Loading...
HomeMy WebLinkAbout11-Public Works - -CITY OF. SAN SBRORDINO - RBQUESTnttiFi6cOUNCIL ACTION Approval of Change Order No. TWO- Subject: Rehabilitation of Pavement on South "E" Street, per Plan No. 7609 FONTANA PAVING, INC. From: ROGER G. HARDGRAVE Dept: Public Works/Engineering Date: 9-20-90 Synopsis of Previous Council action: June, 1988 Allocation of $676,800 approved in the 1988/89 Street Construction Fund Budget, under Account No. 242-362-57688. 04-17-89 Plans approved and authorization granted to advertise for bids. 06-19-89 Resolution No. 89...219 adopted authorizing execution of Program Supplement No. 54. 10-02-89 Resolution No. 89-394 adopted, awarding a contract for the low bid price of $354,998.50. ~ ~ 05-07-90 Change Order No. One approved, authorizing ~'lan (") increase of $14,100.00 in price, from $354,998i-;S0~ to $369,098.50. -0 N :::;:.. ':::. t:;> ... Recommended motion: .;::- 0 That Change Order No. Two to the contract for. the Rehabiliati?n:;:' of Pavement on South "E" Street, in' accordance with Plan NQ.' J 7609, be approved, to authorize extra work cons~sting of removal of unsuitable material, and installation of additional asphalt concrete, at an increase in the contract price of $49,741.12, from $369,098.50 to $418,839.62. I .~~:' :;:: cc: Shauna Edwins Andy Green -~ -<ft.~~ S. atu Contact penon: Supporting data atta..hed: Roger G. Hardgrave Staff Report, Contract Change Order No. Two Phone: 5025 Ward: FUNDING REQUIREMENTS: Amount: $49.741.12 Source: IAcct. No.! 242-362-57668 IAcct. DescriDtionl South "E" Street Pavement Finance: ~ D~ Rehabilitation. Council Notes: 75--0262 Agenda Item NO~ CITY OF SAN BERtGRDINO - REQUEST ~R COUNCIL ACTION STAFF REPORT The soil borings performed prior to final design of this project revealed the existence of an old concrete street beneath the existing asphalt surface. The project design directed the removal of portions of this concrete street which were higher than the new street grade. During construction, a second concrete street was uncovered beneath the first concrete street. Due to trapped moisture between the slabs, the soil was unstable and unable to handle the traffic loads for which the new street was designed. The existing soil had an R-value of less than 20, rather than the R-value of 70 used in the design. Based upon recommenda- tions from the Soils Engineer, the saturated soil was removed and the excavation was backfilled with grindings from the existing asphalt concrete. Also, due to the instability of the soil encountered beneath the road surface, the limits of the pavement reinforcing fabric was extended to include all areas to be rehabilitated, and the asphalt concrete pavement thickness was increased by 1/2 inch. The cost to perform this additional work is $49,741.12. All items of work performed were done at the unit bid prices. A price reduction was applied to all items exceeding 125% of their original bid quantity, as provided in the Standard Specifica- tions. Change Order No. Two increases the contract price by $49,741.12, from $369,098.50 to $418,839.62. Caltrans has reviewed the change order and concurs with this extra work. Therefore, Federal-Aid funds can be used to finance 86% of the cost of this extra work. The total estimated project cost con- tained an amount of $60,285.13 for contingencies. The total amount of Change Orders No. One and Two is $63,841.12. However, the low bid of $354,998.50 was 33.8% under the Engineer's Esti- mate of $536,553.00, which leaves ample funds to finance the cost overrun. We recommend that Change Order No. Two be approved. 9-20-9.0 75-0264 -.... SOUTH CONTIACT CHANG' OGU NO 111='" ~TPT I W U UV. NO o ~ , CUI'I'L He. 1 IT --.. .... MOIM MRn11\ (1\ \ 7609 -nwcr Mft ~ FONTANA PAVING, INC. ,. .. -- ..-.. . -- ... ..... ...... ..... - - .... .. "- .- ," ....-. _ . .. t~ b..... ___..a .. ....... III ....:.... ... " I a I ---.....--- 1....- . r ." ...........=.........., Jb-.c..~.......... . _ ....... ......, .,........,...............:=..... -....... "-'- ... ... ..... ... .... .... .... - L" II ....... ... ..... _ _ WIll 1M ... ... ::..... RESIDENT ENGINEER .--- - ,.-- . ...----- . 1. Overexcavate unsuitable subgrade material and backfill with . A.C. grindings: STA 30+25 to STA 32+50 10' wide x 12" deep STA 40+00 to STA 46+25 34' wide x 12" deep STA 55+50 to STA 57+25 34' wide x 18" de.ep 2. Overexcavate unsuitable subgrade material & backfill wi th base: STA 44+25 to STA 44+75 10' wide 36" deep - 3. Remove concrete slab & backfill with A.C. grindings: STA 51+50 to STA 52+50 22' wide x 0.44' Thick 4. Over-cold plane unsuitable existing pavement & pave with A.C. pavement: STA 62+38 to STA 63+38 (EAST & WEST) 2ea x 48"wide x 3" deep Increase Contract Items at Contract Prices: Item No.6, Planing A.C. Pavement 1,173 S.Y. (6.51) . $1.00/SY . $ 1,173.00 Item No.8. Roadway Excavatlon 1.292 C.Y. (1081) @ $8.36/CY . 10.801.12 Item No. 9. Placement of A.C. Grindfngs as Base 2.221 Tons (1151 ) . $5.50/Ton . 12.215.50 --- -. - ..... . ..-..... ... .. -. . I_ E- -- . . - A_ ...... City [nain@@r - ~~~....1;.:':"~'-:- ~.....;,;,...~ ..,.i .:':'-='"1.1_4,--"'_ ~ ~.. _~~..:-_ J.'!oof.:.."':II::: "-- - -- 'lp -- . :.,....: ........ - .... . .. ... .... ... - .. ........ .. . . ..... I '(I II __.---. '!NOlI ... .. . _ ,... ...... ... _....... I ...". I.LV I -- . . ..w...,""".... -.nAt,..,.. .......- ..... ",-e. n_ ..... - ..- ...... SOUTH "E" STaT 0 2 - 2 . ....- MR036 (61 - ."'T- 7~n.Q I' i a I FONTANA PAVING INC '. . ;;'.c ~...... --........ ~ ............. -........ ... _ r I L J. __ __ _ ~ ~ _r ........... _... . -_ 11__- __ :.... -;u:.... 7~'=' ..._~ ~I - ~ -== =.~~.. -:--,i~= :'_A~ -=--1.~J:1."'" ao-. .... RESI N GINE R - - ... . 5. Increase thicknes~ of A.C. pavement 'by i inch. 6. Install pavement reinforcing fabric and pavement binder on entire project surface. . Increase Contract Items at Contract Prices: Item No. 11, Asphalt Concrete Pavement 740 Tons (151) @ $27.40/Ton .. $20,276.00 Item No. 12, Paving Asphalt Binder 10 Tons (621) @ $200.00/Ton .. 2,000.00 Item No. 13, Pavement Reinforcing Fabric B625 S.Y. (481) @ $0.75/SY .. 6,468.75 ~ustment of Compensation at Agreed Unit Price Item No.8, Roadway Excavation --- $1.00 decrease per C.Y. 992 Tons @ $1.00/Ton .. (992.00) Item No.9, Placement of A.C. Grindfngs as Base $0.50 decrease per Ton 1740 Tons @ $0.50/Ton .. (870.00) Item No. 12, Asphalt Concrete Binder --- $50.00 decrease/Ton 6 Tons @ $50.00/Ton .". (300.00) Item No. 13, Pavement Reinforcing Fabric $0.25 decrease per S.Y. 4125 S.Y. @ $0.25/SY .. (1,031.25) - 49,741.12 J_ -. . ..... . 53 Workin Time Extension T. ',J_ E-- -- .. . - .. _ .4. - ~-:...:..M~M..:..~-;-~ - .:......:.=-..:1 .:~~....~......-_.~.. ;.L".......-: .4.!\':1:.-:'-:= .. 1- - ... - :.. ......- ---.. .....- .... . I '" .... ........ I . II ...... ... . -. ... .. · - ,... .... ... .. .... - .1 . .1.- .- .... - .- .._ JL. . .