Loading...
HomeMy WebLinkAbout14-Development Services CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: James Funk, Director Date: November 13, 2002 1". I , I \,J' . ~ . '<.. I" " Subject: Resolution awarding contract to Pro Tech Engineering, Corp., for Street L Lighting on Base Line Street from Victoria . Avenue to a point 1000' westerly per Plan No. 10397. Dept: Development Services File: 1. 40-4 MCC Date: January 21,2003 Synopsis of Previous Council Action: 7/15/02 Allocation of $30,000 in the 2002/03 Capital Improvement Program (CIP) budget for Base Line St.- HES Street Lights Installation from Victoria Avenue to 1000' westerly (Account No. 250-370-5504-7335). Recommended Motion: Adopt Resolution ~(.b~ TF Contact person: Ron Blymiller, Engineering Associate Phone: 5154 Supporting data attached: Staff Report, Map & Resolution Ward: 7 FUNDING REQUIREMENTS: Amount: $30,000 Source: (Acct. No.) 250-370-5504-7335 Acct. Description: Base Line St. HES Street Lighting Installation from Victoria to 1000' westerly Finance: Council Notes: ~-w ~ LCR->~-.?r. 2.) Agenda Item No. I J..j I/JJ/03 CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT Subject: Resolution awarding contract to Pro Tech Engineering, Corp., for Street Lighting on Base Line Street from Victoria Avenue to a point 1000' westerly per Plan No. 10397. Background: This project was approved in the FY 2002/03 Capital Improvement Program and consists of the installation of street lighting and electrical service. The selection of this site was by citizen request and successfully competed statewide with other projects. On July 26, 2000, this project was deemed eligible for further consideration and placed on the Statewide Prioritized List of Recommended Hazard Elimination Safety (HES) projects to be programmed in the 2001/2002 Federal Fiscal Year. The project has been designed and will be inspected by in-house staff. This should allow the City to complete the design and inspection of the project for the total sum of only $4,627.00. The HES Program provides funds for safety improvements on public roads, public surface transportation facilities, publicly owned bicycle or pedestrian pathways or trails, and for traffic calming measures. These funds are intended to be used to eliminate or reduce the number and severity of traffic accidents at locations selected for improvement. This project was nominated for funding prior to the formation of the Grants Ad Hoc Committee. Plan and specifications for this project are complete and it is ready to be awarded. The estimated project costs are as follows: Construction Cost $19,873.00 Contingencies $5,500.00 Design, Inspection, and Contract Administration $4,627.00 Total $30,000.00 This project was advertised locally in the San Bemardino County Sun Newspaper, Construction Trend Newspaper. the City's web site, and with the San Bernardino Area Chamber of Commerce; the following companies responded: Name of Bidder City Amount of Bid Pro Tech Enl!ineerinl! Corp. Anaheim $ 19,873.00 Pete & Sons Construction, Inc. Riverside $24,054.00 Sierra Pacific Electrical Riverside $27,050.00 LA Signal, Inc. Industrv $30,976.00 Engineer's Estimate $21,200.00 - 2 - STAFF REPORT continued Financial Impact: Funding for this project in the amount of $30,000 has been included in the FY 2002/2003 budget in the Traffic Systems Construction Fund. Of the $30,000, $24,750 will be funded by the Hazard Elimination Safety Program (HES). The remainder of the cost (the required local match) will be funded from the Traffic System Fee Fund. All costs incurred will be charged to Account No. 250-370-5504-7335 (Base Line St. HES Street Lights Installation from Victoria Avenue to 1000' westerly). Recommendation: Adopt Resolution - 3 - City of San Bernardino, California Department of Public Works, Division of Engineering January 15, 2002 File No. W.O. No. DWG. No. 10397 UTILITY NOTICE For Base Line Street Lighting -- HES North Side of Base Line West of Victoria Avenue VICINITY MAP N. T.S. 1 2 RESOLUTION NO. SECTION 1. Pro Tech Engineering Corp., is the lowest responsible bidder for Street 8 9 Lighting on Base Line Street from Victoria Avenue to a point 1000' westerly, per Plan No. 10 10397. A contract is awarded accordingly to said bidder in a total amount of $19,873.00, with 11 a contingency amount of $5,500.00, but such award shall be effective only upon being fully 12 executed hy both parties. All other bids, therefore, are hereby rejected. The Mayor is hereby 13 14 15 on file in the office of the City Clerk and incorporated herein by reference as fully as though 16 authorized and directed to execute said contract on behalf of the City; a copy of the contract is set forth at length. 17 SECTION 2. This contract and any amendment or modifications thereto shall not take 18 effect or become operative until fully signed and executed by the parties and no party shall be 19 20 obligated hereunder until the time of such full execution. No oral agreements, amendments, 21 modifications or waivers are intended or authorized and shall not be implied from any act or 22 course of conduct of any party. 23 SECTION 3. This resolution is rescinded if the parties to the contract fail to execute it 24 within sixty (60) days of passage of the resolution. 25 26 27 28 I I I III 1 RESOLUTION...AWARDING A CONTRACT TO PRO TECH ENGINEERING CORP., 2 FOR STREET LIGHTING ON BASE LINE STREET FROM VICTORIA A VEJ'.'UE TO A POINT 1000' WESTERLY, PER PLAN NO. 10397. 3 4 I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and 5 Common Council of the City of San Bernardino at a meeting thereof, held on 6 the_day of ,2003, by the following vote, to wit: 7 8 9 10 11 12 13 14 15 16 17 Council Members: AYES NAYS ABSTAIN ABSENT ESTRADA LONGVILLE MC GINNIS DERRY SUAREZ ANDERSON MC CAMMACK 18 19 20 21 22 City Clerk day of ,2003. The foregoing resolution is hereby approved this Judith Valles, Mayor City of San Bernardino 23 Approved as to 24 form and legal content: 25 26 27 r! l I! By: r f"'-'" T. ,.C"lJ~~ o 28 CITY OF SAN BERNARDINO Interoffice Memorandum CITY CLERK'S OFFICE Records and Information Management (RIM) Program DATE: January 28, 2003 TO: Leslie Crawford, Engineering Assistant I FROM: Michelle Taylor, Senior Secretary RE: Transmitting Documents for Signature - Resolution 2003-21 At the Mayor and Common Council meeting of January 21,2003, the City of San Bernardino adopted Resolution 2003-21 - Resolution awarding a contract to Pro Technician Engineering Corp. for street lighting on Baseline from Victoria Avenue to a point 1000' westerly, per Plan No. 10397). I am providing you with one certified copy of Resolution 2003-21 and four (4) sets of original bound contracts. Please obtain signatures where indicated and return one fully executed original contract to the City Clerk's office as soon as possible. Please be advised that the resolution and contract will be null and void if not executed within 60 days, or by March 24, 2003. If you have any questions, please do not hesitate to contact me at ex!. 3206. Thank you. I hereby ack wi dge recefofthe ove mentioned documents. Signed: Please sign and return. Date: CITY OF SAN BERNARDINO Interoffice Memorandum CITY CLERK'S OFFICE Records and Information Management (RIM) Program DATE: March 10, 2003 TO: Leslie Crawford, Engineering Assistant I FROM: Michelle Taylor, Senior Secretary RE: Resolution 2003-21 - Pro Tech Engineering Our office has not received the executed contract with Pro Tech Engineering Corp. for street lighting on Baseline from Victoria Avenue to a point 1000' westerly, per Plan No. 10397. This agreement was approved at the Mayor and Common Council meeting held on January 21, 2003, and will be null and void ifnot executed and returned to the City Clerk's Office by March 24, 2003. Please forward the executed agreement to the City Clerk's Office, to my attention, as soon as possible. If you have any questions, please do not hesitate to call me at ex!. 3206. ** FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT ** RESOLUTION AGENDA ITEM TRACKING FORM Meeting Date (Date Adopted): 1- L \-03 14 Item # Vote: Ayes I-'l .er Abstain Nays Change to motion to amend original documents: Reso. # On Attachments: / Contract term: Note on Resolution of Attachment stored separately: ,/' Direct City Clerk to (circle I): PUBLISH, POST, RECORD W/COUNTY NO Date Sent to M:lyor: Date of Mayor's Signature: Date ofClerklCDC Signature: /- 2 ~..t"~-.2) l~2.I-C''2., n-O~ Resolution # "200-3 - 21 Absent -G- ..e- NullNoid After: ~O DA.JS, J 3- 2+03 , By: - Reso. Log Updated: v Seal Impressed: ,./ Date Memo/Letter Sent for Signature: l- ;/\;,,-0:<' 60 Day Reminder Letter Sent on 30th day: 90 Day Reminder Letter Sent on 45th day: See Attached: LDate Returned: 3. f 4 -03 See Attached: See Attached: Request for Council Action & Staff Report Attached: Updated Prior Resolutions (Other Than Below): Updated CITY Personnel Folders (6413, 6429, 6433, 10584, 10585, 12634): Updated CDC Personnel Folders (5557): Updated Traffic Folders (3985, 8234, 655, 92-389): Copies Distributed to: ,/ City Attorney Parks & Rec. ,/ Code Compliance Dev. Services Police Public Services Water Notes: P-f:0 ()O CO!l1ilACT'" Yes ~ No By , Yes No~ By Yes No ~ By Yes No ,/ By Yes No-r B EDA Finance ,./ MIS Others: BEFORE FILING, REVIEW FORM TO ENSURE ANY NOTATIONS MADE HERE ARE TRANSFERRED TO THE YEARLY RESOLUTION CHRONOLOGICAL LOG FOR FUTURE REFERENCE (Contract Term, etc.) Ready to File: 011 Date::! (c.(J 03 Revised 01/12/01