From: ROGER G. HARDGRAVE
Su . Approval of Plans & Authorization
bJect: to Advertise for Bids - Install-
ation of Street Lights on Waterman
Avenue, from 2nd St. to 9th St.,
& Various Streets in Downtown Area
per Plan No. 8201
De~: Public Works
Dete: 9-13-90
Synopsis of Previous Council ection:
June, 1989 Allocation of $86,000 from CDBG Funds approved for
installation of street lights on Waterman Avenue,
from Second Street to Ninth Street.
02-19-90 -- Allocation of $273,000 in CDBG Funds approved for
installation of street lights on various streets in
the downtown area.
Recommended motion:
'-.
That the plans for installation of street lights on Watermarr0 .r',':;
Avenue, from Second Street to Ninth Street, and on portions of- ,~
Sierra Way, Mt. View Avenue, "H" Street,' "F" Street, Fifth Street;~' 1:.:
and Sixth Stree~, in the Downtown area, in accordance with Plan No;, ."
8201, be approved and that the Director of Public -Works/Ci~y ~
Engineer be authorized to advertise for bids. ,~: f2
t-~.
,
l.~ ;::
~-,
".,.~
cc: Shauna Edwins
Andy Green
Ken Henderson
, /Jdw st:~/h
V 9 ture
Contect person: Roger G. Hardgrave
Supporting date attached: Staff Report
Phone:
5025
Ward:
1
FUNDING REQUIREMENTS:
Amount: $358.800
Source: (Acct. No.) 121-52544-01887-0019 & 27
Acct. Descri tion Street Li hts - Waterman Avenue
and Various Strp-ets in Downtown Area
Finance:
Council Notes:
75-0262
A....._....... 1.__ "1_
Q
.CITY OF SAN BERtCRDINO - REQUEST ~R COUNCIL ACTION
STAFF REPORT
I
Page
1
of
2
Plans for installation of street lights on the following
streets have been prepared by the Engineering Division, and the
Project is ready to be advertised for bids:
I. Account No. 121-52544-01884-019 __
Waterman Avenue, from Second Street to Ninth Street
II. Account No. 121-52544-01884--027 __
1. Sierra Way from 6th Street to 9th Street
2. Mt. View Avenue, 5th Street to 9th Street
3. "H" Street, from 4th Street to 7th Street
4. "F" Street, from 4th Street to 7th Street
5. Sixth Street, from "H" Street to Mt View Avenue
6. Fifth Street, from "H" Street to "F" Street
These two projects
contract, in order to reduce
to obtain the best bid price.
will be combined under the same
administrative costs and enable us
The conduits installed on Fifth Street and Sixth Street
will be oversized, in order to allow additional wires to be
installed in the future whenever pedestrian lighting is in-
stalled.
Below is an estimate of the total project cost:
I. Waterman Avenue --
Construction Contract $
Engineering & Insp. (W.O. #1884)
Sub-Total $
Contingencies (l%)f
Total Estimated Cost $
II. Various Downtown Streets
Construction Contract
Engineering & Insp. (W.O. #1885)
Edison Meter Fees
Sub-Total
Contingencies (10%)f
Total Estimated Cost
TOTAL ESTIMATED PROJECT COST--
9/13/90
75-0264
55,000
12,550
67,550
6,750
74,300
$229,200
27,500
2,000
$258,700
25,800
$284,500
$358,800
-------
--------
'CITY OF SAN BERNORDINO - REQUEST .QR COUNCIL ACTION
.
STAFF REPORT
Page 2 of 2
The following funds have been allocated to finance the
costs incurred for this project:
I. Waterman Avenue ----- $ 86,000
II. Downtown Streets 273,000
Total Funds Available $ 359,000
We recommend that the plans be approved and authorization
granted to advertise for bids.
9/13/90