Loading...
HomeMy WebLinkAbout10557 -- ~ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 . ,;,,-L-,.-',. t::..-. .t~,,_. .. . . "'"". RESOLUTION NO. ~ A RESOLUTION OF THE MAYOR AND ~OMMON t'OUNCIL OF THE CITY OF SAN BERNARDINO AUTHORIZING THE EXECUTION OF CHANGE ORDER NO. ONE TO THE CITY HALL-EXHIBIT HALL CONTRACT WITH W. J. BURKE CON- STRUCTION CO., INC. FOR CONTRACT CHANGES. BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. The Mayor of the City of San Bernardino is hereby authorized and directed on behalf of said City to execute Change Order No. One to the City Hall-Exhibit Hall contract with W. J. Burke Construction Co., Inc. for contract changes relating to electrical and interior layout design, a copy of which Change Order No. One is attached hereto, marked Exhibit "A" and in- corporated herein by reference as fully as though set forth at length. I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor Council of the City of San Ber- nardino at a meeting thereof held o~ the /!A:!/a-ay of .~ /" 192-4 by the following vote, to wit: ., AYES: cou~ci~en. ~"'''-__U~--I--: ~!jl/jf~ jrtt~~7A1U~/t?7 NOES, -:;;~.=. 7'/-' .;0;" /.~ < A ./ ABSENT: $4..//~"N~/~(' ...;,?j::LA .I ,~~(tty ~~ is hereby approved this ~ day The foregoing resolution I;? ' 25 of i.l('A'~r",L.--i/ , 1970. 26 27 28 Approved as to form: 29 /- / / 30 31 FILED 32 DEe 2 ~ 1970 ~~Z:::2 . ... r mANGE ORDER . !'IIfA DOCUMENT G701 OWNER r!r ARCHITECT 0 CONTRACTOR 0 FIELD 0 OTHER . . . . . . PROJECT: SAN BERNARDINO CITY HALL AND EXHIBIT HALL (name, address) CENTRAL CITY PROJECT NO. 1 CALIF. $.- 79 TO (Contractor) I I w. J. BURKE CONSTRUCTION CO., INC. 2550 E. Miraloma Pl. Anaheim, California 92806 4884 4884-2 ARCHITECT'S PROJECT NO: CONTRACT FOR: City Hall and Exhiqit Hall L ~ CONTRACT DATE: June 10, 1970 You are directed to make the following changes in this Contract: ADD ITEM iFl: (Supp. lH, Items 1, 2, 3) (See attached) ITEM In: (S upp . In, Item 4) (See attached) ITEM lF3: (Supp. lF4, Items 1 thru 6) (See attached) ITEM lF4: (Supp. lF5, Items 1 thru 4) (See attached) TOTAL ADD TO CONTRACT $1,241.55 849.11 1,653.07 115.04 $3,858.77 The original Contract Sum was . . . . . . . Net change by previous Change Orders The Contract Sum prior to this Change Order was. The Contract Sum will be (increased) (~lr<ilX~ by this Change Order. The new Contract Sum including this Change Order will be . The Contract Time will be CiJxx....KolixUcIIt~k(unchanged) by The Date of Completion as of the date of this Change Order therefore is unchanged. Armstrong-Ulmer Gruen Associates, Inc. '3~IY:TFourth Street --.. ..----------- Address Sa $ 4,904,000.00 $ -0- $ 4,904,000.00 .$ 3,858.77 $ 4,907,858.77 ( ) Days. W. J. I!l!rke Sons tI"'. Go.. Inc..City of San CQNlRACTOR OWNER ..222Q..JL....l{ira1omamP.l..__..__ ..nity Hall Address Address Rernardino B 9~Ol_~~??gf ilii]JP7 DATE OF ISSUANCE December 4, 1970 CHANGE ORDER NUMBER 1 AlA DOCUMENT G701 . CHAt'-:GE ORDER. SEPTEMBER 1966 EDITION. @1%6 AIA@ THE AMERICAN INSTITUTE or ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 ONE PAGE ~ ... ... . ~ ~~ -~ i i CHANGE ORDER NO. 1 CITY HALL - EXHIBIT BALL CENTRAL CITY PROJECT NO. 1 CALIF. R-79 ITEM 11: (Supp. #1, Items 1, 2, 3) a. Clarification of S-21 (attached). change in cost. foundation elevations and details per SK-1/ Previously agreed that this involved no b. Revision of roll-up door details per SK-l/A-12 (Attached). c. Revision of interior room layouts and partitions (including kitchen electrical requirements) as shown on the following attached drawings: SK-l/A-2 SK-I/A-3 SK-I/A-4 SK-l/A-5 SK-I/A-6 SK-1/A-7 SK-l/A-27 SK-I/A-2S SK-I/A-29 SK-I/A-30 SK-I/A-3l SK-1/A-32 SK-2/A-2 SK-2/A-3 SK-3/A-2 SK-l/E-15 ADD TO CONTRACT . . . . $1241.5S ITEM 12: (Supp. 12, Item 14) Electrical revisions shown on following drawings are necessary to conform to Interiors Changes. SK-I/E-4, SK-I/E-7, SK-I/E-S, SK-I/E-9, SK-l/E-IO, SK-I/E-ll and SK-I/E-14. ADD TO CONTRACT S49.11 ITEM 13: (Supp. 14, Items 1 thru 6) a. At Col. D-9 on l/E-4 change note at riser to read "Up to PNL 4EE-1-3-5" instead of "Up to PNL 4E-1-3-S." b. At Control Room on l/E-5 Southwest of Col. C-14: the receptacle on soubh wall connected to "Cir OB-29" is to be +2 '-6" above floor. c. At Lockers and Lounge Room on l/E-5 at Co1. C-9; the receptacle on the south wall connected to "Cir OE-S" is to be +2' -6" above floor. d. At Lighting Panel "MA", Drawing E-7, revise Circuit 11S to read "3- accent-lts. -1000 watts" instead of "spare -1000 watts" and add a 2- pole relay "R25". e. At Partial Second Floor Power Plan, SK-l/E-7, the receptacle 3'-S" south of opening on Col. Line 9 is to be +2 -6" above floor. CHANGE ORDER fftl Page 1 of 2 t .. ." f. Electrical revisions per SK-I/E-3, SK-2/E-4. SK-I/E-5 and SK-I/B-6 (attached) ADD TO CONTRACT . . . . ITEM 14: (Supp. #5, Items 1 thru 4) a. On Exhibit Hall and Upper-Level Power Plan, l/E-15, at outlet on north wall connected to P .A. System conduit in Meeting RoOlll e insert identifying letters "A.J". b. On Exhibit Hall and Upper-Level Power Plan, l/E-15, at conduit run frOlll "LIl" switch on north wall of meeting roOlll C to "LIl" switch on north wall of Meeting Room D change "1/2" -(2) Belden #8461" to . read "l"e -(5) Belden #8760". c. On Lower-Level Power Plan, 2/B-15, at conduit run from "LIl" switch on north wall of Meeting Room F to ''LH'' switch on north wall of Keeting RoOlll G change "3/4" -(2) Belden 18461" to read "l"e -(5) Belden #8760". d. At Note 1. (Symbols), E-15, add the following: ~ ~ t-@) Microphone outlet +30" 4 gang box & ring. Local hall switch +4'.6" SID box w/3 gang ring. Amplifier jack outlet. ADD TO CONTRACT . 0 . . TOrAL ADD TO CONTRACT 1653.07 115.04 $3,858.77 CHANGE ORDER NO.. 1 Page 2 of2 r~ ~,; 'CITY Of SAN BERNARDINO - MEMORANDUM / ,. ~" ~t--:-- Jerry Winstead, City Administrator To Subiect Change Order #1 From Robert E. Dale Assistant Superintendent December 17, 1970 Dote Approved Dote r' -9 / ).y.:-J . . / Change Order #1 has been presented to the City for Approval: These changes which will increase the contract sum by $3,858.77 consist of four items lummarized .1 fellows I Item 1: Add $1,241.55 (a) Clarification of a foundation elevation. No charge. (b) Revision of roll-up door details. (e) Revision of i~erior room layout and partitions (including electrical requirements) Item 2: (a) Add $849.11 Electrical revisions necessary to conform to interior changes. Item 3: (a) (b) (c) (d) Add $1,653.07 Change identifying note of electrical riser to clarify its panel destination. Height of receptacle at control room specified. At locker and lounge, height of receptacle specified. On lighting panel "MA",2 pole relay added. Identifying note on circuit revised. Item 3: Add $115.04 (a) Exhibit Hall, identification provided for outlet of P. A. System. (b) Conduit sizes etc, revised. (c) Conduit sizes etc. revised. (~) Clarification of symbol schedule. The original contract sum was The contract sum will be increased by The new. contract sum .e& will Bl!.. . 4,904,000.00 this change order 3,858.77 4,907,858.77 This change order will not change the date of completion. Yours truly John R. Hunt, Superintendent Department 0 Building and Safety by:- ~. o ert E.Dale --___ Assistant Superintendent "dr",J< Flc 1 RED:Vs CITY ON THE 3v1-iFV.=E