CIT.Y OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
Dept:
Council
ORIGINAfbiect:
Comnitment to Provide Funding
for 33% of Cost - Installation
of Soundwalls along Route 30,
from East Twin Creek Channel
to Garden Avenue
From:
NORINE MILl,El,
Date:
02-06-97
Synopsis of Previous Council action:
A.DiilN. Oii"t:rct-;!
None.
6 FEa 97 .:u It
Recommended motion:
Adopt resolution.
cc, F. Wilson
J. Penman
)1~
,
~ ~- m.:.vo 'L~
ignature
Contact person:
Norine Miller
Phone:
<;OhR
Supporting data attached:
Staff Report
Ward:
7
FUNDING REQUIREMENTS:
Amount:
N/A
Source: (Acct. No.)
(Acct. Description)
Finance:
Council Notes:
t'J1ph.tJ71 hr/k.d
~/I7/q7
Agenda Item No.J I d
75-0262
.CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
STAFF REPORT
The second phase of the Route
Waterman Avenue, was constructed in
Soundwalls, to attenuate noise generated by
the freeway, were not included in the
practice at that time.
30 Freeway, east of
the early 1970's.
vehicles traveling on
project, as was the
freeway
volumes
Traffic volumes have increased over the years that the
has been open to traffic. The increase in traffic
has resulted in accelerated noise levels.
Numerous complaints have been received
Office relative to the noise level. These
generally located in the section between the
Flood Control Channel and Golden Avenue.
in the Council
complaints are
East Twin Creek
Requests have been submitted to Caltrans for soundwalls
to be constructed, in order to provide relief for adjoining
residents. However, Caltrans has established a requirenent that
the noise level must be at least 67 dBA to meet the minimum
criteria for funding. Measurements of the noise level have
indicated that this level had not been met at the time the tests
were taken.
It is anticipated that the California Transportation Com-
mission will program approximately $50 Million in the 1998 STIP
for constructing soundwalls. Competition for these funds is
expected to be vigorous. Caltrans has established a tiered
priority rating system, with the highest level assigned to those
projects with a 33% local funding commitment.
Therefore in order to provide some relief from the
intolerable noise levels, it is recommended that the City make a
commitment to provide 33% of the cost, at such time as State
funds may become available.
The
between the
Avenue, is
$400,000.
total estimated
East Twin Creek
$1.2 Million, of
cost,
Flood
which
for installing soundwalls
Control Channel and Golden
the City's share would be
2-06-97
75.0264
1 RESOLUTION NO.
2 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF
SAN BERNARDINO COMMITTING TO PROVIDE FUNDS TO FINANCE ONE-THIRD
3 OF THE COST FOR INSTALLATION OF SOUNDWALLS ALONG ROUTE 30 FRE~WAY
FROM THE EAST TWIN CREEK CHANNEL TO GOLDEN AVENUE.
4
5
WITNESSETH:
6 WHEREAS, the Route 30 Freeway, east of Waterman Avenue,
7 was constructed in the early 1970' s without any soundwalls to
8 attenuate the noise generated by vehicles travelipg the freeway,
9 and
10
11
12
13
14
15
16
WHEREAS, noise levels have increased / to an intolerable
level, as attested to by the numerous qomplaints received,
/
generally from residents between the E/st Twin Creek Flood
/
Control Channel and Golden Avenue, and
WHEREAS, the California Department of Transportation
anticipates that the California Transportation Commission will
program approximately $50 Million in the Retrofit Soundwall
17 Element (SND) of the 1998 STIP, and is accepting completed Noise
18
19
20
21
22
23
24
25
26
27
Barrier Scope Summary Reports (NBSSR) for candidate retrofit
soundwall projects.
WHEREAS, priority tiering has been established, due to
the expectation that competition for these funds will be
vigorous, and
WHEREAS, the highest priority tier is those projects
which have a 33% local funding commitment, and
WHEREAS, the priority of the soundwalls along Route 30,
between East Twin Creek F~ood Control Channel and Golden Avenue,
could be enhanced by proViding the Department of Transportation
!
28 with a commitment to provide 33% of the total preliminary
02-06-97
RESO: COMMITTING FUNDING FOR INSTALLATION OF SOUNDWALLS ALONG
ROUTE 30 FREEWAY, FROM EAST TWIN CREEK CHANELL TO GOLDEN
AVENUE.
1 estimated cost of $1.2 Million.
2
f
NOW THEREFORE, BE IT RESOLVED BY THE MAYO~ AND COMMON
COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS:
3
4
5
Million, for installation of soundwalls ald~g
6 !
East Twin Creek Channel to Golden Avenueft at
7
SECTION
That
City
of
ONE:
the
San Bernardino
will
provide funds to finance 33% of the total estimated cost of $1.2
funds are made available for the
bala7e
of the total estimated
8
cost.
9
10 I I I I
11 1111
12 I I I I
13 I I I I
141111
15 I I I I
16 I I I I
17 I I I I
18 I I I I
19 I I I I
20 I I I I
21 I I I I
221111
231111
241111
251111
26 I I I I
27 I I I I
281111
/
I
i
I
/
I
/
/
- 2 -
Route 30, from the
such time as state
.
RESO: COMMITTING FUNDING FOR INSTALLATION OF SOUNDWALLS ALONG
ROUTE 30 FREEWAY, FROM EAST TWIN CREEK CHANELL TO GOLDEN
AVENUE.
1 I HEREBY CERTIFY that the foregoing resolution was duly
2 adopted by the Mayor and Cornmon Council of the ei ty of San
18
19
Approved as to form
20 and legal content:
21
22
23
/
/
/
Tom Minor, Mayor
Ci ty of San Bernardino
James F. Penman
City Attorney
24
25
26
27
28
I
- 3 -