Redevelopment Agency .
.........
....,;
City of San Bernardino
".ID'P; ./
;a
,
300 Ncrth "D" s_ Fourth Floor . SID Bomardino, Califcmia 92418
(714) 384-5081 FAX (714) 888-9413
JUNE 18, 1990
MAIN STREET - STREETSCAPE PROGRAM
SynopsIs of PrevIous CommIssIon/CouncIl/CommIttee ActIon:
617/90
CommIttee recommended forwardIng to the CommIssIon for
dIscussIon and dIrectIon.
Recommended MotIon:
(COMMUNITY DEVELOPMENT COMMISSION)
c
Receive and FIle
Respectfully SubmItted,
~i:"\Hl -
Rober J. l mple, ctlng
Executive DIrector
SupportIng data attached: YES
Hard:
FUNDING REQUIREMENTS:
$2,250,000
Project: M/CC, CCN
CommIssIon
Notes:
c
Agenda of: JUNE 18, 1990
Item No. --fI--
c
c
c
-
-
- -
-
--
'-'
.:)
S TAr r R E P 0 R T
This Item Is being presented to the Commission as directed by the
Redevelopment Committee at it's June 7, 1990 meeting. Mayor Holcomb
could not be present at today's Commission meeting and has asked staff to
request that discussion on this item be deferred until the next
Commission meeting.
The discussion at the Committee meeting centered on the status of
streetscape plans for downtown and how the timing of the installation of
the improvements would relate to the construction of the Omnltrans mall
on Fourth Street and to other priorities In the downtown area, notably
construction of additional parking. Main Street reported that the plans
were ready to go out to bid (see attached memo dated June 7, 1990) and
the CommIttee asked that Redevelopment and Engineering staff review the
plans and report to the Commission at this meeting.
An agreement between Main Street and the Commission supplies funding for
Main Street and outlines a work program. The work program provides that
the Commission, the City, and Main Street will plan a program for
streetscape Improvements In the downtown area. Responsibilities are
assigned as follows:
A. Main Street will develop preliminary designs and preliminary
cost estimates.
B. After joint approval of the designs and cost estimates, the
City or the Commission will prepare the flnaldeslgns.
C. The actual construction will be done through the Department of
Public Works.
D. The fInancing (not to exceed $2,108,015) will be the
responsibility of the Commission.
In the event that the estimates exceed $2,108,015 a joint funding plan
will be formulated that may Include phasing.
Main Street has furnished staff with its available drawings and cost
Information.
The present situation is as follows:
A. Other than the attached summary figure of $351,000 for a
typical block, no cost estimates have been provided by Main
Street. Their consultant (Urban Design Studios) advises that
cost estimates were deleted from their scope of work.
B. Main Street furnished Incomplete plans (estimated to be about
801 finished). When completed, they will be adequate for final
drawings If the design concepts are accepted and approved. The
missing portions Include the detail sheets, and all of the
specifications. The consultant believes that the
specifications will be available In approximately two weeks.
~-
-
-
-
- -
,.--
'-'
o
,
-
'-- Hithout the detail sheets and the specifications, staff Is
unable to review the drawings even If the review Is limited to
conceptual issues. The consultant Indicates that more complete
plans are available and a set has been requested for review.
C. Contrary to the statements in the attached memo of June 11,
1990, no formal review or approval of the Main Street
streets cape or the transit mall has been carried out by the
City or the Agency. There have been discussions at
Council/Commission work.shops and various departments have given
Informal assistance and comments but the Commission has tak.en
no action to approve the program. No action has been located
where the Common Council approved either the streetscape
program or the transit mall. Review by City staff and
Commissions will be required before the program Is ready for
Council/Commission consideration. For example, If the program
calls for a new type of traffic signal, It should receive
review by the Traffic Safety Commission.
c
Once completed plans are available they can be submitted to the
Envlronmenta 1 Revi ew Committee who wi 11 evaluate any potential mitigation
measures to be added before the final design plan Is completed and
submitted for plan check.lng. Bid specifications and cost estimates can
then be developed and presented to the Commission/Council for
consideration prior to advertising for bids. Prior to that time. Main
Street's Design Guidelines should be reviewed, modified where
appropriate, and adopted by the Commission and Common Council. Any
necessary phasing plans for financing the construction must be developed
within the context of the overall needs and priorities of the downtown
area.
c
JH:k.ak.:3024H
-
c
r.......
-...;
-
,...
'-
San Bernardino Downtown Main Street, Inc.
290 North "0" Street. Sufte 602 . Post Office Box 1431
San Bernardino. CA 92401
(714) 381-5037
DATE: June 7, 1990
TO: Community Development Committee (RDA)
FROM: Ann Harris, Main Street Executive Director
SUBJECT: Street Scape
__2__2===_____==_==____________________________=__________a...___
The working engineering drawings for the street scape are
complete and ready to go out for bid.
The main emphasis of the entire street scape program is safety
and security.
c
As an example: The block surrounding the Sun Company
(Arrowhead - Court, "0" & 4th Street) will cost $351.000 Total.
$25l,000..........lighting and safety features
39,000..........trees and plantings
19,000..........street hardware
42.000..........administrative
$351.000 - Total (NOTE: This total does not
include any of the Omni Trans
components. )
During this long process to complete these plans, we have been
working with Engineering, Traffic Engineering, Public Works, Parks
and Recreation, and Omni Trans. The engineering drawings include
Omni Trans bus shelter locations.
Attachments
llb
c
c
,,~..,.
'(;-:':;~~"; :~~.
',:~.',""~-"
,:,-"",.
"-'-,,>'"."
".f".? 'I-:{i
';>-"<>:,-i'~-:':,
:>!:;' '--'
~I'(
.:~'::-:~;,
~~!';' ,..~
.'.N~ t~L'
I..,., '
{~d-;;:'" - --,
;>~::,j:t~.
,}".,,> ',.;'<:-',
'i':">' _,~.,.....<
~ ;J'-'
.:~,):.
":"
~~.
T.'o
t: "
I~':', ' '
: "".," i~_.\.--i
t , -.,...,~'. j
r"::-:~> -",', ,-~-< <~>
,; -
r
7, "
J,;
{.
l>.~ .
t';, "
n < "LC.':"
~. '.
t: .':;:' i:~; ::,""
ft:~.,\~.','~;'.'; ~. .
,_.~.' ., , ',' ,1:
:~;l;;-i': :"~~:~(,,..:>~~,
:~~i_..~."
",..,',,-,.,"
c
Ok.
c
'I . :~:'.-<
' . ..~': /~~:::~~. ._......'.
U1,.v,.. V
...'/'."
.. ',' -
.s:. ',' ,
0'
0:; '~::~~j~~,::-,~
C>'. "
<. :~:4~:'~~;/~o.-
""";";
";:'f,;O. . ..
,;\ !e '. 'fl~'" C."
, CD...."" m~. 1<<'"
CD :s -. v
- =.'
en cc"
'o~ . ~:,~,>~,?:\.;:,
::J . ~,,/;,,;;, ,<'.
." ..".,
. Clr'~ ,,);_:, '.): ". '0>
m
e-
ta
.Vt
~{:;~:',
~_:::{
~.~,.'
.'~ .,'.,
'l'-
""
........'J
..~~~:
';' ..
,;;:-
-4
-'-
,c.
U1
o
'~
'-'"
,....".,.'.-..
"
':!
'".
.
i"
'-"'.
~,--;""
;. ~,
'..,;};.~i. ~
..,.-..,
5, .;~_':
..t...
,'...~..<
,,-'.,
.,:'.',
-'-"t~./.y..
. ,.-~,
';}',
,,-'.
,.. "-",,.
,'- ./ "'.
.,,,,,,,l!~c;i~~.,.,t ~-:.';,;,'..t, 1~.,':.;:;i
.
.... ~
.~'t';"
....,....
..~.;::.
.'..:
.'';:j,.i
,. ,:. .~.i-
,">-
i
I
1
~,.:I
o
........ . '.<:~~ i I
~'-"""~"
Lc:'i:f ! I
',,;'" I.
m :1
....,." i I
0' '
o
^
m
c:
C. I
1""'\.' ....... i
WI .~
m
..~
.'
~ !~.~ ~.
C~:r,;' ~
' = ::;.:
S~:. ~
=t:;:;" ..
- -.
c ..; =
---
--.
Soe:
~~ ::. s
.. '"
~ r.
= ..
3: ~
. .
;. .g
i g
. a
~ ~
= .
p ~
..
c
~
~~~~
O~~~
~~~
~~~
>
~
~
-t-t>
~Q =z:
- Q ..:!
-~:~
r:tl .... ~
"'";:
~~~
~~~
~~
o&]
;:~
~
- -
"'"'
.~
:)
,
I
..,
- --
.
,
-
.--
~
--
'C!~tn
-
San Bernardino Downtown Main Street, Ine.
290 North "0" Street. Suhe 602 . Post Office Box 1431
San Bernardino, CA 92401
(714) 381-5037
DATE: June 11, 1990
TO: Robert Temple, Executive Director, Redevelopment
FROM: Ann Harris, Executive Director, Main Street, Inc.
SUBJECT: Street Scape
.---.---.........--------..-.................-..............--...
As the Redevelopment Committee requested, the following is a
chronological outline of meetings regarding the Main Street, Inc.
Street Scape Plan:
c
Main Street has involved business and property owners, city
department heads and staff, elected officials, Main Street
committee members, and Main Street Board of Directors. A
tremendous amount of time and energy by many dedicated individuals
has gone into this process.
November. 1987 - Main Street, Inc. entered into an agreement
with Urban Design Studios to provide conceptual drawings and a
theme for Downtown Main Street's Street Scape Plan.
November. 1987 - ADril. 1990 - Main Street Design Committee
held manv, many meetings to discuss the Street Scape concept and
gain a consensus of opinion on trees, furniture, design, and
overall plan. The Design Committee is an active committee that
meets on a regular monthly basis or more often, if needed. The
city staff members that are on the Design Committee are: Moe
Estevene, Sandra Paulsen, Annie Ramos, and Jim Richardson.
Februarv. 23. 1988 - A meeting was held for various city
department heads. Mark Brodeur of Urban Design Studios presented
-the Street Scape Plan.
Februarv 24. 1988 - A Town Hall meeting was held in the City
Council Chambers. The meeting was attended by Mayor Wilcox, City
Council members, Main Street Board of Directors, Committee members,
business and property owners, and citizens. A complete overview of
the Street Scape Plan was presented at this meeting with
opportunity for citizen input.
c
.'
'.
c
c
r
'-
.)
-
8
Page 2
ADril 8. 1988 - Meeting in Los Angeles with Richard L.
Hatfield, Vice President of Bank of America, O. Barry Parker,
Regional Team Manager of Bank of America, and Charles E. McConney,
Real Estate Negotiator of Wells Fargo Bank. Met with Wayne Wood
and Brooks Johnson in the Main Street conference room to discuss
the Street Scape plan for Court Street.
Januarv - Mav. 1988 - Urban Design Studio worked with the Sun
Company to develop landscaping and Street Scape plans. The Sun
Company approved the plans. Sunburst Honev Locust trees are
alreadv Dlanted in the sun ComDanv's Drivate landscaDina: thev used
that tree to tie into Main Street's Dlans.
November 22 - Februarv 14. 1989 - Correspondence between Main
Street and John Lonergan. Technical memorandum from Urban Design
Studios as requested by Ann Harris, Exeoutive Director. Letters
from Mr. Lonergan to Main Street Board of Directors. Response from
Urban Design Studios (Main Street consultants) to Mr. Lonergan's
letter. Mr. Lonergan requested to be heard by the Main Street
Board. Main Street received letters from Mr. Lonergan, Ticor,
American Title, Masonic Building, and the Sun Company at Mr.
Lonergan's request.
March. 1988 - Ann Harris initiated a meeting with Robert
Chafin, General Manager of Omni Trans to discuss Omni Trans bus
shel ters and how we could get them to upgrade and tie into the over
all Main Street, Inc. Street Scape plan.
ADril 18. 1989 - Community Development Commission approved
agreement, work program, and budaet with Main Street. Part of this
work program and budget was the Street Scape program.
M~rch. 1988 - SeDtember. 1989 - Meetings on the average of
twice a week were held with Main Street, Omni Trans staff, and Main
Street consultants. Involved in these meetings, as needed, were
city staff--Engineering (Gene Klatt), a traffic engineer (Anwar
Wagdy), Planning, and Urban Design Studio. Through this process
the Transit Mall upgrading of the bus shelters was conceived,
planned, and refined. Ann Harris made a presentation to Omni Trans
staff and Board of Directors to gain support for the total project.
SeDtember. 1989 - The Main Street Executive Director and two
Council persons made a trip to Salt Lake City, Utah to review that
city's Main Street, Inc. Street Scape and bus mall concept and
study their bus shelters and trolley cars.
SeDtember. 1989 - Street Scape plan, including Omni Trans bus
shelters, was presented to the Parking Place Commission
\
,....,
.......
,Cj
'-'
Page 3
-
-
Setltember 14. 1989 - Street Scape plans, including ODIni Trans
concept, was presented to the city's Transportation Committee.
October 18. 1989 - At a luncheon workshop, Ann Harris
presented a slide presentation to the Mayor and Council, Main
Street Board of Directors, and department heads.
Communi ty Development Commission gave approval to proceed with
the Transit Mall concept as part of the Main Street, Inc. Street
Scape.
November 1989 - June 1990 - Continue t6 meet on a regular
basis as needed with staff of the following:
c
Main Street, Inc.
ODIni Trans
Urban Design Studio (landscape architect)
RHA-- Consultant for bus shelter design
City staff as follows:
Roger Hardgrave, Director of Public Works
Gene Klatt, Assistant City Engineer
Anwar Wagdy, Traffic Engineer
NQIi: The Engineering Department staff have given
input during the entire development of
engineering drawings.
Met with Mayor Holcomb and other staff members to discuss
Street Scape; specifically, the type of trees around the Sun
Company.
Atlril 27. 1990 - Mayor Holcomb called a meeting with property
owners. Attending that meeting Were Mayor Holcomb, Mark Brodeur,
Ann Harris, Brooks Johnson, Carl Wealder, and a representative from
Ticor. The meeting was to discuss the Street Scape around the Sun
Company.
Mav 1990 - Councilwoman Estrada, Annie Ramos, Gene Klatt, and
Ann Harris met on Fourth Street by the Sun Company, walked the
entire block around the Sun Company, and discussed the Street Scape
and the trees to be used.
June 5. 1990 - Main Street provided conceptual and working
drawings to Richard Pope Associates to design plans for planters
for the Sun Company to enhance the Main Street, Inc. Street Scape
plan.
June 11. 1990 - Turned engineering drawings over to Gary
Wagoner at RDA per his request.
c
llb
c
/"""',
,
'--'
PMQ Developments
365 N. ESt. Ste. #208
San Bernardino, CA. 92401
June 14, 1990
Mayor Bob Holcomb
Mayor's Office
city Hall
300 N. D st.
San Bernardino, Ca. 92418
Dear Mayor Holcomb,
It has just been called to my attention that the streets cape
Improvements Project for the central city has reached the point
where it can be physically implemented. From our meeting a few
weeks ago, I understand that you are concerned about competition
between this project and additional parking facilities for funds.
I share your concern. But after thinking the matter over, I
would like to offer my full support to moving forward immediately
on the streetscape project.
I reason that if we do not go forward at this time, we will
lose the support and funding from the Omnitrans Transit Mall Pro-
ject. Over the past ten years we have seen several similar pro-
jects and ideas raise our hopes for improvements, but stall and
consequently fail and come to nothing. I am very much afraid
that the moment and the momentum for this project is lost now, it
will come to the same futile fate.
since physical improvements in parking facilities are still
several years down the road, loss of this project will mean that
downtown San Bernardino will be where it has been -- few and
intolerably slow improvements. While I in no way favor a "dri-
ve-by downtown", I urge you and the council to seize this oppor-
tunity to make a real, physical difference in what we have offer
in the potentially beautiful heart of our city.
v.e. ~s . ncerely,
~~M
Pa 1 M. Quinton
~
--
-~
--
We, the following citizens, tenants, businessmen, and prop-
erty owners, urge the Mayor, city council, and Administration to
implement the streetscape Improvement Program for the central
city. It is clear that the central city has been seriously
neglected with respect to improvements in public faciiities for
more than a decade and that during this time there has been a
growing concern for public security and deterioration of the
environment. This program will provide sorely needed improvements
in street lighting and streets cape which will greatly aid in
alleviating these problems. Please join us as we move forward to
provide the service and attractive environment that the citizens
~~ ~~~ ~~~~~rdino deserve in the hea~~a))d;i~i~trative center
)kt-) )(;I~ 1.1; 7~ 5 G. /l(l<-YIg~4) tel< I/ftr.
~a-4if ~~~~/U>
/1;/1 C4b ;J.v~~
~;4;@ptf/n0 if;)/; c-R' r:fboAfJ ~ J
bc.J to /pfwI 7leHt/1' L-.
1:~:^~~b;rlg~-
~ _ ~;51~ ~C.\;1 tf ,;:;7j7h4J
(;0\ \\7 ()'j v\r( T- v'-.UJV~-Y'
1c;:~"s~f1L ~ f}-~
~~
c
" -
c
r......
-'
TO: Mayor ~ob Holcomb,
and City Council Members: ~sther Estrada, Jack Reilly, Jess
~lores, Hicheal Maudsley, Tom Hinor, Valerie Pope LUdbam, Norlne
Hiller.
It has come to our attention that the street
Scape Program may be in jeopardy of being
cancelled in favor of a downtown parking
structure. While we all agree that additional
parking is needed for long term growth in
San Bernardio's downtown, we also feel that
the safety and security provided
for in the Street Scape Budget in the way of
lighting is our most immediate need. A safe
and attractive city center, will go a long way
in inducing new buinesses to invest in our
community. We are competing with many other
Inland Empire cities and need to look as
competitive as we feel. Please let us
know how we can help the Mayor and the City
Council see that this Street Scape Program
is implemented with out delay.
Business
'17/'/
"h-o )) ~
.-r- /
-t- I.y..(./f.. c-
~'f( /"" fJ,'
~USlriCSS
", -
,
.'\'1 (U:--
;. ~'i 1 JI:;:. I
i::RP-,P ,e..,,p sr.
?/L'/-S!f /{/t:S+
IMfA{!)fJk~zkL
?6.~
c
\ -
II
Address
Signature
.-..
...J
o
'f.
310 ~
,q 00 {LJ (0./;(..;;1-
~79 UJ, ~~
if {) (;1.//-1 ~~
'1Pf) uJ ( . rf st
~p~w,~
~~a6M ~(~()t~
/f~/t~~$p~1
r; /\ /3rd 1;'7 ~-0
~..
'-
I 'If) (c+
'to 't<Y ~
J t~ ;V P ..if- 5f-(0;
SClw /1w.v-rercl'l'~ Ccf,
~~
~2'