HomeMy WebLinkAbout31-Development Services ORIGINAL CITE' OF SAN iBERNARDINO REQUEST FOR COUNCIL ACTION From: Valerie C. Ross, Director Subject: Authorization for the Director of Development Services to execute Contract Change Order Dept: Development Services No. One to the contract with Oak Engineering, Inc. for Traffic Signal Improvements at 5th Date: January 11, 2007 Street and "F" Street (TC04-16); 30th Street and `B" Street (TC04-17); Highland Avenue File Nos. 1.7430; 1.7431; 1.7432 and `B" Street (TC04-21), per Project Plan No. 11176. MCC Date: January 22, 2007 Synopsis of Previous Council Action: 04/05/2004 Adopted Resolution approving Agreement for Professional Services with Transtech Engineering for Traffic Signal Design. 08/15/2005 Mayor and Common Council approved FY 2005-06 CIP Budget. 08/07/2006 Mayor and Common Council approved FY 2006-07 CIP Budget. 08/21/2006 Adopted Resolution awarding contract in the amount of$354,050.00 to Oak Engineering, Inc. for Traffic Signal Improvements at 5th Street and "F" Street (TC04-16); 30th Street and "E" Street (TC04-17); Highland Avenue and "E" Street (TC04-21), per Project Plan No. 11176. 01/08/2007 Mayor and Common Council continued this item to January 22, 2007. Recommended Motion: Authorize the Director of Development Services to execute Change Order No. One in the amount of $32,929.90 to a contract with Oak Engineering, Inc. for Traffic Signal Improvements at 5th Street and "F" Street (TC04-16); 30th Street and "E" Street (TC04-17); Highland Avenue and `B" Street (TC04- 21), per Project Plan No. 11176. &�J 6 kw- Valerie C. Ross Mark Lancaster, Contact Person: Deputy Director/City Engineer Phone: 3305 Supporting data attached: Staff Report, Cost Distribution Chart Ward: 1,2,7 & Change Order No. 1 FUNDING REQUIREMENTS: Amount: $32,900 Source: (Acct. Nos.) 250-370-5504-7430; 250-370-5504- 7431; & 250-370-5504-7432 Acct. Traffic Systems Fee Fund Description: & Grant (HHES) Finance: COUNCIL NOTES Agenda Item No. i1"t' /� f CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT Subject: Authorization for the director of Development Services to execute Contract Change Order No. One to the contract with Oak Engineering, Inc. for Traffic Signal Improvements at 5th Street and "F" Street (TC04-16); 30th Street and "E" Street (TC04-17); Highland Avenue and "E" Street (TC04-21), per Project Plan No. 11176. Background: On August 7, 2006, the Mayor and Common Council allocated funds as part of the FY 2006/07 Capital Improvement Program (CIP) for Traffic Controls for the above locations. On August 21, 2006, the Mayor and Common Council awarded a contract to Oak Engineering, Inc. in the amount of $354,050.00 for Traffic Signal Improvements at 5th Street and "F" Street (TC04-16); 30th Street and `B" Street (TC04-17); Highland Avenue and "E" Street (TC04-21), per Project Plan No. 11176. On the southwest corner of Highland Avenue and "E" Street, a waterline was accidentally broken due to the contractor's boring equipment making contact with the waterline outside of the marked location. Due to technical problems, the San Bernardino Municipal Water Department (SBMWD) was unable to turn off the water for four hours. The continual flow of water caused significant roadway damage. The contractor is requesting compensation for delay incurred awaiting the water line repairs. The initial cost estimate of the repair was $50,000. Based on the contractor's time and material for the repairs, as well as negotiation with the contractor, the agreed cost of delay and roadway repair has been reduced to $24,679.90. SBMWD has agreed to reimburse the City the amount of $24,679.90 as its share of the cost of the delay and repairs. At 5th Street and "F" Street, an existing pedestrian pushbutton was identified for repair. However, due to previous damage and precise field measure, the pedestrian pushbutton had to be relocated to comply with new ADA regulations. At 30th Street and "'E" Street, the existing signal poles and foundations were found to need replacement due to previous base-plate damage. Also, elevations had to be adjusted to avoid underground utility conflicts with the new ADA ramps being installed. Change Order No. One, in the amount of$32,929.90, consists of the following changes: Item No. 1-1 Install temporary 1-A pole at Highland Avenue and"E" Street. Item No. 1-2 Delay due to waterline breakage and repair at Highland Avenue and `B" Street. Item No. 1-3 Repair asphalt roadway, curb & gutter and sidewalk at Highland Avenue and "E" Street damaged by water line break. Item No. 1-4 Relocate pedestrian pushbutton at 5th Street and"F" Street. Item No. 1-5 Replace (2) 1-A poles and install new foundations at the southwest corner of 30th Street and"E" Street. 2 01/12/2007 9:11 AM CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT—Continued Financial Impact: The FY 2006-07 CIP budget included funding in Acct. Nos. 250-370-5504-7430, 7431 & 7432 for this project. This funding will be adequate to cover the cost of this change order and all other costs for this project as indicated in the attached spreadsheet. The estimated project costs are as follows: TOTAL Original Contract Amount $ 354,050.00 Contract change Order No. One $ 32,929.90 Revised Construction Cost $ 386,979.90 This change order represents an increase of 9.3% in the contract amount. The cost of construction engineering and inspection is estimated to be approximately $5,000, bringing a total cost of change order to be $37,900. The Water Department will reimburse the City $24,679.90, bringing a net cost of change order to $13,220.10. Recommendation: Authorize the Director of Development Services to execute Change Order No. One in the amount of $32,929.90 to contract with Oak Engineering, Inc. for Traffic Signal Improvements at 5th Street and "F" Street (TC04-16); 30th Street and `B" Street (TC04-17); Highland Avenue and "E" Street (TC04- 21),per Project Plan No. 11176. Attachment: Cost Distribution Chart 3 01/12/2007 9:11 AM 4 U �Y � ON M M O O M O C) lqt CD O 69 Gq 60 N � N 6R O N Q. L O N d O O O O U) O O O O O O O) (fl Ul) Z :3 L11 m CD M CD CD d 69 69 64 — W O Q� > a Q ti M O rn J O CD O CD w (D 0o Z C N N lq rl U R L O Cl) 69 Cl) CV U Gq 619, r- U O c LL LL O Z Q � H p °a fl- co O m O Z O C N co a) U- F- O + "t E!? H-? r U U 3 E u 6" 60 Lu a" N (7 p Z -) N O a Lo _ O C C C Z a U LU LU O L y � Dp 7 � LO W O Cl) Z Z L O Il- O M C3 O O E N CN 69 M Z H Q 69 6f� W C r O U Z U) w U C O fn a� CU Z O a� cn ai C L N O C L � U O O - W z W (n Q EL N O O to Q C 06 Q 06 C d U o U E 0) U) Z (6 U .L. L _U = L E C ( _O l.l.l L6 _ LO U) = Q d N .- a z U E o 0 0 O U Z L O N M M M E :3 V Z 0 � LO C � LO� O O O U co M M u O O O LO LO U() N N N DEVELOPMENT SERVICES DEPARTMENT 300 North"D"Street•San Bernardino•CA 92418-0001 • Planning&Building 909.384.5057•Fax: 909.384.5080 Public Works/Engineering 909.384.5111 •Fax: 909.384.5155 San Bernardino www.sbeity.org SM CONTRACT CHANGE ORDER NO. ONE FILE NOS. 1.7430; 1.7431; 1.7432 W.O.NOS. 7430; 7431; 7432 DATE: JANUARY 22,2007 PROJECT: TRAFFIC SIGNAL IMPROVEMENTS AT 5TH STREET & "F" STREET (TC04-16); 30TH STREET & "E" STREET (TC04-17); HIGHLAND AVENUE & "E" STREET(TC04-21),PER PLAN NO. 11176. TO: OAK ENGINEERING,INC. 1305 W. SECOND STREET POMONA,CA 91766 GENTLEMEN: You are hereby compensated for performing the additional work as follows: ITEM NO: DESCRIPTION OF CHANGE COST 1-1 Install temporary 1-A Pole at Highland Avenue&"E" Street. $ 3,500.00 1-2 Cost of delay due to Water Line breakage and repairs at Highland $ 8,614.90 Avenue&"E" Street 1-3 Repair of Asphalt Roadway, Curb&Gutter, and Sidewalk damaged $ 16 065.00 b waterline break at Highland Avenue&"E" Street. ' 1-4 Install a Pedestrian Push Button at 5h Street&"F" Street. $ 750.00 Replace (2) 1-A Poles and Install new Foundations at 30 Street& 1-5 "E" Street on the Southbound Median Island and 30th Street&"E" $ 4,000.00 Street at the Southwest Corner. TOTAL COST CCO#11 $ 32,929.90 JUSTIFICATION: Install Temporary 1-A Pole At the southeast corner of Highland Ave & "E" Street, it was necessary to place the new Item traffic signal pole in the same location as the existing pole, because of conflict with No. 1-1 numerous utilities at the same intersection. It was necessary for the contractor to remove the existing pole and wire a temporary pole to support the mast arm and signal heads during removal of the existing foundation and construction of a new foundation for the permanent signal pole. CHANGE ORDER NO.ONE-OAK ENGINEERING,INC. TRAFFIC SIGNAL IMPROVEMENTS AT 5TH STREET&"F"STREET(TC04-16);30TH STREET&"E"STREET(TC04-17);HIGHLAND AVENUE&"E"STREET(TC04-21),PER PLAN NO. 11176. Delay due to Water Line Repair During construction, a water main, which had been incorrectly marked, and was damaged by the contractor's conduit boring operations. The waterline began leaking and, due to Item technical problems, could not be shut down for 4 hours. During this period, the force of No. 1-2 the water caused the roadway, curb&gutter, and sidewalk to be undermined. This item is to compensate the contractor for delays incurred while waiting for the line to be shut down and repaired. The Water Department has agreed to reimburse the City $24,679.90 for its share of the cost of delay and repairs. Repair of Asphalt Roadway, Curb & Gutter, and Sidewalk Item 1-3 The waterline break described in Item No. 1-2 above caused significant damage to the No. roadway, curb & gutter, and sidewalk. This item is to compensate the contractor for repair of the damaged areas of the street, curb& gutter and sidewalk. Item Install a Pedestrian Push Button at 5th Street& "F" Street No. 1-4 It was necessary to relocate the pedestrian push button for compliance with ADA regulations. Installation of a new foundation with anchor bolts was required. Replace (2) 1-A Poles and Install new Foundations at 30th Street & "E" Street on the Southbound Median Island and 30th Street& "E" Street at the Southwest Corner Two new 1-A poles had to be replaced. The 1-A pole at the southwest corner of 30d' Item 1-5 Street & "E" Street had to be reconstructed to match the new grades for the handicapped No. ramp. The 1-A pole at the median island at 30`h Street & "E" Street had to be replaced after the contractor found that the anchor bolts, which had been sheared off in a prior accident,had been replaced by others using unacceptable methods. SUMMARY OF CONTRACT COSTS The estimated revised contract cost is as follows: Original Bid Amount . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........................$ 354,050.00 Contract Change Order No. One . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....................$ 32,929.90 Revised Construction Contract cost . . . . . . . . . . . . . . . . . . . . . . . . . . ....................$386,979.90 Additional time to complete Contract due to this Change Order.......................... 10 Working Days This change order represents 9.3% of the original contract amount. OAK ENGINEERING,INC. CITY OF SAN BERNARDINO CONTRACTOR DEVELOPMENT SERVICES Accepted Approved By: By: VALERIE C. ROSS Title: Director of Development Services Date: Date: Approved by Mayor and Common Council Date: January 22, 2007 Item No. 2 6. Claims and Payroll. (See Attached) Approved MOTION: That the claims and payroll and the authorization to issue warrants as listed in the memorandum dated December 28, 2006, from Barbara Pachon, Director of Finance, be approved. 7. Personnel Actions. (See Attached) Approved MOTION: That the personnel actions, as submitted by the Chief Examiner, dated January 3, 2007 in accordance with Civil Service rules and Personnel policies adopted by the Mayor and Common Council of the City of San Bernardino, be approved and ratified. City Attorney's Office 8. Resolution of the Mayor and Common Council of the City of San Bernardino authorizing the City Attorney to execute a three-year contract with West Group to provide library and legal research materials to the City Attorney's Office and to authorize the execution of a Purchase Order for the above referenced three- year contract. (See Attached) (Cost to the City -- $139,192 from the General Fund for the three-year contract.) Approved MOTION: That said resolution be adopted. Adopted 2007-1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Development Services 9. Authorize the Director of Development Services to execute Contract Change Order No. One to the contract with Oak Engineering, Inc. for traffic signal improvements at 5th Street and "F" Street (TC04-16); 301h Street and "E" Street (TC04-17); Highland Avenue and "E" Street (TC04-21), per Project Plan No. 11176. (See Attached) (Cost to the City -- $32,900 from the Traffic Systems Fee Fund and HHES Grant.) Wards 1,2&7 Approved MOTION: That the matter be continued to January 2" Ir,rl" XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX -�t 31 5 d7 � r CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION From: Valerie C. Ross, Director Subject: Authorization for the director of Development Services to execute Contract Change Order Dept: Development Services No. One to the contract with Oak Engineering, Inc. for Traffic Signal Improvements at 5th Date: December 7, 2006 Street and "F" Street (TC04-16); 30th Street and `B" Street (TC04-17); Highland Avenue File Nos. 1.7430; 1.7431; 1.7432 and "E" Street (TC04-21), per Project Plan No. 11176. MCC Date: January 8, 2007 Synopsis of Previous Council Action: 04/05/2004 Adopted Resolution approving Agreement for Professional Services with Transtech Engineering for Traffic Signal Design. 08/15/2005 Mayor and Common Council approved FY 2005-06 CIP Budget. 08/07/2006 Mayor and Common Council approved FY 2006-07 CIP Budget. 08/21/2006 Adopted Resolution awarding contract in the amount of$354,050.00 to Oak Engineering, Inc. for Traffic Signal Improvements at 5th Street and "F" Street (TC04-16); 30th Street and "E" Street (TC04-17); Highland Avenue and "E" Street (TC04-21), per Project Plan No. 11176. Recommended Motion: Authorize the Director of Development Services to execute Change Order No. One in the amount of $32,929.90 to a contract with Oak Engineering, Inc. for Traffic Signal Improvements at 5th Street and "F" Street (TC04-16); 30th Street and "E" Street (TC04-17); Highland Avenue and `B" Street (TC04- 21), per Project Plan No. 11176. /&'�' &. TN4"-- Valerie C. Ross Mark Lancaster, Contact Person: Deputy Director/City Engineer Phone: 3305 Supporting data attached: Staff Report, Cost Distribution Chart Ward: 1,2,7 & Change Order No. 1 FUNDING REQUIREMENTS: Amount: $32,900 Source: (Acct. Nos.) 250-370-5504-7430; 250-370-5504- 7431; & 250-370-5504-7432 Acct. Traffic Systems Fee Fund Description: & Grant (HHES) Finance: COUNCIL NOTES Agenda Item No. CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT Subject: Authorization for the director of Development Services to execute Contract Change Order No. One to the contract with Oak Engineering, Inc. for Traffic Signal Improvements at 5th Street and "F" Street (TC04-16); 30" Street and `B" Street (TC04-17); Highland Avenue and "E" Street (TC04-21), per Project Plan No. 11176. Background: On August 7, 2006, the Mayor and Common Council allocated funds as part of the FY 2006/07 Capital Improvement Program (CIP) for Traffic Controls for the above locations. On August 21, 2006, the Mayor and Common Council awarded a contract to Oak Engineering, Inc. in the amount of $354,050.00 for Traffic Signal Improvements at 5th Street and "F" Street (TC04-16); 30th Street and `B" Street (TC04-17); Highland Avenue and "E" Street (TC04-21), per Project Plan No. 11176. During construction, the signal foundation for the southeast corner of Highland Avenue and "E" Street was found to be in conflict with existing utilities. It was necessary for the contractor to remove the existing pole and install a temporary signal pole while the new foundation was constructed. On the southwest corner of Highland Avenue and "E" Street, a waterline was accidentally broken due to incorrect Underground Service Alert (USA) markings. Due to technical problems, the San Bernardino Municipal Water Department (SBMWD) was unable to turn off the water for four hours. The continual flow of water caused significant roadway damage. The contractor is requesting compensation for delay incurred awaiting the water line repairs. SBMWD agreed to reimburse the City in the amount of$5,000 as its share of the cost of the delay and repairs. At 5th Street and "F" Street, an existing pedestrian pushbutton was identified for repair. However, due to previous damage and precise field measure, the pedestrian pushbutton had to be relocated to comply with new ADA regulations. At 30th Street and "'E" Street, the existing signal poles and foundations were found to need replacement due to previous base-plate damage. Also, elevations had to be adjusted to avoid underground utility conflicts with the new ADA ramps being installed. Change Order No. One, in the amount of$32,929.90, consists of the following changes: Item No. 1-1 Install temporary 1-A pole at Highland Avenue and "E" Street. Item No. 1-2 Delay due to waterline breakage and repair at Highland Avenue and "E" Street. Item No. 1-3 Repair asphalt roadway, curb & gutter and sidewalk at Highland Avenue and "E" Street damaged by water line break. Item No. 1-4 Relocate pedestrian pushbutton at 5th Street and"F" Street. Item No. 1-5 Replace (2) 1-A poles and install new foundations at the southwest corner of 30th Street and "E" Street. 2 12/21/2006 10:15 AM CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT Financial Impact: The FY 2006-07 CIP budget included funding in Acct. Nos. 250-370-5504-7430, 7431 & 7432 for this project. This funding will be adequate to cover the cost of this change order and all other costs for this project as indicated in the attached spreadsheet. The estimated project costs are as follows: TOTAL Original Contract Amount $ 354,050.00 Contract change Order No. One $ 32,929.90 Revised Construction Cost $ 386,979.90 This change order represents an increase of 9.3% in the contract amount. The cost of construction engineering and inspection is estimated to be approximately $5,000, bringing a total cost of change order to be $37,900. The Water Department will reimburse the City $5,000, bringing a net cost of change order to $32,900. Recommendation: Authorize the Director of Development Services to execute Change Order No. One in the amount of $32,929.90 to contract with Oak Engineering, Inc. for Traffic Signal Improvements at 5th Street and "F" Street (TC04-16); 30th Street and "E" Street (TC04-17); Highland Avenue and `B" Street (TC04- 21),per Project Plan No. 11176. Attachment: "1"—Cost Distribution Chart 3 12/21/2006 10:15 AM > < § \ / \ k \ \ƒ / 2 CN o § N CD � . 2 % 0 0 0 0 F 0 7(D 2 e LU m % % 7 $ � _ m m � � 2 _ > 2 � \ � k & � 00 k k N m / / 2 t w 3 2 ^ 2 n U 2 g � O � \ / z \ / / Cl) E k § c c � e a) � e 2 0 � $ - G m o D E 2 69 64 L) w o / / 7 ƒ Z D- 0 § - 2 EE Ix LLI U- � £ 0 0 0 0 :3 ® / / Cl) \ k a) q ^ 2 w = _cm / / k d n 2 .@ \ \ E d @ \ 2 O $ $ 9 ® ƒ \ g - o m 9 3 E \ 65 ° Ix -6 o k C\ 5 / ® 5 w <° _ ® s © _ ? 7 C/) « 3 ° 5 ° I z a 3 = 7 a G @ = » = @ / 7@39 k@ / 9 G 2 / \ \ 0 z @ @ @ U / \ \ \ E % = It t t / / / c n r r 6 6 6 S \ \ \ k \ \ \ N N a DEVELOPMENT SERVICES DEPARTMENT 300 North"D"Street-San Bernardino -CA 92418-0001 Planning&Building 909.384.5057-Fax: 909.384.5080 Public Works/Engineering 909.384.5111 -Fax: 909.384.5155 San Bernar Win www.sbeity.org SM CONTRACT CHANGE ORDER NO. ONE FILE NOS. 1.7430; 1.7431; 1.7432 W.O. NOS. 7430; 7431; 7432 DATE: JANUARY 8,2007 PROJECT: TRAFFIC SIGNAL IMPROVEMENTS AT 5TH STREET & "F" STREET (TC04-16); 30TH STREET & "E" STREET (TC04-17); HIGHLAND AVENUE & "E" STREET (TC04-21), PER PLAN NO. 11176. TO: OAK ENGINEERING, INC. 1305 W. SECOND STREET POMONA, CA 91766 GENTLEMEN: You are hereby compensated for performing the additional work as follows: ITEM NO: DESCRIPTION OF CHANGE COST 1-1 Install temporary 1-A Pole at Highland Avenue & "E" Street. $ 3,500.00 1-2 Cost of delay due to Water Line breakage and repairs at Highland $ 8,614.90 Avenue&"E" Street 1-3 Repair of Asphalt Roadway, Curb & Gutter, and Sidewalk damaged $ 16 065.00 b waterline break at Highland Avenue&"E".Street. ' 1-4 Install a Pedestrian Push Button at 5th Street&"F" Street. $ 750.00 Replace (2) 1-A Poles and Install new Foundations at 30th Street& 1-5 "E" Street on the Southbound Median Island and 30th Street& "E" $ 4,000.00 Street at the Southwest Corner. TOTAL COST CCO #1 $ 32,929.90 JUSTIFICATION: Install Temporary 1-A Pole At the southeast corner of Highland Ave & "E" Street, it was necessary to place the new Item traffic signal pole in the same location as the existing pole, because of conflict with No. 1-1 numerous utilities at the same intersection. It was necessary for the contractor to remove the existing pole and wire a temporary pole to support the mast arm and signal heads during removal of the existing foundation and construction of a new foundation for the permanent signal pole. CHANGE ORDER NO.ONE-OAK ENGINEERING,INC. TRAFFIC SIGNAL IMPROVEMENTS AT 5TH STREET&"F"STREET(TC04-16);301H STREET&"E"STREET(TC04-17); HIGHLAND AVENUE&"E" STREET(TC04-21),PER PLAN NO. 11176. Delay due to Water Line Repair During construction, a water main, which had been incorrectly marked, and was damaged by the contractor's conduit boring operations. The waterline began leaking and, due to Item 1-2 technical problems, could not be shut down for 4 hours. During this period, the force of No. the water caused the roadway, curb &gutter, and sidewalk to be undermined. This item is to compensate the contractor for delays incurred while waiting for the line to be shut down and repaired. The Water Department has agreed to reimburse the City $5,000 for its share of the cost of delay and repairs. Repair of Asphalt Roadway,Curb & Gutter, and Sidewalk Item 1-3 The waterline break described in Item No. 1-2 above caused significant damage to the No. roadway, curb & gutter, and sidewalk. This item is to compensate the contractor for repair of the damaged areas of the street, curb &gutter and sidewalk. Item Install a Pedestrian Push Button at 5 1 Street& "F" Street No. 1-4 It was necessary to relocate the pedestrian push button for compliance with ADA regulations. Installation of a new foundation with anchor bolts was required. Replace (2) 1-A Poles and Install new Foundations at 30`h Street & "E" Street on the Southbound Median Island and 30`h Street& "E" Street at the Southwest Corner Two new 1-A poles had to be replaced. The 1-A pole at the southwest corner of 30`" Item 1-5 Street & `B" Street had to be reconstructed to match the new grades for the handicapped No. ramp. The 1-A pole at the median island at 30`h Street & `B" Street had to be replaced after the contractor found that the anchor bolts, which had been sheared off in a prior accident, had been replaced by others using unacceptable methods. SUMMARY OF CONTRACT COSTS The estimated revised contract cost is as follows: Original Bid Amount . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..... $ 354,050.00 Contract Change Order No. One . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...$ 32,929.90 Revised Construction Contract cost . . . . . . . . . . . . . . . . . . . . . . . . . . .....$ 386,979.90 Additional time to complete Contract due to this Change Order ................... 10 Working Days This change order represents 9.3%of the original contract amount. OAK ENGINEERING, INC. CITY OF SAN BERNARDINO CONTRACTOR DEVELOPMENT SERVICES Accepted Approved By: By: VALERIE C. ROSS Title: Director of Development Services Date: Date: Approved by Mayor and Common Council Date: January 8, 2007 Item No.