HomeMy WebLinkAbout46-Development Services ORIG1NAl CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTIO~ From: Valerie Ross, Director Subject: Authorization for the Director of Development Services to execute Contract Change Order No. Two to the contract with David T. Wasden, Inc., for Se\\er and Street Improvements on 34th Street - Leroy Stre,"! to Waterman Avenue (SW 04-23); 48th Street - "F" Street to Electric Avenue (SW 04-24); and Street Improvements on Richardson Street - San Bernardino Avenue to Victoria Avenue (SW 04-34); Cooley Avenue - Tippecanoe Avenue to Gage Canal (SW 04-35); and "E" Street - 2"d Street to 4th Street (SW 04-06), per project Plan No. 11147. Dept: Development Services Date: October 18, 2006 File Nos. 3.7313.3.7502.3.7501 3.7459,3.7458 MCC Date: November 6, 2006 Synopsis of Previous Council Action: September 6, 2005 Adopt Resolution No. 2005-297 awarding a contract in the amount of $874,701.00 with David T. Wasden, Inc., for Sewer and Street Improvements per project Plan No. 11147. July 24, 2006 Approved Change Order No. One to Contract with David T Wasden, Inc. in the amount of $14,904.39 for Sewer and Street Improvements per project Plan No. 11147. Recommended Motion: Authorize the Director of Development Services to execute Contract Change Order No. Two to the contract with David T. Wasden, Inc., for Sewer and Street Improvements on 34th Street - Leroy Street to Waterman Avenue (SW 04-23); 48th Street - "F" Street to Electric Avenue (SW 04-24); and Street Improvements on Richardson Street - San Bernardino Avenue to Victoria Avenue (SW 04-34); Cooley Avenue - Tippecanoe Avenue to Gage Canal (SW 04- 35); and "E" Street - 2"' Street to 4th Street (SW 04-06), per project Plan No. 11147. JMw.UO. 'Ruv Valerie C. Ross Contact Person: Mark Lancaster, Deputy Director/City Engineer Phone: 3305 Supporting data attached: Staff Report & CCO No. Two Ward: 1,3,4,7 FUNDING REQUIREMENTS: Amount: $4.370.82 Source: (Acc!. No) (SW04-24): 132-431-5505-7501 & (SW04-06): 245-365-5504-7313 Acct. Description: Sewer Improvement Projects Council Notes: ~~~ Finance: IbltG./()~. #/~r;-- I ' , II) to J D' Agenda Item No. LJ r., e e e CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT Subject: Authorization for the Director of Development Services to execute Contract Change Order No. Two to the contract with David T. Wasden, Inc., for Sewer and Street Improvements on 34th Street - Leroy Street to Waterman Avenue (SW 04-23); 48th Street - "F" Street to Electric Avenue (SW 04-24); and Street Improvements on Richardson Street - San Bernardino Avenue to Victoria Avenue (SW 04-34); Cooley Avenue - Tippecanoe Avenue to Gage Canal (SW 04-35); and "E" Street - 2nd Street to 4th Street (SW 04-06), per project Plan No. 11147. Background: On August 15, 2006, the Mayor and Common Council allocated funds, as part of the FY 2006/07 Capital Improvement Pro~ram (CIP) for "34th Sireet Sewer Main from Leroy Street to Waterman Avenue (SW 04-23)", "48t Street from "F" Street to Electric Avenue (SW 04-24)", "Richardson Street Sewer Main from Cooley Drive to Victoria Avenue (SW 04-34)", "Cooley Avenue Replace a Parallel Sewer Main from Tippecanoe Avenue to Gage Canal (SW 04-35)", and "Sewer main repair on "E" Street from 2nd Street to 4th Street (SW 04-06)". On September 6, 2005, the Mayor and Common Council approved a Resolution awarding a contract to David T. Wasden, Inc., for Sewer and Street Improvements on 34th Street - Leroy Street to Waterman Avenue (SW 04-23); 48th Street - "F" Street to Electric Avenue (SW 04-24); and Street Improvements on Richardson Street - San Bernardino Avenue to Victoria Avenue (SW 04-34); Cooley Avenue - Tippecanoe Avenue to Gage Canal (SW 04-35); and "E" Street - 2nd Street to 4th Street (SW 04-06), per project Plan No. 11147 and authorization for the Director of Finance to amend the FY 05/06 Budget. On July 24, 2006, Change Order No. One in the amount of $14,904.39 was approved, authorizing the following changes: . Pothole for sewer laterals. . Excavate to locate sewer lateral. . Upon excavation, a conflict arose between the water main and proposed sewer main due toa confli.ct with new sewer main. . De-water trench and re-grade trench was necessary. . Removal of excess concrete was necessary, due to a storm drain encasement conflict: Change Order No. Two in the total amount of$4,370.82 consists of the following changes: Item No.2-I: Repair Unmarked Irrigation Line in "E" Street. During the excavation for the bus pad, an unmarked irrigation line was damaged. The contractor was directed to repair the irrigation line. Item No. 2-2: Repair Unmarked Water Service in "E" Street. During the excavation for the bus pad, an unmarked water service was damaged. The contractor was directed to lower and repair the water service. Item No. 2-3: Regrade Trench after Verizon Relocation in 48th Street. At station 8+70, a Verizon line. was encountered at the same elevation as the proposed sewer line. It was necessary to remake subgrade prior to laying sewer main,line, after Verizon completed the relocation of their telephone cable. 2 10/1 9/20069: 18 AM e e e CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT - Continued Financial Impact: The total cost of Contract Change Order No. Two is $4,370.82. Sufficient funds for this change order are available in the project accounts as indicated in the attached spread sheet "Change Order No.2 - Sewer & Street Improvements Cost Distribution for Project No. 11147." Recommendation: Authorize the Director of Development Services to execute Contract Change Order No. Two to the contract with David T. Wasden, Inc., for Sewer and Street hnprovements on 34th Street - Leroy Street to Waterman Avenue (SW 04-23); 48th Street - "F" Street to Electric Avenue (SW 04-24); and Street Improvements on Richardson Street - San Bernardino Avenue to Victoria Avenue (SW 04-34); Cooley Avenue - Tippecanoe Avenue to Gage Canal (SW 04-35); and "E" Street - 2nd Street to 4th Street (SW 04-06), per project Plan No. 11147. Attachment: "1" Spreadsheet of Cost Distribution. 3 10/19120069:18 AM ~ - . u o:l .... .... <t: - " <Ii .~ '" oJ ... =~ - ... N ....rS = (01 "Cl '" ~ ~ e e r-- ..,. - - - .,., '" .,., N "- N "': ... ": ~ ...., .. - - ....; .,., ,.., ~ = = r- "- N r- '" r- = '" ...., '" 0 '" .., '" - ...... N '" ~ E fA -( fA ... ... 0 fA fA U - 'C! II 0 II II > " 0 - N - "'" " V) S S = 'C! V) -( ~ V) S '" S ... '" ... ,..: ... 0 .: V) ~ N " - ~ ... = "" "" '" U .... .... .OJ .OJ e- o. " = 0:: 0:: '" c c ~ .OJ OJ ... ~ ~ " OJ - '" " <Ii " " Q .... l::: oil Ul 00 \" ... - ~ ... 'C! N 0 Z , , ... ... =- 0 0 - ::: ::: u Ul Ul - - ,.., 0 - ~ V) ,.., r- r- Z , , V) ... - 0 0 = V) V) = V) V) '" , , - .,., ... ,.., 'C! ... ... ,.., -( , , N V) ,.., ... - N -- ,; '" Z .., - N e , , , N N N <Ii - - o z ... <Ii ~ <Ii rJ) e e e DEVELOPMENT SERVICES DEPARTMENT 300 North "0" Street. San Bernardino' CA 92418-0001 Planning & Building 909.384.5057 . Fax: 909.384.5080 Public WorksIEngineering 909.384.5111' Fax: 909.384.5155 www.ci.san-bernardino.ca.us ;" CONTRACT CHANGE ORDER NO. TWO FILE NOS. W.O. NOS. 3,7502,3.7501,7458,7313 7502,7501,7458,7313 DATE: NOVEMBER 6, 2006 PROJECT: SEWER & STREET IMPROVEMENTS ON 34TH STREET - LEROY STREET TO WATERMAN AVENUE (SW04-23); 48TH STREET - "F" STREET TO ELECTRIC A VENUE (SW04-24) & STREET IMPROVEMENTS ON RICHARDSON STREET - SAN BERNARDINO AVE. TO VICTORIA AVE. (SW04-34); COOLEY A VENUE - TIPPECANOE AVE. TO GAGE CANAL (SW04-35); "E" STREET _ 2ND STREET TO 4TH STREET (SW04-06) TO: DAVIDT. WASDEN,INC. 1240 SAN CRISTOBAL DRIVE RIVERSIDE, CA 92506 GENTLEMEN: YOll are hereby compensated for performing the additional work as follows: ITEM NO: DESCRIPTION OF CHANGE COST 2-1 Repair Unmarked Irrigation Line in "E" Street. $ 925.75 2-2 Repair Unmarked Water Service in "E" Street. $ 2,073.62 2-3 Regrade Trench after Verizon Relocation in 48th Street. $ 1,371.45 TOTAL COST CCO #1 $ 4,370.82 JUSTIFICATION: Item Repair Unmarked Irril!ation Line 2-1 During the excavation for the bus pad, an unmarked irrigation line was damaged. The :'110. contractor was directed to reoair the irril!ation line. Item Repair Unmarked Water Service 2-2 During the excavation for the bus pad, an unmarked water service was damaged. The No. contractor was directed to lower and reoair the water service. Item Rel!rade Trench after Verizon Relocation On 48th Street at station 8+70, a Verizon line was encountered at the same elevation as the :\'0. I 2-3 proposed sewer line. It was necessary to remake subgrade prior to laying sewer mainline, after Verizon completed the relocation of their teleohone cable. . e e Change Order No. Two SEWER & STREET IMPROVEMENTS ON 34TH STREET - LEROY STREET TO WATERMAN AVENUE (SW04- 23); 48TH STREET - "F" STREET TO ELECTRIC AVENUE (SW04-24) & STREET IMPROVEMENTS ON RICHARDSON STREET - SAN BERNARDINO AVE. TO VICTORIA AVE. (SW04-34); COOLEY AVENUE - TIPPECANOE AVE. TO GAGE CANAL (SW04-35); "E" STREET - 2ND STREET TO 4TH STREET (SW04-06) SUMMARY OF CONTRACT COSTS The estimated revised contract cost is as follows: Original Bid Amount. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ Contract Change Order No. One. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ Contract Change Order No. Two. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. $ Revised Construction Contract Cost. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 874,701.00 14,904.39 4,370.82 893,976.21 Additional time to complete Contract due to this Change Order.......................... 15 Working Days This change order represents .50 % of the original contract amount. DAVID T. WASDEN, INC. CONTRACTOR Accepted By: CITY OF SAN BERNARDINO DEVELOPMENT SERVICES Approved By: VALERIE C. ROSS Director of Development Services Title: Date: Date: Approved by Mayor and Common Council Date: November 6, 2006 Item No. 2 CITY OF SAN BERNARDINO REQUEST FOR couQBl ~JN~L From: Valerie Ross, Director Subject: Authorization for the Director of Development Services to execute Contract Change Order No. Two to the contract with David T. Wasden, Inc., for Sewer and Street Improvements on 34th Street - Leroy Street to Waterman Avenue (SW 04-23); 48th Street - "F" Street to Electric Avenue (SW 04-24); and Street Improvements on Richardson Street - San Bernardino Avenue to Victoria Avenue (SW 04-34); Cooley Avenue - Tippecanoe Avenue to Gage Canal (SW 04-35); and "E" Street - 2nd Street to 4th Street (SW 04-06), per project Plan No. 11147. Dept: Development Services Date: September 12, 2006 File Nos. 3.7313,3.7502,3.7501 3.7459,3.7458 MCC Date: October 16, 2006 Synopsis of Previous Council Action: July 24, 2006 The Mayor and Common Council approved FY 2004-05 CIP Budget. The Mayor and Common Council approved FY 2005-06 CIP Budget. The Mayor and Common Council authorized the Director of Finance to amend the FY 2004/05 Budget by transferring funds as indicated in the attached spreadsheet entitled "Sewer and Street Improvement Cost Distribution for Project No. 11147", and adopt Resolution. Approved Change Order No. One to Contract with David T Wasden, Inc. in the amount of$4,370.82 for Sewer and Street Improvements, per project Plan No. 11147. Sept. 2004 August 2005 Sept. 2005 Recommended Motion: Authorize the Director of Development Services to execute Contract Change Order No. Two to the contract with David T. Wasden, Inc., for Sewer and Street Improvements on 34th Street - Leroy Street to Waterman Avenue (SW 04-23); 48th Street - "F" Street to Electric Avenue (SW 04-24); and Street Improvements on Richardson Street - San Bernardino Avenue to Victoria Avenue (SW 04-34); Cooley Avenue - Tippecanoe Avenue to Gage Canal (SW 04-35); and "E" Street - 2nd Street to 4th Street (SW 04-06), per project Plan No. 11147. ~U. 'Rd#--- Valerie C. Ross Contact Person: Mark Lancaster, Deputy Director/City Engineer Phone: 3305 Supporting data attached: Staff Report & CCO No. Two Ward: 1,3,4,7 FUNDING REQIDREMENTS: Amount: $4370.82 Source: (Acct. No) (SW04-24): 132-431-5505-7501 & (SW04-06): 245-365-5504-7313 Acct. Description: Sewer Improvement Projects Council Notes: ~ / (J /1', / tJ ~na;te;s; I I / II! (0 /06 Agenda Item No. '-16 CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT Subject: Authorization for the Director of Development Services to execute Contract Change Order No. Two to the contract with David T. Wasden, Inc., for Sewer and Street Improvements on 34th Street - Leroy Street to Waterman Avenue (SW 04-23); 48th Street - "F" Street to Electric Avenue (SW 04-24); and Street Improvements on Richardson Street - San Bernardino Avenue to Victoria Avenue (SW 04-34); Cooley Avenue - Tippecanoe Avenue to Gage Canal (SW 04-35); and "E" Street - 2nd Street to 4th Street (SW 04-06), per project Plan No. 11147. Background: On August 1, 2005, the Mayor and Common Council allocated funds, as part of the FY 2005/06 Capital Improvement Pro~ram (CIP) for "34th Street Sewer Main from Leroy Street to Waterman Avenue (SW 04-23)", "48t Street from "F" Street to Electric Avenue (SW 04-24)", "Richardson Street Sewer Main from Cooley Drive to Victoria Avenue (SW 04-34)", "Cooley Avenue Replace a Parallel Sewer Main from Tippecanoe Avenue to Gage Canal (SW 04-35)", and "Sewer main repair on "E" Street from 2nd Street to 4th Street (SW 04-06)". On September 6, 2005, the Mayor and Common Council approved a Resolution awarding a contract to David T. Wasden, Inc., for Sewer and Street Improvements on 34th Street - Leroy Street to Waterman Avenue (SW 04-23); 48th Street - "F" Street to Electric Avenue (SW 04-24); and Street Improvements on Richardson Street - San Bernardino Avenue to Victoria Avenue (SW 04-34); Cooley Avenue - Tippecanoe Avenue to Gage Canal (SW 04-35); and "E" Street - 2nd Street to 4th Street (SW 04-06), per project Plan No. 11147 and authorization for the Director of Finance to amend the FY 05/06 Budget. On July 24,2006, Change Order No. One in the amount of $14,904.39 was approved, authorizing the following changes: . Pothole for sewer laterals. . Excavate to locate sewer lateral. . Upon excavation, a conflict arose between the water main and proposed sewer main due to a conflict with new sewer main. . De-water trench and re-grade trench was necessary. . Removal of excess concrete was necessary, due to a storm drain encasement conflict. Change Order No. Two in the total amount of$4,370.82 consists ofthe following changes: Item No. 2-1: Repair Unmarked Irrigation Line. During the excavation for the bus pad, an unmarked irrigation line was damaged. The contractor was directed to repair the irrigation line. Item No. 2-2: Repair Unmarked Water Service. During the excavation for the bus pad, an unmarked water service was damaged. The contractor was directed to lower and repair the water service. Item No. 2-3: Regrade Trench after Verizon Relocation. On 48th Street at station 8+70, a Verizon line was encountered at the same elevation as the proposed sewer line. It was necessary to remake sub grade prior to laying sewer mainline, after Verizon completed the relocation of their telephone cable. 2 09/27/2006821 AM CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION STAFF REPORT - Continued Financial Impact: The total cost of Contract Change Order No. Two is $4,370.82. Sufficient contingency funds for this change order are available in the project accounts as indicated in the attached spread sheet "Change Order No.2 - Sewer & Street Improvements Cost Distribution for Project No. 11147." Recommendation: Authorize the Director of Development Services to execute Contract Change Order No. Two to the contract with David T. Wasden, Inc., for Sewer and Street Improvements on 34th Street - Leroy Street to Waterman Avenue (SW 04-23); 48th Street - "F" Street to Electric Avenue (SW 04-24); and Street Improvements on Richardson Street - San Bernardino Avenue to Victoria Avenue (SW 04-34); Cooley Avenue - Tippecanoe Avenue to Gage Canal (SW 04-35); and "E" Street - 2nd Street to 4th Street (SW 04-06), per project Plan No. 11147. Attachment: "1" Spreadsheet of Cost Distribution. 3 09/27/2006 So21 AM ~ - ~ ~ .:: Cl) ] () o::l ~ ~ -< ... C,j OJ ..., , C> OJ ... =~ "'" ... M W\~ = = o ~.s ... '" ... ~ C'll = ~~~ ~ .ti ~~~ o ';: ~ f;o;1 C'll U ~e!l Z ~ 5 <....5 == ~ ~ u.t:e = l:l. Q 5 U.... ... OJ OJ ... ... en o(l ... OJ Ii: OJ en l"- ..,. ..... ..... ..... o z '" ~ '" '" "- M ~ r-: '"' ...., DO ... ..... ~ '" M '" = '" .-- '" .-- '" ..... = M. ...., a- 0 '" M <:> ..... ...;' ",' ",' ..f' E! '" -< '" ... ... 0 '" '" u - '0 II 0 II II C M ~ - - ~ '" S '" S '" '0 '" ~ '" S a- S Eo< ~ ... r-: ... 0 '" '" .. N tl .- O'J Eo< ... '" '" '" <:> U .= .... os .<a e- o. '" ..: ~ <:> '" '" ;:: .- .<a :e os ... ~ ~ C,j - - '" " " <II ~ " Q ):;l CIl CIl oS ~ 00 .... - 0 .... '0 '" 0 Z , , .... .... ~ 0 0 .... ~ ~ u CIl CIl - ..... M 0 ..... .; '" M .-- .-- Z , , '" .... ... 0 0 '" '" '" = '" '" <:> , , ..... '" " M '0 " "T M -< , '" '" M .... ..... '" -- ~ <:> Z M .. '" E! , , , '" M M <II ... .... DEVELOPMENT SERVICES DEPARTMENT 300 North "D" Street. San Bernardino. CA 92418-0001 Planning & Building 909.384.5057. Fax: 909.384.5080 Public WorkslEngineering 909.384.5111 . Fax: 909.384.5155 www.sbcity.org ~ CONTRACT CHANGE ORDER NO. TWO FILE NOS. W.O. NOS. 3,7502,3.7501,7458,7313 7502,7501,7458,7313 DATE: OCTOBER 16, 2006 TO: PROJECT: SEWER & STREET IMPROVEMENTS ON 34TH STREET - LEROY STREET TO WATERMAN AVENUE (SW04-23); 48TH STREET - "F" STREET TO ELECTRIC A VENUE (SW04-24) & STREET IMPROVEMENTS ON RICHARDSON STREET - SAN BERNARDINO AVE. TO VICTORIA AVE. (SW04-34); COOLEY AVENUE - TIPPECANOE AVE. TO GAGE CANAL (SW04-35); "E" STREET - 2ND STREET TO 4TH STREET (SW04-06) DAVIDT. WASDEN,INC. 1240 SAN CRISTOBAL DRIVE RIVERSIDE, CA 92506 GENTLEMEN: You are hereby compensated for performing the additional work as follows: ITEM NO: DESCRIPTION OF CHANGE COST 2-1 Repair Unmarked Irrigation Line $ 925.75 2-2 Repair Unmarked Water Service $ 2,073.62 2-3 Regrade Trench after Verizon Relocation $ 1,371.45 TOTAL COST CCO #1 $ 4,370.82 JUSTIFICATION: Item No. 2-2 Repair Unmarked Irril!ation Line During the excavation for the bus pad, an unmarked irrigation. line was damaged. The contractor was directed to r air the irri ation line. Repair Unmarked Water Service During the excavation for the bus pad, an unmarked water service was damaged. The contractor was directed to lower and re air the water service. Rel!rade Trench after Verizon Relocation On 48th Street at station 8+70, a Verizon line was encountered at the same elevation as the proposed sewer line. It was necessary to remake sub grade prior to laying sewer mainline, after Verizon com leted the relocation of their tele hone cable. Item No. 2-1 Item No. 2-3 Change Order No. Two SEWER & STREET IMPROVEMENTS ON 34TH STREET - LEROY STREET TO WATERMAN AVENUE (SW04- 23); 48TH STREET - "F" STREET TO ELECTRIC AVENUE (SW04-24) & STREET IMPROVEMENTS ON RICHARDSON STREET - SAN BERNARDINO AVE. TO VICTORIA AVE. (SW04-34); COOLEY AVENUE - TIPPECANOE AVE. TO GAGE CANAL (SW04-35); "E" STREET - 2ND STREET TO 4TH STREET (SW04-06) SUMMARY OF CONTRACT COSTS The estimated revised contract cost is as follows: Original Bid Amount. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ Contract Change Order No. One . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ Contract Change Order No. Two. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. $ Revised Construction Contract Cost. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 874,701.00 14,904.39 4.370.82 893,976.21 Additional time to complete Contract due to this Change Order .......................... 15 Working Days This change order represents .50 % of the original contract amount. DAVIDT. WASDEN,INe. CONTRACTOR Accepted By: CITY OF SAN BERNARDINO DEVELOPMENT SERVICES Approved By: VALERIE C. ROSS Director of Development Services Title: Date: Date: 2