Loading...
HomeMy WebLinkAbout11-Development Services ,.'11(, .... ,.",..~J~..~_~'" <? ";f;1"" , , '":, , e e e -- --~ CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION From: Valerie C. Ross, Director Authorization for the Director of Development Services to Execute Contract Change Order No. One to the contract with Grand Pacific Contractors, Inc. for Installation of Reinforced Concrete Box Culvert at 2128 Orange Street (SD04-16), per Plan No. 11568. Subject: Dept: Development Services Date: November 14,2006 File No. 4.7573 MCC Date: December 18, 2006 Synopsis of Previous Council Action: 08/07/2005 The Mayor and Common Council approved FY 2005-06 CIP Budget. 06/05/2006 Adopted Resolution awarding contract in the amount of $45,300.00 to Grand Pacific Contractors, Inc., for Installation of Reinforced Concrete Box Culvert at 2128 Orange Street (SD04-16), per Plan No. 11568. Recommended Motion: Authorize the Director of Development Services to execute Change Order No. One in the amount of $33,424 to contract with Grand Pacific Contractors, Inc. for Installation of Reinforced Concrete Box Culvert at 2128 Orange Street (SD04-16), per Plan No. 11568. ~ (), fJfY Valerie C. Ross Contact Person: Mike Grubbs, Engineering Mgr/Field Engineer 5179 Phone: Supporting data attached: StaffReoort & CCO No. One 4 Ward: FUNDING REQUIREMENTS: $33.424.00 Amount: Source: (Acct. Nos) 248-368-5504-7573 Acct. Description: Storm Drain Construction Fund Finance: Council Notes: I/J.) IS/DID Agenda Item No. J I _,~_..,..",","'_,,~", "~'i'!fI'~,,~;s, P-l CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT e Subject: Authorization for the Director of Development Services to Execute Contract Change Order No. One to the contract with Grand Pacific Contractors, Inc. for Installation of Reinforced Concrete Box Culvert at 2128 Orange Street (SD04-l6), per Plan No. 11568 Background: On August 7, 2005, the Mayor and Common Council allocated funds, as part of the FY 2005/06 Capital Improvement Program (CIP), for Orange Street failed rock-lined channel reconstruction (SD04-l6). On June 5, 2006, the Mayor and Common Council adopted resolution awarding contract in the amount of $45,300 to Grand Pacific Contractors, Inc. for Installation of Reinforced Concrete Box Culvert at 2128 Orange Street (SD04-l6), per Plan No. 11568. This project replaced a portion of a rock-lined ditch with a reinforced concrete box culvert with new side walls to transition back to the existing channel walls. The rock-lined channel was designed to be repaired at one location due to damage from tree roots. e During construction, it was necessary for the contractor to remove an additional tree and three stumps in order to continue work. A wrought iron fence had to be added along each side ofthe channel crossing for safety reasons. The existing rock-lined channel was found by the contractor to be filled with mud and silt, which made assessment of the damage to the channel impossible. After removal of the mud and silt, the contractor found additional channel damage that needed to be repaired. As a result, 45 linear feet of the drainage holes were added to facilitate drainage of the adjacent properties. A credit for bid Item No.5 "Replace Channel Wall" was taken because the item was made unnecessary by the decision to reconstruct the entire channel along the property frontage. Because of the mud and silt buildup in the channel it was impossible to accurately assess damage to the channel during the design phase of the project. After removal of the mud and silt by the construction contractor, it became apparent that extensive additional work was necessary in order to have a safe, functional channel. Change Order No. One, in the amount of $33,424.00, consists of the following changes: e Item No.1-I: Increased clearing and grubbing. Item No. 1-2: Installation of 106 linear feet of wrought iron fence, which was not in the original contract. Item No. 1-3: Removal and replacement of 45 linear feet of channel; which was too badly deteriorated to join to the new channel. Item No. 1-4: Core-drill drain holes for improved drainage from adjacent property. Item No. 1-5: Credit for Bid Item No.5 the need for which was negated by Change Order Item No. 1-3. 2 1210712006 10:45 AM ".~--~.,._~,~.".""''''',''' e e e --._},:O"'''~ CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION STAFF REPORT - Continued Financial Impact: The FY 2006-07 CIP budget included $89,000 in Acct. No. 248-368-5504-7573 for this project, which will be adequate funds to cover the cost of this change order and all other costs for this project. At this time, it is anticipated that all $89,000 of budgeted funds will be used for this project. The estimated project costs are as follows: Ori inal Contract Amount Contract Change Order No. One Revised Construction Cost TOTAL $ 45,300.00 $ 33,424.00 $ 78,724.00 Recommendation: Authorize the Director of Development Services to execute Change Order No. One in the amount of$33,424 to contract with Grand Pacific Contractors, Inc. for Installation of Reinforced Concrete Box Culvert at 2128 Orange Street (SD04-I6), per Plan No. 11568. 3 12/07/2006 U4 AM __,,___,,',,.'<If'''.'.' l'" e e e ~l DEVELOPMENT SERVICES DEPARTMENT 300 North "0" Street. San Bernardino. CA 92418-0001 Planning & Building 909.384.5057 . Fax: 909.384.5080 Public WorkslEngineering 909.384.5111 . Fax: 909.384.5155 www.sbcity.org .. CONTRACT CHANGE ORDER NO. ONE FILE NO. W.O. NO. 7573 DATE: DECEMBER 18, 2006 4.7573 PROJECT: INSTALLATION OF REINFORCED CONCRETE BOX CULVERT AT 2128 ORANGE STREET (SD04-16). TO: GRAND PACIFIC CONTRACTORS, INC. 11405 GEYSER DRIVE MIRA LOMA, CA 91752 GENTLEMEN: You are hereby compensated for performing the additional work as follows: ITEM NO: DESCRIPTION OF CHANGE COST 1-1 Additional Clearing and Grubbing $ 1.000.00 1-2 Install 106 linear feet of Wrought Iron Fence @ $85/pe,r linear feet $ 9,010.00 1-3 Remove & Replace 45 linear feet of Channel $ 28,000.00 1-4 Core Drill Drain Holes $ 414.00 1-5 Credit for Bid Item NO.5 $ (5,000.00) , ! TOTAL COST CCO #1 $ 33,424.00 JUSTIFICATION: Additional Clearin!! and Grubbin!! Item No. 1-1 During construction, removal of an additional tree and 3 stumps' was necessary to allow for construction of the channel. In5talll06 L.F. of Wrou!!ht Iron Fence tal $85/per L.F. I Item No. 1-2 After the new channel as constructed, a wrought iron railing was installed along each side of the crossing to mitil!ate a safetv concern. ' Remove & Replace 45 L.F. of Channel Item No. 1-3 I The original channel downstream from the new installed box culvert was severely deteriorated and did not drain properly. It was necessary to reconstruct 45 LF of , i channel. e e e Change Order No. One Installation of Reinforced Concrete Box Culvert at 2128 Orange 8treet (8004-16). Core Drill Drain Holes Item No. 1-4 The top of the newly constructed channel blocked on-site drainage, which created a water ponding situation. Therefore, the contractor was directed to core (4) 3-inch holes in the channel wall for drainage. Credit for Bid Item No 5 Item No. 1-5 Bid Item No. 5 was to replace a portion of the existing channel wall. With the reconstruction of the entire channel, this item was no lon~er necessarv. SUMMARY OF CONTRACT COSTS The estimated revised contract cost is as follows: Original Bid Amount. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..... ...................$ Contract Change Order No. One............................. ....................$ Revised Construction Contract cost. . . . . . . . . . . . . . . . . . . . . . . . .. ....................$ 45,300.00 33.424.00 78,724.00 This change order represents 73.78% of the original contract amount. Section 3-2.1 of the Standard Specifications states that an increase in the total contract amount of more than 25% must be accomplished by written Supplemental Agreement between the Contractor and Agency, unless both parties agree to proceed with the change by Change Order. The signatures hereon indicate concurrence that accomplishing this change by change order is acceptable to both parties. GRAND PACIFIC CONTRACTORS, INC. CONTRACTOR Accepted CITY OF SAN BERNARDINO DEVELOPMENT SERVICES Approved By: By: VALERIE C. ROSS Director of Development Services Title: Date: Date: Approved by Mayor and Common Council Date: December 18, 2006 Item No. 2