A RESOLUTION OF THE MAYOR AND ~OMMON t'OUNCIL OF THE CITY OF
SAN BERNARDINO AUTHORIZING THE EXECUTION OF CHANGE ORDER NO. ONE
TO THE CITY HALL-EXHIBIT HALL CONTRACT WITH W. J. BURKE CON-
STRUCTION CO., INC. FOR CONTRACT CHANGES.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY
OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. The Mayor of the City of San Bernardino is
hereby authorized and directed on behalf of said City to execute
Change Order No. One to the City Hall-Exhibit Hall contract with
W. J. Burke Construction Co., Inc. for contract changes relating
to electrical and interior layout design, a copy of which Change
Order No. One is attached hereto, marked Exhibit "A" and in-
corporated herein by reference as fully as though set forth at
length.
I HEREBY CERTIFY that the foregoing resolution was duly
adopted by the Mayor
Council of the City of San Ber-
nardino at a meeting thereof held o~
the /!A:!/a-ay of .~ /" 192-4 by the following vote, to wit:
., AYES: cou~ci~en. ~"'''-__U~--I--: ~!jl/jf~ jrtt~~7A1U~/t?7
NOES, -:;;~.=. 7'/-' .;0;" /.~ < A ./
ABSENT: $4..//~"N~/~(' ...;,?j::LA .I
,~~(tty ~~
is hereby approved this ~ day
The foregoing resolution
I;? '
25 of i.l('A'~r",L.--i/ , 1970.
26
27
28
Approved as to form:
29 /-
/
/
30
31
FILED
32
DEe 2 ~ 1970
~~Z:::2
.
...
r mANGE
ORDER
. !'IIfA DOCUMENT G701
OWNER r!r
ARCHITECT 0
CONTRACTOR 0
FIELD 0
OTHER
.
.
.
.
.
.
PROJECT: SAN BERNARDINO CITY HALL AND EXHIBIT HALL
(name, address) CENTRAL CITY PROJECT NO. 1
CALIF. $.- 79
TO (Contractor)
I I
w. J. BURKE CONSTRUCTION CO., INC.
2550 E. Miraloma Pl.
Anaheim, California 92806
4884
4884-2
ARCHITECT'S PROJECT NO:
CONTRACT FOR:
City Hall and Exhiqit Hall
L
~ CONTRACT DATE: June 10, 1970
You are directed to make the following changes in this Contract:
ADD
ITEM iFl: (Supp. lH, Items 1, 2, 3) (See attached)
ITEM In: (S upp . In, Item 4) (See attached)
ITEM lF3: (Supp. lF4, Items 1 thru 6) (See attached)
ITEM lF4: (Supp. lF5, Items 1 thru 4) (See attached)
TOTAL ADD TO CONTRACT
$1,241.55
849.11
1,653.07
115.04
$3,858.77
The original Contract Sum was . . . . . . .
Net change by previous Change Orders
The Contract Sum prior to this Change Order was.
The Contract Sum will be (increased) (~lr<ilX~ by this Change Order.
The new Contract Sum including this Change Order will be .
The Contract Time will be CiJxx....KolixUcIIt~k(unchanged) by
The Date of Completion as of the date of this Change Order therefore is unchanged.
Armstrong-Ulmer
Gruen Associates, Inc.
'3~IY:TFourth Street
--.. ..-----------
Address
Sa
$ 4,904,000.00
$ -0-
$ 4,904,000.00
.$ 3,858.77
$ 4,907,858.77
(
) Days.
W. J. I!l!rke Sons tI"'. Go.. Inc..City of San
CQNlRACTOR OWNER
..222Q..JL....l{ira1omamP.l..__..__ ..nity Hall
Address Address
Rernardino
B
9~Ol_~~??gf ilii]JP7
DATE OF ISSUANCE December 4, 1970
CHANGE ORDER NUMBER
1
AlA DOCUMENT G701 . CHAt'-:GE ORDER. SEPTEMBER 1966 EDITION. @1%6 AIA@ THE
AMERICAN INSTITUTE or ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006
ONE PAGE
~
...
... .
~
~~
-~
i i
CHANGE ORDER NO. 1
CITY HALL - EXHIBIT BALL
CENTRAL CITY PROJECT NO. 1
CALIF. R-79
ITEM 11: (Supp. #1, Items 1, 2, 3)
a.
Clarification of
S-21 (attached).
change in cost.
foundation elevations and details per SK-1/
Previously agreed that this involved no
b. Revision of roll-up door details per SK-l/A-12 (Attached).
c. Revision of interior room layouts and partitions (including
kitchen electrical requirements) as shown on the following
attached drawings:
SK-l/A-2
SK-I/A-3
SK-I/A-4
SK-l/A-5
SK-I/A-6
SK-1/A-7
SK-l/A-27
SK-I/A-2S
SK-I/A-29
SK-I/A-30
SK-I/A-3l
SK-1/A-32
SK-2/A-2
SK-2/A-3
SK-3/A-2
SK-l/E-15
ADD TO CONTRACT . . . . $1241.5S
ITEM 12: (Supp. 12, Item 14)
Electrical revisions shown on following drawings are
necessary to conform to Interiors Changes. SK-I/E-4,
SK-I/E-7, SK-I/E-S, SK-I/E-9, SK-l/E-IO, SK-I/E-ll and
SK-I/E-14.
ADD TO CONTRACT
S49.11
ITEM 13: (Supp. 14, Items 1 thru 6)
a. At Col. D-9 on l/E-4 change note at riser to read
"Up to PNL 4EE-1-3-5" instead of "Up to PNL 4E-1-3-S."
b. At Control Room on l/E-5 Southwest of Col. C-14:
the receptacle on soubh wall connected to "Cir
OB-29" is to be +2 '-6" above floor.
c. At Lockers and Lounge Room on l/E-5 at Co1. C-9;
the receptacle on the south wall connected to
"Cir OE-S" is to be +2' -6" above floor.
d. At Lighting Panel "MA", Drawing E-7, revise Circuit 11S
to read "3- accent-lts. -1000 watts" instead of "spare
-1000 watts" and add a 2- pole relay "R25".
e. At Partial Second Floor Power Plan, SK-l/E-7, the
receptacle 3'-S" south of opening on Col. Line 9
is to be +2 -6" above floor.
CHANGE ORDER fftl
Page 1 of 2
t
..
."
f. Electrical revisions per SK-I/E-3, SK-2/E-4. SK-I/E-5
and SK-I/B-6 (attached)
ADD TO CONTRACT
. . . .
ITEM 14: (Supp. #5, Items 1 thru 4)
a. On Exhibit Hall and Upper-Level Power Plan, l/E-15,
at outlet on north wall connected to P .A. System
conduit in Meeting RoOlll e insert identifying letters
"A.J".
b. On Exhibit Hall and Upper-Level Power Plan, l/E-15,
at conduit run frOlll "LIl" switch on north wall of
meeting roOlll C to "LIl" switch on north wall of
Meeting Room D change "1/2" -(2) Belden #8461" to
. read "l"e -(5) Belden #8760".
c. On Lower-Level Power Plan, 2/B-15, at conduit run
from "LIl" switch on north wall of Meeting Room F
to ''LH'' switch on north wall of Keeting RoOlll G change
"3/4" -(2) Belden 18461" to read "l"e -(5) Belden
#8760".
d. At Note 1. (Symbols), E-15, add the following:
~
~
t-@)
Microphone outlet +30" 4 gang box &
ring.
Local hall switch +4'.6" SID box
w/3 gang ring.
Amplifier jack outlet.
ADD TO CONTRACT
. 0 . .
TOrAL ADD TO CONTRACT
1653.07
115.04
$3,858.77
CHANGE ORDER NO.. 1
Page 2 of2
r~ ~,;
'CITY Of SAN BERNARDINO
-
MEMORANDUM
/ ,.
~" ~t--:--
Jerry Winstead, City Administrator
To
Subiect Change Order #1
From
Robert E. Dale
Assistant Superintendent
December 17, 1970
Dote
Approved
Dote
r' -9
/ ).y.:-J .
. /
Change Order #1 has been presented to the City for Approval:
These changes which will increase the contract sum by $3,858.77 consist
of four items lummarized .1 fellows I
Item 1: Add $1,241.55
(a) Clarification of a foundation elevation. No charge.
(b) Revision of roll-up door details.
(e) Revision of i~erior room layout and partitions
(including electrical requirements)
Item 2:
(a)
Add $849.11
Electrical revisions necessary to conform to interior
changes.
Item 3:
(a)
(b)
(c)
(d)
Add $1,653.07
Change identifying note of electrical riser to clarify
its panel destination.
Height of receptacle at control room specified.
At locker and lounge, height of receptacle specified.
On lighting panel "MA",2 pole relay added. Identifying
note on circuit revised.
Item 3: Add $115.04
(a) Exhibit Hall, identification provided for outlet of
P. A. System.
(b) Conduit sizes etc, revised.
(c) Conduit sizes etc. revised.
(~) Clarification of symbol schedule.
The original contract sum was
The contract sum will be increased by
The new. contract sum .e& will Bl!.. .
4,904,000.00
this change order 3,858.77
4,907,858.77
This change order will not change the date of completion.
Yours truly
John R. Hunt, Superintendent
Department 0 Building and Safety
by:- ~.
o ert E.Dale --___
Assistant Superintendent
"dr",J<
Flc
1
RED:Vs
CITY ON
THE 3v1-iFV.=E