CITY OF SAN BERNARDINO -REQUEST FOR COUNCIL ACTION
From: James Funk, Director '
Subject: Resolution ratifying the submittal
of a grant application for Nonpoint Source
Dept: Development Services Pollution Control Program funds for the
construction of Vision Creek Project.
Date: March 5, 2002 ~ ~" ' " ""~" q ~ ~
1 r ~ + : r.r + ~ MCC Date: March 18, 2002
File:
Synopsis of Previous Council Action:
None
Recommended Motion: Q~
Adopt. resolution. d ~i~~ . 1~
ames u "~~//~~
Contact person: Mehran Sepehri, Senior Civil Engineer Phone: 5127
Supporting data attached: Staff Report, Reso., & application Ward: 2
FUNDING REQUIREMENTS: Amount: Maximum matching fund of $500,00.00 if grant
is awarded
Source:
Acct. Description:. Storm Drain Fund
Finance•
Council Notes
P~~~s 2ma - b G
Agenda Item No.~
3~ 181p~
CITY OF SAN BERNARDINO -REQUEST FOR COUNCIL ACTION
Staff Report
Subject:
Resolution authorizing the submittal of a grant application for Nonpoint Source Pollution
Control Program funds for the construction of Vision Creek Project.
Background:
The City of San Bernazdino in coordination with the proposed Caltrans I-215 freeway widening
project, and the San Bernardino Valley Municipal Water District (SBVMWD) is proposing a
rather unique cost effective water reclamation/ water diversion project that qualifies under the
State Water Resources Control Board's (SWRCB) Nonpoint Source Pollution Control Program.
The Vision Creek Project proposes to divert I-215 Freeway stone water and landscaping
irrigation run off along the east side of the freeway between Olive Street and Base Line Street.
The run off will flow through a series of drainage clarifiers located within the freeway right-of-
way, into existing lateral drainage pipes, terminating into the project's proposed drainage channel
(urban stream). The urban stream concept will simulate actual creek bed flow on a constant
basis, fed by a water source that is provided from the project's planned retention pond in the
vicinity of Base Line Street at "G" Street. The stream is initially designed to flow adjacent to the
freeway along the West Side of "H" Street, between Base Line Street and Olive Street where it
will terminate into an existing "H" Street stone drain channel.
The urban stream will provide both year round water drainage capability for 5 yeaz flood as well
as 100 yeaz flood within the 100' right of way that is proposed for the stream bed. The stream
bed right-of--way shall also function as a landscaped pedestriarilbicycle walkway that will
compiement the proposed Downtown Revitalization Project and is planned to ultimately intersect
the Santa Ana River Trail located a few miles southerly of this location. The project will also
provide acost-effective alternative to the freeway widening project's required underground
drainage complex.
The upstream retention basin included in this project would also significantly reduce the City's
cost to ultimately repair the Mormon Drain through the downtown as well as the cost to relocate
this facility through the northerly lake as shown in the current Downtown Revitalization Project.
The Downtown Revitalization Project was conceived to alleviate the City's high groundwater
table in the area and possible subsequent liquefaction activity during earthquake moments. The
Lakes and Streams Project (Phase I) will be situated between Base Line Street and 9th Street and
I-215 Freeway and "E" Street. The project proposes to develop a series of retention ponds with
connecting streams to circulate and store groundwater that has been drawn to lower the
previously mentioned high groundwater table.
The project is located in the Santa Ana Watershed District and is specifically located within the
San Bernardino Basin area. This basin is one of the largest groundwater basins in southern
California with an estimated 5.5 million acre-feet of water. The basin area is a primary water
supply for over 800,000 residents who reside and work in more than ten municipalities.
-2-
CITY OF SAN BERNARDINO -REQUEST FOR COUNCIL ACTION
Staff Report -continued
The success and impact of the project will be measured through water quality source testing of
neazby wells, and the project's impact on the groundwater fluctuation levels at the retention basin
pump station to be located adjacent to the proposed location of the stream at Base Line Street and
"G" Street. The pedestrian walkway and open space buffer between properties and the I-215
freeway corridor is also enhancing the aesthetics of this azea. In addition, local residents will see
their community being transformed in a positive manner toward a healthier reduced pollution
environment and open space.
The deadline for application submittal was Februazy 1, 2002 and staff learned of the opportunity on
January 28, 2002. Given that only a two page preliminary application was required, staff was able
to prepaze and submit an application in the time allowed, but of course did not have adequate time
to receive Council approval in advance.
PROJECT COSTS
En ineerin Desi n $150,000.00
Construction En ineerin $250,000.00
Ri ht-of-wa cost/ Home Ac uisition $750,000.00
Grade and install concrete ri ra stream channel $750,000.00
Construction of dentention desiltin basins/ onds $500,000.00
Storm drain construction $100,000.00
Contin enc $500,000.00
Pro'ect Total $3,000,000.00
The grant amount is $2,500,000.00 and the local match is $500,000.00.
Financial Impact:
The grant guidelines require a local match of not less than 20% of the total project cost. In
accordance with that requirement, the City would be obligated to allocate local matching funds
of $500,000 if the grant is awazded. It is anticipated that this match would come from the Storm
Drain Fund, although staff would also approach the other impacted agencies such as Caltrans and
San Bernardino Valley Municipal Water District to solicit their participation in local matching
fund.
Recommendation:
Adopt resolution.
-3-
1 RESOLUTION NOO
• 2
RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF
3 SAN BERNARDINO RATIFYING THE SUBMITTAL OF A GRANT APPLICATIO\
4 FOR NONPOINT SOURCE POLLUTION CONTROL PROGRAM FUNDS FOR THE
CONSTRUCTION OF VISION CREEK PROJECT.
5
6 WHEREAS, The City of San Bernardino in coordination with the proposed Caltrans 1-
7 215 freeway widening project, and the San Bernardino Valley Municipal Water District is
8 proposing a rather unique cost effective water reclamation/ water diversion project that qualifies
9
under the State Water Resources Control Board's (SWRCB) Nonpoint Source Pollution Control
10
Program. This grant will provide cost-share funding for construction of a channel east of the I-
11
12 215 Freeway between Olive Street and Base Line.
13 NOW, THEREFORE BE IT RESOLVED that the Mayor and Common Council of the
• 14 City of San Bernardino ratify the submission of an application for a grant in the amount of
15 $3,000,000 from the State Water Resources Control Board's (SWRCB) Nonpoint Source
16
Pollution Control Program to help fund construction of a channel east of the I-215 Freeway
17
between Olive Street and Base Line. A copy of the Grant Application is attached as Exhibit "A"
18
19 and incorporated herein by reference.
20 ///
21 ///
22
23
24
25
26
• 27
28
i
• 1 RESOLUTION...RATIFYING THE SUBMITTAL OF A GRANT APPLICATIO\
2 FOR NONPOINT SOURCE POLLUTION CONTROL PROCRAb1 FUNDS FOR THE
CONSTRUCTION OF VISION CREEK PROJECT
3
I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor
4
5 and Common Council of the City of San Bernardino at a meeting thereof, held on
6 the day of , 2002, by the following vote, to wit:
7 Council Members: AYES NAYS ABSTAIN ABSENT
8 ESTRADA
9 LIEN
10
MCGINNIS
11
12 DERRY
13 SUAREZ
• 14 ANDERSON
15 MCCAMMACK
16
17
Rachel G. Clark, City Clerk
18
The foregoing resolution is hereby approved this day of
19 2002.
20
21 Judith Valles, Mayor
City of San Bernardino
22 Approved as to
23 Form and legal content:
24 JAMES F. PENMAN,
City Attorney
25
26 By:
• 27
28
• Application \umber i8?
CONCEPT PROPOSAL FORM
• SFl' _'001 Costa-Machado \Vater Act of?000
\Vater Code, Division 26, Chapter 6, Article 2, Watershed Protection Program
Rater Code, Division 26, Chapter 7, Article 2, Nonpoint Source Pollution Control Program
Water Code. Division ?b, Chapter 7, Article 5. Coastal Nonpoint Source Control Program
Your concept proposal should contain no more than five pages (seven pages for watershed protection program
applications), and must include this two page concept proposal form, the ttvo page project summan•, and a one page
map (8 %:" x 11" paper) to indicate the location of your watershed, project within it, and "small community" (if
applicable). Applicants applying tar funds as a "small community" must also include the Small Consmuttity
Designation Form. Applicants applying as a "small community" under the divisible segment category must include a
second map as described on the form.
Use 10 point or larger font, and margins no smaller than %:" on 8 %:" x ! I" paper. Proposals received with smaller
print that are judged unreadable will be returned without comment. Proposals that exceed five pages will be reduced
to five pages before being sent to the review' panel. Extra brochures, flyers, newsletters, etc. will be discarded before
sending the proposals to the review panel. This Corm is available in electronic format on thr State Water Resources
Cantrol Baard web site: www.ssvrcb.cp,Eov/orool3lindex.html.
Proposal proponents Idyll submit one original, 7 copies, and Qpg electronic copy of their project application to the
SWRCB. Electronic copies can be on either a CDROhl or 1.44 h18 floppy disk Electronic files in AIS Word are
preferred; however, this is not a requirement. Applicants that cannot meet this requirement must call
1-Sbb-415-3561 for assistance prior to submitting an application. This requirement does not apply to those submitting
electronic applications.
Application No. (Call toll free 1-866-415-3561 to receive an application number.)
FUNDING SOURCE (you may check more than one.)
• SIVRCB Programs `CALFED Programs -
*Watershed Protection Program 'Prop l3-CALFED Watershed Program
Nonpoint Source Pollution Control Program x Prop 13-CALFED Drinking Water Program
Coastal Nonpoint Source Control Program
Applicant must satisfy requirements listed in Attachment 2 "Special Considerations" and fill out the Small Community
Designation Form.
RESPONSIBLE
PROJECT (Ms.,
DIRECTOR (one Mr.,
name only) Dr.): Raymond A. Case • 2/1/02
PRINT SIGNAT DATE
ELIGIBLE LEAD (one name only)
APPLICANT OR
ORGANIZATION: City of San Bernardino/Development Services
TYPE OF ENTITY:
Municipality Local Agency X Nonprofitllandownet9
Educational Institution Nonprofit non landownery
STREET ADDRESS: 300 N. "D" Street
CITY: San Bernardino Zip Code: 92418
P.O. BOX: Zip Code:
COUNTY:
STATE: CA '
PHONE NO.: (909) 384-511 l FAX NO.: (909) 384.5155
- I ' EXHIBIT "A"
Application Number: 582
case~_raC~cisan- FEDERAL TAX ID. NO.:
• E-M.41L ADDRESS: bernardino.ca.us 95-6000772
PROJECT TITLE: Vision Creek Project
PROJECT TYPE (See what activities
qualify, Attachment I) Diversion at control of urban (freeway) runoff
LEGISLATIVE INFORMATION CA Senate District 32nd CA Assembly District 62'd/63rd
U.S. Congressional District
WATERBODY(S)/WATERSHED: Santa Ana River Watershed
(Refer to ARD, Section 5)
COGNTIES IN WHICH THE PROJECT WILL PRIMARILY TAKE PLACE:
San Bernardino
• F[SCAL SUMMARY:
Prop 13 Funds Requested E 2,500,000.00
Other Project Funds (2U°.'o local match) S 500,000.00
Total Project Budget S 3,000,000.00
CERTIFICATION
Please read before signing.
I certify under penalty of perjury that the infot~rtation [have entered on this application is true and
complete to the best of my knowledge and that I am entitled to submit the application on behalf of the
applicant (if the applicant is an entity/organization). I further understand that any false, incomplete, or
incorrect statements may result in the disqualification of this application. By signing this application, I
waive any and all rights to~privacy and confidentiality of the proposal on behalf of the applicant.
U' ~ Z Gt/GZ~
Applicant Signature Date
Raymond A. Casey, Deputy Director/ City Engineer
Printed Name of Applicant
•
-2-
J'LON CREEK (Phase Il: CONCEPT REPORT
• 1) The City of San Bemardino/ Development Services in coordination with the proposed Caltrans I-
215 freeway widening project, and the Municipal Water District is proposing a rather unique cost
effective water reclamation' water diversion project that qualifies under the State «'ater Resources
Control Board's (SWRCB) Nonpoint Source Pollution Control Program. The Vision Creek Project
proposes to divert I-215 Freeway storm water and landscaping irrigation run off along the east side of
the freeway between Olive Street and Base Line. The run off will flow through a series of drainage
clarifiers located within the freeway right-of--way, in[o existing lateral drainage pipes, terminating into
the project's proposed concrete lined with rock and gravel riprap trapezoidal drainage channel (urban
stream). The urban stream concept will simulate actual creek bed flow on a constant basis, fed by a
water source that is provided from the project's planned retention pond in the vicinity of Base Line at
"G" Streets. The stream is initially designed to flow adjacent to the freeway along the west side of "H"
Street, between Base Line and Olive Streets where it will terminate into an existing "H" Street storm
drain channel. Please review the attached project vicinity concept map.
The urban stream shall be multi-faceted in function, providing both year round water drainage
capability for 5-year flooding as well as 100-year flooding within the 100' right of way that is
proposed for the stream bed. The stream bed right-of--way shall also function as a landscaped
pedestrian bicycle walkway that will complement the proposed Downtown Revitalization Project and
is planned to ultimately intersect the Santa Ana River Trail located a few miles southerly of this
location. The project will also provide acost-effective alternative to the freeway widening project's
required underground drainage complex.
• The Downtown Revitalization Project was conceived to alleviate the City's high groundwater table
in the area and possible subsequent liquefaction activity during earthquake moments. The Lakes and
Streams Project (Phase I) will be situated between Base Line and 9th Streets and the [-215 Freeway
and "E" Street. The project proposes to develop a series of retention ponds with connecting streams to
circulate and store groundwater that has been drawn to lower the previously mentioned high
groundwater table.
The project is located in the Santa Ana Watershed District and is specifically located within the San
Bemardino Basin area. This basin is one of the largest groundwater basins in southern California with
an estimated 5.5 million acre-feet of water. The basin area serves as a primary water supply for over
800,000 residents that reside and work in more than ten municipalities.
The basin has been degraded over time with man's interaction and developmental activities which
have contributed extensive contaminates in the groundwater, causing local/ regional water agencies to
spend millions of dollars for clean up of the underground water supply. Contaminants in the basin
include TCE, PCE, DBPC, and Perchlorate. Additionally, there are several LUST sites within the basin
area where remediation activities are underway to prevent the migration of hydrocarbons, MTBE, and
the breakdown products from further contaminating the drinking water supplies.
One area of additional contaminant contribution to the groundwater, which this project intends to
address, can be storm water runoff being percolated to groundwater, rather than discharges to surface
water systems without treatment. Runoff from roads and freeways contain significant amounts of
hydrocarbons and related contaminants that, if allowed to migrate to groundwater, will require
• additional well-head treatment to insure that the groundwater will comply with all potable water
quality standards.
2) The goals and objectives of the Vision Creek Project are consistent with the application criteria
set forth in Prop 13 Article 2. Nonpoint Source Pollution Control Program• 7911 la: Best management
• practices, c) Management measures; 79114 (a) 2. A broad-based nonpoint source project... (b) The
projects funded from the subaccount shall demonstrate a capability of sustaining water quality benefits
for a period of twenty years. Categories of nonpoint source pollution addressed by projects may
include: urban runoff. hydromodification are project oualifiers. Projects to address nonpoint source
pollution include: engineered features to minimize impacts of nonpoint source pollution i a project
Qualifier.
3) The Vision Creek Project is compatible with the SWRCB Guidelines set forth for in Section 6 of
the ARD for: Management Measures for Urban Areas: 3.3 Runoff from Existing Development A)
Existing development; and F) Road, Highway and Bridge Runoff Systems. The project will
endeavor to alleviate the problems caused by urban (freeway) tvnoff and subsequent pollution of
~ groundwater resources by developing strategies that augment source reduction practices
throughout the three specified phases of development which are 1) design phase 2) construction
phase and 3) the post-development phase. The Vision Creek Project is also compatible with and
similar to the Inventory of Nonpoint Source Implementation Projects and Priorities (Santa Ana
Region) that are fisted in Section 4 of the ARD (page 23). The projects that are specifically similar
are: The Fountain Valley List: 10) Projects that divert nuisance flows throughout the region. 19)
Reduce urban runoff, the transport conveyance mechanism... Loma Linda List: 9) Enhanced
stormwater capture.. 22) drainage facilities to reduce/control runoff.
4) Scope of Work: Phase I :Base Line to Olive Street
• 5150,000. Design/Preliminary Engineering
5250.000. Construction Engineering
5750,000. Right-of--way costs/home acquisitions
5750,000. Grade and install concrete riprap stream channel
5500.000. Construction of detention desalting basins/ponds
5100,000. Storm drain construction
52,500,000. Project Cost utilizing best management practices and measures
+ $500,000 (20%) Local Match: City/ Municipal Water District contributions
5) The success and impact of the project will be measured through water quality source testing of
nearby wells and the project's impact on the groundwater fluctuation levels at the retention basin
pump station to be located adjacent to the proposed location of the stream at Base Line and "G"
Streets. The aesthetic value of the pedestrian walkway and open space buffet- between properties
and the I-215 freeway corridor is also worth mentioning.
6) The project will ensure community and stakeholder outreach involvement through a continuing
series of public meetings related to the "water project". Also, local residents will see and read in the
local newspaper about their community being transformed in a positive manner that emphasizes
humanistic appreciation of open space and a healthier pollution-free environment.
•
• -
City of San Bernardino, California
• Department of Development Services/Pctblic Works
Vision Creek
,.
--~
i
_I I I I _ ~ _ _-_-- -- ~
Q = _
_
,y ,~ ^~'~~
,
r
,. --
~-__ ___- ~ 00.00 .- -__-~ I~'O
_ ~r.~.;
/_~~"
y _ ,_
Section ~ "A "- "A"
SECTION 3
PROGRAM SPECIFIC TIMELINES
• PROPOSITION 13 SWRCB PROCESS
RFP-TO-EXECUTION TIMELINE
CONCEPT RFP APPLICANTS SUBMIT CRRIQUE AND
CONCEPT PROPOSALS FEEDBAIX ON CALFED • STATE REGIONAL BOARDv
TD SUBMITTAL OF STATE W ATER BOARD
70 SWRCB PROGRAM CONGER MOPOSALS BOARD-
MIFRFSTED PROPOSALS ~ sUBMR PRIORITY LISTS
PARTffS FOR REV~W AND PROVmED 70 FLGIBILffY REV~W
FEEDBACK APPLICANTS lDavhw"AdaW '/ TO PROGRAM
/pnNM •Aprh 11 lfaYpay-AbvA JI (AdnnA-AApYh 11 Ihpr.AlrauA7 /,/WYAYSYp~II•Aavh.L~I?/
Pmpmeb j
Plionry Ln
STATE BOARD WMI CORB.OTTEE
APPROVES RESOLUMN! PRIORITY SELECTS PRIORITY PROTECTS FOR
USr STATE WATFJI BOARD
(QnWn.A~fwAr!) CONSmERA770N
~~~r-AAmeA/p-AAvm1/p
Appned Cut and RalamnY
Qxh parts tirJlup here RtlO~itlO^ 11p of Pr.
CYnlm natp a eeaallyd
within lMp ytle of m+pa ~
ofawalp.
SEI2CTION
N077FTCATWW
DCVEIAPMENTOP
PRa1.D11wARY SCOPL
\ sECws
M~-Mamp />)
Selatipn Learn and
Prcparatiaa INwpimn
CdNPLETED CONTRAR
PACKAGES TO CONTRAR
OFFICE i0R PROCESSMG
11AYYmArr-AbuA/J/
Stet due
opnN be Ten
CONTRACT OFFICE PROCESS/ ~"•a A•ya
CONTMROR SIGNATURFI horn wbmilW
DER OF GENERAL SERVICES ~Y Cmnnn
REVIEW/SIGNATURE BSnx
l,YU ku rAur Pa Dy~.l••/
WNY [p10M Ipain YNd IIp CMIM pR
dne Mpch auane hWinam®unea
EKECV7ED CONTAACI YNiI pp mNrpt pan due
_ woaR cAN Bwm
oN sTmnwTEB
• lRART pAn...
• This is a besacue sanario. The actual time is contingent upon the quick syybmitul otthe contract package by Ne Contractor.
This turn around time is wntingent upon the number of contracts in the Contract Ogee during this timeframe.
Contractors should not budget the lands for atleast 120 days after their submittal of the draft scope and budget If the pukage is received inside the
timefteme, the date will eithu be ehanaed or the pukaee will be returned to the Contract Manaeer for corrcMion. Be aware that if the start date slips, it will
Ci o San Bernardino, California
~ f
Department of Development Services/Public Works
~ Vision Creek
N
Coltrane Park / Playfield W E
Storm System
2 ~ Oesilting ec Retention Basin
S
I
• School ~
BA.SEl1NE STREET
Vision Cneek Walkway ~ .Area ~
3
' - a'
i
• ;
• ~ ,
,o---------- - ~'
NINTH STREET f
City's Existing Storm gain 5yetem
VISION CREEK
100.00'
'H' Street i
,S`ection "A "- "A "
;~,
-,
1
_' - _ --
E
d
N ~
cn ~
c
'o
C .7
~ E
O w ~ ~
j:y~K
~ L _4 ~'
~ p . `i y
~ ~ ~'
~ ~ ~ E
v
r_ W
v1 ~ ~ Y ~ v
`1v ~ i 3 ~
Z x
Y o w
'' U >
~ U
~ ,o
~ ~ ~ ,~
~ ~,
E ~ -
A °cn GCD
~-
R
~ O Q
n u
n ~
~ •'
''
• - - - l-P _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~i _ _ _
O ~ ~ _-____ . _
~ ` ~'
~ N
~ N ~ ~-_
~ a ~,>
~ ~
~ ~
.,,y
~
~ ~
~,
~ c, r
d '~ ~
~ ~ ~
. ~ o,
'~ ~' ~,
~ ~ ~
~ ~ .C'
~ ~ a
~ ~ c~
~ ~ ,,,v o~
~ ~ ~
~ a~
A
~ ~
~ ° ,~,,~-
~ °'
a~
~~-~
,,~
FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT
RESOLUTION AGENDA ITEM TRACHING FORMnn
Meeting Date (Date Adopted): 3-1 `6~J~ Item # (1} Resolution # d 60
~ -~
Vote: Ayes ~ ,~ Nays ( Abstain Absent E~-
Change to motion to amend original documents:
Reso. # On Attachments: Contract term: NulWoid After: '-
Note on Resolution of Attachment stored separately:
Direct City Clerk to (circle 1): PUBLISH, POST, RECORD W/COUNTY By: ^
Date Sent to Mayor: Iq -O ~ Reso. Log Updated: Y
Date of Mayor's Signature: 3-x0-02 Seal Impressed: ~
Date of Clerk/CDC Signature: 3 a 1-43
Date Memo~l~tte• t for Signature: See Attached: _ Date Returned: ^
60 Day Reminder Letter Sent on 30th See Attached: _
90 Day Reminder Letter Sent on 45th day: Attached:
Request for Council Action & Staff Report Attached: Yes ~ No By
Updated Prior Resolutions (Other Than Below): Yes No By
Updated CITY Personnel Folders (6413, 6429, 6433, 10584, 10585, 12634): Yes _ No ? By
Updated CDC Personnel Folders (5557): Yes _ No ~ By
Updated Traffic Folders (3985, 8234, 655, 92-389): Yes _ No ~ By
Copies Distributed to:
City Attorney ~,/ Code Compliance Dev. Services ~ EDA Finance ~ MIS
Parks & Rec. Police Public Services Water Others:
Notes:
BEFORE FILING REVIEW FORM TO ENSURE ANY NOTATIONS MADE HERE ARE TRANSFERRED TO THE
YEARLY RESOLUTION CHRONOLOGICAL LOG FOR FUTURE REFERENCE (Contract Term, etc.)
Ready to File: ~ Date: _s~ I Oi)'
Revised 01/12/01