Loading...
HomeMy WebLinkAbout27-Public Works CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION File No. 1.871 From: ROGER G. HARDGRAVE Subject: Approval of Change Order No. 2 - Street & Traffic Signal Improve- ments on Tippecanoe Avenue, fron Redlands Boulevard to Hospitality Lane, per Plan No. 8888 -- HOLr~lD-LOtm COnSTRUCTION, INC. Dept: Public Horks Date: 2-03-97 ORIGINAL Synopsis of Previous Council action: 05-06-96 - Approved transfer of $100,000 frOM Account No. 250-670- 57871, Traffic Signal at South "E" & Fairway Dr., to Account No. 250-670-57878,"Widen and interconnect traffic signals, Tippecanoe Avenue, fran Redlands Blvd. to I10spi tali ty Lane," ann Dirpc':ot: of Public Horks authorized to negotiate cooperative agreenent with City of Lona Linda. Resolution No. 92-109 adopted authorizing execution of cooperative agreenent with LOMa Linda for improvement of Tippecanoe Avenue at 1-10 Freeway. Plans approved & authorization granted to advertise for bids. (Continued on second page) 12-02-91 ADMIN. C::'lt~lC~t b Fill 97 2.J I' 10-19-92 - Recommended motion: That Change Order No. 2 to the contract with Holland-Lowe Construction, Inc., for traffic signal and street improvements on Tippecanoe Ave., from Redlands Blvd. to Hospitality Lane, in accordance with Plan No. 8888, be approved; to authorize the additional work required in the removal and replacement of unsuitable material and for additional excavation, on a time and material basis, at a cost not to exceed $44,000.00, for an in- crease in contract price from $367,419.45 to $411,419.45; and that the Director of Finance be authorized to amend the 1996-97 Budget to reflect a $44,000 increase in the project allocation. ~. Bill Bapf: a F~ed \hlson Co~.st. Insp. Signature cc: Contact person: Roa~r G. Har~qrnve Phone: ,07, Supporting data attached: Staff Report & CCO #2 Ward: 1 FUNDING REQUIREMENTS: Amount: $44.000 (Traffic SysteM Fee Funn) Source: (Acct. No.) 250-370-5504-1501 Acct. Descri tion Traffic. si rove- * nents - Tippecanoe Ave.. fron Redlands Blvd. to Hospitality Lane Council Notes: Finance' J-/n/q1 '* S(J,~J15<:r -,i) """..-,,4<.- q.t- ,4"06e'1 AM-.....u.-.,- Agenda Item No. .J7 75.0262 " " PUBLIC WORKS DEPARTMENT File No. 1.871 SYNOPSIS OF PREVIOUS COUNCIL ACTION: (Continued) 06-17-96 - Resolution No. 96-170 adopted Holland-Lowe Construction for $326,419.45. awarding the low a contract bid price to of 01-27-97 - Contract Change Order No. 2 for the installation of two additional catch basins, and the relocation of existing electrical components, at an estimated cost of $41,000.00, approved. 2-03-97 CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT During excavation for the subgrade for street and traffic signal improvements on Tippecanoe Avenue, from Redlands Boulevard to Hospitality Lane, unsuitable material was encountered. After testing this material, the Consulting Soils Engineer determined that this naterial had to be removed to a depth of 42 inches. If this material is not removed, and replaced with material in conformance with the plans and special provisions, the new pavement would nost likely fail soon after completion of this project. Therefore, the Contractor was directed to proceed with removal of the unsuitable material and replacement of naterial from a designated borrow site. The Contractor subni tted a price quote of approxinately $80,000 for this necessary extra work. We were unable to concur with this proposed price, so the work will be done on a time and material basis, in accordance with Section 3-3 of the Standard Specifications. The estimated cost of this extra work is $44,000. The total estimated project cost, based upon the actual low bid price, contained an anount of $51,080.55 for contin- gencies, which can be used to finance the costs incurred for change orders. Change Order No. One was approved on 1-27-97, for the price of $41,000, which leaves a balance of $11,080.55 in contingencies. The overrun has been discussed with Cal trans personnel, who have confirmed supplemental Federal-Aid STP Funds are available to cover the actual costs that will be incurred. All costs incurred for Change Order No. Two will be charged to Account No. 250-370-5504-1501. Funding for this project is being provided fron Federal-Aid STP Funds (88%); and the Inland Valley Development Agency (12%). We recommend that Contract Change Order No. Two be approved. 2-03-97 75.0264 '. CONTACT CHANGB ORDBR NO. 2 ROAD TIPPECANOE @ I-10 FED NO. STPLN-S033(009) TO: HOLLAND-LOWE CONSTRUCTION REV NO. SHBBT 1 CONTRACT SUPPLe NO. OF 1 NO. 8888 You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until aooroved bv the state Hiahwav Enaineer Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as eauioment is actual Iv used and no allowance will be made for idle time. The last percentage shown. is not accumulated increase of decrease from the original quantity in the Engineers Estimate. BXTRA WORK AT FORCB ACCOUNT: Additional work performed in the removal and replacement of unsuitable materials with base material supplied by the City, and all of the additional grading and excavation, which includes the removal of all excess material, as directed by the Resident Engineer, on a time and material basis, at an estimated cost of $ 44,000.00. By reason of this order the time of completion will be adjusted as follows: ____ working days Submitted by: Resident Bngineer, Date: Approval Recommended: Date: Approved: City Bngineer Date: We the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all material, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full oavment therefor the orices shown above. Accepted Date: Contractor: HOlland-Lowe Construction, Inc. By: Ti tle: If the contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the work and filing a written protest within the time therein specified. .,'.,,", l;r4Tl~.- '......' ~...'.~.?';fi. .;)','.. City of San'Bernardlno BUDGET TRANSFER REQUEST DATE 2-5-97 TRANSFER FROM TO ACCOUNT NO. Dept. Budget Fund Div Code SUFX REV AMOUNT ACCOUNT NO. Dept. Budget Fund Diy Code SUFX REV AMOUNT 250 000 4945 $44,000 (Increased Revenue) 250 370 5504 1501 $44,000 (Tippecanoe Ave. Improvemen ts) REASON FOR TRANSFER, To provide supplemental funds to finance the additional costs incurred by Contract Chanqe Order No. Two. The funds will be provided from Federal-Aid STP and IVDA. REQUESTED BY Public Works DEPARTMENT FINANCE & ADMINISTRATOR'S OFFICE USE ONLY J. V. Number COUNCIL ACTION (REQUIRED) (NOT REQUIRED) DATE APPROVED, APPROVED, DIRECTOR OF FINANCE CITY ADMINISTRATOR DISTRIBUTION: WHITE. Finance 150-101 YELLOW. Finance PINK. Requesting Department