HomeMy WebLinkAbout07-Public Works CITY OF SAN BERNA8DINO - REQUEST Fca COUNCIL ACTION Files: 1.307/1.308/1.309 Contract Change Order No. TWO - Subject: Installation of Guard Rail on Little Mountain Dr., Rancho Ave. and Waterman Avenue, per Plan No. 8262 -- PALADIN CONSTRUCTION, INC. From: ROGER G. HARDGRAVE Dept~ Public Works Date: 1-06-93 AD;.!lN. Ofio'lC~ Synopsis of Previous Council action: June, 1990 Allocation of $217,000 approved in 1990/91 Street 7 ,),,,i 95 9: 04 Construction Fund Budget. OB-03-92 Plans approved and authorization granted to advertise for bids, and the transfer of $10,200 approved. 10-05-92 Resolution No. 92-393 adopted awarding a contract to Paladin Construction, Inc. for the low bid price of $180,295.50. Recommended motion: That Change Order No. TWO to the contract with Paladin Construction, Inc., for the installation of Guardrail on Little Mountain Drive, Rancho Avenue, and ~;D.tcrman Avenue, in accordance with Plan No. 8262, be approvp.d, t~ authorize the Contractor to provide a Railroad Protective r,iahility Insurance Policy, at an increase in the contract nr~cc of $6,900.00; from $172,543.50 to $179,443.50. cc: Shauna Clark Barbara Pachon (JJ,~ r- Contact person: Roqer G. Hardqrave Phone: 5025 Supporting data attached: Staff Report, CCO #2 Ward: 3 & 5 FUNDING REQUIREMENTS: Amount: $6.900.00 (Street Construction Fund) Source: (Acct. No.1 242-362-57309 Acct. Descri tion Installation Mountain Dr.. Rancho Ave. & Waterman Ave. Finance: Council Notes: 75-0262 Agenda Item No. 7 CITY OF SAN BERNA.INO - REQUEST Foe COUNCIL ACTION STAFF REPORT Caltrans is requiring the Contractor to provide a Railroad Protective Insurance Policy while performing the removal of the existing concrete rail and the installation of the new Type 26 concrete barrier on Waterman Avenue, at the Southern Pacific Railroad overpass south of Redlands Boulevard. The Contractor will purchase the insurance policy and be reimbursed for the costs incurred. Contract Change Order No. One deleted a portion of the temporary "K" Rail, and decreased the contract price by $7,752.00. There is a total of $38,456.50 in contingencies available to finance the additional costs of the Railroad Protecti ve Insurance Policy. Cal trans will participate in the financing of 90% of these additional costs, from Federal-Aid High Hazard Elimination Funds. We recommend that Contract Change Order No. 2 be approved. 1-06-93 75.0264 r--- . . COIITRACT CHUGB ORDBR NO. 2 ROAD Guardrail-Waterman Avenue FBD NO. HES 3069(036) TO: Paladin Construction Inc. REV NO. Bridge SUPPLe NO. SHBBT 1 COIITRACT NO. OF 1 8262 You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until aDDroved bv the state Hiahwav Enaineer Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as eauiDment is actuallv used and no allowance will be made for idle time. The last percentage shown is not accumulated increase of decrease from the original quantity in the Engineers Estimate. BXTRA WOU ATAGREBD PRICB: Provide a Railroad Protective Insurance Policy for work to be performed on the Waterman Avenue OVerpass, south of Redlands Blvd., at the agreed price of $6,900.00. BSTIMATBD COST DBCREASB S By reason of this order the 34 working days Submitted by: INCREASB S 6.900.00 time of completion will be adjusted as follows: Resident Bngineer, Date: Approval Recommended: Date: Approved: city Bngineer Date: We the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all material, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full Davment therefor the Drices shown above. Accepted Date: Contractor: By: Title: If the contractor does not siqn acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the work and filing a written protest within the time therein specified.