HomeMy WebLinkAbout13-Public Works From: ROGER G. HARDGRAVE CITY OF SAN BERN~ ~DINO - REQUEST F{ I COUNCIL ACTION File No. 1.289 Approval of Contract Change Order Subject: No. 3 Rehabili tat ion of Pave- ment in Waterman Avenue, from &rrton Road to Redlands Blvd., per Plan No. 8869 -- E. L. YEAGER CONSTRUCTION CO., INC. Public Works Dept: Date: 11-9-93 Synopsis of Previous Council action: June, 1991 -- Allocation of $110,000 in 1991/92 Storm Drain Construction Fund Budget, under Account No. 248-368- 57883, approved. June, 1992 -- Allocation of $400,000 in 1991/92 Street Construction Fund Budget, under Account No. 242-362-57289, and $50,000 in Traffic Systems Fee Fund. under Account No. 250-670-57896, approved. 03-08-93 Plans approved and authorization granted to advertise _'._' 1;-. for bids. 06-21-93 Contract awarded to E. L. Yeager, at the low bid price of $322,531.00. Recommended motion: That Contract Change Order No. 3 to the contract with E. L. Yeager Construction Co., Inc., for the rehabilitation of pavement in Waterman Avenue, from Barton Road to Redlands Blvd., in accordance with Plan No. 8869, be approved; to compensate Contractor for lowering and rewiring existing traffic signal conduit at 3 locations at an increase in the contract price of $8,081.16; from $326,062.54 to $ 3 3 4 , 14 3 . 70. cc: Shauna Clark Barbara pachon tM~ Contact person: Gene R. Klatt Phone: 5125 Supporting data attached: Staff Report, CCO #3 Ward: 3 FUNDING REOUIREMENTS: Amount: $8,081.16 (Storm Drain Construction) Source: (Acct. No.) 248-368--57883 Acct. Descri tion Rehabilitation of Waterman Avenue, from Barton Road to REd lands Blvd. Finance' Council Notes: 7<;.n?j;;? Agenda Item No. /3 CITY OF SAN BERNA: ~DINO - REQUEST FC 1 COUNCIL ACTION STAFF REPORT During the installation of the 33-inch reinforced concrete storm drain pipe on Waterman Avenue and Caroline Street, the existing traffic signal conduit was found to be at a depth of 3-feet instead of the depth of 18 inches, which is indicated on the plans. Ci ty standards show traffic signal conduit to be in- stalled at a depth of 18 to 24 inches. It is, therefore, unusual for conduit in the City of San Bernardino to be installed at a depth exceeding 24 inches. The construction plans for this project the conduit was at a depth of 18 inches. However, who constructed the traffic signals actually conduit at a depth of about 3 feet. indicated that the contractor installed the Conduit event of a minor the conduit could to be removed and can normally be raised a small amount in the conflict. However, due to the unexpected depth, not be raised to clear the storm drain, but had reinstalled. In order to provide temporary service to the traffic signals while making the necessary modifications to the conduits, it was necessary for the contractor to reroute traffic signal wiring overhead. There were 3 conduits which needed to be re- located to clear the storm drain. It was also necessary for the contractor to remove the existing wiring and pull new wire through the conduit, as the existing wiring was too short to be reused in the conduit. The total estimated project cost included an amount of $48,437.46 in contingencies which is available to fund the cost for this extra work. We recommend that Contract Change Order No. approved. 3 be 11-9-93 .,,,_n?~4 C I T Y 0 F SAN B ERN A R DIN 0 DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION project: PAVEMENT REHABILITATION, TRAFFIC SIGNAL INTERCONNECT AND STORM DRAIN IMPROVEMENTS-WATERMAN AVENUE;REDLANDS BLVD. TO BARTON ROAD File NO.: 1.289 plan NO.: 8869 Date: 10/18/93 CONTRACT cHANGE ORDER NO. THREE TO: E.L. YEAGER CONSTRUCTION CO., INC. P.O. BOX 87 Riverside, CA 92502 Gentlemen: You are hereby compensated for the additional work as follows: 1) Set up temporary overhead wiring to feed the existing traffic signals at the corner of Waterman Avenue and Caroline. 2) Lowering the existing traffic signal conduit, removal of the existing wiring and the installation of new wiring, as directed by the Resident Engineer, as follows, A) An existing 3-inch conduit located on Waterman Avenue, North of Caroline. B) An existing 3-inch conduit located on Caroline, East of Waterman Avenue. C) An existing 1-1/2-inch conduit located on the northeast corner of Waterman Avenue and caroline that conflicted with the installation of a storm drain catch basin. Total Extra Work cost added to the contract .....$ 8.081.16 previouS contract price .........................$ 326.062.54 Amended Cost price ..............................$ 334.143.70 Additional time to complete contract due to Change Order _o_workinq Davs CONTRACTOR CITY OF SAN BERNARDINO Accepted BY: Recommended By: ROGER G. HARDGRAVE DATE Director of PUblic works/city Enqr Title: Date: