Loading...
HomeMy WebLinkAbout2006-031 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 RESOLUTION NO. 2006-31 RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING A SERVICES AGREEMENT FOR PROFESSIONAL SERVICES WITH STANTEC CONSULTING, INC. (STANTEC) TO PROVIDE SEWER LINE CAPACITY EV ALUATlONS, INCLUDING FIELD FLOW TESTS AND TO MAKE RECOMMENDATIONS FOR UPGRADES AND IMPROVEMENTS OF SEWER LINES AT VARIOUS LOCATIONS IN THE CITY OF SAN BERNARDINO, SW04-21, SW04-36, SW05-01, SW05-02, SW05-05, SW05-06 AND SW05-07, (CITY FUNDED PROJECTS), AND REPEALING RESOLUTION NO. 2005-384. BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. STANTEC CONSULTNG, INC., 19 Technology Drive. Irvine, CA 92618, is competent, experienced and able to perform the scwcr line capacity evaluations, including licld {low tests and to makc recommendations for upgrades and improvemcnts of sewer lincs at various locations in the City of San Bemardino, SW04-2!, SW04-36, SWO)-O! S W05-02, SW05-05. SW05-06 and SW05-07, (City Funded Projects) per Agreement for Prolcssional Services, attached hcreto and incorporated hercin as Exhibit "A," for the IJOt-to-exceed amount of 5; 43,844.00. Pursuant to this detemlination. the Purchasing Manager is hereby authorized and directed to issue Pllrchase Ordcrs for said services to said firm. The Mayor is hcreby authorized and dirccted to execute said Agreement on behalf of the City. SECTION 2. Thc authorization to execute the above referenced Agrecment is rescinded If it is not executed witbin sixty (60) days of the passage of'this resolution. SEC nON 3 Resolution No. 2005-3~4 is hereby repealed. 27 /i/ 28 2006-31 1 RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING A SERVICES 2 AGREEMENT WITH STANTEC CONSULTING, INC. (STANTEC) TO PROVIDE SEWER LINE CAPACITY EVALUATIONS, INCLUDING FIELD FLOW TESTS AND 3 TO MAKE RECOMMENDATIONS FOR UPGRADES AND IMPROVEMENTS OF SEWER LINES AT VARIOUS LOCATIONS IN THE CITY OF SAN BERNARDINO, 4 SW04-21, SW04-36, SW05-01, SW05-02, SW05-05, SW05-06, SW05-07, (CITY FUNDED 5 PROJECTS), AND REPEALING RESOLUTION NO. 2005-384. 6 7 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and Common Council of the City of San Bernardino at a joint regular 8 meeting thereof, held 9 on the 6th day of February 10 Council Members: AYES , 2006, by the following vote, to wit: ABSTAIN ABSENT NAYS 11 ESTRADA 12 13 x LONGVILLE x x MC GINNIS 14 15 16 17 JOHNSON 18 DERRY x KELLEY x x x MC CAMMACK 19 -~~LJ_ 0 C{"'-L-~ Ra el Clark, City Clerk' . The foregoing resolution is hereby approved this giA, ayof FebruaJ:L_, 2006. 20 21 22 23 Approved as to 24 form and legal content: 25 26 27 JAMES F. PENMAN, City Atto By: VI~ 28 2006-31 EXHIBIT "A" AGREEMENT FOR PROFESSIONAL SERVICES ORIGINAL Agreement for Professional Services to provide sewer line capacity evaluations, including field flow tests and to make recommendations for upgrades and improvements of sewer lines at various locations in the City of San Bernardino, SW04-21, SW04-36, SW05-01, SW05-02, SW05-05, SW05-06 and SW05-07, (city funded projects). This AGREEMENT is made and entered into this g4 day of .~\l~, 2006, by and between the City of San Bernardino, California, a municipal corporation, hereinafter refe ed to as the "City" and Stantec Consulting, Inc., an Arizona Corporation, (Stantec) hereinafter referred to as "Consultant." WITNESSETH: A. WHEREAS, City has need for Civil Engineering Services; and, B. WHEREAS, Consultant is competent, experienced and able to perform said services; and, C. WHEREAS, Consultant has provided the most advantageous and best proposal for the provision of such services; and, D. WHEREAS, The Keith Companies, Inc., on September 15, 2005, merged into Stantec Consulting, Inc.; NOW THEREFORE, the parties hereto agree as follows: I. SCOPE OF SERVICES Consultant shall perform those services specified in the Request for Proposal (RFP), dated August 8, 2005, to provide Civil Engineering Services for sewer line capacity evaluations, including field flow tests and to make recommendations for upgrades and improvements of sewer lines at various locations in the City of San Bernardino, SW04-21, SW04-36, SW05-01, SW05-02, SW05-05, SW05- 06 and SW05-07, (City-Funded Projects) and Consultant's proposal dated August 29, 2005, (submitted by The Keith Companies, Inc.) all of which are attached hereto and incorporated herein as Attachments "A" and "B." The flow tests have been increased from 9-day periods on a 24-hour basis to two (2) full weeks or 14-day periods on a 24-hour basis. 2. TERM OF AGREEMENT The services of Consultant are to commence after the City has authorized work to start by issuance of a Notice to Proceed. This Agreement shall expire one year from the date of this Agreement, unless extended by written agreement of the parties. 3. STANDARD OF PERFORMANCE Consultant shall complete all work product and design in conformance with City of San Bernardino Standard Specifications and Standard Drawings. 2006-31 4. CHANGES/EXTRA SERVICES A. Performance of the work specified in the Proposal is made an obligation of Consultant under this Agreement, subject to any changes made subsequently upon mutual written agreement of the parties. Any change, which has not been so incorporated, shall not be binding on either party. 5. COMPENSATION A. The City shall reimburse the Consultant for actual costs (including labor costs, employee benefits, overhead, profit, other direct and indirect costs) incurred by the Consultant in performance of the work, in an amount not to exceed $43,844.00, except that reimbursement shall not include courier services, mileage or reimbursement for travel to the City to attend meetings or conduct the activities. Actual costs shall not exceed the estimated wage rates and other costs as set forth in the Proposal. See Attachment "C" for Consultant's cost breakdown attached and incorporated herein. B. Said compensation shall not be altered unless there is significant alteration in the scope, complexity or character of the work to be performed. Any adjustment of the total cost of services will only be permitted when the Consultant establishes and City has agreed, in writing, that there has been, or is to be, a significant change. C. The Consultant is required to comply with all Federal, State and local laws and ordinances applicable to the work. 6. PAYMENT BY CITY A. The billings for all services rendered pursuant to this Agreement shall be submitted monthly by Consultant to City and shall be paid by City within thirty (30) days after receipt of same, excepting any amounts disputed by City. City retains the right to challenge all or any part of an invoice. All tasks as specified in Proposal shall be completed prior to final payment. 7. SUPERVISION AND ACCEPTANCE OF SERVICES A. The Director of Development Services of City or his designee, shall have the right of general supervision over all work performed by Consultant and shall be City's agent with respect to obtaining Consultant's compliance hereunder. No payment for any services rendered under this Agreement shall be made without prior approval of the Director of Development Services or his designee. 2 2006-31 8. COMPLIANCE WITH CIVIL RIGHTS LAWS AND AMERICANS WITH DISABILITIES ACT Consultant hereby certifics that it will not discriminate against any employee or applicant for employment because of race, color, religion, sex, marital status, national origin or disability. Consultant's hiring practices and employee policies shall comply with applicable Federal, State and local laws. Such action shall include, but not be limited to, the following: Recruitment and recruitment advertising, cmployment, upgrading and promotion. 9. TERMINATION OF AGREEMENT A. This Agreement may be terminated by either party upon thirty (30) days written notice in the event of substantial failure of the other party to perform in accordance with the terms of this Agrccment. Each party shall have twenty (20) days following date of such notice within which to correct the substantial failure giving rise to such notice. Consultant hereby covenants and agrees that upon termination of this Agreement for any reason, Consultant will preserve and make immediately available to City, or its designated rcpresentatives, maps, notes, correspondence, or records related to work paid for by the City and required for its timcly completion, and to fully cooperate with City so that the work to be accomplished may continue. Any subsequent use of such incomplete documents shall be at the sole risk of the City and City agrees to hold harmless and indemnify Consultant from any claim, losses, costs, including attorney's fees, and liability arising out of such use. B. This Agreement may be tenninated for the convenience of the City upon thirty (30) days written notice to Consultant. Upon such notice, Consultant shall provide work product to City and City shall compensate Consultant in the manncr set fOlih above. C. Following the effective date of tcrmination of the Agreement pursuant to this Section, the Agreement shall continue until all obligations arising from such termination are satisfied. 10. CONTINGENCIES In the event that, due to causes beyond the control of and without the fault or negligence of Consultant, Consultant fails to meet any of its obligations under this Agreement, and such failure shall not constitute a default in performance, the City may grant to Consultant such extensions of time and make other an.angements or additions, excepting any increase in payment, as may be reasonable under the circumstances. Increases in payment shall be made only under the "changes" provision of the Agrccment. 11. INDEPENDENT CONTRACTOR Consultant shall act as an independcnt contractor in the performance of the services provided for under this Agreement. Consultant shall furnish such services in its own manner and in no respect shall it be considered an agent or employee of the City. 3 2006-31 12. ASSIGNMENT OR SUBCONTRACTING Neither this Agreement, nor any portion thereof, may be assigned by Consultant without the written consent of City. Any attempt by Consultant to assign or subcontract any performance of this Agreement without the written consent of the City shall be null and void and shall constitute a breach of this Agreement. 13. NOTICES All official notices relative to this Agreement shall be in writing and addressed to the following representatives of Consultant and City: CONSULTANT Mr. Robert S. Reid, P.E., President Stantcc Consulting, Inc. 19 Technology Drive Irvine, CA 926 18-2334 CITY Mr. James Funk, Director Development Services Department City of San Bernardino 300 North "0" Street San Bernardino, CA 92418 14. RESPONSIBILITIES OF PARTIES Upon termination, or completion of all work under this Agreement, Consultant will transfer ownership and title to City of all programs, reports, documents, plans and specifications. 15. INDEMNITY Consultant shall indemnify, defend and hold CITY, its officers, employees and agents hannless from and against any and all claims, demands, suits, actions, proceedings, judgments, losses, damages, injuries, penalties, costs, expenses (including attorney's fees) and liabilities, of, by, or with respect to third parties, which arise from Consultant's negligent performance of services under this Agreement. Consultant shall not be responsible for, and City shall indemnify, defend and hold harmless Consultant from and against, any and all claims, demands, suits, actions, proceedings, judgments, losses, damages, injuries, penalties, costs, expenses (including attorneys' fees) and liabilities of, by or with respect to third parties, which arise from the City's negligence. With respect to any and all claims, demands, suits, actions, proceedings, judgments, losses, damages, injuries, penalties, costs, expenses (including attorneys' fees) and liabilities of, by or with respect to third parties, which arise from the joint or concurrent negligence of Consultant and City, each party shall assume responsibility in proportion to the degree of its respective fault. 16. LIABILITY/INSURANCE Consultant shall maintain insurance policies meeting the minimum requirements set forth herein. All insurance maintained by the Consultant shall be provided by insurers satisfactory to the City. Certi ficates evidencing all insurance coverage required herein shall be delivered to the City prior to the Consultant performing any of the services under the Agreement. All insurance certificates required herein shall name the City as an additional insured and provide for thirty (30) days written notice from the insurer to the City prior to cancellation or modification of any insurance policy of the Consultant. 4 2006-31 A. ERRORS & OMISSIONS - The Consultant shall maintain errors and omissions insurance with a combined single limit of not less than One Million Dollars ($1,000,000.00) per occurrence. B. COMPREHENSIVE GENERAL LIABILITY AND AUTOMOBILE INSURANCE - The Consultant shall maintain comprehensive generalliability and automobile liability insurance with a combined single limit of not less than One Million Dollars ($1,000,000.00) per occurrence. C. WORKER'S COMPENSATION INSURANCE - The Consultant shall maintain worker's compensation insurance in accordance with the laws of the State of California for all workers employees by the Consultant. 17 . VALIDITY Should any provision herein be found or deemed to be invalid, this Agreement shall be construed as not containing such provision, and all other provisions which are otherwise lawful shall remain in full force and effect, and to this end the provisions of this Agreement are declared to be severable. 18. ENTIRE AGREEMENT This Agreement represents the entire and integrated understanding between the parties hereto and supersedes all prior and contemporaneous negotiations, representations, understandings and Agreements, whether written or oral, with respect to the subject matter thereof. This Agreement may be amended only by written instrument signed by both parties. III III 5 . 2006-31 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date shown below. ST ANTEC CONSULTING, INC. Datc: '2---/1-1/0 !f I by: ~/J ~ Signature !4buJ s ~,,j ) f?,f1l.J~1 Print NamelTitle Date j/.vzVUk7j:J,I:J t[}{; ,SAN BERNARDINO ATTEST: ~0~t /j L<-t'~ Rac I Clark, CIty Clerk Approved as to forn] and legal content: James F. Penman City Attorney By ~II~ III 6 2006-31 ATTACHMENT "A" .- City of San Bernardino Development Services Department PUBLIC WORKS DIVISION REQUEST FOR PROPOSAL TO PROVIDE CIVIL ENGINEERING SERVICES FOR -','.,- SEWER LINE PIPE CAPACITY EVALUATIONS AND RECOMMENDED UPGRADES AND IMPROVEMENTS TO SEVERAL SEWER LINES SITUATED AT VARIOUS LOCATIONS WITHIN THE CITy OF SAN BERNARDINO ISSUED ON: AUGUST 8. 2005 DUE ON: AUGUST 29. 2005 I. INTRODUCTION 2006-31 The City of San Bernardino (City) intends to engage the services of a consulting engineering firm (Consultant) to provide sewer pipe capacity evaluations, including field flow tests and to make recommendations for upgrades and improvements of sewer lines situated at various locations within the City of San Bernardino. These sewer lines are part of the City of San Bernardino Capital Improvement Program (CIP). SEWER LINE LOCATIONS Se ment ID SW04-21 SW04-36 SW05-01 SW05-02 SW05-05 SW05-06 SW05-07 . Sewer lines recommended for improvements in the Psomas (WSMP) Report. PROJECT DESCRIPTION Location Project Description Virginia SI. Replace approximately 719 feet of existing 8" sewer main with rl. 12" sewer main in Virqinia SI. between "I" SI. and "H" SI. Design replacement of existing sewer main in "I" 51. between 17th SI. and 21s1 St:with new sewer 7m SI. Replace or parallel approximately 2,830 linear feet of 12-inch sewer main with 15-inch sewer main and 30 linear feet of 18- inch sewer main with 24-inch sewer main from MI. Vernon Ave. to Harris SI. Harris SI. Replace or parallel approximately 423 feet of 18-inch sewer main with 24-inch sewer main in Harris 51. from th SI. to 400 feet south .- Industrial Pkwy Replace or parallel approximately 334 feet qf 12-inch sewer main with 15-inch sewer main in Industrial Parkway near Cajon Boulevaro to Lexinoton Way Tippecanoe Ave Replace or parallel approximately 442 linear feet of 24-inch sewer main with 30-inch sewer main in Tippecanoe Ave from Base Une SI. to 9th SI. I Colorado SI. Replace or parallel approximately 2,785 linear feet of 8-inch i sewer main with 1O-inch to 12-inch sewer main in California SI. i from Base Line SI. to Colorado St; in Colorado SI. from California St. to Magnolia Ave south of Hansford SI. from Colorado St. to Grand St., and Grand 51. from cul-de-sac to Evans S1. 2 of 7 2006-31 II. BACKGROUND Psomas prepared a Wastewater Collection System Master Plan (WSMP), in 2002. In the report, Psomas provides recommendations for sewer line improvements throughout the city, based on land use information, population projections, and data obtained from a temporary flow monitoring study. The hydraulic modeling software used for the study was the H20MAP SEWER 2.5. The report lists deficiencies found as a result of peaked situations in the sewer system, and provides recommendations and related costs for either replacing or paralleling existing sewer mains. Costs estimates were based on costs as of January 2002 for the Inland Empire. The City is seeking a qualified consultant to review the available information, perform independent flow tests and pipe capacity evaluations and make recommendations regarding the cost effectiveness of the listed sewer line improvements. III. SCOPE OF SERVICES Services to be performed related to the above listed sewer lines include, but are not limited to the following: . Review the information available in the City's Master Plan for the listed sewer lines. . Review/study the existing and calculated flow capacity for the listed sewer lines. . Review/study the proposed improvements and cost estimates presented by the Psomas Report for the listed sewer lines. . Perform a field evaluation of the1isted sewer lines and identify any potential construction constraints. . Review available plans, maintenance records and proposed improvement cost estimates for the listed sewer lines. . Conduct flow tests at selected manhole locations for the listed lines. The flow tests should be conducted for a minimum 9-day period on a 24-hour basis. . Consultant may conduct the flow monitoring study using the same manhole locations of the Psomas study, but may expand the number of locations at the City's approval. . Establish high, average'and low flow periods from the recorded data. 'Flow tests must be conducted by a qualified sub-contractor. . Based upon the review of available information and the flow monitoring study, assist the City in determining whether or not the improvements recommended in the Psomas report should be implemented and/or provide alternative recommendation for upgrading the listed sewer lines. . Meet with the City's Engineering and appropriate Water Department personnel to discuss the preliminary improvement recommendation. . Prepare final report providing improvement/upgrade recommendations and updated cost estimates for each sewer line. IV PROPOSAL REQUIREMENTS 3 of 7 2006-31 A. Six (6) copies of the proposal shall be submitted to the following: City of San Bernardino Department of Development Services Division of Public Works ATTN: Mr. Byron G. Montalvo, P.E., Senior Civil Engineer 300 North "D" Street, 3rd Floor San Bernardino, CA 92418 Proposals shall be received in hand by this Division up to the hour of 5:30 P.M. on Mondav, Auaust 29. 2005. B. Responsive proposals will include, but not be limited to, the following: 1. Responsive proposals will present a Scope of Services that includes at a minimum the above described services and any other tasks necessary for the evaluation of the sewer lines. The sewer line evaluations and improvement recommendations will be used to prepare plans, specifications and cost estimates for the listed sewer lines. 2. Identify the professional, technical and support staff that will be performing the work associated with the proposed scope of services. Short resumes may be included, but extensive resumes should be limited to key personnel only. 3. Include a timeline indicating project milestones for the delivery of the final report.--.. 4. Include a list of similar projects recently completed by the Consultant, identifying the location, date, agency and contact person name, and address and phone number. 5. Previous obligations with other projects (related to time and availability of staff). 6. Name of sub-consultants or sub-contractors to be used for specific aspects of the project, including a summary of previous working arrangements on similar types of work. 7. Statement of local preference eligibility, including identification of any office located in the City of San Bernardino and the number of employees stationed at the office, the number of employees doing business inside the City limits, and a copy of your firm's City of San Bernardino Business License. 8. Items, actions or information the Consultant expects to be provided by the City. 4 of 7 2006-31 9. Any comments or suggestion that the Consultant believes necessary to improve the finished project or to comply with the requirements of this RFP. 10. Separate sealed envelope. Fixed fee or not-to-exceed fee for the work required by this RFP, together with an hourly rate sheet applicable to this project for classifications above, including all materials and expenses, shall be submitted in a separate sealed envelope. Please note that the City will not payor compensate for travel time, courier services, mileage or reimbursement for travel to the City of San Bernardino to attend meetings or conduct the activities necessary to complete tasks required to be performed as part of consultant services. The fee proposal shall include the total fee and a separate fee breakdown for the individual segment 1.D. This is necessary for cost tracking within the City's Capital Improvement Program. V. SELECTION PROCESS The selection process will be based on a point system and will consist of three phases as follows: 1. First phase selection shall consist of an evaluation by staff (including the Development Services Director, City Engineer, and Senior Engineer/Project Manager) of proposals based on the above items identified in Section IV B (except No. 10). An additional five (5) points will be given to City of San Bernardino based consultants. In order to be deemed as "City of San Bernardino Based Consultant, the company shall have an office with a minimum of two (2) owners or employees doing business inside the City IiITrit6 and shall possess a City Business License. The three (3) consultants with the highest points will continue to the interviews. A maximum of 100 points can be achieved in this phase of the selection process. The three consultants with the highest numerical scores will be invited to continue with the second phase of the selection process. 2. Second phase of the selection process will consist of staff evaluation of a presentation by the three consultants with the highest numerical score from the first phase selection. The interview will be detailed questions"on this specific project, including, but not limited to, personnel, schedule, project staging, and knowledge of the project.. Five (5) points of local preference will also be awarded in this phase of the selection process for Consultants that meet the requirements identified in paragraph 1 above. A maximum of 100 points can be achieved in this phase of the selection process. 3. The third and final phase of the selection process will consist of staff submitting a final package to the Mayor and Council for consideration approval. Final scores of the top three consultants will be submitted to the Mayor and Common Council with a recommendatiQf1 to award an Agreement for Professional Services to the consultant with the highest numerical score. However, the Mayor and Common Council have the prerogative to award an Agreement for Professional Services to any of the top three consultants or reject all proposals. 5 of 7 2006-31 4. If the Mayor and Common Council award an Agreement for Professional Services, the selected consultant will be requested to execute an Agreement for Professional Services (draft copy attached). Failure of the consultant to execute the Agreement within 60 days of approval by the Mayor and Common Council will void the approval. VI GENERAL This "Request for Proposal" does not commit the City to award a contract, pay any costs incurred in the preparation of a proposal in response to this request, procure or contract for any services. All proposals submitted in response to this request will become the property of the City and may be used by the City in any way deemed appropriate. The City reserves the right to accept or to reject, in part or in its entirety, the response to the request for proposal if such action is deemed to be in the best interest of the City. Any contract entered into as a result of this proposal shall be considered to include the items of work detailed in this proposal unless specifically deleted in the proposal at the request of the City. VII PAYMENT The Consultant that is recommended by Staff and approved by Mayor and Common Council shall attend a preliminary meeting to establish the start date and resolve other issues. Once the Notice to Proceed has been given, the Consultant can submit for payments. The City will release funds at percentages with receipt of preliminary and final reports. No payment shall be given above the percentage of completed work accepted by the City. The City shall hold 15%~of the total cost for 360 calendar days after acceptance of the final report by the CitYFor 45 calendar days after the City issues a Notice of Completion for the project, whichever occurs first. Any request for additional information or clarification should be submitted to Mr. Byron G. Montalvo, P.E. Public Works, at (909) 384-5263. ATTACHMENTS: Liability/Insurance Requirements Draft Copy of Agreement for Professional Services LIABILITY /INSURANCE REQUIREMENTS Engineer shall maintain insurance policies meeting the minimum requirements set forth herein. All insurance maintained by the Engineer shall be provided by insurers satisfactory to the City. Certificates evidencing all insurance coverage required herein shall be delivered to the City prior to the Engineer performing any of the services under the Agreement. All insurance certificates required herein shall name the City as an additional insured and provide for thirty (30) days written notice from the insurer to the City prior to cancellation of any insurance policy of the Engineer. 6 of 7 2006-31 A. ERRORS & OMISSIONS - The Engineer shall maintain errors and omissions insurance with a combined single limit of not less than One Million Dollars ($1,000,000.00) per occurrence. B. COMPREHENSIVE GENERAL LIABILITY AND AUTOMOBILE INSURANCE The Engineer shall maintain comprehensive general liability and automobile liability insurance with a combined single limit of not less than One Million Dollars ($1,000,000.00) per occurrence. C. WORKER'S COMPENSATION INSURANCE The Engineer shall maintain worker's compensation insurance in accordance with the laws of the State of California for all workers employees by the Engineer. If additional information is needed, please contact Mr. Byron Montalvo at (909) 384-5263. Sincerely, BYRON G. MONTALVO, P.E. Senior Civil Engineer BGM:pm -...- 7 of 7 , , - ~ :-' -. ,. '.~ ''C-'', ..... ..... s L , \ L. < '- "J . . ... ~ ; ....,.~.." .' -iw; -,- . .,' .. ..-. ,~,... ~:Jj ~ fi.- ~~ ~ ~ ~" 11;'.... l1!'''' ~: ~','-" 1459 L -~~ ATTACHI/1ENT "B" :""-'-.' .. "3.- ~r-C"- eo -r1<C , 1- <: ; I 9 Technology Drive Irvme. CA 92618 ., <{ .'.' } 2006-31 Iii F:l,\,l',;;i :,-, I'll". ;,..i, " ), i: In,c:,ll\t't'l-ln.s ~t'l \i,,--'<, \Jri"d,,~,C\\\'1 ill1< )l~'t-"q1d,it: F\..tlUi.it1(lnS. ll'~rd,Jl"",:!,i l~:i" t< T',<o ..cE',:n C0<T1penLe5 ~ Table of Contents Table of Contents........................................................................ .................. ........ .......1 PROJECT UNDERSTANDING ................................................................................ 1 PROJECT APPROACH........................................... ............... 2 KEY DESIGN ISSUES ...................................................................... 3 SCOPE OF WORK .................................................................................................... 5 1. Data Collection and Review.................................................................... 5 2. Flow Testing............................................................................................5 3. Hydraulic Analysis ................................................................................ 5 4. Prepare Report ......................................................................................... 6 5. Meetings .......................................................... .............. .......................6 PROJECT TEAM ............................................................................... ..................7 ORGANIZA nON CHART............................................................ ............... 7 RESUMES ............................................ ....... .................8 SUBCO:-;SULTA;..IT PROFILE... ........... .. ........ .15 Key Personnel...................... ............ .......16 COMPANY PROFILE....... ..........................17 REFERENCES ............................................................. 19 BUDGET ................................. ................................ ...................................... 22 SCHEDULE ........... ............ ....... ................... .......... ......................... ............ ............ 23 L'\!S URANCE ............................................................................................................ 24 2006-31 ..".,. """.,r. C,." '~e'!TKC J PROJECT UNDERSTANDING . In 2002, Psomas prepared a Wastewater Collection System Master Plan (WSMP). The report provides recommendations for sewer line improvements throughout the City. The recommendations were based on hydraulic modeling analyses based on land use information. population projections, and data obtained from a temporary flow monitoring study. The improvements recommended in the report were due to deficiencies found in the existing sewer collection system as a result of peak flow conditions. The report provided recommendations and related costs for either replacing or paralleling the existing sewer lines. Cost estimates were based on costs as of January 2002 for the Inland Empire. The purpose of this study is to review the available information, perform independent flow tests, and perform pipe capacity evaluations for the listed improvements from the WSMP. New recommendations are to be made as to the costs effectiveness of the listed sewer line improvements. The improvements to be evaluated are listed below. It should be noted that all but one of the improvements were recommended in the WSMP by Psomas. This would be the 7th Street sewer line replacement or parallel pipe. Se\\ er Line Impnn ement Locations Segment Location - Project Description lD SW04-21 Virginia Street Replace approximately 719 ft of existing 8-inch sewer main with 12- inch sewer in Virginia St. between "I" St. and "H" St. SW04-36 'T Street Replace of existing sewer main 'T St between 17'h St and 21" St with new sewer Replace or Parallel approximately 2,830 feet of 12-inch sewer main 5W05-01 7'h Street with IS-inchs sewer, and 30 feet of existing IS-inch sewer main with 24-inch sewer from Mt. Vemon A venue to Harris St. .- SWOS-02 Harris Street Replace or Parallel approximately 423 feet of 18'irtch sewer main with 24-inch sewer in Harris 5t from 7'h 5t to 400 feet south. Industrial Replace or Parallel approximately 334 feet of I2-inch sewer maID 5WOS-OS Park way with IS-inch sewer in Industrial Park"a, near Cajon Boulevard to Lexington Way SW05-06 Tippecanoe Replace or Parallel approximately 442 feet of 24-inch sewer main A venue with 30-inch sewer in Tinoecanoe A\'enue from Base Line St to 9'h St Replace or Parallel approximately 2.785 feet of 8-inch sewer main with lO-inch to 12-inch sewer main in California St from Base Line 5t SW05-07 Colorado Street to Colorado St: in Colorado St from California 5t to Magnolia A venue south of Hansford St from Colorado St to Grand St, and Grand 5t from cuI-dc-sac to E\'ans 51. PI459 I 8,29105 2006-31 [~ t't'(lrl'~,d t" ! . ';' '-, 'I, : ~~ l' L, : " 11 L r:.:::. 1 11\ ' \ '11 ",;..', ',c . \ l ' ,ne ";.e,er Compan>es TKC \, c\:il-'U' <";,,\\ c-' ; iiil i'1t-,~ '-,"l"',h It\ \ ,,\\;.idli,-'i1)_ l !':..~."-J~l~.... .;~,j no!": '. ,'In. :;, PROJECT APPROACH The Keith Company's approach will focus on adhering to a clearly defined scope, establishing and achieving specific project goals, and assembling the most qualified team members. We have completed many wastewater capacity studies and capital sewer pipeline replacement designs. Our past experience has shown that it is important to obtain accurate information regarding existing underground facilities and investigate thoroughly alignment alternatives to choose the most cost effective and efficient alignment and constnlction methodology. TKC has identified several goals for this project. These goals will provide direction in planning, coordinating, and preliminarily designing the proposed facilities to effectively accomplish the scope of services defined in this proposal. Specific project goals include: . Thorough and accurate collection and interpretation of plans of existing facilities. . Full utilization of current resources, data and experience to produce a quality document in a timely manner. . Comprehensive evaluation of alternatives. . Provide the most cost effective and efficient recommendations. . Provide accurate and comprehensible re.port and exhibits. . Meet or precede the project schedule. . Maintain frequent and quality communication with the City of San Bernardino. . Maintain frequent and quality coordination with other agencies involved. While the scope of services and project goals provide general direction, the overall success of the project lies in our Project Team's ability to complete the required tas~s and achieve the goals established. TKC's team will be directed by a project principal with extensive experience in these types of projects. The project principal will ensure that there is frequent and effective communication with the project team members and the City of San Bernardino. Pl4S9 2 8/29,05 ~31 ~ !-'ll'~ ,'-~,:: ~,_ )'rl''.l~k \i\ jl Ll1,~il1\ \'1111'.':' "-,:,:" Tee ,e'c c~pen~.In<c \ ,lri,_ U~ <"\\,-'1 I lilt' F'l!",-'C',T_" i!-. F\,i]U.I:i,-n'- l r;.:..n:l'-l -,:' KEY DESIGN ISSUES As part of our approach to the project, TKC understands the importance of understanding the key issues that are related to the project. The success of this type of project is associated with the project team's ability to foresee issues or identify procedures that will have a direct impact on the quality of the deliverable, as well as the schedule and budget. Tettemer has identified a few of these key issues in preparation of this proposal. They are briefly described below. Understanding of Flows and Flow Monitoring Locations TKC understands that to appropriately perform any sewer flow assessment analysis such as the one proposed herein, a firm understanding of the existing tlow conditions is absolutely essential. As-built plans and interviews with operations staff will be vital sources of information to determine the flows into and out of the specific sewer reach to be studied. Identification of all branch sewer laterals and service laterals is needed so that proper manhole flow monitoring locations can be selected. In order for the flow monitoring data to provide meaningful data, careful consideration must be given to the locations and duration of modeling. The durations identified in the RFP will be reviewed for each site to determine if other duration recommendations are required. Consideration must also be given to manhole accessibility and traffic control. Existing Condition Assessment Other factors will need to be considered other than just the hydraulic limitations to make the best recommendations for improvements. Factors such as maintenance and repair issues will need to be addressed. Maintenance records will be reviewed and operational staff will be interviewed to gain a firm understanding of the existing conditions of each of the sewer improvement reaches. Accurate Flow Monitoring In addition to selecting the appropriate locations for monitoring, the monitoring data will need to be accurate and interprett;d correctly. The monitoring equipment will need to be calibrated correctly and checked after installed to be sure that the equipment is not clogged and reading the measurements properly. Hydraulic A.nalysis Utilizing the flow monitoring data correctly and performing a reliable hydraulic analysis is critical to making proper recommendations. TKCs hydraulic analyses will be performed using MWHSoft's H20MAP Sewer modeling software. Model input data for the physical se'fer parameters will based from the as-built sewer plans. The input data and results will be reviewed with City staff. PI~S9 ' 82905 1'1, '\l,'<.;,ll ' I 'j ,.\ Id, '- : \1; f I'<~' f','. " '_ ~,.].." T'-,e K...t;t1 Compe"'oes n<c \ "!];('U~ ~;"\\(~ [1'1' l'Ii"" ,\1',', L~'- r \,li;:."iIll',Jl'- ".;,1, ~ ,nd \l11r1','\', '<' '1' QA/QC As with any project, TKC understands the need for QA/QC to meet the high standards of quality and develop accurate and meaningful recommendations. Management will be heavily im'olved in the project to check the progress frequently to ensure the integrity and reliability of the study. PI~S9 ~ 8290; !'I\T'h.,j ~,' )'1("\ l~k ~i\ il LnSlllt'ttT.; ....;,.1\ II ,'-- \ ,I;I',U~ <\'\\t'l I ie,- !'i;'\' l ,lr<i(-jn ~ \ .1lU.lll,'1';" l 1',:'::'>, J,,],! ! I;' T"E' ><:e,tr-, Cornparuel5 n<c , :",. ~' t __ SCOPE OF WORK I. Data Collection and Review A. Obtain and review the information available in the City's Master Plan for the listed sewer lines. B. Obtain. review. and study the existing and calculated flow capacity for the listed sewer lines. e. Review proposed improvements and cost estimates presented by the Psomas Report for the listed sewer lines. D. Perform a field evaluation of the listed sewer lines and identify any potential construction constraints. E. Review available plans. as-built plans. maintenance records, and proposed improvement cost estimates for the listed sewer lines. F. Interviews with City operation staff to determine existing conditions and supplement information in the maintenance records. 2. Flow Testing A. Prepare a flow monitoring plan to be reviewed with City staff. As stated in the RFP. the same locations used in the WSMP may be used for this study, but the City may request the number of locations to be expanded. Monitoring locations Will be shown on II x 17 drawings, or atlas maps, for the City's review prior to installing monitoring equipment. B. Conduct flow tests for selected location from the approved monitoring plan. The flow tests are assumed to be for 9-day periods on a 24-hour basis. This duration will be reviewed and other parameters may be recommended on a site by site basis. Flow testing will be performed by Downstream Services. Inc. e. Flow test data will include average flows, high flows, and low flow periods. ]. Hydraulic Analysis A. Based on the as-built plan information and flow monitoring data, TKC will create a hydraulic model for the sewer pipes to be studied. The H20MAP Sewer modeling software will be utilized. The model will be run for the peak flow conditions. The results will be compared against the City design and analysis criteria for depth of flow and velocity. Defiqiencies will be identified and reviewed with City staff. Modeling results tables and model node diagrams will be provided to the City. PI~\9 \ 82905 2006-31 E2 BJ i'L'I~\''''';\ t,_ l'r,"_ !,~" '.1'..:: r "';':"~l"') ,~-..: "",'" \ \' \ .111t~~1" <";':''.',-'1 i in, !'lj"" -T,i- i~\ i \ji~Llli, 1:'- l ;'~t.dl"': 1,\ '11 "'-,..,e Ke'Lr Camp8",e'" n<c B. Based on the modeling results. TKC will assist the City in determining recommended improvements. Recommendations may include confirming the previous report's recommendations or provided alternate or new recommended improvements. 4. Prepare Report A. A report will be prepared that will describe the data. assumptions, results. and recommendations for each of the sites to be studied. The report will include tables and figures to best illustrate the conclusions. The figures will be 11 x 17 and provided in color that will clearly show the existing sewer and sewer improvement locations and limits. B. A cost estimate will be prepared for each recommended improvement. The costs will tabulated with unit prices shown. C. Draft copies of the report will be submitted to the City for review and comment. It is assumed that two (2) draft report submittals will be needed prior to the final report completed. City review times are assumed to be two (2) weeks. 5. Meetings A. Meetings will he necessary to appropriately complete the project. For budgetary purposes a total of three (3) meetings is assumed, each for a duration of two (2) hours. The tbx~e meetings will include a project kickoff meeting, progre<;s review and improvement recommendations meeting, and report review meeting. The kickoff meeting will be used to establish project goals, schedule, lines of communication, and points of contact. The second meeting w ill include appropriate staff to discuss preliminary improvement recommendations. The third meeting will be held to discuss City's review comments and modifications to the report. 1'1459 (, 8129,05 T,."" -<'.<'o.t" Lee. e+T1<C I PROJECT TEAM ORGANIZA TlON CHART [!1 CITY OF SAN B[RNARDINO Robert S. Reid, PE Jeffrey Dunn, PE Upon notice to proceed on this project, the project team will be fully available to spend the necessary time on this' project for a successful completion and meet the schedule as illustration on the proposed project schedule provided. PI459 7 8129/05 2006-31 , , _! ,,~ l ; _~ 1 _ll,l " T'-,,,, Ke,V"l CompanieS TI<"C :\" ,'I" "':-."'i'- , : r' ' " ~ t" 1 \.,! t1 . I' i' : ;[',' , RESUMES Robert S. Reid, P.E. - Principal-In-Charge MBN I 986/Business/University of Michigan BS/1984/Mechanical Engineering/University of Michigan 1992/Professional Civil Engineer/CA #C049624 1989/Certified Public AccountantlCA #52171 E Qualifications: Mr. Reid has 20 years of diversified experience in water resources engineering and consulting for the public sector. He is responsible for managing all phases of water resource projects including conceptual planning. feasibility studies, facility design, and construction management. Mr. Reid has also been responsible for evaluating numerous water distribution and wastewater collection systems, and has developed facility plans to meet projected future needs, These plans have involved major infrastructure projects related to water transmission, treatment, and storage facilities, and wastewater collection facilities. Education: Registration: Mr. Reid has extensive experience with preparing preliminary and final designs as well as providing construction management services for water distribution and wastewater collection facilities. He has managed design teams and construction inspectors for a wide array of projects which include water reservoir" water booster pump stations, pressure-reducing stations, wate, and wastewater flow monitoring stations, wastewater lift stations, force mains, and pipelines. He has been directly responsible for the design and construction support for over 100 miles of capital water and sewer pipelines with over 50 miles of these pipelines located along existing roadways. Improvement District No.6, Sewer Collection Study; Aliso Viejo, California (Moulton Niguel Water District): Project Engineer for a wastewater collection system facility master plan for the 6,OOO-acre improvement district known as Aliso Viejo, This project included the 'collection of sewage generation data for different types of land use, the review of the existing and proposed collection systems, the identification of potential deficiencies; and the evaluation of system modifications to correct over-loaded sewer mains. Irvine Center Drive Water and Sewer Relocations; Irvine, California (Irvine Ranch Water District): Project Manager responsible for the preliminary design report, final design, and construction support services for the relocation of 1,800 linear feet of IS-inch diameter sewer trunk line and 1,400 linear feet of 18-inch diameter water transmission pipeline, The project was coordinated with the preparation of the street widening plans. The roadway remained open to traffic during all phases of construction, P14;9 X 8/29/05 2006-31 T~e K",'I:'"' COrT'1p..n,ee n<c ;' c.:. ~ ~; ,: l'" IRWD Capital Improvements, Trabuco and Jeffrey Roads and Bryan Avenue; Irvine, California (Irvine Ranch Water District): Principal-in-Charge of design, and preparation of plans and specifications, as well as coordination with the agency and other consultant groups. The project included the design and preparation of detailed plans for 12,800 feet of 12-inch domestic water pipeline along with a pressure-reducing station; 2,900 feet of 30-inch pipeline, 9,200 feet of 12-inch pipeline, and 800 feet of 8-inch pipeline of reclaimed water; and 1,300 feet of 18- inch and 6,700 feet of IS-inch sanitary sewer line. Jeffrey Road Reclaimed Water Pipeline and Trunk Sewer; Irvine, California (Irvine Ranch Water District): Principal-In-Charge of providing engineering services for the project that extended from Irvine Center Drive to Trabuco Road. The trunk sewer and reclaimed water pipeline project encompassed approximately 9,000 feet of each pipeline, including crossing the Metro Link railroad tracks and the Interstate S rights-of-way. The initial portion of the project required close coordination with the city of Irvine's Jeffrey Road Grade Separation Project. Additionally, various water and sewer facilities associated with the grade separation construction project were relocated. The scope of services included the preparation of a preliminary design report: evaluating environmental concerns and identifying necessary measures to mitigate impacts of the construction; performing necessary geotechnical investigations; obtaining permits; and the preparation of construction plans and technical specifications. This project included close coordination with Caltrans, the city of Irvine, and The Irvine Company. Joint Regional Treatment Plant Effluent Pipeline; Laguna Niguel, California (Moulton Niguel Water District): Project Manager responsible for the design, construction inspection, and staking for a 24-inch ductile iron secondary effluent disposal pipeline at the A WMA Joint Regional Treatment Plant. The pipeline was routed through a regional park and in close proximity to a dam. Various alignment studies were performed to minimize the impact to the park guests, the dam, the trees, and landscaping. Aerial photography was used to generate base maps. The project required coordination with the S,tate of California Department of Harbors, Beacheso and Parks. Katella Smart Street, Domestic Water Main Relocation, Phase 2; Anaheim, California (City of Anaheim, Public Utilities Department): Project Manager responsible for preparing the preliminary design report and final design plans for replacing approximately 2, I 00 linear feet of an existing 6-inch diameter asbestos cement pipe (ACP) and 2,100 linear feet of a 12-inch diameter cast iron pipe with a single 12-inch diameter ductile iron pipe. These domestic water improvements were a part of the overall infrastructure improvements to transform Katella Avenue, which is a central arterial access, into a "Smart Street." All existing laterals and services were reconnected to the new 12-inch water main. This project included extensive utility research and was bundled with additional street and storm drain improvements. PI459 Y 8/29'05 2006-31 '<" T"e Ke;1;n Compen,e" TKC ;\:,ir l' :'" " i\:':':' J, ",:.1:) Jeffrey T. Dunn, P.E. - Project Manager Education: BS/1995/Civil Engineering/California POly1echnic University, Pomona ] 998/Civil Engineer/California #58455 American Water Works Association Orange County Water Association Qualifications: Mr. Dunn has a wide variety of experience in water resource planning and engineering involving domestic water, reclaimed water. and sewer facilities. His planning experience includes more than 24 facility master-planning projects, as well as computer network modeling and analysis, and preparation of urban water management plans. His planning projects have included developments as large as 35,000 acres and over 12,000 residential dwelling units. Ranging in size, he has designed over 2,700 pipe networks and modeling projects for domestic, reclaimed, and sewer systems. Other experience includes planning and design of water, reclaimed water, and sewer pipelines; pump station analysis and design; pressure-reducing stations; reservoir storage analysis; and construction support servIces. Registration: Affiliations: Baseline, Archibald, and Hellman Sewer Analysis; Rancho Cueamonga, California (Cucamonga Valley Water District): Project Manager currently responsible for a hydraulic sewer analysis for three sewer improvement locations based on the current sewer master plan. The project consists of tlow monitoring. model analysis, development of future tlows, and making recommendations as to improvements required. Kraemer Boulevard Sewer Repairs; Plaeentia, California (City of Placentia): Project Engineer responsible for preparing the plans for repair of ten- and twelve- inch sewer mains in five locations. Mr. Dunn's tasks included research of utilities, base map preparation. plan and profile of repair locations, repair details, and construction notes. Garden Grove Festival Sewer Capacity Analsysis; Garden Grove, California (Gary Coursey & Associates): Project Engineer for performing a sewer capacity study on the existing sewer system within the City of Garden Grove. City standards and requirements were utilized, with reviews with the City staff. Flow monitoring was performed which included a tlow monitoring plan to be approved by the City. A network model analysis was performed using the tlow monitoring data to determine " capacity of existing sewer to accommodate a new commercial development. Utility Plan for Former Marine Corps Air Station, EI Toro; Orange County, California (Irvine Ranch Water District): Project Manager responsible for the preparation of a utility plan for the domestic water, reclaimed water, and sewer collection facilities required to serve the proposed Orange County Great Park. The Great Park Plan includes approximately 3,400 new homes, 2.9-million-square-feet of PI.W) 10 829'05 2006-31 il ,,'" T...,e Ke.t;n Co..-npen+el!l -rxc ,.1'1' j" commercial and industrial space. central park. sports parks. golf courses. educational facilities. transit-oriented district. and habitat preserve. Regional water and reclaimed water hydraulic network analyses were performed, including extended-period simulations to determine facility sizing, as well as storage and pumping requirements. Project costs were provided and a funding plan was developed for the formation of water and sewer improvement districts. Vista Del Verde Village Ill, Master Water/Sewer Plan; Yorba Linda, California (Yorba Linda Water District): Project Engineer responsible for the preparation of the Water and Sewer Facilities Master Plan document. Tasks included coordination with the Yorba Linda Water District to determine design and development requirements. Other tasks included writing of tbe report document, preparing exhibits, and hydraulic model analyses of the Water and Sewer Systems Master Plans. Vista Del Verde Village IV, Master Water/Sewer Plan; Yorba Linda, California (Yorba Linda Water District): Project Manager responsible for the preparation of the Water and Sewer Facilities Master Plan document. Responsibilities included coordination with the District as well as the Metropolitan Water District. Other tasks included writing the report document. preparing exhibits. and hydraulic model analyses of the Water and Sewer Systems Master Plans. Sub-Area Master Plan, Planning Areas) & 2; In-ine, California (Irvine Ranch Water District): Project Manager responsible for the preparation of a Sub-Area Master Plan for domestic water, wastewater, n6rFpotable water. and telemetry systems to serve approximately 4,600 dwelling units in Planning Areas I and 2 within the city of Irvine's sphere of influence. A regional sewer study was performed for two of the District's large-trunk sewer systems. Domestic and reclaimed water network analyses were performed. as well as a Zone 3 and 5 Storage Zone analyses. The hydraulic analyses included extended-period simulations where pumping capacities and water-age characteristics were investigated. Sub Area Master Plan, Planning Area 6; Irvine, California (Irvine Ranch Water District): Project Manager responsible for the preparation of a Sub-Area Master Plan for domestic water, sewer, and non-potable water to serve approximately 4,500 dwelling units within Planning Area 6 of the city of Irvine' s sphere of influence. The SAMP included a storage analysis for the domestic and reclaimed water systems to determine proposed reservoir sizes and locations. Additional tasks for the SAMP included preparing probable opinion of estimated construction costs for the proposed water and sewer systems separated by IRWD and developer-funded facilities. Sub-Area Master Plan, Planning Areas SB, 8A, 9A, and Spectrum 8; Irvine, California (Irvine Ranch W~ter District): Project Engineer for the preparation of a Sub-Area Master Plan for domestic water, wastewater, non-potable water, and telemetry systems to serve approximately 12,350 units in Planning Areas 5B, SA, 9. 9A, and Spectrum S of the city of Irvine's sphere of influence. A regional sewer PI4S9 II 829:05 2006-31 " i: \ ~-, -': t:,! ~ \> l !'t;;'-"'~' The Ke,tr Compen.es n<c '. i! r;l ~~! 1 , '. -J : r>~ ", " :' l-' study was performed of the existing trunk sewer systems to determine capacity for the new sewer !lows. The regional sewer study included nearly 70'7r of the entire district. GIS data was utilized to de\'elop land uses information and sewer tributary areas. Springbrook Estates Off-Site Sewer Study; Riverside, California (Springbrook Investments, LP): Project Manager for off-site sewer engineering ser\'ices. Springhrook Estates included the development of 184 acres in the Highgrove Community of Riverside, as well as off-site sewer from the project along Spring Street to Iowa A venue, then south to Palmyrita A venue where it joim the City of Ri verside' s existing sewer system. Tonner Hills Water and Sewer Facilities Plan; Brea, California (Nuevo Energy Company): Project Engineer responsible for the Water and Sewer Master Facility Plan for the Tonner Hills development, a master-planned community of approximately 823 acres owned by Nuevo Energy Company. Water and sewer service was provided by the City of Brea. The project consisted of the addition of two reservoir tanks and pump stations to the City's water distribution system. Close coordination was required with the City's Distribution Master Plan document. The sewer collection included one lift station and force main along with the gravity sewers that connect to the existing collection system. Vista Del Verde Village III, Bastanchury Sewer Pipeline; Yorba Linda, California (Yorba Linda Water District): Project Engineer responsible for the preparation of the preliminary design report and'constmction documents for approximately 800 feet of ten-inch gravity PYC sewer. The sewer profile design required the ability to go under an existing 60-inch diameter storm drain facility and 36-inch water transmission main. Coordination was necessary with other consultants to determine tie-in points to a new 60-inch diameter manhole located in the middle of an intersection. Irvine BoulevardlLambert Road Sewer Capital Facilities; Irvine, California (Irvine Ranch Water District).: Project Manager responsible for preparing the preliminary design report and final design of the sewer pipelines in Irvine Boulevard and Lambert Road within the city of Irvine. The project included the design of 2,751 linear feet of 12-inch PYC sewer pipe and 3,646 linear feet of IS-inch PYC sewer pipe. Due to the nature of traffic on Irvine Boulevard. the alignments were carefully studied to not only avoid other utilities, but to consider traffic control during construction and maintain the most number of travel lanes open as possible. The project involved coordination with several other consultants to ensure all design requirements and pipe clearances were met. 1'1459 12 82905 2006-31 Tn", Kfe_tc Campen.... TK"C , ._ .",' - .1: ~, I Adelina Pirijanyan, EIT - Assistant Engineer Education: Registration: BS/2003/Ci\il Engineering 2002/EITlI6736 Qualifications: !\Is. Pirijanyan. prior to graduating and receiving her Bachelor of Science degree in Civil Engineering. had interned in the water resources industry for a few years and gained valuable experience. Since earning her degree. she has worked as an assistant engineer on projects such as wastewater treatment plants, a portable aeration plan. GIS sewer line update for City of Santa Monica, Trunk Sewer Mapping for Orange County Sanitation District. master planning, computer network modeling. domestic water pipeline design, gravity sewer, force main design. and reclaimed water pipeline design. Her pipeline design projects have included plan and profiles for pipe diameters up to 24-inches. Her software experience includes mONET. mOMAP SEWER, GIS ARC INFO, and AutoCAD. Trunk Sewer Mapping; Orange County,California (Orange County Sanitation District): Associate Engineer assisting the project engineer and team members with the preparation of an electronic map of Orange County Sanitation District's (OCSD) sewer system, Trunk Sewer Mapping: Project included mapping of OCSD owned and maintained sewers, data collection of sewer information, compiling data into a database and connecting the database to the map of the sewers. The final product was a GIS map of the OCSD sewer system. Hard copies of these maps were also created. similar to the Thomas guide. Moorpark Wastewater Treatment Plant 5.0 MGD Expansion; Ventura County, CA (City of Moorpark): Aide Project Engineer with design of Moorpark Expansion of Wastewater Treatment Plant OCSD WDR CMOM 02-04 Compliance Portable Aeration Plan; Orange County, CA (Orange County Sanitation District): Prepare a GIS map of the bodies of water in Orange County. The map contained bodies of water data (area, depth, location, size, etc...) to be used in creating an Aeration Plan for the Orange - County Sanitation District, to meet water quality standards set by Regional Water Quality Control Board. OCSD WDR CMOl\l 02-04 Compliance, Tustin Area Spill Control (Orange County' Sanitation District): Research Sanitary Sewer Overflow/Capacity, Management, Operation and Maintenance (SSO/CMOM) regulations. GIS Sewer Data Update; Santa Monica, CA (City of Santa Monica): City of Santa Monica's Sewer system was previously created in GIS; however their data set had errors and new line work needed to be added. Updated their GIS data and mapped the additional sewer lines. The project included running multiple queries to identify missing links and emJrS using Arc Info and Microsoft Database. Water and Sewer System Master Plan; Banning, California (City of Banning): Associate Engineer responsible for the hydraulic and sewer analyses, model PI4S9 11 829/05 2006-31 San 1/1111 illt \, .,'!; ",; ~ <..;, \\ t') I i ;)1- 1 '1: -l-' ' ... r',.d ~,.lI; "\ <. i';':,lC:t"- ':""\ h~;'1 Tne Ke,Ch com_e_\ TI<C I', ,,) '\~d! Ii, I't '.n I~k ll\ Ii 1- 11:2.1 !It.';~ 11)~ ", I I. i,," ,ill-'" calibration. planning and report preparation for the Water and Sewer System Master Plan. Headlands Domestic Water and Sewer Hydraulic Analysis; Dana Point, California (City of Dana Point): Associate Engineer responsible for the hydraulic and sewer analyses, model calibration, planning and report preparation for the water system master plan. Sewer Area Study for Golden Valley Ranch; Santa Clarita, California (City' of Santa Clarita): Associate Engineer responsible for the sewer analyses. model calibration. planning and report preparation for the Sewer System Master Plan. llRP 12 and 13 Hydraulic Analysis; Irvine, California (City of Irvine ): Associate Engineer responsible for the hydraulic analyses, model calibration. planning and report preparation for the Water System Master Plan. P14\9 14 8/29'05 2006-31 Pn'l'l":,tl h' !'r,.., Id, l '1\ i! L n~Jih ,] in:s --';,..)\ I,,'''' \,Hil'u' <-:"\;:l'~ il!:l' Fq'<' l 'll',L\!\ E\~l!UJlh~l> I pr:, ,;jC', .i~l,! Ij~:;'I, T,-e Ke'L~' Cornpanoee TI<C "."'- "', SUBCONSUL T ANT PROFILE Downstream Services Inc. is full service company providing efficient and consistent inspection. installation. maintenance, and repair of all wet utilities since 1996. Downstream Services is an industry leader in handling, storage, and delivery of digital information. Downstream Services utilizes the latest technology available to the wastewater industry. Advanced technologies enable Downstream to gather and deliver high quality digital inspection data for our clients, and to required specifications. Downstream provides the following services: . Flow Monitoring . CCTV Sewer Inspection and Cleaning . Storm Drain Maintenance . Storm Drain Repair and Slip Lining . Storm Water Filter Sales and Service . Municipal Repairs and Emergency Response . Cnderground Ctility Installation Downstream maintains full time facilities for maintaining, servicing. repairing equipment, and fabricating required components. Most repairs are conducted in house resulting in minimal equipment down time. . Downstream Services understands that every sewer is unique. We take into account flow hydraulics, silt level, accessibility, and surcharge. Downstream uses the best meter for each individual application. Our inventory of meters include Sigma, ISCO, and F!owDar technology. . Downstream also has a full fleet of CCTV and Cleaning trucks that may be used to facilitate flow monitoring projects by cleaning lines prior to install if needed. We place a sediment retention tool in the upstream manhole to prevent sedimentation of submerged sensors to ensure continuous uninterrupted data. . A complete manhole inspection is conducted for every site. Deliverables of this inspection will include digital video clips, still photo's and brief condition assessment of the manhole. P14'~ 1) 8/29,05 2006-31 i"h.t-: !e) I'll'\ lLiv \. '1\ Ii I: n::.:,llh'l 'In::: "'c r '. h, . .',1,,''-:' \t:\'_tJ lllk ['if'" \ .q'.j'-Jl~ F'\.lll:,tl', i" \ ;'::'IJc!'" ~'1'.i T"", Ke,t" Cornpan"'l!I TI<C illl Key Personnel Wilma Roberts offers 25 years of experience in construction and general engineering. In a variety of management positions and as principal and co founder of Downstream Services inc. Mrs. Robens is responsible for day to day operation and executive administrative duties. Victor Roberts is the founding principal and Vice President of Downstream Services Inc. Victor is responsible for overseeing day to day operations including financial and asset management. He posses extensive knowledge of the laws and regulations governing general engineering, contracting. and the treatment and disposal of hazardous materials. Jake Jacobson as Principal in Charge offers II years of experience in the environmental industry. Mr. Jacobson holds the responsIbilities of Business/Project development, ensuring adequate assets are available, including trucks, equipment, and personnel. Jake will also monitor, project cost, and overall progress. Richard Delgadillo as Project Manager brings 21 years of experience in the wastewater industry. Richard has managed WW collection systems, and WWTP Maintenance operations as a municipal employee. Richard has also worked as a project manager in the private sector managing flow monitoring and condition assessment projects in Southem California, Las Vegas, Reno, Phoenix, and Hawaii. His responsibilities include busmess development, project management, and technical training. Dave Johnson is the Field Superintendent and project coordinator. HlS responsibilities include CCTV inspection crew management, field dala recording, cham of custody sampling, reporting of spills, protection of property;'and general employee training. He also maintains certification in HAZWOPER, confined space entry, I st aid, and CPR. Downstream Services has never had an injury due to confined space entry with Dave as Safety Coordinator. Maggie Minnamon as Manager of Information Systems will oversee data administration and quality control. Ms. Minnamon possesses extensi ve experience in electronics, and computer systems. Ms. Minnamon will facilitate the processing and refinement of by field personnel as quality control manager. Her responsibilities include data processing, delivery preparation, development and maintenance of database, and data warehousing. PI459 It, 82905 Pli'P\h;;! 1,' 1':\',,1.1< i.. I\li LI;~!lll'I.'III1.c:. .....1.'1\ kt'~ \-~!1iL'lI~ '~l'\\l-j \;1](' l'lj'<:' I d~~,h'll\ F\dlud;iZ'n~ l r.~:JJ<', .llld !l1lf'lc \,,"~~\ill' T"'e "'e'c:r Cornp.......es TKC COMPANY PROFILE Established in 1983, The Keith Companies (TKC) provides integrated planning, engineering, and design services for private and public sector projects. TKC is proud to provide comprehensive consulting services to an array of clients and strives to respond to client expectations by providing them with paramount service today and into the future. With approximately 850 professionals, TKC operates from 17 divisions throughout Arizona, California, Michigan, Nevada, Oregon, Texas, and Utah. The company offers specialized services in the following disciplines: . Civil Engineering . Land Planning . Surveying & Mapping . Site Acquisition . Water Resources . Environmental Services . Cultural Resources . Construction Management . Electrical Engineering . Mechanical Engineering . Fire Protection . ChemicallProcess Engineering . Instrumentation/Control Systems Integration . Power Plant Commissioning and Startup Services . Power Plant Operations, Training, and Plant Documentation Services . Power Plant Manpower Services TKCs clients benefit from the synergy created from the multi-disciplinary team approach that combines particular talents and experience to achieve client goals, The firms technical excellence, creativity, and unparalleled client responsiveness spans across all disciplines. Behind the successes of every TKC project stands dedicated relationships between our staff and client and agency representatives. Exceptional service is TKCs trademark. The firm is committed to the philosophy that to provide the best planning, engineering, and design services requires an intimate understanding of the processes and continual and personal communication, From electronic data collection and"GPS technology to automated design through scheduling and project close-out, TKC uses modern technology and resources to deliver a product with minimal costs in a timely manner. I'I.W! 17 8/2905 2006-31 Iii i't\T\'~,li I') I'rl'\ Ilk (1\ Ii !-i1S1[ll','r)I~~ "'vl\ kl ~ \dri"L'~ "t'\\l') 11lH' Plp"-' i. .1j~,h1\\ 1-"',l~l;Jll.\:~" l l'~ "J,'~ .-,j!. T.-.e Ke,th Comp8....uel5 TKC '\ l. : " ~ ' I ' ; , TKC believes in setting and continually meeting the highest possible standards when it comes to the stability which clients require, these include individual relationships and technical proficiency. The firm is known for its meticulous selection of personnel, and dedicates itself to finding qualified people and creating an environment in which they can thrive. By developing professionals who combine specialized skills with broad-based knowledge as well as management skills, the TKC staff is able to manage projects through teamwork to achieve the most beneficial results for its clients. TKC professionals are your most valuable resource for providing creative, cost-sensitive solutions in an ever-changing environment. PI4S9 IX 8/29/0; >'!('i',-."Ii (,1 j;l. \ Il:C", i\ ,: r- :";;0'..;1> t::,":' "l r" :,l" \ dh~" ...;(-\\(~ : in, !'li"" ,1:.',h1~', ~ \_i!ll,l:i"~i~ l ;'17;1",1-1," ,l\1d :]1':'1; ,.]-" '. TnE' K",;[.,.-, Compen"'!5 T1<C San ilo REFERENCES Irvine Ranch Water District Wide Reservoir Storage Analysis //Tille Rallch Water District Michael Hoolihall, PE I 5600 Salld Cml\'oll Ave, Irville, CA 926/8 (949) 453-5553 A water storage analysis was performed for IRWD's potable and non-potable water systems to update their current Water Resources Master Plan. The project consisted of incorporating and utilizing IRWD's GIS data, which included demands and water facility information. Pressure zone service areas were identified and used to develop storage service areas. USGS data was utilized to develop the pressure zone service areas. For each water system, the demands were calculated and totaled by storage areas out to Year 2025. in five year increments. Surpluses and shortfalls were analyzed to determine recommendations for new storage or operational adjustments. Updated tables and exhibits were created for use in preparing a revised Chapter 5 of the Water Resources Master Plan Update. Jeffrey Road Reclaimed Water Pipeline and Trunk Sewer Irl'ille Rallch Water District Stel'e Malloy, PE I 5600 Salld Call)'oll A I'e. Irl'ille, CA 926/8 (949) 453-5570 Engineering services were provided for a 30-inch diameter trunk sewer and a 30-inch diameter reclaimed water transmission main project that extends from Irvine Center Drive to Trabuco Road. The project encompasses approximately 9,000 feet of each pipeline, including crossing the Metro Link railroad tracks and the Interstate 5 rights- of-way. The District divided this project into two construction packages. The first package will be constructed with the City of Irvine's Jeffrey Road Grade Separation Project. In addition to the two pipelines, responsible for the design of the relocations of various water and sewer facilities associated with the grade separation construction project. The second construction package included the remainder of the pipelines and required routing the two pipelines through Caltrans' rights-of-way with a portion being open cut and the remainder utilizing a bore-and-jack under Interstate 5, The scope of services included the preparation of a preliminary design report; evaluating environmental concerns and identifying necessary measures to mitigate impacts of the construction; obtaining permits; and the preparation of construction plans and technical specifications. Close coordination was required with Caltrans and the City of Irvine. Irvine Center Driw Water and Sewer Relocations Irl'ille Rallch Water District P14"i9 19 8129/05 2006-31 III Fr,'pl',,-,d (,\ 1'1\'\ ll:"", ,1\ lll- j,:-:.:n~'l'ril;;' "';l'!\ !,~" \ ,i!\"~'''' -';C\\ ,'I ll!'" i)ll~t'; Jl'd', i\\ l\.,du,Hlllr;... ~ !\~: .;,It-;l1tl ! T T'o", KB,t:r- Companoee TK"C , [1". AI D\son, PE 15600 Sand Can\'Oll A "e. In'ine, CA 92618 (949) 453-5595 Prepared preliminary design report and final design, and provided construction support services for the relocation of 1,800 linear feet of a IS-inch diameter sewer trunk line and 1,400 linear feet of an 18-inch diameter water transmission pipeline in the City of Irvine Existing pipelines remained in service while new pipelines were constructed. Projects were coordinated to coincide with street widening plans. Roadway remained open to traffic during all phases of construction. Northern Sphere Area Construction Management Program Irvine Ranch Water District Billy A. Stewart 15600 Sand Canyon Ave. Irvine, CA 92618 (949) 453-5610 TKC's Tellemer division is currently serving as the Construction Program Manager for five District designed construction projects and six ICDC development projects situated within The Irvine Company's Northern Sphere Area. Duties include review of shop drawings; coordination between the District, ICDC and affected agencies: attending weekly and monthly progress meetings; respond to "Requests for Information" (RFls); review daily reports, change' orders and progress payment estimates; coordinate survey and testing subconsultants; preparation of final as-built plans; and other tasks as directed by the District. East Orange Utilities Study; Orange County, California Local Agency Formation Commission (LAFCO) Kim Koeppen 12 Civic Center Plaza, Rm. 235 Santa Ana, CA 92701 (714) 834-2556 ICDC owns a large area of property that is located within the City of Orange's sphere of influence. The portion of this property east of State Route 241, the Foothill Transportation Corridor, has been divided into two planning areas, called East Orange Area I and East Orange Lake Village. The majority of East Orange Area I is currently within the boundaries of Irvine Ranch Water District (IRWD). A small portion of East Orange Area I and all of the proposed East Orange Lake Village are currently within the boundaries of Santiago County Water District (SCWD). IRWD and SCWD have both expressed a willingness and desire to provide municipal water and wastewater services to at least portions of the same development areas. It is LAFCO's responsibility to determine the best service provider to these new development areas. To assist the Orange County LAFCO in determining the most 1'1459 211 8'2905 2006-31 ~ lBJ PI "!,t.',,,,,l I, I le\ hk I.. ;"." ! i;,_" ., l. i L':' ", ~', The Keith Compen.ee. TI<"C \, .1 :-I;'li' ",;,.\\ ,:- liT"! f"" .11":' i: I', .l!.l,;! i. l'~ i f1~:_,jv' ,'11 "i ] ',', r" appropriate provider, Tettemer wa, retained to objectively review the probable engineering and financial implications of the various service provider options, Buck Gully, Linda Isle, and Carnation Pump Station Rehabilitation City of Newport Beach Michael], Sillacori, PE 3300 Newport Blvd, Newport Beach, CA 92658 (949) 644-3342 TKC's Tettemer division was responsible for the design of a buried 400 gpm duplex pump sewer lift station to replace an existing 50 year old Buck Gully station in the city of Newport Beach, The project includes the demolition of the existing station, installation of a new below grade dry well and partial wet well structure. roof slab oyer existing wet well, and retaining wall, upgrades to electrical controls and SCADA system, site drainage and grading. and other associated improvements. For the Linda Isle and Carnation pump stations, the improvements included new electrical and instrumentation facilities housed in above grade architecturally aesthetic enclosures, new access hatches, force main bypass facilities, and associated hardscape improvements. I'I~Sl) 21 8129/05 Pt\\p,'''dll(' F'H."\ ld, l :\' T'""'e Ke,tr Con;pEI"IOEI n<c \ cl oi,. ':";" ~I..'\\":':' : j :1<,' I'! ['~ t. -'i' !, l~c.;I,hj,.~ .1; II,,,,, ".' 'I ",'.:,; BUDGET City of San Bernardino Various Sewer Line Locations Pipe Capacity Evaluations and Proposed Man-Hours Budget TKC Man-Hours As,;ist Principk-in~ Project Engineer! Total TA Task Dcscriotion Charge ~lanager CADD Staff Man-Hours I Data Collection and Review 8 -- 12 20 2 Flow Testin~ I 8 8 17 ~- -' --'-'---'-"-- ___._____n -- .--..- - -_.~-_.._-_. -- - -- ---~-- 3 __ !'ly_draul~~n~lysis 2 +- I~ ~() 78 - -- -- -.... - -- -- -- .- -..-..-- --- 4 Prepare Report 4 24 32 60 - - --- --- -- ---.--- -- - - -..--.- ~_ "U .----- ----'-- 5 Meetings , ~ 6 12 Total 13 62 112 187 PI4SY 22 8'29,05 2006-31 ~ E " E " > 0 Ii .5 " . " " ~ . c " . 0 " ~ " " ~ .. 6> r- :;; . 0. <il <il ,S :> c c " " ~ 0; . 0" ~ . "" w w 0 ,- " "" 16E .u " E li 0 Ill" . "II: ~ . "" "- Ul " '0 " " >0 ,t::".;:::::: <.l " '" ~ . .. E > E W . ~ 0 ~ c " '" B E " 'u w w w w ~ w w :B w w :B w ]I E . " 0 0 0 " " " 0 0 " " 0. " " " ~ W N " " M " w :;; 0 a: '" " ii OJ OJ :;; '> ;; " '" 5i N M " <.l . . . . '" '" '" . " 'C 0 0 . . . 0 0 . . . . 0 I u: r- r- 0 0 0 r- r- 0 0 0 0 r- Oo r- r- r- r- r- r- r- D: " " ~ W W W ~ W W W W W W W ~ " 0 " [j; 0 ~ 0 0 " 0 " v " " OJ M " ~ " ;;; li ii OJ N M " " ;; '" '" '" O' " . U U ~ ~ ~ Vi 0 . 1il . u 1il . . 1il u u " 1il r- ;: 0 . ;: 0 . . Ul ~ r- ~ ~ r- ~ ~ ;: ~ ". . . ". (3 . B " 5. (3 "- 0 '" . a: B t r- '" c " is 8- . u . . is '" '" a: c . ;; 0 is <il . ~ '" g " . 5 c u , u: is '" u u: . . B c = '" E E 0 'E u c . ~ u '" u 0 ~ u: c ~ Jl ~ '" c " . ~ 0 a; 0 0 . '. '" . '" . '" 0 ~ c . ~ S . . " . " . . 1i 8- " " ,S ,Q 0 <il " . , :l- .. " u ~ c . . ~ . . . . . c " " . " '" il. '" i1 " E .. " ~ '" "- _w . " " ," . . . ". .~ . ". . .0 . " . Z " " B r- . " a: (3 '" a: (3 "- .- 0 ~ 5. .M ~ ~ . .. . "- ",O' . u " . !> ~ . . "';; . a: r- '" 0 " ~ I "- "'0 .,-----,....,---, t:::!: I , I~ Q iN M Iv I~ w w m ~ ~ .~iP e<li I I "-0 I 23 .f~ 11l n u .--L: -Q [] " 2006-31 ;).,."..:.."..' . '. . Sal ilo Proposal w Provide Civil Engint't.:!\J1g o..;d\ i(',-'~ Yarlous S('\\-er Line Pipe CdpdCit\ r\..llUJI\,'n-; 1'~:.IJ,'" ,~:~d :11'",-" T"e Keft"" Compen>e. T1<C INSURANCE ell. All: !!i191 KEITHCOMP ACORD. I DATEIWIl/OOIVYI 12/211/M I THIS CERTIFICATE IS rsSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOlDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE P'DlleIES BELOW. ~'" O..ley, Renton & As.ociates P. O. Box 10550 Santa Ana. CA 92711..0550 714427-6110 INSURERS AFFORDING COVERAGE INSUREIl" Hartford Fir. Ins. CO. INSURER II American Automobile Ins. CO. 'NSURER c XL Specialty Insurance Co. INSUREIlD IOISURERE lNSUMD The Keith Companies, Inc. db_ Keith Engine.ring, Inc) Irvine 19 T.chnology Drive Irvine, CA 12618.2334 COVERAGES THE POLICIES OF INSURANCE LISTED BELOW ......VE 8EEN ISSUED TO THE INSURED N...MED ABOVE FO", THE POLICY PERIOD INDICATED NOfWITtiST-'NOING -'Ny REClUIREMENT TERM OR CDNOITION OF ...NY CONTRACT OR aTtiER OOClJMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PE",TAIN, THE INSURANCE AFFOROEO BY THE POLICIES DESCRI8ED "'EREIN IS SUBJECT TO ALL THE TERf..\S, EI(ClUSIONS AND CONDITIONS OF SUCH L.~lICIES AGGREGATl:. UNITS SHOWN MAY KAVE BEEN REDUCED BY PAID CLAIMS !':"~ T'l1'EOIINMJIUoMCf I'OUC't'NlJlNlfll ~ICYEFFf.CTI'IE ~'t'UPlII"TlOfoI LIMITS A GEIoIEIW,.UA81UT'( 57CESOA1665 12/31104 12/31/05 EACH OCCURRENCE 51,000,000 .~_ cc..llll.ERGIALGENE~.:lf<8llITY ~~!.~~~ (~~ ~~~"-!- __~'L~Q.9.!t_ll____ __ cUOIUS.....OE '.Jt OCCUR INDP. CONTRACTORS __"'_~DEX_F_I"'"'_:>:"'1'!'_")"'__ s10-,-9QIL_ _0 - X CONTRACTUAL INCLUDED P€RSQN"'l. "'OV,tojJUR'" 51,000,000 X BFPO,XCU GENEIW. "'GGREGA.TE _ 52,000,000 GE..'I.",GGAEG....n:LIIrIlIT"'FI'I.lEsFER _F~~Ts___':~"-'f,I~-O,~t>.__q,~J!,~@,_____ "'-POLIC,,"'XFRO. .XLOC A AUTOMOM.E UA",ITY 57UENTL0698 12/31104 12131105 51,000,000 CQt.OIIINEOS'''';:;,El'''''T rEo oto><l<o~'1 X ",Oll'AUTO AlL OIlYOlEO AUTOS SCfEOUlEOAUToS X I'<IREO"'UTOS X OlON_O_EOAUlOs 8ODll~ '''JURY 'Fef~c BODll"'Vj"'~ p~, "",d.~" FROPER""O"'AA"E p~, O<<;"'~'" ~UTO ON," _ EA -o'CC<DE~T S CAUGt:lIA1lIl.IT'f ",,,,,.,,,UTO OTHER ~I<A'l 'U'GONL" ~...c_c:. __~.__ .._ ;loGe, s E-O,;:;o-<OCCURRE'lCE EXCUlUAlIlllTY OCCUR Cl-'-lloOsloOA.OE "'GG~E"""TE DEDUCTIBLE RETENTIOtoI 1 B WOItll.fIlSCOMPENSATIOI4AN) fMPLOY'fIlS.l....IIlUTY WZPB0927777 12/31/04 12/31/05 X T~.n~lfs Cl~ El E.AC1<-'CClDE"'T 11,000,000 E,L QI$EA.SE .E.A.ElllF,OYEE 11,000,000 El QISf.ASE .pollcn.,rr 11000000 - $1,000,000 per claim $2,000,000 annl aggr. C Ollffll Pror...lonal Liability DPRM06S88 12/31/04 12/31105 OESCIIlPTIOJI Of OPflllATlQIrlSI\.OCAnollSNEt<<;L.E5lEXCLUSlOOl' "COEO Ill' E..oiJRUIllENTISPECLAl PflOV+_ General liability policy excludes claims .rislng out of the performance of protessional services. Evidence of coyerages in for!;e CERTlftCATE HOLDER .IOOI11QNALINSURED;"SIJIIIEIIL.ETTlII CANCELLATION SHOULD IMYO/F T11E...OYIE DEICRlHO POLICES IE f;,.,.cELLEO llEFORE TMIE EIIPIItA'IION OA11!TIolEIl!OF. TllEISSUINOINSUllfll WILL I_XIPMA1L 3D O"'IllWlllrrtlN NOncE TOT11E f;EIITlfICATl IlOLOEItNAMEO TOTllE LEFT. BII'JIIRI&a......IlUllUX MIUJ:~..lC..~..I.~ WlCIIX FOR PROPOSAL USE ONLY AutJ.tQltlZEOItE"!EIEN'ATIVE ACORD 2$-5 1719711 nf 1 .,.117397 II iii ACORD CORPORATION ,ga8 PI41Y 24 R 29 05 2006-31 ~ Tettemer & Associates ,.,-consu tlng eng r',flers ATTACHMENT "C" August 29, 2005 P.N.: 1459.00.011-100 Mr. Byron Montalvo, P.E. Senior Civil Engineer Deveolpment Services Department 300 North "D" Street San Bernardino, CA 92418-0001 Subject: Proposal to Provide Civil Engineering Services for Sewer Line Pipe Capacity Evaluations and Recommended Upgrades and Improvements to Several Sewer Lines Situated at Various Locatious within the City of San Bernardino Dear Mr. Montalvo: Attached for your review is The Keith Companies, Inc. proposed fee and our hourly rate sheet for the subject project. Our proposal is a firm offer good for 90 days. As required in the Request for Proposals, this cost data has been included in this separately sealed envelope. Thank you for considering The Keith Companies for this exciting project. Should you have any questions please do not hesitate to contact me at (949) 923-6264. Sincerely, The Keith Companies, Inc. ~)~ Robert S. Reid, P.E. President - T eltemer Division Enclosures c: Robert Ohlund, TKC (w/encl.) Jeff Dunn,TKC (w/encl.) ;'-~"'1panies Dflve i-/::~(, C;d,,'tC,18-2334 1- ~i49,\l-~3h2n f: ;+F' ::j236u77 I"i'/;"/'; h,i'.h,~::; ~,om 2006-31 "1" \0 01'<1" 0 ... '" \Or""lO'",," ... 0 " MVV')"<:tO OC (j; '" " N~MOOr.:N ..; N - "- N ... aa = '" 0 a> a e f- a> ~WWtAtA '" , > , , Q E on '" I '" r- r- . C. '" ~ '" '1. ~ " " E e b u - - 0 ~ -;; N .... U - " - " " c "0 0 r.tl " = Q i '" '" < ~ , '" v - ovo '" c f- a> - " ." \00''0::1"- ." "0 0 M lrlVO '" .0 " NNOOr-~N N ~ '" "- '" -l ~ .... - etI '" " c. a 0 0 f- :r: (AGAWf;I7tA '" "0 a> ~ "0 <: , = f- 0 0 r- _:I: r- oo 0 N a> " . N - r- ." - oc e ..... o " - 'll f- . :; e ff I::l::: Q ;:s <.l Cl::i ~ Vi ~ ~ - .... Q a> " .~ -= 0 Noo 0 N ." <<1 - = " 'll 0 -< ~o - .- ~ :r: ",< "0 "0 i: u '" = ~ '" ~ ~ ::;; = l:: U U t '" <::l '" '" '" .~ ~ 00 00 ." v ." .... a> = ;:; f- " . - N '" ~ Q "-:; .- ;:s = - ~ ~ ~ =' '" I ~ "j IlJ - , 2 ~ , ... ~ l:: .s- '" I- N v'" '" Q > ~ u ~ - ro.l " u .e- o "- , .- >> ~ U - I .- 'll 'i <.l '" ~ <:) - Q C. 2- f- ~ U ~ a> C. I .- ~ I '" , = '" Q " .- ;; - " C> ~ .., <J 0 " I III Q >- ...;l - .., u " ~ in a> " = Q " '" " .- -'" .;;:, -" ...;l ~ .. '" " " '" f- ~ .. () a> ." _:<l :;; ~ " '" ~ " :>, a> " '" 1:: Q) ~ _2 If) 00" 0 III '" U "..: "'- If) " -- " =' =It) .~ ~ 2J g Q o ,,- .- U E- ~ e " ~ '" .s~.t;[.~ <; ~ ~ 0 :>-.. iU " ;, Clr:i::r:~ ::;; a; '" ... - N <<1 V on :g. Ii: 2006-31 Compensation for work performed on a time and materials basis will be computed as follows: co n::; u !ti n 9 e ng i n eers MANAGEMENT Hourlv Rate President .......................................................................... ..................................................... ........ .............. .$185.00 Vice President II ......... ................................................... .... .......... ........ .............. ..... ........ ............. ........... ........180.00 Vice President I .......................... ................................... ..... ........... ................... ......... .......... ........... ..... .... ...... .175.00 Director III. ... ................... ................ ......... ......................... ........................ .,......... ........................................ ...170 .00 Director II........... .... .............................................. .............. ..... ... .......... ....... ............ ...................... ........... ... .... 165.00 Director I........... ....... .................... ..... ... ................. ........... ........ .... .............. .......... ........... ...... ......................... .160 .00 Sr. Project Manager... ............................... ........... .... ..... ................. ..................... ............ .............................. .155.00 Supervisor II, Project Manager.. ... ....................... .......... .... ........ .................... ...... ........ ................. .......... ..... ...150.00 Supervisor I ............. ........................ ..... ....... ......... ...... ............ ............ ....... ..................... ..... ........... ............... .145.00 Assistant Project Manager... .............................................. ....................... ........................... ......................... .130 .00 CIVIL ENGINEERING AND MAPPING SERVICES Sr. Project Surveyor ................. ................... ..... .................. .... ....... .......................... ............ ...... .... .......... .....$150.00 Sr. Project Engineer ... ...... ....... .................................... ............... ........... .............. .... ............. ........ ............... ...145.00 Project Surveyor................. ....... ............. ................... ......... ....... ........ ....... ........... ..................... .............. ........ 142.00 Sr. Project Designer .............. ..................... ................................. ................................................................... 140.00 Project Engineer, Processing Manager........................ ........................ ...... ............. .......... ................ .............135.00 Sr. Survey Analyst..................... ........... .............................. ............... .......... ... ..... .......... ... ............. ................ .132 .00 Project Designer.......... .... ............................ ................... .... .......... ............ .......... .......................... .......... ..... ... 130.00 Sr. Design Engineer ....... .............. .............. ......... ....................... ......... ......... ... ............ ................ ............... ....125.00 Survey Analyst .. ........................ ............ .... .............................. .................. .......... ......... ............ ......... ............ .122.00 Sr. Designer ........... .................. ....... ........................ .............................. ................... ....... ..... ........ ............... ...120.00 Design Engineer, Designer .. ....................... ........ ...... ........ ....................... ....... ........... ........... ............... ......... .11 0.00 Design T eehnician........... .... ........ .... ......... '" ....... ................. .... ........................ ............... ..... ...... ..... ... ... ... .......105.00 Assistant Engineer, Sr. Technician, Research/Processing Coordinator 11......................................................100.00 Jr. Survey Anaiyst .................... ........ ........... .................. ................... ......... .......... ..... ... .... ........ ............... ....... ...96.00 T eehnician, Jr. Engineer...... ...... .......... ..... ... ....... ........... ...... ... ....... ... ..... .......... ....... ........ .......... ......... ...... ..... ....95.00 Project Coordinator, Research/Processing Coordinator I............... ....." ..........,............... ..n......... .... ......"..,.... .90.00 Jr. Technician ....... ......" .... ......... ...... ....' ... ,._. ......... .......... ........ ....."".. ... ... ...........,. ..... ........ .... ... ..,.......,." .... ..... ..80.00 Engineer/Survey Aide, Office Work ..... ...... ......... ........... .......... ........... ..... ......... ................... ...... ........ ...............75.00 FIELD SURVEY Field Coordinator..... .......... .... .... ......... .... ............... ......... ............. ...... .... ......... ........ ............ ......... ........ ........ .$130 .00 Survey Technician ............ ........... ....... ..... ........ .... ..... ..... ......... ..... ........ ................. .......... ........ ...... ........... .........96.00 Three Person Crew................. ........ ... ..... ........... ...... ....... ........... ..... .......... ...... ....... ...... ................. ............ ... ..245.00 Two Person Crew................. .... ............ ............... ..... ..... ......... ... ... .... ...... ... ..... ............ ........... ..... ................... .205.00 One Person Crew.................. ...................... ............... ....... ..... ..... ........ ....... .... .......... ..... ... ....... .............. ........ .150.00 PLANNING SERVICES Principal Planner .............................. $135.00 Sr. Planner ......................................... 125.00 Project Pianner................................... 115.00 Planner..... .... ....... ................. ... ...... ..... 105.00 Assistant Planner, Graphic Designer.... 90.00 Planning Technician ...."....................... 80.00 CULTURAL RESOURCES Project Mgr/Cultural Resources.. ...... ........ ...... ...... ..$130 .00 Archaeologist/Paleontologist ....................................114.00 Field/Lab Supervisor.. .... ...... ......................... ...... ......100.00 Field/Lab Technician III ..............................................83.00 Field/Lab Technician II ...............................................78.00 Field/Lab Technician I ................................................68.00 SPECIAL SERVICES Consultation Re: Litigation.................... ...........................................................................$375.00 MISCELLANEOUS FEES The following BeNices are billed at our cost plus 15%: . Subcontracted services. Map check fees or filing fees advanced by us. . Transportation, meals and lodging for overnight travel and incidental travel expenses. . Commercial delivery services, including Federal Express, Express Mail, and Messenger Services. . Excessive long distance telephone caUs. telegrams, and other costs directly applicable to the project. . Plotting and blueprint services and printing. (The client is encouraged to arrange for printing, other than prints or plots on our bll,leprint machine and plotters, to be contracted diredlywith an outside blueprint company acceptable to us.) MILEAGE. .....................................................................$ .405/mlle or current allowable rate established by the IRS NOTE: EEO obligations of Exec Order 11246 and 41 CFR Parts 60-1.4, 60-250.5 and s;;;;are incorpor.ated in non-exempt US Government contracts/subcontracts. 4 i' TKC Corpo DIvision Manager ~ r- O;'OOLOSOIm.51..'docIFEESCHI!DULES\II TCIIOl1IlJ\200STomplllle,daI.