HomeMy WebLinkAboutS01-Public Works I File No. 6.50-17 CiTOF SAN BERNARDINO - RI()uEST FOR COUNCILQCTION , From: _ ''',''', Of". Approval of Change Order No. ONE ROGER G. HARDGRAVE:~l:'J.' ",-,''''d 'Subject: - Construction of Pedestrian ..- . ~ ~';, 53 42 Bridqe for City Hall Annex, Public Works/Engin~iJ!' \.j - PCL CONSTRUCTION Dept: Date: 9-12-90 SERVICES, INC. Synopsis of Previous Council action: 03-05-90 Authorization granted to advertise for bids. 06-04-90 Bids rejected and authorization granted to re- advertise for bids. 08-06-90 -- Resolution No. 90-350 adopted, awarding a contract for the low bid price of $116,000.00. ..;. :':,J 'I;" r.":,~) '':-:< r"t c..., r-"", -0 tOJ , :,.. (,\;:; S;::! _:i... ::.c '.;;J o -! "'''1 Recommended motion: (,"j (,") That Change Order No. One to the contract with PCL Construction Services, Inc. for the construction of a pedestrian Bridge for City Hall Annex, in accordance with Plan No. 8119, be approved, to authorize the Contractor to lengthen the pedestrian ramp and add stiffener plates to existing steel beam, for an increase in the contract price of $9,350.68, from $116,000.00 to $125,350.68. o;.~/.~ cc: Shauna Edwins Andy Green Supporting data atteched: . Roger G. Hardgrave Staff Report, CCO n Phone: 5025 Contact person: Ward: 1 FUNDING REQUIREMENTS: Amount: $9,350.68 Source: (Acct. No.! 048-029-59850 for City Hall Annex Finance: of (;". \ \....~: Buildin Acct. Descri tion Renovation t Council Notes: 75-0262 Agenda Item No. 5 -I I CITY f:! SAN BERNARDINOO RE~EST FOR COUNCIL (jTION STAFF REPORT Page 1 of 2 During the first stages of construction, the Contractor discovered two errors in the construction drawings prepared by the Consulting Engineer. One was a one-half foot error in the elevation differ- ence between the third floor of the City Hall Annex (Thrifty Building) and the Five-Level Parking Structure. The plans do not reflect the survey measurements provided by the City. As a result, the pedestrian ramp must be extended by eleven feet, in order to comply with the State of California I s Title 24 re- quirements for handicap access. The cost to perform this extra work is $4,576.11. The second problem was the result of the Consultant using the structural framing plan from the second floor of the City Hall Annex rather than the third floor. Therefore, the project drawings did not include the stiffener plates necessary to increase the load carrying capacity of the existing steel beam to handle the additional load imposed by the pedestrian bridge. The cost to add the beam stiffener is $2,730.42. Due to the changes to the ramp and the structure, the structural steel shop drawings, the rebar shop drawings, the handrail shop drawings and the beam stiffener plate shop drawings must be revised. The cost to revise the shop drawings by the Subcontractor is $1,767.15. During the drilling of the bridge caissons, an unmarked 3" irrigation line was encountered. The Contractor removed the interfering portion of the line and capped off the remaining line. The cost to perform this work was $277.00. Change Order No. One authorizes the Contractor to lengthen the pedestrian ramp an additional 11 feet, install stiffener plates to the existing beam within the Annex Building and revise the shop drawings. The removal of the irrigation line is also authorized. The total estimated cost of Change Order No. One is $9,350.68, which will increase the contract price from $116,000 to $125,350.68. An amount of $6,900 was included in the total estimated project cost for contingencies, which can be used to finance the cost for this extra work. The remainder of the cost for Contract Change Order No. One can be financed from the available balances for other items of renovation work to be financed from the total available amount of $600,000. 9-12-90 75-0264 , CITY CF SAN ..RNARDINCO R.CO.ST FOR COUNCIL ():TION STAFF REPORT Page 2 of 2 We have reviewed the prices quoted by the Contractor, and feel they are fair and reasonable for the work entailed. Therefore, we recommend that the extra work be approved. URGERCY CLAUSE All work on this project has been suspended pending the approval of this Change Order, and it is essential that the extra work issue. be settled as soon as possible to keep the project on schedule and avoid claims for delay costs. 9-12-90 75-0264 ~ --~~- -~ -- ---...-- -- -' - ---.- ------ ..... ....H_ I. -. - - -. eJECT Bridge for City Hall Annex FILE NO. : () :) 0 PLAN NO. 8119 DATE : 9-11-90 EN6INEERI"~ DIVISION DEPARTMENT OF PUBlIC WORKS CITY OF SAN BERNARDINO CONTRACT CHANGE ORDER NO. ORB P C L Construction Services, Inc. TO 18825 Bordeen Irvine, CA 92715 Gentlemen: You are hereby authorized and directed to perform the following extra work for the prices determined as listed. The prices shall be considered as full compensation for performing the work, complete and in-place. 1. Lengthen the pedestrian ramp 11 feet t, install an additional step, and modify this handrail and guardrail to terminate at the end of the ramp (Lump Sum)......... $4,576.11 2. Add stiffener plates to existing steel beam in Annex Building & fireproof per sketches SK 1-4 (Lump Sum)... 2,730.42 3. Revise shop drawings and prepared detailed drawings (Lump Sum)... 1,767.15 4. Remove and cap interfering waterline (time & material).... 277.00 Total Extra Work Cost added to Contract ............... $ 9,350.68 Previous Contract Price ............................... $ 116,000.00 Amended Cost Price ......:...............................$ 125,350.68 Additional time to complete .Contract due to Change Order 17 Working Days CONTRACTOR: CITY OF SAN BERNARDINO: Accepted By : Title: Approved By ROGER G. HARDGRAVE Director of .Public Works/City Engi' Accepted Date Approved Date : ~