Subject: General Plan Amendment No. 06-01 to change
the land use designation of approximately 10.23 acres
from IH, Industrial Heavy to RU, Residential Urban;
Tentative Tract Map No. 17754 to create a small lot
subdivision; and Development Permit 3 No. 06-05 to
construct 47 single-family homes. The project site is
located on the south side of Walnut Street west of an
extension of Artesian Avenue.
Date:
March 12,2007
MCC Date: April 2 ,2007
S~'nopsis of Previous Council Action:
None
Recommended Motion:
That the Mayor and Common Council close the public hearing and:
I) Adopt the Resolution,
2) Adopt the Mitigated Negative Declaration and Mitigation Monitoring I Reporting Plan, and;
3) Approve Tentative Tract Map No. 17754 and Development Permit 3 No. 06-05 based upon the Findings of Fact
.. contained in the Planning Commission Staff Report, subject to the amended Conditions of Approval and Standard
. Requirements.
YdJAiu(},~
Valerie C. Ross
Contact person: Arnn T ;~ng ~f"n;OT Pl~nnpr
Phone: lR4.'iO'i7
Supporting data attached: S!.ffRepnrt & R~.nlll!inn
Ward(s):
Ward 3
FUNDING REQUIREMENTS:
Amount: N/A
Source: (Ace!' Nn )
(Ar.C't Dpc:.r.ription)
Finance:
Council Notes:
e
Agenda Item No. ;3l.J
'1/3../07
e
e
e
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
STAFF REPORT
SUBJECT:
GENERAL PLAN AMENDMENT NO. 06-01, TENT A TNE TRACT
MAP NO. 17754 (SUBDNISION NO. 06-06), AND DEVELOPMENT
PERMIT 3 NO. 06-05
OWNER/APPLICANT:
Augustin Rodriguez
ANR Industries, Inc.
10702 Hathaway Drive, No. I
Santa Fe Springs, CA 90670
562-777-7807
BACKGROUND
The applicant requests that the Mayor and Common Council approve General Plan Amendment
No. 06-01 to change the land use designation of approximately 10.23 acres from IH,lndustrial
Heavy to RU, Residential Urban. Also requested are Tentative Tract Map No. 17754 to create a
small lot subdivision with a minimum lot size of 5,000 square feet and Development Permit 3 No.
06-05 to construct 47 single-family homes on approximately 10.23 acres. The project site is
located on the south side of Walnut Street west of an extension of Artesian Avenue. Please refer
to the Planning Commission Staff Report for additional discussion (Exhibit 2).
On February 21,2007, the Planning Commission opened the public hearing and received public
testimony on this matter. After a brief discussion, the Planning Commission considered a
motion to recommend approval of General Plan Amendment No. 06-01, Tentative Tract Map
No. 17754 (Subdivision No. 06-06) and Development Permit 3 No. 06-05. The Planning
Commission voted unanimously for the proposal. Commissioners Durr, Enciso, Hawkins,
Heasley, Longville, Mulvihill, Munoz, and Sauerbrun voted in support of the motion and
Commissioners Coute and Rawls were absent.
The Planning Commission was concerned about the architectural treatments for windows and
doors and requested that the treatments be consistently applied for all elevations (3600). The
Planning Commission made this a condition of approval for the project.
Although the proposed project will be completed in three phases, the Planning Commission
wanted to ensure that the amenities would be completed as part of Phase I. The project applicant
has agreed that the amenities would all be completed as part of Phase I, and this requirement has
been included in the Conditions of Approval.
e
e
e
GPA06-0//1TM/7754/DP306-05
Hearing Dale: 4.2/.07
Page 2
Subject to approval of the proposed General Plan Amendment, the proposed project complies
. with Development Code requirements and will enhance the character of the existing
neighborhood. The proposed project has been designed to incorporate architecture and amenities
that will improve the project site and will promote and implement the objectives Jllld policies of
the General Plan.
FINANCIAL IMPACT
None. The applicant paid the filing fees for the General Plan Amendment, Tentative Tract Map
and Development Permit applications.
RECOMMENDATION
That the Mayor and Common Council close the public hearing and:
1) Adopt the Resolution,
2) Adopt the Mitigated Negative Declaration and Mitigation Monitoring / Reporting Plan, and;
3) Approve Tentative Tract Map No. 17754 (Subdivision No. 06-06) and Development Permit 3
No. 06-05 based upon the Findings of Fact contained in the Planning Commission Staff
Report subject to the Conditions of Approval and Standard Requirements.
EXHffiITS:
I Location Map
2 Planning Commission Staff Report dated February 21,2007
Attachment A - Locational Map
Attachment B-1 - General Plan Amendment Area
Attachment B-2 - Site PlanlFloor PlanslLandscape Plan/Elevations
Attachment C - Conditions of Approval
Attachment D - Standard Requirements
Attachment E - Initial Study
Attachment F - Mitigation MonitoringlReporting Program
3 Resolution
e
EXHIBT 1
CITY OF SAN BERNARDINO PROJECT: GPA 08-0.
TTM 17754
PLANNING DIVISION DP3 06-05
LOCATION MAP
HEARING DATE: 2.21.07
J-..J
i~
~ lJ'I- r-
eo
-tt \
0
llWllIlllJill ~~~ ~ ~ ~ ~
I@IIIIIIII t::lc-'-" '\ ~~ J
'"
=I Ilr"~
i'j <( I '"
g - 71J
r-- .. r-....
~
~ "
~~rolect Site '
:i"'"/~%'--~ I III
~~~O
~~
(
\
I r= II I I1II Ul'T11--~ _
E p'N p:: r- II
r-- r--
-- r-- f--
r-'~Wl ::
I BITEr-
,illIlB = 11 ~
IlIIIID = - / J\
r 1 t :: ~
t- m r ,III
--Qi'lrnJi
nt,
\
\
/
I
a
(C) C~of San Bernardino..,
.., ..... 11 11 .
Ii
r-- .
t--
r-- r-
--
r-
is:. b
" - 1F111iJI
-
;II'
)
If I
REGON
..:...'
r
u
NORTH
llrw
~mrn
1=
a.
.....
-
~~l~
I-
--
-
e
e
e
EXHIBIT 2
SUMMARY
CITY OF SAN BERNARDINO PLANNING DMSION
CASE:
General Plan Amendment No. 06-01, Tentative Tract Map No. 17754
(Subdivision No. 06-06), Development Perri1it 3 No. 06-05
3
February 21, 2007
I
AGENDA ITEM:
HEARING DATE:
WARD:
OWNERAlPPLICANT:
Augustin Rodriguez
ANR Industries, Inc.
10702 Hathaway Drive, No. I
Santa Fe Springs, CA 90670
562-777-7807
REQUESTILOCATION:
General Plan Amendment No. 06-01
Change land use designation of 10.23 acres from IH, Industrial Heavy to RU, Residential Urban.
Tentative Tract Map No. 17754
Subdivide approximately 10.23 acres into 47 lots as a small lot subdivision with a minimum lot
size of 5,000 square feet.
Development Permit 3 No. 06-05
Construct 47 single-family homes with a minimum unit size of 1,826 square feet.
The project site is located on the south side of Walnut Street opposite of Artesian Avenue in the
IH, Industrial Heavy land use district.
CONSTRAINTS/OVERLAYS:
Flood Zone X (non-shaded), Alquist-Priolo Special Study Zone
ENVIRONMENTAL FINDINGS:
o No Significant Effect
o Negative Declaration
Iil Potential Effects, Mitigation Measures and Mitigation MonitoringlReporting Plan
STAFF RECOMMENDATION:
Iil Approval
Iil Conditions
o Denial
o Continuance to:
e.
e
e
GPA No. 06-01
17M No. 17754($ub. 06-06)
DP3 No. 06-05
Hearing Dale: 2.21.07
Page 2
REQUEST AND PROJECT DESCRIPTION
The applicant requests approval of General Plan Amendment No. 06-01 under the authority of
Development Code ~ 19.50 to change the land use designation of 10.23 acres from ill, Industrial
Heavy to RU, Residential Urban. Tentative Tract Map No. 17754 is proposed under the authority
of Development Code Section 19.66.070 to create a small lot subdivision with a minimum lot
size of5,000 square feet on the 10.23-acre site, and Development Pemrit 3 No. 06-05 is a
proposal to construct 47 single family homes with a minimum unit size (floor area) of 1,826
square feet, under the authority of Development Code Section 19.04.020, Table 04.01 (Q). The
project site is located on the south side of Walnut Street opposite Artesian Avenue in the ill,
Industrial Heavy, land use district (Attachments A, B-1 & B-2).
'The proposed General Plan Amendment would expand the existing RU, Residential U"rban land
use district from the north side of Walnut Street to cover the 1 0.23-acre project site, as needed to
permit the proposed development project. The RU land use district is intended to promote the
development of detached and attached units, at a maximum density of 8 units per gross acre and
a minimum lot size of 5,000 square feet. The overall gross density of the proposed project is 4.6
units per gross acre, and the minimum lot size proposed by Tentative Tract Map 17754 is 5,000
square feet. Private streets are proposed on site, with access from a main entry on Walnut Street.
The project is designed to accommodate 47 detached single-family homes in a gated residential
development to be constructed in 3 phases: 15 homes are planned with Phase I, 14 homes with
Phase II and 18 homes will be complete the project as Phase III. The project would provide 15%
(1.5 acres of) open space to include the following amenities: a park with BBQ areas and a tot lot
play area. The applicant proposes to construct a 6-foot decorative block wall around the
perimeter of the site, and to provide vinyl fencing between the homes.
The proposal offers a 2-story building design ~th 3 different model plans. Each model plan
offers 4 variations of finishes that include Spanish, Cottage, French and Traditional styles for a
total of 12 variety choices.
The three model plan layouts proposed for TIM 17754 are as follows:
Plan 1: 1,826 square feet (living area) with a 2-car garage (400 square feet) - 2-story
Plan 2: 2,035 square feet (living area) with a 2-car garage (400 square feet) - 2-story
Plan 3: 2,270 square feet (living area) with a 2-car garage (400 square feet) - 2-story
Plans 1, 2, and 3 offer custom options to convert a retreat area into a bedroom, or to convert a
loft into a bedroom. The proposed homes are wood frame/stucco construction with concrete tile
roofs. The homes will include distinctive exterior features, interior detailing, kitchen features,
and master suites. Architectural treatments include variations in roof style, front entry projections
and varied garage door designs. The homes include window treatments, automatic garage doors
and fully landscaped front yards, and common open space areas. The following illustrates the
distribution of model plans on the proposed project:
.
.
e
GPA No. 06-01
17M No. 17754(Sl/b. 06-IJ6)
DP3 No. 06-IJ5
Hearing Date: 2.21.07
Page 3
Plan I - (4bd/2-1I2ba) - 15 homes (32%)
Plan 2 - (4bd/2-1I2ba) - 14 homes (30%)
Plan 3 - (4bd/2-1I2ba) - 18 homes (38%)
TOTAL - 47 homes (100%)
SETTING/SITE CHARACTERISTICS
The project site consists of four parcels designated IIi, Industrial Heavy by the General Plan. The
site is located in the western portion of the City, and is currently vacant. Surrounding properties
are designated IIi, Industrial Heavy and RU, Residential Urban (Attachment B-1). The area is
characterized by older residential neighborhoods developed in the 1940' s and 1950' s.
Surrounding the site to the north are existing residences in the RU land use district. To the east
abutting the site are vacant lots in the IIi district, and to the west are existing industrial uses in
the IIi district. Vacant parcels abutting the site to the south are designated IIi.
The project site is also located in an Alquist-Priolo Earthquake Fault Zone, and the San Jacinto
fault was located in the southwestern comer of the site. A geotechnical analysis and fault surface
rupture hazard study was prepared in compliance with Alquist-Priolo requirements. These
studies have been reviewed and approved by Dr. Floyd Williams, City Geologist, and the
recommended mitigation measures (Attachment F) have been incorporated in the project design.
BACKGROUND
The DevelopmentlEnvironmental Review Committee (D/ERC) first reviewed the proposal on
November 2, 2006 and moved the project to Planning Commission, pending minor map revisions
and environmental review.
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
Hogle-Ireland, Inc. prepared an Initial Study on behalf of the project applicant. The
Environmental Review Committee independently reviewed, analyzed, and exercised judgement
in reviewing the Initial Study and approved its release for public review pursuant to the Public
Resources Code and CEQA guidelines. The Initial Study and Draft Mitigated Negative
Declaration (MND) were circulated for public review from November 9, 2006 through
November 29, 2006. No comments were received.
FINDINGS AND ANALYSIS - GENERAL PLAN AMENDMENT
1.
Is the proposed amendment internally consistent with the General Plan?
Land Use Policy 2.5.6 requires that new development be designed to complement and not
devalue the physical characteristics of the surrounding environment. The proposed
project will complement the adjacent existing residential neighborhood by developing an.
in-fill property with detached single-family units. Community Design Policy 5.6.4
requires that private and common open space amenities be provided on-site, and the
proposal is consistent with this policy, as evidenced by its compliance with the
Development Code standards for Small Lot Subdivisions.
e
e
e
GPA. No. 06-01
17M No. I 7754(SlIb. 06-06)
DP3 No. 06-05
HeDring Date: 2.21.07
Page 4
2.
Is the proposed amendment detrimental to the public interest, health, safety,
convenience, or welfare of the City?
The proposal would not pose any threat to the public health, safety and welfare of the
City in that the proposed residential project would be required to comply with all
applicable provisions of the Development Code, Chapter 19.04, Residential Districts. The
proposal would be developed consistent with the RU land use district for detached single-
family uses. The proposed amendment would allow development of a comprehensive
residential project, compatible with the 95-unit condominium project proposed on the
north side of Walnut Street, in the interest of the public..
3.
Does the proposed amendment maintain the appropriate balance of land uses within the
City?
The property is adjacent to other residential uses in the RU land use district and is
consistent with the General Plan Policies as described in Finding No. I. The proposal
would provide additional opportunities for housing development, and would not
adversely impact the balance of land uses within the City. The site consists of only 10.23
acres, therefore it is not significant to the existing balance of land uses. The applicant
proposes to promote land use consistency by extending the existing RU district to include
the project site. The proposal will prevent potential land use conflicts that could occur
under the existing General Plan which designates the subject site Industrial Heavy, while
most adjacent projects are designated RU, Residential Urban.
4.
Is the subject parcel physically suitable (including, but not limited to, access, provision of
utilities, compatibility with adjoining land uses, and absence of physical constraints) for
the requested land use designation and anticipated land use developmeni?
All agencies responsible for reviewing access, and providing water, sanitation and other
public services have had the opportunity to review the proposal, and none have indicated
an inability to serve the project for residential uses. The proposed amendment area is
bounded by existing, dedicated streets and existing infrastructure suitable for urban
development. All future residential development proposals for the site must conform to
applicable provisions of the Development Code for setbacks, lot coverage and height
requirements. There are no physical constraints on the site that would preclude
development of the site as proposed.
FINDINGS AND ANALYSIS - TENT A TIVE TRACT MAP
1.
Is the proposed map consistent with the General Plan?
The proposed subdivision map is consistent with the General Plan and Development
Code. The map created will meet development criteria as shown in Table "A":
.
.
.
GPA No. 06-01
7TM No. 17754(Sub. 06-06)
DP3 No. 06-05
Ht!lJring Date: 2.21.07
Page 5
TABLE' A' -- DEVELOPMENT CODE AND GENERAL PLAN CONFORMANCE
CATEGORY PROPOSAL DEVELOPMENT CODE - GENERAL .
PLAN
Pennitted Use Small Lot Subdivision Permitted Consistent
Lot Size 5,000 sq.ft. 5,000 sq.ft. N/A
Density 4.6 units/ac. 8 units/ac. 9 units/ac.
ODen SDace 15% 15% Consistent
Access 2 standard means 2 standard means Consistent
2.
Is the design of the proposed subdivision consistent with the General Plan?
The proposed subdivision is consistent with the General Plan. The Land Use Element
(Table LU-2) describes the intended uses for the Residential Urban land use district as
single or multi-family residences in a high quality urban setting. Land Use Policy 2.7.5
requires that development be contingent upon the ability of public infrastructure to
provide sufficient capacity to accommodate its demands and mitigate its impacts. Land
Use Goal 2.2 promotes development that integrates with, and minimizes impacts on,
surrounding land uses. Community Design Policy 5.5.1 requires new and in-fill
development to be of compatible scale .and massing as existing development. The
proposed development will implement these goals and policies of the General Plan.
3.
Is the site physically suitable for the type of proposed development?
The site is physically suitable for single-family dwellings within a small lot subdivision,
as evidenced by compliance with all standards noted in Table A. Each proposed lot will
provide adequate area for a detached single-family unit, and will have direct access to an
improved private street. Extensions of the existing infrastructure in the vicinity will
provide water, sewer, drainage, and utility services to each unit. There are no physical
constraints that would preclude development of the site as proposed.
4.
Is the site physically suitable for the proposed density of development?
. The project site is approximately 10.23 acres in area. The General Plan allows up to 9.0
units per gross acre in the RU district, and the proposed subdivision is for single-family
development at 4.6 units per acre. The proposal meets all applicable development
standards for setbacks, lot coverage, landscaping, access, drainage, utilities, etc. The
proposed project would be compatible with the scale and character of the surrounding
neighborhood, and would enhance existing conditions in the project area. Therefore, the .
proposed density of development is suitable.
e
e
e
GPA No. 06-01
1TM No. 17754(Sub. 06-06)
DPJ No. 06-05
Hearing Date: 2.21.07
Page 6
5.
Is the design of the subdivision likely to cause substantial environmental damage. or
substantially and unavoidably injure fISh or wildlife or their habitat?
An Initial Study was prepared according to the CEQA Guidelines to determine the
presence and extent of any environmental impacts that could result from development.
The project site is surrounded by urban land uses. Mitigation measures have been
included in the Initial Study to ensure that environmental effects will not be significant.
The site has been disturbed and currently does not contain any sensitive habitat, therefore
the proposed project is not likely to cause substantial environmental damage or injure fish
or wildlife or their habitat.
6. Is the design of the subdivision likely to cause serious public health problems?
There are no environmental or other conditions on the site that are likely to cause serious
public health problems. The design of the subdivision meets the requirements of the
Subdivision Map Act, the General Plan, and Development Code. This project will be
subject to the Mitigation MonitoringlReporting Plan (Attachment F) which contains
mitigation measures to ensure that no serious public health and safety problems will
occur as a result of the project. All potential impacts of the project will be adequately
mitigated by the measures incorporated as Conditions of Approval.
7.
Will the design of the subdivision or the type of improvements conflict with any
easements, acquired by the public at large. for access through or use of, property within
the proposed subdivision?
The design of the subdivision and the proposed improvements will not conflict with any
easements that cannot be maintained or relocated. All documentation relating to
easements and dedications will be reviewed and approved by the City Engineer prior to
recording the Final Map.
FINDINGS AND ANALYSIS - DEVELOPMENT PERMIT TYPE ill
1. Is the proposed development permitted within the subject zoning district and does it
comply with all of the applicable provisions of the Development Code. including
prescribed development/site standards and any/all applicable design guidelines?
The proposed development is consistent with the General Plan and Development Code, in
that the RU, Residential Urban, land use district allows residential units at a maximum
density of 8 units per gross acre. The proposal is for development of detached single-
family homes on a small lot subdivision. All proposed homes meet the RU development
standards as shown in Table "B".
e-
e
e
GPA No. 06-01
17M No. 17754(S..b. 06-06)
DPJ No. 06-05
Hearing Date: 2.21.07
Page 7
T LE "8" D I
Cod/Ge
IPI C fi
AD - eve ooment e oera an on ormanee
CATEGORY PROPOSAL DEVELOPMENT GENERAL PLAN
CODE -
Permitted Use Small Lot Subdivision Permitted Pennitted
Density 4.6 dulac. 8 dulac. 9 dulac.
Setbacks
- Front 20 feet average 20 feet average
- Side 5 feet 5 feet min. N/A
- Rear 15 feet 15 feet min.
- Side Street 15 feet 15 feet min.
Unit Size 1,826 s.f. to 1,200 s.f. min. N/A
2,270 s.f.
Height 2 stories (24 feet) 2 stories (35 feet) N/A
2. Is the proposed development consistent with the General Plan?
The proposed use is consistent with a number of General Plan goals and policies.
Community Design Policy 5.5.1 requires new and in-fill development to be of compatible
scale as existing development. Community Design Policy 5.5.6 requires a variety of
architectural styles, massing, floor plans, f~ade treatment, and elevations. Community
Design Policy 5.5.7 states a preference for a diversity of floor plans, setbacks, colors, and
rooflines. Land Use Policy 2.5.4 requires that all new structures achieve a high level of
architectural design and provide careful attention to detail. The design of the proposed
development will implement these goals and policies of the General Plan.
3.
Is the proposed development harmonious and compatible with existing and future
developments within the land use district and general area. as well as the land uses
presently on the subject property?
The proposed project is consistent with the residential character of surrounding land uses,
as well as future residential development proposed adjacent to the site. The proposed
single-family units will be compatible with the existing single-family units in this area.
The design and character of the proposed development will enhance the existing
conditions in the neighborhood.
e
e
e
GPA. No. 06-01
TTM No. 17754(Sub. 06-06)
DP3 No. 06-05
Hurillg Dale: 2.21.07
Page 8
4.
Is approval of the Development Permit for the proposed development in compliance with
the requirements of the California Environmental Quality Act and Section 19.20.030(6)
of the Development Code?
Approval of this Development Permit is in compliance with the requirements of the
California Environmental Quality Act and Development Code Section 19.20.030 (6)
pertaining to environmental resources and constraints. Approval of the proposed project
would not result in any significant effects relating to services or infrastructure capacity.
This is because the necessary infrastructure is in place or will be installed to handle the
anticipated demand resulting from this proposed project. It is anticipated that the impacts
relating to traffic, noise, air quality, biological and cultural resources, geology & soils, _
water quality, and land use would be less than significant with implementation of the
proposed mitigation measures contained in the MitigationIMonitoring Reporting Plan
(MMRP) in Attachment F.
5.
Will there be potential significant negative impacts upon environmental quality and
natural resources that could not be properly mitigated and monitored?
No significant harmful effects on the quality of the environment or on natural resources
will result from of this project. The project site has no habitat value for endangered or
threatened species. Although the site is located in a fault zone, the City Geologist has
reviewed and approved the geotechnical studies prepared for the site in accordance with
the Alquist-Priolo guidelines and requirements. The site can be adequately served by all
required utilities and public services. Therefore, no significant impact on environmental
quality is anticipated. .
6.
Is the subject site physically suitable for the type and density/intensity of use being
proposed?
The site is physically suitable for the type and density/intensity of the project being
proposed as evidenced by project compliance with all applicable Development Code
Standards as noted in Tables "A" & "B".
7.
Are there adequate provisions for public access, water, sanitation, and public utilities
and services to ensure that the proposed use would not be detrimental to public health
and safety?
All agencies responsible for reviewing access, and providing water, sanitation and other
public services have all had the opportunity to review the proposal, and none have
indicated an inability to serve the project. The proposal will not be detrimental to the
public health and safety in that compliance with all applicable Codes will be required in
the development of this project.
e.
e
e
GPA No. 06-01
17'M No. 17754(Sub. 06-06)
DPJ No. 06-05
Hearing Date: 2.21.07
Page 9
8.
Are the location, size design and operating characteristics of the proposed development
detrimental to the public interest, health, safety, convenience, or welfare of the City?
The proposal is consistent with all provisions of the Development Code for RU
development standards. The proposed single-family units will be compatible with the
single-family units developed in the area. The home designs will complement the
neighboring single-family structures. Architectural treatments include variations in roof
style, entry area and garage door designs. All windows and doors and side and rear
elevations will be architecturally treated. The proposed project will not be detrimental to
the public interest or welfare of the City in that the development will provide a new high
quality development to revitalize an existing neighborhood.
CONCLUSION
The proposal satisfies all Findings of Fact for approval of General Plan Amendment No. 06-01,
Tentative Tract Map No. 17754 (Subdivision No.06-06) and Development Permit 3 No. 06-05.
RECOMMENDATION
Staff recommends that the hearing be closed and that the Planning Commission recommend that
the Mayor and Common Council independently review, analyze and exercise judgement in
consideration of the Initial Study and in making a determination, and that they:
1. Adopt the Mitigated Negative Declaration and Mitigation MonitoringlReporting Plan
(Attachment F),
2. Approve General Plan Amendment No. 06-01 based upon the Findings of Fact contained
in this Staff Report, and;
3. Approve Tentative Tract Map No. 17754 (Subdivision No. 06-06) and Development
Permit 3 No. 06-05 based upon the Findings of Fact contained in this Staff Report and
subject to the Conditions of Approval (Attachment C) and Standard Requirements
(Attachment D).
Respectfully Submitted,
~t.~
Valerie C. Ross
Drrector of the Development Service Department
e
e
e
)
a
Senior Planner
Attaclunent A
Attaclunent B-1
Attaclunent B-2
Attaclunent C
Attaclunent D
Attaclunent E
Attaclunent F
Location Map
Proposed General Plan Amendment
Site Plan/Phasing Plan/Floor PlanslElevations
Conditions of Approval
Standard Requirements
Initial Study/Mitigated Negative Declaration
Mitigation MonitoringIReporting Plan
GPA No. 06-01
17M No. 17754(Sub. 06-06)
DP3 No. 06-05
Hearing Date: 2.21.07
Page 10
e
e
e
ATTACHMENT A
CITY OF SAN BERNARDINO PRO.JECT: GPA 06-0.
TTM 17754
PLANNING DIVISION DP3 06-05
LOCATION MAP
it
HEARING DATE: 2.21.07
NORTH
~ I"~ '" ~' - ill
- I
-
T IT =I~' ~- .~ - ~..
...,. I::IJ
- '\ / l~ ~";II II i ~
=c: 31 'b' ~
; '--
<( ~ . ~ ,
8 ill' !-
,...........nl
i~ - '7Ii REOON, - rL-
III W I~ ~ ~~
Ub '-- "
~
0 ~f IIII IT I IIII~
1.
~
ffiI ~ .L.... -
:/~
0 -/ ject s\te - =
/, pro. - -
~~~ '"
I lL .1-
- ........ -
f- -
8?~~ I - -
~ ........ _.
.~
a / ffiffid t:: ill - II-
'\ 1/ ~ -[)H'\
.~
J -
-
-
t- !!! ---
- ~EmUT ~ IT;
\ m >--
/I 1
Mil ...I~
...... I- -
Ii I-
(ClCi\ofSan Bernardino. .- -
~ .~ ....l.~.. .. -
e
e
e
ATTACHMENT B-1
CITY OF SAN BERNARDINO PROJECT: GPA 06-01
NORTH
u
PLANNING DIVISION
LOCATION MAP
LAND USE DISTRICTS HEARING DATE: 2.21.07
WJillIIIIII HA " . .. \\~ I u--; mm
III . rf[J.J~ ~tm ~I~ ~mrn
- WF "c, -lIt ~ a~ I II llil ill
~ ' .1~E I'.... -' I , _
'"""" -' ~
,~ ~ ":fl ff'- llEG.O -..;:: = ===
~ \ ~ T.w.!o!III lit '/II I~ 1= IIII II TrlIr -
\.. - HtN Em~
o~ }I I E L1lJ~ t::l:Il:::
~ \ 0 0 - }~ ;;;]1 ::}J~ ~
n
1, \; ~ ~N
1'- I
r T III I
I
r
,~
~
-
I:
IE
(C} CitY. of San Bernardino.,
... ....;a... f" J1 l..
/
-
T
Legend:
~
Proposed IH to RU Area (10.23 acres)
Parcels: 0274-031-17, 18, 19 & 20
--
i;
w'i.
I~il
ATIACHMENT B-2 : .. -
~-~.....
4
i! ;
-I
I .!II!
io:~li
1,1 i.iI
~H
I
~
1::,
~;:
0'"
:t ~ ~
~~;
t;..~
~~n
~~p
~e "
~~
~8
tit
I
II ~ !:
11--; i..ii: II I!
~ I , 'i III II'
I Ii! i' ~ I~
-- !I" I I'. II
ZI!!!!!S~
J!
I I,.
, 111'i
~ 1111
i
I
I! ..
1m,'..:! Iii;!
/I:! II
--
'V
l.C)
I'-
I'-
T""
d~
Z~
..J
a..Q.
<(~.;,
(iiO
:2: I- ci
;:iEz
I-a:z
e
I- <;:)
~lI) ~ Ir, .
Wi= . .1111' .
>0 ,III
'II
_z ~ II,
1-8 I'll
<( . '11111
I- ..,~
Z ~II
II
W 'r II
l- t'
- 11 I,
r.-1
. 1IlI
I'll
dll
I'll
d II .'
t~_~l
iJJl
-'
I
I'
, I 1
t I Iii
m. '1
;;~.I; ,.
~-.-
! i I
ilil II
'gil ·
I !
:l; I
~i
e,
, I!
i II I' i I' I II
iii. II~ :i .1: l~ II II
;m ~III II~f 1'1 liU '1 Y!i I~I
nn IliI!lIlillllllillll!lllll Ifill ti
e.
e
e
;;.
-. -... -
il I . I~~~
-,
I "i ;ZI!!!!5~ . i I
.,
-- I I III.; . I ~ ~
; I I ~ ,: 111 , I ~II ~
."i'11 4 -, ,!. . ~l ~,.
I Ii d
I! -- . i ~ i I ;: I;, ~;111 ili · I ij' ~~
I ilil '11;I!r,"~I, 0) iill t;
-- II ! II t J II, I, 1.11I Imll! III. I ," ~ <J
I ~H
,/-:..._-<~...
.'':>,.'
I
111 I~
.... '1
j5!S ..
! I
ii I
I:~ -j
,
I
I !
~ i
~
I I I: .! J II . to i
II 1111 Ii II 111'1: vi II 11111; wi 1I I!~
~ "~;, j' ., "lillll j' II !Il~ j' II II;.
II Iii ;lli II lillllli,llli II lillll'i; II fil ;I~i
I' ""II' · ," II .. · "111' ,Ii,'
I:, " ~I 1_. ,I . _, I:. ,5 _I ., 1_,...
~I !;I !iClti !jl !i~If;llli !;I !i;;ii Ii ~ lei
I:, ~ ili~ =1 I'lilill',; II 1'1i1;:.I II ~ Iii
" '1'; ~l~ , Ojl ; ~ig~1 'I Ojl; ~I!I, ..' :w.
!I i Iii lim i~ i Iii Iillni il! i Iii 1m! i~ i Iii liel
.
, I:
i Iii! lit! ~i !.! ~ L I~ .
;m .1111 .Iill 1'1 IiU li:1 g!~ r'
1m 1151!'1151"11111111!I11~11 lib .il
e.
e
e
i; I:
I .Ir' 'z~..1 I
Ire! . l l I
I I! ~ I: till I I .!Ill ~ i
!. un I I II 'I - I! I ! I - ill ~ ~
P -- r ii II i I; i: ;l! ~;;II il; III i ; Iii' ~ ~
_!-l II i "lllIi :. ~ II! I~ .!!!! t!le I!! I hi! 0 ~!! ~ I u
.H
,
1
+
I
~II
il::
.III
~
III
j!i:
,,~
I
Ii II
ll.J
'III
iLII
~ G1111
i iii, II
9 .111
~ I,
. c I
'I .
'11'11 " '
III '
"II
1111,
I'll
11111
, 'I~'II'
1111'
~ II
I II
"
iI I
IH
illI
1'11,:, _
dll ' -,!
I'll'
IIII~
tUJ, .
, j ~~
I. J! .! ; II: . II: i ~
I :1 llil:l :1 i!1:W=III:! li", ill~:! :1 11'1i II " SI
. .. ~I' " " '1'!l1 I " :1111, " I!I
. I! Ii, !!Ii II Ii, l!lilll! I! fl, ;II~; I! 6, iP.! I I!
II I:. 1;91'1 I., 1;li~ ' '1 I., ~1!1!" .:0 '8i ! I
!l !II lill.ll" !il !i1il;IIII' !il !i11i II' !!I 1.11 I II Iii I' L '
l !h . ii! I I!I . ii" ; !h i;::; I !:i e!i I. I. ~I .I~ I~
.i Ildl!l: .11 ..dbil~' 5 III :blll all III :IP' ;m ~~ L I, H I. ~I I
I !Ii i i! iI! i i lll!d i iii Ell i!i Ii ibr 1IIl11~~!.1 !~d.fMid Ii III
-,
--
.-.{i:7,'..//--...~.:..-..
- ."-
I"'~'"
.m'l
,j:!S ..
:
. I
!' I
il.111
I Iii
.-'!L I~s
.~~
is
!i
,
"
"
-
e
,"j~it.:
-"~"4:'
""/f't.'.Il'''ll'''''
~~~~f1:;
. '\
e
-'.-"
"'i_'
e
I
01
~
'" ~
Z
0 :c:
.... ~i
<
>
""
...J ~i
""
-
z ~
<
...J ~
...
~
e.
,
,
I
I
I
,
~I
,
01
i~OOD. ~
I~ - i
;
,
I
,
1'--
o
e
~
HI
"',t11
I:
I'
"
"
"
"
"
-\1
,
,
,
,
,
g ---
..._~
:::::f. --
.:::=~~
,
I .'
I,---rt~.;._-
->, ~f; :
I' l5 I
-' ,
,
i i1I-------~
=~~~
;t
3 ci'~
I~st
fil~-~
i-..
It,
-"
. z::
..c
p~
~-----------------------------------.
, ,
, ,
, ,
, ,
, ,
, ,
, ,
, ,
, ,
, -,
, ,
, ,
, ,
; , I
~ ' "'~ :
1 '~Ii----- ~
, ,
,
,
,
.._____________4
,
,
,
,
,
,
,
,
,
,
e
,
'~""
~
!
~~
~~
/:l.J
i
~
~
'" ~
z
0 :t::
e ..... ~i
-<
>
....
-' ~l
....
c. <:3
z
-< ~
-'
....
~
e.
e
j
.11
i
~
e.
.- --:r
, '
:1
tl.
I,
I,
I,
I,
I,
i
e
i------------------.-----------
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,I
,
,
,
------,
, ,
, ,
ir/ l
,/,..... t :
~.
Ui
,
I
.. " I
" '
, ~ ,
'''jt__n :
. ,
. ,
,
,
,
r---------...
,
,
,
,
,
,
,
,
, '
, ,
,
~
~
III
~
.!
n
:
Oi
;t
5 ~2
1ii .., Sf
~ ~~
i c<':;
i I~
C'I"
..
Z!::
~~
~
~
::c:
~.
~~
'l)
C3
~
~
~
'" ~
z
0 :r:
-
tit ..... ~.
<(
>
"-l ~~
.....
"-l j:l.,i
..., Cl
z
<( ~
.....
...
~
"'''t
e
e
~...-
---
i
HI
e-
e
e
!
Oi
i~
..
I
III
~
t
.
.
;t
5 g-i2
~ olil
! ~~
i ,tj
,..,..
z~
-<
~;;:
,
,
-.,
I'
"
"
I'
"
I'
I'
I'
"
"
I'
I'
I'
"
,
~"
di
-<C
...
~i
---j
..._ ________l :
. ' ,
, ,~: '
" ; .- t
,. '
, '
" :
,
r-----
,
,
,
n f
,
,
,
,
~
~
::r::
~i
~i
~
~
~
e
ATIACHMENTC
REVISED CONDITIONS OF APPROVAL
Tentative Tract Map No. 17754 (Subdivision No. 06-06)
& Development Permit 3 No. 06-05
1. This approval is to subdivide approximately 10.23 acres to create a samll lot
subdivision with a minimum lot size of 5,000 sqare feet and construct 48 detached
single family units with a minimum unit size of 1,826 square feet. The project
site is located on the south side of Walnut Street opposite of Artesian Avenue in
the RU, Residential Urban land use district.
2. Within two years of this approval, the filing of the final map with the Council
shall have occurred or the approval shall become null and void. Expiration of a
tentative map shall terminate all proceedings and no final map or parcel map shall
be filed without first processing a new tentative map. The City Engineer must
accept the final map documents as adequate for approval by Council prior to
forwarding them to the City Clerk. The date the map shall be deemed filed with
the Council is the date on which the City Clerk receives the map. The review
authority may, upon application filed 30 days prior to the expiration date and for
good cause, grant an extension to the expiration date pursuant to Section
19.66.170 of the Development Code and the State Map Act.
e
Project:
Expiration Date:
Tentative Tract Map No. 17754
April 2, 2009
3. Within two years of development approval, commencement of construction shall
have occurred or the permit/approval shall become null and void. In addition, if
after commencement of construction, work is discontinued for a period of one
year, then the permit/approval shall become null and void. However, approval of
the Development Permit does not authorize commencement of construction. All
necessary permits must be obtained prior to commencement of specified
construction activities included in the Conditions of Approval and Standard
Requirements.
Project:
Expiration Date:
Development Permit 3 No. 06-05
April 2, 2009
e
e
e
e
TTM No. 17754
DPIII No. 06-05
Hearing Date: 2121/07
Page 2
4.
The review authority may grant a one-time extension, for good cause, not to
exceed 12 months. The applicant must file an application, the processing fees, and
all required submittal items, 30 days prior to the expiration date. The review
authority shall ensure that the project complies with all Development Code
provisions in effect at the time of the requested extension.
5.
In the event this approval is legally challenged, the City will promptly notify the
applicant of any claim, action or proceeding and will cooperate fully in the
defense of this matter. Once notified, the applicant agrees to defend, indemnify
and hold harmless the City of San Bernardino (City), the Economic Development
Agency of the City of San Bernardino (EDA), any departments, agencies,
divisions, boards or commission of either the City or EDA as well as
predecessors, successors, assigns, agents, directors, elected officials, officers,
employees, representatives and attorneys of either the City or EDA from any
claim, action or proceeding against any of the foregoing persons or entities. The
applicant further agrees to reimburse the City for any costs and attorneys' fees
which the City may be required by a court to pay as a result of such action, but
such participation shall not relieve applicant of his or her obligation under this
condition.
The costs, salaries, and expenses of the City Attorney and employees of his office
shall be considered as "attorneys fees" for the purpose of this condition.
As part of the consideration for issuing this permit, this condition shall remain in
effect if this Tentative Tract and/or Development is rescinded or revoked, whether
or not at the request of applicant, and variety in floor plans, elevations, and
materials.
6. Any This permit or approval is subject to all the applicable provisions of the
Development Code in effect at the time of approval. This includes Chapter 19.20
_ Property Development Standards, and includes: dust and dirt control during
construction and grading activities; emission control cif fumes, vapors, gases and
other forms of air pollution; glare control; exterior lighting design and control;
noise control; odor control; screening; signs, off-street parking and off-street
loading; and, vibration control. Screening and sign regulations compliance is
important considerations to the developer because they will delay the issuance of
Certificates of Occupancy until they are complied with. Any exterior structural
equipment, or utility transformers, boxes, ducts or meter cabinets shall be
architecturally screened by wall or structural element, blending with the building
design and include landscaping when on the ground.
e
1TM No. 17754
DPIII No. 06-05
Hearing Dale: 212//07
Page 3
7.
Any change in elevation or building pad height of 6" or more along the perimeter
of the tract/parcel map will require approval by the Planning Commission. Any
change in elevation or building pad height of I-foot or more on interior lots will
require approval by the Planning Commission. The applicant's/owner's engineer
will certify the elevation of the building pads to the City Engineer, prior to
construction of the building foundation.
8. Submittal requirements for permit applications (building, site improvements,
landscaping, etc.) to the BuildingIPlan Check Division and the Public
WorkslEngineering Division shall include all Conditions of Approval and
Standard Requirements issued with the Tentative Parcel Map and Development
Permit. The Landscape Plan shall be approved by the City Engineer prior to
issuance of a grading permit. Submit 5 copies to the Engineering Division for plan
check.
9. Construct a 6-foot decorative block wall around the perimeter of the site, and
provide vinyl fencing between the homes.
10.
The applicant shall post a bond in an amount equivalent to the cost oflandscaping
including landscape installation and one year of maintenance service. The purpose
of the bond is to ensure that all landscaping survives the planting process and last
for a period of at least one-year. The bond will be released no sooner than one-
year after issuance of the final Certificate of Occupancy and only after such time
as the survival of the landscaping has been verified by City staff.
e
II. (*) The applicant shall provide at least 15% of the dwelling units in the
development at affordable housing cost to persons and families of low or
moderate income and such units shall be occupied by these persons or families in
compliance with Health and Safety Code Chapter 4, Article 9, Section 33413 (b)
(2) (A) (i).
12. (*) The amenities on site shall be completed as part of Phase 1.
13. (*) The architectural treatments for windows and doors shall be consistently
applied for all elevations (3600).
14. All mitigation measures described in the Initial Study and Mitigation
Monitoring/Reporting Plan (Attachment F) shall be applicable and are hereby
incorporated by reference as conditions of approval.
IS. No final Certificate of Occupancy shall be issued until all conditions of approval
have been completed.
e
e
ITM No. 17754
DP1I1 No. 06-05
Hearing Dale: 2/21/07
Page 4
16.
This permit or approval is subject to the attached conditions or requirements of
the following City Departments or Divisions:
a. Public Works Division
b. Building & Safety
c. Fire Department
d. Public Services
e. Water Department
(*) Modified by the Planning Commission on February 21,2007.
e
e
e-
e
e
ATTACHMENT D
CITY OF SAN BERNARDINO
Development Services Department - Public Works Division
Standard Requirements
Description: 47 unit smali lot SFR subdivision
Applicant: San Marcos Paloma Homes. LLC
Location: Walnut & Artesian
Case Number: Tr. 17754 & DP3 06-05
1. Drainaae and Flood Control
All necessary drainage and flood control measures shall be subject
to requirements of the City Engineer, which may be based in part
on the recommendations of the San Bemardino County Flood
District. The developer's Engineer shall furnish all necessary data
relating to drainage and flood control.
A local drainage study will be required for the project. Any drainage .
improvements, structures or stonn drains needed to mitigate
downstream impacts or protect the development shall be designed
and constructed at the developer's expense,. and right-of-way
dedicated as necessary.
c) The retention basin shall be designed in accordance with
"Detention Basin Design Criteria for San Bernardino County." The
basin shall be designed to contain the run-off from the 100-year
five-day stonn and will percolate dry within 72 hours. The
percolation rate used for draining the retention basin shall be
supported by the results of a percolation test with an appropriate
safety factor applied.'
a)
b)
d) All drainage from the development shall be directed to an approved
public drainage facility. If not feasible, proper drainage facilities
and easements shall be provided to the satisfaction of the City
Engineer.
e)
If site drainage is to be outletted into the public street, the drainage
shall be conveyed through a parkway culvert constructed in
accordance with City Standard No. 400. Conveyance of site
drainage over the Driveway approaches will not be pennitted.
e.
e
e
Project: Tr. 17754 & DP3 06-05
Page 2 of9
A Water Quality Management Plan (WQMP) is required for this
project. The applicant is directed to the City's web page at
www.ci.san-bemardino.ca.us - Departments - Development
Services - Public Works for templates to use in the preparation of
this plan.
g) A Storm Water Pollution Prevention Plan (SWPPP) will be required.
The applicant is directed to the City's web page at www.ci.san-
bemardino.ca.us - Departments - Development Services - Public
Works for templates to use in the preparation of this plan.
f)
h) The City Engineer prior to issuance of a grading permit (if required)
shall approve the WQMP and the SWPPP.
i)
A "Notice of Intent (NOI)" shall be filed with the State Water
Resources Control Board for construction disturbing 1 acre or more
of land (including the project area, construction yards, storage
areas, etc.).
The City Engineer, prior to grading plan approval, shall approve an
Erosion Control Plan. The plan shall be designed to control erosion
due to water and wind, including blowing dust, during all phases of
construction, including graded areas which are not proposed to be
immediately built upon.
j)
2. Gradina and Landscapina
a) The grading and drainage plan shall be signed by a Registered
Civil Engineer and a grading permit will be required. The grading
plan shall be prepared in strict accordance with the City's "Grading
Policies and Procedures" and the City's "Standard Drawings",
unless otherwise approved by the City Engineer.
b) A separate rough grading plan is recommended, but may be
incorporated into the precise grading plan.
c) Pad elevations shown on the rough and/or precise grading plan
shall not vary more than one-foot for interior pads or one-half foot
for exterior pads from the pad elevations shown on the tentative
tract map as approved by the Planning Commission. Exterior pads
are those pads immediately adjacent to existing streets or existing
residential areas.
d)
If more than 5 trees are to be removed from the site, a tree removal
permit conforming to the requirements of Section 19.28.090 of the
Development Code shall be obtained from the Department of
S:\PLANNING\PC SUln" Rc.1xnu\2007'tI2.21.l)i\TTM L 77S4\PW's Final.doe
02l15lll7
e
e
Project: Tr. 17754 & DP3 06-05
Page 3 of9
e)
Development Services-Planning Division prior to issuance of any
grading or site development permits.
If more than 5,000 cubic yards of earthwork is proposed, a grading
bond will be required and the grading shall be supervised in
accordance with Section 3317.2 of the Califomia Building Code.
If more than 1,000 cubic yards of earth is to be hauled on City
Streets then a special hauling permit shall be obtained from the City
Engineer. Additional conditions, such as truck route approval,
traffic controls, bonding, covering of loads, street cleaning, etc. may
be required by the City Engineer.
One 4' x 11' PCC pad at least 4" thick shall be provided in tne rear
or side yard area of each lot for storage of recycling containers.
The pad shall be screened from public view and a 3' wide concrete
walkway shall be provided from the driveway to the pad. All gates
along the access way shall have a clear width of 3'-6" minimum.
f)
g)
h)
Perimeter walls, if required, shall be included on the rough grading
plan and will be part of the rough grading permit issued by the City
Engineer.
i)
Retaining walls, block walls and all on-site fencing shall be
designed and detailed on the on-site improvement Plan. This work
shall be part of the on-site improvement permit issued by the City
Engineer.
j) All walls shall be Constructed of decorative block with architectural
features acceptable to the City Planner.
k) Interior fencing material within 5 feet of any structure shall be either
non-combustible or 1-hour fire rated. Vinyl fencing is not allowed
within 5 feet of the structure.
I) The project Landscape Plan shall be reviewed and approved by the
City Engineer prior' to issuance of a grading permit. Submit 3
copies to the Engineering Division for Checking.
m) The public right-of-way, between the property line and top of curb
(also known as "parkway") along adjoining streets shall be
landscaped by the developer and maintained in perpetuity by the
property owners association. Details of the parkway landscaping
shall be included in the project's on-site landscape plan.
e
S:\PLANNING\P(' Stnfl"R'1\OrtS\2007'it12.21.tJ7\TTM 17754\PW's Final.doe
021 15m
e.
e
e
Project: Tr. 17754 & DP3 06-05
Page 4 of9
3.
Utilities
a) Design and construct all public utilities to serve the site in
accordance with City Code, City Standards and requirements of the
serving utility, including gas, electric, telephone, water, sewer and
cable TV (Cable TV optional for commercial, industrial, or
institutional uses).
b) Each parcel shall be provided with separate water and sewer
facilities so the City or the agency providing such services in the
area can serve it.
c) Backflow preventers shall be installed for any building with the
finished floor elevation below the rim elevation of the nearest
upstream manhole.
d) Sewer main extensions required to serve the site shall be
constructed at the Developer's expense.
This project is located in the sewer service area maintained by the
City of San Bemardino therefore, any necessary sewer main
extension shall be designed and constructed in accordance with the
City's "Sewer Policy and Procedures" and 'City Standard Drawings.
Utility services shall be placed underground and easements
proVided as required.
g) A street cut permit, from the City Engineer, will be required for utility
cuts into existing streets.
e)
f)
h) All existing overhead utilities adjacent to or traversing the site on
either side of the street shall be undergrounded in accordance with
Section 19.20.030 (non-subdivisions) or Section 19.30.110
(subdivisions) ofthe Development Code.
i) Street lights on private streets shall be designed and installed in
accordance with the City's street lighting design guide and policy.
The policy is available. on the City's website.
j) Existing Utilities which interfere with new construction shall be
relocated at the Developer's expense as directed by the City
Engineer, except overhead lines, if required by provisions of the
Development Code to be undergrounded. See Development Code
Section 19.30.110 (subdivisions).
S:\PLANNING\PC Smfi' Rtpons\2007\j)2.21.U7\TIM !7754\PW'. Fmal.cIoo
02llSlll7
-
e
e
Project: Tr. 17754 & DP3 06-05
Page 5 of9
k)
Sewers within private streets or private parking lots will not be
maintained by the City but shall' be designed and constructed to
City Standards and inspected under a City On-Site Construction
Permit. A private sewer plan designed by the Developer's Engineer
and approved by the City Engineer will be required.
4. Mappina
a)
b)
A Final Map based upon field survey will be required.
All street names shall be subject to approval of the City Engineer
prior to Map approval.
Additional survey and map information including, but not limited to,
building setbacks, flooding and zones, seismic lines and setbacks,
. geologic mapping and archeological sites shall be filed with the City
Engineer in accordance with Ordinance No. MC-592.
c)
d) If this Map is located in an Assessment District and the assessment
has not been paid off, the subdivider shall submit an apportionment
application to the Real Property section of the Public Works
Division. Application forms can be obtained from the Real Property
Section at (909) 384-5026.
5.
Improvement Completion
a) Plans for street, sewer, drainage improvement, landscape and
irrigation plans for the entire project shall be completed, subject to
the approval of the City Engineer, prior to the Map recordation.
b) If the construction/installation of required improvements are not
completed prior to Map recordation, an improvement security
accompanied by an agreement executed by the developer and the
City will be required.
c) Street light energy fee to pay cost of street light energy for public
street lights for a period of 4 years shall be paid. Exact amount
shall be determined and shall become' payable prior to map
recording.
d) All rights of vehicular ingress/egress shall be dedicated from
Walnut Street.
6. Street Improvement and Dedications
a)
All public streets and public easements within and adjacent to the
development shall be improved to include combination curb and
gutter, paving, access ramps, street lights, sidewalks, and
S:\PLANNI~G.P(, SUltr Rc.'pons\2007\U2.21.07\TTM l7754\'PW's Final.doe
02115107
e.
e
Project: Tr. 17754 &. DP3 O6-OS
Page 60f9
b)
appurtenances, including, but not limited to, relocation of public or
private facilities which interfere with new construction, and striping.
All shall be accomplished in accordance with the City of San
Bemardino "Design Policies and Procedures" and City "Standard
Drawings," unless otherwise approved by the City Engineer. Street
lighting, when required, shall be designed and constructed in
accordance with the City's "Street Lighting Policies and
Procedures." Street lighting shall be shown on street improvement
plans except where otherwise approved by the City Engineer.
For the streets listed below, dedication of adequate street right-of-
way (R.W.) to provide the distance from street centerline to
property line and placement of the curb line (C.L.) in relation to the
street centerline shall be as follows:
Street Name
Right of WavCft.)
Curb LineCft)
Walnut St.
30'
20'
Construct 8" Curb and Gutter per City Standard No. 200 adjacent to
the site. Widen pavement adjacent to the site to match new curb
and gutter. Construct approach and departure transitions for traffic
safety and drainage as approved by the City Engineer.
d) Construct sidewalk adjacent to the site in accordance with City
Standard No. 202, Case "A" (6' wide adjacent to curb).
c)
e) Construct accessible curb ramps in accordance with City Standard
No. 205, modified as approved by the City Engineer to comply with
current ADA accessibility requirements, at all curb retums within
and adjacent to the project site. Dedicate sufficient right-of-way at
the comer to accommodate the ramp.
f) Interior private streets shall be designed and constructed with 32'
minimum from curb face to curb face, and a sidewalk on each side
of the street in accordance with City Standard No. 202, Case "A" (6'
wide adjacent to the curb). One side of the street shall be marked
for no parking at any time.
e
g)
h)
Driveway Approaches shall be per City Standard No. 203.
All Curb retum radii shall be 25 feet minimum.
S:\PLo\ NN ING,I'(" Stan' RtpOfU~OO7~12.2J .07\TTM 177S4\PW', FinaI.doc
02115107
e.
e
e
Project: TI. 17754 & DP3 06-05
Page 7 of9
Construct allcul-de-sac's and knuckles in accordance with City
Standard Drawing No. 101.
j) The pavement on Walnut Street adjoining the site shall be
rehabilitated to centerline using a strategy approved by the City
Engineer.
i)
k) Install Street Lights on Walnut Street adjacent to the site in
accordance with City Standard Nos. SL-1 and SL-2.
I) Install street lights on interior streets in accordance with the City's
Street Lighting Design Policies and Guidelines.
7. Phasina
a) If the project is to be developed in phases, each individual phase
shall be designed to provide maximum public safety, convenience
for public service vehicles, and proper traffic circulation. In order to
meet this requirement, the following will be required prior to the
finalization of any phase:
Improvement plans for the total project or sufficient plans beyond
the phase boundary to verify the feasibility of the design shall be
complete to the satisfaction of the City Engineer.
c) A Plan shall be submitted for review and approval by the
Engineering Division, Fire, and Planning Departments, indicating
what improvements will be constructed. with the given phase,
subject to the following: .
b)
d) Dead-end streets shall be provided with a minimum 40 foot radius
paved tum around.
e) Half width streets shall be provided with a minimum 28 foot paved
width:
f) Street improvements shall be completed beyond the phase
boundaries, as necessary to provide secondary access:
g) Drainage facilities, such as storm drains, channels, earth berms
and block walls, shall be constructed, as necessary, to protect the
development from off-site flows:
h)
A properly designed water system shall be constructed, which is
capable of providing required fire flow, perhaps looping or
extending beyond the phase boundaries.
S:\PLANNING\P(' SUll" Repcnu\2007\1l2.21.U7\TrM l7154\PW'li Final.doe
021 1 5IIT7
e.
e
e
Project: Tr. 17754 & DP3 06-05
Page 8 of9
Easements for any of the above and the installation of necessary
utilities shall be completed; and,
j) Phase boundaries shall correspond to the lot lines shown on the
approved tentative map.
i)
8. ReQuired EnQineerlnQ Plans
a) A complete submittal for plan checking shall consist of street
improvement, sewer, storm drain, traffic signal, striping, lighting,
grading, on-site landscaping and irrigation, landscaping and
irrigation in the landscape maintenance district, and other plans as
required. Piecemeal submittal of various types of plans for the
same project will not be allowed.
b) The rough grading plan may be designed and submitted in
combination with the precise grading plan.
c) All improvement plans submitted for plan check shall be prepared
on the City's standard 24" x 36" sheets. A signature block
satisfactory to the City Engineer or his designee shall be provided.
After completion of plan checking, final mylar drawings, stamped
and signed by the Registered Civil Engineer in charge, shall be
submitted to the City Engineer for approval.
e) Electronic files of all improvement plans/drawings shall be
submitted to the City Engineer. The files shall be compatible with
AutoCAD 2000, and include a .DXF file of the project. Files shall
be on a CD and shall be submitted at the same time the final mylar
drawings are submitted for approval.
d)
f) Copies of the City's design policies and procedures and standard
drawings are available at the Public Works Counter for the cost of
reproduction. They are also available at no charge at the Public
Works Web Site at
http://www.ci.san-bernardino.ca.us/site/pw/default.htm
9. ReQuired EnQineerinQ Permits
a) Grading permit.
b)
On-site improvements construction permit (except buildings - see
Development Services-Building Division), including landscaping.
Off-site improvement construction permit.
c)
S:\PLANNINGlPC sllIn. Repo"'UOO7'<.lZ.21.07\TIM I n54\PW', Final.doc
02115107
Project: Tr. 17754 & DP3 06-05
Page 9 of9
e 10. ADDlicable Engineering Fees
a) All plan check, permit, inspection, and impact fees are outlined on
the Public Works Fee Schedule. A deposit in the amount of 100%
of the estimated checking fee for each set of plans will be required
at time of application for plan check. The amount of the fee is
subject to adjustment if the construction cost estimate varies more
than 10% from the estimate submitted with the application for plan
checking.
b) The current fee schedule is available at the Public Works Counter
and at htto://www.cLsan-bemardino.ca.us/site/ow/default.htm
c) Expeditious plan review is available. A non-refundable feeln the
amount of 125% of the estimated plan check fee for each set of
plans will be required at time of application for expedited plan
check. The amount of the fee is subject to adjustment if the
construction cost estimate varies more than 10% from the estimate
submitted with the application. Expedited plan checking is not
available for landscape plans.
11. Public Works OccuDancv Reguirements for Tract DeveloDment.
e
Perimeter walls shall be installed and accepted prior to acceptance
of rough grading.
b) On-site landscaping (private areas) shall be installed and accepted
prior to release of gas utility and prior to final inspection.
a)
c) The streets within any phase of the subdivision shall be base paved
(0.10 foot low) prior to delivery of construction materials to the site.
d) Prior to final inspection of the last three homes in the tract (or
phase), the final lift of pavement shall be installed.
e) Prior to final inspection and release of the last three homes in the
tract (or phase), the'pavement on the streets adjacent to the tract
shall be rehabilitated. The method and extent of rehabilitation shall
be determined at time of final inspection by the City Engineer.
e
S;\PlJ\NNIXGP(' StOlfi' Repon.c;\1007'l.l2.21 .U7\TIM I 77.54\PW'li Final.doc::
02115107
e.
e
e
DEVELOPMENT SERVICES DEPAllTMENT
300 North "0" Street. San Bernardino' CA 92418'()()()1
Planning & Building !109.384.SOS7 . Fax: 909.384.5080
Public WorkslEngineering !109.384.5Ul . Fax: 909.384.5155
- www.sbcily.org
..
February 15,2007
Won Kim
6600 Beachview Drive, #218
Rancho Palos Verdes, CA 90275
RE: Conditional Use Permit No. 07-01 - Add used auto sales to an existing auto rental
business located at 148 E. Baseline Street
Dear Mr. Kim,
The Planning Division has reviewed the above-referenced application materials. All
application materials have been accepted and the application is deemed complete,
pursuant to Section 65943 of the California Government Code. Please note that additional
information may be requested as needed to complete a preliminary environmental
evaluation pursuant to the California Environmental Quality Act (CEQA) Guidelines
Section 15060.
This project is scheduled for preliminary review by the Development & Environmental
Review Committee (D/ERC) at the meeting of Thursday, March 8, 2007 at 9:00 a.m.
The D/ERC meets in Conference Room A on the 41h floor of City Hall located at 300
North "D" Street. At that meeting, the D/ERC members will provide input regarding
technical aspects of the project, including engineering, design, and conformance to City
development standards.
If you have any questions about the status of this application or the review process, please
contact the project planner, Aron Liang at (909) 384-5057 extension 3332.
Sincerely,
. t1
. ../ / 'i
.7' ~_.0~cj
Terri Rahhal
Deputy Director/City Planner
e
e
e
City of San Bernardino
STANDARD REQUIREMENTS
Development Services/Plan Check Division
Property address:
DRCICUP/DP: TI~~ ~ , \ 11 ~ ~ ~ . DATE: \ I. '"2- I O~
Dr":3 t-lo.o~-o~
NOTE; NO PLANS WILL BE ACCEPTED
PLAN CHECK WITHOUT CONDITIONS
APPROVAL IMPRINTED ON PLAN SHEETS.
FOR
OF
Submit 6 sets of plans, minimum size 18" x 24", drawn to scale. If plan check is for
expeditious review, submit 6 sets. The plans shall include (if applicable):
a. site plan (Include address & assessors parcel number)
b. foundation plan
c. floor plan (label use of all areas)
d. elevations
e. electrical, mechanical, & plul!lblng plans
f. detail sheets (structural)
g. cross section details .
h. show compliance with Title 24/Accesslbllity (disabled access)
i. a plan check deposit fee will be required upon submittal of plans.
. Call Development Services (plan check) 909-384-5071 for amount.
1. The title sheet of the plans must specify the occupancy classification, type of construction, It
the building has sprlnkle~ & the current applicable codes.
2. The person who prepares them must sign the plans. Also, provide the address & phone
number of that person. Some types of occupancies require that the plans are prepared,
stamped, and signed by an architect, engineer, or other person licensed by the State of
California.
3. For structures that must Include an engineers design, provide 2 sets of stamped/wet signed
calculations prepared by a licensed architect/engineer.
4.
Provide 2 sets of Title 24/Energy compliance forms and calculations. Some compliance
forms are required to be printed on the plans.
300 N '0' Street San Bemardn;o CA 92418
909-384-5071 Office
909-384-5080 Fax
e
e
e
5.
Submit grading, site, and/or landscape plans to Public WorksIEnglneering for plan check
approval and permits. For more Information, phone 909-384-5111.
6. Fire sprinkler plans, Ores suppression system plans, etc., shall be submitted to the FIre
Department for plan check approval and permits. For Information, phone 909-3114-S38I.
7. Signs require a separate submittal to the Planning Division for plan check approval and
permits. For information, phone 909-384-5057.
8. Restaurants, food preparation facilities. and some health related occupancies will require .
clearances and approved plans from San Bernardino County Health Department. For
information, phone 909-387-3043.
9. Occupancies that Include restaurants, car washes, automotive repair/auto body, dentist
offices, food preparation facilities or processing plants, etc. may require approvals and
permits from San Bernardino Water Reclamation. For information, phone 909-3114-5141.
10. An air quality permit may be required. Contact South Coast Air Quality Management
Division for information, phone 909-396-2000.
11. State of California Business & Professions Code/Contractors License Law requires that
permits can be Issued to licensed contractors or owner-builders (that are doing the work).
Contractors must provide their State license number, a city business registration, and
workers compensation policy carrier & polley number. Owner-builders must provide
proof of ownership.
NOTE: PLAN CHECK TIME ON THESE TYPES OF PROJECTS IS APPROXIMATELY 4-6
WEEKS FOR 1ST CORRECTIONS. EXPEDITIOUS REVIEW IS APPROXIMATELY 10 WORKING
DA YS. THE DEVELOPMENT REVIEW PROCESS IS NOT THE BUILDING PLAN CHECK AND
DOES NOT IMPL Y THAT THE DESIGN AS SUBMITTED WILL BE APPROVED WITHOUT
CORRECTIONS.
Comments:
300 N 'd. Slreel San Bernardino CA 92418
909-384-5071 Office
909-384-5080 Fax
CITY OF SAN BERNARDINO FIRE DEPARTMENT
. STANDARD REQUIREMENTS
AP./;:;SIA.f'.IllAIAt,AJLff
. I
7JfJ3
00 . 05
Case: 7/M 11-t.:;;f
Dale: /1-z.-:0
R~By: ~I
GENERAL REQUIREMENTS:
~ _ _ _.....", CIIlIIlIUcIIlln pIonIlO IlulldngMII SIMly Iorfft CopImlM_.....", pIon-'
~...ClIy",SIn__fft ~.
ll1e.... I ) I r"'" provIdlllor ...._ ~........ _ an 1oalIigo. CDI1IlIuCtian _. MII___
-1UIlPIied by'" -1IIIIIl'" _an IiI8:
WATER PURVEYOR FOR FIRE PROTE :
RY ll1e..... II ell: . _ _lor'" _", Ihlo plajecllo ~ by:
.i"tf SIn__............W_~ [j~..'lI (801)384-5391
E8I1 VIlttlyW_1lild>1l:1 E1~ (101I1 888 8888
OtIIerW_IlU_ Phone:
~UC FIRE PROTECTION FAClunES: '<5II1It-L- U 1M>TA-<J..L'l7 ANI) (Jfl!rRAT/O/Ift:lL .
PIdc"'~_1Ilql.IIrwd8lang_II_noIlo_300feellor_ond___ondll_noIlo_
500 I.. lor ,......11IoI-. --
)ir Flrehydr8nl___'" 1.500gpmII. 2OpoI_ __lIIreq_lor_ond__lliII-._'"
hydrInl__'" l.ooogpm II. 20 poI_ ___ Jeqliredlor ._IIol_
ro..- FIre hydrlm IypI ond opocIlIc _ _... J<*Illy _ by'" ClIy of SIn!lomlnlno FI.. ~ In"",,- _1IlI_ _. fft
r- hydmnI: rnIIIeri* end 61 ,- - ....'" shill COI'Dm to the......... and Ip I'" "1. d the...... purveyor.
~Pulllicfko hydrInta. ..._. MIl pubic __ _10.- roo Depo""*1l ~1II1Ile _.I,p.f._ .__~ MIl
shall'" installed by tho water purveyor or byllle -..por II'" _ purveyor's discl8llon. CanIIcIIhe Wiler _ _ _Ior_
information.
ACCESS:
B p- two .1pIlIIe. ...... ...... ......", .......M/egrMI1o \he poopoIIy onIrInoI. ll1e rouI8S _... """'.11I_.
_...__10 -. _lIlIlorfirl--. _ _y.11alI hive ..._rdrivlng"'-of noI....1Ilon2Ofeelof..-
-_. .
V e_ _y 10 _ 150 feel of II porIIano of 1IlI_ WII", lllingIIlIoly buildngo. a-( I U5t-A,-,- Fi 12.6 .;sp Tl.l ~U::1f.5
/()" E-.cl1OldW8y 10 _ 50 feel of1lll_WII", II .....Iuto.y -.go. I AI 71J o~E:. UM r-r;s
D P_"NO PARKING" oIgnI-"''' pIIIdng of _ -*I ~ IIduce IIle __ of ICOIIIIOlldWIys 1o....1Ilon II1e IIqUinld - SIgno
1ll1O_"I'IIlELA... NOPAIlICING ..c.....11.1r. .
D lleId-ond_"'" noI_5001eIl1n 1ongIh-- '-. - 4OfoOl__
~ ll1e..... of ...,__ (podcorprivlll) _~~ DeportmenIIor__.
~k.__ond__Io"'__ond IOcom~::;lIIruc~/o)?' 70 .Fa:nMiS /~
~ P-.....,..._..._IO~_bI-.g II'I~ IinI. No"'!IYdIIIIII_..._40feel",...,
_.... ll1e "",,""''''__1ypI, _DIlI:!Ii lnCIlond 4InC1loutlal,___byIl1eFlrelllperln-. _~IO"
..,... _... J i. II.~.."NO PARKING"..... by pointing ...81nC1l-' red Ibfpe lor 15 feel In _ _In Iranl of.. hydrInlln.......
momor......noI...-bypl1llld-. ~1O...In_rby,...
BUILDINGS:
rv' __ _..._ an1lll bl-.g1l1l1e lronIor___1oc81ion in such . momor.IO..._1Iom1lll......._ Can-
)1"\ _Mllmullltomly___...81nC1l11....1inGII~___...4_....ll1e_of..__-
1__1IlI_of"'~
D ldInIIy_lIIIMII___'" _0I1I1e....._
D _~_..._prlarI01IlIbl-.gbolng~'P'"" ll1emlnlmumlllinglorony"_.' "orlo2A1-' -..on_- ......01
.._g~~_..._1IlIIno_.....",1IlIbuIIdInlllo....,75____...~.
D .-__ 18 or_ .-...... (_1_ 2Oor.-unIIo. or......-....... (-1- _or_In",_",
oquIpp8d__8....._~IoNFP...~.
D AI b\-.gI, ....,5.000 _..... _... oquIpp8d _.. -.. .".....ystem dooIgnod 10 NFP'" - lbIo -- OIlliolIngb\-.gl
.- ....,385d1yo.
f SUbmII plllnllor 1IlI.. ~ I "... ayolMIlo 1IlI FIre ~ prior 10 be;InnIng - of the 8yoIern. Penn' Jeqlired.
T_ impIo\I_1n II ...._.0<<1 -.go 11I10'" __ by IIle FIre 00pIl1menl prior 10 IlIJl of --. PennI Jeqlired.
p_lInI....... (required 1IIIIlughou11. PIIno muot'" opp<oved by II1e FIre 0ep0rlmInt prior 10 IlIJl of_lion. ---.
r... Depo""*1l~._,IO~~oyIIIm. _... roquiredll_ ~I opp<oved 1ocIIIon.
B FIre ~ -...-...., 11200 - 311I_ (801) 384 5388
fft ~manlloring"'-' PIIno muot... __ by the _ Depo""*1l prior 10 1IlIIIIrt of_ -__.
D 00c0.Ipn LoId.
_: ll1e1AJliconl_--,In-.g, ...,c:hongoolO - D.j>.o""'~ "'" 1...-
ADDlTlONALINFORMATION: Au- :::TrJ'l.(/croll.6S \S"~lL CtJ/l~LV II.Ir111 8tS€-A.
'6rPrA.h:J ARne:;
e
"'lJOflIIIoCDI
e
City of San Bernardino Public Services Department
Development Project Conditions of Approval
300 North D Street - 4th Floor
San Bernardino, CA 9241 8
Project Number: DP3 No. 06-05 & Project Planner: Aron Liang Review Date: 11.2.06
TIM No.1 7754
Project Description/Business Name: Construct 48 homes
Project Location/Address: South of Walnut Street opposite of Artesian Avenue Service Account:
Reviewed By: Gracie Washington e-mail: Washington_gr@sbcity.org Phone: 909.384.5549. .
Ext.3162
. Standard Development Requirements
Project shall meet all applicable Standard Development Requirements as attached.
. Integrated Waste Management Survey
Applicant shall submit an Integrated Waste Management Survey for each of the activities marked below
with the initial application to Planning for approval by the Public Services Department Refuse and Recycling
Division prior to issuance of permits for each activity.
The information contained in the Survey as well as any related comments and mitigation provided by Public
Services shall be summarized in the Initial Study and EIR if required for the project under CEQA.
0 Demolition & Site o Construction / Renovation o Business Operations or Event
Preparation
. Additional Requirements or Recommendations
e
MD/PS 6.27.2003
City of San Bernardino Public Services Department
Standard Development Requirements
. Page 2 of 2
RESIDENTIAL TRACTS & LOTS
Collection Services
1. Residential refuse and recycling services are to be provided by the City of San Bernardino Refuse & Recycling
Division a minimum of once weekly.
2. The City shall provide upon request one set of a blue, green, and black 96 or 64-gallon automated service cart
to each single family unit. OR one set to every 2 units in multi-unit dwellings up to 8 units.
3. Commercial requirements shall apply to all multi-unit dwellings over 8 units. unless otherwise approved.
4. Nonresidential establishments such as small offices. shops, meeting halls, or churches, which generate 2 cubic
yards or less of non-bulky waste per week and are located on the same side of a residential block receiving
automated cart service shall meet residential rather than commercial requirements.
Automated Cart Storage &. Access
Residential units shall construct a minimum 4 feet by 11 feet concrete pad located out of view of public right-
of-way for storage of each set of up to 4 automated carts. If visible from the public right-of-way. the storage
area shall be screened by landscaping, or masonry or solid wood fencing. SHOW ON GRADING AND SITE PLANS.
6. The path of travel from the storage pad to street shall be continuously paved without step or curb with 4-foot
minimum gate openings in walls and fencing. The path of travel may include a paved driveway or patio area.
SHOW ON GRADING AND SITE PLANS.
Service Vehicle Access
7. Projects shall meet City Engineering vehicle access requirements on all streets within a residential tract. These
requirements shall not limit requirements for Fire vehicle access.
Curbside Service Area
8. A minimum 14-foot linear space on the street along the curb adjacent to the driveway of each residence must
be clear for automated service carts, with a minimum 2-foot setback and 13-foot vertical clearance of all
obstructions such as structures. fences, and raised landscaping.
Gated Access
9. Gated properties that are locked and unmanned on service days anytime between the hours of S AM and S PM
Monday through Saturday shall provide access code or key to Public Services.
.
MD/PS 6.27.2003
02/13/2007 17:04
9093845532
5lMID
PAS:: 01/01
~..
SAN'ftMMDlNO MUNICIPAL WAT!Illl!PAImIINT
ADRCIERCc.r.
- APN NlAIBER:
EPN NUMBER:
REVIEW OF PLANS:
ClWNER:
DEVB.OPER:
TYPE OF PROJECT:
STANDARD REQUIREMENTS
GENERAL PLAN AMENDMENT NO. os.G1. ~NTATIW 'nlACT MAP NO. 1Tl'54 (8U1DMBION NO. Q6.lI8). &
274-ll31.17. 18, 19. & 20
200&-112
DATE COMPILED: 111112008
COMPILED BY; 8nI_, Till
NUMBER OF UNITS:
LOCATION:
s.me .. obcMl
88n Mln:ca P__ Hama, LLC
A l8ClueotlD eII.nae the IInd ... dIIlgndon Df.ppI'llldrnaIIIy 10.23 _ ""'" IH, Ind_1 HeIVY III RU.l, .nd
construct 48 lingle flmly __1ocIIed an !he sout~ _ Df Wllnul Avenue .nd ArlIslIn S_l
o
So~ ell...... ofW.1nut AVI_ and A/luIIft _
WATER DEPAAT"~NT ENGIr.n:~RlNG:
e
CONTACT: Uldllilld. M.lIMw PHONE NUMBER: (90i) 3801-5388 FAX NUMBER: (lOt) 381 8532
_: All _5_... Su/JjIctfD IIl.II.-./fItpI/a_ o'IIlI_~1IIf
!;!] Size 01 Main AdjKenl !hi PrajIcI 4' CJ. /8" DJ.P. In WALNUT ST.
~ AppraxIm.. Will.. _.. ZUIi !lIvIlion of WItIr Starage: .1.2!1 Hydral1l Flow 0 2OpI1:
n TYJlII, 51.., Locatlon and DillInce to N_I FirI HydnInl
U WItIr Supply Study Required :J Pressure RellUlllor Required on CullOmer Silo of !he _
o Oll.iIe water Facitilies Requirad :l WNr Main R8lmbu...mllll Due
DAres Nol Served by San iIoImardlno Munldplll W..r Depl/lmlnl
!;!] Networ1< Hydraulic Analyslo ~lIId JlIIr Unllonn llIIlgn Stlndards
Commel1ls: ".8" MAIN ElCT1;NSION REQUIRED THROUGHOUT PI'lOJ!CT
- WILL II! ReQUiReD TO REPLACE SECTION OF 4" MAIN IN WALNUT UNDER R&R wilT
D.I.P. (JACK & BORE)
"- 2! fl. WA~R UTIUTY EASEMENT RECUIRED THROUGH AL~ PRIVATE STREETS, INC~UDlNG FIRE HYDRANT
LATERALS AND METER BOXES.
'. ALL EASEMENTS AND GRANT OF EASEMeNT. LANGUAGE MUST BE PROPE~ Y DISPLAYED ON THE TRACT MAP
PRIOR TO RECORDATION WITH THE CITY OF &AN BERNARDINO. '
'. DEVE~PEft INSTAUED AGR!!MENT REQUIRED
WATU ClUALITV CONTROL
CONTACT: -... Con PHONE NUMBER: (909) 3801-5325
!;!] R.P.P. Baolcllow DIIVicII Raqulllld 1\ Selvict Connectiorllot DomeIlio $eMce
~ Double Ch.ck BacIdIoW DavIca Requillld It SIftIioI Connedion for Fire Ind Irrigation
~ Bacldlow DavIes III be InepectIlI belore Water Servioe esn be Acliv_
: ,l No lIack1\oW Deviea ill required lIllhis lime
!lEWEA CAlJACITY INJIOUATION
CONTACT: 11Iomaen. NaIl PHONE NUMBER: (909) 384-5093 FAX NUMIlM: (D) 38i ellla
-: ,."",'ofPaym""r_IIes_",,,,..-., ~o.patfm...r_lo _oeoflhe-..,,_
r: -. Caplclly ~H Appliolble II lhia line
c: -- CapaoI\y ~.. /IlU1I'" JlIIilI III the Water DeJlllllrnollllor ~ Gallons Per OIly: Equivllenl DMling UnIII: l!.
R: Subjad 10 _leul.lion of Fee plior III Ihe ilaua... Df Ilulldlng Ponnft
C Breakdown Of 1!atIm_ Gallons Per Day
COpy TO: Customar; PI.nning; Engineering
FAX NUMBER: (909) 384-921
Poat-II" Fax Note
T.
7671
Co.
Co.iDoIIt
-"
Fal3
-'3
....,
e
Thursday, November 02.2008
EPM
..... 1 ., 1
1_
_
_
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
AITACHMENTE
CITY OF SAN BERNARDINO
INITIAL STUDY FOR
Paloma Park Homes Residential Subdivision
Tentative Tract Map No. 17754 (SUB 06-06)
GPA 06-01 & DP306-05
PROJECT DESCRIPTION/LOCATION:
The proposed project is a Tentative Tract Map to develop an approximately 1O.23-acre site with 48 single-family
residential lots of 5,000 square feet in area, and appurtenant infrastructure including but not limited to street, open
space, and an on-site stormwater retention basin. The project site is located south of Walnut Street, generally west of
Mt. Vernon Avenue. and east of Muscott Street, between Mill Street and Rialto Avenue. The site is also located in
close proximity to theBNSF rail yards and is affected by the San Jacinto fault which traverses the northwest to
southeast direction along the westerly portion of the site area. Assessor's Parcel Numbers 0274-031-17, 18, 19, 20.
DATE:
November 6, 2006
PREPARED BY
Hogle-Ireland, Inc.
2825 E. Taquitz Canyon Way, Suite 106
Palm Springs, CA 92262
760-327-9042
PREPARED FOR
Gty of San Bernardino
Development Service Department
300 North "0" Street
San Bernardino, CA 92418
909-384-5057
REVIEWED BY
Independendy reviewed, analyzed and exercis;, judament in making the determination, by the
Development/Environmental Review Conunittee on 'I. z. "ZeJob. pursuant to Section 21082 of the California
Environmental Quality Act (CEQA).
IS 1 .
e
e
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
The Califomia Environmental Quality Act (CEQA) requires the prepantion of an Initial SlUdy when a proposal must
obtain discretionary approval from a governmental agency and is not exempt from CEQA. The purpose of the Initial
Study is to determine whether or nor a proposal, not exempt from CEQA, qualifies for a Negative Declaration or
whether or not an Environmental Impact Report (EIR) must be prepared.
1.
Project Tide:
Paloma Park Homes Residential Subdivision
(fentative Tract Map 17754)
2.
Lead Agency Name:
Address:
City of San Bernardino
300 North "0" Street
San Bernardino, CA 92418
3.
Contact Person:
Phone Number:
AlOn Liang, Senior planner
909-384-5057
4. Project Location (Address/Nearest cross-streets): The project site is proposed for the south side of the
1500 block (1501-1611) of west Walnut Street, located west of Mt Vernon Avenue and east of Muscot! Street
between Rialto Avenue and Mill Street. The project's northwestern edge is the comer of the intersection of
Walnut Street and Artesian Avenue.
5.
Project Sponsor:
Address:
ANR Industries, Inc
10702 Hathaway Drive, Unit 1
Santa Fe Springs, CA 90670
562-777-7807
6. General Plan Designation: IH (Industrial Heavy)
7. Description of Project (Describe the whole action involved, including, but not limited to, later phases
of the project and any secondary, support, or off-site feature necessary for its implementation. Attach
additional sheets, if necessary):
The project is the development of a 10.23-acre site, including a request to amend the City's General Plan Land
Use designation and a request to Change the Zone from Industrial Heavy (IH) to Residential Urban (RU-l); to
allow a "small lot" Planned Residential Development consisting of detached single-family buildings on 5,000
square foot lots. The proposal requires a Development III Permit. The proposed project is a Tentative Tract
Map subdivision of approximately 1 0.23 acres to develop 48 homes and an open space area which would
include a storm water retention basin, a tot-lot, a pool and pool house, and sheltered picnic areas in a park like
setting. The proposed density is 4.7 dwelling units to the acre. Exhibit 1 shows the regional location and vicinity
of the site. Exhibit 2 is an aerial photograph showing the approximate boundaries of the site. Exhibit 3 shows
the proposed layout of Tract Map 17754 and Exhibit 4 shows the Phasing Plan. These exhibits are included as
attachments at the end of the Initial Study
The project will be constructed in a series of three phases. The following table shows each phase and the
number of units to be constructed.
Phase Units
I 15
II 14
III 19
Total 48 I
IS 2
e
e
e
,
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
8.
Surrounding Land Uses lIDd Setting:
North: RU Residential Urban, Mobil Home Park and Indusuial Light (ll.)
South: V scant land in an Industrial Heavy (lH) Zone
West Vacant land and an Auto-Wrecking yard in an Industrial Heavy (lH)Zone
East Vacant land in an Industrial Heavy (IH) Zone
9. Other agencies whose approval is required (e.g., permits, finllDce approval, or participation
agreement): None identified.
IS 3
e
eO
o
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED:
The environment21 factors checked below would be potentially affected by this project, involving at least one impact
that is a "Potentially Significant Impact" as indicated by the checklist on the following pages.
0 Aesthetics 0 Agriculture Resources 0 Air Quality
0 Biological Resources 0 Cultural Resources 0 Geology / Soils
0 Hazards & Hazatdous 0 Hydrology / Water Quality 0 Land Use / Planning
Materials 0 Noise 0 Population / Housing
0 Mineral Resources 0 Recreation 0 Transportation / Traffic
0 Public Services 0 Mandatory Findings of
0 Utilities / Service Systems Significance
On the basis of this Initial Study, the City of San Bernardino Environment21 Review Committee finds:
o
I find that the proposed project COULD NOT have a significant effect on the environment, and a
NEGATIVE DECLARATION will be prepared.
rgJ
I find that although the proposed project could have a significant effect on the environment, there will not be a
significant effect in this case because revisions in the project have been made by or agreed to by the project
proponent. A MITIGATED NEGATIVE DECLARATION will be prepared.
I find that the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required
I find that the proposed project MAY have a "potentially significant impact" or "potentially significant unless
mitigated" impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier
document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on
the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required,
but it must analyze only the effects that remain to be addressed
o I find that although the proposed project could have a significant effect on the environment, because all
potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE
DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that
EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that ate imposed upon the
proposed project, nothing further is required
~cr'
Signature
1&,.J L.~
Printed Name
//. 9. o~
Date
CJ Pf-~~CJ
For
IS4
.
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
Potentially
Significa,nt
Impact
Less Than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
I. AESTHETICS - Would the project:
aJ Have a substantial adverse effect on a scenic vista as
identified in the City's General Plan?
o
o
181
o
bJ Substantially damage scenic resources, including but
not limited to, trees, rock outcroppings, and historic
buildings within a state scenic highway?
o
o
181
o
cJ Substantially degrade the existing visual character of
quality of the site and its surroundings?
o
o
181
o
d) Create a new source of substantial light or glare which
would adversely affect day or nighttime view in the
area?
o
181
o
o
eJ Other:
o
o
o
o
.
Discussion:
I. a-c) Five residential buildings and a barn occupy the northern boundary of the site. The remainder of the site is
primarily vacant The project site is not within an area identified as a significant scenic vista or scenic
highway. The site is bordered by Walnut Street to the north and a towing yard and vacant land to the west
A large vacant parcel utilized1?Y the Colton Water District is located .to the east Vacant land and a power
transmission line easement are to the south of the subject property. As the property to the south of the site
is vacant; views o( the San Bernardino Mountains would not be impacted by the projeCt. There are no
historic buildings, rock outcroppings or scenic resources. The proposed residential development would
include landscape design that will enhance the site area. The proposed residential product will be reviewed
by the City to ensure that the aesthetics and site design conform to the City's residential design standards.
Less than significant impacts are anticipated
I.d)
The site is located within an area with surrounding land use designations for single-fami1y and light and heavy
industrial development. Incremental increases of light and glare will be created by the proposed project
through the installation of street lights and lights within and on the exterior of the homes (when constructed)
on the internal project parking areas. Each dwelling unit will have its own two car garage that may be
. eqnipped with lights for security. Standard conditions of approval for the project will ensure compliance with
the City's Development Code standards for light and glare as contained in Section 19.20 of the Development
Code. Per the Development Code no glare incidental to any use shall be visible beyond any boundary line of
the parcel and exterior lighting shall be energy-efficient and shielded or recessed so that direct glare and
reflections are contained within the boundaries of the parcel, and shall be directed downward and away from
adjoining properties and public rights-of-way. No lighting shall blink, flash, or be of unusually high intensity
or brightness. AU lighting fixtures shall be appropriate in scale, intensity, and height to the use it is serving.
Security lighting shall be provided at all entrances/exits. Compliance with the conditions shall ensure that any
anticipated impact would to be less than significant
.
IS 5
e
e
e
CITY OF SAN BERNARDINO
DEVELOPMENTSERVlCES
INITIAL STUDY
II.
AGRICULTURE RESOURCES:
Less Than
Potentially Significant Less Than No
Significant With Significant Impact
Impact Mitigation Impact
Incotporated
0 0 0 181
a) Convert Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance (Farmland), as
shown on lbe maps prepared pursuant to lbe
Farmland Mapping and Monitoring Program of lbe
California Resources Agency, to a non-agricultural
use?
b) Other:
o
o
o
o
Discussion:
II a) The California Resources Agency defines prime farmland, Unique Farmland, or Farmland of Statewide
Importance for lbe San Bernardino County as farmlands which include chyland grains of wheat, barley. oats,
and chyland pasture. The project site does not meet lbese characteristics.
The proposed project does not convert prime Farmland, Unique Farmland, or Farmland of Statewide
Importance as shown on lbe maps prepared pursuant to lbe Farmland Mapping and Monitoring Program of
lbe California Resources Agency. Therefore no impact is anticipated.
The project site is partially vacant, is not located in an agriculture preserve or located wilhin 300 feet of
agriculturally zoned property. Despite lbe suitability of lbe soils for f~ on lbe property, urbanization in
lbe community, high cost of water and pressures for additional development severely CQnstrain lbe viability of
agriculture as a dominant land use. The transition of agricultural uses to more urbanized uses is expected and
is consistent with the objectives of lbe General Plan. Therefore, no significant impacts are anticipated on
agricultural resources.
156
Discussio'n:
NOTE: Tentative Tract Map 17754 (paloma Park) is located south of walnut Street and consists of approximately 48
single-family homes. Tentative Tract Map 17239 (San Marcos) is located north of Walnut Street and consists of 95
detached single-family condominium units. Both projects are being proposed by one applicant, ANR Industries, !nc.
Because the sites are across the street from each other and development will likely occur within the same time frame,
the air quality analysis was performed by Mestre Greve Associates on February 13, 2006 based on the sum of both
tract criteria. That is, they were treated as one project for the purposes of evaluating potential air quality impacts.
III a)
Air quality at any site is dependent on the regional air quality and local pollutant sources. Regional air quality is
determined by the release of pollutants throughout the air basin. Estimates for the South Coast !Ur Basin
(SCAB) have been made for existing emissions ("2003!Ur Quality Management Plan", August 1,20(3). The
data indicate that mobile sources are the major source of regional emissions. Motor vehicles (Le., on-road
e
IS 7
>}f'
e
e
e
III b)
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
mobile sources) account for approximately 45 percent of volatile organic compounds (Voq, 63 percent of
niuogen oxide (NOx) emissions, and approximately 76 percent of carbon monoxide (CO) emissions.
The South Coast Air Quality Management District (SCAQMD) haS divided the SCAB into 38 source receptor
areas (SRA) with a designated ambient air monitoring station representative of most of these areas. The
project is located in SCAQMD Source Receptor Area 34, San Bernardino.
The air quality monitoring station designated for this area is the San Bemardino-4'" Sueet Station. This is the
nearest air quality monitoring station to the project. The air pollutants measured here include ozone (0,),
(CO), Particulate Matter (pMIO and PM,,), and niuogen dioxide (NO,). Sulfur dioxide (SO,) was not
monitored at this station. 'Sulfates are produced by the reaction in the air of sulfur dioxide (SO,), which is a
component of acid rain. Sources of sulfur dioxide include coal burning power plant and diesel engines.
California does not have any coal burning power plants and all diesel fuels sold in the state are now lower in
sulfur, and ~ulfates are not an issue in the area. The proposed project would not contribute to additional
sulfates in the atmosphere and therefore, this is not an issue.
SO, concenuations have generally been low throughout the South Coast Air Basin for many years due to the
reduction in the amount of sulfur in diesel fuels. Projected emissions are based on assumptions for
development in the City's General Plan, which are substantially less than the assumptions in the AQMP;
consequently, the project will not contlict with or obsuuct the implementation of the AQMP.
Based on an air quality modeling analysis performed by Mesue Greve Associates, there will be no significant
short-term consuuction or long-term operational impacts due to the project based on the SCAQMD
thresholds of significance (See Table 1). Projected emissions for this relatively small project will not exceed
SCAQMD thresholds of significance for pollutants (See Tables 2 and 3) and will only be a fraction of the total
emissions throughout the basin (See Table 4).
Table 1
SCAQMD Regional Pollutant Emission Thresholds ofSiJtnificance
Pollutant Emissions (lbs/ day)
ROG NOx PM10
75 100 150
55 55 150
Consuuction
Operation
CO
550
550
so:
150
150
Table 2
Construction Emissions for TIM 17239 and TIM 17754
(Short T ettO Impacts)
Pollutant Emissions (lbs/ day)
ROG NOx PM10
1.0 4.4 0.1
0.7 21.4 0.4
0.0 0.0 133.0
10.6 67.0 28
12.4 92.8 136.3
75 100 150
Activity
On-Road Vehicle
Heavy Duty Trucks
Ground Disturbance
Consuuction Equipment
Total Emissions
SCQAMD Thresholds
Source: URBEMIS2oo2
CO
8.4
3.3
0.0
87.9
99.6
550
IS 8
.
e
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
Table 3
Project EmissioDs for TIM 17239 and TIM 17754
(Lolllt T elm Impacts)
Pollutant Emissions (Ibs/ day)
Source CO ROG NOx PMI0 SOX
Vehicular Trips 163.6 18.5 45.9 1.4 0.1
Natuntl Gas Conswnption 0.6 0.2 2.5 0.0 0.0
Conswner Product Usage 0.0 9.8 0.0 0.0 0.0
Electrical Genet'lltion 0.5 0.0 2.7 0.1 0.3
Total Project Emi..ioDS 164.7 28.5 51.1 L5 0.4
SCAQMD Thresholds 550 55 55 150 150
Source: URBEMIS2002
Table 4
Project Net Emissions for TIM 17239 and TTM 17754
Compared With ReRional Emissions
Pollutant Emissions (tons/day)
CO ROG NOx
0.082 0.014 0.026
2,414 584 532
Project Emissions
2020 South Coast Air
Basin*
Project as Percentage of
Basin
· Source: 2003 AQMP Tables 3-5A & 3-5B
PMI0
0.001
318
SOx
0.000
76
0.0034%
0.0024%
0.0048%
0.0002%
0.0003%
Temporary impacts will result from project construction acQvlOes. Air pollutants will be emitted by
construction equipment and fugitive dust will be genet'llted during grading of the project site. Gnading
represents the construction activity that will result in the highest levels of air pollutant emissions associated
with construction.
Considet'llble short-term emissions of ROG will occur from the application of architectural coating (painting)
and asphalt paving. Table 5 shows the maximwn allowable activity that can take pbce in order to avoid
exceeding the ROG threshold Each maximwn per day is calculated separately and does .not consider
emissions from activities listed in Table 2. Mitigation measures will need to be implemented to remain under
the SCAQMD threshold for short-term ROG.emissions.
Mitigation measures will be implemented to ensure that asphalt paving and painting do Dot occur
concurrendy. Building materials will be chosen to minimize the need for painting and when painting is
necessary, efficient methods of application will be utilized to minimize ROG off-gassing.
IS 9
tit
tit
tit
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
The project will be devdoped in a series of phases, as deseribed in the project description. Information
regarding the specific types and &mown of construction equipment were not available at the time of the
analysis. As such, assumptions and emission factors were devdoped for a worst-case scenario to provide the
data in Table 2 Assumptions include the use of four pieces of heavy equipment, a water truck and 30
construction worker vehicles (40 miles round trip per vehicle) per day. Since a worst-case scenario was used,
specific phasing information such as maximum area to be graded per day and specific pieces of equipment
will not affect the Mestre Greve analysis.
Mitigation Measures
In evaluating the proposed project using the URllEMIS2002 model, assumptions adhering to SCAQMD
Rules 402 and 403 are required; therefore, the conclusion of less than significane is based on mitigation
measures enumerated herein. In order to mitigate these potential impacts, the City requires the preparation
and approval of PM" management plans, which must be reviewed and approved by the Public Works
Division. In addition, the project proponent must incorporate the following Air Quality (AQ) mitigation
measures into the project and implement them in order to reduce potential impacts to a levd of less than
significant.
AQ-l The project shall comply with the requirements of the SCAQMD Rules 402 and 403 for
fugitive dust, which requires the implementation of Reasonable Available Control Measures
(RACM) for all fugitive dust sources, and the Air Quality Management Plan (AMCP), which
identifies Best Available Control Measures (BACM) and Best Available Control
Technologies (BACT) for area sources and point sources, respectively.
AQ-2
. The project proponent shall ensure that construction equipment shall be properly
maintained and serviced to minimize exhaust emissions.
. The project proponent shall ensure that existing power sources are utilized where
feasible via temporary power poles to avoid on-site power generation.
. The project proponent shall ensure that construction personnel be informed of ride
sharing and transit opportunities.
. The project proponent shall ensure that any portion of the site to be graded shall be pre-
watered to a depth of three feet prior to the onset of grading activities.
. The project proponent shall ensure that watering of the site or other soil stabilization
method shall be employed on an on-going basis after the initiation of any grading
activiry on the site. Portions of the site that are actively being graded shall be watered
regularly to ensure that a crust is fonned on the ground surface, and shall be watered at
the end of each workday.
. The project proponent shall ensure that all disturbed areas are treated to prevent erosion
until the site is fully constructed.
. The project proponent shall ensure that landscaped areas are installed as soon all
possible to reduce the potential for wind erosion.
. The project proponent shall ensure that SCAQMD Rule 403 is adhered to, ensuting the
clean up of construction-related dirt on approach routes to the site.
. The project proponent shall ensure that all grading activities are suspended during lint
and second'stage ozone episodes or when winds ex,ceed 2S miles per hour.
IS 10
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
e III c)
e
III d)
.
All buildings on the project site shall conform to energy use guidelines in Title 24 of the
Califomia Administrative Code. .
AQ-3 To reduce emissions all equipment used in grading and construction must be tuned and
maintained to the manufacturer's specification to maximize boming of vehicle fuel.
AQ-4 The residences shall be constructed to UBC standatds for insulation of walls, roofs,
windows, etc. to minimize emissions from home heating and cooling.
AQ-S The residences should be built with natural gas fireplaces to reduce the criteria pollutant
emissions of wood smoke.
AQ-6 Construction scheduling shall be as such that asphalt paving operations and the application
of architectural coating (painting) do not occur concurrently.
AQ-7 To the greatest extent feasible, use of pre-coated, pre-colored and naturally colored building
materials will be used to minimize the amount of paint used for architectural coating.
AQ-8 To the greatest extent possible, high transfer efficiency painting methods such as HVLP
(High Volume Low Pressure) sprayers and brushes/rollers will be used for the application of
architectural coating.
As per the discussion in III b above, the project is in the South Coast Air Basin, a non-attainment baain for
nitrogen dioxide, sulfates, particulate matter, and ozone. The proposed project could add incrementally to
pollutants in the basin, however because the project is small and witli the above mitigation measures to be.
implemented, short-term and long-term impacts are less than significant (for NO" PM,. and ozone) and the
contribution to regional air quality impacts would be de minimus.
In 1998 and 1999, the SCAQMD conducted a study of air toxics in the Basin, Multiple Air Toxics Exposure
Study II (MAlES-II). The MATES-II study estimated that the average basin wide potential cancer risk from
all Toxic Air Contaminants (TAq was about 1,400 excess cancers per mil1ion. Meaning that, statistically,
1,400 people in one mil1ion contract cancer due to their lifetime exposure to TAC in the basin. The study
determined that approximately 71 percent of the risk was from Diesel Particulate Matter (DPM). It should be
noted that this estimated risk is based on a 70-year exposure to TAC concenirations measured and modeled
during the MATES-II study period and do not take into account any future reductions in TAC
concentrations.
In 1998 the California Air Resources Board (ARB) identified particulate matter from diesel-fueled engines
(Diesel Particulate Matter or DPM) as a TAC. As a part of the identification process, the ARB's Office of
Environmental Health Hazard Assessment (OEHHA) evaluated the potential for DPM to affect human
health. The OEHHA found that exposures to DPM resulted in an increased risk of cancer and an increase in
chronic noncancer health effects including a greater incidence of cough, labored breathing, chest tighmess,
wheezing, and bronchitis.
. On April 28, 2005, ARB adopted an "Air Quality and Land Use Handbook" which provides advisory
guidelines for siting sensitive uses near facilities that generate toxic air contaminants. The handbook is
intended to serve as a general reference guide for evolnohng and reducing air pollution impacts associated
with new projects that go through the land use decision-making process. The handbook recommends
IS 11
e
e
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
III e)
minimum distances &om significant sources ofTAC. Two sources cited in the handbook are nil yards and
distribution centers. The following summarizes these statements:
lUil Yards
1. Avoid placement of sensitive land uses within 1,000 feet of a major service and
maintenance nil yard.
ii. Consider siting limitations and mitigation approaches within a mile of a nil yard
Distribution Centers
1. Avoid siting new se2nsitive land uses within 1,000 ft of a distribution center that
accommodates over 100 trucks per day, more than 40 trucks with operating lftnsport
refrigeration units (IRUs) per day, or where TRU unit operations exceed 300 hours per
week..
11. Take into account the configuration of existing distribution centers and avoid locating
residences near entry and exit points.
However, the project site is located in proximity to the BNSF rail yards. The homes proposed in the project
are located more than 1,000 feet from the rail facilities to the north and to the southwest (See Exhibit 2).
It has been determined that the best way to determine significance is by comparing the risk at the proposed
project site to the typical risk experienced South Coast Air Basin. The risk in the vicinity of the project site
does not exceed 500 in a million. This is much less than the -1,400 in a million average risk in the SCAB.
Therefore, the project is not significandy impacted by T AC.
During development of the proposed project, primary regional emission sources will be generated by motor
vehicles. Other emissions will originate &om natural gas combustion associated with water/space heating and
the generation of electricity; as well as from the use of consumer products. These emissions should Dot
generate objectionable odors for the surrounding residents. .
IS 12
e
Discussion:
IV. a)
Natural Resources Assessment, Inc., (NRA, Inc.), conducted a general Biological Resources Assessment for
Tentative Tract Map No. 17754 on January 20, 2006. The purpose of the assessment was to deteanine the
potential presence of sensitive biological resources on site and impacts to those resources. A data search was
conducted to provide information on plant and wildlife species known occurrences within the vicinity. A
walking fidd survey taken from the site boundaries using binoculars was conducted by Ms. Karen Kirtland on
January 11, 2006. Reviewing aerial photographs the project was evaluated as to known habitats in the
IS 13
-.
e
e
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
surrounding Olea. The field survey focused on sensitive biological resources, and included observations of
potential habitat for sensitive species.
BurrowiQf Owl
The burrowing owl which lives in burrows in grassy or spuse shrubby habitat forages over the ground
surface for insect prey and seldom flies in the air. As a result of coastal development the burrowing owl is
declining and the CDFG has designated the burrowing owl as California Species of Special Concern, (CSC).
These species Ole so designated because of declining population levels limited nnges and/or continuing
threats making them vulnerable to extinction. While habitat exists on the project site for the bw:rowing owl;
as a result of the disking of the site for weed control, colonization is not expected while the current land
management practices are in place.
BR-l Bu~wing owls are not expected to take up residence on the sire as long as the current land
management practices remain in force. However, if the sire remains fallow, burrowing owls
could colonize the property. In that event, it is recommended that a focused survey for that
species be conducted. Nesting season occurs between February 1 and August 31, with the
peak nesting period between April 15 and July 15. Surveying should be conducred 30 days
ahead of grading. The survey shaD be conducted according to the recommended guidelines
of the Burrowing Owl Consortium (1993). A report of findings shaD be submitted to the
Development Service Department prior to issuance of grading permits.
San Bernudino Kangaroo Rat
The San Bernudino kangaroo rat (SBKR) is. described as being confined to primary and secondary aUuvial
fan scrub habitats, with sandy soils deposited by fluvial (water) rather than aeolian (wind) processes; burrows
Ole dug in loose soil usuaUy near or beneath shrubs. In recent years they have been found in highly disturbed
habitats adjacent to otherwise suitable habitat. However this species is pulicuIu to scrub communities along
natural river beds, streams and drainage. The drainage along the eastern portion of the site has been
channelized for SO years and therefore altered due to flood control efforts. No suitable habitat exists on the
site for the SBKR on the property.
Raptors and Migpto()7 birds Habitat
Most of the raptor species (eagles, hawks, falcons and owls) Ole experiencing population declines IS a result of
habitat loss. Some, such as the peregrine falcon, have also experienced population losses IS a result of
environmental toxins affecting reproductive success, animals destroyed as pests or colleted for falconry and
other direct impacts on individuals. Only a few species such as the red- tailed hawk and the bam owl have
expanded their range in spite of or as a result of human modifications to the environment. As a group raptors
Ole of concern to staie and federal agencies. Raptors and migratory birds whether listed or not also received
protection under the Migratory Bird Treaty act (META) of 1918. The META prohibits individuals to kill, take
posses or sell any migratory bird, bird puts, (including nests and eggs) except in accordance with regu1ations
prescribed by the Secretary ofInterior Department (16 V.S Code 703) State protection is extended to aU birds
of prey by the CDFG Code Section 2503.5.
Limited and disturbed raptor and migratory bird foraging habitat exists on site. The loss of this habitat to
development is not considered to be significant due to the project locanon in an urban area and the disturbed
nature of the site. The eucalyptus and other orn.mental trees adjacent to the site provide suitable nesling
habitat for the raptors and migratory birds. (See aerial photograph in Fig.2). NRA, Ine. has determined that
there is no potential for any other sensitive species on site due to past uses of the sire and the condition of.
quality of the habitat on site.
IS 14
e
e
e
IV b)
IV c)
IV d)
IV e)
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
There are no riparian habitats located on the project site.
There are no US Corps of Engineers jurisdictionaJ drainages or wetlands on site, and no water of the State on
the property. There are no California Deparanent of Fish and Game (CDFG) jurisQictional drainages or
wetlands present on the site. The project site does not contain any wetlands as defined by Section 404 of the
Federal Clean Water Act
Wildlife movement and the fragmentation of wildlife habitat are recognized as important wildlife issues that
must be considered in assessing impacts to wildlife. In summary, habitat fragmentation is the division or
breaking up of larger habitat areas into smaller areas that mayor may not be capable of independently
sustaining wildlife and plant populations. Wildlife movement, (more properly recognized as species
movement), is the temporal movement of species along various types of corridors. Wildlife corridors are
especially important for connecting fragmented wildlife habitat.
The project site is located in an urban area of the City of San Bernardino which is not is not within an
adopted Habitat Conservation Plan area.
IS 15
--l
e.
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
v.
CULTURAL RESOURCES - Would the project:
Less Than
PotentWly Significant Less Than No
Significant With Significant Impact
Impact Mitigation Impact
Incorporated
0 0 0 181
0 181 0 0
a) Be developed in a sensitive archaeological area as
identified in the City's General Plan?
b) Cause a substantial adverse change in the significance
of an archaeological resource pursuant to ~15064.5 of
CEQA?
c) Cause a substantial adverse change in the significance
of a historical resource as defined in ~15064.5 of
CEQA'
o
r8I
o
o
d) Directly or indirectly destroy a unique paleontological
resource or site or unique geologic feature?
o
r8I
o
o
e
e) Disturb any human remains, including those interred
outside of formal cemeteries?
o
o
o
181
1). Other:
o
o
o
o
Discussion:
V a) The project site is not located within a sensitive archaeological area as identified in the City's General Plan
Program EIR. In addition, the existing buildings on-site are not listed as historic. (SBGP EIR, 2005)
V b-c) The project site is partially developed with a trailer park, and other areas of the site have been disturbed with
piles of fill material, including asphalt and illegal dumping. During grading and construction, it may be
possible that excavation could expose unknown archaeological or historic resources, not currently visible on-
site. In such a case, the following mitigation measure would be implemented:
CR-1 Prior to issuance of grading permits, the developer sball bave an archaeologist prepare a
monitoring program to be approved by the Development Services Department, whicb
outlines how grading and earthwork will be monitored to protect cultural resources. This
program will identify when and how often a monitor will be on site to monitor earthwork
activities. Upon completion of the earthwork, sucb that a monitor is no longer needed, the
monitor sball submit a report of monitoring to the Development Services Department.
v d) The San Bernardino Valley is known to contain paleontological resources. During grading and construction,
it may be possible that excavation could expose unknown paleontological resources, not currently visible on-
site. In such a case, the following mitigation measure would be implemented:
e
CR-2 In the event that paleontological resources are unearthed during grading or excavation, such
activities sballcease in the vicinity and the developer sball inform the project planner. The
project planner shall inform the San Bemardino County Museum paleontologists. SBCM
IS 16.'
e
e
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
staff shaU determine the appropriate course of action, including the implementation of a
paleontological recovery program.
Ve) There is no evidence of human temains on-site. However, in the unlikely event that any cultutal teSOUttCS or
human remains are unearthed, the following mitigation measures shall be implemented:
CR-3 If any human remains are uncovered, the City, the County Museum and the County Coroner
shaU be notified, and aU activity at the site sbaU cease until the City provides clearance to
resume grading ot construction activities.
IS 17
VI a) A Report ofG'Olechnical Inveltigation. Walnul SI,.,ISoulh Relidenlial Pro/eel, San Bernardino, California, was prepared
. by Southern California Soil and Testing Inc., in August 2005. The project site is relatively flat with a gentle
slope trending in a northwest -southeast direction with an overall change in elevation of approximately 10
feet. Grading to develop building pads, roads, curbs and gutters will be required but no import or ctport of
soil is anticipated In order to ensure stable surface and subsurface conditions for the development of the
site, the Report includes a number of recommendations for development of the site. Implementatioo of the
following mitigation measure will ensure that development of the project will be conducted in accordance
with recommendations contained in the Report.
e
GS-l Grading operations shall be performed in accordance with the recommendations contained
in the Report of Geotechnical Investigation, Walnut S~t South Residential Pmj<<;t, Sa
Bernardino, California (August 200S) and the Fault Surface Rupturf: Hazard Study, WalDut
IS 18
e
e
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
VI b)
Street Residential Project, San Bernardino, Califomia Ouly 2005), prepared by Southern
California Soil and Testing, Inc.
GS-2 Existing, compressible solls underlying portions of the site to receive settlemeot-seoaitive
improvements shall be removed to a minimum depth of 5 feet below existing or finished
grade, whichever is more. Deeper removal may be required if soil conditions warraot during
grading operations. A qualified geologist or engineer shall be contacted to determine actual
removal depths during grading.
According to the FfJlilt Stnfa<t RxpItITr Hazard SfNifj. Wain'" Stml &sid4ntial Prof.a. San Bernardino. Califorttia.
prepared by Southern California Soil and Testing Inc. in July 2005 the project area is located in the City of
San Bernardino in the northwest portion of the San Bernardino vaDey. The vaDey is located within a
depressed structural block bounded by the San Andreas fault to the northeast and the San Jacinto fault to the
southwest. The valley is underlain by approximately 800 feet of sediments overlying crystaUine bedrock.
Sediments are primarily alluvial fan, stream and flood deposits derived &om the San Bernardino and San
Gabriel mountains. The San Jacinto fault zone extends &om the Cajon Pass area southwest to the Imperi2l
Valley.
Locally the San Jacinto fault zone traverses the project site and the Alquist-Priolo Earthquake Zone
associated with the fault encompasses the site (Exhibit 5). The Alquist-Priolo Fault Zoning Act is intended to
reduce the hazard of ground rupture to structures for human occupancy. A fault is given this designation if it
is considered to be "sufficiently active and well-defined" such that it poses a risk of surface rupture. An
active fault is defined as one that has experienced movement during Holocene time (corresponding to the last
11,000 years). The San Jacinto fault is a major active component of the San Andreas fault system.
Southern California Soil & Testing, Inc., analyzed.the site geology, faulting. seismic analysis, groundwater and
liquefaction, flooding and erosion, and slope stability. What appears to be the main strand of the San Jacinto
fault traverses the southwestern portion of the site.
This fault is considered active based upon clear cut offset of Holocene sediments. Based upon current
understanding of the activity level of the San Jacinto fault zone, there is a significant risk of result movement
with ground surface rupture at the subject site within the life span of the proposed residential development
In general, however, no geotechnical conditions were encountered which would preclude the development of
the site as presently proposed, provided the recommendations presented herein are followed.
GS-3 Site development, including construction of foundations, shan be conducted in accordance
with the recommendations contained in the Repon of Geotechnical InvestigatiOD, Walnut
Street South ResideDtial Project, San Bunardino, Califomia (August 2005) and the Fault
Surface Rupture Hazard Study, Walnut Sueet Residential Project, San Bernardino, Califomia
Ouly 2005), prepared by Southern (:alifornia Soil and Testing, Inc.
GS-. . All structures for human occupancy as defined by the Alquist-Priolo Fault Zoning Act shall
maintain a minimum distance of 50 feet &om the northeastern limit of faulting. Sethack
distance shan be measured to the closest portion of the foundations of the proposed
structures.
GS-5 All structure for human occupancy shall maintain a minimum distance of 25 feet &om the
northeastern limit of the intense, fault related liquefaction features. Sethack distance shall
be measures to the closest portion of the foundations of the proposed structures.
IS 19
.
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
GS-6
Post-tension foundations based on the Post Tensioning Institute method .hall be utilized for
the support of proposed structures.
All foundation excavations shall be approved prior to forming or placement of reinforcing
steel by a qualified engineer.
GS-7
VI c) The main geotechnical conditions associated with the fault that will affect the development of the site, as
presently planned, are the presence of potentially compressible sediments underlying the site and the active
San Jacinto fault traversing the southwestern portion of the site. Recommendations contained in the Fault
Surface Rupture Study and Report of Geotechnical Investigation shall be incorporated into the development
of the project. Mitigation measures GS-l and GS-2 outlined above, will ensure that impacts are less than
significant.
VI d) The project site is curren tly vacant except for less than a half dozen houses that would be dernolished. The
majority of the site is covered with common weedy vegetation such that topsoil is held in place. During
grading and construction, erosion or the loss of topsoil could occur, however, with implementation of
mitigation measures identified in Section III Air Quality for the control of fugitive dust, and Section VlIl
Hydrology and Water Quality for the control of stormwater and sediments on-site, the incidence of erosion
would not occur. Because the site is relatively flat, gently sloping in a southeasterly direction, the site will be
graded to accommodate drainage but will not be developed with slopes or other changes in topography that
would be susceptible to erosion or loss of top soil
.
VIe)
The project site is relatively flat with a change in elevation of approximately 10 feet across the site and is
located in an area where there are no physical features that would be subject to landsliding or mudsliding.
Subsidence associated with groundwater extraction is not a common occurrence in the City of San
Bernardino even though the water supply is wholly from groundwater. This is because the Water
Department has a long histoty of water extraction and replenishment such that subsidence does not occur.
VI f) Lquefaction is caused by build-up of excess hydrostatic pressure in saturated cohesionless soils due to cyclic
stress generated by ground shaking dunng an earthquake. The significant factors on which soil liquefaction
potential depends are the soil type and density, intensity and duration of earthquake and depth of
groundwater. With the presence of underlying alluvial material, along with the absence of groundwater less
that 50 feet below grade, potential susceptibility to soil liquefaction is considered to be less than significant
for most of the site. However, there is one area of the site that was identified in the Fault Surface Rupture
Hazard Study that is susceptible to liquefaction. This area is located on the west side of the site in the No-
structure Zone delineated on the site plan (Exhibit 3). No habitable structures are proposed for
development in that area.
VI g) The unique physical feature located on the project site is the San Jacinto fault described above. The proposed
project does not include development of habitable structures or other development. The area in the vicinity
of the fault has been designated a Non-structure Zone and will remain open space.
VI h)
During construction, grading and excavation could resulr in soil erosion, generate dusr or create unstable soil
conditions. For erosion associated with storm events the project contractor will be required to adhere to the
requirements of the City of San Bernardino and to the National Pollutant Discharge EliII1ination System
(NPDES) through implementation of a storm water Pollution Prevention Plan (SWPPP). The following
mitigation measures will ensure that the projecr will have a less than significant impact on erosion, dust and
unstable soils during construction (note: also see Section III Air Quality and Section VIII Hydrology and
Water Quality):
.
IS 20
e
e
e
CITY OF S~ BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
GS-8
GS-9
Prior to the issuance of grading permits, the developer shall receive approval of an erosion
control plan and PMIO management plan &om the Public Worb Division of the
Development Services Department.
An erosion control plan shall be prepared and implemented for the proposed project that
identifies specific erosion control measures to control on-site and off-site erosion &om the
time of ground disturbing activities are initiated through grading completions. This erosion
control plan shall include the following measureS at a minimum.
a. Specify the timing of grading and construction to minimize soil exposure to rainy
periods experienced in Southern California.
b. An inspection and maintenance program shaD be included to ensure that any erosion,
which does occur either on-site or off-~ite as a result of this project, will be corrected
through a remediation or restoration program within a specified time frame.
IS 21
IS 22
e
e
e
Discussion:
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
VII a,c-d) The proposed project is a residential subdivision and does not include a land use that involves the use,
manufacturing, storage or transport of hazardous or potentially hazardous materials. The project site is not
located on a site which is identified as a hazardous materials site. No significant impacts are anticipated. A
Phase I Environmental site assessment was conducted by All Phase Environmental, Inc., the results
revealed that no evidence of recognized environmental conditions in connection with the property exists.
However the following recommended measures and notable conditions apply:
VII b)
VII e)
VII f)
VII g)
HAZ-I Materials suspected of containing asbestos are anticipated to exist in the Property
buildings which are proposed for demolition. When demolition has the potential to
disturb the above materials, a licensed California Certified Asbestos Consultant must
survey the materials for asbestos. If asbestos is found, an asbestos abatement contractor
must fint remove these items prior the renovation or demolition.
HAZ-2 Given the age of the residences on-site, lead based painr may have been used in these
residences. If any renovation on the property involves the sanding, chipping, stripping or
welding of painted surfaces or if demolition will occur, a licensed Califomia Certified
Lead based Paint inspector and Risk Assessor must survey the materials for lead content.
This survey will determine the necessary precautions and disposal requirements needed
to perform the work safely.
HAZ-3 Fill material dumped on the property was visually identified to contain asphalt and may
be contaminated with low levels of petroleum products. Testing of this aoil may be
required for off-site disposal It is recommended that the landfill scheduled to receive
this soil be contacted and sampling requirements be obtained and followed prior to Us
removal off-site.
HAZ-4 There is a small discolored patch of soil, approximately two-feet by four-feet, along the
north Property border where it appears oil has been dumped. This spill appears to be
minimal and is not anticipated to substantially contaminate the groundwater on the
Property. It is recommended that this soil be excavated and disposed of as petroleum
contaminated.
A visual survey of the site was conducted on September 13, 2004. No drums, containers, fluids or other
evidence of stored hazardous materials were noted, and no impacts related to hazardous materials are
anticipated.
The project site is not located within the San Bernardino International Airport Land Use Plan. The San
Bernardino Airport is located approximately 8 miles to the southeast of the project site. The nearest airport
is the Rialto Municipal Airport located approximately 6 miles away. No negative impacts are anticipated to
result from this type of development.
The proposed project will not impair implementation or interfere with an emergency response or
evacuation. The project plan includes adequate access to emergency vehicles and will be subject to its own
emergency preparedness plan. This would consist of a map showing points of ingress and egress, where
on-sueet parking is not allowed, and how circulation for emergency vehicles would be provided The plan
is subject to review and approval by the City Fire MarshaI1. No significant impacts are anticipated.
As indicated in the General Plan the proposed project is not located within a Fire Hazard Area. The City
Council adopted an ordinance in January 2004 (Me 1162) that established a Building Safety Enhancement
IS 23
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
.Area (BSEA), which places additional Fire protection standards of development on aD new construction
projects within the City. With the implementation of the standards within the BSEA the potential impact
from this project in regards to exposure to fires will be lowered to a level of less than significance.
e
e
IS 24
,-,,'
IS 2S
.~
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
e INITIAL STUDY
Potentially Less Than Less Than No
Signifiant Signifiant Signifiant Impact
. Impact With Impact
Mitigation
Incorporated
VIII. HYDROLOGY AND WATER QUALITI
(Hall January 2006) - Would the project
g) Place housing within a lOO-year flood hazard 0 0 0 18I
area as mapped on a fedcral Flood Hazard
Boundary or Flood Insurance Rate Map or other
flood hazard delineation map? (panel No.
0607 1 C8677F)
h) Place within a lOO-year flood hazard area structures 0 0 0 18I
which would impede or redirect flood flows?
i) Expose people or structures to a significant risk of 0 0 ~ 0
loss, injury, or death involving flooding, including
flooding as a result of the failure of a levee or darn?
j) Inundation by seiche, tsunami, or mudflow? 0 0 0 18I
e k) Other: 0 0 0 0
Discussion:
VIII a)
The City implements National PollutantDischargc E1imination System (NPDES) requirements for surface
water discharge for all qualifying projects, including the project site. The development of the propcrry will
result in the improvement of the site, including habitable struCturc5, sttccts and other impervious surfaces.
The developer will be required to retain tOO-year storm flows on site. The City Engineer requires the
preparation of hydrology analysis to assure that on-site retention or detention is sufficient to accomplish this
requirement. The proposed project is not expected to violate any water quality standards or waste Water
discharge requirements. Project build out will increase wastewater flows. However, anticipated flows will be
accommodated through sewer mains and the wastewater treatment plant owned and operated by the City of
San Bernardino without significantly impacting wastewater treatment facilities. Storm water and project
generated urban runoff will be retained on site within adequate retention basins occurring on the subject
propcrry. This and related improvements will enable the project to comply with NPDES requirements. lbe
project will be served by the City of San Bernardino for domestic water, which conforms to the accepted
water quality standards.
e
The project sponsor submitted a Water Quality Management Plan (WQMP), prepared by Hall & Foreman,
Inc. in January 2006, to address issues associated with storm water discharges. Expected pollutants for
residential developments include Bacteria & Viruses, Nutrients, Pesticides, Sediments, Trash & Debris,
Oxygen Demanding Substances and Oil & Grease. lbe WQMP addresses pollutant discharges through the
use of various Best Management Practices (BMPs) through Site Design, Source Control and TRattnent
Control.
The following lists the BMPs to be implemented for the project
IS 26
r--~-
e.
e
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
1. Site Design BMPs
a. Maximize Permeable Area
b. CoFactor Reduction
c. Increase Permeable Surfaces
d Streets and Sidewalks at Minimum Width
e. Minimize Impervious Surfaces
f. Use of Natural Drainage Systems
g. Low Row In6ltration
h. Construction of Retention Facilities
i. Minimize Directly Connected Impervious Areas
2. Source Control BMPs
a. Education ofPropeny Owners
b. Activity Restrictions
c. Employee Training/Education Program
d. Street Sweeping PriVate Street and Parking Lots
e. Common Areas Catch Basin Inspection
f. Landscape Planning
g. Roof Runoff Controls
h. Efficient Irrigation
i. Storm Drain Signage
3. Treatment Control BMPs
a. Infiltration Basins
The above referenced BMPs will be implemented in the following manner:
. Maximize Area Permeability: 1.87 acres of open space have been incorpOtllted into the
project design.
. C-FaclOt Reduction: To the extent possible, landscaped areas on individual lots will
accommodate a percentage of runoff resulting from the impervious areas, thereby reducing the
coefficient of runoff, or 'C-Facto'.
. Increase Permeable Surfaces: Project will exceed the requirement for open space of 1.27
acres entailing 1.87 acres and install a retention basin and a recreational park for infiltration.
. Streets and Sidewalks at Minimum Width: To the extent possible, the project will cons_ct
streets and sidewalks to minimum widths necessary without compromising safety. The project
will provide opportunities for landscaping for collection of roof runoff.
. Minimize Impervious Surfaces: The project will minimize the use of impervious surfaces with
open space landscaping and the retention basin located in the southwestern portion of the site.
. Use of Natural Drainage Systems: Dtainage systems will be consistent with natural drainage
system generally flowing in a northeast to southwest direction. Where applicable, open spaces
and landscaping will be used within the Project area.
. Low Flow Infiltration: The project will provide opportunities for flltration/in6ltration with the
installation of a retention basin, further discussed.
. Construction of Retention Facilities: The project will provide opportunities for in6ltration of
a retention basin and grass swales, further discussed.
. Minimize Directly Connected Impervious Areas: Drainage resulting from rooftops will be
directed into landscaped areas, where applicable. To the extent possible, drainage will be directed
into pervious areas or into the retention basin. There i. little to no sloped areas within the
Project; however, dtlIinage will be directed into pervious and landscaped areas.
IS 27
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
e
. Education of Property Ownen: Educational materials will be distributed to property ownen
focusing on good housekeeping pnctices and other means for protecting storm water quality.
Project conditions shall require that the Home Owner's Association (HOA) provide applicable
materials to residents.
. Activity Restrictions: The established homeowner's association shall restrict the use and
handling potential pollutants that could discharge into the storm drain system. The HOA shall
include provisions for the protection of water quality in their Conditions, Covenants &
Restrictions (CC&Rs). Pesticide application must be performed by a certified applicator.
. Employee Training/Education Program: Employees and agents of the HOA shall receive
educational materials regarding their particular activities how they can prevent impacts to water
quality.
. Street Sweeping Private Streets and Parking Lots: The Owner and HOA shall provide street
sweeping for Commercial and Multi-Family Planning Areas including privately owned streets.
Streets shall be sweeped at least twice annually, prior to the storm season in the late summer or
early fall, to reduce the amount of sediment, garden waste, and trash entering the storm drain
systems. Street sweeping requirements apply to streets where there is sufficient curb and gutter
to justify street sweeping.
. Common Areas Catch Basin Inspection: The HOA shall inspect common area catch basins
on an annual basin in the later summer or early fall. Common area catch basins shall be cleaned
if sediment and/or debris fills 25% or more of the sediment/debris capacity of the facility.
. Landscape Planning: Native and/or drought tolennt plants shall be utilized in the landscape
design. Opportunities for natutal infiltration, slope protection and plant groupings shall be
evaluated and utilized.
. Roof Runoff Controls: Residential sites must be designed to contain and infiltrate roof runoff,
or direct roof runoff to vegetative swales or buffer areas.
. Efficient Irrigation: Runoff shall be minimized through utilization of mulches, electronic
irrigation devices and minimization of ovenpny.
. Storm Drain Signage: The phnse "No Dumping - Flows to Creek" shall be stenciled on all
catch basins.
. Infiltration Basins: Ponding will. not exceed 72 hours in order to meet vector control
requirements. The HOA shall be responsible for long-term Oper:ations and Maintenance, further
discussed
e
The following table indicates the efficiency of Infiltration Basins to treat certain pollutants of
concern:
e
Pollutant of Concern
Sediment/Turbidi
Nutrients
T nsh & Debris
O. en Demandin Substances
Bacteria & Viruses
Oils & Grease
Pesticides
. H a High Removal Efficiency
M . Medium Removal Efficiency
L . Low Removal Efficiency
U . Unknown Removal Bfficiency
Level of Removal Efficien
H/M
H/M
U
H/M
H/M
U
U
IS 28'.
.
e
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
The collection of BMPs to be implemented on the project are designed to minimize the impacts of pollutants
of concern on receiving waters. Through the implementation and monitoring of the WQMP, the project will
be incompliance with the provisions of the City's NPDES MS4 PermiL Impacts on water quality will be
reduced to a level less than significant through the following mitigation measure.
HWQ-t Prior to issuance of grading permits, the project shsll be designed to establish a storm
system that would intercept run-off and treat pollutants of concern. The applicant shsll
prepare a Water Quality Management Plan (wQMP) for the project that includes a
description of the proposed drainage system and the various components (including Side
Design, Source Control and Treatment Control BMPs) that wiD prevent significant
discharges of pollutants of concern into receiving waten.
VIII b) The proposed project is the development of an in-fill residential project consisting 48 single-family detached
homes on "smilllots" of 5,000 square feet on approximately 10.23 acres. The proposed project requests a
. Change of Zone from Industrial Heavy (lH) to Residential Urban (RU-l).
The SBMWD recently completed the Urban Water Management Plan (U\VMP) update (December 2005) that
documents water supply reliability and outlines water use efficiency measures adopted to ensure adequate
water supply in the service area. Included in the UWMP is an estimate of future needs based on population
growth in the City. Since the City is largely built out except for the Verdemont area of the City, projects suCh
as the Walnut Street Tract No. 17754 "small lot" subdivision will likely make up the future growth in the City.
The UWMP identifies an additional 1,055 residential customers between 2005 and 2010, based on the amount
of vacant residential land remaining in the City, and an additional 1,270 residential customers in 2020. The 48
proposed single-family dwellings in this project would be included in this calculation.
SBMWD produces its water supply from 57 groundwater wells located throughout its service ares. Water
wens exist in the vicinity of the site southeast of the Walnut Street and Artesian Avenue intersection.
According to the Department of Water Resources, the depth to groundwater is approximately 188 feet below
grade (phase I Site Assessment, October 2003). Recharge of the aquifer is generally through local
precipitation and by stream flow from rain and snowmelt from the San Bernardino Mounrains watershed.
There are two groundwater wells on the project property but are proposed to be filled Therefore, the project
would not contribute to the depletion of groundwater supplies or interfere with groundwater recharge as
proposed by development of the project. Therefore, no significant impact to groundwater resources is
anticipated
VIII c)
Development of the project site includes the construction of 48 detached single-family dwellings plus,
internal streets, curb and gutter, driveways and landscaped areas. During construction, storm events may
occur that could cause erosion of on-site soils. The developer will be required to comply with NPDES
permit requirements for construction projects. Grading activities associated with the construction period
could result in a temporary increase in the amount of suspended solids in surface flows during a concurrent
storm event, thus resulting in surface water quality impacts. The project site is larger than one acre and,
therefore, is required to comply with the NPDES General Construction Permit to minimize water pollution.
Development in the City of San Bernardino is subject to the State of California's General Construction
Permit under the federal NPDES. The Permit requires that any development proposal that would disturb
more than one acre is required to file a Notice of Intent (NO!) and prepare and implement a Stormwater
Pollution Prevention Plan (SWPPp) prior to implementation of grading or other soil disturbing activities.
The State of California is authorized to adtninister various aspects of the NPDES permiL Construction
activities covered under the State's General Construction permit include removal of vegetation, grading.
excavating, or any other activity that causes the disturbance of one acre or more. The permit requires
IS 29
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
e
e
VIII d-e)
VIIIf)
recipients to reduce or eliminate non-storm water dischotges into storm water syStems, and to develop and
implement a Stormwater Pollution Prevention Plan (SWPPp).
The Regional Water Quality Control Board (RWQCB), Santa Ana Region has issued an area-wide NPDES
Storm Water Permit for the County of San Bernardino, the San Bernardino County Rood Control District,
and the incorporated cities of San Bemardino County within the Santa Ana Region. The City of San
Bernardino then requires implementation of measures for a project to comply with the area-wide permit
requirements. The SWPPP must include Best Management PIlIctices (BMPs) to prevent the project from
polluting surface watets. This is a standard condition of approvolapplicable to most urban projects.
In addition, the applicant must also prepare and implement a Water Quality Management Plan (WQMP) that
would remain in place during the life of the project. A WQMP has been prepared for the project. The
following measures must be implemented ensure impacts &om water runoff and erosioa are less than
significant.
HWQ-2
Prior to issuance of grading permits, the developer shall file a Notice of Intent (NOI)
with the State Water Quality Control Board for construction disturbing one acre or
more of land. Prior to the issuance of a grading permit, the applicant shall suhmit a
copy of the NOI and accompanying SWPPP that specifically identifies the BMP's
that would be used on-site to control stormwater on-site during construction.
Development of the project site includes the construction of 48 detached single-family dwellingS,. plus
internal streets, curb and gutter, driveways and landscaped areas. As a result, stonnwater runoff will occur
from the project site due to the creation of impervious surfaces. Design of the project includes an
internal stonnwater control system consisting of curbs and gutters, dIlIins, and an on-sire retention basin.
In addition, new urban uses would create urban pollutants that must be controlled. The following
mitigation measures are recommended to minimize potential impacts &om properties north of the sire.
HWQ-3 Prior to the issuance of grading permits, a site-sPecific drainage study, which meets
the standards of the City of San Bemardino Puhlic Works Division shall be prepared
by a Civil Engineer who is registered in the State of Califomia. All recommendations
&om this analysis, including facilities necessary to mitigate drainage impacts,
maximize percolation and groundwater recharge to the extent feasible shall be
incorporated into all grading and site improvement plans.
See responses to questions c-eabove.
VIIIg-h) The project site is not located within .lOO-year flood plane.
VIII i)
VIII j)
The nearest water structure to the site is the Lytle Creek channel, a concrete lined channel that runs in a
northwest-southeast direction approximately 2,500 feet northeast of the project site. The channel
contains water intermittendy and does not pose a risk to the project site.
Inundation by seiche, tsunami, or mudflow would not occur because the nearest water feature in the area
is the Lytle Creek channel which carries water intermittendy and is located approximately 2,500 feet away.
The project site is not located near the coast so would not be subject to a tsunami. Finally, the project
site is relatively flat and is not located in on area of steep slopes that would be the source of a mudflow.
1830
e
IX a) The proposed project will Dot diszupt or divide the physical arrangement of an established community. The
project proponent is requesting a change of designation from Industrial Heavy to Residential UrhID (RUl)
per the standards of a "small lot subdivision" in a Planned Residential Development. The adjacent uses are
low to medium intensity industrial, such as an automobile towing facility and the BNSF Railroad storage
yards. Across the street to the north are properties zoned Industrial Light and Residential Urban. Other
surrounding uses are the existing legally nOll-conforming single-fami1y residential uses in the vicinity, and
potential future residential uses on the north side of Walnut Street. The proposed project does not have the
potential to disrupt or divide the physical arrangement of the existing community.
IX b)
The project includes a request for a General Plan Amendment and a Zoning Ordinance change to allow a
small lot subdivision for a detached single-family planned residential development in the configuration and
density proposed The proposal is to develop the 10.26 acres, which is currently zoned as Industrial Heavy,
into 48 single-family dwelling units, with an open space component in compliance the 15 percent useab1e
open space tequttement.
Surrounding land uses and current land use designations are as follows:
IS 31
,
e
. North:
. South:
. West:
. East:
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
RU Residential Urban, Mobil Home Park and Industrial Light (IL), north of the Lytle
Creek Channel are residential neighborhoods
Vacant land in an Industrial Heavy (IH) Zone.
Vacant land and an Auto-Wrecking yard in an Industrial Heavy (IH) Zone
Vacant land in an Industrial Heavy (IH) Zone, east of this area are existing residential
neighborhoods.
The area is a mix of industrial uses and residential neighborhoods with some vacant land The greatest
impacts to the proposed residential subdivision from surrounding industrial uses are associated with air
quality, noise and traffic. Air Quality impacts are evaluated in Section III; Noise impacts associated with
proximity to the BNSF rail yard are addressed in Section XI. Currently traffic along Walnut Stteet and
MUSCOll Street is light and the streets are not designed to handle large trucks or other vehicles typically
associated with industrial uses. In addition, the major industrial use in the area, BNSF, does not appear to use
either of these streets to access its site. In the event that adjacent vacant land is developed with industrial
uses and tIaffic is routed along Walnut Street or Muscott Street, a conflict between residential uses and
industrial uses could occur. However, it would be speculative to try and determine what the needs of that use
would be in terms of access, road width, etc.
Therefore, as currently proposed including the General Plan amendment and Zone Change to allow
residential use, and with existing conditions in the vicinity taken into consideration, the project would not
conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project
e
IX c)
The project is not located within a wildlife conservation plan or natural community conservation plan so it
will not conflict with any applicable habitat conservation plan or natural community conservation plan. The
project is located within the San Bernardino Urban Conservation and Enhancement Area, which is not
intended to undergo a fundamental change in the land use pattern. The focus of the Area is to maintain
stability and quality assurance and strategies are aimed at enhancing and improving the existing uses. The
polices and implementation measures in the General Plan and Neighborhood Improvement program guide
the enhancement of this strategic area. The project site is located in a fairly urbanized region of the city and
no appropriate wililIife habitat exists adjacent to the site, therefore there are no impacts to habitat
conservation plans or natural communities as a result of the development of this project.
IX d) The project site is flat and not located within or adjacent to the Hillside Management Overlay District,
therefore there are no impacts to slopes associated with the development of this project.
IX e) The project site is not being developed within Foothill Fire Zones A, B, or C as identified in the City's
General Plan Safety Element, therefore there are no impacts to fire hazards on-site.
e
IS 32
e.
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
a) Result in the loss of availability of a known mineral
resource that would be of value to the region and the
residents of the state?
Less Than
Potentially Significant Less Than No
Significant With Significant Impact
Impact Mitigation - Impact
Incorporated
0 0 0 181
X. MINERAL RESOURCES - Would the project:
b) Result in the loss of a locally-important mineral
resource recovery site delineated on a local general
plan, specific plan or other land use plan?
o
o
o
181
c) Be located in a Mineral Resource Zone as adopted by
the State Mining and Geology Board and identified in
the City's General Plan?
o
o
o
181
Discussion:
e
X a-c)
According to the San Bernardino General Plan Environmental Resources Element, the project site is within
the MRZ-2 Mineral Zone. This zone is one where the available geological information indicates that there are
significant mineral deposits or that there is likelihood of significant mineral deposits. The Lytle Creek Wash
area has aggregate extraction operations occurring in various locations along the length of the wash, but Dot
in the immediate vicinity of the project site. Due to the site's location within a relatively urban area, recovery
of aggregate resources form the site is not considered to be viable, but the proposed project does not
preclude aggregate material from being extracted in other locations in the wash. Therefore, no significant
impacts to mineral resources are anticipated.
e
IS 33
e
XI a)
NOTE: Tentative Tract 17239 (San Marcos) consists of 95 detached single-family condominium units, and
Tentative Tract 17754 (paloma Park) consists of approximately 48 single-family homes. Because of the
proximity of the north and south tracts of this project and their concurrent development, a noise analysis was
performed by Mestre Greve Associates on February 13, 2006 based on the sum of both tract criteria.
The proposed project will consist of single-family residential units; the noise associated with the proposed use
is expected to be well within the standards established in the General Plan. However, short-term
construction noise may affect adjacent residences during on-site construction from equipment and vibration
from excavation and grading.
The only source of noise impacting the project site is from activity at the rail yard located just southwest of
the project. The noise measurements presented in Section 1.5 showed that the Ldn (Day-Nigh Average
Level) at the measurement site was 61.7 dBA. Ldn represents the average A-Weighted sound level during a
24-hour period, obtained after the addition of 10 decibels to sound levels in the night from 10:00 p.m. to 7:00
a.m. The measurement site was selected to represent the worst-case receptor within the project. Therefore,
noise levels in all other areas of the project will be less than the measured noise level. Thetefore, outdoor
noise levels within the project will not exceed the City's 65 Ldn outdoor noise standard
IS 34..
e
e
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
Typical construction (complying with Tide 24 energy efficiency requirements) provides 12 dB of outdoor-to-
indoor noise reduction with open windows and .t least 20 dB of reduction with closed windows. Therefore,
indoor noise levels are projected to be 50 Ldn with open windows and 42 Ldn with closed windows. With
open windows the indoor noise levels will exceed the interior standard but the standard will not be exceeded
if windows can remain closed. Therefore, the project will be significandy imp.cted by noise if windows of
the homes cannot remain closed. Mitigation is .s follows:
N-1 Buyer Notification Program-All potential buyers of homes in the project shall be notified to
the existence of the rail yards in the vicinity of the project and the fact that most of the
activities at these rail yards occur during the nighttime hours, that noise levels in the area are
typicaDy higher during the nighttime hours than during the daytime hours, and that
windows will need to be c:losed to reduce the noise levels generated by the rail yard to below
the City's standards, although the residents are not required to keep the windows closed.
N-2 Mechanical Ventilation-Homes within the project win need to be ahle to keep their
windows c:losed to meet the City's 4S Ldn standard. Therefore, mechanical ventilation
confirming to the requirements of the Uniform Building Code will need to be provided to
aDow occupants to keep their windows c:losed. Note that windows do not need to be sealed
shut, but be able to remain c:losed at the occupants' discretion. Mechanical ventilation
anows this. The means to satisfy this condition han be included in the architectural
drawings for the project prior to issuance of building permits.
N-3 Sound Rated Windows-To ensure that homes adjacent to the rail yard are not significantly
impacted by single event noise from rail yard activities or train pass bys on the rail line east
of the project site aD windows in the homes on Lots 24-29 of Tract 17239, and Lots 1-3, 11-23,
36-40, and 46-48 of Tract 17754 shown in Exhibit 7 shaD be sound rated with a minimum
STC raring of 34. Window specifications shaD be inc:luded in the architectural drawings for
the project prior to issuance of building permits.
XI b) As discussed in item ..... .bove the project itself should not h.ve .ny imp.cts on the levels of noise (Including
ground bome vibrations) due to its residential n.ture, however there may be some excessive vibrations or
noise levels during construction. With the proper mitigation as indic.ted for item ..... the impact from
ground bome vibrations should be less than significant. The project site is nOt exposed to considerable noise
levels &om any arterial ro.dways.
XI c) The project is residential in n.ture. There will be .n increase in noise levels during the day &om children
playing .nd vehicle ingress and egress &om the project ares, but this increase is not considered to be a
substantial permanent increase in ambient noise. The project area is a residential land use district; the noise
generated by residential uses is expected within the are.. No impact is .nticipated.
XI d) Noise levels generated by construction of the project will exceed the California Model Noise Ordinance
Limits .t the homes adj.cent to the project. However, the Model Noise Ordinance exempts construction
noise th.t occurs during weekday daytime hours and noise generated by typical construction equipment
. during these hours is typically not considered to result in . significant noise imp.ct. Construction is not
proposed to occur outside the hours of 7:00 ..rn. and 7:00 p.rn. Monday through Saturday, nor on national
holidays. With this condition construction of the project will not result in . significant short-term noise
impact.
IS 35
e
e
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
N-4 Noise-generating construction activities are prohibited between the hours of7,GO p.m. and
7:00 a.m. nor anytime on Sundays or federal holidays.
XI e) The project is not located within an airport land use plan or Airport Influence Area, therefore it would not
expose people residing or working in the project area to excessive noise levels.
IS 36
e
e
tit
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
XII. POPULATION AND HOUSING - Would the project
a) Induce subst2l1tW population growth in an area, either
direcdy (for example, by proposing new homes and
businesses) or indirecdy (for example, through
extension of roads or other infrastructure)?
b) Remove existing housing and displace substantial
numbers of people, necessitating the construction of
replacemen t housing elsewhere?
c) Other: Is the proposed project in a redevelopment
area? Is the proposed project subject to Indusionary
housing provisions?
Discussion:
Less Than
Potentially Significant Less Than No
Significant With Significant Impact
Impact Mitigation Impact
Incorporated
0 0 181 0
o
o
o
181
o
181
o
o
XII a) The proposed project would add 48 new single-family units to the area with an overall density of 4.7 dwelling
units per acre. The project will require a General Plan Amendment and Zoning Ordinance to allow the
development of single-family homes on a small lot subdivision in the Industrial Heavy zone where it is
proposed. The project site is already served by roads and other infraauucrure to which the proposed project
will connect. In a city that is over 50 square miles and has a population of approximately 190,000, the
subdivision of 10.26 acres and the addition of 48 single-family residences is a relatively small project. The
project is anticipated to have a less than significant impact on inducing growth.
XII b) Five single-family residences, detached garages, a barn, stored materials and a vacant unused lot currently
occupy the project site and would be demolished The applicant is also the current landlord of these dwellings
and collects rent from the tenants residing in the five homes. There is no plan to assist in relocating the
tenants.
XII c) The proposed project is located in the Mt. Vernon Corridor Redevelopment Area as defined in the City of
San Bernardino General Plan. In accordance with the provisions of the Replacement and Inclusionary
Housing Plan - Year 2001, the project is required to make 15% ofits units available at a cost affordable by
low or moderate-income households. This would equate to 7 units of affordable housing. The project
proponent will be required to enter a covenant with the City to keep the specified units available at affordable
rates for a set amount of time. The City currendy has a surplus of affordable housing according to the City of
San Bernardino Replacement and Indusionary Housing Plan - Year 2001 (Resolution No. CDC/2001-17).
Through fiscal year 2011-2012, the Mt. Vemon Corridor Redevelopment Area is required to provide 38 units,
15 available for very-low income households and 23 available for low to moderate income households.
Currendy, this Redevelopment Area has 97 exiting units available to these income levels which consists 59
surplus units (97 - 38 = 59). Table 6 illustrates this information. Impacts are anticipated to be less than
significant.
IS 37
e
e
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
Table 6
Mt. Vernon Corridor Redevelopment Area Inclusionai}' Housing Requirements
2001-20n
Existing Units Projected Total Total Units Reauired Gross Needed
VerY Low I Low to Mod.
97 157 254 15 I 23 38
Source: Replacement and lnclusionary Housing Plan - Year 2001
IS 38
XIII a) Fire Protection: The City of San Bernardino Fire Department provides fire protection and emergency
medical services in the City. The Fire Department provides emergency medical care (with emergency
medical team personnd and panmedics), "HozMat" (hazardous materials) teams and resources, and aitaaft
rescue and fire fighting services. The Fire Department also conducts fire safety inspections of businesses,
and educates the public about safety measures through school and disaster preparedness programs.
The City of San Bernardino Fire Department has 12 fire stations. The nearest fire station to the project site
is Fire Station No.9 located at 202 North Meridian Avenue, approximatdy 1.5 miles northwest of the
project site. The proposed project is a residential in-fill project of 48 detached single-fami1y dwellings that
would not require additional Fire Department services beyond what can be provided. Devdoper Impact
fees are collected at the time of building permit issuance. Therefore, impacts to fire protection are
anticipated to be less than significant.
tit
Police Protection: The City of San Bernardino operates its own Police Department that divides the City
into five districts or areas. The project site is located in Area A with two Police stations serving the area;
one at 1574 West Baseline Street and a second at 1332 West Fifth Street. The Fifth Street Station is
approximatdy two miles northeast of the project site. All emergency calls and requests for service from the
project site will be dispatched from the main police station at 710 North D Street. Response times of police
patrol units average 4.5 minutes for 911 Emergency calls; 7.9 minutes for 911 Priority One (Urgent) calls;
and 19.2 minutes for Priority Two (As Soon as Possible) calls.
Devdopment of the project site will generate an inaemental increase in the need for police protection in
the project area. The Police Department reviews its needs on a yearly basis and adjusts service levels as
IS 39
e
e
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
needed to maint2in an adequate level of public protection. Developer Impact fees are collected at the time
of building permit issuance for approved projects. Therefore, with thc payment of these fees, impacts to
law enforcement are anticipated to be less than significant.
Schools: The project site is located within the boundary of the San Bernardino City Unified School District.
The proposed 48 detached single-family dwellings could generate a population of 125 persons based on a
household size of 2.6 persons (from the IS prepared by LiIbum) per household and future students would
be expected to attend the local schools. The School District required development impact fees to be paid
on the basis of square footage per unit. These fees are currendy collected at the time of building permit
issuance. Therefore, impacts to schools are anticipated to be less than significant.
~ The proposed project is anticipated to generate approximately 125 people based on a household size
of 2.6 persons per household. The applicant is proposing on-site recreation amenities but this does not
preclude residents from uti1izing the public parks. The City's Parks, Recreation and Community Services
Department operates the City's parks and recreation programs. Residential projects are required to pay
developer impact fees for Parks and Recreation which will be collected at the time of building permit
issuance. Therefore, impacts to parks are anticipated to be less than significant.
Government Services: The proposed development would not require the use of additional governmental
services beyond what has been identified above. Therefore, no impact is anticipated.
Maintenance of Fublic Facilities: The additional amount of traffic generated by the proposed project would
be approximately 900 daily trips. The project applicant would be required to pay fees established by the
Public Works division to minimize impacts to public roads, refer to Traffic and Circulation section (Section
XV). Therefore, potential impacts to maintenance of local roads are anticipated to be less than significant.
1540 .
.
.
.
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
Potentially
Significant
Impact
XIV. RECREATION
a) Would the project increase the use of existing
neighborhood and regional parks or other
recreational facilities such that substantial physical
deterioration of the facility would occur or be
accelerated?
o
b) Does the project include recreational facilities or
require the construction or expansion of
recreational facilities which might have an adverse
physical effect on the environment?
c) Other:
o
o
Discussion:
XIV a)
LcssThan
Significant
With
Mitigation
Incorporated
o
o
o
Less Than
Significant
Impact
No
Impact
l8]
o
o
l8]
o
o
The proposed project includes the development of Tentative Tract 17754, a residential "small lot"
subdivision of 48 single-family lots on approximately 10.23 acres. The proposed project would increase the
use of existing neighborhood parks such as Lytle Creek Park, Nunez Park, and Nicholson Park.
Development of the proposed project will create an incremental increase in the demand for governmental
and public services, which are anticipated by build out of the General Plan and mitigated by the payment of
development impact fees. Therefore substantial physical deterioration of these facilities would be mitigated
and a less than significant impact is anticipated
XIV b) The proposed project includes open space associated with retention basins on-site but no active
recreational facilities arc proposed.
IS 41
e
XVa-b)
XV c)
The proposed project consists of 48 new detached single-family residences on a "small lot" subdivision,
which will incrementally impact the area street system. Direct access to the development is planned via
internal roadways that open onto Walnut Street. Walnut Street intersects with a major roadway, Mount
Vernon. Walnut Street at its intersection with Mr. Vemon is signalized. Internal roads will provide one (1)
lane in each direction and will be approximately 37 feet wide. Since the project includes less than 50
dwelling units, a traffic impact study was not Wllmlnted per the project proponent's consultation with LSA
Associates, Inc.
As proposed the project will not cause a significant change in the level of service at any of the aclja~t
intersections, less than significant impacts are anticipated
The proposed project will not affect air tuflic patterns. No significant impacts are anticipated
1542
e
e
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
XVd)
XV e)
XVf)
XVg)
The project is being designed to meet all current City standards for street widths, comer radii, intersection
contro~ etc. No impact is anticipated.
The proposed project will provide at least two means of access for each phase of the project. No impact
is anticipated.
Parking will be provided on-site for each individual home at the minimum rate of two interior garage
spaces plus driveway space for two additional vehicles. Many of the units are proposed with two car
garages. In addition, interior streets are designed to accommodate curbside parking on both sides of the
street. No significant impact is anticipated.
The proposed residential project will not conflict with any adopted policies, plans. or programs relating to
alternative transportation. No significant impacts are anticipated.
1543
. .'~r.~
XVI aJ The proposed project will result in the construction of 48 detached single-family dwellings. The City has a
permit &om the Santa Ana Regional Water Quality Control Board for all wast=ater generated within its
boundaries. The City has planned for the development of the project site as residential units and light
industrial uses, including wast=ater. The current system for wastewater will be adequate to handle the
increase expected from the 48 residences. No significant impact is anticipated.
e XVI b)
The proposed project includes the construction of new water and sewer service facilities on the project site
to tie into the existing facilities. The existing facilities have adequate capacity to handle the expected
IS 44
e
e
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
increase from the pro!,<>sed development. Also see discussion in Section VIII Hydrology and Water
Quality.
XVI c)
The proposed project includes construction of on-site storm water facilities including retention basins to
prevent on-site and off-site flooding. All construction of the proposed storm water facilities must occur
during construction of the project. Therefore, no impacts to the City's storm water ficilities would occur.
XVI d)
The proposed project is the development of an in-fill "Planned Residential Development" (PRO) project; a
48-unit detached single-family dwel1ings on a "small lot" subdivision on approximately 10.23 acres. The
project is served by the SBMWD water system. There is currently a sufficient water supply available from
the City of San Bernardino to serve this project. No impact is anticipated.
The SBMWD recently completed the Urban Water Management Plan (UWMP) update (December 2005)
that documents water supply reliability and outlines water use efficiency measures adopted to ensure
adequate water supply in the service area. Included in the U'IX'MP is an estimate of future needs based on
population growth in the City. Since the City is largely built out except for the Verdemont area of the City,
projects such as the Walnut Street Tract 17754 "small lot" subdivision will likely make up the future growth
in the City. The UWMP identifies an additional 1,055 residential customers between 2005 and 2010, based
on the amount of vacant residential land remaining in the City, and an additional 1,270 residential
customers in 2020. The 98 condominiums proposed in this project would be included in this calculation.
XVI e)
The site is within the City of San Bernardino sewage service area, which has adequate capacity to serve the
proposed project. Appropriate Sewer Connection Fees will be required by the Department of Public
Works through standard conditions of approval. Any impacts to the sewer system will be less than
significant.
XVI f) The proposed project will be served by the City of San Bernardino Refuse & Recycling Division, which
provides collection service. to residential and commercial customers for refuse, recyclables, and green
waste. The City uses one of three different County landfills in the region for solid waste disposal. Materials
that are not recycled in compliance with California Integrated Waste Management Act (AB 939) are taken
to one of two regional landfills in the valley (San Timoteo: permitted until 2026 or Mid- Valley: pamitted
until 2033). The existing landfills have the capacity to handle the increase expected by the proposed
developmendt is anticipated that the existing solid waste provider (City of San Bernardino) would provide
service to the project site during and after construction. Significant impact to solid waste services or landfill
capacities is not anticipated.
}"'VI g) The City of San Bernardino Public Service Department is subject to all federal, state, and loalltatutes
regarding solid waste disposal. The proposed project will utilize the services provided by the City of San
Bernardino and will be subject to the same regulations as is the City. No impact is anticipated.
IS 45
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
e.
Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
XVII. MANDATORY FINDINGS OF SIGNIFICANCE
b) Does the project have impacts that are individually
limited, but cumulatively considerable?
("Cumulatively considerable" means that the
incremental effects of a project are considerable
when viewed in connection with the effects of past
projects, the effects of other current projects, and
the effects of probable future projects.)
c) Does the project have environmental effects which
will cause substantial adverse effects on human
beings, either directly or indirectly?
o
o
181
o
o
o
o
181
Discussion:
e
XVII a) The project site would not have a significant impact on biological resources because of the highly disturbed
nature of the site. Thus, the project does not have the potential to degrade the quality of the environment
or substantially reduce the habitat of a fish or wildlife species, cause a fish or wilcllife population to drop
below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or
restrict the range of a rare or endangered plant or animal, or eliminate important examples of the major
. periods of California history or prehistory.
XVII b) The proposed project will not generate significant impacts to the environment because of the relatively
small size of the project - 48 dwelling units.
XVII c) As demonstrated by the Initial Study, the projeCt does not contain environmental effects which will cause
substantial adverse effects on human beings, either directly or indirectly, if mitigation measures are
incorporated into the projecL
e
IS 46
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
e
MITIGATION MEASURES
AIR QUAUTY
AQ-l The pro;oct shall comply with the requir=""ts of the SCAQMD Rulos 402 and 403 for fugitive
dust, which r<quiros the impl=""tation of Reasonable Available Control Moosuros (RACM) for all
fugitive dust sourcos, and the Air Quality Manag<m""t Plan (AMCP), which id<ntifios Bost Available
Control M..suros (BACM) and Bost Available Control T<ebnologios (BACI) for aroa SOUlC<S and
point sourcos, rospectivdy.
AQ-2
a. The project propon""t shall <nsure that construction <quipment shall be prop<rly maintainod and
serviced to miillmize exhaust emissions.
b. The project proponent shall ensure that existing power sources are utilized wh= f..sible via
t=porary power pol.. to avoid on-site power goneration.
c. The project propon""t shall ""sure that construction porsonnd be informod of ride sharing and
transit opportunities.
d. The project propon""t shall ensure that any portion of the site to be graded shall be pre-watorod to a
dopth of throe foot prior to the onset of grading activities.
e. The project proponent shall msure that watering of the site or other soil stabilization method shall
be =ployed on an on-going basis aflU the initiation of any grading activity on the site Portions of
the site that or< activdy h<ing graded shall be wat<red rogularly to ensuro that a crust is formod on
the ground surface, and shall b. wat<red at the end of each workday.
f. The project proponent shall msure that all disturbed areas are tr<ated to prevent omsion until the sit<.
is fully constructed.
g. The project propon""t shall ""sure that landscaped aroas are installed as soon as possible to r<ducc:
the potential for wind omsion.
h. The project proponmt shall msm< that SCAQMD Rule 403 is adh<red to, ensuring the ckan up of
construction-related dirt on approach routos to the site.
1. The project proponmt shall msure that all grading activiti.. are susp""ded during fint and s<cond
stag< ozone opisod.. or whm winds exceod 25 milos por hour.
J. All buildings on the projoct site shall conform to enugy use guiddines in Tide 24 of the California
Administrative Code.
e
AQ-3
AQ-4
AQ-5
.AQ-6
e AQ-7
To reduce unissions all <quipmmt usod in grading and construction must be tunod and maintainod
to the manufacturer's specification to maximize burning of vehicle fuel.
The r..id""ces shall b. constructed to UBC standards for insulation of walls, roofs, windows, ete. to
miillmize unissions from home h..ting and cooling.
The rosidmces should b. built with natural gas firoplaces to reduce the criteria-poUutant unissions of
wood smoke.
Construction scheduling shall be as such that asphalt paving operations and the application of
architectural coating (painting) do not occur concurrendy.
To the gr..tost atmt f..sible, use of pre-coated, pre-colorod and nanrrally colored building materia1a
wiD be usod to miillmize the amount of paint used for architectural coating.
IS 47
e.
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
AQ-8 To th~ great~st extent possibl~, high tr.msfer ~fliciency painting m~thods such as HVLP (High
Volum~ Low Pressur~) sprayers and brush~s/rollers will ~ us~d for th~ application of architectural
coating.
BIOLOGICAL RESOURCES
HR-1 Burrowing owls are not ~xp~ct~d to take up r~idenc~ on th~ sit~ as long as th~ current land
managem~nt practices r=ain in forc~. However, if th~ sit~ r=sins fallow, burrowing owls could
colonize th~ property. In that event, it is recommend~ that a focus~d surv~ for ilia! ~~ ~
conducted prior to project constructions relat~ to ground disturbance. The surv~ should b~
conduct~d according to the r~commend~d guidWn~s of th~ Burrowing Owl Consortium (1993).
CULTURAL RESOURCES
CR-1 Prior to issuance of grading permits, the developer shall hav~ an archa~ologist pr~are a monitoring
program to be approved by the Development Servic~s D~artment, that outlin~ how grading and
earthwork will b~ monitored to protect cultural resources. This program will identify when and how
often a monitor will be on site to monitor earthwork activities. Upon completion of th~ earthwork,
such that a monitor is no longer needed, the monitor shall submit a r~ort of monitoring to th~
Developm~nt Services Department.
e
CR-2 In the event that pal~ontological r~ources ar~ unearthed during grading or excavation, such actiViti~
shall cease in the vicinity and the developer shall inform the project pbnner. The project pbnner
shall inform the San Bernardino County Museum pal~ontologists. SBCM staff shall d~termin~ th~
appropriate course of action, including th~ impl=entation of a pal~ontological r~covery program.
CR-3 If any human r=ains ar~ uncovered, th~ City, th~ County Museum and the County Coroner shall ~
notifi~d, and all activity at the site shall cease until the City provides clearanc~ to r~um~ grading or
construction activities.
GEOLOGY AND SOILS
GS-1 Grading op=tions shall be perform~ in accordanc~ with the recommendations contain~ in ~
R~ort o/Wot.dJmtallnlJUtlgatlon, Walnllt St,.,t SOllth p,mdt"tiaI Prof.a, San Bmranii"o, Calif0mi4 (August
2005) and th~ FaIIlt S1I1= Rxpfllrr Hazard Stllt!J, Wabrllt Sfrrlt p,mdt"tiaI Profta, San BmumliIll1.
California Guly 2005), prepar~d by Southern California Soil and T~ting.lnc.
GS-2 Existing, compressibl~ soils underlying portions of the site to r~ceive s~ttl=ent-sensitiv~
improv=ents shall ~ remov~d to a minimum d~th of 5 fe~t below existing or finish~ grade,
whichev~r is more. Deeper r~moval may be required if soil conditions warrant during grading
operations. A qualified geologist or engineer shall be contacted to determine actual r~moval d~ths
during grading.
e
GS-3 Sit~ development, including construction of foundations, shall b~ conduct~d in accordan~ with tb~
recommendations contained in the "&port 0/ GlOfethnitallntJIftlgatio", WaI"lIt Sm.t SOIIth RNiJnItiaI
Pmj.a, San BlTt/ardino, California (August 2005) and th~ FaIIlt SII1<<' Rxpfllrr Hazard Sfllt!J, WaItud Sfrrlt
Rlfidt"tiaI Prof.a, San B""ardi"o, California (July 2005), pr~par~ by Southern California Soil and
Testing, Inc.
IS 48
e
e
e
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
GS-4 All structures for human occupancy as defined by the Alquist-Priolo Fault Zoning Act shall maintain
a minimum distance of SO feet from the northeastern limit of faulting. Setback distance shall be
measures to the closest portion of the foundations of the proposed structures.
GS-S All structure for human occupancy shall maintain a minimum distance of 2S feet from the
northeastern limit of the intense, fault related liquefaction features. Setback distance shall be
measures to the closest portion of the foundations Qf the proposed structures.
GS-6 Post-tension foundations based on the Post Tensioning Institute method shall be utilized for the
support of proposed structures.
GS-7 All foundation excavations shall be approved prior to forming or placement of reinforcing steel by a
qualified engineer.
GS-8 Prior to the issuance of grading permits, the developer shall receive approval of an erosion control
plan and PM\U management plan from the Public Works Division of the Development Services
Department.
GS-9 An erosion control plan shall be prepared and implemented for the proposed project that identifies
specific erosion control measures to control on-site and off-.ite erosion from the time of ground
disturbing activities are initiated through grading completions. This erosion control plan shall include
the following measures at a minimum.
a.
Specify the timing of grading and construction to minimize soil exposure to rainy periods
experienced in Southem California.
b. An inspection and maintenance program shall be included to ensure that any erosion, which
does occur either on-site or off-s.ite as a result of this project, will be corrected through a
remediation or restoration program within a specified time frame.
HAZARDS AND HAZARDOUS MATERIALS
HAZ-l Materials suspected of containing asbestos are anticipated to exist in the Property buildings which
are proposed for demolition. When demolition has the potential to disturb the above materials, a
licensed California Certified Asbestos Consultant must 'survey the materials for asbestos. If
asbestos is found, an asbestos abatement contractor must first remove these items prior the
renovation or demolition.
HAZ-2 Given the age of the residences on-site, lead based paint may have been used in these residences. If
any renovation on the property involves the sanding, chipping, stripping or welding of painted
surfaces or if demolition will occur, a licensed California Certified Lead based Paint inspector and
Risk Assessor must survey the materials for lead content. This survey will determine the necessary
precautions and disposal requirements needed to perform the work safely.
HAZ-3 Fill material dumped on the property was visually identified to contain asphalt and may be
contaminated with low levels of petroleum products. Testing of this soil may be required for off-
site disposal. It is recommended that the landfill scheduled to receive this soil be contacted and
sampling requirements be obtained and followed prior to its removal off-site.
HAZ-4 There is a small discolored patch of soil, approximately two-feet by four-feet, along the north
Property border where it appears oil has been dumped This spill appears to be minimal and is not
1849
e.
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
anticipated to substantially contaminate the groundwater on the Property. It is recommended that
this soil be excavated and disposed of as petroleum contaminated.
HYDROLOGY AND WATER QUALITY
HWQ-! Prior to issuance of grading permits, the project shall be designed to establish a storm system that
would intercept run-off and treat pollutants of concem. The applicant sball prepare a Water
Quality Management Plan (WQMP) for the project that includes a description of the proposed
drainage system and the various components (including Side Design, Source Control and
Treatment Control BMPs) that will prevent significant disohuges of pollutants of concern into
receiving waters.
HWQ-2 Prior to issuance of grading permits, the developer shall file a Notice of Intent (NOl) with the
State Water Quality Control Board for construction disturbing one acre or more of land Prior to
(he issuance of a grading permit, the applicant shall submit a copy of the NOI and accompanying
SWPPP that specifically identifies the BMP's that would be used on-site to control stormwater
on-site during construction.
HWQ-3
Prior to the issuance of grading permits, a site-specific drainage srudy, which meets the standards
of the City of San Bernardino Public Works Division shall be prepared by a Civil Engineer who is
registered in the State of California. All recommendations from this analysis, including facilities
necessary to mitigate drainage impacts, maximize percolation and groundwater recharge to the
extent feasible shall be incorporated into all grading and site improvement plans.
. NOISE
N-! Buyer Notification Prograrn--All potential buyers of homes in the project shall be notified to the
existence of the rail yards in the vicinity of the project and the fact that most of the activities at
these rail yards occur during the nighttime hours, that noise levels in the area are typically higher
during the nighttime hours than during the daytime hours, and that windows will need to be
closed to reduce the noise levels generated by the rail yard to below the City's standards,
although the residents are not required to keep the windows closed.
N-2 Mechanical Ventilation-Homes within the project will need to be able to keep their windows
closed to meet the City's 45 Ldn standard Therefore, mechanical ventilation confirming .to the
requirements of the Uniform Building Code will need to be provided to allow occupants to keep
their windows closed. Note that windows do not need to be sealed shut, but be able to remain
closed at the occupants' discretion. Mechanical ventilation allows this. The means to satisfy this
condition hall be included in the architectural drawings for the project prior to issuance of
building permits.
.
IS SO
e
e
e
CITY OF SAN BERNARDINO
DEVELOP~NTSERV1CES
INITIAL STUDY
N-3 Sound Rated Wmdows-To ensure that homes adjacent to the rail yud are not significandy
impacted by single event noise &om rail yud activities or train pass bys on the rail line east of the
project site all windows in the homes on Lots 24-29 ofTraCl17239, and Lots 1-3, 11-23,36-40,
and 46-48 ofTraCl17754 shown in Exhibit 7 sball be sound rated with a minimum STC rating
of 34. Window specifications shall be included in the architectural drawings for the project prior'
to issuance of building permits.
N-4 Noise-generating construction activities are prohibited between the hours of7:oo p.m. and 7:00 .
a.m. nor anytime on Sundays or federal holidays.
IS 51
.
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
e.
REFERENCES. The following references cited in the Initial Study are on file in the Development Services
Department.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
I!.
12.
13.
e 14.
15.
16.
e
All Phase Environmental Inc., Phas, I EIIIIiro1l11l."taI Sill AmsJllt.,,1 ofWaI"I/1 Slml ESA SOl/I_I
Co",.,.ofWaltrl/1 SIn.IQ//dAmriIl"A",_, SO" BmtanJi"o, Califomia, 92410, September 13,2004.
Alquist-Priolo Earthquake Fault Zones Map
City of San Bernardino General Plan (SBGp)
City of San Bernardino General Plan Program EIR (SBGPEIR)
City of San Bernardino General Plan Land Use Plan/Zoning Districts Map
City of San Bernardino Development Code (fide 19 of the San Bernardino Municipal Code)
City of San Bernardino Replacement and Inclusionary Housing Plan - Year 2001
Federal Emergency Management Agency, Flood Insurance Rate Maps
Hall & Foreman, Inc., Drai1/l1gt &portforT."IIlJi/ft Tract Map No. 17754, April 3, 2006.
Hall & Foreman, Inc., Water QI/ality Ma1/l1gt111,,,1 Pia" for Sa" Marcos Homll, u..c Dtllllopmllll Proj.ct,
January 2006.
Mestre Greve Associates, Air QI/ality Assmmlllt for Tllltativ, Tracts 17239 and 17754, City of San
BtI7IIl1'dino, February 13, 2oo6a.
Mestre Greve Associates, Noise Amssmlllt for T.ntativ, Tracts 17239 and 17754, City of San Bmtardino,
February 13, 2oo6b.
Natural Resources Assessment, Inc., G.ntral Biolotftal Assmm.nt for Tentative T met map No, 17754,
January 20, 2006.
Southern California Soil and Testing, Inc., FaIIlt sllrfaa Rxptll,.. Hazard Stl/<!J, Walnllt Slmt &sidnttial
Project, San Bmtardino, Calijim"", July 2005.
Southern California Soil and Testing, Inc., &pot ofGttJltchnical I"vestigatio", Walnl/t SIn.t SOllth
&sidential Pro/.ct, San BtI7IIl1'dino, Califorlli4, August 2005.
Southern California Soil and Testing, Inc., &portofpercolation Tilt RIll/its, Waltrllt SIn,t Somh Residential
Proj.ct, San BtI7IIl1'di"o, Califorllia,January 2006.
IS S2 .
I
.1 ' .
, . .
e
e
e
Regional Map
@~~
.
.-
.~
@
@
f- .
oC"'"",.....
"....".......,. ......,.....,.~...... of
Rq:rnno' C <,Ol<xt \lop
i
i
il
,,'
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
-..
........... 'f.
............... .:.
---
.
a
t...
-
@l
&.....oc:wcu...p 0 G>
.-
~..
I'to/Kt . .._
s. san
'Iwo*' --
. ~ @
... ..~
. .~
Lm'W u..
(:''''I;NI.o
CJ
.-'"
',.- ... SlIMI
w._~
J
t
l
..
.,......-,._,... .........._ d. .._.......
\ "'':lnrty \lJ.p
lIClGJ.E-I!L.L.\~D INC.
.l'.....'"""~~'-.....,.....~'fht..
Ai~o.
..._~.'
Ii'\..
J.Ja~
.,
@l
0.............
,.....
.
t
i-
.
':~.
.'';;
I ~~
;; Ii,
!~\O
~,~.~
,,~
..
Walnut Street North Track No.l~
S;m B..'t"Tl:IrUlnll. C.;abIomi;t
RegionaL' Vicinity Map
jq...." 2S.1ll16
IS 53
j
J
;
"
~c-w
,..,.
W.UllIIr...
,0;.....-;..
.
.
e
. .
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
Vicinity Aerial Photograph with Project Site
Tract ::-Jo.17754
S," Bcnuu:clinLl. Califomia
HOGLE-lRElA.'\.;TI D<c.
." 1.J...tl"......,"C'dll~".1->rl._.w.'l:J,...
Aerial Photograph
January ~5..200C5
IS 54
.
.
.
"
.
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
INITIAL STUDY
Site Pl2n
-
.zl'C,l1a.:-anc,...
TENTATIVE TRACT MAP NO. 17754
CDtar1I>>IAL ... ~ .-rI! PUN ..
"~IG'OI-
-
Em-E'~.l!";= .
~~_7.U':
_.......&t'&IZ~
_1__'"
-"
. - ,
. ..
--. --
iili'~-m~:::::
~'!!i~~
==..
=J
--
-
-
....-.:0=
!5::i:"
-
...........
=1:..:..':"'-
-
Er-';l..--'"
-
itiiC"
-
P-.fil!"-
--
ilK!'F'"
~--
-~
-:-,.---- ----t-- -
I
__..l....._
-
--~-
....
U
~..-
-
.....-
IS 55
t
-
-
--...
--...-
--
~-_..-
. -
~
-
=-..=.-=.:1.11:......-
~
- -
~'l!."=:'a"=....
~l
l'HF';-- ~
...
___ .~.. ~ S I
e
!!i:~.-..~
lIlUNlW! n&oICTlIM...."'" _.
--....,..",.......... I
-.-
CITY OF SAN BERNARDINO
DEVELOP~SERVlCES
INITIAL STUDY
e
Exhibit 5: Alquist-Priolo Zone Boundary Map
.. - - -~;;;-:r-'- . -3. . , j' 1
~~ s:~Nn-" h ~S t: ~Ip,,~'. r i17.1;k I ,I
;.~" cD'lOl, " h: II :'J'; ;:',: 1: 1:-& I'.~ I Ii Ill.r
:.......~ ,'\' I r. I' (,) I' JiC ,'~ i I ~ J,: ...w'1
'1_.'" '. I. I ;, ""':::..-JLil ....-.!..... ..~~._-- ..--->>'
.' m'II..=,,'7~'I1~1 i' (-.'@......I ~. 1i <(It
. j;.' L :1' l' -~-=t" ~~. - I, ' ?
r"~'J"h} ...Jl....:~~:,~ .j , ) .alai It! - 'f'JI: - s: :r- ~!
'~.".'t;j~t.:c-' Jj.:' " ' " "'LlI ':- !.!.~ ~~-- l~l_A.~~-"
l.i,'7jt"I;;11~~_-1~-=--::~s~"" ....'7~-~_7-.0---~--"l;--1: -v- I te:=' - .
,'II:""",ll - "---C"'1' ;" ~ I' _'l lii : t~~ I
-f'l I'! '. ; t~ I );,:: . I il . 'I I t~ .~ .
. . - ''''' '. '. _ ,-~"..,.''''''' uJ" :....: 'I I ~ ~ - .. '.r'
,,_ ~~ I J <" \-:-_ c: ~ ...JI.W_ p~ 'I 1\ -':c....,
.' '<f'-I ,;:#. .... i' :0,'" ., c~' ...."':<.. II ::!" ii~'Ia-...sa' - '-. 1
'. "\... -~: -=,;--t;- -=--== ::;: "'" .C~tl' ~ :tl' ' '.:: ,
,:' '\ \ ;.-;, ~,-=-'i, , .... ,- '~~ ,_ -=.-Ui. .... . "
'~:I\" .~ _;. f '=.,.(j) "~"=~"-"''''''-~'--I --,-- 11.,.'I~.i"'I'
;;::_,,.!: _; ,: :,----" ~.:';---:. 1.'" \Iii' ~'iljl"
'i\'-. \.:1J:l'\.~:'.'~_'~..: -';L..__=-, ...1....!r-~~~~~~:.'" ....... 111""'1=-1
.1,..,..... r-:';)'>~" ,~ j." ':(!). .. - '
.:J '.: , ;:; : "'1"\' J ':i ,;. ~: ,-'~.--t':' ~ ......'. ·
II <. ...-.,[- . .--.' .' ,I ' .. ...: V.".~..' 'L-.. .---=o..~. "'--""'-
.. '. . -.-;-.....::-. - ~.-------.'~- '" r' .-- I
....., -..--- -'-',~'., -.., . CJ,oi'e '. \'.~ -, '
.- ,,' -, :c_~, ' .":;::: \<.11 'tI' ..,-"';:'-~~-:~ _..~~-~
,"; , .~ on 'J& ~ "~-"-~
".-=-:,::.:_-,":. c / " , _._ ._,.:tl:
':t-._-,--~ I~ ._ <, .::. - +--- ""0
. t ,_. " ..:::....... .:o-~~.:.=~..:......._-;;h
:~,: -,1--:, _ ,. _., ~-. d
. ..' _ '?~.-r.,~ .t:;'-~..~~,......--- 'e,:'"
\ ",~-~~...i:-_-~ j r~-r--"'- . ~
". \:.,~.::~ ~'i. ___;, J I ~ ~ ~
~ ~~CJ- -.~. ',~ \ '~~i~;.;::.~:.~, =< ~
r"-.. ,,; . .;,~.-~~~ a:
~; 'r-,:;,_:')', ~' /~.-I~.:"- i. I . .'~ ~..;~~~~f ~.?:.'~~:/ .-~::~~
.. , 1 . 1./ ~ ,... ...,....._~ . . . .. ~~
.___, . '. .... : ... L~"", r ---...
, .", .<.. c>r.;. ~fri%:. 1------~--....-
..--...,--r----. ,':::"~. '. A"'Y ~~'" .- 1': II I =-. .
.... .!.. / l~';.'~----.....-.. ..-;:-::\-.-.... ~-~....:":<.;;,;o.~""" --.~ It ;'. .. -:
/./ I '.~ ;t; .\".,~:{" '"z?'::"'.'>r:"">~J; .......z: f i'..' .
(' ......,. ,..;';",t''!',' ~<f::;-"'~/: --'0":-
,~ ' _,~: .' .>;"''('C'. .<<'Y'-, --- . . ..,.' I'
- / f'-1 .-..r. <. t -...;..i ,.Go '::t> "'~_ .~_' ...+:':"'~'->_".. . +. :. I"
"~~.:" .' ...-.:_'~,-_~X .#...~--_....~...r'-~.-....."
....J'11'1~ -- 1 Ii........ ,,",;~~~:;:p.;;- ...,._.~~.r.:_... oI..~____._-.r;
. ~/:,. "':l i r(j3~rt~.;:~~. . .:-/~.- ~-"-:"';~~I' ;L.
,"..\ lIIJ I ~ 'tll ~~V' /~_' "<,;'re. 1 I "f---;, ' . ~~
..!Ito:~~~Li <'.,,;'$~1 ;,"'::::;"';>~~'i. .' ilh
fir"~')."-;:,- ..,,",.y'--" I I
',--,Il:!.;!l.~ .-:-:;:'/I';;!;
t't ~~7C; ,.:- O~ 7,~ ."-1
....~;.'.I:' ~. .0::.-.'.-..' ~ '-~--",:,,-~-''''j='
... foil. ~.....' .~ - ..... .. I
. ~-:z.r 1," . :
, t-~; :" -. I
I >\f:l.:. ~~....( . ~l
.. . '-,i( v. -- . . I
:.0 ---~r-'"
e
e
;:
;:
~ M
D I t
Z I 1l
. .-
II ~..
~ .. =
. "
I ~
.
. .
...--":'" ~ .
11--::
L
...~.""-: '-4
- -S;f,If"
.
'.
-;. ..-:..!~---
"";-'1 !~~- ,'-"-
,
,
I
..
I
I~."",
I.-I' ~
1""-'"
~ ....-::-a.
!< l- .
\.
",
. \ "
... .:.._~~-.~~'-
.1 .~. ~. .-....,..--.".:.-\
L
". .C" 1l",~
-"
. ......~
~~-r:r
-'
'"
~
. .f'
;.'-.=... .-
IS 57
D. D
= lill
w 1) ~ IIil
Z G to- 11-11;
O ..... to- j II
N ... f.U
D. !lll;
C I
:~ '\ 1~~~....-. ..\...
\' ----
,
\
e.
e
e
ATIACHMENT F
TENTATIVE TRACT NO. 17754 (SUB NO. 06-(6)
GENERAL PLAN AMENDMENT NO. ()(H)1
DEVELOPMENT PERMIT m NO. 06-05
MITIGATION MONITORINGIREPORTING PLAN
This Mitigation Monitoring and Reporting Program has been prepared to implement the
mitigation measures outlined in the Initial Study for the Tentative Tract No. 17754. This program
has been prepared in compliance with the California Environmental Quality Act (CEQA) and the
State and City of San Bernardino CEQA Guidelines.
CEQA Section 21081.6 requires adoption of a monitoring and/or reporting program for those
measures or conditions imposed on a project to mitigate or avoid adverse effects on the
environment. The law states that the monitoring or reporting program shall be designed to ensure
compliance during project implementation.
The Mitigation Monitoring and Reporting Plan contain the following elements:
1.
The mitigation measures are recorded with the action and procedure necessary to
ensure compliance. The program lists the mitigation measures contained within
the Initial Study.
A procedure for compliance and verification has been outlined for each
mandatory mitigation action. This procedure designates who will take action,
what action will be taken and when, and to whom and when compliance will be
reported.
The program contains a separate Mitigation Monitoring and Compliance Record
for each action. On each of these record sheets, the pertinent actions and dates
will be logged, and copies of permits, correspondence or other data relevant will
be retained by the City of San Bernardino.
The program is designed to be flexible. As monitoring progresses, changes. to
compliance procedures may be necessary based upon recommendations by those
responsible for the program. If changes are made, new monitoring compliance
procedures and records will be developed and incorporated into the program.
2.
3.
4.
The individual measures and accompanying monitoring/reporting actions follow. They are
numbered in the same sequence as presented in the Initial Study.
Mitigation Monitoring and Reporting Plan
TIM No. lnS4, GPA No. 06-01 & DP3 06-05
Page 2
e . MITIGATION MEASURES
m. AIR QUALITY
AQ-I The project shall comply with the requirements of the SCAQMD Rules 402 and
403 for fugitive dust, which requires the implementation of Reasonable Available
Control Measures (RACM) for all fugitive dust sources, and the Air Quality
Management Plan (AMCP), which identifies Best Available Control Measures
(BACM) and Best Available Control Technologies (BACT) for area sources and
point sources, respectively.
IMPLEMENTATION AND VERIFICATION
Public Works and Planning staff shall review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed prior to issuance of grading permit.
WRITTEN VERIFICATION PREPARED BY:
e DATE PREPARED:
AQ-2
e
.
The project proponent shall ensure that construction equipment shall be
properly maintained and serviced to minimize exhaust emissions.
The project proponent shall ensure that existing power sources are utilized
where feasible via temporary power poles to avoid on-site power
generation.
The project proponent shall ensure that construction personnel be
informed of ride sharing and transit opportunities.
The project proponent shall ensure that any portion of the site to be graded
shall be pre-watered to a depth of three feet prior to the onset of grading
activities.
The project proponent shall ensure that watering of the site or other soil
stabilization method shall be employed on an on-going basis after the
initiation of any grading activity on the site. Portions of the site that are
actively being graded shall be watered regularly to ensure that a crust is
formed on the ground surface, and shall be watered at the end of each
workday.
The project proponent shall ensure that all disturbed areas are treated to
prevent erosion until the site is fully constructed.
.
.
.
.
.
e.
e
e
.
Mitigation MonitoriDg and Reporting Plan
TI'MNo. 17754, GPANo. 06-01 &DP3 O6-OS
Page 3
The project proponent shall ensure that landscaped areas are installed as
soon as possible to reduce the potential for wind erosion.
The project proponent shall ensure that SCAQMD Rule 403 is adhered to,
ensuring the clean up of construction-related dirt on approach routes to the
site.
The project proponent shall ensure that all grading activities are suspended
during first and second stage ozone episodes or when winds exceed 2S
miles per hour..
.
.
IMPLEMENTATION AND VERIFICATION
Public Wodes and Planning staff shall review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed prior to issuance of grading permit and
during construction.
WRITTEN VERIFICATION PREPARED BY:
DATE PREPARED:
.
All buildings on the project site shall conform to energy use guidelines in
Title 24 of the California Administrative Code.
IMPLEMENTATION AND VERIFICATION
Building & Safety staff shall review this development proj ect.
COMPLIANCE RECORD
When Required: The verification shall be completed prior to issuance of building permits.
WRITTEN VERIFICATION PREPARED BY:
DATE PREPARED:
e
Mitigation Monitoring and Reporting Plan
lTMNo. 177S4, GPANo. 06-01 &:DP3 O6-OS
Page 4
AQ-3 To reduce emissions all equipment used in grading and construction must be
tuned and maintained to the manufacturer's specification to maximize burning of
vehicle fuel.
IMPLEMENTATION AND VERIFICATION
Public Works and Planning staff shall review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed prior to issuance of grading permit and
monitored during the life of the grading and construction process.
WRITTEN VERIFICATION PREPARED BY:
DATE PREPARED:
AQ-4 The residences shall be constructed to UBC standards for insulation of walls,
roofs, windows, etc. to minimize emissions from home heating and cooling.
IMPLEMENTATION AND VERIFICATION
e Building & Safety staff shall review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed prior to issuance of building permits.
WRITTEN VERIFICATION PREPARED BY:
DATE PREPARED:
e
e.
e
e
Mitigation MonitoriDa aDd ReportiDg Plan
'ITMNo. 17754, GPANo. 06-01 &DP306-0S
Page S
AQ-S The residences should be built with natural gas fireplaces to reduce the criteria
pollutant emissions of wood smoke.
. IMPLEMENTATION AND VERIFICATION
Building & Safety staff shall review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed at plan review, prior to issuance of building,
during inspections and prior to issuance of certificate of occupancy.
WRITTEN VERIFICATION PREPARED BY:
DATE PREPARED:
AQ-6 Construction scheduling shall be as such that asphalt paving operations and the
application of architectural coating (painting) do not occur concurrently.
AQ-7 To the greatest extent feasible, nse of pre-coated, pre-colored and naturally
colored building materials will be used to minimize the amount of paint used for
architectural coating.
AQ-8 To the greatest extent possible.. high transfer efficiency painting methods such as
HVLP (High Volume Low PreSsure) sprayers and brushes/rollers will be used for
the application of architectural coating.
IMPLEMENTATION AND VERIFICATION
Building & Safety and Planning staff shall review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed prior to issuance of building permits.
WRITTEN VERIFICATION PREPARED BY:
DATl!: PREPARED:
Mitigation Monitoring and Reporting Plan
lTMNo.177S4,GPANo.06-01 &DP306-0S
Page 6
e . IV. BIOLOGICAL RESOURCES
BR-l Burrowing owls are not expected to take. up residence on the site as long as the
current land management practices remain in force. However, if the site remainS
fallow, burrowing owls could colonize the property. In that event, it is
recommended that a focused survey for that species be conducted. Nesting season
occurs between February 1 and August 31, with the peak nesting period between
April 15 and July 15. Surveying should be conducted 30 days ahead of grading.
The survey shall be conducted according to the recommended guidelines of the
Burrowing Owl Consortium (1993). A report of findings shall be submitted to the
Development Service Department prior to issuance of grading permits.
IMPLEMENTATION AND VERIFICATION
Engineering, Building & Safety and Planning staff shall review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed prior to issuance of grading permits.
e
WRITTEN VERIFICATION PREPARED BY:
DATE PREPARED:
e
,.;
Mitigation Monitoring and ReportiDg Plan
TI'M No. 17754, GPA No. 06-01 &. DP3 06-05
Page 7
tit. v.
tit
tit
CULTURAL RESOURCES
CR-I Prior to issuance of grading permits, the developer shall have an archaeologist
prepare a monitoring program to be approved by the Development Services
Department, which outlines how grading and earthwork will _be monitored to
protect cultural resources. This program will identify when and how often a
monitor will be on site to monitor earthwork activities. Upon completion of the
earthwork, such that a monitor is no longer needed, the monitor shall submit a
report of monitoring to the Development Services Department.
IMPLEMENTATION AND VERIFICATION
Building & Safety and Planning staff shall review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed prior to issuance of grading permits and
monitored during the life of the grading process.
WRITTEN VERIFICATION PREPARED BY:
DATE PREPARED:
CR-2 In the event that paleontological resources are unearthed during grading or
excavation, such activities shall cease in the vicinity and the developer shall
inform the project planner. The project planner shall inform the San Bernardino
County Museum paleontologists. SBCM staff shall determine the appropriate
course of action, including the implementation of a paleontological recovery
program.
IMPLEMENTATION AND VERIFICATION
Planning staff shall review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed prior to issuance of grading permits and
monitored during the life of the grading process.
WRITTEN VERIFICATION PREPARED BY:
DATE PREPARED:
e.
e
e
Mitigation MODitoriDg and Reporting Plan
TI'M No. 17754. GPA No. ~1 & DP3 ~S
Page 8
CR-3 If any human remains are uncovered, the City, the County Museum and the
County Coroner shall be notified, and all activity at the site shall cease until the .
City provides clearance to resume grading or construction activities.
IMPLEMENTATION AND VERIFICATION
Building & Safety and Planning staff shall review this development project.
COMPLIANCE RECORD
When ReqQired: The verification shall be completed prior to issuance of grading permits and
monitored during the life of the grading process..
WRITTEN VERIFICATION PREPARED BY:
DATE PREPARED:
Mitigation Monitoring and Reporting Plan
1TM No. 17754, GPA No. 06-01 & DP3 06-0S
Page 9
e . VI. GEOLOGY AND SOILS
GS-l Grading operations shall be perfonned in accordance with the recommendations
contained in the Report of Geotechnical Investigation, Walnut Street South
Residential Project. San Bernardino, California (August 2005) and the Fault
Surface Rupture Hazard Study, Walnut Street Residential Project. San
Bernardino, California (July 2005), prepared by Southern California Soil and
Testing, Inc.
GS-2 Existing, compressible soils underlying portions of the site to receive settlement-
sensitive improvements shall be removed to a minimum depth of 5 feet below
existing or finished grade, whichever is more. Deeper removal may be required if
soil conditions warrant during grading operations. A qualified geologist or
engineer shall be contacted to determine actual removal depths during grading.
IMPLEMENTATION AND VERIFICATION
Building & Safety and Planning staff shall review this development project.
COMPLIANCE RECORD
e
When Required: The verification shall be completed prior to issuance of grading permit and
monitored during the life of the grading process.
WRlTIEN VERIFICATION PREPARED BY:
DATE PREPARED:
GS-3 Site development, including construction of foundations, shall be conducted in
accordance with the recommendations contained in the Report of Geotechnical
Investigation, Walnut Street South Residential Project, San Bernardino,
California (August 2005) and the Fault Surface Rupture Hazard Study, Walnut
Street Residential Project, San Bernardino, California (July 2005), prepared by
Southern California Soil and Testing, Inc.
GS-4 All structures for human occupancy as defined by the Alquist-Priolo Fault Zoning
Act shall maintain a minimum distance of 50 feet from the northeastern limit of
faulting. Setback distance shall be measures to the closest portion of the
foundations of the proposed structures.
e
GS-5 All structure for human occupancy shall maintain a minimum distance of 25 feet
from the northeastern limit of the intense, fault related liquefaction features.
Setback distance shall be measures to the closest portion of the foundations of the
proposed structures.
e.
e
tit
Mitigation MonitoriDg aDd Reporting Plan
TIM No. 177S4, GPANo. 06-01 &.DP3 06-05
Page 10
GS-6 Post-tension foundations based on the Post Tensioning Institute method shaH be
utilized for the support of proposed structures.
IMPLEMENTATION AND VERIFICATION
Building & Safety, Public Works and Planning staff shall review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed prior to issuance of grading permits and
prior to construction of slabs-on grade and/or pavement.
WRITTEN VERIFICATION PREPARED BY:
DATE PREPARED:
Mitigation MoDitoriDg aod ReportiDs Plan
TI'MNo. 17754, GPANo. 06-01 &DP3 O6-OS
Page 11
e
OS-7 All foundation excavations shall be approved prior to fonning or placement of.
reinforcing steel by a qualitied engineer.
OS-8 Prior to the issuance of grading permits, the developer shall receive approval of an
erosion control plan and PM,o management plan from the Public Works Division
of the Development Services Department.
OS-9 An erosion control plan shall be prepared and implemented for the proposed
project that identities specitic erosion control measures to control on-site and off-
site erosion from the time of ground disturbing activities are initiated through
grading completions. This erosion control plan shall include the following
measures at a minimum.
a. Specify the timing of grading and construction to minimize soil exposure to
rainy periods experienced in Southern California.
b. An inspection and maintenance program shall be included to ensure that any
erosion, which does occur either on-site or off-site as a result of this project,
will be corrected through a remediation or restoration program within a
specitied time frame.
tit IMPLEMENTATION AND VERIFICATION
Building & Safety, Public Works and Planning staff shall review this development project
COMPLIANCE RECORD
When Required: The veritication shall be completed prior to issuance of grading permit.
WRITTEN VERIFICATION PREPARED BY:
DATE PREPARED:
e
Mitigation Monitorillg and Reporting Plan
TIM No. 17754, GPA No. 06-01 & DP3 O6-OS
Page 12
e . VII... HAZARDS
e
e
Although the site is not on the State Hazardous Waste and Substances Sites List and is not
proposing a llmd use that involves the use, manufacturing, stQrage or transport of hazardous or
potentially hazardous materials and no impacts are. anticipated, the following mitigation
measures are to be implemented in order to ensure that there will continue to be no impacts
throughout the course of development.
HAZ-I Materials suspected of containing asbestos are anticipated to exist in the Property
buildings which are proposed for demolition. When demolition has the potential
to disturb the. above materials, a licensed California Certified Asbestos Consultant
must survey the materials for asbestos. If asbestos is found, an asbestos abatement
. contractor must first remove these items prior the renovation or demolition.
IMPLEMENTATION AND VERIFICATION
Building & Safety staff shall review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed during construction by Building & Safety
Inspectors.
WRITTEN VERIFICATION PREPARED BY:
DATE PREPARED:
e.
e
e
Mitigation MODitoriDg IDd Reporting Plan
lTMNo. 17754, GPANo. 06-01 &DP3 06-05
Page 13
HAZ-2 Given the age of the residences on-site, lead based paint may have been used in
these residences. If any renovation on the property involves the sanding. chipping. .
stripping or welding of painted surfaces or if demolition will occur, a licensed
California Certified Lead based Paint inspector and Risk Assessor must survey
the materials for lead content. This survey will determine the necessary
precautions and disposal requirements needed to perform the wort safely.
IMPLEMENTATION AND VERIFlCATION
Building & Safety staff shall review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed to prior to removal and/or demolition by
Building & Safety Inspectors.
WRITTEN VERIFlCATION PREPARED BY:
DATE PREPARED:
HAZ-3
Fill material dumped on the property was visually identified to contain asphalt
and may be contaminated with low levels of petroleum products. Testing of
this soil may be required for off-site disposal. It is recommended that the
landfill scheduled to receive this soil be contacted and sampling requirements
be obtained and followed prior to its removal off-site.
IMPLEMENTATION AND VERIFlCATION
Building & Safety and Engineering staff shall review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed prior to issuance of grading permit.
WRITTEN VERIFlCATION PREPARED BY:
DATE PREPARED:
e.
e
--
Mitigation MODitoriDg IDd Reporting Plan
'ITMNo. 17754, GPA No. 06-01 & DP3 06-05
Page 14
HAZ-4 There is a small discolored patch of soil, approximately two-feet by four-feet,
along the north Property border where it appears oil has been dumped. This spill .
appears to be minimal and is not anticipated to substantially contaminate the
groundwater on the Property. It is recommended that this soil be excavated and
disposed of as petroleum contaminated.
IMPLEMENTATION AND VERIFICATION
Building & Safety and Engineering staff shall review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed prior to issuance of grading permit.
WRITTEN VERIFICATION PREPARED BY:
DATE PREPARED:
Mitigation MoDitoriDg aDd Reporting Plan
lTMNo. 17754, GPANo. 06-01 & DP3 O6-OS
Page IS
e . vm. HYDROLOGY AND WATER QUALITY
HWQl Prior to issuance of grading permits, the project shall be designed to establish a
storm system that would intercept run-off and treat pollutants of concem. The
applicant shall prepare a Water Quality Management Plan (WQMF) for the project
that includes a description of the proposed drainage system and the various
components (including Side Design, Source Control and Treatment Control BMFs)
that will prevent significant discharges of pollutants of concern into receiving waters.
HWQ2 Prior to issuance of grading permits, the developer shall file a Notice of Intent
(NO!) with the State Water Quality Control Board for constrUction disturbing one
acre or more of land Prior to the issuance of a grading permit, the applicant shall
submit a copy of the NO! and accompanying SWPPP that specifically identifies the
BMF's .that would be used on-site to control stonnwater on-site during construction.
HWQ3 Prior to the issuance of grading permits, a site-specific drainage study, which meets
the standards of the City of San Bernardino Public Works Division shall be prepared
by a Civil Engineer who is registered in the State of California. All recommendations
from this analysis, including facilities necessary to mitigate drainage impacts,
maximize percolation and groundwater recharge to the extent feasible shall be
incorporated into all grading and site improvement plans.
e
IMPLEMENTATION AND VERIFICATION
Public Works staff sball review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed prior to issuance of grading permit.
WRITTEN VERIFICATION PREPARED BY:
DATE PREPARED:
e
Mitigation MoDitoriog and Reporting Plan
TIM No. 17754, GPA No. 06-01 ell: DP3 O6-OS
Page 16
e . XI. NOISE
N-I Buyer Notification Program-All potential buyers of homes in the project shall
be notified to the existence of the rail yards in the vicinity of the project and the
fact that most of the activities at these rail yards occur during the nighttime
hours, that noise levels in the area are typically higher during the nighttime
hours than during the daytime hours, and that windows will need to be closed to
reduce the noise levels generated by the rail yard to below the City's standards,
although the residents are not required to keep the windows closed.
IMPLEMENTATION AND VERIFICATION
Public Works staff shall review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed prior to the completion of construction and
complaints shall be monitored through Code Enforcement.
WRITTEN VERIFICATION PREPARED BY:
e DATE PREPARED:
e
Mitigation Monitoring and Reporting Plan
TIM No. InS4, GPANo. 06-01 &DP3 06-05
Pase 17
e
N-2
Mechanical Ventilation-Homes within the project will need to be able to keep
their windows closed to meet the City's 45 Ldn standard. Therefore, .
mechanical ventilation confirming to the requirements of the Uniform Building
Code will need to be provided to allow occupants to keep their windows closed.
Note that windows do not need to be sealed shut, but be able to remain closed at
the occupants' discretion. Mechanical ventilation allows this. The means to
satisfy this condition hall be included in the architectural drawings for the
project prior to issuance of building permits.
N-3 Sound Rated Windows--To ensure that homes adjacent to the rail yard are not
significantly impacted by single event noise from rail yard activities or train
pass bys on the rail line east of the project site all windows in the homes on Lots
24-29 of Tract 17239, and Lots 1-3, 11-23, 36-40, and 46-48 of Tract 17754
shown in Exhibit 7 shall be sound rated with a minimum STC rating of 34.
Window specifications shall be included in the architectural drawings for the
project prior to issuance of building pennits.
IMPLEMENTATION AND VERIFICATION
Building & Safety staff shall review this development project.
e
COMPLIANCE RECORD
When Required: The verification shall be completed during building plan review and inspected
during construction.
WRITTEN VERIFICATION PREPARED BY:
DATE PREPARED:
N-4 Noise-generating construction activities are prohibited between the hours of7:oo
p.m. and 7:00 a.m. nor anytime on Sundays or federal holidays.
IMPLEMENTATION AND VERIFICATION
Code Enforcement and Planning staff shall review this development project.
COMPLIANCE RECORD
When Required: The verification shall be completed prior to issuance of building permits.
WRITTEN VERIFICATION PREPARED BY:
e DATE PREPARED:
e
e
e
1
2
3
4
5
6
7
8
RESOLUTION NO.
RESOLUTION OF THE CITY OF SAN BERNARDINO ADOPTING GENERAL
LAN AMENDMENT NO. 06-01 TO THE GENERAL PLAN OF THE CITY OF SAN
ERNARDINO, TO AMEND THE GENERAL PLAN LAND USE DESIGNATIONS
ROM IH, INDUSTRIAL HEAVY, TO RU, RESIDENTIAL URBAN, FOR 10.23
CRES LOCATED ON THE SOUTH SIDE OF WALNUT STREET WEST OF AN
XTENSION OF ARTESIAN A VENUE.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY
F SAN BERNARDINO AS FOLLOWS:
SECTION I. Recitals
9
10
11
12
13
14
15 nanimous vote on a motion to recommend approval of the General Plan Amendment has been
16
17
18
19
20
21
(a) WHEREAS, the General Plan for the City of San Bernardino was adopted by. the
ayor and Common Council by Resolution No. 2006-360 on October 2, 2006.
(b) WHEREAS, General Plan Amendment No. 06-01 was considered by the Planning
ommission on February 21, 2007, after a noticed public hearing. The Planning Commission's
onsidered by the Mayor and Common Council.
(c) WHEREAS, General Plan Amendment No. 06-01 was reviewed under the
alifornia Environmental Quality Act (CEQA) through an Initial Study which found no
ignificant adverse effects on the environment after incorporation of mitigation measures.
(d) WHEREAS, the Mitigated Negative Declaration pursuant to CEQA has been
22 eviewed by the Planning Commission and the Mayor and Common Council in compliance
23
24
ith the California Environmental Quality Act (CEQA) and local regulations.
25
26
(e) WHEREAS, the Mayor and Common Council held a noticed public hearing and
By reviewed and considered proposed General Plan Amendment No. 06-01 and the Planning
27 ommission and Environmental Review Committee actions and Planning Division Staff Report
28 n April 2, 2007:
I
\((0. 8Y
'II uP Y
e
e
e
1
2
3 .nterest of the orderly development of the City and is consistent with the goals, objectives and
4 olicies of the existing General Plan.
5 SECTION 2. Mitij(ated Nej(ative Declaration
6
NOW, THEREFORE BE IT RESOLVED, FOUND AND DETERMINED by the
7
8
9
10
11
12
13
14
15
16 ernardino that:
17
18
19
20
21
22
23
24
25
26
27
28
(f) WHEREAS, the adoption of General Plan Amendment No. 06-01 is deemed in the
ayor and Common Council that the proposed amendment to the General Plan of the City of
an Bernardino will have no significant adverse effect on the environment with incorporation
f the proposed mitigation measures, and the Mitigated Negative Declaration and Mitigation
onitoring/Reporting Plan heretofore accepted by the Environmental Review Committee as to
he effect of this proposed amendment is hereby ratified, affirmed and adopted.
SECTION 3. Findinj(s
BE IT FURTHER RESOLVED by the Mayor and Common Council of the City of San
The proposed amendment is internally consistent with the General Plan in that it meets
General Plan Policy 2.5.6 that new development be designed to complement and not
devalue the physical characteristics of the surrounding environment, and the proposed
project will complement the adjacent existing residential neighborhood by developing an
in-fill property with detached single-family units.
The proposed amendment would not be detrimental to the public interest, health,
safety, convenience, or welfare of the City in that the site will allow development of a
comprehensive project, meeting all applicable development standards, i.e, open space,
and amenities for Planned Residential Development. Furthermore, the project will be
required to comply with the mitigation measures in the Mitigation Monitoring /
2
e
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
e
e
Reporting Plan.
The proposed amendment would not impact the balance of land uses within the City in
that the proposed property is adjacent to other residential uses in the RU, Residential
Urban land use district and is consistent with Land Use Policy 2.7.5.
The subject site is physically suitable (including, but not limited to access, provision
of utilities, compatibility with adjoining land uses, and absence of physical constraints)
for the requested land use designation and the anticipated land use development in
that all required utilities and public services can adequately serve the site.
SECTION 4. Amendment
BE IT FURTHER RESOLVED by the Mayor and Common Council that:
The Land Use Plan of the General Plan of the City of San Bernardino is amended by
changing the land use designation from IH, Industrial Heavy, to RU, Residential Urban
for 10.23 acres located on the south side of Walnut Street west of an extension of
Artesian Avenue. This amendment is designated as General Plan Amendment No. 06-
01 and its location is outlined on the map entitled Attachment A, and shown on
Attachment B, copies of which are attached and incorporated herein for reference.
General Plan Amendment No. 06-01 shall become effective immediately upon adoption
of [his resolution.
SECTION 5. Map Notation
This resolution and the amendment affected by it shall be noted on such appropriate
General Plan maps previously adopted and approved by the Mayor and Common
Council and which are on file in the office of the City Clerk.
III
3
Ie
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
e
ie
SECTION 6. Notice of Determination
The Planning Division is hereby directed to file a Notice of Determination with the
County Clerk of the County of San Bernardino certifying the City's compliance with
the California Environmental Quality Act in preparing the Initial StudylMitigated
Negative Declaration.
III
III
III
4
5
-:
1-
,.
, ,
e
\
ATTACHMENT A
CITY OF SAN BERNARDINO PROJECT: GPA 06-0t
TTM 17754
PLANNING DIVISION DP3 06-05
LOCATION MAP
1J
HEARING DATE: 2.21.07
NORTH
Uillk~II" II ~ ~ ~ 11 ~ = Wi jIillJ
~ rfnlll=/--' ~ ~~lL- -:OIllGBE~~- ~rnm
r- '\ ~.., 1-' i~ N!3jfflff ~ JJ
~z I,~ '.J 11 ~ u
~ =J If' r- z ~
-~ .( ~~ , r-- ill) 0
o iQ 1. t-,...qREGON =>. -...ni-.. ~
III W _, r--.~r LC:I..""""
I-- 0
,
t---.;
(fl----'
\ CO
\\ ~
,.....
. "jll!/lll = II I TrTlr-'--..
~~""~,~!A E Qrp: r-
'/~ -. Site I-- l-
I" /'/ project - 1= ~ r-
~~t'r iLl ~
~~oo Imit3m~ ~
~,~ QOIJJIIJIBDtl - r-
( ITITIB r- Ul ~
illIIID~ r-/j<'
I r- fiij' '1 ~
I- :It
-
r-
o
\
\
I ~
I- m
:';;;-; ;Q
~IML
il
r---
/;
I
I.tlt-
-'C=-
- -i-
I, r- -
,....
'-
'"
(C) C,ity, of San Bernardino,
~~. ......u..
/
I-
ATTACHMENT B
--
CITY OF SAN BERNARDINO PROJECT: GPA 06-01
~
PLANNING DIVISION
LOCATION MAP
LAND USE DISTRICTS HEARING DATE: 2.21.07
NORTH
(C) City of San Bernardino,
~........ 111 A.. _ .
~~rt ~I I IJ ;; ~ ~'mm
c" ~~ LL .' . - G t;: mrn
~ c. 'l'l;~... lJ~ /11 ull W
I, : E
--.ooa -. '--
l REG.O - -
- ~ -..:; -
JL.J'. Gl
lL II' If 1 L ' .. nn~~i~gW II/II I jtr:Jnr-.
-: A ~IEmmtlJ
00 It .1~lHi~ ~
I_=- ill - -;('1):-
I = r- -v \
. - II!
"'I a ~ I
1\-';~T. .- e-".'
n I iT I I II
'I~I . J-/ M1ltl I. ;:
/1 I ~~
UllilJ llL II
GRES
"II 'IT
--1
f-I ~
Ill. t-
\ \
'\
~~H
'e \H \
I
Y'
.
\ \
Legend:
~
Proposed IH to RU Area (10.23 acres)
Parcels: 0274-031-17,18,19& 20