Loading...
HomeMy WebLinkAbout23-Public Works From: CI;Y OF SAN BERNARDINO - ~EQ~~~~-FOR COUN-~IL- ~C~lo~n-1 File No. 6.51-16 i Approval of Contract Change Order lIo. 1 - Installation of Handicap Ranp & Renodel of Council Chambers, per Plan No. 9568 --- MOODY CONSTRUCTION ROGER G. HARDGRAVE Subject: Dept: Public Works Date: 3-26-97 ORIGINAL Synopsis of Previous Council action: 01-22-96 Approval of concept, and Facilities ManageMent direc- ted to coordinate implementation of plan. June, 1996 - Adoption of 1996/97 Budget with allocation for improveMents. 10-07-96 Plans approved and authorization granted to advertise for bids. 12-16-96 Resolution No. 96-371 adopted awarding a contract for low bid price of $59,350.00. Recommended motion: That Change Order No. 1 to the contract with Moody Construction for the installation of a handicap raMp and restrooM renodel for the Council ChaMbers, in accordance with Plan No. 9568, be approved; to authorize the Contractor to perforM extra work consisting of the installation of a floor system to elininate the well between the Council platforM and the general seating in the Council Chambers, on a time and naterial basis, at a total additiona1" cost not to exceed $9,600.00, for an increase in the contract price from $59,350.00 to $68,950.00. cA ~. cc: Fred Wilson Tim Steinhaus Jim Sharer Signature Contact person: Rooer G. Hardqrave Phone: 5025 Supporting data attached: Staff Report & CCO #1 Ward: 1 FUNDING REOUIREMENTS: Amount: $9,600 (General Fund & CDBG Progran) Acct. Descri tion 001-322-5706 & rm'lr, Accnllnts lIROfi-gOl?, gfi-204 Recarpet Council Chambers & ADA 1m roven ts t~ t),'j ~ ,"-.. .',_.~~"!- j, Source: (Acct. No.) "., k~.~-; S'7 Finane "' Council Notes: 75-0262 Agenda Item No. 9/7/97 .~ r------- ~. CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT The plans for remodeling the Council Chambers to meet handicap accessibility requirements direct the construction of a ramp along the north side. A ramp would also be constructed to provide handicap access to the depressed area between the theatre seating and the Council dias. The plans show the two steps leading to this depressed area as being 6 inches in height, while they actually are 7 inches. This difference would necessitate extension of the ramp to provide access to this area, which would severely restrict the use of this area. It is very likely that the depressed area will have to be eliminated at some time in the future in order to gain compliance with more stringent standards for handicap access. In view of these considerations, it was decided that it would be advisable to fill in the depressed area at this time. Filling in this area will require removal of the first two rows of theater seats. This area can be used for handicap seating, or chairs could be placed during those times when supplemental seating is needed. The Contractor was directed to proceed on a time and material basis, in accordance with Section 3 of the Standard Specifications for Public Works Construction, not to exceed $9,600.00. The total estimated project cost included an amount of $9,650.00 for contingencies, which can be used to finance the additional cost authorized by Change Order No. One. We recommend that Change Order No. One be approved. 3-26-97 75-0264 ~. pile No.:6.5l-l6 Plan No.: 9568 Date: 3/25/97 C I T Y 0 F SAN B ERN A R DIN 0 DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION proj ect: INSTALLATION OF HANDICAP RAMP AND RESTROOM REMODEL AT THE CITY HALL'S COUNCIL CHAMBER. CONTRACT CJlAJ!tGE ORDER NO. on TO: MOODY CONSTRUCTION 883 S. Lovel Street Banning, CA 92412 Gentl_en: You are hereby authorized and directed to perform the following work as directed by the Resident Engineer, as follows: Fill in the well area between the city Council Seating and the General Seating area within the City Council Chambers per the attached plan, and as directed by the Resident Engineer, on a time and material basis, at a total cost not to exceed $ 9,600.00. Total Estimated Extra Work Cost added to the Contract ..$ 9.600.00 Previous Contract Price ................................$ 59.350.00 Amended Cost Price .....................................$ 68.950.00 Additional time to complete Contract due to Chanqe Order -O-Workina Davs CONTRACTOR CITY 01' SAJ!t BERJ!tARDINO Accepted Recommended By: By: ROGER G. HARDGRAVE DATE Director of Public Works/city Enqr Title: Date: