of the project (GP 2005).
Since the actual uses of the site are not known at this time, the following mitigation
measure is proposed to help assure that potential impacts related to solid waste
services will be less than significant:
U-2 As future tenants are identified, such future tenants shall coordinate with
County solid waste relative to site planning and the payment of impact
fees to help assure the project does not negatively affect County solid
waste services or area landfills. This measure shall be implemented to
the satisfaction of the Planning and Public Works Directors.
With implementation of the proposed mitigation measure, potential impacts to solid
waste services will be reduced to less than significant levels.
h) Other: This category is for any other issues that involve public services. At this
time, no other issues are known in this regard.
No Impact: No other impacts to public services are expected to occur as a result of
this project.
The proposed San Bernardino Alliance California Specific Plan will not alter the
fmdings of the 1995 San Bernardino International Trade Center Specific Plan EIR
with respect to utilities. In addition, the non-physical aspects of the SPA will have no
impacts related to utilities.
5.17 - MANDATORY FINDINGS OF
SIGNIFICANCE
a) Does the project have the potential to
degrade the qnality of the environment,
substantially reduce the habitat of a fish or
o
~
o
o
M/chaal Brandman Asaoclatas
H:\CllenIl2636\26360006\SBAC Addendum 040907.doc
5-68
.
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I
City of San Bernardino
Initial Study for Southga18
Environmental Checklist Form
wildlife species, cause a fish or wildlife
population to drop below self-sustaining
levels, threaten to eliminate a plant or animal
community, reduce the number or restrict the
range of a rare or endangered plant or animal
or eliminate important examples of major
periods of California history or prehistory?
b) Does the project have impacts that are
individually limited, but cumulatively
considerable? ("Cumulatively considerable"
means that the incremental effects of a project
are considerable when viewed in connection
with the effects of past projects, the effects of
other current projects, and the effects of
probable future projects.)
D
D
181
D
c) Does the project have environmental
effects which will cause substantial adverse
effects on human beings, either directly or
indirectly?
D
181
D
D
Discussion:
a) Does Ihe project have the pOlenlial to degrade the quality of the environment,
substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife
population to drop below self-sustaining levels, threaten to eliminate a plant or
animal community, reduce the number or restrict the range of a rare or endangered
plant or animal or eliminate important examples of major periods of California
history or prehistory?
Less Than Significant With Mitigation Incorporated. The project has the
potential to affect unknown cultural resources due to the historical use along the
Santa Ana River. However, measures have been proposed that will keep these
potential impacts at less than significant levels. Although the site is along the Santa
Ana River, it contains no riparian, listed, or sensitive resources that would require
federal or state permitting. The project may impact occupied habitat of the SBKR, so
the project will obtain appropriate federal permitting to assure the project will not
have significant impacts on listed species.
b) Does the project have impacts that are individually limited, but cumulatively
considerable?
Michael ElnIndman Associates
H:\Clientl2636\26360006\SBAC Addendum 040907.doc
5-69
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Bernardino
InlUal Study for Southgate
Environmental Checklist Fonn
Less Than Significant Impact. The proposed project, including the new Koo site, is
an industrial project in an area planned for and surrounded by other industrial uses.
A variety of measures have been recommended to reduce potential impacts of this
individual project to less than significant levels so it will not make a significant
contribution to potential cumulatively considerable impacts.
c) Does the project have environmental effects which will cause substantial adverse
effects on human beings, either directly or indirectly?
Less Than Significant With Mitigation Incorporated. The project involves
industrial uses which may cause impacts related to air quality, noise, and hazardous
materials. However, a number of mitigation measures were proposed, the project
will be required to comply with City, County, and State regulations regarding public
and occupational health and safety for such uses, and the project is in an area planned
for and surrounded by similar uses. Therefore, no substantial adverse effects to
humans, either directly or indirectly, are anticipated from the project, including the
Koo property.
5.18 - DOCUMENTATION ON PREPARATION OF AN ADDENDUM TO THE
PREVIOUS EIR
When a lead agency has a1ready prepared an EIR, CEQA mandates that "no subsequent or
supplemental environmental impact report shall be required by the lead agency or any responsible
agency, unless one or more of the following events occurs: (a) substantial changes are proposed in the
project which will require major revisions of the environmental impact report; (b) substantial changes
occur with respect to the circumstances under which the project is being undertaken which will
require major revisions in the environmental impact report; (c) new information, which was not
known and could not have been known at the time the environmental impact report was certified as
complete, becomes available." (Cal. Pub. Res. Code, ~ 21166) State CEQA Guidelines Section 15162
clarifies that a subsequent EIR or supplemental EIR is only required when "substantial changes"
occur to a project or the circumstances surrounding a project, or "new information" about a project
implicates "new significant environmental effects" or a "substantial increase in the severity of
previously significant effects." (State CEQA Guidelines, ~ 15162.)
When only minor technical changes or additions to a previous EIR or negative declaration are
necessary and none of the conditions described in Public Resources Code section 21166 calling for
the preparation of a subsequent of supplemental EIR or negative declaration have occurred, CEQA
allows the lead agency to prepare and adopt an addendum. (State CEQA Guidelines, ~ 15164(b).)
Mlchaa/Brandman Assoc/ares
H:\Client\2636\26360006\SBAC Addendum 040907.doc
5-70
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Barnardlno
InltJal Study for Southgata
Environmental Checklist Fonn
Previous analysis of environmental impacts has been conducted for tbe proposed project, including an
Initial Study and a draft EIR which incorporated tbe Initial Study. The EIR prepared in 1995 for tbe
San Bernardino International Trade Center (SBITC) determined that tbe proposed specific plan would
create significant impacts related to noise, and short- and long-term air quality even after
implementation of all feasible mitigation.
The 1995 SBITC project proposed 11.05 million square feet of industrial uses on 616.2 acres. In
1999, tbe project area was increased to IIA million square feet. The currently proposed
San Bernardino Alliance California Specific Plan proposes a maximum buildout of 14.15 million
square feet of building space on 657.2 acres (41 acres overtbe 1999 approved project area); however,
because portions of tbe Specific Plan have already been implemented at Floor Area Ratios less !ban
what is being proposed, and because much of tbe development is planned at Floor Area Ratios less
than tbe maximum proposed, tbe actual building square feet at buildout is projected at 11.64 million
square feet. This represents a 2 percent increase in square footage over tbe approved 1999 project.
At that time, an Initial Study was prepared that concluded an Addendum to tbe original EIR was tbe
most appropriate CEQA document for tbe proposed project changes. In addition, in 2005 a separate
EIR was prepared for tbe Stater Brotbers facility totaling 1.93 million square feet proposed on
163 acres within tbe Centergate area of the San Bernardino Alliance California Specific Plan. The
Stater Brotbers EIR was prepared to document tbat that project would not create any new or different
significant impacts from tbose identified in tbe original EIR. Since then, Hillwood and tbe IVDA
have developed the proposed specific plan changes outlined in Section 3 of this Initial Study. The
analyses in the preceding sections determined that tbe actual buildout of tbe San Bernardino Alliance
California Specific Plan will be substantially less !ban tbe maximum potential since so much of tbe
specific plan area has already been built out at much lower floor area ratios !ban anticipated under tbe
original specific plan. This reduction in square footage and the change in use from traditional
industrial to "high cube" warehouses have reduced traffic generated by the project by 82 percent,
according to updated traffic studies for tbe overall specific plan and tbe proposed Soutbgate
Warehouse Project (see Appendices E and F). These project changes will also result in significantly
less air pollution and noise being generated by project traffic. The analysis in tbe preceding sections
demonstrates !bat tbe currently proposed project will produce impacts that are significantly reduced
from tbose outlined in tbe 1995 EIR (see Appendix H), even witb tbe addition of32.6 acres to tbe
specific plan. This analysis merely clarifies tbe characteristics of tbe proposed project and entire
project site, including tbe Hubbs, Koo, DF AS, and Third Street District parcels, and does not
represent significant new information or change tbe significance conclusions ofthe original EIR. The
following table compares each environmental issue from tbe current Initial Study checklist to tbe
fmdings oftbe 1995 EIR.
Michael Brandman Associates
H:\Cllentl2636\26360006\SBAC Addendum 040907.OOc
5-71
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
C/fy of San Bernardino
Initial Study for Southgste
Envlronmentsl ChfJckllst Fonn
As summarized in Table 14, the proposed San Bernardino Alliance Specific Plan does not represent
significant new information or change the significance conclusions of the original EIR, and it actually
represents lesser impacts for Air Quality, Traffic and Noise. Therefore, this Initial Study concludes
that an Addendum to the original EIR is the most appropriate CEQA document for these proposed
changes to the San Bernardino Alliance California Specific Plan, consistent with the requirements of
CEQA.
Table 14: Current Impacts Compared to the Original 1995 EIR
Aesthetics
A . cultural Resources
Cultural Resources
Mineral Resources
Noise
Po ulation and Housin
Public Services
Recreation
Tran ortationfTraffic
Utilities and Service S stems
0 0 181 0
0 0 181 0
0 0 0 181
0 0 181 0
0 0 181 0
0 0 181 0
0 0 181 0
0 0 181 0
0 0 181 0
0 0 181 0
0 0 0 181
0 0 181 0
0 0 181 0
0 0 181 0
0 0 0 181
0 0 181 0
Michael ElnIndman Assoclstes
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
5.72
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San BemanJlno
Inllial Study for Southgate
References
SECTION 6:
REFERENCES
6.1 - REFERENCE DOCUMENTS
The following references cited in the Initial Study are on file in the Development Services
Department.
1. City of San Bernardino General Plan.
2. City of San Bernardino General Plan Land Use Plan/Zoning Districts Map
3. City of San Bernardino Development Code (Title 19, San Bernardino Municipal Code)
4. City of San Bernardino Historic Resources Reconnaissance Survey
5. Alquist-Priolo Earthquake Fault Zones Map
6. South Coast Air Quality Management District, CEQA Air Quality Handbook
7. Federal Emergency Management Agency, Flood Insurance Rate Maps
8. Public Works Standard Requirements- Water
9. Public Works Standard Requirements - Grading
DOC 2001 Department of Conservation. Farmland Mapping and Monitoring Program, 2001.
EIS 1993 Uuited States Air Force. Final Environmental Impact Statement: Disposal and
Reuse of Norton Air Force Base, California. June 1993.
GP 1989 City of San Bernardino. City of San Bernardino General Plan. June 2,1989.
GP 2005 City of San Bernardino. City of San Bernardino General Plan. November I, 2005.
KOA 2006a Katz, Okitsu & Associates, Traffic Study for a Major Warehouse Projecl in the City
of San Bernardino, January, 2006. (Appendix E)
KOA 2006b Katz, Okitsu & Associates, Specific Plan Trtiffic Study for the Inland Valley
Development Agency in the City of San Bernardino, March 2006. (Appendix F).
MBA 2004a Michael Brandman Associates. San Bernardino Kangaroo Rat presence/Absences
Trapping Studies on the Focus Realty Site, City of San Bernardino.. April 2004.
MBA 2004b Michael Brandman Associates. San Bernardino Kangaroo Rat Habitat Assessment
Hillwood Investment Properties Project San Bernardino, California. October 2004.
MBA 2005 Michael Brandman Associates (Erinn Johnson). Revised Delineation of Clean
Water Act Jurisdictional Waters Hillwood's Southgate Property San Bernardino
County, California. July 2005 (Revised April 2007).
MBA 2006 Michael Brandman Associates. URBEMIS 2002 (Version 8.7) Model Outputs.
March 2006 (Appendix A).
Michael ElnJndman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.doc
6-1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Barnardlno
InitJal Study for Southgate
Rafanlneas
LSA 1995 LSA Associates, Inc. Draft EIR San Bernardino International Trade Center SCH
95082052. November 1995.
mc 1995 The Natelson Company, Inc. San Bernardino International Trade Center Specific
Plan Analysis. April 6, 1995.
CITY 2004 LSA Associates, Inc. City of San Bernardino Initial Study for DHL Air Cargo
Facility Development Permit II No. 04-27. July 22, 2004.
CITY 2005 Tom Dodson & Associates. City of San Bernardino Draft Subsequent
Environmental Impact Reportfor Stater Bros. Distribution Center Project.
June 2005.
CITY 1999 Tom Dodson & Associates. Initial Study for Amendment to the San Bernardino
International Trade Center Specific Plan. September 13, 1999.
CITY 1993 City of San Bernardino Request for Council Action May 6, 1993. Including the
Norton Air Force Base Conversion to Civilian Operation: Interim Airport Operating
Plan Initial Study.
IVDA 2005 San Bernardino Alliance California Specific Plan (Draft)
Tetra 1991 Tetra Tech, Inc. Documentary Research and Field Reconnaissance Relating to
Cultural Resource at Norton Air Force Base, California, Submitted to Western
Region, National Park Service, Interagency Archeological Services Branch,
Sacramento, California.
Websltes: US Department of Agriculture Soil Conservation Service. Soil Survey of the San
Bernardino County Southwestern Part, California. 1971.
ESRIlFEMA Hazard Awareness Site
http://www.esri.comlhazards/makemap.html
California Division of Aeronautics
http://www.dot.ca.gov/hq/planning/aeronaut/documents!ALUPHComplete-7-
02rev.pdf
6.2 - DOCUMENT PREPARATION STAFF
Michael Brandman Associates
Kent Norton, Project Manager
Joan Valle, Assistant Project Manager
Michael Hendrix, Air Quality Analyst
James Hickman, Environmental Analyst
Mike Serrano, Senior GIS Technician
Sandra Palkki, Word Processing
Mlehaai Btandman Associates
H:\Cllent\2636\26360006\SBAC Addendum 040907.dcc
6-2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of San Barnanllno
Initial Study for Southgate
APPENDICESITECHNICAL STUDIES
(on attached CD)
Appendix A: Air Quality
Appendix B: Biological Resources Assessment (Southgate)
Appendix C: Biological Resources Assessment (Koo)
Appendix D: Jurisdictional Delineation Report
Appendix E: Traffic Impact Analysis (Southgate) and Memo dated August 11, 2006
Appendix F: Traffic Impact Analysis (SBACSP)
Appendix G: Related Correspondence
Appendix H: Mitigation Measures from Previous 1995 EIR
MlchaalBrandman Associates
H:\CIlent\2636\26360006\SBAC Addendum 040907.doc