Loading...
HomeMy WebLinkAbout10272 ,# . ,. \0 _~" ~ . . RESOLUTION NO. ,I i/c2 7;; ..) 1 A RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AWARDING A CONTRACT TO B.W.B. Constructors, Inc. 2 FOR THE CONSTRUCTION OF NORTHPARK BOULEVARD BETWEEN "H" STREET AND WESTERN AVENUE IN ACCORDANCE WITH SPECIAL PROVISIONS NO. 4036. 3 4 RESOLVED, that the bid of B.W.B. Constructors, Inc. 5 for the construction of Northpark Boulevard between "H" Street , . 6 and Western AvenUe, ih accordance with Special provisions No. 4036 7' I I 81 91 I 10i I 111 , is the lowest responsible bidder therefor,fand that the same be and is hereby accepted and all other bids are hereby rejected. That the contract, a copy of which is attached hereto, marked Exhibit "A" and referred to and made a part hereof as fully as though set forth at length herein, be and the same is 121 , , 13' hereby awarded to B.W.B. Constructors, Inc. 141 I I That the Mayor and city Admhistrator of the City of San 151 I 161 Bernardino are hereby authorized and directed to execute said contract on behalf of said City. 171 I HEREBY CERTIFY that the foregoing Resolution was duly 1~ adopted by the Mayor and Common Council of the City of San , 1~ , 20 , thereof, held on the /~ Bernardino 21 day of , 1970, by the following vote, to wit: AYES: Co ncilmen ttifl~k~ //)~/~-I~La ) ~"r"d!fL; d~~ ~~,~ ~ NOES: 7~~ ABSENT. ~ .~' Jr ~J/-61 . City - Cle Resolution is hereby approved this ~day of 2' 2~ 24 2~ 26 I 27' 1 28 291 1 ! 3(1 I 31; I I 3~ The foregoing ~ 71/ ' 1970. Approve as to form: } // Ma /':J .r,:P r:-' ~'/($~J f/,A~/ CJ.ty Att rney FILED MAY 1 9 1970 ,~ ': . } ~~ . , . ~~ C I T Y 0 F SAN B ERN A R DIN 0 S TAT E 0 F C A L I FOR N I A -"""" CONTRACT DOCUMENTS ./ PLANS AND SPECIAL PROVISIONS NO. 4036 FOR THE CONSTRUCTION OF NORTHPARK BOULEVARD BETWEEN "H" STREET AND WESTERN AVENUE GAS TAX PROJECT NO. 506 DEPARTMENT OF ENGINEERING City of San Bernardino April 1970 C( L'::"''' It. h.JjiJ/~/ /l ;: .,. , .. .~.~ .. NOTICE INVITING. BIDS NOTICE IS HEREBY GIVEN that the City of San Bernardino will receive bids or proposals for: THE CONSTRUCTION OF NORTBPARK BOULEVARD BETWEEN "B" STREET AND WESTERN AVENUE, IN ACCORDANCE WITH SPECIAL PROVISIONS NO. 4036, ON FILE IN THE OFFICE OF THE CITY ADMINISTRATOR, ROOM 2'01, CITY HALL. Deliver all bids to the City Administrator's Office, Room 201, City Hall, 363 North "E" Street, San Bernardino, California, with the specification title and number clearly marked on the outside of the envelope. . Said bids or proposals will be receivea up to the hour of 2:00 p.m., Tuesday, 12 May 1970 , at which time all of said bids or proposals will be publicly opened, examined and declared in the Council Chambers, 392 Court Street, San Bernardino, California. No bid will be received unless it is made on a proposal form furnished by the City. All bids or proposals shall be sioned, sealed and accompanied bv cash, cashier's cheCK, c~rtified check or'bid bond made payable to the City of San Bernardino, in the amount of ten per cent (10%) of the bid. Such cash, check or bond shall be given as a guarantee that the bidder will enter into the contract if awarded to him. In the event the bidder refuses to execute said contract, the use hv the public of the improvements will be delayed, and the- public will suffer great damage. "'rom the nature of the case, 'it would be extremely difficult and impractical to fix said amount of damage. Therefore, the City and the bidder.aoree that the above sum of 10% shall be paid to the City upon the condition above set forth as liouidated damages and not as a forfeiture. All bonds furnished pursuant to this notice must be under- written bv a surety company having a rating in .Best's most recent Insurance Guide of "A" or better. Pursuant to law, the Mavor and Common Council. of the City of San Bernardino, bv Resolution No. 5718 and anY and all amendments thereto which are hereby referred to and made a part hereof bv reference as fully as though set forth at length herein, have ascertained and determined the oeneral orevailino rate of per diem waoes, and of per diem waoes for legal ~olidavs and overtime work for each craft or type of workman needed in the execution of contracts under jurisdiction of said Mayor and Common Council. Said pre'vailing rates of wages shall conform to "1;7age Scales for the Six Basic Trades", filed in the Office of the City Clerk, 'and "Sub-Trades Hourly wage - Rates of Buildino and Construction Trade Council of San Bernardino and Riverside. f u' . - Page 2 - Notice Inviting Bids Counties", filed in the Office of the City Clerk, which are made a part of said Resolution No. 5718 and amendments there- to. It shall be mandatory upon the contractor to whom the contract is awarded and 'upon any sub-contractor under him, to pay not less than said specified rates to all laborers, workmen, and mechanics employed by them in the execution of the contract, and to prevent discrimination in the employment of persons because of race, creed, color, or national oriain, as set forth in the provisions of Resolution No. 7414 of the Mayor and Common Council of the City of San Bernardino. No bid will be accepted from a contractor who is not licensed in accordance with the provisions of Chapter 9, Division III of the Business and Professional Code. The City of San Bernardino reserves the right to reject any' and all bids. Plans and specifications may be obtained from the city Admin- istrator's Office, Room 201, City Hall, 363 North "E" Street, San Bernardino, Caiifornia 92401, upon a non-refuntlable payment of $5.00 for each set. CITY OF SAN BERNARDINO BY: LUCILLE GOFORTH City Clerk , ..... -- -.~ SPECIAL PROVISIONS SECTION I GENERAL 1.01 General -- The work embodied herein shall be done in accordance with the Standard Specifications No. 2271, revised October 1966, of the City of San Bernardino, Department of Engineering insofar as the same may apply, and as modified and in accordance with the following special provisions. 1.02 Place of Production/Manufacture -- In the performance of this contract, Contractor agrees to use or supply only such unmanufactured materials, articles and supplies as have been produced in the United States, and only such manufactured materials, articles and supplies as have been manufactured in the United States substantially all from materials produced in the United States, unless exempted from this requirement by article 1, Chapter 4, Division 5, Title 1 of the Govern- ment Code of California or by treaties or general trade agreements of the United States. 1.03 Conflicts -- In case of conflict between the Standard Specifications and these special provisions, the special provisions shall take precedence over and be used in lieu of such conflicting portions. SECTION I I DESCRIPTION OF WORK 2.01 General -- The work to be done consists, in general, of clearing and grubbing for new roadway, performing earthwork, grading roadbed, asphalt concrete, construction ofa triple box culvert, and such other items or details not mentioned above which are required by the plans, the Standard Specifications, or these Special Provisions, are to be constructed or furnished and installed, all as shown on the plans, as specified herein and as directed by the Engineer. 2.02 Maintaininq Traffic -- Public traffic will be prohibited through the construction area until acceptance of this project by the City. SECTION I II CONSTRUCTION DETAILS 3.01 Earthwork -- The earthwork involved shall conform to the provlslons of Section 19 of the Standard Specifications of the Department of Public Works, Division of Highways, State of California, Business and Transportation Agency, dated January 1969; except as modified as follows: Structure excavation and backfill shall conform to Section 19.3 except that payment therefor shall be considered as included in the prices paid for the various structures. SP-l . . Compaction of original ground as specified under Section 19-5.02 will not be required, however, the subgrade shall be prepared and compacted as provided in Section 19-1.03, "Subgrade". The fill dikes of the flood control channel in the vicinity of Station 39+92 and within the limits indicated on the drawings shall be excavated to original ground and the material replaced as specified for embankment construction. Unsuitable excavated material shall become the property of the contractor and be disposed of outside the street right of way in accordance with Section 7-1.13 of the above specifications. All vegetation and other. deleterious materials' shall be removed from the sub- grade for a depth of six inches prior to compaction. , Import material shall be furnished and installed by the contractor. It is estimated that 3,100 cubic yards of import material will be required. Import material shall comply wIth Section 19-7 and shall have a minimum R-value of 60. In Embankment Construction the relative compaction of each layer within 0.71 feet of finished grade shall not be less than 95%. The relative compaction of the layers of embankment below a plane 0.71 feet below finished grade shall not be less than 90%. Payment for Roadway Excavation shall be on a lump sum basis as provided in the contract which price shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in excavating, loading, hauling, depositing, spreading and compacting excavated material in place, including furnishing and applying water, including furnishing and placing import material, including removal and replacement of flood control dikes, including removal of existing pavement, base, subbase and/or basement soil, and disposing of unsuitable materials all as shown on the plans. 3.02 Asphalt Concrete -- Type "B" asphalt concrete shall conform to the provisions of Section 15 of the Standard Specifications and these Special Provisions. ~aving asphalt to be mixed with the mineral aggregate shall be steam-refined asphalt having a penetration of 60-70, 85-100, 120-150, or 200-300, the range of penetration to be designated by the Engineer. Asphalt concrete may be spread and compacted in one layer of total compacted thickness of 0.21 feet. A prime coat shall be furni shed and applied as di rected by the Engi neer. 3.03 Finishing Roadway -- Finishing roadway shall conform to Section 16 of the Standard Specltlcatlons. Compensation for finishing roadway shall be considered as included in the prices paid for the various contract items of work and no additional compensation will be allowed therefor. SP-2 , ~ 3.04 Markers --Markers shall conform to the provlslons in Section 82 of the Standard Specifications of the Department of Public Works, Division of Highways, State of California, dated January, 1969. All marker posts shall be metal. Drawing A74 showing guide markers is included with and made a part of these special provisions. 3.05 Portland Cement Concrete "Structure (Box Culvert and Transitions) ~1"..,. A reinforced Portland cement concrete box culvert, transitions and appurten- ances is to be constructed, all as shown on the plans, as directed by the Engineer, and as herein provided. The work shall conform to the requirements of Section 51 of the standard Specifications of the Department of Public Works, Division of Highways, State of California, dated January, 1969. Portland cement concrete shall be Class A. The concrete shall have a compressive strength of not less than 3000 pounds per square inch at 28 days. Drawing D88, Construction Leads on Culverts, is included with and made a part of these Special Provisions. Concrete curbs, sidewalks and parapet walls, to the top of the curb or side- walk, and headwalls shall be considered a part of the culvert structure. All concrete above the top of curb or sidewalk shall be considered as a part of the Barrier Railing and shall be paid for under the Barrier Railing Item. All concrete below the top of curb or sidewalk shall be paid for under Portland cement concrete structure (Box Culvert and Transitions) item. Concrete transition structures upstream and downstream from the culvert shall be constructed and paid for under this same bid item. The price paid per cubic yard for Portland cement concrete structure (box culverts and transitions) shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in the construction of the concrete structure complete in place, as shown on the plans, including all required structure excavation and backfill, including previous back- fill material, including drains and expansion joints and including furnishing and placing all bar reinforcing steel. The estimated quantity of Portland cement concrete structure (Box Culvert and Transitions) shall be the final quantity for which payment shall be made unless the dimensions of the structures as shown on the plans are revised by the Engineer. 3.06 Barrier Railing -- Barrier railing shall conform to the provisions in Section 83 of the Standard Specifications of the Department of Public Works, Division of Highways, State of California, dated January 1969. SP-3 , ~~ . The bottom limit of payment for barrier railings shall be the top of curb or top of sidewalk as shown on the plans. Barrier Railing will be paid for at the contract price per lineal feet, which price shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, including concrete in concrete railing and in barrier railing and metal railing for barrier railing, including furnishing and placing bar reinforcing, and for doing all the work involved in constructing the railing, complete in p1ace~~as ~hown on the plans. . 3.07 Install New Cable Barricades -- New Cable Barricades shall be furnished and installed as indicated on the plans. Location of Cable Barricades shall be as directed by the Engineer in the field. Footings for posts shall be constructed of Portland Cement Concrete to the dimensions as shown on the plans. 3.08 Gunite -- Gunite-lined channels, overflows, and all other work requir- ing gunite linings shall be constructed to the lines and grades given by the Engineer and in accordance with the designs shown on the plans. Gunite shall consist of pre-mixed sand and Portland cement, pneumatically transported in a dry state and hydrated at a nozzle immediately prior to expulsion from the transporting conduit. Only experienced foremen, nozzlemen and gunmen shall be employed on gunite work. Only approved equipment shall be used in the mixing and placing of gunite. The equipment shall be thoroughly cleaned whenever such work is stopped for a period in excess of 20 minutes. Materials: (a) General - Materials used in gunite construction shall conform to the provisions of Section 14 "Portland Cement Concrete", of these specifications, except as hereinafter specified. (b) Sand - Sand shall have a fineness modules of between 2.70 and 3.30, and sha 11 be graded as fo 11 ows: SIEVE SIZE PER CENT PASSING 3/8 Inch 100 No. 4 97-100 No. 8 79-85 No. 16 60-73 No. 30 36-47 No. 50 10-20 No. 100 0-4 SP-4 . ...~ "Y-' Moisture content of sand shall be between 3% and 6% by weight. Proportions - Gunite shall be mixed in the proportions of one part of cement to 5 parts of sand, based upon dry and loose volume. Accurate means, satisfactory to the Engineer, shall be provided and used to determine the proper amount of sand for each batch. Batches requiring fractional sacks of cement will not be permitted unless the Contractor weighs the cement in each batch. Mixing - Before being charged into the machine, the cement and sand shall be thoroughly mixed dry in an approved power batch mixer, equipped with a device for accurately timing the mixing operations. The cement and sand shall be mixed for at least 1-1/2 minutes, during which time the mixer shall rotate at a peri- pheral speed of 200 feet per minute. The dry mixed material shall be used prompt- ly after preparation, and any material that has been mixed for more than 45 minutes shall be wasted. Preparation of Subgrade - Earth surfaces to which gunite is to be applied shall be neatly trimmed to line and grade, and shall be firm, unyielding and free of surface water and deleterious substances. Ground wires shall be installed in such a manner that they accurately outline the finished surface of the lining as indicated on the plans. They shall be located at intervals sufficient to insure proper thickness throughout. Wires shall be stretched tight and shall not be removed prior to application of finish coat. Headers shall be installed along the upper edge of channels to confine the outer limits of the lining as indicated on the plans. Headers shall be securely fas tened to 1 i ne and grade. . Placing - Gunite shall be placed in the most expeditious manner, as deter- mined by the location of the work. There shall be a nozzleman's heloer in attend- ance at the nozzle whose duty it shall be to raise the wire mesh reinforcement sufficiently to permit placing gunite beneath the mat at frequent intervals to insure proper location of reinforcement. All surfaces which are to receive gunite shall be wetted with water immediately prior to placing gunite. Rebound shall not be incorporated in the work in any manner. Water and air pressures shall be maintained at such uniform pressures as will afford dense, uniform and consistent results. When coatings one inch or more in thickness are to be applied to vertical or steeply sloping surfaces, the gunite shall be applied in two or more layers of not more than 3/4 inch in thickness to prevent sloughing of freshly placed material. When more than one layer is to be applied, a time delay long enough to prevent sloughing, but not long enough to allow the previously placed gunite to set completely, shall be allowed. SP-5 Reinforcement - Reinforcement for gunite-1ined channels and overflows shall -~,onsist of welded wire fabric, made from cold-drawn steel wire, electrically '~we1ded at the intersections of the transverse and longitudinal wires, and con- forming to the "Specifications for Cold-Drawn Steel Wire of Concrete Reinforce- ment", ASTM Designation: A 82-34. Reinforcement shall be cleaned as specified in subsection 15.05 (b) of these specifications. Wire mesh reinforcement shall lap a minimum of one mesh spacing and securely tied with 16 gauge annealed wire at intervals not exceeding 18 inches. Joints - At the end of the day's work or similar stoppage period, the gunite shall be sloped off at an angle of approximately 45 degrees to the surface being shot, and the sloped portion shall be covered with burlap and kept continuously wet until guniting of the adjacent sections is started. Before shooting the adjacent sections, the sloped portion shall be thoroughly cleaned by means of air and water blast. Finishing - After gunite has been placed as herein specified, the surface shall be checked with a straightedge and any low spots or depressions shall be brought up to proper grade by placing additional mortar. The gunite shall be rodded off to true lines, leaving a surface reasonably free from humps or depressions. Ground wires shall then be removed and the surface worked with a wood float to remove any surface irregularities. The entire surface shall then be lightly broomed to secure a uniform surface texture. Curing - All finished gunite surfaces shall be cured by the application of an impervious membrane as specified under subsection 15.07 of these specifications. Necessary equipment for keeping gunite surfaces moist until curing membrane is applied shall be on the site ready for use before any gunite is applied. Measurement and Payment - All gunite shall be measured in place in accord- ance with dimensions shown on the plans and sections. The price paid per square foot of surface area shall include full compensation for furnishing all labor, materials, tools and equipment and doing all work in- volved in constructing gunite surfaces, complete in place as specified, including preparation of subgrade, furnishing and applying curing membrane, and furnishing and placing reinforcement. 3.09 Curbs and Gutters -- This work shall conform to Section 18 of the Standard Specifications. Full compensation for excavation and backfill required in connection with curb and gutter, construction shall be considered as included in contract price paid per cubic yard for Portland cement concrete (curbs, guttersh and no additional compensation will be allowed therefor. SP-6 , 3.10 Relocate Section Corner Monument -- A section corner at the box culvert shall be relocated as directed by the Engineer. 1. Contractor shall furnish and install cover and frame, and concrete for monument inserted in opening left in top of box culvert. 2. City will furnish all necessary lines and grades and will furnish and set brass disk in monument. The above work will be paid for at the lump sum price stated in the contract. 3.11 Flood Control District Requirements -- All work shown on the plans within F.C.D. right of way shall be performed at the times required by and in accordance with the F.C.D. permit issued to the City for the work. Payment for complying with the requirements of the permit shall be considered as included in the various project bid items and no additional compensation shall be allowed therefor. SP-7 T c. .~ ,~ ~U, "'..InJ .. - -0 co l... cl 0" e .:.-fs E ",..J ~ . ~~ '" '" c..... ~:::-.. (/)J: ... L'- 03: ..... 0 c oJ " <;:..... " .. Cl~ " -....... " -0 o o 'l: "" OJ t;j : I. : o-+- ,c ",- -.t~ "'" L7: '- .J:. "-3 '" 4 '" -- ",.0 :> 0 oU 0.... . ~-o ;", ~ ...~l' q..sn::> NC , ';0 ",0.. :..... ~,.~ o Z . ,', ...., ~l o >< .0 ~ o <<) .9~2. oM -. =-=::1 II lit , ' __L __::J . lA, '\, 'I " ==y ==:J ....... ,. f u ~ . u / ~~ .... ~~ L_ t- c L'- 0" 0...... -O.....c.n.~ o.q .. ~",o. -o,\..J! ~li::E , ",3 v.o -'" ")C, g''- . 0'" i.90~ ~ J: " ... o ~ 019 :;:zN ~ E . -<f - :2 ~ [;1 ~ ('I I)" ~~ 4 '" u..1L o,!J o D ':1 }- [ ~ I- 14 <t ii Q DJ o " -' - c:s: )0- W Q UJ co --=t (.) - oJ c:J -04 cO .. l..9 ... . '" '" .... ~ . ..:..J- !W, ! I Il j ;~ .,',. ~. :i~ ~ i I ~I i i """.r1~lj j1 ~i; I 0 . "'1 .. ,: ~ ~t ~ ~~ '~... !l' . ItJ~ - "! t. ,. :~I :.. c In. wI . -" O~ ~ o '" w Z . Z c 0 ~ ~ i ~ 0- .!!: ~~ . u -:1 0: W '" 0: " ,. 0: ....Ja:w b! :d ~~3: !2 OUa:: '" ~~w 0:..'" owo: Ia::~ ~ \". <. .o;.:'i ~_." ~ 1!:5 .....,..... r: ~- .. j~~~ , ~.-...... _ _ _0.. I ~~;;~: 0: . I~'-" .' '. ~~ ~ '1] l' ..1 o~ " G;I ..,. e~::i!: ~-.-~ .... ~ _! ttl en '_t.~ .z 0 e U ::; ~'N"'=' ~ ~~~ - ~ - .... ~~ so:: ...J ~ ~ ~f-:i! ~ ~~iIi a:: I .V-,Z 1- ~ g t:T1 . ~_ a: O. '. ., ww <D '0Zj .~ - - 1-1.+ --1 Cl~ . f:!t.... . _.' ' i-;J:fl:': m '-E;'<;-$~ 6~O;: on~, . ~-' -"" r" OS . ~'" .v 1 ;,jti., ~~~i Z~ifi ". !1Pl f $ . ~ ;; ~ ", .v-,I e ! ~ a: w '" a: " ,. .... <n o 0- w -' :> ic ! "r~~I/LI '",'R 'li-~~~ -<,91/<;:.;;- 0> 4. "0-'.2 t; L I" L~ ;, i~~' 0 r 51 . . f .......!Il Z 0;;.2 ~ a. -- 0 -...._ \< '. '~='~"~':">="'i.a: ~- ~ e ~ ~ ~ Q~ ~oJ>"" ~ ~~!2 ~ '.',~ w '~^- . <0'_' a: .'i- ; g::! a L 9= <> ~ <; <( - <,.I .0 , ::I:_c__....., ii, ~ ~ ~ '.,! '.' ~!~i! :::; . I '0. - . ::1:..'0 <{ ''''~H~ ~t;; ~,~ ~~. . . ,. l ~,~,~ .~-'J ~J..-.~/16--+---~16G.L . -I- lO: .~.... '"..... ~ ~ ;, ~ ~ ,.., .m j~~~~~~ ~~i!__NN, . .~ 03 '0 ,u ,3~ '" > " . . o 0 0 5! - - -; .. t,It,1 )-)- ...... .:>'" ~ i 1: ._ iii~ .~ ~ I . .. a:. !J W & '6 ~~ :i "- I' ,.. -,u! <f~~" a:. '.. w.! S~! ~~ lil' lH 1;1 '-:3 "'~~ .. :sj... ~hi Q. c!Joa . . ., v ~.. O? ~ l:~ .~ <t i i 2 ':!.!'.! ~ J:C1. ~ol @@ ~ !o c c -g ~'2 z ... .2 .. 0- ~ j III XIII '0 '0 '0 '0 -';"-.Q Oq.;:" e9@@ SDA74-A.1 ~ ~ i . z ~ ~ ~ oii. i "0: i ij g 5 -0 .. a~ .~ i i E I<l :!::~~ II g':'5 .2~ ::. ot:) .._ 3j~ 2!j .. Ci-'"'.; j! ~ o ciS _ _.. ~ ~:a~~ ~i i Ii: S ~JJ <i u ~ ~.. .~ Jgl1i '.~ . ~m 28;: ~";'~ i~l ~"":Ci i~-: ..gj :sitC1. i"O~ will "'1-111111 ~ .~ m .'0 - e( , ;.r. <n e( -' 0 4(t)(t) ....0: WUJ 0", -'0: "e( u::O w 0. <n .... W " U " 0: <D ~ f9 'j ~ ~ao ~ ~ia. . "" ~io .!"sz ._ <n H .~ - "~~l! t;; 1'1 '015..0112 G.. ~g.. ~~ij~E <t~ -;::;; I- 1;;;:::E'" -,a 0:: ;; Q ~}i~ z ~~~.h;~ m & ~ r t1~2~:J a.!J=~a o::~ --~'- "'.... a t.~ i!il ~ ~~~~j~~~!! ti ~ ~". .;' ~.~~ ~;;~ ::n ~~~g~l'=):;~~W' "1O!dIIl6JOl ", .'.....0 5!S.2 "'- g.2...J E ... '--- - - ~ go'" "':0 ~ 11 0 I 0;;' \.L ! - !~'i ~ '.... ~ 6 6 E'" Wi ~ ~;;; ~~ ~ ~ - ,:; ~~ a: '0 .c. -:ct. I t EO : ' 'll/"T'h~&Oj '" ,,'" Cl: 'T111-r----.. ...J I L ;;._ , ~. " I , ~ 101 a.. L- '" ~'_._t_~,'---,-,-,'"T1 .' 0 8 8 ~ !< I~! ' :)' li-->'I~"'~ ~ i ~ I ~~W ~ N ,6 o Z o Z ~',...~~j~ ~ ";' ~ '7 <; ~ ~"".."'~ i3 u _ ~. ! ~ . ~ 11:::'= CI !2 ~ C :e ~ ~ ::i ~ ~ . , ni !7: ~ .iiJ ~!~ ;5:i5 \ <. -; .O-,S i ) ~l } :.& : .h::" ~'= ~ ~ ,#'" ~ <n a: W '" a: " N " ,#:':::;, ~ .0-,. j .. .0-,<: W ~\"<. .. .O~l -; .. l~ .~i. ;~ "" ~< f~fl :i ~ ~, ..J :@<It: ~ll : ,~,l r l>i6 o i/ .Zf,6 j.~ a: W {aff. -i!.;}~ '" -n ~ a: " ,. ~.~ W .....2~ U .;, ~l " z ~t-l ~ " a: " W ,O-,l :J: .O-,l d ~ 0Q ~'6 : ~,,6 i-4"'!h i ~rr I 1. ~~&2 "'~2- j.~ i ,f~.. !~ ~& ,!G cO .l ~--~- '- 'i~l ~,.:#-.I 9_::.:..__-_- -..~-,.... I I " iO, I I' III I; " I' ! II i I, . . . ~I j m ~ I 1 . ! '. " '. - ". ~~ 'I" ~ ";'. I I: ~\i _ I f -.~. I. i~j+ ::::..1 : '~~II i...", : :;;..->--- ;'~I I I .. :~\i -r-- o',~. I r~~ ft-I UJ. :,' ':;;'2 . ". 2. . ;j !! :;~ ';:.: ~ !! ",Oq",_q ...c "":NN"" ~~~ -0-0<5-0 .!::~ ...;,.;,..;"" HU:m ~ g ~ E ~'5~: :.:.5",... ~ z '. '. . . ; '. - . . '. .. -=~' -. H .........;.........~-_. 088-' ! ~ 1 · f l :3 b ~ ~ j .;:; .. ~ ~ .. ll: :,i i .. ~. . jj -;:g g 0;'0 :.;~ ~ ~lS &,;: - Ci~' oI!~.~ j"" ,~~ 0= E a"-:=o ::-; a~~i &,!~ ~~ .fci .5.=0. N i '. 11' '. . ; I i ~.' ". ". :I" ." . -+-- i1: I ~~ I , 51 : :I: >-e> e>;z ~i= -'!; "", ,,>- ,,'" -u. ";0 " . ...! ~. !~ i~ =- o ~ ,m o . ~~.~ : ~' , I G z ~~ '. :!~~~ ~i=~~. 04..J% (i;l-llJe) ::;~~i 3"'...... zoo .. oo::....z ..,I-~~ ~~~~ In ",0 .. .. -- zo in , . V> >- '" '" :'l => U :I: U '" .. u '" '" "'Ii: ",'" w3 0." O::u 0:ci "'>- w " '" >- '" w :'l => u x o <D , CD CD o '" I- 0: W :; => u z o CJ) o .. o .J Z Q I- u => 0: I- CJ) Z o u .. '" 1'0' , .' i I I . I I I I I il\ j ':".: I ~{, il :~~-' I. -"- ~" I i ~ , l\"~ ~. J, If' II I{ l~ 'I !,,{ i \i.i,';;: ~ . ! ;,~ \ , \ I . PROPOSAL FORM TO THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO The undersigned declares that he has carefully examined the location of the proposed work, that he has examined the plans and read the accompanying instructions to bidders and hereby proposes to furnish any and all required labor, materials, trans- portation and service for the construction of NORTHPARK BOULEVARD BETWEEN "H" STREET AND WESTERN AVENUE, in strict conformity with Plan and Special Provisions No. 4036, City of San Bernardino, Department of Engineering, and also in accordance with Standard Specifications No. 2271, City of San Bernardino, Department of Engineering, revised October 1966 and he proposes and agrees if this proposal is accepted, that he will contract with the City of San Bernardino, in the form of the copy of the contract annexed hereto, to provide all necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the materials specified in the contract, in the manner and time therein prescribed, and that he will take in full payment therefor the following unit prices or lump sum prices, to-wit: ~'T ;. .'" .' IlUI QUANTI~Y TOTAL 1. Lump SUIII o PLAN NO. 4036 DESCRIPTION OF ITEMS WITH UNIT PRICE WRITTEN IN WORDS UNIT PRICE <I 3 /7.:)",'9 I 2. Lump Sum Cleari~g and g~bing }J)the lu~p SU~I pn ce Of, 1,_,-,<",,- fI,;~<~<.t..:_ t..--.v. IV .-4 ......,t ....; ;~. _d..7_..........~....L:1 ;..;-.-.L......;;~ .,t\tJ_i./~~-1'">- Lump Sum t ~C~) 9;) 00 --- .; Roadway excavation at the lump sum . f 7J.' - /// ,') prl ce 0 ....,'-'" I_('-""<'~""_ .//' ., C, '., ~/_I,;...,',,,,,,,,~ /Y~~4.1'v.A-i(!..-k. ~'-.J t.-t..,'..-4.....-;#- Lump Sum 3. 12 Ton $ 3&~5 ff -'13 2, <:~ 4. 1,900 Tons As;:hal( Concrete (Type "B") at ~c ';:)c--({i...',,-.v d,><J... ) ..z; --'. . ,-- ._.....1.P...u-I."'-.-_ _~ 'J.-.....L-r,.-'--.... rr:L'~.......L-<1 per ton. Ton 4' t7S J /2,<5L-S"'!2 s. 300 Cubi c Yards P. C. C. Structure (Box C~Jvert and Transitions) at {g~.J_ )i..t...7"-..'-~v.,!J-" NU-:.:.e rvv--r .j~-".<'o-<<~ per cu. yds. Cu.Yd. ,f /J:YZ 0'5}. ;j I ""c :s 6J (OeD - 6. 93 'i. I,OS0 lineal Feet Barrier Railing at :/;..,..,~, ~ t-ft?..-,.~ , Lin. Ft. ,f! 2 o~~ per lin. ft. 4 "c . /'7~() .-- ~',~re Feet Gunite Lini39 at t~J'2",LeN d""-j.~ I ",-..o",--C ;" -- ., ""~~1 Sq. Ft. ;$/'2:5. per sq. ft. # IZ"lt, 65:- .__,.J_'_,?'l>"':""'~"/~,~ DESCRIPTION OF ITEMS WITH UNIT UNIT ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE TOTAL 8. 115 Cubic Yards P.C.C. Curbs and Cu.Yd. Gutters Type "B" including 10- #'-'lC/''::' ,fl c~ de press i on at ;r~ti'l '(, .."- ~'~~'r-v per cu. yd. --'I 0" . ~ 9. Lump Sum Drainage Structure (Catch Basi'n) at the lump sum price of ..-r., )/. d fI (' ~v; / )1.....,~-,--~~., - -t.';;-;''''j.~}....,-.:'<-~ ~ -::v..:..e---r",..... Lump Sum ~ 6':::) /Zb 0 -~ 10. 140 Lineal Feet 18" C.M.P. (16 Ga.) including six end sections at C~vJ7~. () c-U?~T-Y ,f ....l :/ p-,.:t;; (t o,,;;,C:-;- Lin.Ft. -,tj n. If) /1::- ,p" . pO 15'9 t,--- 11. 110 per lin. ft. Lineal Feet 24" C.M.P. (16 Ga.) including one end section at '/wJ'4,a- -0 ..,P/~ per lin. ft. Lin.Ft. 11 _ cc""J /'2<.- 4 ....~ /32,.0 - 12. 80 Lineal Feet of 36" x 22" C.M.P. Arch (14 Ga.) including two end sect ions at '7)-+>'>J!'t;;.?,.~. o D.f'L2......,-v Lin.Ft. /It "ft) IS"2.-'":I ,- 13. 94 q' c'" 1'1.- -$ . 0<'> &Sg- . 14. 18 per lin. ft. Markers at --1l~......~ f) c,iJ,tJ.,..,-..- each. Each d 7~~ 4' c S</-b".-- Warning signs at a:'tf {:jt..t!.(}of-......- each. Each 4-' 3 ",.0 .:> - . . , , . ITEM QUANTITY .~-- ----- 15. /" Lump Sum DESCRIPTION OF ITEMS WITH UNIT PRICE WRITTEN IN WORDS UNIT PRICE TOTAL Install New Cable Barricades at the Lump sum price of .-- J) "I' . --T' ~~.t'l- /Y-t:"J.<.,Cr-"~Z _-...:t:--.-'-r.-z.. ~--L;~,..,f': <:) t;1-i(J-c~r' ' Lump Sum ;$ L!7S"'::'- 16. 14 Lineal Feet Barricade per Std. Dwg, No. 232l-Z at E~IlI;<w \:) ,,(?J2"-r~"" per lin. ft. Lin.Ft. ;g If:";:'" If, ZS't....::.- 17. 1 Each ~j us ti ng Manholes to grade at CL .? _ );-<.<.....L,~.( 'h,"'';;;: <\7 &11(2",......,; . . each. Each /Z-C <:!2. $0 /2,00.- 18. Lump Sum Relocate Section Corner Monument at t e lump sum price of . _ 0- .:Y-4.....y Lump Sum ;ff / . cD (:10 .- TOTAL ;f 7/ c:; 2- r c':: . Note: The unit price must be written in words and also shown in figures. The total price must be extended for each item of work and the total of all items inserted in the space provided. , ,--, , In case of a discrepancy between words and figures, the words shall ---:prevail. _.--;-- It is the understanding of the undersigned that the work hereinabove descri bed shall be commenced wi thi n 10 days from the date of the "Noti ce to Proceed", and shall be completed withln 80 calendar days from date of said notice, -- The undersigned further agrees that in case of default in executing the contract, or furnishing necessary bonds, all within the specified time, the proceeds of the Bidder's Guaranty accompanying this proposal shall be forfeited to the City of San Bernardino. Licensed in accordance with an act providing for the registration.of contractors, License No. /7937'2 , Classification "A" FIRM NAME: 23 (,.,j K r:~; ,\1< r J2"? a c:. /cJ ,;e 5 fti <C, o BUSINESS ADDRESS /r~L)7 c: "'It... 2Jud .(aM 'i3€~FlM,I..:.< 2$WiS/h..1.$<(ywufor; In,", ~f'2'-""".l! //J~~'~' !'?-Ls;denr c:: .d, i' SIGNATURE OF BIDDER: }'q' If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individuals, or co-partners composing the firm. If a corporation, state legal name of the corporation, also the names of the president, secretary, treasurer and manager thereof, BlAIR /AA/< TJ2iA'~7/J ZS ;t:',... c;.... iJ?d07<b/Wt5C.jiV,,,,#, 07...6.5", ,-); E I 73~tJd ji,~~d~Z S~6. , K.A. Sidi't:..?Ue.4.J/.~V, ";-"'''5" Dated: 5")) 2-- I , 1970. ",--oj" .'\__, ," .. . AGREEMENT CITY OF SAN BERNARDINO This Agreement, made and concluded this 1970, between the City of San Bernardino, party day of of the first part, and , Contractor, party of the , second part. Article I - Witnesseth, That for and in consideration of payments and agreements hereinafter mentioned, to be made and performed by the said party of the first part, and under the conditions expressed in the two bonds, bearing even date with these presents, and hereunto annexed, said party of the second part agrees with the said party of the first part, at his own proper cost and expense to do all the work and furnish all the materials, except such as are mentioned in the Special Provisions to be furnished by said party of the first part, necessary to complete in good workmanlike and substantial manner the construction of NORTHPARK BOULEVARD BETWEEN "H" STREET AND WESTERN AVENUE, in strict conformity with the Plans and Special Provisions No. 4036, on file in the Office of the City Engineer, and also in accordance with Standard Specifications No. 2271, City of San Bernar- dino, Department of Engineering, revised October 1966, which said Plans, Special Provisions and Standard Specifications are hereby specially referred to and by such reference made a part hereof. Article II - And the said contractor agrees to receive and accept the follow- ing prices as full compensation for furnishing all materials and doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid, or from the acts of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City of San Bernardino and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work, and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Special Provisions, and requirements of the Engineer under them, to-wit: j . ~ , " . Article III - The said party of the first part hereby promises and agrees with the said contractor to employ, and does hereby employ the said contractor to provide the milterials and to do the vlork ilccording to the terms and conditions herein contained and referred to, for the prices aforesaid, and hereby contracts to pay the same at the time, in the manner, and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, admin'istrators, successors, and assigns, do hereby agree to the full performance of the covenants herein contained. Article IV - It is further expressly agreed by and behieen the parties hereto that should there be any conflict betl./een the terms of this instrument and the bid or proposal of said contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of.~he said terms of said proposal conflicting herewith. ' IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date first above written. ATTEST: Approved as to form this day of . 1970. /)~~ :/~ Cct:;d{;ney CITY OF SAN BERNARDINO BY, tZr c.l! /j~ BY : City Administrator CONTRACTOR NAME OF FI RI.l: BY: TITLE: HAl LI NG ADDRESS: PHONE NO. -~