HomeMy WebLinkAbout15-Facilities Management
- CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
. From':' James Sharer, Director Subject:
Resolution authorizing the Purchasing Manager to
increase purchase order with Lawrence W. Rosine Co.
Dept: Facilities Management from $53,900.00 (plus the $5,000 contingency) by
$12,000.00 to $70,900.00.
Date:
April 30, 2002
C-..~." 'L
. ld "'II' ~ri
Meeting Date: May 20, 2002
Synopsis of Previous Council Action:
01-07-02 City Council adopted Resolution 2002-10, which authorized the execution ofa contract with Lawrence W.
Rosine Co. for the installation of a Tarkett gymnasium floor at the San Bernardino Boys' and Girls' Club
in the total amount of$53,900.00 with a contingency amount of $5,000.00.
Recommended Motion:
Adopt Resolution.
Contact person:
James Sharer
es W. Snarer
Director of Facilities Management
Phone: 384-5244
Supporting data attached:
Staff Report
Ward(s): N/A
FUNDING REQUIREMENTS:
Amount: $12,000.00
Source: 001-321-5706
Barbara Pachon
Director of Finance
Council Notes:
Q~"" 26::,L - 13~
5/_
Agenda Item No. jS
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
STAFF REPORT
SUBJECT
Resolution authorizing the Purchasing Manager to increase purchase order with Lawrence W.
Rosine Co. from $53,900.00 (plus the $5,000 contingency) by $12,000.00 to $70,900.00.
BACKGROUND
At the January 7, 2002 Council Meeting, the Mayor and Common Council authorized the
execution of a contract with Lawrence W. Rosine, Co. for the installation of a Tarkett
gymnasium floor at the San Bernardino Boys' and Girls' Club in the amount of $53,900.00 with
a $5,000.00 contingency in case it was determined that an additional moisture guard is needed to
be put down before the flooring is laid.
Before installing the new Tarkett gymnasium flooring, the contractor tested the slab floor for
vapor (moisture) emissions, pH, and adhesion. The initial test showed that the floor moisture
emissions and pH were too high, while the adhesion factor was too low. Staff was successful in
bringing the pH into balance and increased the adhesion factor by using a wax-type stripper,
vinegar and clear water rinse; however, the moisture emissions remained too high.
The manufacturer will not warrant the new floor if average vapor emissions exceed 3.0 pounds
per 24 hours. Unfortunately, the gym floor has averaged over 5.0 pounds. Subsequent efforts and
tests failed to produce an average that was acceptable to the manufacturer to warrant. One of the
tests was conducted by an independent contractor to help ensure the validity of the other tests.
Staff, the manufacturer, and the contractor came up with three alternatives:
I) Install the sports flooring without any moisture barrier. The risk is that the product may fail
due to moisture migration and the warranty would be void.
2) Have Floorseal Technologies install a moisture barrier system as independent contractor at
the cost of $3.50 per square foot. Based on 6,500 square feet the total would come to
$22,750. This method would provide a 10-year warranty.
3) Have the floor sandblasted then skim-coated with Ardex Feather Finish at a cost of $2.65/s.f.,
which would total $17,225. This would preserve the manufacturer's 5-year warranty.
Staff recommends alternative number three since there is a cost savings and a 5-year warranty
was deemed adequate. The materials for this moisture barrier (Ardex Feather Finish) are readily
available, the contractor can install the barrier within a few days after receipt of the materials,
and the new sports flooring can be installed within a few days thereafter, which would allow the
gym to resume normal operation before the busy summer season.
Vendor
Lawrence W. Rosine
Current Amt
$53,900.00 plus
5,000.00 contingency
Increase
$12,000.00
Total
$70,900.00
FINANCIAL IMP ACT
There is sufficient money in account number 001-321-5706 to cover these expenditures, and
increase purchase order with Lawrence W. Rosine, Co. The funds are available from the City
Hall Basement floor replacement project, which came in under budget.
RECOMMENDATION
Adopt Resolution.
)"
. I
2
3
4
5
6
7
8
9
10
II
12
13
. 14
15
16
17
l (G(Q~v
RESOLUTION NO.
RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY 0
SAN BERNARDINO AUTHORIZING THE PURCHASING MANAGER TO INCREAS
THE PURCHASE ORDER WITH LAWRENCE W. ROSINE CO. FOR TH
INSTALLATION OF A MOISTURE PROOF BARRIER AT THE SAN BERNARDIN
BOYS' AND GIRLS' CLUB IN THE AMOUNT OF $12,000.00.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY
OF SAN BER,\'ARDINO AS FOLLOWS:
SECTION 1. LAWRENCE W. ROSINE CO. was awarded a contract per Resolution
2002-10 for installing a Tarkett gymnasium floor at the San Bernardino Boys' and Girls' Club
per Specification No. F02-61 in the amount of$53,900 plus a contingency amount of$5,000 for
a possible moisture guard. Due to excessive and unanticipated moisture emissions from the
gymnasium floor. a moisture-proof barrier (Ardex Feather Finish) is required to ensure that the
Tarkett gymnasium flooring is properly affixed to the floor and to preserve the manufacturer's 5-
year warranty. which are excess of the contract limits. Pursuant to this determination, the
Purchasing Manager is hereby authorized and directed to increase purchase order wjth
LAWRENCE W. ROSINE CO. by $12,000.00 from $53,900.00 plus the $5,000.00 contingency
18 amount to $70.900.00.
19 SECTION 4. The authorization to execute the above-referenced Change Purchase Order
20 for the aforementioned changes is rescinded ifnot issued within sixty (60) days of the passage of
21 this resolution.
22 /I /II
23 /I /II
24 / 1111
25 /I /II
!
26 I /I /I
. 27 1111/
28 / /I /I
11-0. (0'
6/Z0 (bP
".
.
2
3
4
5
6
7
8
9
10
II
12
13
. 14
15
16
17
18
19
20
21
. 27
RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY 0
SAN BERNARDINO AUTHORIZING THE PURCHASING MANAGER TO INCREAS
THE PURCHASE ORDER WITH LAWRENCE W. ROSINE CO. FOR TH
INSTALLATION OF A MOISTURE PROOF BARRIER AT THE SAN BERNARDIN
BOYS' AND GIRLS' CLUB IN THE AMOUNT OF $12,000.00.
I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and
Common Council of the City of San Bernardino at a meeting thereof,
held on the day of , 2002, by the following vote, to wit:
Council Members:
AYES
NAYS
ABSTAIN _ ABSENT
ESTRADA
LIEN
MCGINNIS
DERRY
SUAREZ
ANDERSON
McCAMMACK
City Clerk
The foregoing resolution is hereby approved this
day of
,2002.
Judith Valles, Mayor
22 City of San Bernardino
23 Approved as to form and legal content:
24
~--:4 ,4.
!
25
I-
James F. Penman, City Attorney
26
28
'?-";N'.;Jr'~,TI-.,<f:'J<W..",;:",,~[,,~Jl';;l"t~';.l'~<"';' ~~~~~~'-;~."<'i4.'; 'C: 70''7'~:!~'y".\J?!!L,.~ ". ~' ",',
_= ![.~~;~:~:,!I\,;~~f:t~~,-~~,"" "
...
** FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT **
RESOLUTION AGENDA ITEM TRACKING FORM
Meeting Date (Date Adopted): 6 -dO-O:;) Item #
Vote: Ayes I J 3- 'I Nays-0
Change to motion to amend original documents:
IS
Resolution # /)00;). -1325
Abstain .-.(;r Absent <5
Reso. # On Attachments: -=-- Contract term:
Note on Resolution of Attachment stored separately: -=-
Direct City Clerk to (circle 1): PUBLISH, POST, RECORD W/COUNTY
NulVVoid After: 100 OPi'(J J 7-lq~
I
By: -
pro1br'i
Date Sent to Mayor: 5-8 \-0 d-
Date of Mayor's Signature: S -;)6 -0 ~
Date ofClerk/CDC Signature: -5- d3-Q;>.
Reso. Log Updated:
Seal Impressed:
1/
Y
Date Mem Letter Sent for Signature:
60 Day Reminder Letter Sent on
90 Day Reminder Letter Sent on 45th day:
See Attached:
See Attached:
Date Returned: -
e
d:
Yes L No By
Yes No-L By
Yes No t/ By
Yes NO~/ By
Yes No By
Request for Council Action & Staff Report Attached:
Updated Prior Resolutions (Other Than Below):
Updated CITY Personnel Folders (6413, 6429, 6433,10584,10585, 12634):
Updated CDC Personnel Folders (5557):
Updated Traffic Folders (3985, 8234, 655, 92-389):
Copies Distributed to:
City Attorney /
Parks & Rec.
Police
Public Services
Water
Others:
Finance ,./
~Jl..l11 E;S
MIS
Code Compliance
Dev. Services
EDA
Notes:
BEFORE FILING, REVIEW FORM TO ENSURE ANY NOTATIONS MADE HERE ARE TRANSFERRED TO THE
YEARLY RESOLUTION CHRONOLOGICAL LOG FOR FUTURE REFERENCE (Contract Term. etc.)
Ready to File: m"
Date: 5 ({)"3/0 ~
Revised 01/12/01