Loading...
HomeMy WebLinkAbout17-City Administrator \ CITY OF SAN BER.QRDINO - REQUEST ~R COUNCIL ACTION From: Fred Wilson Assistant City Administrator Dept: City Administrator D8~: October 5, 1990 Su~~: Amendment to the agreement with Omnicom, Inc. to provide specific engineering communication services. Synopsis of Previous Council ~ion: 11/20/89 -- Resolution #89-462 adopted authorizing the execution of an agreement with omnioomto perform consulting services relative to the East End Radio Communications Improvement Project. 9/17/90 -- Resolution 90-383 adopted authorizing execution of an agreement with Omnicom, Inc. to perform consulting services in support of project titled "Work Plan for City's 800 MHz Radio Communication System and Mobile Data Terminal System. " Recommended motion: Adopt resolution. .! ,--( - .,~{ \.- oJ":';" - Signature Fred wilson Phone: 5122 Contact person: Supporting da~ attached: Yes Ward: FUNDING REQUIREMENTS: Amount:_ $15,000 Source: (Acct, NoJ 001-224-53150 (Acct. DescriPtion) Finance: (';\ Ii l' \. ".~"'\""- ..... ' Council Notes: 7....n:)62 Agenda Item NO.A-- . CITY OF SAN 8ERNQ.DINO - REQUI!ST F~ COUNCIL ACTION STAFF REPORT '!"T. Resolution No. 90-383 was adopted on September 17, 1990 which authorized the execution of an agreement with omnicom to perform engineering communication services relative to the 800 MHz Radio System and Mobile Data Terminals. The initial proposal submitted by omnicom included a package relating an evaluation of CAD and RMS as part of the 800 MHz radio and MDT study. The objective of this package was to analyze the existing CAD and RMS systems and to recommend alternatives to upgrade/replace these systems to meet the public safety needs of the city for the next decade. Although this portion of the plan was not recommended as part of the , agreement approved through Resolution No. 90-383 ."" is .,. recommended for consideration at this time for the following reasons: 1. The RMS system is outdated. It is almost at 100% capacity in disk storage space. The police need at least 2-3 years of history on the system but currently only have 90 days due to lack of space. The system is extremely slow because of the overloaded resources and old technology. 2. The CAD computer which is used to record all 911 calls, although not at capacity, is expected to be close or at capacity if MDT's are brought on-line. 3. If MDT's are purchased, upgrades to CAD/RMS will be necessary to ensure functionality. 4. Any recommended upgrades to CAD/RMS will be based on meeting the City'S public safety needs for the next 5-10 years. 5. The potential cost to upgrade the two computers is estimated at $400,000 or higher. Faced with this type of expenditure, it seems appropriate to evaluate all options to ensure that the most cost effective system is implemented. , , 75.0264 o o The cost of this study is $29,500. Approximately $14,500 will be reallocated from the' first phase of the MDT study and the remainder will be appropriated from the Police Department computer services budget. The study will be complete by mid November, 1990 D A. WILSON, Assistant city Administrator FAW/sh 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 II o o RESOLUTION NO. RESOLUTION OF THE CITY OF SAN BERNARDINO AUTHORIZING AN AMENDMENT TO THE AGREEMENT WITH OMNICOM, INC. RELATIVE TO THE PROVISION OF SPECIFIC ENGINEERING COMMUNICATIONS SERVICES FOR THE 800 MHZ RADIO SYSTEM AND MOBILE DATA TERMINAL SYSTEM. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. The Mayor is hereby authorized and directed to execute on behalf of said city an amendment to the Agreement with Omnicom, Inc. relative to the provision of specific engineering communication services in support of the project titled "Work Plan for the city's 800 MHz Radio Communication System and Mobile Data Terminal System." SECTION 2. A copy of the additional scope of work titled "Consulting Services for the Evaluation of Computer Aided Dispatch and Records Management" marked Exhibit "1" is attached and incorporated herein by reference as fully as though set forth at length. SECTION 3. The authorization to execute the above referenced agreement is rescinded if the parties to the agreement fail to execute it within sixty (60) passage of this resolution. days of the I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and Common Council of the City of San Bernardino at a meeting thereof, held on the , 1990, by the following vote, day of to wit: !I RESOLUTION AUTHORIZING AMENDMENT TO OMNICOM. INC. .0 () 1 council Members AYES NAYS ABSTAIN 2 3 ESTRADA " REILLY FLORES 5 MAUDSLEY 6 MINOR 7 POPE-LUDAM 8 MILLER 9 10 11 12 13 CITY CLERK 14 The foregoing resolution is hereby approved this 15 day of , 1990. 16 17 w. R. HOLCOMB, MAYOR 18 City of San Bernardino 19 Approved as to form and legal content: 20 JAMES F. PENMAN, 21 City Attorney 22 .J~ 23 24 25 26 27 28 I -2- I. 10/05/90 I I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 II " ,- o o FIRST AMENDMENT TO AGREEMENT THIS AMENDMENT TO AGREEMENT is made and entered into this day of , 1990, by and between the CITY OF SAN BERNARDINO, hereinafter called "City", and omnicom, Inc., hereinafter called "Consultant". WITNESSETH: WHEREAS, the parties entered into that certain Agreement for Consultant's services dated September 17 1990 and WHEREAS, the parties desire now to amend said Agreement, NOW, THEREFORE THE PARTIES HERETO AGREE AS FOLLOWS: 1. section 3 (A) of said Agreement is hereby amended to read as follows: section 3. PaYment and provision for PaYment A. Maximum Compensation (1) Maximum total compensation to be paid under this agreement shall be $8,863 for the development of the long range radio communication plan, $12,010 for the development of the Mobile Data Systems plan and $29,500 for the evaluation of computer aided dispatch and records management as outlined in consultant's cost proposals, attached hereto, marked Exhibit , "A" (Radio Comprehensive Plan) and Exhibit. "B" (Mobile Data Comprehensive Plan) and Exhibit "C" (CADjRMS) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ~ ~ ~ ~ 26 27 28 II " o o Payment to consultant for services provided under this agreement shall be on a monthly basis with project costs identified by Consultant in four expense categories: direct engineering expense; travel; perdiem expense; general and Administrative expense; and profit/fee expense. 2. section 4 of said Agreement is hereby amended to read as follows: section 4. General Descrintion of Work to be Done City hereby retains Consultant to perform appropriate radio communications surveys; needs assessments, analyses, preliminary design and comprehensive planning necessary to meet the requirements of the City of San Bernardino as it relates to the development of a comprehensive Radio Communication Plan. Included, will be the development of a comprehensive plan for mobile data terminals involving needs assessments, interviews, analysis, preliminary design and planning. The optimum system configuration(s) that will meet the existing and long term mobile data requirements of the City of San Bernardino will be identified. The third phase of the project will be to survey, study and analyze the existing Computer Aided Dispatch (CAD) and Records Management (RMS) Systems and to recommend alternative strategies to upgrade or replace these systems to meet the public safety needs of the city for the next decade. -2- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ~ ~ 24 ~ 26 27 28 !I r o o The result will be the provision of both short, and long term comprehensive solutions to the City of San Bernardino radio communication system mobile data and CAD/RMS needs. 3. section 8c of said agreement is hereby amended to read as follows: Section 8: Hold Harmless C. Public Liability Insurance, on a comprehensive basis, in an amount not less than $1,000,000 combined single limit per occurrence for bodily injury and property damage. The policy must be endorsed to show the City of San Bernardino as additional insured. The Consultant shall furnish certificates of insurance to the City prior to the commencement of operations, which certificates shall clearly indicate that the Consultant has obtained insurance in the type, amount and classification as required for strict compliance with this section and that no . material changes or cancellation of this insurance shall be effective without thirty (30) days prior written notice to the city. IN WITNESS WHEREOF the parties hereto have executed this Amendment to Agreement on the day and date first above shown. / / / / / / / / / / -3- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Ii II RESOLUTION A~IOnI~I~~G ,..) ...".".............................. ~........;u..u,........u_u.....J. Attest: CITY CLERK Approved as to form and legal content: JAMES F. PENMAN, City Attorney -4- ~o AGRE,~ENT WI Tn OMNICOM, INC. '......J By: w. R. HOLCOMB, MAYOR City of San Bernardino CONSULTANT: By: Ll o 0 2.1 coet DeI8II, PhaM IIA . ~ or COmprehen8lve Plan QIRIICT .tlftl.....ltIft .vDIlENSE PrcjIct DlIectof, 40 Hrs. @ S4S SenIor Project Engineer, 8 Hrs. @ $42 PrcjIct EngInllr, 40 Hrs. @ $40 EngInllrillg Owrheed @ 55" I ,. l I I , I I I I I I I TRAVEL AND PER DIEM EXPENSeS 1 Round Trip AIrlIne Fare @ $858 3 Men Days Per DIem @ $105 3 Days Rental Vehicle @ $85 GENERAL AND ADMINISTRATNE EXPENSES Gener8I and AdministratIve Expense @ 11" PROFIT IF.lE EXPEtlSE ProfttIF.. . 10% TOTAL. PHASE IIA 9 $ 1,800.00 338.00 1,800.00 2,054.80 $ 958.00 315.00 195.00 ~fi =1\= $ 5,790.80 $ 1,488.00 $ 798.47 $ 805.73 $ 8.883.00 ~ IPWIIT'IlIT -.- o o EXHIBIT -8- COlt 1MtIII. PhaM II- MDT NMdI AI''''ment, ~and compr"*",",,," , 8tnIOr ProIICt EnglnMr. 108 HrI. @ $ 42 EngInMrInO Ovtfhtld @ 55% . 4,4&2.00 2.441.80 t8,8OO.eo I 2 Round Trip Travel &penMI . $858 I Men DtlyI Per DIem @ $105 I ~ Rlntel. $ as . 1.918.00 ..00 380.00 . 2,938.00 Oentl'e1 and Admlnlstratlvt ExpenH @ 11% . 1.082.03 . 1,081.88 ProtltlFH @ 10% TOTAL. PHASE U $ 12.010.48 6 , " I -- --------- ---. - ,-09-90 TUE 1~()~7 OMNICUM, ~ r-. '- _ o ".1 eost Detail, Phase I . Site Survey and Need. Assessment DJB.P.CI' ~ERlNQ.BXPENSB SenIor Project Bnpneer, 126 Hrs. @ S 42 E...rlnS Overhead @ SS% 2 Round Trip Travel Expenses @ $958 10 Man Days Per Diem @ $105 5 Automobile Rental at S 65 General and Administrative Expense @ 11 % Profit/Fee @ 10% S 5,292.00 2,910.60 S 1,916.00 1,050.00 325.00 TOT AI., PHASE I EXHIBIT .C. " I I i !,~ ! , , . 1=1'_02 " S 8,202.60 S 3,291.00 S 1,264.30 S 1,275.79 S 14,033.69 ! I , . .-',."....~.__-4t.. ....~. .~ o o 4.1 Cott Decall, Phase II . System A1tematlves and Economic: Analyses and Com'........" Plall Senior Project Bnalneer, 152 Hrs. @ S 4i BD8fneerlnI Overhead @ 55% S 6,384.00 3,511.20 $ 9,895.20 . 2 Round TrIp Travel Expenses @ $958 5 Man Days Per Diem @ $105 S Automobile Rental @ $ 65 $ 1,916.00 525.00 325.00 $ 2,766.00 General and Administrative Expense @ 11% $ 1,392.73 ~O~XPENSS Profit/Fee @ 10% $ 1,405.39 TOTAl., PHASB II S 15,459J2 EXHIBIT .C. , , : '0 ~IT -1- PROPOSAL CITY OF SAN BERNARDINO CONSULTING SERVICES FOR THB EVALUATION OF COMPUTER AIDED DISPATCH AND RECORDS MANAOEMENT September. 1990 OMNlCOM. IDe. Telecommunications Enaineerlng Woodc:rest Office Park 325 John Knox Road, Suite :8-204 Tallahassee. Florida 32303 (904) 386-3180 --- '--' 1.0 2.0 -~ '";:.) - ... 'J _ ".;...... '-' 1'1 (--oj .1. '-' ...J r'l ~ .r "-IC. o o TABLE OF CONTENTS 'UNDEItS'r.ANDING TIlE PROJEcr . . , . I . . , . , . . . . , . , . . . I . , . I , . . , . , PIlOJEcrWORK ,!..AN".,. I"'" I".'.........,.......,....'. 2.1 2.2 2.3 2.4 2.5 Project Management .., Project Personnel ..... . I..... ,. I"'" .,..." ... I" ...... I I' I"" ...., 1..1.'.'...... ... .... Major Projec:t Team Feature . I . . , . . . , . . , . . . , , . , , . . . . . . . . , . . . Work Plan Overview , . . . . . , , . . . . , . . I . . . . . . . . . . . . . , , . . . . . . , Task Descriptions ..............,.............,... I . . I , . . . 3.0 PROJECI' SCHEDULE . . . , . . . . . . I , . . , . , . . . I , , . . . , , , , . . . , . , . . , . 4.0 5.0 PROJECt COSTS. . . . . . . . . . , . . . . . . . . . .. . . I . . . . . . , . . . . . . . .. . . . . . 4.1 Cost Detail, Phase I . Site Survey and Needs Assessment . . . . . . . . . . 4.2 Cost Detail, Phase n . System Alternatives and Economic Analyses and Comprehensive Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 18 PERSO~LRES~ ....................,...........,..... I P.12I3 PAGE 1 3 3 4 4 6 9 14 16 17 19 , , o o 1.0 UNDERSTANDING THE PROJECt' nt ovorall objectives of this project are to survey, study and analyze the exlstln& Computet Aided Dispatch (CAD) and Records Management (RMS) systems of the City of San Bernardino and to recommend alternative strategies to upgrade or replace these systems to meet the public safety needs of the Oty for the next decade. nt City desires the services of a competent computer and communlcatioDl consultant to assist in achievll1& the overall objectives of this project. The lnltlal effort of the consultant is to study and evaluate the public safety data processing Deeds of the City and to provide alternative system deslp that will correct existing problems and limitations, and provide a reliable system. compatible with present tecbnoloiY and anticipated future requirements such as a Mobile Data Terminal system. Based upon this study and analysis, a Systems Evaluation and Alternatives Report will be provided, from whicb the selected systems configurations will be identified. Tbe selected system will then be incorporated Into the Oty's CAD/RMS Comprehensive Plan. To accomplish this objective. the consultant must possess expertise In a number of computer-related disciplines so that he may recommend a cost effeetlve CAD and RMS system that will meet the current and future needs of the City In the provision of public safety services to its citizens. The technical fields to be addressed in this project include: functional design of CAD and RMS apptlcatlon software System Software Architecture CAD and MDT System Interface Requirements CAD and RMS Hardware Requirements Communications Center Processing Requirements Records Center Processing Requirements 1 ... ~. _- _ r- _ 1:;;..1 ;::J- o 0 . 1.0 UNDERSTANDING THE PROJECT (Continued) OMNICOM'I initial activity will be to evaluate the presoDt Oty CAD and Recorda Manaaement systems. OMNICOM will use the Information gathered from the detailed needa assessments, Interviews and site surveys to develop alternative concepts for a complete CAD and RMS data processlna system, Including equipment, manlliement, operation. and facUities. OMNICOM will present these alternative concepti, along wlth short and long-term technical, operational, organlzatlonal and coat criteria, to the City for its review and for selection of the optimum confI&uration. OMNICOM is highly capable of applying a biah level of technical expertise in theso fields in a form and manner that Is most advantascous to the City of San Bernardino. In addition, OMNICOM's experience In project manqement and planninawlll assure the City of overall project integration by tho provision of the following capabilities: . Project Management System Planning System Integration Comprehensive Long Ranae Planning Ufe Cycle Cost Analysis Alternative System Operational and Cost Analysis . . 2 . . -' o o 2.0 PROJECI' WORK PLAN nil MCdoD of the proposal describes the seneral approach to be used and Identifies the tub that will be performed to meet the project objectives. Although we identify a specific: apprOach and describe bow all required tasks will be accompUshed, some modifications may be required II we become more familiar with the factOI1 that will affect the project. In this respect, we are flexible and are prepared to modify our approach to satisfy the City's needs and requirements and the eYOMn, performance oriented objectives II they are developed. 2.1 Project Manaaemellt OMNICOM proposes to use the system approach to this program, witb a team of project engineers/specialists working under direction of a project manaser. This OMNICOM team will Interface with the City'. Project DIrector and his staff at the Project Director/Project Manager level. The OMNICOM Project Manager will coordinate, schedule and manage the OMNICOM project pel10nael and win review and approve all project documentation, plans and designs. The president of OMNICOM will perlodic:ally review the status of the project to ensure that the project remains on schedule and apply additional resources to the project II necessary for timely project completion. The president will also direc:tly participate In the project on an as-needed basis and will be aVallable to the City for any special requirements that might arise. 3 - - -=----' '- ,.;....'~ '-, , . ~ ~ 1", ,_ . F' . tr,;J " o 2.1 Project Manaaement (Continued) o OMNICOM recoanJzea the importance of haviDa a dedicated project manlllor and hu so1ectod an Individual who possesses the manaaerlal and technical skills that are neeessaJ)' for project success. He will replarly follow the project proareSl and coordinate with the City Project Director to report proaress and receive Instructions, feedback and guidance as necessazy for the succossful accomplishment of the project's goals and objectives. In addition, the complete tecl1nical staff of OMNICOM is available to provide additional expertise and support In all areas of Public Safety communications and computer consultin&. U Project Personnel For this project, OMNICOM proposes to apply top public safety computer engineering and management personnel to" address the full spectrum of requirements. The prlmazy OMNICOM project team proposed for this project consists of the foUowina personnel: Project Engineer, Mr. Hugh EI&hmle, CAD and RMS Systems 1.3 MaJor ProJeet Team Features Some important features the project team can provide the City arc: . A blgh level of technical and management support to the City data processing, records and communications staff. . An effective system engineering work plan with the methodology that WI'll permit project schedule visibility and form the basis for project control by the OMNICOM Project Manager and the City. , , .. 4 - " -. - ('"... 'oJ "-' o o 2.3 M.r Project TelUll Features (Continued) . StroDI project manqement based upon extensive project experience to ensure both the quality and timeliness of each project task. A high level of experience in CAD and RMS systems, communicatiom systems and their Interfaces. A high level of experience of OMNICOM's Project Manqer in I*forming Public Safety projects. . A hiah level of experience with MDT systems and the hardware and software requirements to Interface MDT with in place CAD and Rccords Management Systems. A national professional engineering and consulting firm whose business Is public safety communications, public service communications and computer consuldng and engineering. Highly skilled engineers experienced in the survey, analysIs, design procurement and implementation of CAD systems, and RMS systems, communications systems, MDT systems. An effective system en&ineerlng work plan with the methodology that will permit project schedule visibility and form the basis for project control by the OMNICOM Project Manager and the City Project Director. . Strong project management based upon extensive project experience to ensure both the quality and tlmeliness of each project task. s f' , ".~~" .,,-- ,..... -.:J.::;O o o 2A Work Plan Overview Based upon our knowledge and experience with public safety system projects. we propose to approach the project by perfonning the plarmfng, englneering and management tasks that will deliberately and logically accomplish the project goals. The proposed project phases that will encompass the scope of the tasb are presented bere to clearly define the major segmenq of the project and provide detailed visibility for proJect control. In order to clearly define the tasks that are required to be performed, the project work plan is divided into the followlns two phases. Phase I . Phase II - Site Survey and Needs Assessment System Alternatives, Economic Analyses and Comprehensive Plan An overview of these two phases Is as follows: Phase I . Site Surve)' and Needs Assessment ./ In this phase, the existing CAD and RMS systems wlll be surveyed to document the current resources, their status and associated problems. Computer hardware, system software, CAD and RMS application software as well as operational procedures will be included. A needs assessment will be perfonned to Identify the current and future data V processing needs and requirements of the City's public safety agencies via interviews with key personnel from both the user agencies and the computer support group. 6 --' '-'" ,., ..L. ,_ '-'. +.. J. rt ~. P. 1 \3 o o . 2.4 Work Plan <henlew (Continued) Information obtained from the systelDl evaluations will be analyzed to estabUah system alternatives to improve or replace existina systems or to add additional systems. The analysis will include all the command and control and records management requirements to support the various data processing systems needs of the participating agencies. Phue II . System Altemative., EeoDOmIc All""" Ind Comprehensive Plan Information obtained from the site surveys, needs assessment and systems analysls v will be used to generate system alternatives to meet the requirements of the City of San Bernardino. These system alternatives will be used as technical, operational and economic models to assist OMNICOM and the City in fInalIzina system designs to meet the City's needs. At the conclusion of Phase II, the followina two reports will be provided to the City: "CAD and RMS System Evaluation and Alternatives Report": Part I of this document wUl present tbe survey results, documented problem areas, and the CIty's public safety computer needs and requirements. Any Interim recommendations regarding tbe City's computer systems will also be made at this time. Part II of this report will present the alternative system configurations for tho ../ CAD and RMS systems. Advantages, disadvantages and system cost estimates will be provided for all alternatives. 1 . . o o ~ 2.4 Work Plan Overview (Continued) TbIa wrItten report will be presented to the CIty and discussions will be held between the CIty and OMNICOM regarding the optimum system configuration including any optional equipment or services. The selected CAD and RMS system configurations will then be Incorporated into the Comprehensive Plan: . "City of San Bernardino Comprehensive CAD and RMS Plan": this plan will describe the selected data processIns configuration, short term and lon8 term recommendations, and appropriate interfaces between Computer Aided Dispatch, Criminal History Data Bases, Records Management Systems and peripheral sub-systems. The plan will cite the advantages and disadvantages of the chosen configuration, provide overall cost estimates, and a phased, multi- year implementation schedule to identify annual budsetary requirements if necessary. An Executive Summary to this report will be provided to explaln and justify the need for the recommended computer system(s). The submissIon of the ComprehensIve Plan completes Phase n of the project. this is the logical place to hold the project activity until capital funding Is budgeted and approved at which time OMNICOM can, at the City's request, proceed to a Pha.~e m, Final S~tem De~lgn, Development of SpccifiC8fioo~ IInd Bid Evaluations and a Phase IV, System Implementation. - 8 L t-'. 1. ~ o 1.5 Task Descriptions o The .tuks that are required to successfully implement tho study methodolosy arc II fonows: . Phase I . Task L1 . Task I.2 . Task 1.3 . Task 1.4 . Pha.. II . Taslc IT. t . Taslc 1I.2 . Task n.3 . Task n.4 . Task n.s . Site Survey ud NeeclI Aseetl....t Project Orientation Needs Assessment/ Aaency Interviews Site Surveys Systems Analyses System Alternatives, Economlc ADaJyses lUId Comprehelldve Plall Alternative Configuration Development "CAD/RMS Systems Evaluation and Alternativcs. Report Optimum Systems Configuration Selection .Comprehensive CAD and RMS Plan" Approval of Selected Systems (City) A detailed description of these tasks follows: Phase I. Site Survey and Needs Assessment 1.1 Project Orlelltatlon 1bis task contains the activities which wm enable the OMNICOM project team to meet with City project personnel In order to become more familiar with City operations and to establish reporting relationships with the appropriate project personnel The work schedule will be solidified at this meeting and project documentation guidelines including progress reports will be established as necessary. 9 "" -__ '-' ,.1 .' .J.:. r. c. p _ 13 o o 2.5 Task Description. (Continued) 1.2 Need. AlMSlllleDtl A&enc7 Intent..,. The needs assessment is Intended to review. update and obtain current Information on specific program details that will affect the project activity. It wlllidentify the CAD/RMS needs of each particlpating department through the process of Interviewing, gathering background reports, studies and other pertinent documentation, to identify specific communication needs. J.3 SIte Sun't)'. Site surveys will be performed to Identify and study the exIsting public safety data processing resources of the City. The following tasks will be included: Survey the City communications center, records center and data processing center to Identify equipment including computers, terminals, and peripheral equipment. Interview administrative, operational and field personnel to identify computer related problems, obtain future operational requirements and Identify any unusual operatIonal crIteria which may affect system design. Interview dispatch center call-takers, dispatchers and supervisors to Identify problem areas and operational needs. Observe call-taking and dispatching activities. . Interview data processIng programmers and operations personnel and supervIsors to Identify problem areas and operational needs. 10 I I - --' ,-', l ,; ~ ,~ ,-. ;' .. ..I. n c. . P.. 14 o 3.5 Ta.k Daerlptloas (Continued) o Review system documentation. Interview Records Section clerks and supervisors to Identify problem areas and operational needs. . Observe flow of data throu&h Records Section. . Observe field unit interface with Records Management System. 1.4 SJatem Analyses 'lbe data compiled during the needs assessment and site survey tasks will be analyzed to identify current system problems, and opportunities that may be used to develop cost effective alternative system deslp The foUowIns tasks are included: Analyze Computer Aided Dispatch system to identify mobile data communications requirements. . Analyze all dispatch center data elements captured In terms of usage and redundancy, such as calls for service and response times, as well as call-taking and dispatching procedures. Analyze the computer maintenance process to identify mean time ~tween failure (MTBF) and service. staff complement, technical expertise levels, test equipment, physical plants and so forth. . Analyze all standard operating procedures, long-range plans. impact studies. population growth trends and demographic studies to predict future data processing system growth requirements. 11 - ...--' o o 2.5 T.sk Descrlptlo.s (Continued) Ph... II. S7llem Altemadves, Eeonomle ADaIf... and Comprehensive PI.. 11.2 Alternative Configuration Development This task Involves the conceptualization of alternative system confiauratlons to permit comparisons In efficiency, effectiven... and cost for decision makin, purposes. Develop alternative computer hardware and software conflaurations for ac<:omplishin, the City's public safety data procenina requirements. . Develop the advantages and disadvantages of each candidate system pertaining to the data processing problems of tho public safety aaeneles and meeting future requirements. . Develop cost data for each alternative system c:onflauration Indudlng all capital costs and ali on-going expenses. 11.2 'Communlcatlon Systems Evaluation and Alternatives" Report Part 1 of this report will present the survey results, documented problem areas and the CIty's data prace..lng needs and requirements. Any Interim recommendations for communication systems improvements will be made In this report. In Part II of this report, the alternative system configurations will be described utilizln, system diagrams, system cost estimates and the advantages and disadvantages of each candidate system. 12 -' -.;,.' ~" ~ .;. ....;, ; ...:.:... ';I ~ il rot ..L '- 'J r'l .. .Lnc. P. 1 '7 .~. o o 3.0 PROJEcr SCHEDULE 1bJIIOCdon presents the proposed project schedule deplq the time .quenct of eventl which OMNICOM proposes to follow in acc:ompllshlna the work tasks Identified in Section 2.0 "Project Work Plan." The task numbers on the schedule tables correspond dIrectly to the task numbers In' Section 2.5 tided 'Task Descriptions". This proposed schedule is submitted for general planning purposes only. If the City desires schedule modifications or adjustments, OMNICOM will mate every effort to accommodate the desired change. Each phase of the project is presented separately on the bar charts to accommodate time lapses that may occur between phases due to funding, equipment delivery or other delays. Table 3.1 presents the proposed project schedule. The work hours requIred to perform this project are Identified In Table 4.1. OMNICOM has detailed the work hours requIred of each project participant. 14 I I, . ~ '" '-' , I r i ... '_. '-' , , ~ .... "-1....",.. P _ 1 <=: - '" on I V .- .... - 1"1 .- N .- .- .- 0 . - I 01 . 01) " I 10 II'l I-- .... . I"'l N .- . i 0 I~ ~ :g ~ ~ VI ..... i ~~ ~ :::Ii ~ ..... ..... ~ Z , j ~ ~ ~ft'l . ~ ~i ... ;;) .~ ~ Q ! ....... 15 :::Ii g - i tz ~ ~~ G ~ :! ~ !;( ~ - ..... EO: ~~ g ~ 8 ~. . ~tz ~ I7l i qn .!! ~ ~!Z ~ ~! ~$ ~~ ~ ~ 'iij i~ I ;i g .. I I..... 10.1 ~ I ~z 2~ ~~ If ~ . ~1o.I ~~ I"l -~ ~ ~ ~ ;~I .....~ ~~ '5 ~ ~ ti'/(/1 z~ VI ~ ~Q. B~ a i~ ~ ~~ ~ "1 if:l~ ~ N 1"1 , U ~ "": ~ == '" == = . l 15 ! --.=1 '-" I" ..i,. ~ '-' '"j", ..i,. r-I C _ r-" .. l'~ o o 4.0 PROJECf COSTS OMNIOOM, Inc. will provide the professional services described In our proposal for costa presented herein. Firm costs are presented for all phases of the Project, and Indude detailed calculations of engineerlna hours and rates, travel and per diem expeDSel, administrative costa and profit. Prices quoted are valid for one hundred el&hty (180) days from the date of proposal openlna. If an Increase or decrease in project scope Is required to fulfill the project aoals and obJectives, these costs may be also adjusted accordingly. It Is proposed that OMNICOM, Ine. Invoice the City on a monthly basis for professional services performed and expenses Incurred. OMNICOM's Federal 10 Number Is S9.2IS4481. 16 i..- I I o o iT '1.1 Cost Detail, Phase I . Site Survey and Neeell AslISlIIlent DIB".r.T EN~BERING EXPENSB Senior Project Bn&fneer, 126 Hrs. @ $ 42 Enameerln. Overhead @ 55% $ 5,292.00 2,910.60 $ 8,202.60 2 Round Trlp Travel Expenses @ $958 10 Man Days Per Diem @ $105 5 Automobile Rental. at $ 6S $ 1,916.00 1,050.00 325.00 $ 3,291.00 General and Administrative Expense @ 11% S 1,264.30 Profit!Fee @ 10% S 1,275.79 , TOTAL. PHASE I S 14,033.69 17 " i ! M '-' '- , - 0::;.' ~ - J' 0'- -------,.-u c... ..L .~ .; -~,_; ,....) 1'1 r-1 .L '-- U "I ~ .L roC.. P.. ~.=- o o 4.1 Cost Detail, Pha.. II . System Altemadves and Economic: ADalyses and Comptelaenllve Plan Senior Project Enafneer, 152 Hrs. @ S 42 Ensfneerlng Overhead @ 55% $ 6,384.00 3,511.20 S 9,895.20 2 Round Trip Trave) Expenses @ $958 5 Man Days Per Diem @ $105 5 Automobile Rcntal @ S 65 $ 1,916.00 525.00 325.00 $ 2,766.00 Oencral and Administrative Expense @ 11% S 1,392.73 lJtOFIT ~XPENSl:: . Profit/Fee @ 10% S 1,405.39 TOTAl.., PHASE II $ 1S,459J2 18 o o 5.0 PERSONNEL RESUMES 11111 secdOft contains the resume of tho project eqlJleer who will be porformlDa tho Itudy tub. Other OMNICOM engfneers wm be available as needed to assist In spedfic tasks. 19 I I. -"'.. .i. r-, ,_ _ ~. _ ~.3 Huah J. E1ahmle, Sr., ManOnent Information Systems En~ftP Mr. ElghmIe has over thirty years in experience data processing operations and mlUUl&elUent, systems dellgn and computer programmlna with strong emphasis on government applications Including command and control systems and public safety Computer Aided Dispatch (CAD) systems. Mr. ElghmIe's experience and background in computerized public safety systems ineIudes the design and programmins of several systems for police, fire and emergency medical services for both large and small agencies. These systems have been installed on both larae scale shared maln frame computers and dedicated mini and micro computers, Indudina IBM, NCR, HP, DEe and Unisys machines. His machine experience Includes IBM 3Oxx/43O() (MVS, DOS, TSO, CICS), IBM 36/38, DEC VAX, Unlsys, Hewlett-Packard 3000, and various microprocessors (Unix, MS-OOS, crOS). His language proficiency includes Assembler (IBM, DEe, Micros), COBOL, "C, Pascal, RPG and 4th generation lanauages. Notable accomplishments by Mr. Eighmle Include the design and programming of the Metropolitan Dade County (Florida) computer aided dispatch system for PoUce, Fire and EMS; the design, programming and installation of a command and control system for transit vebicles In Miami, Florida; and the design and installation of an early minicomputer-based bank teller system. He has data processing management experience In both the public and private sector, havina supervised the U.S. Southeastern Region a California-based computer company and also supervised a large data processing staff of computer programmers and analysts for a large municipal government agency. As a commissioned officer In the U.S. Army, he conducted computer training courses for programmers and senior officers in Viet Nam, Japan and the United States. Mr. Elghmie received a Bachelor of Arts degree In Government from the University of Miami in 1960. He has served as guest lecturer in data processing to the Industrial College of the Armed Forces In Washington, D.C., where he appeared In a lecture series with J. Presper Eckert, co-Inventor of ENIAC. He has also taught Computer Science at Purdue Univ~rslty. I I i I. 20