Loading...
HomeMy WebLinkAbout1986-527 .,'1 . ',0.':' ':',~~_ .,>,_,'t:t, ,.ct., , 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ,'..' "q "'''. ,,"' " ;...",....,.,.,.,_.' '...,,',," ..'" ,.,,,,,,, -f"~"""",,,,,,,'J',,(':;~':;>';'J,..7.,. RESOLUTION NO. 86-527 RESOLUTION OF THE CITY OF SAN BERNARDINO AUTHORIZING THE EXECUTION OF A LETTER TYPE PROPOSAL FROM L. A. WAINSCOTT AND ASSOCIATES RELATING TO PROVIDING CIVIL ENGINEERING AND ARCHITECTURAL SERVICES FOR CONSTRUCTION OF ADDITIONAL SEATING, CLUBHOUSE AND SEWER AT FISCALINI FIELD IN PERRIS HILL PARK. BE IT RESOLVED BY THE MAYOR AND COMMON COUNC IL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. The Mayor of the City of San Bernardino is hereby authorized and directed to execute on behalf of said City a letter type proposal from L. A. Wainscott and Associates, relating to providing Civil Engineering and Architectural Services, for construction of additional seating, clubhouse and sewer at Fiscalini Field in perris Hill Park, a copy of which is attached hereto, marked Exhibit "A" and incorporated herein by reference as fully as though set forth at length, but such award will be effective only Iipon the contract being fully signed. SECTION 2. The contract authori zed by thi s resol ution shall not take effect until fully signed and executed by both parties. Neither party shall be obligated hereunder unless and until the contract is fully executed and no oral agreement thereto shall be implied or authorized. I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and Common Council of the City of San Bernardino at an adjourned regular meeting thereof, held on the day of , 19!1&, by the December 22nd following vote, to-wit: 11111 1 12/19/86 12/19/86 '. ~ L A WAINSCOTT & ASSOCIATES, INC. CIVIL ENGINEERS. LAND SURVEYORS. ARCHITECTS CONSTRUCTION MATERIALS CONSULTANTS Mr. Roger Hardgrave Director of Publ ic Works/ City Engineer City of San Bernardino 300 North D Street San Bernardino, CA 92418 LARRY J. VESELY, AlA RONALD F. CARDUCCI, P,E. RUSSELL E. SHARP, P.E LA "Al" WAINSCOTT, P.E JOHN DAWSON. LS. ELLIOTT B. SHAW December 17, 1986 WO NO 342.04 RE: Perris Bal I Park Dear Roger: Thank you for this opportunity to provide architectural and engineering ser- vices for the above referenced project. We have broken down the services by disclpl ine for your review: I. DESIGN SERVICES A. Civil Engineering 1. Set aerial control and provide 1"=40m scale topographic mapping 2. Design pads for new buildings' 3. Design sewer system to serve new buildings 4. Design water system to serve new bull dings 5. Coordinate with the City B. Archl-tec-ture 1. Prepare plot plan 2. Prepare plans and specifications for new and relocated sea-ting 22400 BARTON ROAD SUITE 200 GRANO TERRACE CALIFORNIA 92324 (714)824-1775 MATERIALS OFFICE- 12210 MICHIGAN AVE SUITE 26 GRAND TERRACE CALIFORNIA 92324 (714) 824-1777 , ~ Mr. Roger Hardgrave December 17, 1986 Page 2 342.04 3. Prepare plans and specifications for clubhouse a. base bid - metal building b. alternative bid - prefab modular building 4. Prepare plans and specifications for expansion of press box 5. Coordinate with the City 6. Assist the City in obtaining bids C. Materials Testing Services 1. Provide a field investigation including at least three test borings to a depth of approximately 25' 2. Provide laboratory testing of bulk and onslte soil samples 3. Provide engineering analysis 4. Provide recommendations for foundation bearing values, retaining wal Is, and site grading 5. Prepare a report of the investigation The materials testing services do not include a geological investigation, I iquefaction studies, or underground util ity locations. It is not anticipated that either the geologic Investigation or liquefaction study wll I be needed at this time. Prior to any borings we would request the City to locate al I un- derground uti I Ities and services in the vicinity of the proposed borings. II. COST ESTIMATE The above services wil I be provided on an hourly basis for a not-to- exceed cost of $20,250.00 exclusive of prints and other "out-of-pocket" ex- penses which wi I I be bil led at cost. These services wi I I be bll led monthly according to the attached Schedule of Rates. r ~ Mr. Roger Hardgrave December 17, 1986 Page 3 Per your request, plans and topographic mapping to assisting you and the City of San Bernardino of this project. SliZk ~ L Ell i ott B. Shaw Principal EBS:mc Attachment "liS By' . ~,_ J j'f/ , . (,(go",,")? ~ 342.04 have begun. We look forward In the successful completion -) jjiulttlaJ L?( /f'/~ (date) . .. " ~ L A WAINSCOTT & ASSOCIATES, INC. SCHEDULE OF RATES Pr i nc i pa I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ Eng i neer. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . $ Arch 1 tect. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ Associate Engineer & Geologist.....................$ Engineering Technician/Pian Checker................$ Arch i tectura I Des 1 gner. .. . . . . . . . . . . . . . . . . . . . . . . . . . . $ Laboratory & Fie I d Techn f c i an. . . . . . . . . . . . . . . . . . . . . . $ Eng I neer 1 ng A I de. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ Arch i tectura I A ide. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ Survey Crew Party Ch I ef. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ I nstrument Man............................... $ Cha i nman. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ EDM - Total Station................................$ Computer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ Subs i stence........................................ $ C I er i ca I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ Fie I d Techn I c i an Veh I c I e. .. .. . . .. .. .. .. . .. .. .. .. .. . $ 80.00 per hour 68.00 per hour 68.00 per hour 61.00 per hour 49.00 per hour 49.00 per hour 40.00 per hour 37.00 per hour 37.00 per hour 57.00 per hour 39.00 per hour 27.00 per hour 10.00 per hour .02 CPU pg/second 40.00 per day 24.00 per hour 0.25 per mile 1) Fees and other charges wi I I be bll led monthly as the work progresses, and shal I be due at the time of bll ling. 2) CI lent hereby agrees that the balance as stated on the bll ling from Engineer to Client Is correct, conclusive and binding on the Client unless CI ient within ten (10) days from the date of the making of the bl I ling notifies Engineer in writing of the particular Item that is at leged to be Incorrect. 3) Any amounts not paid within thIrty (30) days of the bil ling date shal I be considered delinquent, and shal I bear a service charge of one and one-half (1 1/2) percent per month on the unpaid balance not to exceed the maximum annual Interest al lowed by law. 4) A $10.00 per hour per employee premium shal I be paid for al I overtime requested by the client. July 1986