File No. 6.50-17
CiTOF SAN BERNARDINO - RI()uEST FOR COUNCILQCTION
,
From:
_ ''',''', Of". Approval of Change Order No. ONE
ROGER G. HARDGRAVE:~l:'J.' ",-,''''d 'Subject: - Construction of Pedestrian
..- . ~ ~';, 53 42 Bridqe for City Hall Annex,
Public Works/Engin~iJ!' \.j - PCL CONSTRUCTION
Dept:
Date:
9-12-90
SERVICES, INC.
Synopsis of Previous Council action:
03-05-90 Authorization granted to advertise for bids.
06-04-90
Bids rejected and authorization granted to re-
advertise for bids.
08-06-90 -- Resolution No. 90-350 adopted, awarding a contract
for the low bid price of $116,000.00. ..;.
:':,J
'I;"
r.":,~) '':-:<
r"t
c...,
r-"",
-0
tOJ
,
:,..
(,\;:;
S;::!
_:i...
::.c
'.;;J
o
-!
"'''1
Recommended motion:
(,"j
(,")
That Change Order No. One to the contract with PCL Construction
Services, Inc. for the construction of a pedestrian Bridge for
City Hall Annex, in accordance with Plan No. 8119, be approved,
to authorize the Contractor to lengthen the pedestrian ramp and
add stiffener plates to existing steel beam, for an increase
in the contract price of $9,350.68, from $116,000.00 to
$125,350.68.
o;.~/.~
cc: Shauna Edwins
Andy Green
Supporting data atteched: .
Roger G. Hardgrave
Staff Report,
CCO n
Phone:
5025
Contact person:
Ward:
1
FUNDING REQUIREMENTS:
Amount: $9,350.68
Source: (Acct. No.!
048-029-59850
for City Hall Annex
Finance:
of
(;". \
\....~:
Buildin
Acct. Descri tion Renovation
t
Council Notes:
75-0262
Agenda Item No.
5 -I
I CITY f:! SAN BERNARDINOO RE~EST FOR COUNCIL (jTION
STAFF REPORT
Page 1 of 2
During the first stages of construction, the Contractor
discovered two errors in the construction drawings prepared by
the Consulting Engineer.
One was a one-half foot error in the elevation differ-
ence between the third floor of the City Hall Annex (Thrifty
Building) and the Five-Level Parking Structure. The plans do
not reflect the survey measurements provided by the City. As a
result, the pedestrian ramp must be extended by eleven feet, in
order to comply with the State of California I s Title 24 re-
quirements for handicap access. The cost to perform this extra
work is $4,576.11.
The second problem was the result of the Consultant
using the structural framing plan from the second floor of the
City Hall Annex rather than the third floor. Therefore, the
project drawings did not include the stiffener plates necessary
to increase the load carrying capacity of the existing steel
beam to handle the additional load imposed by the pedestrian
bridge. The cost to add the beam stiffener is $2,730.42.
Due to the changes to the ramp and the structure, the
structural steel shop drawings, the rebar shop drawings, the
handrail shop drawings and the beam stiffener plate shop
drawings must be revised. The cost to revise the shop drawings
by the Subcontractor is $1,767.15.
During the drilling of the bridge caissons, an unmarked
3" irrigation line was encountered. The Contractor removed the
interfering portion of the line and capped off the remaining
line. The cost to perform this work was $277.00.
Change Order No. One authorizes the Contractor to
lengthen the pedestrian ramp an additional 11 feet, install
stiffener plates to the existing beam within the Annex Building
and revise the shop drawings. The removal of the irrigation
line is also authorized. The total estimated cost of Change
Order No. One is $9,350.68, which will increase the contract
price from $116,000 to $125,350.68.
An amount of $6,900 was included in the total estimated
project cost for contingencies, which can be used to finance the
cost for this extra work. The remainder of the cost for
Contract Change Order No. One can be financed from the available
balances for other items of renovation work to be financed from
the total available amount of $600,000.
9-12-90
75-0264
, CITY CF SAN ..RNARDINCO R.CO.ST FOR COUNCIL ():TION
STAFF REPORT
Page 2 of 2
We have reviewed the prices quoted by the Contractor,
and feel they are fair and reasonable for the work entailed.
Therefore, we recommend that the extra work be approved.
URGERCY CLAUSE
All work on this project has been suspended pending the approval
of this Change Order, and it is essential that the extra work
issue. be settled as soon as possible to keep the project on
schedule and avoid claims for delay costs.
9-12-90
75-0264
~
--~~- -~ -- ---...-- -- -' - ---.- ------ ..... ....H_ I.
-. - - -.
eJECT Bridge for City Hall Annex FILE NO. :
() :) 0
PLAN NO. 8119 DATE : 9-11-90
EN6INEERI"~ DIVISION
DEPARTMENT OF PUBlIC WORKS
CITY OF SAN BERNARDINO
CONTRACT CHANGE ORDER NO. ORB
P C L Construction Services, Inc.
TO 18825 Bordeen
Irvine, CA 92715
Gentlemen:
You are hereby authorized and directed to perform the
following extra work for the prices determined as listed. The
prices shall be considered as full compensation for performing the
work, complete and in-place.
1. Lengthen the pedestrian ramp 11 feet t, install an
additional step, and modify this handrail and guardrail
to terminate at the end of the ramp (Lump Sum)......... $4,576.11
2. Add stiffener plates to existing steel beam in Annex
Building & fireproof per sketches SK 1-4 (Lump Sum)... 2,730.42
3. Revise shop drawings and prepared detailed drawings
(Lump Sum)... 1,767.15
4. Remove and cap interfering waterline
(time & material).... 277.00
Total Extra Work Cost added to Contract ............... $ 9,350.68
Previous Contract Price ............................... $ 116,000.00
Amended Cost Price ......:...............................$ 125,350.68
Additional time to complete .Contract due to Change Order 17 Working
Days
CONTRACTOR: CITY OF SAN BERNARDINO:
Accepted
By :
Title:
Approved
By
ROGER G. HARDGRAVE
Director of .Public Works/City Engi'
Accepted Date
Approved Date :
~