HomeMy WebLinkAbout15-Development Services
ORIGINAL
CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION
From:
Valerie C. Ross, Director
Subject:
Authorization for the Director of Development
Services to execute Contract Change Order No.
One to the contract with Downstream Services,
Inc. for Cleaning Sewer Siphons at Various
Locations in the City of San Bernardino (SW-D
2005/2006), per Project Plan No. 11340B.
Dept:
Development Services
Date:
June 29, 2006
File Nos. 3.7475
MCC Date: July 24, 2006
Synopsis of Previous Council Action:
August 2005
The Mayor and Common Council approved FY 2005-06 CIP Budget.
October 2005
Authorized the Director of Finance to transfer $111,600 from Sewer Line Maintenance Fund
balance to Account No. 132-431-5505-7475 "SW-D Sewer Siphon Flushing at Various
Locations" and transfer $23,400 from Unallocated Sewer Line Maintenance Fund balance to
Account No. 132-431-5505-7567 "SW06-03 "South "E" Street Sewer Siphon Cleaning" and
adopt Resolution.
Recommended Motion:
I. Authorize the Director of Development Services to execute Contract Change Order No. One to the contract
with Downstream Services, Inc. for Cleaning Sewer Siphons at Various Locations in the City of San
Bernardino (SW-D 2005/2006), per Project Plan No. I 1 340B.
_~O.1(w
Valerie C. Ross
Contact Person:
Mike Grubbs, Engineering Manager/Field Engineer
Phone:
5179
Supporting data attached:
Staff Report, Change Order No. I
Ward:
1,3,7
FUNDING REQUIREMENTS:
Amount: $22.398.39
Source: (Acct. No) 132-431-5505-7475,132-431-5505-7567
Acct. Description: Sewer Line Maintenance Fund
Finance:
Council Notes:
7~DfI
Agenda Item No.J 5
e
e
e
CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION
STAFF REPORT
Snbject:
Authorize the Director of Development Services to execute Contract Change Order No. One to the contract with
Downstream Services, Inc. for Cleaning Sewer Siphons at Various Locations in the City of San Bernardino
(SW-D 2005/2006), per Project Plan No. 1 I 340B.
Background:
On August I, 2005, the Mayor and Common Council allocated funds, as part of the FY 2005/06 Capital
Improvement Program (CIP) for Cleaning Sewer Siphons at Various Locations in the City of San Bernardino
(SW -D), per Project Plan No. I I 340B.
On October 3, 2005, the Mayor and Common Council approved a resolution to contract Downstream Services,
Inc. for "Cleaning Sewer Siphons at Various Locations in the City of San Bernardino (SW-D 2005/2006)", per
Project Plan No. I 1340B.
Upon cleaning the sewer siphons, it was determined that specific additional tasks, as described in the attached
change order, were necessary to properly clean these siphons.
Item I-I "Increase Length at Waterman and Santa Ana River at Siphon Location No.2." The actual length was
measured at 1,065 feet. The Design Section had estimated the length from available drawings at 666 feet. The
additional 399 feet needed to be cleaned.
Item 1-2 "Increase Length at South "E" Street and Santa Ana River at Siphon Location No.6." The actual
length was measured at 840 feet. The Design Section had estimated the length from the available plans at 717
feet. The additional 123 feet needed to be cleaned.
Item 1-3 "Increase Length at South "E" Street and Santa Ana River (Lorna Linda Siphon) at Siphon Location
No.7." The actual length was measured at 840 feet. The Design Section had estimated the length from the
available plans at 717 feet. The additional 123 feet needed to be cleaned.
Financial Impact:
The total cost of Contract Change Order No. One is $22,398.39. Sufficient contingency funding for this change
order is available in the various project accounts as indicated in Attachment I.
Recommendation:
Authorize the Director of Development Services to execute Contract Change Order No. One to the contract with
Downstream Services, Inc. for Cleaning Sewer Siphons at Various Locations in the City of San Bernardino
(SW-D 2005/2006), per Project Plan No. 11340B.
Attachment:
"1" Cost Distribution Chart
2
07/10/2006850 AM
.
'" '"
'" 0 '"
~'" 0 en '"
N ~ .,;
""~ ~
e .._ c .-: ...
en.lE ::II ..j .,; Attachment "1 "
" .. 0
:;::I E Co)
" .. u
0",<(
0 :;;
n-
o
... ... '" N
N
1'i
. 0
N
'"
j:::
e
III
co
...
...
~
~
ci
Z
ti
!!l~
9:>
a:m
..
z"
0-
;::0
<(....
o
o
...J
..'"
:>w
o
a:
~
....z
~~
;!;o
Zo
~~
~~
A-
u;
'"
~
w
..
~
0 00 0>
" '"
"'~" N <ci ...
" " " t- '" .;
..",0 t- oo 0>
.c: ~ . '" N ...
oo~ ~ ..
N
... ...
~
~1j 8 8 co
~ .. ~ .,; .,; co
CII"-G) 10 g
00"" 00
oD:E '" co
;0 .;
-A-" '" ~
B-Z ~
~o
... ...
.. ;1; 0
" ... Clt
'il N .,;
" 00 ;:! ,.;
.. Q) N
'" 0 <D t-
" '" .:
'" N
"
0
0
... ...
~ 0
N 00
.,;
'" '"
Q) t-
o <D
'"
..
"oil
:8 1: c
uG.l:8
2 E u
1ii & a
g ~ ~
0"-
:Ii! ...
CD
CD
,.;
GO
CD
.:
N
...
..
~
"
"
o
.i
",
in
o
...
o
00
00
'"
'"
~
8
g
Q)
:i
co
...
!
..;
GO
~
...
...
" U
0 "
'"
CI. 0 " "
." .c: en"
u .Q-Ol-~
: C/)cmu
,-._ .... C
0 l])~Ci5O
~ ~, ~
cn()~i:r.l
~
" '"
C1.""
- E 0
o " 0 ~
Z :i: ~
e en
~ '"
" t-
"" t- oo
E ... '"
t-
" .;, t-
Z .;,
~ g g
" '"
" , "1
0 ;;; ;;;
u
~ 't 't
Pl '"
~ '"
~
e
e
e
DEVELOPMENT SERVICES DEPARTMENT
300 North "D" Street. San Bernardino. CA 92418.0001
Planning & Building 909.384.5057. Fax: 909.384.5080
Public WorkslEngineering 909.384.5111 . Fax: 909.384.5155
www.sbcity.org
'"
CONTRACT CHANGE ORDER NO. ONE
DATE: JULY 24, 2006
PROJECT: CLEANING SEWER SIPHONS AT VARIOUS LOCATIONS IN THE
CITY OF SAN BERNARDINO (SW-D 2005/06).
FILE NOS. 3.7475
TO:
DOWNSTREAM SERVICES, INC.
2855 PROGRESS PLACE
ESCONDIDO, CA 92029
GENTLEMEN:
You are hereby compensated for performing the additional work as follows:
ITEM NO: DESCRIPTION OF CHANGE COST
1-1 Increase Length at Waterman & Santa Ana River $ 14,360.01
1-2 Increase Length at South "E" Street and Santa Ana River $ 5,412.00
1-3 Increase Length at South "E" Street and Santa Ana River Loma $ 2,626.38
Linda Siphon
TOTAL COST CCO #1 $ 22,398.39
JUSTIFICATION:
Item Increase Lenl!th at Waterman & Santa Ana River
No. 1-1 At siphon location No.2, the actual siphon length was measured at 1,065 feet. The bid
distance was 666 feet. Therefore, an additional 399 feet of sewer main line was cleaned.
Item Increase Lenl!th at South "E" Street and Santa Ana River
No. 1-2 At site No.6, the siphon was measured at 840 feet. The bid length was 717 feet. An
additional 123 feet of sewer main line was cleaned.
Item Increase Lenl!th at South "E" Street and Santa Ana River Lorna Linda Siphon
No. 1-3 At site No.7, the siphon was measured at 840 feet. The bid length was 717 feet. An
additional 123 feet of sewer main line was cleaned.
SUMMARY OF CONTRACT COSTS
The estimated revised contract cost is as follows:
Original Bid Amount. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $
Contract Change Order No. One. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $
Revised Construction Contract cost. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$
184,584.40
22.339.02
206,923.42
e
e
e
Change Order No. One
Cleaning Sewer Siphons at Varions Locations in the City of S.B. (SW-D 2005/06)
Additional time to complete Contract due to this Change Order.......................... 20 Working Days
This change order represents 12% of the original contract amount.
DOWNSTREAM SERVICES, INC.
CONTRACTOR
Accepted
By:
Title:
Date:
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
Approved
By:
Date:
VALERIE C. ROSS
Director of Development Services
Approved by Mayor and Common Council
Date: July 24, 2006
Item No.
2
e
e
e
ream Services, Inc.
SANITARY SEWER & STORM WATER SPECIALISTS
February 20, 2006
City of San Bernardino
Development Services Department
300 North "0" Street
San Bernardino, CA
Phone (909) 384-5382
Fax (909) 384-51 I I
Attention: Michael D. Wolf- Construction Engineer
Project Sewer Siphon Cleaning (SW-D 2005/06), File No. 3.7475B, Plan/Spec No. I 1340B, Acct # 132-
431-5502-7475, W.O. #7475
Subject Notice of Delay and Request of Change Order for Sites 02,04,06,07.
DearMr. Wolf-
Thank you for your support and the time that has been spent by you and your staffto accomplish this
difficult project to this point. We have successfully cleaned 5 sites that have been approved by you and the
Construction Inspector-Andy Navarro. We have attempted all 7 sites. Please see attached:
These sites include:
. Site 0 I Mill Street @ "G" Street
. Site 02 Waterman Avenue @ Santa Ana River
. Site 03 Perris Hill Park @ Twin Creek Channel
. Site 04 Tippecanoe Avenue @ Warm Creek Channel (24")
. Site 05 "I" Street @ Lytle Creek Channel
. Site 06 South "E" Street and Santa Ana River
. Site 07 South "E" Street and Santa Ana River (Lorna Linda) (20")
We have some concerns on this project that we feel are justified and need attention. In accordance with the
Contract, page SP-19, Section 6-1.05 EXTRA WORK AND MARKUP, Section 3.3 of the Standard
Specifications, (unknown physical conditions of an unusual nature differing materially from those
ordinarily encountered and generally recognized as inherent work of the character being performed").
Several sites have been determined to meet this condition and are listed below.
The following sites are requiring attention.
Site 02
o Site 02 Waterman and Santa Ana River 8" and 12" DIP
o Bid distance is 666ft for a contract compensation rate of $23,972.40 = $35.99 ft
o Change Order Condition -Actual distance is I 065ft- difference of 399ft@ $35.99ft =
$14,360.01 Additional Cost
Site 04
o
Site 04 Tippecanoe Avenue @ Warm Creek Channel
www.downstreamservices.com
Corporate Ollice 2855 Progress Place, Escondida, CA92029, Ph 7607462544, Ph 800 2620999, Fax 760 746 2667
Page I of2
e
e
e
ream Services, Inc.
SANITARY SEWER & STORM WATER SPECIALISTS
o Sizes 24" CIP and 14" CIP- 24" (24"cleaned and passed inspection per Andy Navarro-
Friday January 27)
o Distance 340' both pipes, bid price is $ 23.50 per foot per pipe
o Change Order Condition - On the 14" CIP we have spent 2.5 working days attempting to
remove the foreign objects through confined space entries and using various attachments
to our hydro jetting equipment. Construction debris is a reportable item listed in spill
reports to the RQCB. This line does not convey flow, is inoperable, and outside the
intended scope of the contract. We request activating a T&M condition to complete
cleaning of this pipe
Site 06
o Site 06 South "E" Street and Santa Ana River
o Bid distance 717ft for a contract compensation rate of31,548.00~ $44.00ft
o Change Order Condition- Actual distance 840ft difference of 123ft @ $ 44.00ft ~
$5,412.00 Additional Cost
Site 07
o Site 07 South "E" Street and Santa Ana River (Lorna Linda)
o Sizes 20" CIP 16"CIP and 14"CIP (20"cleaned and passed inspection per Andy Navarro
- Friday February lOth)
Change Order 01 Site 07
o Bid distance is 717ft for contract compensation rate of$44,904.00 ~ $20.87 per foot per
pipe (3 pipes total)
o Change Order 01 Site 07 Condition-actual distance 840' difference of 123ft @(1 pipe
approved only) 20.87fr= $2,567.01 Additional Cost 1 Pipe
Change Order 02 Site 07
On the 16" CIP and 14" CIP we have spent 1.5 working days attempting to penetrate thru
these lines through confined space entries and using various attachments to our hydro jetting
equipment. Pre-existing condition not disclosed under any document or at the pre bid or
construction meeting. Pipes appear to be 100% impacted with foreign objects and debris.
These two lines do not convey flow, are inoperable, and are outside the intended scope of the
contract.
In summary Site 02 is longer than the bid specs represent, Site 04 - Tippecanoe siphon is blocked by
unknown foreign objects and debris and is non functioning outside the scope of cleaning. Site 07 - South
"E" Street and Santa Ana River (Lorna Linda), all pipes are longer than the bid specs represent, two of the
three siphons (16" and 14") are blocked by unknown foreign objects and debris and are non ftmctioning
and outside the scope of cleaning. These events directly affect the time constraints, therefore Downstream
Services (DSI) request a change order for these sites.
This letter is Notification of Delay as required by contract requirements.
Please contact me @ (760) 746-2544 to schedule a meeting your earliest convenience to address these
matters.
R~
Jake Jacobson
Operations Manager
www.downstreamservices.com
Corporate Ollice 2855 Progress Place, Escondido, CA 92029, Ph 760 746 2544, Ph 800 262 0999, Fax 760 746 2667